Hulett Jones
- Listed as
- architect, authorized agent-others
- Firm
- Jones/Haydu
- Based in
- San Francisco
- On San Francisco permits
- Nov 2009 to Mar 2021
8 permits since 2000 (architect on 7 permits, authorized agent-others on 1 permit): 6 completed, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 17, 2021 | Completed final sign-off Jun 2021 | 335 Diamond St | Jeff King And Company Inc | replacement of an extg retaining wall.Details
replacement of an extg retaining wall. | |
| Jun 28, 2017 | Completed final sign-off Jun 2019 | 160 Bernard St | Barker-O'donoghue Master Bldrs | value engineering revision to app#201408133730 s1 issued 5/5/17. replacement of proposed steel moment frames with wood framed shearwalls. changes to exterior openings/locations.Details
value engineering revision to app#201408133730 s1 issued 5/5/17. replacement of proposed steel moment frames with wood framed shearwalls. changes to exterior openings/locations. | |
| Apr 16, 2014 | Completed final sign-off Jul 2014 | 101 Greenwich St | Skyline Construction | this application is limited to the interior & consists of an office t.i. of approx. 2,800 sf on the 4th fl. work consists of minor non structural demo, construction of non-structural partition forming an office space. mech, elec & plumb under separate permit. n/a to ordinance #155-13Details
this application is limited to the interior & consists of an office t.i. of approx. 2,800 sf on the 4th fl. work consists of minor non structural demo, construction of non-structural partition forming an office space. mech, elec & plumb under separate permit. n/a to ordinance #155-13 | $120,000 |
| Aug 2, 2012 | Never finaled issued Aug 2012, no final | 1599 Howard St | Northern Sun Associates | interior non structural improvements to include cabinetry, countertops, finishes, and equipment. all plumbing and elec work under separate permit. new equip added. no mech changesDetails
interior non structural improvements to include cabinetry, countertops, finishes, and equipment. all plumbing and elec work under separate permit. new equip added. no mech changes | $5,000 |
| Jun 1, 2012 | Completed final sign-off Feb 2013 | 181 Greenwich St | Skyline Construction | limited to interior: minor (non structural) demoliton. no plumbing changes proposed. mechanical & electrical to be under separate permit. work consists of non structural demo on floors, 2, 4 & 5. new multi-tenant corridor on 2nd floor. demo of non egress stair between 4 & 5th floor. infill stairDetails
limited to interior: minor (non structural) demoliton. no plumbing changes proposed. mechanical & electrical to be under separate permit. work consists of non structural demo on floors, 2, 4 & 5. new multi-tenant corridor on 2nd floor. demo of non egress stair between 4 & 5th floor. infill stair | $23,000 |
| Oct 18, 2010 | Completed final sign-off Oct 2011 | 255 West Portal Av | Angotti & Reilly Inc. | interior remodel for a new retail-includes new partitions, electrical, plumbing & lighting. mechanical repaired/repl in kind. design/build under seperate p.a. minor modifications to exterior include repair/repl finishes in kind, replace storefront in kind. project is on ground fl of (e) 1 story bldgDetails
interior remodel for a new retail-includes new partitions, electrical, plumbing & lighting. mechanical repaired/repl in kind. design/build under seperate p.a. minor modifications to exterior include repair/repl finishes in kind, replace storefront in kind. project is on ground fl of (e) 1 story bldg | $130,000 |
| Oct 13, 2010 | Completed final sign-off Nov 2010 | 101 Greenwich St | Hathaway Dinwiddie Co. | 3rd floor-per ab-017, all non structural interior walls, doors, ceiling & finishes to be demolished. the entire 3rd floor is vacant space. all work this permit is confined to vacant spaceDetails
3rd floor-per ab-017, all non structural interior walls, doors, ceiling & finishes to be demolished. the entire 3rd floor is vacant space. all work this permit is confined to vacant space | $1,000 |
| Nov 4, 2009 | Never finaled issued Nov 2009, no final | 1160 Battery St | levy's plaza. soft interior demo of one wall per ab 017 @ 1st floor. wall is non structural existing wall. work in anticipation of future tenant use.Details
levy's plaza. soft interior demo of one wall per ab 017 @ 1st floor. wall is non structural existing wall. work in anticipation of future tenant use. | $500 |