Back to kitchen remodel contractors
L C Builders Inc.
- Based in
- San Francisco
- On San Francisco permits
- Apr 2013 to May 2026
- Last 24 months
- 16 permits filed
67 permits since 2000: 53 completed, 8 in progress, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
21 kitchen remodel permits: 16 completed, 2 in progress, 1 never finaled, 2 expired or cancelled. Typically 9 days from filing to permit and 252 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 4, 2025 | Completed final sign-off Sep 2026 | 1070 Clay St | remodel (e) kitchen, bathroom, & replace (e) furnace/ water heater w/ new at 1/f & 2/f. remove/replace (e) window w/ new at side & back of building.Details
remodel (e) kitchen, bathroom, & replace (e) furnace/ water heater w/ new at 1/f & 2/f. remove/replace (e) window w/ new at side & back of building. | $120,000 |
| Apr 30, 2025 | Completed final sign-off Mar 2026 | 1178 Folsom St | unit #406,506 & 601 conversion of 3 residential units (studio b type) to mobility units (b-m type) enlarge bathroom to provide circular turning space per cbc 11b-304.3.1 inside the bathroom. relocate (e) toilet & tub, (n) accessible lavatory. relocate (e) accessible pocket door. (n) kitchen counterDetails
unit #406,506 & 601 conversion of 3 residential units (studio b type) to mobility units (b-m type) enlarge bathroom to provide circular turning space per cbc 11b-304.3.1 inside the bathroom. relocate (e) toilet & tub, (n) accessible lavatory. relocate (e) accessible pocket door. (n) kitchen counter | $200,000 |
| Jun 17, 2024 | In progress issued Sep 2025 | 133 Denslowe Dr | remodel (e) kitchen, rmeove a load beraring wall and adding new post and beam.Details
remodel (e) kitchen, rmeove a load beraring wall and adding new post and beam. | $40,000 |
| Jan 20, 2023 | Completed final sign-off Nov 2023 | 840 Powell St | (1) kitchen remodel, new kitchen cabinets and appliances. remodel (3) bathrooms and (1) powder room. install (n) fixtures to (e) locations. (3) shower pans. replace (e) outlets to (n) outlets; replace (e) lighting fixtures to (n) fixtures.Details
(1) kitchen remodel, new kitchen cabinets and appliances. remodel (3) bathrooms and (1) powder room. install (n) fixtures to (e) locations. (3) shower pans. replace (e) outlets to (n) outlets; replace (e) lighting fixtures to (n) fixtures. | $90,000 |
| Dec 1, 2022 | Completed final sign-off Nov 2023 | 840 Powell St | selected demo for (1) kitchen cabinets & fixtures; (2) bathroom cabinets & fixtures.Details
selected demo for (1) kitchen cabinets & fixtures; (2) bathroom cabinets & fixtures. | $750 |
| Oct 31, 2022 | Completed final sign-off Jul 2024 | 3133 Taraval St | revision to bpa#201905231498-r1 for install on 176 sq. ft. warming kitchen @ g/f shell space. kitchen for warming/prep/serving purposes only for preprepared senior meal service, electric appliance only. revision to exterior front entry to re-level for accessible entryDetails
revision to bpa#201905231498-r1 for install on 176 sq. ft. warming kitchen @ g/f shell space. kitchen for warming/prep/serving purposes only for preprepared senior meal service, electric appliance only. revision to exterior front entry to re-level for accessible entry | $35,000 |
| Sep 16, 2022 | Completed final sign-off Mar 2023 | 3283 22nd St | unit 1107: kitchen and bathroom remodelDetails
unit 1107: kitchen and bathroom remodel | $90,000 |
| Mar 15, 2022 | Completed final sign-off Jul 2025 | 4109 Pacheco St | interior renovation of 1 kitchen & 2 bathrooms, new 2nd floor deck at rear yard with stairs to gradeDetails
interior renovation of 1 kitchen & 2 bathrooms, new 2nd floor deck at rear yard with stairs to grade | $165,000 |
| Aug 26, 2021 | Expired or cancelled expired Jun 2023 | 3289 22nd St | unit 1107: renovation of kitchen and bathroom similar. interior painting.Details
unit 1107: renovation of kitchen and bathroom similar. interior painting. | $20,000 |
| Feb 9, 2021 | Completed final sign-off Feb 2022 | 2380 Folsom St | voluntary barrier removal & lowering of entry to sidewalk level for increased accessibility. renovation of existing 2nd floor kitchen into new fully accessible bathroom. renovation of existing 3rd floor kitchen into new fully accessible kitchen.Details
voluntary barrier removal & lowering of entry to sidewalk level for increased accessibility. renovation of existing 2nd floor kitchen into new fully accessible bathroom. renovation of existing 3rd floor kitchen into new fully accessible kitchen. | $20,000 |
| Nov 18, 2020 | In progress issued Sep 2026 | 2601 Lawton St | -remove violation #2019-003659 enf -legalize the ground floor to adu (add kitchen, remodel 2 bathrooms) -legalize lawton street illegal infilled porch add spiral stair to second floor rear.Details
-remove violation #2019-003659 enf -legalize the ground floor to adu (add kitchen, remodel 2 bathrooms) -legalize lawton street illegal infilled porch add spiral stair to second floor rear. | $10,000 |
| Jul 6, 2020 | Completed final sign-off Jan 2021 | 65 Dellbrook Av | kitchen remodel in-kind. no structural work. remodel 2 bathrooms at 2nd flr in-kind. new 4" led recessed lights and rewiringDetails
kitchen remodel in-kind. no structural work. remodel 2 bathrooms at 2nd flr in-kind. new 4" led recessed lights and rewiring | $50,000 |
| Oct 17, 2019 | Completed final sign-off Dec 2025 | 589 04th Av | raise bldg 2.5' vertical/horizontal add & int'r renov.1st fl: (n)garage/storage. 2nd fl:(n)unit 1:(3)beds(2)bths,laundry/living/dining, kitche,baywindow,front balcony & reardeck. 3rd fl:(n)unit 2:(3)beds,(2)baths,laundry,living/dining,kitchen,bay window,front/rear balconyDetails
raise bldg 2.5' vertical/horizontal add & int'r renov.1st fl: (n)garage/storage. 2nd fl:(n)unit 1:(3)beds(2)bths,laundry/living/dining, kitche,baywindow,front balcony & reardeck. 3rd fl:(n)unit 2:(3)beds,(2)baths,laundry,living/dining,kitchen,bay window,front/rear balcony | $400,000 |
| Jul 24, 2019 | Completed final sign-off Nov 2019 | 328 San Jose Av | at second floor only - kitchen: replace (e) kitchen cabinets and flooring - no exterior, no structural work no ordinances.Details
at second floor only - kitchen: replace (e) kitchen cabinets and flooring - no exterior, no structural work no ordinances. | $8,000 |
| Dec 18, 2018 | Completed final sign-off Jul 2019 | 19 Bessie St | construct new bedroom at ground flr. relocate kitchen replace (e) window to sliding door at rear of bld. construct new bedroom, bath at basement level. construct new staircase to connect ground level and basement.Details
construct new bedroom at ground flr. relocate kitchen replace (e) window to sliding door at rear of bld. construct new bedroom, bath at basement level. construct new staircase to connect ground level and basement. | $45,000 |
| Sep 5, 2018 | Never finaled issued Sep 2018, no final | 2301 Mission St | revision to pa # 201712196855. structural changes to soffit above limited kitchen vendor enclosure, rev to vendor bar construction and enclosure of kitchen vendor tenants as condition of approval by dphDetails
revision to pa # 201712196855. structural changes to soffit above limited kitchen vendor enclosure, rev to vendor bar construction and enclosure of kitchen vendor tenants as condition of approval by dph | |
| Dec 6, 2016 | Completed final sign-off Mar 2017 | 234 Edinburgh St | remodel (e) kitchen, remove/replace cabinets, counter & fixtures at 2nd floor. legalize one (e) bed room & construct one (n) bed room, one full bath room & one half bath room at ground floorDetails
remodel (e) kitchen, remove/replace cabinets, counter & fixtures at 2nd floor. legalize one (e) bed room & construct one (n) bed room, one full bath room & one half bath room at ground floor | $52,000 |
| Nov 14, 2016 | Completed final sign-off Jan 2018 | 1068 Clay St | remodel extg kitchen, bath room and rewire electrical lighting . all work at 3rd floor.Details
remodel extg kitchen, bath room and rewire electrical lighting . all work at 3rd floor. | $32,000 |
| Apr 27, 2016 | Completed final sign-off Dec 2016 | 1175 Chestnut St | #301- replace kitchen cabinet and sink, replace bathroom floor and wall tile, replace bath tub and install new exhaust fan. n/a ordinance #155-13Details
#301- replace kitchen cabinet and sink, replace bathroom floor and wall tile, replace bath tub and install new exhaust fan. n/a ordinance #155-13 | $10,000 |
| Mar 4, 2016 | Completed final sign-off Aug 2016 | 2601 Lawton St | 2nd floor: remodel kitchen and bathroom, remove lathe and plaster and replace with new sheetrock, 5/8 type x. no structural work. electrical and plumbing under seperate permits.Details
2nd floor: remodel kitchen and bathroom, remove lathe and plaster and replace with new sheetrock, 5/8 type x. no structural work. electrical and plumbing under seperate permits. | $60,000 |
| Oct 26, 2015 | Expired or cancelled cancelled Oct 2017 | 1426 06th Av | inside non-structural exploratory demo in kitchen & living rm (ceiling & interior wall approx 200 sf) after exploratory work patch up in-kind.Details
inside non-structural exploratory demo in kitchen & living rm (ceiling & interior wall approx 200 sf) after exploratory work patch up in-kind. | $3,000 |