Mark Moore
- Listed as
- architect, engineer
- Firm
- Zfa Structural Engineers
- Based in
- San Francisco
- On San Francisco permits
- May 2008 to Apr 2023
106 permits since 2000 (engineer on 101 permits, architect on 5 permits): 82 completed, 13 never finaled, 11 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 106.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 24, 2023 | Completed final sign-off Apr 2024 | 2335 Golden Gate Av | Cahill Contractors Llc. | deferred submittal - shop drawings for acc glass inc window wall system - fixed window located high above the end of the basketball court (ref pa 2021-0521-0845)Details
deferred submittal - shop drawings for acc glass inc window wall system - fixed window located high above the end of the basketball court (ref pa 2021-0521-0845) | |
| May 5, 2022 | Completed final sign-off Mar 2023 | 642 Guerrero St | Blackline Construction | demolish a rear structure (garage)Details
demolish a rear structure (garage) | |
| Nov 18, 2021 | Completed final sign-off Jul 2022 | 166 Valparaiso St | Olmec Builders Inc | modification of pa #202107094099. substitute steel beam for pslDetails
modification of pa #202107094099. substitute steel beam for psl | |
| Sep 26, 2020 | Completed final sign-off Dec 2024 | 1254 33rd Av | Jerimiah F Deasy/General Contractor | to comply with nov202045931: rev to pa201712287588s1 to address fire damaged building currently under constructionDetails
to comply with nov202045931: rev to pa201712287588s1 to address fire damaged building currently under construction | |
| Sep 12, 2020 | Completed final sign-off Dec 2023 | 660 Sanchez St | Pete Moffat Construction Inc | addition of concrete fence wall on top of (e) retaining wall at perimeter of rear yard.Details
addition of concrete fence wall on top of (e) retaining wall at perimeter of rear yard. | $500 |
| Jan 9, 2020 | Expired or cancelled expired Jan 2026 | 2898 Vallejo St | Ashbury Gen Constructing & Eng | revision to pa #2017-0223-9944 s2: addition of a mechanical basement in an area that was excavate for access to pool excavations.Details
revision to pa #2017-0223-9944 s2: addition of a mechanical basement in an area that was excavate for access to pool excavations. | |
| Oct 28, 2019 | Completed final sign-off Nov 2019 | 457 Roosevelt Wy | Ashbury Gen Constructing & Eng | revision to pa 2019-0211-2567 to include concrete wall and foundation at western end of the basement and to comply with nov 201799561 and 201863891Details
revision to pa 2019-0211-2567 to include concrete wall and foundation at western end of the basement and to comply with nov 201799561 and 201863891 | |
| Sep 26, 2019 | Never finaled issued Oct 2019, no final | 851 Missouri St | revision to permit #201811296960; due to unforeseen (e) conditionsDetails
revision to permit #201811296960; due to unforeseen (e) conditions | ||
| Sep 6, 2019 | Expired or cancelled expired Jun 2023 | 2715 Steiner St | Arrow Builders Inc | revision to pa# 201902203324 & 201906183738. including bathroom remodel and replacement of existing foundation and shear wall.Details
revision to pa# 201902203324 & 201906183738. including bathroom remodel and replacement of existing foundation and shear wall. | $20,000 |
| Aug 14, 2019 | Completed final sign-off Oct 2019 | 1085 Page St | Rebuild Sf | replacement of a structurally deficient header (on 2nd fl) below a bearing wall.Details
replacement of a structurally deficient header (on 2nd fl) below a bearing wall. | $8,000 |
| Aug 12, 2019 | Completed final sign-off Dec 2019 | 2445 Mariposa St | Guzman Construction Group Inc. | revision to pa 201901281364: administrative permit to include unit #'s (e) exterior walls at 109, 209, 309 in work scope to repair damages from dry=rot. the damaged framing and finish materials will be replace in kind; cost of construction included in original pa 201901281364.Details
revision to pa 201901281364: administrative permit to include unit #'s (e) exterior walls at 109, 209, 309 in work scope to repair damages from dry=rot. the damaged framing and finish materials will be replace in kind; cost of construction included in original pa 201901281364. | |
| Jun 13, 2019 | Completed final sign-off Jan 2020 | 30 Wayne Pl | Steelcore Builders Inc | rev to pa# 201706290672; project involves seismic strenghening measures to comply with the sf soft story ordinance design iebc appx. a-4Details
rev to pa# 201706290672; project involves seismic strenghening measures to comply with the sf soft story ordinance design iebc appx. a-4 | |
| May 1, 2019 | Completed final sign-off Oct 2019 | 631 Mangels Av | Graham Construction | voluntary structural strengthening to increase shear value of rear wall.Details
voluntary structural strengthening to increase shear value of rear wall. | $5,000 |
| Mar 20, 2019 | Completed final sign-off Jun 2019 | 44 Montclair Tr | Lone Wolf Construction | revision to app#201807134512. the length of new shear wall has increased on the basement level. n/a for maherDetails
revision to app#201807134512. the length of new shear wall has increased on the basement level. n/a for maher | $20,000 |
| Mar 15, 2019 | Completed final sign-off Mar 2020 | 580 Hill St | (n) rear deck off 2nd flr w/ spirial stair to yard, and (n) balcony off 3rd flr bath over (e) roof. (n) doors to deck & balcony. no work at front facade.Details
(n) rear deck off 2nd flr w/ spirial stair to yard, and (n) balcony off 3rd flr bath over (e) roof. (n) doors to deck & balcony. no work at front facade. | $10,000 | |
| Jan 3, 2019 | Completed final sign-off Aug 2019 | 348 19th Av | voluntary strengthening of the ground floor of an apartment building in the longitudinal direction.Details
voluntary strengthening of the ground floor of an apartment building in the longitudinal direction. | $25,000 | |
| Nov 29, 2018 | Completed final sign-off Jan 2021 | 1 Watchman Wy | mandatory soft story retrofit of 3-story wood-framed residential building using asce 41-13 retrofit is additon of plywood to existing wallsDetails
mandatory soft story retrofit of 3-story wood-framed residential building using asce 41-13 retrofit is additon of plywood to existing walls | $40,000 | |
| Nov 29, 2018 | Completed final sign-off Jan 2021 | 901 Missouri St | soft story retrofit per sfebc chapter 4d engin. criteria: asce 41-13Details
soft story retrofit per sfebc chapter 4d engin. criteria: asce 41-13 | $40,000 | |
| Nov 29, 2018 | Completed final sign-off Jan 2021 | 851 Missouri St | soft story retrofit per sfebc chapter 4d engin. criteria: asce 41-13Details
soft story retrofit per sfebc chapter 4d engin. criteria: asce 41-13 | $40,000 | |
| Nov 29, 2018 | Completed final sign-off Jan 2021 | 83 Watchman Wy | soft story retrofit per sfebc chapter 4d engin. criteria: asce 41-13Details
soft story retrofit per sfebc chapter 4d engin. criteria: asce 41-13 | $40,000 | |
| Nov 29, 2018 | Completed final sign-off Jan 2021 | 51 Turner Tr | mandatory soft story retrofit of 3-story wood-framed residential building using asce 41-13 retrofit includes strenthening of existing walls with plywoodDetails
mandatory soft story retrofit of 3-story wood-framed residential building using asce 41-13 retrofit includes strenthening of existing walls with plywood | $40,000 | |
| Nov 29, 2018 | Completed final sign-off Jan 2021 | 700 Missouri St | soft story retrofit per sfebc chapter 4d engin. criteria: asce 41-13Details
soft story retrofit per sfebc chapter 4d engin. criteria: asce 41-13 | $40,000 | |
| Oct 17, 2018 | Completed final sign-off Mar 2019 | 568 05th Av | S And L Remodeling And Design Inc | unit 3, 3rd fl; kitchen remodel. remove walls, 1 bearing, 1 non load bearingDetails
unit 3, 3rd fl; kitchen remodel. remove walls, 1 bearing, 1 non load bearing | $8,500 |
| Sep 13, 2018 | Completed final sign-off Feb 2019 | 2782 24th St | Flying Colors | add structural drawings to 201708114562Details
add structural drawings to 201708114562 | $10,000 |
| Aug 3, 2018 | Completed final sign-off Mar 2019 | 2629 Larkin St | Sneed & Co Construction Inc. | replace (e) deteriorated retaining wall at west property line.Details
replace (e) deteriorated retaining wall at west property line. | $30,000 |
| Jun 5, 2018 | Completed final sign-off Apr 2019 | 34 Presidio Tr | Dijeau Poage Construction Inc. | revision to pa # 201609127366. revision of foundation design of exterior patio & site features per geotech engineer recommendation. no changes to architectural and landscape scope as approved in pa # 201609127366.Details
revision to pa # 201609127366. revision of foundation design of exterior patio & site features per geotech engineer recommendation. no changes to architectural and landscape scope as approved in pa # 201609127366. | |
| May 10, 2018 | Completed final sign-off Sep 2018 | 870 32nd Av | Graham Construction | remove bearing walls in kitchen & install beams. remodel kitchenDetails
remove bearing walls in kitchen & install beams. remodel kitchen | $45,000 |
| Dec 13, 2017 | Never finaled issued Dec 2017, no final | 281 Chestnut St | Moroso Construction Inc | upgrade (e) elevator system and ele systemDetails
upgrade (e) elevator system and ele system | $5,000 |
| Nov 3, 2017 | Completed final sign-off Aug 2018 | 781 Francisco St | Lone Wolf Construction | remodel of (e) 3 story building including renovation of existing two bathrooms, two kitchens & basements. replacement of rear & side windows in kind. not visible from st.Details
remodel of (e) 3 story building including renovation of existing two bathrooms, two kitchens & basements. replacement of rear & side windows in kind. not visible from st. | $47,000 |
| Oct 19, 2017 | Completed final sign-off Jun 2018 | 866 Haight St | Spryscapes Const Inc. | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. retrofit includes strengthening of shear walls and anchorage.Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. retrofit includes strengthening of shear walls and anchorage. | $40,000 |
| Oct 17, 2017 | Completed final sign-off Feb 2018 | 880 Faxon Av | Moroso Construction Inc | earthquake brace & bolt strengthening siesmic retrofit per engineered plan.Details
earthquake brace & bolt strengthening siesmic retrofit per engineered plan. | $10,000 |
| Oct 13, 2017 | Completed final sign-off May 2026 | 3254 24th St | Guzman Construction Group Inc. | minor demolition, rehabilitation, interior finishes, electrical. voluntary structural strenghthening.Details
minor demolition, rehabilitation, interior finishes, electrical. voluntary structural strenghthening. | $156,000 |
| Oct 13, 2017 | Never finaled issued Oct 2017, no final | 1719 Green St | Larkspur Builder | seismic upgrade voluntary of lateral system including wood shearwalls, wood and steel beams & posts, new steel gravity beam, and replacement of extg brick foundation with reinforced concrete.Details
seismic upgrade voluntary of lateral system including wood shearwalls, wood and steel beams & posts, new steel gravity beam, and replacement of extg brick foundation with reinforced concrete. | $75,000 |
| Oct 13, 2017 | Completed final sign-off Jun 2018 | 890 Capp St | Guzman Construction Group Inc. | minor demolition, rehabilitation, interior finishes, electrical. voluntary structural strenghthening.Details
minor demolition, rehabilitation, interior finishes, electrical. voluntary structural strenghthening. | $28,750 |
| Oct 6, 2017 | Completed final sign-off Mar 2019 | 1301 Folsom St | Construction Studios, Inc | 1/f-3/f: interior improvement for baths, showers, ada, mech, electrical & plumbing upgrades. stairs, ada lobby revision, improvements on roof. shell and core, improvements only. n/a ordinance #155-13Details
1/f-3/f: interior improvement for baths, showers, ada, mech, electrical & plumbing upgrades. stairs, ada lobby revision, improvements on roof. shell and core, improvements only. n/a ordinance #155-13 | $200,000 |
| Sep 14, 2017 | Expired or cancelled withdrawn Oct 2019 | 199 Chestnut St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $40,000 | |
| Aug 18, 2017 | Completed final sign-off Jul 2018 | 555 Mission St | Bcci Construction Company | 34th floor - revision to pa #201705318038 to include structural support details of nanawall (a moveable, foldable partition) to conference/accessory assembly space related to tenant improvement work.Details
34th floor - revision to pa #201705318038 to include structural support details of nanawall (a moveable, foldable partition) to conference/accessory assembly space related to tenant improvement work. | $5,000 |
| Aug 11, 2017 | Never finaled issued Sep 2017, no final | 1719 Green St | Larkspur Builders Inc. | demo existing sunroom, renovation of kitchen and addition of one bathroom.Details
demo existing sunroom, renovation of kitchen and addition of one bathroom. | $135,000 |
| Aug 11, 2017 | Completed final sign-off Jan 2019 | 440 04th Av | Oarcon Inc | renovation of foundation to be replaced, related to bpa#2017-0601-8165.Details
renovation of foundation to be replaced, related to bpa#2017-0601-8165. | $40,000 |
| Aug 3, 2017 | Completed final sign-off Nov 2018 | 2945 16th St | soft story retrofit per sfebc chapter 4d, 2016 cebc aappendix a-4. (residential pa #201708033747) n/a maher ordinanceDetails
soft story retrofit per sfebc chapter 4d, 2016 cebc aappendix a-4. (residential pa #201708033747) n/a maher ordinance | $150,000 | |
| Aug 3, 2017 | Completed final sign-off Nov 2018 | 2945 16th St | soft story retrofit per sfebc chapter 4d, 2016 cebc aappendix a-4. (commercial pa #201708033746) n/a maher ordinance and including seismic workDetails
soft story retrofit per sfebc chapter 4d, 2016 cebc aappendix a-4. (commercial pa #201708033746) n/a maher ordinance and including seismic work | $300,000 | |
| Aug 3, 2017 | Completed final sign-off Sep 2018 | 3434 18th St | Guzman Construction Group Inc. | mandatory structural soft story retrofitto correct a tier 4 (e) soft stroy condition per sfebc chapter 4d, 2016 cebc aappendix a-4. n/a maher ordinanceDetails
mandatory structural soft story retrofitto correct a tier 4 (e) soft stroy condition per sfebc chapter 4d, 2016 cebc aappendix a-4. n/a maher ordinance | $345,000 |
| Aug 2, 2017 | Completed final sign-off Dec 2017 | 101 San Pablo Av | Buck O'neill Builders Inc. | new casework, window and (flat) skylight @ existing library. remodel (e) bathroom.Details
new casework, window and (flat) skylight @ existing library. remodel (e) bathroom. | $60,000 |
| Jul 24, 2017 | Expired or cancelled withdrawn Dec 2019 | 102 South Park | resendtial: seismic retrofit to comply with mandatory soft story ordinance per sfebc chapter 4d, asce41-13, to comly with nov#201642252. maher ordinance not required.Details
resendtial: seismic retrofit to comply with mandatory soft story ordinance per sfebc chapter 4d, asce41-13, to comly with nov#201642252. maher ordinance not required. | $25,000 | |
| Jul 24, 2017 | Expired or cancelled withdrawn Dec 2019 | 102 South Park | commercial: seismic retrofit to comply with mandotary soft story ordinace per sfebc chapter 4d, asce41-13, to comly with nov#201642252. maher ordinance not required.Details
commercial: seismic retrofit to comply with mandotary soft story ordinace per sfebc chapter 4d, asce41-13, to comly with nov#201642252. maher ordinance not required. | $25,000 | |
| Jul 24, 2017 | Expired or cancelled withdrawn Dec 2019 | 22 South Park | commercial: seismic retrofit to comply with mandotary soft story ordinace per sfebc chapter 4d, asce41-13, to comly with nov#201642251, a residential hotel. maher ordinance not required.Details
commercial: seismic retrofit to comply with mandotary soft story ordinace per sfebc chapter 4d, asce41-13, to comly with nov#201642251, a residential hotel. maher ordinance not required. | $25,000 | |
| Jul 24, 2017 | Expired or cancelled withdrawn Dec 2019 | 22 South Park | residential: seismic retrofit to comply with mandotary soft story ordinace per sfebc chapter 4d, asce41-13, to comly with nov#201642251, a residential hotel. maher ordinance not required.Details
residential: seismic retrofit to comply with mandotary soft story ordinace per sfebc chapter 4d, asce41-13, to comly with nov#201642251, a residential hotel. maher ordinance not required. | $25,000 | |
| Jun 29, 2017 | Completed final sign-off Jan 2020 | 30 Wayne Pl | Steelcore Builders Inc | soft story retrofit of four story wood framed residential building. retrofit includes addition of shear walls and spiral steel moment framesDetails
soft story retrofit of four story wood framed residential building. retrofit includes addition of shear walls and spiral steel moment frames | $60,000 |
| Jun 28, 2017 | Completed final sign-off Jun 2019 | 160 Bernard St | Barker-O'donoghue Master Bldrs | value engineering revision to app#201408133730 s1 issued 5/5/17. replacement of proposed steel moment frames with wood framed shearwalls. changes to exterior openings/locations.Details
value engineering revision to app#201408133730 s1 issued 5/5/17. replacement of proposed steel moment frames with wood framed shearwalls. changes to exterior openings/locations. | |
| May 22, 2017 | Completed final sign-off Oct 2017 | 450 Vallejo St | Clayton Timbrell & Co | rear bldg - increase foundation wall height 24" to repair rotten wood framing & resolve water infiltration problem.Details
rear bldg - increase foundation wall height 24" to repair rotten wood framing & resolve water infiltration problem. | $30,000 |
| May 9, 2017 | Completed final sign-off Apr 2018 | 301 El Camino Del Mar | Clayton Timbrell & Co | misc structural work: header replacement, shear wall hold downs and guardrail install.Details
misc structural work: header replacement, shear wall hold downs and guardrail install. | $3,000 |
| May 5, 2017 | Never finaled issued May 2017, no final | 857 Alvarado St | Graham Moore Construction Inc | voluntary seismic strengthening.Details
voluntary seismic strengthening. | $20,000 |
| Apr 21, 2017 | Completed final sign-off Aug 2017 | 3839 Washington St | American Builders | strengthen existing fence for wind load, strengthen tube steel post connections at exist joist bay below, scope includes rebuilding fence.Details
strengthen existing fence for wind load, strengthen tube steel post connections at exist joist bay below, scope includes rebuilding fence. | $65,000 |
| Feb 28, 2017 | Never finaled issued Mar 2017, no final | 114 Sansome St | Bcci Construction Company | 4th floor - revision to pa #201702028527 to revise structural details in response to field condition. n/a maher ordinanceDetails
4th floor - revision to pa #201702028527 to revise structural details in response to field condition. n/a maher ordinance | |
| Feb 28, 2017 | Completed final sign-off Mar 2018 | 505 Lyon St | Graham Construction | convert (e) basement to conditioned habitable space (n) den and create interior communicating stair. structural foundation upgrade. basement space to be (n) den.Details
convert (e) basement to conditioned habitable space (n) den and create interior communicating stair. structural foundation upgrade. basement space to be (n) den. | $67,000 |
| Jan 19, 2017 | Completed final sign-off Oct 2018 | 2846 Fillmore St | Frank & Grossman Landscaping Contr Inc | new steps, fence, paving, fountain feature, planting, irrigation, low voltage lighting, landscape scope maher naDetails
new steps, fence, paving, fountain feature, planting, irrigation, low voltage lighting, landscape scope maher na | $170,000 |
| Nov 21, 2016 | Completed final sign-off Aug 2017 | 2300 Mason St | Ren Lei Construction Co | renovation of top 2 floors of an (e) 3 story commercial bld. change of use for addition of residence. variance required for open space, minor facade alterations include street level entry door at mason st. addition of 2nd flr window at mason. addition of 2ns & 3rd flr windows at francisco maher naDetails
renovation of top 2 floors of an (e) 3 story commercial bld. change of use for addition of residence. variance required for open space, minor facade alterations include street level entry door at mason st. addition of 2nd flr window at mason. addition of 2ns & 3rd flr windows at francisco maher na | $51,000 |
| Sep 8, 2016 | Completed final sign-off May 2024 | 1409 South Van Ness Av | Wickman Development And Construction | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 | $56,000 |
| Sep 8, 2016 | Completed final sign-off May 2024 | 1415 South Van Ness Av | Wickman Development And Construction | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4; adu under permit #201703242338Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4; adu under permit #201703242338 | $56,000 |
| Jul 18, 2016 | Completed final sign-off Nov 2018 | 127 05th Av | Spe Construction Inc. | new rear deck & framed stair in set back less than 10' from grade, replace windows at sun room & living room, no other work, all other work under pa #201608104652.Details
new rear deck & framed stair in set back less than 10' from grade, replace windows at sun room & living room, no other work, all other work under pa #201608104652. | $85,000 |
| Jul 7, 2016 | Completed final sign-off Dec 2017 | 938 Hampshire St | Euro Mind Design Corp, American Builders | 3rd flr add bath, pour slab in basement, revision to 201603101761.Details
3rd flr add bath, pour slab in basement, revision to 201603101761. | $120,000 |
| Jun 24, 2016 | Completed final sign-off Dec 2016 | 3770 Cesar Chavez St | Jln Builders | interior renovation to 2nd level includes remodel of (e) kitchen and bathroom. cabinetry at living room and new gas fireplace to replace (e) wood burining fireplace.Details
interior renovation to 2nd level includes remodel of (e) kitchen and bathroom. cabinetry at living room and new gas fireplace to replace (e) wood burining fireplace. | $100,000 |
| Jun 14, 2016 | Completed final sign-off Dec 2016 | 46 El Sereno Ct | Grand Finishes | replace all windows in kind except g/f rear, replace entry door, garage door, exterior paint. remodel kitchen, join bedroom w/2nd bath, electrical, plumbing & heating duct. full remodel g/f rooms to include master bedroom/bath & officeDetails
replace all windows in kind except g/f rear, replace entry door, garage door, exterior paint. remodel kitchen, join bedroom w/2nd bath, electrical, plumbing & heating duct. full remodel g/f rooms to include master bedroom/bath & office | $200,000 |
| Apr 29, 2016 | Completed final sign-off Dec 2016 | 1188 Harrison St | Moroso Construction Inc | interior remodel, replace & upgrade interior stairs & restrooms, new entry door, minor facade & window repairs, replace damaged garage door, new breakroom kitchen. n/a ordinance #155-13Details
interior remodel, replace & upgrade interior stairs & restrooms, new entry door, minor facade & window repairs, replace damaged garage door, new breakroom kitchen. n/a ordinance #155-13 | $119,026 |
| Apr 29, 2016 | Completed final sign-off Mar 2017 | 1184 Harrison St | Moroso Construction Inc | interior remodel, all finishes & new restroom, new stair to 2/f, replace entry door & ramp, minor facade repairs, replace (e) garage door. n/a ordinance #155-13Details
interior remodel, all finishes & new restroom, new stair to 2/f, replace entry door & ramp, minor facade repairs, replace (e) garage door. n/a ordinance #155-13 | $82,402 |
| Apr 4, 2016 | Completed final sign-off May 2016 | 735 Waller St | Michael Mc Nulty Construction***Ask Id | construction of a concrete retaining wall to replace an existing wood lagging retaining wall. project also includes construction of a slab on grade with a 3 ft deep sump fit with concrete walls.Details
construction of a concrete retaining wall to replace an existing wood lagging retaining wall. project also includes construction of a slab on grade with a 3 ft deep sump fit with concrete walls. | $10,000 |
| Mar 31, 2016 | Completed final sign-off Feb 2017 | 1124 De Haro St | Saturn Construction Co | renovation & full seismic retrofit, infill @ (e) 2nd floor lightwell(18 sq ft),new foundation per plan,new shear walls,relocate/remodel bath @ 2nd floor,remodeled kitchen @ 2nd floor,new window & door @rear facade,new skylight,new partition walls @ 2nd floor,new furnace & water heaterDetails
renovation & full seismic retrofit, infill @ (e) 2nd floor lightwell(18 sq ft),new foundation per plan,new shear walls,relocate/remodel bath @ 2nd floor,remodeled kitchen @ 2nd floor,new window & door @rear facade,new skylight,new partition walls @ 2nd floor,new furnace & water heater | $162,000 |
| Feb 4, 2016 | Expired or cancelled cancelled Jan 2026 | 2628 Broderick St | raising of head heights in non bearing walls and installation of pocket door in bearing wall; maher n/aDetails
raising of head heights in non bearing walls and installation of pocket door in bearing wall; maher n/a | $5,000 | |
| Jan 21, 2016 | Completed final sign-off Aug 2018 | 2268 Pine St | Buck O'neill Builders Inc. | reconfiguration of g/f interior including replacement of stairs to basement, exterior work includes (n) rear deck, removal of rear bay window, replacement of (n) wall & sliding glass door.Details
reconfiguration of g/f interior including replacement of stairs to basement, exterior work includes (n) rear deck, removal of rear bay window, replacement of (n) wall & sliding glass door. | $80,000 |
| Jan 7, 2016 | Completed final sign-off Apr 2018 | 3878 Jackson St | Paul Ryan Associates | widening of existing garage opening, new garage door, install finish at (e) front stairs, new pavers over garage for (e) exterior roof deck, new paver over (e) front deck, replace (e) front gate in kind.Details
widening of existing garage opening, new garage door, install finish at (e) front stairs, new pavers over garage for (e) exterior roof deck, new paver over (e) front deck, replace (e) front gate in kind. | $76,000 |
| Dec 17, 2015 | Completed final sign-off Dec 2018 | 1731 Powell St | temporary shoring of site site, permit approved under bpa# 200908124639Details
temporary shoring of site site, permit approved under bpa# 200908124639 | $100,000 | |
| Nov 23, 2015 | Completed final sign-off Aug 2018 | 2268 Pine St | Buck O'neill Builders Inc. | replace existing masonry foundation with new concrete foundation including reconfiguration of the ground floor & new bath, bedroom, media room & sunken lightwell.Details
replace existing masonry foundation with new concrete foundation including reconfiguration of the ground floor & new bath, bedroom, media room & sunken lightwell. | $200,000 |
| Nov 16, 2015 | Never finaled issued Apr 2016, no final | 120 Turquoise Wy | A L Martin Construction | replace in kind front gate & fence & west property line fence; remove (e) wood retaining walls & stairs on west side and replace with concrete wall & stairs; replace in kind front entry walkDetails
replace in kind front gate & fence & west property line fence; remove (e) wood retaining walls & stairs on west side and replace with concrete wall & stairs; replace in kind front entry walk | $50,000 |
| Sep 14, 2015 | Completed final sign-off Jun 2016 | 345 Lyon St | Euro Mind Design Corp | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. mandatory soft story retrofit of (3) story wood frame residential bldg. work includes strengthening of sheer walls and new isolated foundations.Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. mandatory soft story retrofit of (3) story wood frame residential bldg. work includes strengthening of sheer walls and new isolated foundations. | $50,000 |
| Aug 12, 2015 | Completed final sign-off Apr 2016 | 2149 Lyon St | Koefoed Const Co | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. strengthening of shear walls and add a special steel moment frame at 1st story.Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. strengthening of shear walls and add a special steel moment frame at 1st story. | $50,000 |
| Jul 30, 2015 | Completed final sign-off Jan 2016 | 501 Oak St | Connor Daly Corporation | soft story ordinance per sfbc chapter 34b, includes shear walls and special moment frame in the 1st fl of a 3 story building. iebc app. a4.Details
soft story ordinance per sfbc chapter 34b, includes shear walls and special moment frame in the 1st fl of a 3 story building. iebc app. a4. | $50,000 |
| Jul 14, 2015 | Completed final sign-off Dec 2017 | 938 Hampshire St | Euro Mind Design Corp, American Builders | to comply with nov#h9403645, 201520932, 200989380, 201538971, 201538921, 201411822, 201520761, 201410532, 201538991, 201401822. reconstruct rear deck & stair per 9515826. eliminate roof structure over (e) roof built without benefit of a permit application.Details
to comply with nov#h9403645, 201520932, 200989380, 201538971, 201538921, 201411822, 201520761, 201410532, 201538991, 201401822. reconstruct rear deck & stair per 9515826. eliminate roof structure over (e) roof built without benefit of a permit application. | $300,000 |
| Jun 4, 2015 | Never finaled issued Oct 2015, no final | 121 Golden Gate Av | Solarix Systems | install a solar hot water heating system. roof-mounted collectors and storage tank (roof mech room).; maher n/aDetails
install a solar hot water heating system. roof-mounted collectors and storage tank (roof mech room).; maher n/a | $60,000 |
| May 11, 2015 | Expired or cancelled expired Jan 2020 | 2898 Vallejo St | Ashbury Gen Constructing & Eng | renovate (e) sfd. no change in use. addition @ bsmt 2 & bsmt 1. 1st fl: remodel of kitchen, add 2 bath. 2nd fl: remodel of kitchen, powder rm, living rm. 3rd fl: remodel of 3 baths, master bed & closet. 4th fl: remodel 1 bath. change 1 property line window on east side with new fire rated window.Details
renovate (e) sfd. no change in use. addition @ bsmt 2 & bsmt 1. 1st fl: remodel of kitchen, add 2 bath. 2nd fl: remodel of kitchen, powder rm, living rm. 3rd fl: remodel of 3 baths, master bed & closet. 4th fl: remodel 1 bath. change 1 property line window on east side with new fire rated window. | $1,500,000 |
| May 11, 2015 | Completed final sign-off Mar 2016 | 8 03rd Av | Moroso Construction Inc | interior: alterations at 1/f & 2/f include kitchen & bath. replace furnaces, water heater, revise lighting. exterior: replace windows & doors, new roofing, repair/replace parapet. extend (e) deck @ rear. seperate permit for bay addition, pa#201502027191Details
interior: alterations at 1/f & 2/f include kitchen & bath. replace furnaces, water heater, revise lighting. exterior: replace windows & doors, new roofing, repair/replace parapet. extend (e) deck @ rear. seperate permit for bay addition, pa#201502027191 | $300,000 |
| Apr 29, 2015 | Completed final sign-off Jul 2018 | 434 Waller St | Selvig Development | revision to app #201207114598 relocation of single story rear egress spiral stair with associated landings at each unit plus footing. permit is with variance application for the change in roof line previously constructed under appln #201207114598Details
revision to app #201207114598 relocation of single story rear egress spiral stair with associated landings at each unit plus footing. permit is with variance application for the change in roof line previously constructed under appln #201207114598 | $30,000 |
| Mar 12, 2015 | Completed final sign-off Sep 2015 | 1814 Hyde St | Michael Mc Nulty Construction***Ask Id | remodel 1st fl apt in a 5 unit building. main purpose is to remove partiton walls to open floor plan. requires strengthening of walls to redistribue load and reinforce floor joists. also remove rear exterior exit stair (second exit) for roof deck. n/a ordinance #155-13Details
remodel 1st fl apt in a 5 unit building. main purpose is to remove partiton walls to open floor plan. requires strengthening of walls to redistribue load and reinforce floor joists. also remove rear exterior exit stair (second exit) for roof deck. n/a ordinance #155-13 | $50,000 |
| Mar 2, 2015 | Never finaled issued Mar 2015, no final | 285 Topaz Wy | J L Construction Inc | elevator installation. master bath remodel, 2 new window openingsDetails
elevator installation. master bath remodel, 2 new window openings | $65,000 |
| Feb 3, 2015 | Completed final sign-off Aug 2017 | 196 Avila St | Amn Construction | addition to pa# 201411171602 footing at garage wall, new slab on grade. n/a ordinance #155-13Details
addition to pa# 201411171602 footing at garage wall, new slab on grade. n/a ordinance #155-13 | $10,000 |
| Nov 26, 2014 | Completed final sign-off May 2017 | 2747 Green St | Paul Ryan Associates | revision to landscape pa#201407151314 as noted in 1. scope is: deletion of upper dining terrace & steps in lieu of 2 raised platforms at rear yard, bbq counter relocated to west side, water feature deleted.Details
revision to landscape pa#201407151314 as noted in 1. scope is: deletion of upper dining terrace & steps in lieu of 2 raised platforms at rear yard, bbq counter relocated to west side, water feature deleted. | |
| Sep 4, 2014 | Completed final sign-off Oct 2014 | 705 Noriega St | Kasten Builders/Creative Contr.Of Calif | revision to pa# 201310250258 - removal of (e) landing & steps and construction of new deck.Details
revision to pa# 201310250258 - removal of (e) landing & steps and construction of new deck. | $15,000 |
| Jun 20, 2014 | Completed final sign-off Apr 2015 | 174 Beaver St | T N T Construction, Upcycle Builders Inc. | remove (e) chimney 7 fireplace, remodel (e) kitchen, replace (e) living room windows & doors, change slope roof ot flat roof @ rear bay, (n) built in shelves & gas fireplace.Details
remove (e) chimney 7 fireplace, remodel (e) kitchen, replace (e) living room windows & doors, change slope roof ot flat roof @ rear bay, (n) built in shelves & gas fireplace. | $80,000 |
| May 2, 2014 | Completed final sign-off Jul 2014 | 1296 Church St | Grand Finishes | remove wall between kitchen & bedroom, relocate subpanel, removel closet enclosure in bedroom.Details
remove wall between kitchen & bedroom, relocate subpanel, removel closet enclosure in bedroom. | $12,000 |
| Feb 14, 2014 | Completed final sign-off Nov 2014 | 2780 19th Av | Amn Construction | revision to pa #201309277992. add structural header. remove header from existing planDetails
revision to pa #201309277992. add structural header. remove header from existing plan | |
| Feb 11, 2014 | Never finaled issued Feb 2014, no final | 2401 Moraga St | Brendan Lalor Construction | revision to pa#2011-10-21-7311 reduces the rear yard addition @ ground level & removes addition @ 2nd & 3rd levels.Details
revision to pa#2011-10-21-7311 reduces the rear yard addition @ ground level & removes addition @ 2nd & 3rd levels. | |
| Sep 27, 2013 | Completed final sign-off Mar 2014 | 3282 Jackson St | Clayton Timbrell & Co | new 8x4x1/4 beam supporting unoccupied attic floor, add 4x4 posts at basement, entry and second floor.Details
new 8x4x1/4 beam supporting unoccupied attic floor, add 4x4 posts at basement, entry and second floor. | $5,000 |
| Aug 30, 2013 | Completed final sign-off Mar 2014 | 2735 Green St | Paul Ryan Associates | install temporary building & bsmt shoring along west property line during construction at adjacent property (2747 green) under a separate permit.Details
install temporary building & bsmt shoring along west property line during construction at adjacent property (2747 green) under a separate permit. | $50,000 |
| Aug 30, 2013 | Completed final sign-off Mar 2014 | 2747 Green St | Paul Ryan Associates | install temporary building & bsmt shoring along east property line. additional shoring work at adjacent property is under a separate permit.Details
install temporary building & bsmt shoring along east property line. additional shoring work at adjacent property is under a separate permit. | $80,000 |
| May 30, 2013 | Completed final sign-off Mar 2014 | 135 Mississippi St | Gci, Inc | exterior improvements including new deck and new mechanical equipment lift on 6' columns. replace 3 windows with new roll up window/doors. ugrade 2 exit doors.no interior workDetails
exterior improvements including new deck and new mechanical equipment lift on 6' columns. replace 3 windows with new roll up window/doors. ugrade 2 exit doors.no interior work | $486,000 |
| Feb 21, 2013 | Completed final sign-off Apr 2016 | 662 Waller St | Buck O'neill Builders Inc. | remodel an (e) 2 level residence within 2 unit bldg. remodel includes partial demo of (e) walls & roof, (n) interior & exterior walls, (n) dormers, (n) windows @ light wells & rear facade & 2 (n) bathrooms, 1 remodel bathroom & 1 remodel kitchen.Details
remodel an (e) 2 level residence within 2 unit bldg. remodel includes partial demo of (e) walls & roof, (n) interior & exterior walls, (n) dormers, (n) windows @ light wells & rear facade & 2 (n) bathrooms, 1 remodel bathroom & 1 remodel kitchen. | $150,000 |
| Sep 21, 2012 | Expired or cancelled withdrawn Dec 2015 | 284 Stanyan St | structurel seismic work & interior tenant improvement of existing offices.Details
structurel seismic work & interior tenant improvement of existing offices. | $200,000 | |
| Sep 14, 2012 | Completed final sign-off Feb 2013 | 50 Stow Lake Dr | upgrade concession counter and kitchen, renovate boat repair area into dining, storage, ada restroom. new lighting, electrical, plumbing.Details
upgrade concession counter and kitchen, renovate boat repair area into dining, storage, ada restroom. new lighting, electrical, plumbing. | $180,000 | |
| Jul 18, 2012 | Never finaled issued Apr 2013, no final | 3048 16th St | scope of work is structural and surface repair of e sidewalk. sidewalk surface has been cited by dpw. no work inside of buildingDetails
scope of work is structural and surface repair of e sidewalk. sidewalk surface has been cited by dpw. no work inside of building | $350,000 | |
| Jan 3, 2012 | Completed final sign-off Nov 2012 | 1291 05th Av | Upscale Construction Inc. | interior remodel within extg bldg envelope. 1st floor: renovate extg storage laundry and mch space. add bathroom. 2nd floor:relocate extg power room in place. kitchen remodel. 3rd floor: in place master bathroom and closet remodel.Details
interior remodel within extg bldg envelope. 1st floor: renovate extg storage laundry and mch space. add bathroom. 2nd floor:relocate extg power room in place. kitchen remodel. 3rd floor: in place master bathroom and closet remodel. | $275,000 |
| Nov 4, 2011 | Completed final sign-off Dec 2013 | 99 Mendosa Av | horizontal addition to an existing home, adding ~ 340 sqt. including basement & upper floor, alteration of (e) decks @ rear removing decorative roof @ front cosmetic work.Details
horizontal addition to an existing home, adding ~ 340 sqt. including basement & upper floor, alteration of (e) decks @ rear removing decorative roof @ front cosmetic work. | $100,000 |