Back to bathroom remodel contractors
L C Builders Inc.
- Based in
- San Francisco
- On San Francisco permits
- Apr 2013 to May 2026
- Last 24 months
- 16 permits filed
67 permits since 2000: 53 completed, 8 in progress, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
23 bathroom remodel permits: 21 completed, 1 in progress, 1 expired or cancelled. Typically 9 days from filing to permit and 268 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 4, 2025 | Completed final sign-off Sep 2026 | 1070 Clay St | remodel (e) kitchen, bathroom, & replace (e) furnace/ water heater w/ new at 1/f & 2/f. remove/replace (e) window w/ new at side & back of building.Details
remodel (e) kitchen, bathroom, & replace (e) furnace/ water heater w/ new at 1/f & 2/f. remove/replace (e) window w/ new at side & back of building. | $120,000 |
| Apr 30, 2025 | Completed final sign-off Mar 2026 | 1178 Folsom St | unit #406,506 & 601 conversion of 3 residential units (studio b type) to mobility units (b-m type) enlarge bathroom to provide circular turning space per cbc 11b-304.3.1 inside the bathroom. relocate (e) toilet & tub, (n) accessible lavatory. relocate (e) accessible pocket door. (n) kitchen counterDetails
unit #406,506 & 601 conversion of 3 residential units (studio b type) to mobility units (b-m type) enlarge bathroom to provide circular turning space per cbc 11b-304.3.1 inside the bathroom. relocate (e) toilet & tub, (n) accessible lavatory. relocate (e) accessible pocket door. (n) kitchen counter | $200,000 |
| Apr 30, 2025 | Completed final sign-off May 2026 | 1174 Folsom St | g/f ste #a t.i. included 1 unisex bathroom w/ toilet & lavatory. lunch area counter w/ upper cabinets, sink, refrigerator, file storage room, prefabricated movable meeting pod w/ integrated ventilation, moveable , mep improvementsDetails
g/f ste #a t.i. included 1 unisex bathroom w/ toilet & lavatory. lunch area counter w/ upper cabinets, sink, refrigerator, file storage room, prefabricated movable meeting pod w/ integrated ventilation, moveable , mep improvements | $500,000 |
| Aug 15, 2024 | Completed final sign-off Oct 2024 | 3156 Turk Bl | expand and remodel existing bath on top floor unit b. reloage entrance location to adjacent storage room. relocate storage room door.Details
expand and remodel existing bath on top floor unit b. reloage entrance location to adjacent storage room. relocate storage room door. | $15,000 |
| Jan 20, 2023 | Completed final sign-off Nov 2023 | 840 Powell St | (1) kitchen remodel, new kitchen cabinets and appliances. remodel (3) bathrooms and (1) powder room. install (n) fixtures to (e) locations. (3) shower pans. replace (e) outlets to (n) outlets; replace (e) lighting fixtures to (n) fixtures.Details
(1) kitchen remodel, new kitchen cabinets and appliances. remodel (3) bathrooms and (1) powder room. install (n) fixtures to (e) locations. (3) shower pans. replace (e) outlets to (n) outlets; replace (e) lighting fixtures to (n) fixtures. | $90,000 |
| Dec 1, 2022 | Completed final sign-off Nov 2023 | 840 Powell St | selected demo for (1) kitchen cabinets & fixtures; (2) bathroom cabinets & fixtures.Details
selected demo for (1) kitchen cabinets & fixtures; (2) bathroom cabinets & fixtures. | $750 |
| Sep 16, 2022 | Completed final sign-off Mar 2023 | 3283 22nd St | unit 1107: kitchen and bathroom remodelDetails
unit 1107: kitchen and bathroom remodel | $90,000 |
| Mar 15, 2022 | Completed final sign-off Jul 2025 | 4109 Pacheco St | interior renovation of 1 kitchen & 2 bathrooms, new 2nd floor deck at rear yard with stairs to gradeDetails
interior renovation of 1 kitchen & 2 bathrooms, new 2nd floor deck at rear yard with stairs to grade | $165,000 |
| Aug 26, 2021 | Expired or cancelled expired Jun 2023 | 3289 22nd St | unit 1107: renovation of kitchen and bathroom similar. interior painting.Details
unit 1107: renovation of kitchen and bathroom similar. interior painting. | $20,000 |
| Mar 16, 2021 | Completed final sign-off Jan 2022 | 558 24th Av | legalize (e) bathroom at ground fl. construct 1 new bedroom and 1 new storage at ground fl. infill and construct 1 new bedroom at ground fl.Details
legalize (e) bathroom at ground fl. construct 1 new bedroom and 1 new storage at ground fl. infill and construct 1 new bedroom at ground fl. | $75,000 |
| Feb 9, 2021 | Completed final sign-off Feb 2022 | 2380 Folsom St | voluntary barrier removal & lowering of entry to sidewalk level for increased accessibility. renovation of existing 2nd floor kitchen into new fully accessible bathroom. renovation of existing 3rd floor kitchen into new fully accessible kitchen.Details
voluntary barrier removal & lowering of entry to sidewalk level for increased accessibility. renovation of existing 2nd floor kitchen into new fully accessible bathroom. renovation of existing 3rd floor kitchen into new fully accessible kitchen. | $20,000 |
| Nov 18, 2020 | In progress issued Sep 2026 | 2601 Lawton St | -remove violation #2019-003659 enf -legalize the ground floor to adu (add kitchen, remodel 2 bathrooms) -legalize lawton street illegal infilled porch add spiral stair to second floor rear.Details
-remove violation #2019-003659 enf -legalize the ground floor to adu (add kitchen, remodel 2 bathrooms) -legalize lawton street illegal infilled porch add spiral stair to second floor rear. | $10,000 |
| Jul 6, 2020 | Completed final sign-off Jan 2021 | 65 Dellbrook Av | kitchen remodel in-kind. no structural work. remodel 2 bathrooms at 2nd flr in-kind. new 4" led recessed lights and rewiringDetails
kitchen remodel in-kind. no structural work. remodel 2 bathrooms at 2nd flr in-kind. new 4" led recessed lights and rewiring | $50,000 |
| Oct 17, 2019 | Completed final sign-off Dec 2025 | 589 04th Av | raise bldg 2.5' vertical/horizontal add & int'r renov.1st fl: (n)garage/storage. 2nd fl:(n)unit 1:(3)beds(2)bths,laundry/living/dining, kitche,baywindow,front balcony & reardeck. 3rd fl:(n)unit 2:(3)beds,(2)baths,laundry,living/dining,kitchen,bay window,front/rear balconyDetails
raise bldg 2.5' vertical/horizontal add & int'r renov.1st fl: (n)garage/storage. 2nd fl:(n)unit 1:(3)beds(2)bths,laundry/living/dining, kitche,baywindow,front balcony & reardeck. 3rd fl:(n)unit 2:(3)beds,(2)baths,laundry,living/dining,kitchen,bay window,front/rear balcony | $400,000 |
| Feb 20, 2019 | Completed final sign-off Apr 2022 | 289 Bradford St | converting unconditioned 1st fl to habitable: 1/f (n) multi-use & bath, (n) stair connecting 1st & 2nd fl. (n) windows at 1st & 3rd fl. (n) rear yard patio. (n) siding at rear side.Details
converting unconditioned 1st fl to habitable: 1/f (n) multi-use & bath, (n) stair connecting 1st & 2nd fl. (n) windows at 1st & 3rd fl. (n) rear yard patio. (n) siding at rear side. | $90,000 |
| Dec 18, 2018 | Completed final sign-off Jul 2019 | 19 Bessie St | construct new bedroom at ground flr. relocate kitchen replace (e) window to sliding door at rear of bld. construct new bedroom, bath at basement level. construct new staircase to connect ground level and basement.Details
construct new bedroom at ground flr. relocate kitchen replace (e) window to sliding door at rear of bld. construct new bedroom, bath at basement level. construct new staircase to connect ground level and basement. | $45,000 |
| Dec 19, 2017 | Completed final sign-off Sep 2019 | 2301 Mission St | interior remodel of (e) commercial space; including, reconfiguration of prfessional services, reconfiguration of retail space & construction of new accessible bathrooms. retail space to be divided into 5 different tenant spaces.Details
interior remodel of (e) commercial space; including, reconfiguration of prfessional services, reconfiguration of retail space & construction of new accessible bathrooms. retail space to be divided into 5 different tenant spaces. | $200,000 |
| Jun 1, 2017 | Completed final sign-off May 2019 | 309 Holly Park Cr | rear @ vertical addition. fill in (e) open under-deck / house area to create storage. legalize / reduce (e) rear decks. sprinkler building. interior renovation. 2 new bedroom & 2 new baths.Details
rear @ vertical addition. fill in (e) open under-deck / house area to create storage. legalize / reduce (e) rear decks. sprinkler building. interior renovation. 2 new bedroom & 2 new baths. | $280,000 |
| Dec 6, 2016 | Completed final sign-off Mar 2017 | 234 Edinburgh St | remodel (e) kitchen, remove/replace cabinets, counter & fixtures at 2nd floor. legalize one (e) bed room & construct one (n) bed room, one full bath room & one half bath room at ground floorDetails
remodel (e) kitchen, remove/replace cabinets, counter & fixtures at 2nd floor. legalize one (e) bed room & construct one (n) bed room, one full bath room & one half bath room at ground floor | $52,000 |
| Nov 14, 2016 | Completed final sign-off Jan 2018 | 1068 Clay St | remodel extg kitchen, bath room and rewire electrical lighting . all work at 3rd floor.Details
remodel extg kitchen, bath room and rewire electrical lighting . all work at 3rd floor. | $32,000 |
| Apr 27, 2016 | Completed final sign-off Dec 2016 | 1175 Chestnut St | #301- replace kitchen cabinet and sink, replace bathroom floor and wall tile, replace bath tub and install new exhaust fan. n/a ordinance #155-13Details
#301- replace kitchen cabinet and sink, replace bathroom floor and wall tile, replace bath tub and install new exhaust fan. n/a ordinance #155-13 | $10,000 |
| Apr 22, 2016 | Completed final sign-off Aug 2016 | 2601 Lawton St | 1)legalize one extg bedroom, construct 2 new bedrooms, 2 half bathrooms & family room at g/f. 2)remove (e) garage door, in-fill with 2 clad wood windows at lawton street.Details
1)legalize one extg bedroom, construct 2 new bedrooms, 2 half bathrooms & family room at g/f. 2)remove (e) garage door, in-fill with 2 clad wood windows at lawton street. | $58,000 |
| Mar 4, 2016 | Completed final sign-off Aug 2016 | 2601 Lawton St | 2nd floor: remodel kitchen and bathroom, remove lathe and plaster and replace with new sheetrock, 5/8 type x. no structural work. electrical and plumbing under seperate permits.Details
2nd floor: remodel kitchen and bathroom, remove lathe and plaster and replace with new sheetrock, 5/8 type x. no structural work. electrical and plumbing under seperate permits. | $60,000 |