Permit GraphShortlistSan Francisco building permits since 2000

L C Builders Inc.

Contractor license
978738
State license record
Based in
San Francisco
On San Francisco permits
Apr 2013 to May 2026
Last 24 months
16 permits filed

67 permits since 2000: 53 completed, 8 in progress, 2 never finaled, 4 expired or cancelled.

Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Bathroom remodel permits

AllRoof deck 1Deck 5Stairs 6Kitchen remodel 21Bathroom remodel 23

23 bathroom remodel permits: 21 completed, 1 in progress, 1 expired or cancelled. Typically 9 days from filing to permit and 268 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Nov 4, 2025Completed
final sign-off Sep 2026
1070 Clay Stremodel (e) kitchen, bathroom, & replace (e) furnace/ water heater w/ new at 1/f & 2/f. remove/replace (e) window w/ new at side & back of building.
Details
Permit
202511048919
Status
complete
Filed
Nov 4, 2025
Permit issued
Dec 10, 2025
Final sign-off
Sep 4, 2026
Declared cost
$120,000
Address
1070 Clay St

remodel (e) kitchen, bathroom, & replace (e) furnace/ water heater w/ new at 1/f & 2/f. remove/replace (e) window w/ new at side & back of building.

Open the permit page

$120,000
Apr 30, 2025Completed
final sign-off Mar 2026
1178 Folsom Stunit #406,506 & 601 conversion of 3 residential units (studio b type) to mobility units (b-m type) enlarge bathroom to provide circular turning space per cbc 11b-304.3.1 inside the bathroom. relocate (e) toilet & tub, (n) accessible lavatory. relocate (e) accessible pocket door. (n) kitchen counter
Details
Permit
202504305540
Status
complete
Filed
Apr 30, 2025
Permit issued
May 9, 2025
Final sign-off
Mar 13, 2026
Declared cost
$200,000
Address
1178 Folsom St

unit #406,506 & 601 conversion of 3 residential units (studio b type) to mobility units (b-m type) enlarge bathroom to provide circular turning space per cbc 11b-304.3.1 inside the bathroom. relocate (e) toilet & tub, (n) accessible lavatory. relocate (e) accessible pocket door. (n) kitchen counter

Open the permit page

$200,000
Apr 30, 2025Completed
final sign-off May 2026
1174 Folsom Stg/f ste #a t.i. included 1 unisex bathroom w/ toilet & lavatory. lunch area counter w/ upper cabinets, sink, refrigerator, file storage room, prefabricated movable meeting pod w/ integrated ventilation, moveable , mep improvements
Details
Permit
202504305519
Status
complete
Filed
Apr 30, 2025
Permit issued
May 6, 2025
Final sign-off
May 8, 2026
Declared cost
$500,000
Address
1174 Folsom St

g/f ste #a t.i. included 1 unisex bathroom w/ toilet & lavatory. lunch area counter w/ upper cabinets, sink, refrigerator, file storage room, prefabricated movable meeting pod w/ integrated ventilation, moveable , mep improvements

Open the permit page

$500,000
Aug 15, 2024Completed
final sign-off Oct 2024
3156 Turk Blexpand and remodel existing bath on top floor unit b. reloage entrance location to adjacent storage room. relocate storage room door.
Details
Permit
202408158781
Status
complete
Filed
Aug 15, 2024
Permit issued
Aug 15, 2024
Final sign-off
Oct 31, 2024
Declared cost
$15,000
Address
3156 Turk Bl

expand and remodel existing bath on top floor unit b. reloage entrance location to adjacent storage room. relocate storage room door.

Open the permit page

$15,000
Jan 20, 2023Completed
final sign-off Nov 2023
840 Powell St(1) kitchen remodel, new kitchen cabinets and appliances. remodel (3) bathrooms and (1) powder room. install (n) fixtures to (e) locations. (3) shower pans. replace (e) outlets to (n) outlets; replace (e) lighting fixtures to (n) fixtures.
Details
Permit
202301200476
Status
complete
Filed
Jan 20, 2023
Permit issued
Jan 20, 2023
Final sign-off
Nov 8, 2023
Declared cost
$90,000
Address
840 Powell St

(1) kitchen remodel, new kitchen cabinets and appliances. remodel (3) bathrooms and (1) powder room. install (n) fixtures to (e) locations. (3) shower pans. replace (e) outlets to (n) outlets; replace (e) lighting fixtures to (n) fixtures.

Open the permit page

$90,000
Dec 1, 2022Completed
final sign-off Nov 2023
840 Powell Stselected demo for (1) kitchen cabinets & fixtures; (2) bathroom cabinets & fixtures.
Details
Permit
202212017515
Status
complete
Filed
Dec 1, 2022
Permit issued
Dec 2, 2022
Final sign-off
Nov 3, 2023
Declared cost
$750
Address
840 Powell St

selected demo for (1) kitchen cabinets & fixtures; (2) bathroom cabinets & fixtures.

Open the permit page

$750
Sep 16, 2022Completed
final sign-off Mar 2023
3283 22nd Stunit 1107: kitchen and bathroom remodel
Details
Permit
202209162620
Status
complete
Filed
Sep 16, 2022
Permit issued
Sep 19, 2022
Final sign-off
Mar 3, 2023
Declared cost
$90,000
Address
3283 22nd St

unit 1107: kitchen and bathroom remodel

Open the permit page

$90,000
Mar 15, 2022Completed
final sign-off Jul 2025
4109 Pacheco Stinterior renovation of 1 kitchen & 2 bathrooms, new 2nd floor deck at rear yard with stairs to grade
Details
Permit
202203159990
Status
complete
Filed
Mar 15, 2022
Permit issued
Sep 22, 2023
Final sign-off
Jul 1, 2025
Declared cost
$165,000
Address
4109 Pacheco St

interior renovation of 1 kitchen & 2 bathrooms, new 2nd floor deck at rear yard with stairs to grade

Open the permit page

$165,000
Aug 26, 2021Expired or cancelled
expired Jun 2023
3289 22nd Stunit 1107: renovation of kitchen and bathroom similar. interior painting.
Details
Permit
202108267209
Status
expired
Filed
Aug 26, 2021
Permit issued
Aug 26, 2021
Declared cost
$20,000
Address
3289 22nd St

unit 1107: renovation of kitchen and bathroom similar. interior painting.

Open the permit page

$20,000
Mar 16, 2021Completed
final sign-off Jan 2022
558 24th Avlegalize (e) bathroom at ground fl. construct 1 new bedroom and 1 new storage at ground fl. infill and construct 1 new bedroom at ground fl.
Details
Permit
202103166688
Status
complete
Filed
Mar 16, 2021
Permit issued
Jun 22, 2021
Final sign-off
Jan 19, 2022
Declared cost
$75,000
Address
558 24th Av

legalize (e) bathroom at ground fl. construct 1 new bedroom and 1 new storage at ground fl. infill and construct 1 new bedroom at ground fl.

Open the permit page

$75,000
Feb 9, 2021Completed
final sign-off Feb 2022
2380 Folsom Stvoluntary barrier removal & lowering of entry to sidewalk level for increased accessibility. renovation of existing 2nd floor kitchen into new fully accessible bathroom. renovation of existing 3rd floor kitchen into new fully accessible kitchen.
Details
Permit
202102094335
Status
complete
Filed
Feb 9, 2021
Permit issued
Jul 8, 2021
Final sign-off
Feb 7, 2022
Declared cost
$20,000
Address
2380 Folsom St

voluntary barrier removal & lowering of entry to sidewalk level for increased accessibility. renovation of existing 2nd floor kitchen into new fully accessible bathroom. renovation of existing 3rd floor kitchen into new fully accessible kitchen.

Open the permit page

$20,000
Nov 18, 2020In progress
issued Sep 2026
2601 Lawton St-remove violation #2019-003659 enf -legalize the ground floor to adu (add kitchen, remodel 2 bathrooms) -legalize lawton street illegal infilled porch add spiral stair to second floor rear.
Details
Permit
202011189243
Status
issued
Filed
Nov 18, 2020
Permit issued
Sep 16, 2026
Declared cost
$10,000
Address
2601 Lawton St

-remove violation #2019-003659 enf -legalize the ground floor to adu (add kitchen, remodel 2 bathrooms) -legalize lawton street illegal infilled porch add spiral stair to second floor rear.

Open the permit page

$10,000
Jul 6, 2020Completed
final sign-off Jan 2021
65 Dellbrook Avkitchen remodel in-kind. no structural work. remodel 2 bathrooms at 2nd flr in-kind. new 4" led recessed lights and rewiring
Details
Permit
202007069592
Status
complete
Filed
Jul 6, 2020
Permit issued
Jul 6, 2020
Final sign-off
Jan 20, 2021
Declared cost
$50,000
Address
65 Dellbrook Av

kitchen remodel in-kind. no structural work. remodel 2 bathrooms at 2nd flr in-kind. new 4" led recessed lights and rewiring

Open the permit page

$50,000
Oct 17, 2019Completed
final sign-off Dec 2025
589 04th Avraise bldg 2.5' vertical/horizontal add & int'r renov.1st fl: (n)garage/storage. 2nd fl:(n)unit 1:(3)beds(2)bths,laundry/living/dining, kitche,baywindow,front balcony & reardeck. 3rd fl:(n)unit 2:(3)beds,(2)baths,laundry,living/dining,kitchen,bay window,front/rear balcony
Details
Permit
201910174823
Status
complete
Filed
Oct 17, 2019
Permit issued
Jan 30, 2024
Final sign-off
Dec 17, 2025
Declared cost
$400,000
Address
589 04th Av

raise bldg 2.5' vertical/horizontal add & int'r renov.1st fl: (n)garage/storage. 2nd fl:(n)unit 1:(3)beds(2)bths,laundry/living/dining, kitche,baywindow,front balcony & reardeck. 3rd fl:(n)unit 2:(3)beds,(2)baths,laundry,living/dining,kitchen,bay window,front/rear balcony

Open the permit page

$400,000
Feb 20, 2019Completed
final sign-off Apr 2022
289 Bradford Stconverting unconditioned 1st fl to habitable: 1/f (n) multi-use & bath, (n) stair connecting 1st & 2nd fl. (n) windows at 1st & 3rd fl. (n) rear yard patio. (n) siding at rear side.
Details
Permit
201902203336
Status
complete
Filed
Feb 20, 2019
Permit issued
Dec 16, 2019
Final sign-off
Apr 26, 2022
Declared cost
$90,000
Address
289 Bradford St

converting unconditioned 1st fl to habitable: 1/f (n) multi-use & bath, (n) stair connecting 1st & 2nd fl. (n) windows at 1st & 3rd fl. (n) rear yard patio. (n) siding at rear side.

Open the permit page

$90,000
Dec 18, 2018Completed
final sign-off Jul 2019
19 Bessie Stconstruct new bedroom at ground flr. relocate kitchen replace (e) window to sliding door at rear of bld. construct new bedroom, bath at basement level. construct new staircase to connect ground level and basement.
Details
Permit
201812188608
Status
complete
Filed
Dec 18, 2018
Permit issued
Dec 24, 2018
Final sign-off
Jul 15, 2019
Declared cost
$45,000
Address
19 Bessie St

construct new bedroom at ground flr. relocate kitchen replace (e) window to sliding door at rear of bld. construct new bedroom, bath at basement level. construct new staircase to connect ground level and basement.

Open the permit page

$45,000
Dec 19, 2017Completed
final sign-off Sep 2019
2301 Mission Stinterior remodel of (e) commercial space; including, reconfiguration of prfessional services, reconfiguration of retail space & construction of new accessible bathrooms. retail space to be divided into 5 different tenant spaces.
Details
Permit
201712196847
Status
complete
Filed
Dec 19, 2017
Permit issued
Jan 23, 2018
Final sign-off
Sep 20, 2019
Declared cost
$200,000
Address
2301 Mission St

interior remodel of (e) commercial space; including, reconfiguration of prfessional services, reconfiguration of retail space & construction of new accessible bathrooms. retail space to be divided into 5 different tenant spaces.

Open the permit page

$200,000
Jun 1, 2017Completed
final sign-off May 2019
309 Holly Park Crrear @ vertical addition. fill in (e) open under-deck / house area to create storage. legalize / reduce (e) rear decks. sprinkler building. interior renovation. 2 new bedroom & 2 new baths.
Details
Permit
201706018091
Status
complete
Filed
Jun 1, 2017
Permit issued
Apr 20, 2018
Final sign-off
May 20, 2019
Declared cost
$280,000
Address
309 Holly Park Cr

rear @ vertical addition. fill in (e) open under-deck / house area to create storage. legalize / reduce (e) rear decks. sprinkler building. interior renovation. 2 new bedroom & 2 new baths.

Open the permit page

$280,000
Dec 6, 2016Completed
final sign-off Mar 2017
234 Edinburgh Stremodel (e) kitchen, remove/replace cabinets, counter & fixtures at 2nd floor. legalize one (e) bed room & construct one (n) bed room, one full bath room & one half bath room at ground floor
Details
Permit
201612064203
Status
complete
Filed
Dec 6, 2016
Permit issued
Dec 15, 2016
Final sign-off
Mar 21, 2017
Declared cost
$52,000
Address
234 Edinburgh St

remodel (e) kitchen, remove/replace cabinets, counter & fixtures at 2nd floor. legalize one (e) bed room & construct one (n) bed room, one full bath room & one half bath room at ground floor

Open the permit page

$52,000
Nov 14, 2016Completed
final sign-off Jan 2018
1068 Clay Stremodel extg kitchen, bath room and rewire electrical lighting . all work at 3rd floor.
Details
Permit
201611142535
Status
complete
Filed
Nov 14, 2016
Permit issued
Mar 6, 2017
Final sign-off
Jan 8, 2018
Declared cost
$32,000
Address
1068 Clay St

remodel extg kitchen, bath room and rewire electrical lighting . all work at 3rd floor.

Open the permit page

$32,000
Apr 27, 2016Completed
final sign-off Dec 2016
1175 Chestnut St#301- replace kitchen cabinet and sink, replace bathroom floor and wall tile, replace bath tub and install new exhaust fan. n/a ordinance #155-13
Details
Permit
201604275783
Status
complete
Filed
Apr 27, 2016
Permit issued
Apr 27, 2016
Final sign-off
Dec 19, 2016
Declared cost
$10,000
Address
1175 Chestnut St

#301- replace kitchen cabinet and sink, replace bathroom floor and wall tile, replace bath tub and install new exhaust fan. n/a ordinance #155-13

Open the permit page

$10,000
Apr 22, 2016Completed
final sign-off Aug 2016
2601 Lawton St1)legalize one extg bedroom, construct 2 new bedrooms, 2 half bathrooms & family room at g/f. 2)remove (e) garage door, in-fill with 2 clad wood windows at lawton street.
Details
Permit
201604225443
Status
complete
Filed
Apr 22, 2016
Permit issued
Apr 27, 2016
Final sign-off
Aug 10, 2016
Declared cost
$58,000
Address
2601 Lawton St

1)legalize one extg bedroom, construct 2 new bedrooms, 2 half bathrooms & family room at g/f. 2)remove (e) garage door, in-fill with 2 clad wood windows at lawton street.

Open the permit page

$58,000
Mar 4, 2016Completed
final sign-off Aug 2016
2601 Lawton St2nd floor: remodel kitchen and bathroom, remove lathe and plaster and replace with new sheetrock, 5/8 type x. no structural work. electrical and plumbing under seperate permits.
Details
Permit
201603041217
Status
complete
Filed
Mar 4, 2016
Permit issued
Mar 4, 2016
Final sign-off
Aug 10, 2016
Declared cost
$60,000
Address
2601 Lawton St

2nd floor: remodel kitchen and bathroom, remove lathe and plaster and replace with new sheetrock, 5/8 type x. no structural work. electrical and plumbing under seperate permits.

Open the permit page

$60,000