L C Builders Inc.
- Based in
- San Francisco
- On San Francisco permits
- Apr 2013 to May 2026
- Last 24 months
- 16 permits filed
67 permits since 2000: 53 completed, 8 in progress, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
5 deck permits: 4 completed, 1 in progress. Typically 323 days from filing to permit and 257 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 14, 2024 | Completed final sign-off Oct 2024 | 2976 23rd St | minor dryrot repair. repair/replace (e) deck planks (less than 50%). exterior siding replacement to match (e) wood. remove/refurbish (e) metal structure (remove rust). all work at rear, no work visible from street.Details
minor dryrot repair. repair/replace (e) deck planks (less than 50%). exterior siding replacement to match (e) wood. remove/refurbish (e) metal structure (remove rust). all work at rear, no work visible from street. | $109,000 |
| Dec 8, 2022 | In progress issued Feb 2026 | 558 24th Av | extension at rear g/f (~67 sq ft).new fire rated wall at 2/f deck.Details
extension at rear g/f (~67 sq ft).new fire rated wall at 2/f deck. | $20,000 |
| Mar 15, 2022 | Completed final sign-off Jul 2025 | 4109 Pacheco St | interior renovation of 1 kitchen & 2 bathrooms, new 2nd floor deck at rear yard with stairs to gradeDetails
interior renovation of 1 kitchen & 2 bathrooms, new 2nd floor deck at rear yard with stairs to grade | $165,000 |
| Nov 7, 2017 | Completed final sign-off Dec 2017 | 351 Oxford St | dry rot repair at the rear deck less than 50% repair work.Details
dry rot repair at the rear deck less than 50% repair work. | $250 |
| Jun 1, 2017 | Completed final sign-off May 2019 | 309 Holly Park Cr | rear @ vertical addition. fill in (e) open under-deck / house area to create storage. legalize / reduce (e) rear decks. sprinkler building. interior renovation. 2 new bedroom & 2 new baths.Details
rear @ vertical addition. fill in (e) open under-deck / house area to create storage. legalize / reduce (e) rear decks. sprinkler building. interior renovation. 2 new bedroom & 2 new baths. | $280,000 |