Back to bathroom remodel contractors
Oarcon Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2015 to Jun 2026
- Last 24 months
- 5 permits filed
47 permits since 2000: 30 completed, 6 in progress, 9 never finaled, 2 expired or cancelled.
Of the 9 never-finaled permits, 3 are 3 to 5 years old, 6 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 7 completed, 2 in progress, 3 never finaled, 2 expired or cancelled. Typically 28 days from filing to permit and 331 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 23, 2025 | Completed final sign-off Mar 2026 | 1249 Lombard St | remove existing tiles in 2 bathrooms and 1 half bathroom, replace flooring, re paint unit. like for like bathroom repairs.Details
remove existing tiles in 2 bathrooms and 1 half bathroom, replace flooring, re paint unit. like for like bathroom repairs. | $37,500 |
| Oct 23, 2025 | In progress issued Oct 2025 | 1251 Lombard St | remove existing tiles in 2 full bathrooms and 1 half bathroom. replace flooring, paint unit.Details
remove existing tiles in 2 full bathrooms and 1 half bathroom. replace flooring, paint unit. | $37,500 |
| Jun 25, 2025 | In progress issued Aug 2025 | 2924 26th Av | construct 2 story addition at rear of existing house. structural interior remodel includes 2 new bathrooms. incorporated storage space at 1st fl into habitable space.Details
construct 2 story addition at rear of existing house. structural interior remodel includes 2 new bathrooms. incorporated storage space at 1st fl into habitable space. | $400,000 |
| Oct 11, 2023 | Completed final sign-off Nov 2024 | 3054 Octavia St | add additional dwelling unit (adu)@ 1st floor by converting rear part of garage. provide new kitchen and bathroom at adu. new adu per state government code sec 66314.Details
add additional dwelling unit (adu)@ 1st floor by converting rear part of garage. provide new kitchen and bathroom at adu. new adu per state government code sec 66314. | $150,000 |
| Aug 17, 2023 | Completed final sign-off Jul 2024 | 2609 Larkin St | unit 2609 3rd & 4th flr remodel kitchen and 2 bathrooms; unit 2611 2nd flr remodel kitchen & bath, remove and replace lath & plaster with gyp board throughout 2nd and 3rd floors only.Details
unit 2609 3rd & 4th flr remodel kitchen and 2 bathrooms; unit 2611 2nd flr remodel kitchen & bath, remove and replace lath & plaster with gyp board throughout 2nd and 3rd floors only. | $80,000 |
| Jul 21, 2023 | Completed final sign-off Oct 2024 | 3054 Octavia St | units 3054 & 3056: 1/f, provide new walls @ garage; 2/f-3/f, remodel kitchens, (2) bathrooms in each unit, remove wall between kitchen/dining rooms @ each level, remove lathing/plaster & replace throughout with gyp boardDetails
units 3054 & 3056: 1/f, provide new walls @ garage; 2/f-3/f, remodel kitchens, (2) bathrooms in each unit, remove wall between kitchen/dining rooms @ each level, remove lathing/plaster & replace throughout with gyp board | $90,000 |
| Aug 25, 2020 | Never finaled issued Feb 2022, no final | 262 Castro St | renovation of an existing sfd. renovation includes excavation (247.4 cubic yards) and expansion of conditioned space at existing crawl space, removal of front stair and entry porch, remodel of kitchen, addition of interior stair, remodel of existing bathroom, addition of 1 bath & 1 bedroom.Details
renovation of an existing sfd. renovation includes excavation (247.4 cubic yards) and expansion of conditioned space at existing crawl space, removal of front stair and entry porch, remodel of kitchen, addition of interior stair, remodel of existing bathroom, addition of 1 bath & 1 bedroom. | $400,000 |
| Dec 27, 2018 | Completed final sign-off Jun 2021 | 737 04th Av | remodel existing two story building, including a horizontal addition at the back of the building. add 2 bed and 2 bathsDetails
remodel existing two story building, including a horizontal addition at the back of the building. add 2 bed and 2 baths | $232,000 |
| Jan 31, 2018 | Completed final sign-off May 2018 | 1200 17th Av | repair/remodel (e) bathroom & kitchen in apt 203 in kind. new cabinets, plbg fixtures. patch damaged lath & plasterDetails
repair/remodel (e) bathroom & kitchen in apt 203 in kind. new cabinets, plbg fixtures. patch damaged lath & plaster | $40,000 |
| Oct 26, 2017 | Completed final sign-off Jan 2019 | 440 04th Av | to comply with nov 201611491, item # 2 - remodel e 3rd floor bedrooms and bathrooms, relocation of existing kitchen and bathrooms. also include renovations to bedrooms and dining rooms, addition of bedroom and bathroom in basement. new dormer.Details
to comply with nov 201611491, item # 2 - remodel e 3rd floor bedrooms and bathrooms, relocation of existing kitchen and bathrooms. also include renovations to bedrooms and dining rooms, addition of bedroom and bathroom in basement. new dormer. | $230,000 |
| Sep 27, 2017 | Expired or cancelled withdrawn Nov 2021 | 2770 Jackson St | change of use from single family to 3 units building. remodel of (e) 3 story over basement building including vertical excavation of garage below (e) basement. horizontal addition @ 3rd floor. addition of roof deck & renovation of (e) kitchen & bathrooms. 1 new bathroom. ** maher: yes, dph **Details
change of use from single family to 3 units building. remodel of (e) 3 story over basement building including vertical excavation of garage below (e) basement. horizontal addition @ 3rd floor. addition of roof deck & renovation of (e) kitchen & bathrooms. 1 new bathroom. ** maher: yes, dph ** | $372,000 |
| Jun 28, 2017 | Never finaled issued Jun 2017, no final | 2161 North Point St | remodel 2 bathrooms on 2nd floor . replace 400 sf hardwood floor @ 1st floor.Details
remodel 2 bathrooms on 2nd floor . replace 400 sf hardwood floor @ 1st floor. | $60,000 |
| Jun 1, 2017 | Expired or cancelled withdrawn Oct 2017 | 440 04th Av | to comply with nov 201611491 item no 2. remodel of (e) 2 story bld, including expansion into attic space, relocation of (e) kitchens and bathroomsDetails
to comply with nov 201611491 item no 2. remodel of (e) 2 story bld, including expansion into attic space, relocation of (e) kitchens and bathrooms | $230,000 |
| Oct 1, 2015 | Never finaled issued Dec 2019, no final | 260 Castro St | horizontal & vertical extension. front facade will also be altered. add an additional residnetial unit. (e) unit has 2 bedrooms & 1 bath. the remodel will add 1 bedroom & 2 baths. new addition unit will add 3 bedrooms & 3 bathrooms.Details
horizontal & vertical extension. front facade will also be altered. add an additional residnetial unit. (e) unit has 2 bedrooms & 1 bath. the remodel will add 1 bedroom & 2 baths. new addition unit will add 3 bedrooms & 3 bathrooms. | $50,000 |