Oarcon Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2015 to Jun 2026
- Last 24 months
- 5 permits filed
47 permits since 2000: 30 completed, 6 in progress, 9 never finaled, 2 expired or cancelled.
Of the 9 never-finaled permits, 3 are 3 to 5 years old, 6 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 12, 2026 | In progress issued Jun 2026 | 1249 Lombard St | new garden deck in front of the buildingDetails
new garden deck in front of the building | $80,000 |
| May 22, 2026 | In progress issued Jul 2026 | 1249 Lombard St | new roof deck on top or existing garageDetails
new roof deck on top or existing garage | $45,000 |
| Oct 23, 2025 | Completed final sign-off Mar 2026 | 1249 Lombard St | remove existing tiles in 2 bathrooms and 1 half bathroom, replace flooring, re paint unit. like for like bathroom repairs.Details
remove existing tiles in 2 bathrooms and 1 half bathroom, replace flooring, re paint unit. like for like bathroom repairs. | $37,500 |
| Oct 23, 2025 | In progress issued Oct 2025 | 1251 Lombard St | remove existing tiles in 2 full bathrooms and 1 half bathroom. replace flooring, paint unit.Details
remove existing tiles in 2 full bathrooms and 1 half bathroom. replace flooring, paint unit. | $37,500 |
| Jun 25, 2025 | In progress issued Aug 2025 | 2924 26th Av | construct 2 story addition at rear of existing house. structural interior remodel includes 2 new bathrooms. incorporated storage space at 1st fl into habitable space.Details
construct 2 story addition at rear of existing house. structural interior remodel includes 2 new bathrooms. incorporated storage space at 1st fl into habitable space. | $400,000 |
| Apr 11, 2024 | Completed final sign-off Oct 2024 | 3054 Octavia St | replace wood siding at first floor front facade and wood garage door in kindDetails
replace wood siding at first floor front facade and wood garage door in kind | $20,000 |
| Feb 15, 2024 | In progress issued May 2026 | 1 Helen St | demolish 1 story garageDetails
demolish 1 story garage | $10,000 |
| Jan 29, 2024 | Completed final sign-off Oct 2024 | 3054 Octavia St | window replacement in (e) opening @ 2nd floor, 13 double hung and 1 casemebnt and 1 french door at 3rd flr. 13 double hung and 1 casement and 1 french door. all aluminum clad wood assembles. u-factor 0.3. in kind operation. including the rear building as well in kin 10 double hung and 1 casementDetails
window replacement in (e) opening @ 2nd floor, 13 double hung and 1 casemebnt and 1 french door at 3rd flr. 13 double hung and 1 casement and 1 french door. all aluminum clad wood assembles. u-factor 0.3. in kind operation. including the rear building as well in kin 10 double hung and 1 casement | $49,000 |
| Nov 15, 2023 | Completed final sign-off Nov 2024 | 3054 Octavia St | remove rear stairs at front building and replace with decks at 2/f and 3/f. provide sliding doors to new wood decks.Details
remove rear stairs at front building and replace with decks at 2/f and 3/f. provide sliding doors to new wood decks. | $20,000 |
| Nov 15, 2023 | In progress issued May 2026 | 1 Helen St | construct a new 4 story, single family dwelling with attached garageDetails
construct a new 4 story, single family dwelling with attached garage | $1,600,000 |
| Oct 11, 2023 | Completed final sign-off Nov 2024 | 3054 Octavia St | add additional dwelling unit (adu)@ 1st floor by converting rear part of garage. provide new kitchen and bathroom at adu. new adu per state government code sec 66314.Details
add additional dwelling unit (adu)@ 1st floor by converting rear part of garage. provide new kitchen and bathroom at adu. new adu per state government code sec 66314. | $150,000 |
| Aug 17, 2023 | Completed final sign-off Jul 2024 | 2609 Larkin St | unit 2609 3rd & 4th flr remodel kitchen and 2 bathrooms; unit 2611 2nd flr remodel kitchen & bath, remove and replace lath & plaster with gyp board throughout 2nd and 3rd floors only.Details
unit 2609 3rd & 4th flr remodel kitchen and 2 bathrooms; unit 2611 2nd flr remodel kitchen & bath, remove and replace lath & plaster with gyp board throughout 2nd and 3rd floors only. | $80,000 |
| Aug 1, 2023 | Completed final sign-off Jun 2025 | 969 Hyde St | renew bp #201706018168 and obtain final inspection. soft story upgrade to multi use building. this permit for commercial portion. work to include ada upgrades.Details
renew bp #201706018168 and obtain final inspection. soft story upgrade to multi use building. this permit for commercial portion. work to include ada upgrades. | |
| Aug 1, 2023 | Never finaled issued Aug 2023, no final | 969 Hyde St | renew bp #201702240115. soft story upgrade to multi-use building. this permit for residential area.Details
renew bp #201702240115. soft story upgrade to multi-use building. this permit for residential area. | |
| Jul 21, 2023 | Completed final sign-off Oct 2024 | 3054 Octavia St | units 3054 & 3056: 1/f, provide new walls @ garage; 2/f-3/f, remodel kitchens, (2) bathrooms in each unit, remove wall between kitchen/dining rooms @ each level, remove lathing/plaster & replace throughout with gyp boardDetails
units 3054 & 3056: 1/f, provide new walls @ garage; 2/f-3/f, remodel kitchens, (2) bathrooms in each unit, remove wall between kitchen/dining rooms @ each level, remove lathing/plaster & replace throughout with gyp board | $90,000 |
| Jul 3, 2023 | Completed final sign-off Nov 2024 | 3054 Octavia St | exploratory demo - less than 20%. permits to be obtain later for repairs. expose ceilings 2x2 access holes to verify framing @ 2 units only total of 8 holesDetails
exploratory demo - less than 20%. permits to be obtain later for repairs. expose ceilings 2x2 access holes to verify framing @ 2 units only total of 8 holes | $100 |
| Oct 31, 2022 | Completed final sign-off May 2023 | 1210 Lombard St | revision to pa 20160516-7513 & 2021-0917-8630 remove (e) brick flue at roof & provide new flue enclosure fire rated enclosure through-outDetails
revision to pa 20160516-7513 & 2021-0917-8630 remove (e) brick flue at roof & provide new flue enclosure fire rated enclosure through-out | $4,000 |
| Jan 18, 2022 | Completed final sign-off Sep 2023 | 1210 Lombard St | revision to permit 202105271198. reduced deck size and changes to materials. rubble walls changed to timber. tie walls and simplified layout. (e) return wall to remain, to be modified to support fire place. updated paving to match new layout. updated planting and lighting.Details
revision to permit 202105271198. reduced deck size and changes to materials. rubble walls changed to timber. tie walls and simplified layout. (e) return wall to remain, to be modified to support fire place. updated paving to match new layout. updated planting and lighting. | |
| Dec 9, 2021 | Never finaled issued Dec 2021, no final | 2621 Larkin St | repair dryrot at 1st floor south east corner. work at front exterior.Details
repair dryrot at 1st floor south east corner. work at front exterior. | $4,000 |
| Sep 17, 2021 | Completed final sign-off Sep 2023 | 1210 Lombard St | revision to pa 201605167513. provide roof deck and operable hatch.Details
revision to pa 201605167513. provide roof deck and operable hatch. | $40,000 |
| Jul 28, 2021 | Completed final sign-off May 2023 | 1210 Lombard St | revised pa 201605167513. provide new fire rated exterior wall at east property line.Details
revised pa 201605167513. provide new fire rated exterior wall at east property line. | $10,000 |
| May 27, 2021 | Completed final sign-off Apr 2024 | 1210 Lombard St | new landscapre deck & stairs @ rear yard. deck & stairs to be less than 3' high from existing grade, new retaining wall @ east elevation, new fence & west & north elevation.Details
new landscapre deck & stairs @ rear yard. deck & stairs to be less than 3' high from existing grade, new retaining wall @ east elevation, new fence & west & north elevation. | $60,000 |
| Aug 25, 2020 | Never finaled issued Feb 2022, no final | 262 Castro St | renovation of an existing sfd. renovation includes excavation (247.4 cubic yards) and expansion of conditioned space at existing crawl space, removal of front stair and entry porch, remodel of kitchen, addition of interior stair, remodel of existing bathroom, addition of 1 bath & 1 bedroom.Details
renovation of an existing sfd. renovation includes excavation (247.4 cubic yards) and expansion of conditioned space at existing crawl space, removal of front stair and entry porch, remodel of kitchen, addition of interior stair, remodel of existing bathroom, addition of 1 bath & 1 bedroom. | $400,000 |
| Jul 14, 2020 | Completed final sign-off Feb 2022 | 1208 Lombard St | voluntary structural strengthening. add property line wall and concrete footing at east elevation. reinforce roof rafters & provide new roofing as requiredDetails
voluntary structural strengthening. add property line wall and concrete footing at east elevation. reinforce roof rafters & provide new roofing as required | $38,000 |
| Mar 16, 2020 | Completed final sign-off Mar 2022 | 1208 Lombard St | temporary shoring to accomodate excavation for new basement construction at 1210 lombard st.Details
temporary shoring to accomodate excavation for new basement construction at 1210 lombard st. | $200,000 |
| Mar 12, 2020 | Never finaled issued Mar 2020, no final | 262 Castro St | exploratory demo to see existing framing conditions and foundation elevations. at 2 location per roomDetails
exploratory demo to see existing framing conditions and foundation elevations. at 2 location per room | $100 |
| Mar 12, 2020 | Never finaled issued Mar 2020, no final | 260 Castro St | exploratory demo to see existing framing conditions and foundation elevations.Details
exploratory demo to see existing framing conditions and foundation elevations. | $100 |
| Oct 4, 2019 | Completed final sign-off Apr 2022 | 545 Francisco St | exterior remodel. ada upgrade of (e) entry. remove (e) canvas awning & replace (e) windows on francisco street & install new windows on water street. interior t.i. under seperate permit. ** maher: n/a **Details
exterior remodel. ada upgrade of (e) entry. remove (e) canvas awning & replace (e) windows on francisco street & install new windows on water street. interior t.i. under seperate permit. ** maher: n/a ** | $30,000 |
| Jun 4, 2019 | Never finaled issued Jun 2019, no final | 545 Francisco St | vacant space compliance w/ab-017demolition; of interior non-bearing partitions, remove existing finish flooring, light fixtures, and kitchen equipment, exploratory demo of wall finishes at potential bearing walls. no exterior work. tenant imrpovemens under separate permit.Details
vacant space compliance w/ab-017demolition; of interior non-bearing partitions, remove existing finish flooring, light fixtures, and kitchen equipment, exploratory demo of wall finishes at potential bearing walls. no exterior work. tenant imrpovemens under separate permit. | $5,500 |
| May 13, 2019 | Completed final sign-off Sep 2019 | 2100 Fell St | revision to construction detail for approved plans bpa #201612296245Details
revision to construction detail for approved plans bpa #201612296245 | |
| Mar 4, 2019 | Completed final sign-off Sep 2019 | 10 Glendale St | to comply with nov#201864382. repair water damage to units 203 through 309 6 units total. replace in-kind. drywall in units whre needed.Details
to comply with nov#201864382. repair water damage to units 203 through 309 6 units total. replace in-kind. drywall in units whre needed. | $50,000 |
| Dec 27, 2018 | Completed final sign-off Jun 2021 | 737 04th Av | remodel existing two story building, including a horizontal addition at the back of the building. add 2 bed and 2 bathsDetails
remodel existing two story building, including a horizontal addition at the back of the building. add 2 bed and 2 baths | $232,000 |
| Aug 15, 2018 | Completed final sign-off May 2023 | 1210 Lombard St | exploratory demo of existing drywall/lath and plaster for structural engineer in regard to seismic upgrade. approx 100 sq ft work in both unitsDetails
exploratory demo of existing drywall/lath and plaster for structural engineer in regard to seismic upgrade. approx 100 sq ft work in both units | $3,000 |
| Jul 31, 2018 | Completed final sign-off Mar 2023 | 125 Lundy's Ln | revision to pa# 2017-1004-0417 to show as built condition. replace perimeter foundation. correct second floor ceiling joists.Details
revision to pa# 2017-1004-0417 to show as built condition. replace perimeter foundation. correct second floor ceiling joists. | |
| Mar 30, 2018 | Completed final sign-off Jan 2019 | 440 04th Av | replacement of portion of an (e) gabled roof w/ a (n) flat roof and addition of (n) roof deck and guardrail.Details
replacement of portion of an (e) gabled roof w/ a (n) flat roof and addition of (n) roof deck and guardrail. | $12,000 |
| Jan 31, 2018 | Completed final sign-off May 2018 | 1200 17th Av | repair/remodel (e) bathroom & kitchen in apt 203 in kind. new cabinets, plbg fixtures. patch damaged lath & plasterDetails
repair/remodel (e) bathroom & kitchen in apt 203 in kind. new cabinets, plbg fixtures. patch damaged lath & plaster | $40,000 |
| Oct 26, 2017 | Completed final sign-off Jan 2019 | 440 04th Av | to comply with nov 201611491, item # 2 - remodel e 3rd floor bedrooms and bathrooms, relocation of existing kitchen and bathrooms. also include renovations to bedrooms and dining rooms, addition of bedroom and bathroom in basement. new dormer.Details
to comply with nov 201611491, item # 2 - remodel e 3rd floor bedrooms and bathrooms, relocation of existing kitchen and bathrooms. also include renovations to bedrooms and dining rooms, addition of bedroom and bathroom in basement. new dormer. | $230,000 |
| Oct 4, 2017 | Completed final sign-off Mar 2023 | 125 Lundy's Ln | expand (e) garage. convert (e) storage space to occupiable space. floor plan revision on 2nd fl. remove covered area of front porch. new metal railing.Details
expand (e) garage. convert (e) storage space to occupiable space. floor plan revision on 2nd fl. remove covered area of front porch. new metal railing. | $100,000 |
| Sep 27, 2017 | Expired or cancelled withdrawn Nov 2021 | 2770 Jackson St | change of use from single family to 3 units building. remodel of (e) 3 story over basement building including vertical excavation of garage below (e) basement. horizontal addition @ 3rd floor. addition of roof deck & renovation of (e) kitchen & bathrooms. 1 new bathroom. ** maher: yes, dph **Details
change of use from single family to 3 units building. remodel of (e) 3 story over basement building including vertical excavation of garage below (e) basement. horizontal addition @ 3rd floor. addition of roof deck & renovation of (e) kitchen & bathrooms. 1 new bathroom. ** maher: yes, dph ** | $372,000 |
| Aug 11, 2017 | Completed final sign-off Jan 2019 | 440 04th Av | renovation of foundation to be replaced, related to bpa#2017-0601-8165.Details
renovation of foundation to be replaced, related to bpa#2017-0601-8165. | $40,000 |
| Jul 28, 2017 | Completed final sign-off Jan 2019 | 1307 Bay St | soft story ordinance sf building code chptr 34b and fema p807Details
soft story ordinance sf building code chptr 34b and fema p807 | $75,000 |
| Jun 28, 2017 | Never finaled issued Jun 2017, no final | 2161 North Point St | remodel 2 bathrooms on 2nd floor . replace 400 sf hardwood floor @ 1st floor.Details
remodel 2 bathrooms on 2nd floor . replace 400 sf hardwood floor @ 1st floor. | $60,000 |
| Jun 1, 2017 | Expired or cancelled withdrawn Oct 2017 | 440 04th Av | to comply with nov 201611491 item no 2. remodel of (e) 2 story bld, including expansion into attic space, relocation of (e) kitchens and bathroomsDetails
to comply with nov 201611491 item no 2. remodel of (e) 2 story bld, including expansion into attic space, relocation of (e) kitchens and bathrooms | $230,000 |
| Feb 9, 2017 | Completed final sign-off Jan 2019 | 440 04th Av | exploratory demo of existing drywall; exploratory demo of concrete slab. for engineer to view openings in regard to seismic upgrade.Details
exploratory demo of existing drywall; exploratory demo of concrete slab. for engineer to view openings in regard to seismic upgrade. | $2,000 |
| May 16, 2016 | Completed final sign-off May 2024 | 1210 Lombard St | remodel all interior. excavate to add basement. rear addition, (e) lightwell reconfiguration, add (n) lightwell @ 2nd/3rd floor, add garden room @ basement level, convert a portion of (e) building @ second level to (n) garage.Details
remodel all interior. excavate to add basement. rear addition, (e) lightwell reconfiguration, add (n) lightwell @ 2nd/3rd floor, add garden room @ basement level, convert a portion of (e) building @ second level to (n) garage. | $900,000 |
| Oct 16, 2015 | Never finaled issued Dec 2019, no final | 264 Castro St | front bldg. to erect 2 stories, 1 basement, single family resident building.Details
front bldg. to erect 2 stories, 1 basement, single family resident building. | $50,000 |
| Oct 1, 2015 | Never finaled issued Dec 2019, no final | 260 Castro St | horizontal & vertical extension. front facade will also be altered. add an additional residnetial unit. (e) unit has 2 bedrooms & 1 bath. the remodel will add 1 bedroom & 2 baths. new addition unit will add 3 bedrooms & 3 bathrooms.Details
horizontal & vertical extension. front facade will also be altered. add an additional residnetial unit. (e) unit has 2 bedrooms & 1 bath. the remodel will add 1 bedroom & 2 baths. new addition unit will add 3 bedrooms & 3 bathrooms. | $50,000 |