Angotti & Reilly Inc.
- Based in
- San Francisco
- On San Francisco permits
- Sep 2003 to Jan 2026
- Last 24 months
- 5 permits filed
203 permits since 2000: 139 completed, 7 in progress, 34 never finaled, 23 expired or cancelled.
Of the 34 never-finaled permits, 4 are 3 to 5 years old, 9 are 5 to 10 years old, 21 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 203.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 5, 2026 | In progress issued Jan 2026 | 2519 Mission St | revision to permit application 2020-0311-6802 s1 changes per uncovered site conditions.Details
revision to permit application 2020-0311-6802 s1 changes per uncovered site conditions. | $5,000 |
| Mar 14, 2025 | In progress issued Mar 2025 | 1998 Broadway | interior alteration to a single existing condominium unit on the 12th fl. of a 15- story residential building. all work interior, non structural. no change in use or occupancy. no increase in floor area. no exterior alterations. remodel existing kitchen counter, cabinets and appliancesDetails
interior alteration to a single existing condominium unit on the 12th fl. of a 15- story residential building. all work interior, non structural. no change in use or occupancy. no increase in floor area. no exterior alterations. remodel existing kitchen counter, cabinets and appliances | $325,000 |
| Jan 7, 2025 | Completed final sign-off Jun 2025 | 248 West Portal Av | repair dry rotted stair and deck at rear door way <50% in kind. ref code nov #202429702; add hand rails to both sides of each stair assembly., (n) 1-hr fire rated wall and foundation @ property line for stair protection.Details
repair dry rotted stair and deck at rear door way <50% in kind. ref code nov #202429702; add hand rails to both sides of each stair assembly., (n) 1-hr fire rated wall and foundation @ property line for stair protection. | $11,500 |
| Nov 6, 2024 | Completed final sign-off Apr 2025 | 1998 Broadway | unit 1204: investigative demo, remove seelcted finishes, partitions, cabinets & fixtures at direction of architect in preparation for a single residential condo remodel/ under separate permit. all demo non structural, no alteration/new work under this permit. no change in use/occupancyDetails
unit 1204: investigative demo, remove seelcted finishes, partitions, cabinets & fixtures at direction of architect in preparation for a single residential condo remodel/ under separate permit. all demo non structural, no alteration/new work under this permit. no change in use/occupancy | $1,500 |
| Oct 17, 2024 | In progress issued Oct 2024 | 1260 Clay St | ref 202407106146- per inspector minor dry rot repair less than 50%. report number 18549Details
ref 202407106146- per inspector minor dry rot repair less than 50%. report number 18549 | $1,100 |
| Jul 10, 2024 | In progress issued Jul 2024 | 1260 Clay St | inspect, repair or is necessary replace exterior windows in kind matching existing replace clay street wood siding, inkind, no changes to sizes charateristiscs all work to match existing (facing street) work is for the entire building common areaDetails
inspect, repair or is necessary replace exterior windows in kind matching existing replace clay street wood siding, inkind, no changes to sizes charateristiscs all work to match existing (facing street) work is for the entire building common area | $224,000 |
| Jul 10, 2024 | In progress issued Jul 2024 | 1230 Clay St | inspect, repair or is necessary replace exterior windows in kind matching existing replace clay street wood siding, inkind, no changes to sizes charateristiscs all work to match existing (facing street)Details
inspect, repair or is necessary replace exterior windows in kind matching existing replace clay street wood siding, inkind, no changes to sizes charateristiscs all work to match existing (facing street) | $168,000 |
| Jul 10, 2024 | In progress issued Jul 2024 | 1250 Clay St | inspect, repair or is necessary replace exterior windows in kind matching existing replace clay street wood siding, inkind, no changes to sizes charateristiscs all work to match existing (facing street)Details
inspect, repair or is necessary replace exterior windows in kind matching existing replace clay street wood siding, inkind, no changes to sizes charateristiscs all work to match existing (facing street) | $22,400 |
| Apr 27, 2023 | Never finaled issued May 2023, no final | 15 Crescent Av | rev to pa# 202103096181; to comply w/ nov 202306896 replace the (e) 2nd fl. framing with new wood fl. framing between grid lines a&bDetails
rev to pa# 202103096181; to comply w/ nov 202306896 replace the (e) 2nd fl. framing with new wood fl. framing between grid lines a&b | $3,000 |
| Apr 20, 2023 | Never finaled issued May 2023, no final | 15 Crescent Av | revision to pa 2021-0309-6181-s1 and to comply with complaint 202306896 in-kind rebuild of (e) wood framed exterior wall @ rear of (e) structure. no change to (e) wall layout or (e) building footprint. reduce the size of previously approved non-egress window from 48" to 24" window is at rear of bldgDetails
revision to pa 2021-0309-6181-s1 and to comply with complaint 202306896 in-kind rebuild of (e) wood framed exterior wall @ rear of (e) structure. no change to (e) wall layout or (e) building footprint. reduce the size of previously approved non-egress window from 48" to 24" window is at rear of bldg | $6,000 |
| Apr 10, 2023 | Completed final sign-off Oct 2024 | 15 Crescent Av | revision to bpa#202103096181-s1, repair/rebuild (e) wood framed property line wall w/new 1-hour rating assembly, repair/rebuild (e) concrete planter to match (e) planterDetails
revision to bpa#202103096181-s1, repair/rebuild (e) wood framed property line wall w/new 1-hour rating assembly, repair/rebuild (e) concrete planter to match (e) planter | $6,000 |
| Apr 5, 2023 | Completed final sign-off Oct 2023 | 2507 Sacramento St | repair or replace damaged plywood siding on west elevation of building. repaint elevationDetails
repair or replace damaged plywood siding on west elevation of building. repaint elevation | $35,000 |
| Mar 22, 2023 | Never finaled issued Apr 2023, no final | 15 Crescent Av | revision to permit 202103096181-s1. demo approx. 80sf of existing slab on grade foundation and install new concrete slab on grade and footings.Details
revision to permit 202103096181-s1. demo approx. 80sf of existing slab on grade foundation and install new concrete slab on grade and footings. | $6,000 |
| Jan 30, 2023 | Expired or cancelled cancelled Sep 2025 | 729 Bush St | minor explorations and testing to provide information for structural engineer in support of work proposed under pa# 2019-1114-7309 when received planing commison approval on 12/15/2022 no work shall commence until historic preservation architcet has connected an intial survey to be completed as anDetails
minor explorations and testing to provide information for structural engineer in support of work proposed under pa# 2019-1114-7309 when received planing commison approval on 12/15/2022 no work shall commence until historic preservation architcet has connected an intial survey to be completed as an | $500 |
| Oct 24, 2022 | Completed final sign-off Mar 2023 | 75 Laguna St | 1/f & 2/f: subdivide 1 large office into 3 offices, replace lighting in meeting room, add automatic door opener to (4) restroom doors. fire alarm/sprinklers under sep permits.Details
1/f & 2/f: subdivide 1 large office into 3 offices, replace lighting in meeting room, add automatic door opener to (4) restroom doors. fire alarm/sprinklers under sep permits. | $228,597 |
| May 12, 2022 | Completed final sign-off May 2022 | 5401 Geary Bl | revision to pa# 202110130372 for health department review only.Details
revision to pa# 202110130372 for health department review only. | |
| Dec 15, 2021 | In progress issued Nov 2025 | 850 Bryant St | modernization/upgrade of elevator #2, # new machine and microprocessor baded controllers as well as new suspensions and door operating euipment. decommissioning of elevator #4 and #% removal of hoise, compensation ropes mechanical fastening hoistway.Details
modernization/upgrade of elevator #2, # new machine and microprocessor baded controllers as well as new suspensions and door operating euipment. decommissioning of elevator #4 and #% removal of hoise, compensation ropes mechanical fastening hoistway. | $3,000,000 |
| Oct 13, 2021 | Completed final sign-off May 2022 | 5401 Geary Bl | repair dry rot floor in kitchen repair in kind. replace floor drain.Details
repair dry rot floor in kitchen repair in kind. replace floor drain. | $20,000 |
| Jul 20, 2021 | Completed final sign-off Apr 2026 | 2700 21st St | convert 1/f commercial space to 1 residential unit with 3-bedrooms & 2 baths. (e) residential unit to remain (e) detached garage structure to remain. (e) rear yard and seve as common usage outdoor space to remain. new sprinkler system sep permit nfpa-13d.Details
convert 1/f commercial space to 1 residential unit with 3-bedrooms & 2 baths. (e) residential unit to remain (e) detached garage structure to remain. (e) rear yard and seve as common usage outdoor space to remain. new sprinkler system sep permit nfpa-13d. | $300,000 |
| Apr 13, 2021 | Completed final sign-off May 2022 | 2700 21st St | demo finishes as necessary for inspection by structural engineer. replace finishes in kind.Details
demo finishes as necessary for inspection by structural engineer. replace finishes in kind. | $3,000 |
| Mar 9, 2021 | Completed final sign-off Oct 2024 | 15 Crescent Av | exterior- rebuild front entry stair, repair/restore (e) horizontal wood siding on entire structure. (n) addition & deck at rear. replace all wood windows. interior- renovate (e) kitchen & bath. repair (e) finishes & wood framing. (n) bath in (n) rear addition.Details
exterior- rebuild front entry stair, repair/restore (e) horizontal wood siding on entire structure. (n) addition & deck at rear. replace all wood windows. interior- renovate (e) kitchen & bath. repair (e) finishes & wood framing. (n) bath in (n) rear addition. | $217,351 |
| Dec 2, 2020 | Completed final sign-off Dec 2023 | 501 06th St | accessible business entrance program per ordinance 51-16. provide vertical actuation bar at exterior front door (due to 24" pull side maneuvering clearance not able to be met)Details
accessible business entrance program per ordinance 51-16. provide vertical actuation bar at exterior front door (due to 24" pull side maneuvering clearance not able to be met) | $2,000 |
| Dec 2, 2020 | Expired or cancelled cancelled Jan 2026 | 797 Bryant St | accessible business entrance program per ordinance 51-16. replace threshold & sidewalk at exterior lansing. (shared plans with pa# 202012020025, 501 06th st)Details
accessible business entrance program per ordinance 51-16. replace threshold & sidewalk at exterior lansing. (shared plans with pa# 202012020025, 501 06th st) | $5,000 |
| Oct 20, 2020 | Completed final sign-off Dec 2025 | 415 18th Av | abe upgrades ti including regreading the s/w to meet ada grades at entry, new threshholds, door hardware and verticle actuation bar as equivelent facilitation. accessible business entrance program per oridinance 51-16Details
abe upgrades ti including regreading the s/w to meet ada grades at entry, new threshholds, door hardware and verticle actuation bar as equivelent facilitation. accessible business entrance program per oridinance 51-16 | $212,000 |
| Oct 5, 2020 | Completed final sign-off Nov 2021 | 61 John F. Shelley Dr | repave and expand parking area, extend retaining wall, repave walkway, pave access path, remove and replace trees, install site furnishings, replace select benches.Details
repave and expand parking area, extend retaining wall, repave walkway, pave access path, remove and replace trees, install site furnishings, replace select benches. | $200,000 |
| Mar 11, 2020 | Never finaled issued Oct 2023, no final | 2519 Mission St | alterations of an existing bldg including change of use from retail to non-profit theater with accessory bar use.work includes exterior storefront alterations,seismic improvements & interior alterations, fully fire sprinklerd.Details
alterations of an existing bldg including change of use from retail to non-profit theater with accessory bar use.work includes exterior storefront alterations,seismic improvements & interior alterations, fully fire sprinklerd. | $750,000 |
| Jan 31, 2020 | Completed final sign-off May 2021 | 8 Octavia St | ground fl retail interior ti - new partitions, doors, lighting, restrooms, hvac & finishes. no exterior work. (e) vacant space.Details
ground fl retail interior ti - new partitions, doors, lighting, restrooms, hvac & finishes. no exterior work. (e) vacant space. | $75,000 |
| Dec 30, 2019 | Never finaled issued Jan 2020, no final | 950 Mason St | alteration to server room of an existing level of e hotel. work includes demo of partition and patch and repair. no exteior work, fire alarm and sprinkler sep permitDetails
alteration to server room of an existing level of e hotel. work includes demo of partition and patch and repair. no exteior work, fire alarm and sprinkler sep permit | $14,000 |
| Dec 17, 2019 | Completed final sign-off Jun 2021 | 1187 Franklin St | provide gender neutral restrooms at existing library,one of them accessible.accessibility upgrades@existing multi-user restrooms including:a)replac lavatory in women's+men's w/lavatory with rim no higher than 34".b)provide power door operator at men's.c)lower mirrors.d)replace toilet partitions,Details
provide gender neutral restrooms at existing library,one of them accessible.accessibility upgrades@existing multi-user restrooms including:a)replac lavatory in women's+men's w/lavatory with rim no higher than 34".b)provide power door operator at men's.c)lower mirrors.d)replace toilet partitions, | $200,000 |
| Oct 22, 2019 | Completed final sign-off Dec 2019 | 2028 Taraval St | revision to 201708215453 for field conditions, new shearwall footing at partition wall 8" long, partitioin wall connection detail to joists, revised connection detail for steel frame (residential)Details
revision to 201708215453 for field conditions, new shearwall footing at partition wall 8" long, partitioin wall connection detail to joists, revised connection detail for steel frame (residential) | $2,730 |
| Oct 22, 2019 | Completed final sign-off Dec 2019 | 2028 Taraval St | revision to soft story retrofit 201708215454 for field conditions, new shearwall footing at partitoins wall (8'long) partitions wall connection detail to joists, revised connection detail for steel frame (commercial)Details
revision to soft story retrofit 201708215454 for field conditions, new shearwall footing at partitoins wall (8'long) partitions wall connection detail to joists, revised connection detail for steel frame (commercial) | $270 |
| Oct 21, 2019 | Completed final sign-off Jan 2020 | 2121 03rd St | remove 6 property line windows at south elevation of (e) building, infill opening with new 2-hr fire rated partiton to ensure type 1-b envelope integrity n/a maherDetails
remove 6 property line windows at south elevation of (e) building, infill opening with new 2-hr fire rated partiton to ensure type 1-b envelope integrity n/a maher | $35,900 |
| Aug 9, 2019 | Completed final sign-off Sep 2019 | 799 Bryant St | repair fire seperation between prep kitchen on ground fl. add 2nd fl office with 5/8 type x gyp bd to match existing.Details
repair fire seperation between prep kitchen on ground fl. add 2nd fl office with 5/8 type x gyp bd to match existing. | $30,000 |
| Jul 30, 2019 | Completed final sign-off Apr 2021 | 2220 Chestnut St | to comply w/ accessbile business entrance programDetails
to comply w/ accessbile business entrance program | $29,000 |
| Jul 19, 2019 | Completed final sign-off Aug 2019 | 501 06th St | g/f restaurant;-repair fire separation ceiling between 2/f above pre kitchen area. replace t bar approx. 200 sf; no other work.Details
g/f restaurant;-repair fire separation ceiling between 2/f above pre kitchen area. replace t bar approx. 200 sf; no other work. | $11,000 |
| Jul 12, 2019 | Completed final sign-off Jul 2021 | 1187 Franklin St | alteration (new openings in (e) wall and holes for conduit) at 1st flr library for 2 futre accessible single user restrooms, hall and small conference room. alterations (cores) at (e) multi-user restrooms for future horn strobes.Details
alteration (new openings in (e) wall and holes for conduit) at 1st flr library for 2 futre accessible single user restrooms, hall and small conference room. alterations (cores) at (e) multi-user restrooms for future horn strobes. | $54,000 |
| Jun 14, 2019 | Completed final sign-off Sep 2019 | 2757 Polk St | unit 3: remodel unit. new copper cold water supply, new electrical service, and new kitchen cabinets. install (1) new window in kitchen. repaint apartment and refinish floors. window faces south light well.Details
unit 3: remodel unit. new copper cold water supply, new electrical service, and new kitchen cabinets. install (1) new window in kitchen. repaint apartment and refinish floors. window faces south light well. | $88,000 |
| Jun 12, 2019 | Never finaled issued Jun 2019, no final | 219 Avila St | complete stucco demo at front facade. install new stucco in kind. retain decorative medallians. replace three windows at front facade with marvin aluminum clad wood windows.rev pa201903276368Details
complete stucco demo at front facade. install new stucco in kind. retain decorative medallians. replace three windows at front facade with marvin aluminum clad wood windows.rev pa201903276368 | $17,930 |
| Jun 10, 2019 | Never finaled issued Aug 2019, no final | 1300 Columbus Av | interior renovation at (e) 1st flr restaurant determine occupant loadDetails
interior renovation at (e) 1st flr restaurant determine occupant load | $480,000 |
| May 31, 2019 | Completed final sign-off Aug 2019 | 23 Geary St | 7th fl: interior tenant alteration including demo of partition and patching and painting, electrical demo under separate permit. no mech, no new lighting. ref pa #201108172603.Details
7th fl: interior tenant alteration including demo of partition and patching and painting, electrical demo under separate permit. no mech, no new lighting. ref pa #201108172603. | $4,500 |
| May 24, 2019 | Never finaled issued Jun 2019, no final | 50 08th St | remodel interior. construction non structural wall. convert (e) hotel suite to 2 hotel guestrooms. remodel (e) guestrooms & bathrooms. revision to 201904238756Details
remodel interior. construction non structural wall. convert (e) hotel suite to 2 hotel guestrooms. remodel (e) guestrooms & bathrooms. revision to 201904238756 | $50,000 |
| Apr 23, 2019 | Completed final sign-off Sep 2021 | 50 08th St | construct glass door entry to 2 offices located on 4th fl. of an (e) tourist hotel, non structural demo of interior wall rev. to 2019 0228 4112Details
construct glass door entry to 2 offices located on 4th fl. of an (e) tourist hotel, non structural demo of interior wall rev. to 2019 0228 4112 | $50,000 |
| Mar 27, 2019 | Completed final sign-off Dec 2019 | 219 Avila St | emergency dry rot repair along stucco repairs at the front bayDetails
emergency dry rot repair along stucco repairs at the front bay | $12,000 |
| Mar 11, 2019 | Never finaled issued Mar 2019, no final | 1300 Columbus Av | gypsum board repairs at guestrooms, guest bathrooms and and corridors on floors 1-5 to abate mold (hazardous material) discovered in construction of barriel removal upgrade permit 2018-1012-3068Details
gypsum board repairs at guestrooms, guest bathrooms and and corridors on floors 1-5 to abate mold (hazardous material) discovered in construction of barriel removal upgrade permit 2018-1012-3068 | $10,000 |
| Feb 28, 2019 | Completed final sign-off Sep 2021 | 50 08th St | 4/f: demolish interior non-structural partitions, construct egress doors, infill swimming poool w/structural foam (eps). remove & replace pool tile trim, remove pool equipment install 1 tree, install irrigation system. under separate permit mep & fire safetyDetails
4/f: demolish interior non-structural partitions, construct egress doors, infill swimming poool w/structural foam (eps). remove & replace pool tile trim, remove pool equipment install 1 tree, install irrigation system. under separate permit mep & fire safety | $50,000 |
| Oct 12, 2018 | Never finaled issued Nov 2018, no final | 1300 Columbus Av | 1st-5th floors - barrier removal upgrade & current mobility guestrms and to provide additional mobility & communication guestrm to meet dispersion. scope includes new closets, floors, wall and ceiling finishes. guestrm and new finishes at lobby & mezzanine include are mep modifications to accomodateDetails
1st-5th floors - barrier removal upgrade & current mobility guestrms and to provide additional mobility & communication guestrm to meet dispersion. scope includes new closets, floors, wall and ceiling finishes. guestrm and new finishes at lobby & mezzanine include are mep modifications to accomodate | $888,000 |
| Jun 13, 2018 | Completed final sign-off Oct 2018 | 201 Folsom St | rev to pa# 201711133849; add ada closer to restroom door, reroute hvac duct, remove 2nd exit from original permit set of plansDetails
rev to pa# 201711133849; add ada closer to restroom door, reroute hvac duct, remove 2nd exit from original permit set of plans | $2,500 |
| Jan 9, 2018 | Expired or cancelled cancelled Jan 2026 | 8 Octavia St | interior front window signage, maher ord 155-13 naDetails
interior front window signage, maher ord 155-13 na | $6,000 |
| Jan 9, 2018 | Expired or cancelled cancelled Jan 2026 | 8 Octavia St | erect exterior blade sign, maher ord 155-13 naDetails
erect exterior blade sign, maher ord 155-13 na | $500 |
| Nov 13, 2017 | Completed final sign-off Oct 2018 | 201 Folsom St | interior tenant improvement for retail space, new restroom, counters, millwork and finishes. no pets, no grooming, no boardingDetails
interior tenant improvement for retail space, new restroom, counters, millwork and finishes. no pets, no grooming, no boarding | $50,000 |
| Oct 19, 2017 | Completed final sign-off Aug 2018 | 8 Octavia St | unit 307: first time ti, g/f -mnor wall framing, electrical, light and kitchenette. vacant space to be used at retail, no structural work. no change facade, no excavation, total square footage 650 sq. ft.Details
unit 307: first time ti, g/f -mnor wall framing, electrical, light and kitchenette. vacant space to be used at retail, no structural work. no change facade, no excavation, total square footage 650 sq. ft. | $30,000 |
| Aug 21, 2017 | Completed final sign-off Dec 2019 | 2030 Taraval St | commericial area: no work in commercial area:mandatory soft-story retrofit using 2016 cebc appendix 4. work limited to ground floor only. no work in commercial storefront.new moment frame to be installed outside storefront and rear ground floor.windows to be replaced to provide more sheerall length.Details
commericial area: no work in commercial area:mandatory soft-story retrofit using 2016 cebc appendix 4. work limited to ground floor only. no work in commercial storefront.new moment frame to be installed outside storefront and rear ground floor.windows to be replaced to provide more sheerall length. | $8,100 |
| Aug 21, 2017 | Completed final sign-off Dec 2019 | 2028 Taraval St | residential area only: mandatory soft-story retrofit using 2016 cebc appendix 4. work limited to ground floor only. no work in commercial storefront. new moment frame to be installed outside storefront and rear ground floor. windows to be replaced to provide more sheerall length.Details
residential area only: mandatory soft-story retrofit using 2016 cebc appendix 4. work limited to ground floor only. no work in commercial storefront. new moment frame to be installed outside storefront and rear ground floor. windows to be replaced to provide more sheerall length. | $81,900 |
| Aug 11, 2017 | Never finaled issued Sep 2017, no final | 886 Valencia St | new hvac system only, electrical under separate permit. ref core & shell pa # 201703091033.Details
new hvac system only, electrical under separate permit. ref core & shell pa # 201703091033. | $20,000 |
| May 15, 2017 | Never finaled issued May 2017, no final | 90 New Montgomery St | 2/f #250- t.i. for an office space in an existing multi story office bldg. scope includes new gypsum board walls, millwork, minor electrical, plumbing & hvac, paint & finishes. n/a ordinance #155-13Details
2/f #250- t.i. for an office space in an existing multi story office bldg. scope includes new gypsum board walls, millwork, minor electrical, plumbing & hvac, paint & finishes. n/a ordinance #155-13 | $141,000 |
| Apr 25, 2017 | Completed final sign-off Jan 2018 | 1182 Market St | suite 425: t.i. for new cabinet, replace extg sink and water heater at breakspace, new non bearing partitions, new doors, ada upgrades at entry and restrooms and extend extg ducts to new rooms,reswitch extg lighting.Details
suite 425: t.i. for new cabinet, replace extg sink and water heater at breakspace, new non bearing partitions, new doors, ada upgrades at entry and restrooms and extend extg ducts to new rooms,reswitch extg lighting. | $165,382 |
| Apr 3, 2017 | Completed final sign-off Aug 2017 | 3471 California St | 2nd flr: non structural ti - new partitions, new acoustic ceiling, new elect outlets/lighting, (e) restrooms to be made accessible, (e) mech system to remain. relocate ducts & registers under sep permit.Details
2nd flr: non structural ti - new partitions, new acoustic ceiling, new elect outlets/lighting, (e) restrooms to be made accessible, (e) mech system to remain. relocate ducts & registers under sep permit. | $210,400 |
| Mar 22, 2017 | Completed final sign-off Aug 2017 | 3473 California St | 2nd flr: non structural ti demo permit, remove partitions. acoustics ceiling, light fixtures. access features to be provided per sfbc ab-107 by subsequent tenantDetails
2nd flr: non structural ti demo permit, remove partitions. acoustics ceiling, light fixtures. access features to be provided per sfbc ab-107 by subsequent tenant | $11,000 |
| Mar 9, 2017 | Completed final sign-off Nov 2017 | 888 Valencia St | g/f -non structural core & shell by landlord. new partitions, new storefront, new restrooms & fixtures, new elect panel, no new electrical distribution or lighting in tenant spaces until future ti plans are submitted. no (e) mech system maher naDetails
g/f -non structural core & shell by landlord. new partitions, new storefront, new restrooms & fixtures, new elect panel, no new electrical distribution or lighting in tenant spaces until future ti plans are submitted. no (e) mech system maher na | $55,000 |
| Dec 5, 2016 | Completed final sign-off Jan 2017 | 228 Grant Av | revision to pa 2015-1005-9570. no change to scope of work permit revision to the addition of the lighting schedule and title 24 formsDetails
revision to pa 2015-1005-9570. no change to scope of work permit revision to the addition of the lighting schedule and title 24 forms | |
| Oct 5, 2016 | Completed final sign-off Jan 2017 | 228 Grant Av | 4th floor: add 1 ada accessible restroom. remodel kitchen/breakroom and existing restroom.Details
4th floor: add 1 ada accessible restroom. remodel kitchen/breakroom and existing restroom. | $70,000 |
| Oct 4, 2016 | Completed final sign-off Nov 2016 | 1625 Post St | title 24 application 201510079079.Details
title 24 application 201510079079. | |
| Sep 27, 2016 | Completed final sign-off Oct 2016 | 999 Green St | to obtain final inspection for work approved under pa#200503147444. all work is complete.Details
to obtain final inspection for work approved under pa#200503147444. all work is complete. | |
| Sep 19, 2016 | Never finaled issued Oct 2016, no final | 335 Powell St | basement- demo of existing locker rooms and spa treatment rooms to expand and renovate fitness center. n/a ordinance #155-13Details
basement- demo of existing locker rooms and spa treatment rooms to expand and renovate fitness center. n/a ordinance #155-13 | $395,000 |
| Jul 13, 2016 | Completed final sign-off Jun 2017 | 498 Sanchez St | current restaurant, new owner, upgrade kitchen facilitiies, add hvac unit. install 2 handsinks and prepsink per health dept code. install new led, lighting new counter, and finishes. no external changes. see drawing sheet a0.01 for clear description of work.Details
current restaurant, new owner, upgrade kitchen facilitiies, add hvac unit. install 2 handsinks and prepsink per health dept code. install new led, lighting new counter, and finishes. no external changes. see drawing sheet a0.01 for clear description of work. | $100,000 |
| May 31, 2016 | Never finaled issued May 2016, no final | 498 Sanchez St | removal of counters and seating platforms. removal of broken tiles. removal of wood flooring. sof demo only ab-017Details
removal of counters and seating platforms. removal of broken tiles. removal of wood flooring. sof demo only ab-017 | $5,000 |
| May 19, 2016 | Completed final sign-off Aug 2016 | 950 Mason St | installation of new tony bennett statue on front lawn of hotel facing mason st; maher n/aDetails
installation of new tony bennett statue on front lawn of hotel facing mason st; maher n/a | $11,000 |
| Feb 3, 2016 | Completed final sign-off May 2016 | 345 Taylor St | interior renovation of existing non-accessible hotel guest bathrooms. work includes removal & replacement of (e) plumbing fixtures & finishes in bathrooms.no change to occupancy or egress. maher n/aDetails
interior renovation of existing non-accessible hotel guest bathrooms. work includes removal & replacement of (e) plumbing fixtures & finishes in bathrooms.no change to occupancy or egress. maher n/a | $132,000 |
| Jan 13, 2016 | Completed final sign-off Mar 2016 | 1275 Minnesota St | ti including new partition and sink. electrical under separate permit, no change to lighting, no mechanical, no structural, sprinkler revisions if needed. under separate. ref pa 2015-0206-7724Details
ti including new partition and sink. electrical under separate permit, no change to lighting, no mechanical, no structural, sprinkler revisions if needed. under separate. ref pa 2015-0206-7724 | $18,000 |
| Dec 29, 2015 | Expired or cancelled cancelled Jan 2026 | 1321 Mission St | change of water heater selection,proof that fan coil does not require automatic shutoff system,no work to be done; reference to issued permit 201508315722.Details
change of water heater selection,proof that fan coil does not require automatic shutoff system,no work to be done; reference to issued permit 201508315722. | |
| Nov 24, 2015 | Completed final sign-off Feb 2016 | 450 Powell St | minor revisions to lighting and title 24 of pa 2015-0708-0973Details
minor revisions to lighting and title 24 of pa 2015-0708-0973 | |
| Nov 20, 2015 | Completed final sign-off Sep 2016 | 950 Mason St | arcade level (one floor below main lobby level) tenant improvement to convert a vacant dining room in an existing hotel to office use. work includes new ceiling, walls, finishes . lighting to be re-used & new. proposed to use same existing mechanical ducting n/a maher ordinanceDetails
arcade level (one floor below main lobby level) tenant improvement to convert a vacant dining room in an existing hotel to office use. work includes new ceiling, walls, finishes . lighting to be re-used & new. proposed to use same existing mechanical ducting n/a maher ordinance | $248,000 |
| Nov 5, 2015 | Completed final sign-off Feb 2018 | 950 Mason St | level m: new 14 guestrooms within an existing hotel work to include new partitions mechanical, electrical, new fixtures, finishes and equipment. no exterior work, fire alarm and sprinkler under separate permit; maher n/aDetails
level m: new 14 guestrooms within an existing hotel work to include new partitions mechanical, electrical, new fixtures, finishes and equipment. no exterior work, fire alarm and sprinkler under separate permit; maher n/a | $1,475,000 |
| Oct 7, 2015 | Completed final sign-off Nov 2016 | 1625 Post St | expand fitness center to replace meeting rooms, increase square footage from 395 sf to 2850 sf.Details
expand fitness center to replace meeting rooms, increase square footage from 395 sf to 2850 sf. | $180,000 |
| Aug 31, 2015 | Never finaled issued Sep 2015, no final | 1321 Mission St | tenant installation for coffee shop and wine/beer bar.Details
tenant installation for coffee shop and wine/beer bar. | $45,000 |
| Aug 24, 2015 | Completed final sign-off Oct 2015 | 530 Bush St | (e) conneting stair between 7th and 8th floors to be enclosed with new shaft wall construction, (e) mechanical duct to be rerouted around stair, electrical lights over stair to be disconnectedDetails
(e) conneting stair between 7th and 8th floors to be enclosed with new shaft wall construction, (e) mechanical duct to be rerouted around stair, electrical lights over stair to be disconnected | $10,000 |
| Jul 30, 2015 | Completed final sign-off Dec 2017 | 2961 Mission St | change of use. ti to convert grd floor retail space to cooking school and full service restaurant, work include; new entry/exits, new ada bathrooms, installation of cooking school equipment, install cooking school equipment, replacement of storefront glazing, reveal concealed storefront clerestory.Details
change of use. ti to convert grd floor retail space to cooking school and full service restaurant, work include; new entry/exits, new ada bathrooms, installation of cooking school equipment, install cooking school equipment, replacement of storefront glazing, reveal concealed storefront clerestory. | $250,000 |
| Jul 8, 2015 | Completed final sign-off Nov 2015 | 282 Bella Vista Wy | replace damaged 6"x6" wood post and replace with hss 6" x 6" x 3/8". replace damaged wood sheething and exterior stucco in kind. to correct nov 201541771. (repair auto accident damage)Details
replace damaged 6"x6" wood post and replace with hss 6" x 6" x 3/8". replace damaged wood sheething and exterior stucco in kind. to correct nov 201541771. (repair auto accident damage) | $5,500 |
| Jul 8, 2015 | Completed final sign-off Feb 2016 | 450 Powell St | electrical work for retail spaceDetails
electrical work for retail space | $8,000 |
| Jun 24, 2015 | Completed final sign-off Feb 2016 | 450 Powell St | street level: interior remodel/renovation, no mehcanical, plumbing, structural, fire sprinkler or alarm work to be done; no exterior work. mep to be completed under separate permit. maher n/aDetails
street level: interior remodel/renovation, no mehcanical, plumbing, structural, fire sprinkler or alarm work to be done; no exterior work. mep to be completed under separate permit. maher n/a | $35,000 |
| May 22, 2015 | Completed final sign-off Feb 2016 | 450 Powell St | interior demolition. no mep, fire, or structural work. no accessible work per ab-017. tenant improvement work under separate permit.Details
interior demolition. no mep, fire, or structural work. no accessible work per ab-017. tenant improvement work under separate permit. | $1,500 |
| Apr 15, 2015 | Expired or cancelled cancelled Jan 2026 | 134 Maiden Ln | new steel frame and fabric awnings ref pa # 2014 1003 8084Details
new steel frame and fabric awnings ref pa # 2014 1003 8084 | $5,000 |
| Apr 14, 2015 | Expired or cancelled withdrawn May 2015 | 555 Clay St | replace damage intermediate sheet metal cornice with new sheet metal to match exiting dimsasions profile and finish. replace 7 exterior light fixtures. n/a for maher ordinance.Details
replace damage intermediate sheet metal cornice with new sheet metal to match exiting dimsasions profile and finish. replace 7 exterior light fixtures. n/a for maher ordinance. | $17,000 |
| Mar 11, 2015 | Completed final sign-off Jul 2015 | 134 Maiden Ln | revision to 201412093412 to remove and subtitue light fixtures and revise title 24 indoor lighting sheets.Details
revision to 201412093412 to remove and subtitue light fixtures and revise title 24 indoor lighting sheets. | |
| Feb 24, 2015 | Completed final sign-off Oct 2015 | 653 Market St | install remote automatic door opener push plates on exterior of building (wireless). door push plates are for accesibility. ** maher: compliance with ordinance no# 155-13 not required **Details
install remote automatic door opener push plates on exterior of building (wireless). door push plates are for accesibility. ** maher: compliance with ordinance no# 155-13 not required ** | $500 |
| Feb 24, 2015 | Completed final sign-off Oct 2015 | 653 Market St | install new vinyl window signs. new sign, non-electric, single faced, door/window sign. maher ord n/a.Details
install new vinyl window signs. new sign, non-electric, single faced, door/window sign. maher ord n/a. | $100 |
| Feb 11, 2015 | Completed final sign-off Oct 2015 | 653 Market St | remodel retail space. includes finish changes, new non structural partitions, new mechanical work,new electrical and lighting. no change to exterior except add push buttons for automatic door opener under separate permit, new signage to be under sep. permit, sprk modifications under seperate prmt.Details
remodel retail space. includes finish changes, new non structural partitions, new mechanical work,new electrical and lighting. no change to exterior except add push buttons for automatic door opener under separate permit, new signage to be under sep. permit, sprk modifications under seperate prmt. | $110,000 |
| Jan 27, 2015 | Completed final sign-off Nov 2015 | 134 Maiden Ln | erect a non illuminated double faced projecting sign.Details
erect a non illuminated double faced projecting sign. | $1,000 |
| Jan 27, 2015 | Completed final sign-off Nov 2015 | 134 Maiden Ln | erect an illuminated single faced wall sign.Details
erect an illuminated single faced wall sign. | $1,500 |
| Dec 23, 2014 | Never finaled issued Jan 2015, no final | 950 Mason St | new fixtures finishes & equipment in 3 specialty suites bathrooms in main building and tower. non structural modifications to partition layout, relocate bathrooms, no exterior work. sprinkler modifications under seperate permit. n/a ordinance #155-13.Details
new fixtures finishes & equipment in 3 specialty suites bathrooms in main building and tower. non structural modifications to partition layout, relocate bathrooms, no exterior work. sprinkler modifications under seperate permit. n/a ordinance #155-13. | $105,000 |
| Dec 9, 2014 | Completed final sign-off Mar 2015 | 134 Maiden Ln | new interior non structural partitions, new finishes, modification to existing stair, new lighting,no change to mechanical system. no change to exterior.Details
new interior non structural partitions, new finishes, modification to existing stair, new lighting,no change to mechanical system. no change to exterior. | $285,000 |
| Nov 19, 2014 | Completed final sign-off Dec 2015 | 1034 Kearny St | seismic upgrade of an unreinforced masonry ground floor, concrete 2nd & 3rd fl, wood fl & roof joist framing. permit is not for occupancy per sfbc ab-017. accessibility features are addressed in appln #201409126125. all conditions serving the area of remodel will fully comply w/ access requirement.Details
seismic upgrade of an unreinforced masonry ground floor, concrete 2nd & 3rd fl, wood fl & roof joist framing. permit is not for occupancy per sfbc ab-017. accessibility features are addressed in appln #201409126125. all conditions serving the area of remodel will fully comply w/ access requirement. | $445,000 |
| Nov 10, 2014 | Never finaled issued Nov 2014, no final | 134 Maiden Ln | demolish portion of interior fit-out per ab-017. include a portion of stair landing, exterior eling and brick paving o pdroperty behind construction barricade. remove awning, sign fabric. new construction barricade with vinyl graphics. t.i. under separate permit.Details
demolish portion of interior fit-out per ab-017. include a portion of stair landing, exterior eling and brick paving o pdroperty behind construction barricade. remove awning, sign fabric. new construction barricade with vinyl graphics. t.i. under separate permit. | $11,500 |
| Oct 21, 2014 | Never finaled issued Oct 2014, no final | 46 Rausch St | interior remodel of (e) 2nd flr unit including new bathrm, kitchen remodle, rear bath remodel, replace window @ porch (3 total), remove rear stairs to 2nd flr & infill flr, remove int walls at rear, new closets @ (e) room, new laundry rm, new lighting, new gas furnace & water heater.Details
interior remodel of (e) 2nd flr unit including new bathrm, kitchen remodle, rear bath remodel, replace window @ porch (3 total), remove rear stairs to 2nd flr & infill flr, remove int walls at rear, new closets @ (e) room, new laundry rm, new lighting, new gas furnace & water heater. | $160,000 |
| Oct 3, 2014 | Completed final sign-off Nov 2015 | 134 Maiden Ln | replace existing non-original storefront. interior tenant improvement under separate permit. signage under separate permit.Details
replace existing non-original storefront. interior tenant improvement under separate permit. signage under separate permit. | $20,000 |
| Sep 12, 2014 | Completed final sign-off Dec 2015 | 1034 Kearny St | remodel of 2,012 sf first floor, including new enclosed + open offices, new restrooms + staff kitchenette, new skylights. electrical + mechanical systems under separate permit. permit includes change of use from vacant adult theater to non profit organization's office on ground floor.Details
remodel of 2,012 sf first floor, including new enclosed + open offices, new restrooms + staff kitchenette, new skylights. electrical + mechanical systems under separate permit. permit includes change of use from vacant adult theater to non profit organization's office on ground floor. | $105,000 |
| Aug 14, 2014 | Never finaled issued Aug 2014, no final | 33 Powell St | remodel of two existing hotel guest rooms at the 2nd floor room #220 & #221. n/a maher ordinanceDetails
remodel of two existing hotel guest rooms at the 2nd floor room #220 & #221. n/a maher ordinance | $95,000 |
| Jul 28, 2014 | Never finaled issued Dec 2014, no final | 33 Powell St | voluntary seismic upgrade from basement to underside of 2nd floor. plus plywood sheathing at floors 2-6. (n) public bathrooms in basement. ** maher: compliance with ordinance no# 155-13 not required **Details
voluntary seismic upgrade from basement to underside of 2nd floor. plus plywood sheathing at floors 2-6. (n) public bathrooms in basement. ** maher: compliance with ordinance no# 155-13 not required ** | $1,200,000 |
| May 2, 2014 | Completed final sign-off Sep 2014 | 2060 Fillmore St | replacement of existing interior concrete slab on grade with new to match exisiting in (e) location. no exterior work. no structural. building remains vacancy under ab-017Details
replacement of existing interior concrete slab on grade with new to match exisiting in (e) location. no exterior work. no structural. building remains vacancy under ab-017 | $8,000 |
| Apr 21, 2014 | Completed final sign-off Sep 2014 | 2060 Fillmore St | this is a permit application for interior improvements to a retal store. the project includes work on the ground level. new partitions, upgraded restrooms, new storefront and entrance doors, lighting and elec. work,mechanical and elec., f/a under this permitDetails
this is a permit application for interior improvements to a retal store. the project includes work on the ground level. new partitions, upgraded restrooms, new storefront and entrance doors, lighting and elec. work,mechanical and elec., f/a under this permit | $275,000 |