Block 0324, lot 002
345 Taylor St
- City’s use
- Commercial Hotel
- Built
- 1926
- Stories
- 9
- Units
- 114
- Rooms
- 115 bathrooms
- Building
- 50,403 sq ft
- Lot
- 7,219 sq ft
- Zoning
- RC4
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
40 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 3, 2018 | Never finaled issued Jan 2018, no final | 345 Taylor St | street space permit - renewal of permit #m862631Details
street space permit - renewal of permit #m862631 | ||
| Dec 5, 2017 | Never finaled issued Dec 2017, no final | 345 Taylor St | street spaceDetails
street space | ||
| Jan 20, 2017 | Never finaled issued Jan 2017, no final | 345 Taylor St | Fire & Security & Alarm Co/ F.S.A.C. | as built to app#201611102437 extg not new ansul system is connected to extg control panel. n/a maherDetails
as built to app#201611102437 extg not new ansul system is connected to extg control panel. n/a maher | |
| Nov 10, 2016 | Never finaled issued Nov 2016, no final | 345 Taylor St | revision to pa #201609157875 - includes changes to restaurant lighting layout & removal of all basement equipment & lighting scope. no change in occupancy or egress. n/a maher ordinanceDetails
revision to pa #201609157875 - includes changes to restaurant lighting layout & removal of all basement equipment & lighting scope. no change in occupancy or egress. n/a maher ordinance | ||
| Nov 10, 2016 | Completed final sign-off Feb 2017 | 345 Taylor St | Fire & Security & Alarm Co/ F.S.A.C. | t.i. 201608185450; due to remodeling in bar/rest area & kitchen, 3 new horn strobes will be installed & tie-in to (e)power supply.new ansul system will be connected to (e)control panel; maher n/aDetails
t.i. 201608185450; due to remodeling in bar/rest area & kitchen, 3 new horn strobes will be installed & tie-in to (e)power supply.new ansul system will be connected to (e)control panel; maher n/a | $2,000 |
| Nov 3, 2016 | Never finaled issued Nov 2016, no final | 345 Taylor St | Fire & Security & Alarm Co/ F.S.A.C. | 1st floor - due to int remodeling new power supply panel will be install near ex. control panel, & 5 new horn/strobes will be install for complete coverage. new devices will be tie-in to ex. notifcation circuit. ref pa #201603020975. n/a maher ordinanceDetails
1st floor - due to int remodeling new power supply panel will be install near ex. control panel, & 5 new horn/strobes will be install for complete coverage. new devices will be tie-in to ex. notifcation circuit. ref pa #201603020975. n/a maher ordinance | $5,000 |
| Oct 31, 2016 | Completed final sign-off Feb 2017 | 345 Taylor St | revision to 201608185450. scope includes adding accessible wheelchair platform lift and steps in restaurant. no change in occupancy. no exterior workDetails
revision to 201608185450. scope includes adding accessible wheelchair platform lift and steps in restaurant. no change in occupancy. no exterior work | ||
| Sep 15, 2016 | Completed final sign-off Feb 2017 | 345 Taylor St | plumbing and elec design for bar equipment, restaurant lighting, new kitchen prep space sesign. e kitchen equip to remain. ref 201608185450. no change in occupancy. n/a ordinance #155-13Details
plumbing and elec design for bar equipment, restaurant lighting, new kitchen prep space sesign. e kitchen equip to remain. ref 201608185450. no change in occupancy. n/a ordinance #155-13 | $35,000 | |
| Aug 18, 2016 | Never finaled issued Aug 2016, no final | 345 Taylor St | scope of work includes restaurant redesign with new bar, lighting, and kitchen prep area. extg kitchen equipment to remain. no change in occupancy, mep and kitchen design to be under seperate permit.Details
scope of work includes restaurant redesign with new bar, lighting, and kitchen prep area. extg kitchen equipment to remain. no change in occupancy, mep and kitchen design to be under seperate permit. | $27,000 | |
| Aug 17, 2016 | Completed final sign-off Aug 2016 | 345 Taylor St | O'connor Plumbing & Fire Protection | extend 13 (e) drops to new ceiling ht. per nfpa 13Details
extend 13 (e) drops to new ceiling ht. per nfpa 13 | $6,000 |
| Aug 2, 2016 | Never finaled issued Aug 2016, no final | 345 Taylor St | street spaceDetails
street space | ||
| Jul 29, 2016 | Never finaled issued Sep 2016, no final | 345 Taylor St | Zebra Awning Co Inc | replace (e) entrance awning with similar size but new shape with signage maher naDetails
replace (e) entrance awning with similar size but new shape with signage maher na | $3,000 |
| Jul 29, 2016 | Completed final sign-off Nov 2016 | 345 Taylor St | Zebra Awning Co Inc | painted sign on awning, single faced non-electricDetails
painted sign on awning, single faced non-electric | $600 |
| Jun 29, 2016 | Completed final sign-off Mar 2017 | 345 Taylor St | revision to pa 2016-0302-0975. scope revisions include cafe ti equipment layout. & mep work. minor modifications to lobby. no exterior work. remove acrylic sheet from beneath skylight. correct bottom step conditoin shown on base bpa noted above. compliance with maher ordinance no 155-13Details
revision to pa 2016-0302-0975. scope revisions include cafe ti equipment layout. & mep work. minor modifications to lobby. no exterior work. remove acrylic sheet from beneath skylight. correct bottom step conditoin shown on base bpa noted above. compliance with maher ordinance no 155-13 | $35,000 | |
| Jun 2, 2016 | Completed final sign-off Jun 2016 | 345 Taylor St | interior renovation of (e) non-accssible guest bathrooms. work includes removal & replacement of (e) plumbing fixtures and finishes in (7) bathroom on 5th - 9th floor. revision to permit 2016-0203-8695. no change to occupancy or egress. (e) lighting & hvac to remainDetails
interior renovation of (e) non-accssible guest bathrooms. work includes removal & replacement of (e) plumbing fixtures and finishes in (7) bathroom on 5th - 9th floor. revision to permit 2016-0203-8695. no change to occupancy or egress. (e) lighting & hvac to remain | $30,000 | |
| May 25, 2016 | Never finaled issued Jun 2016, no final | 345 Taylor St | Alpha Architectural Signs & Lighting | 2nd fl: install non-electric single faced wall sign over entranceDetails
2nd fl: install non-electric single faced wall sign over entrance | $1,000 |
| May 25, 2016 | Never finaled issued Jun 2016, no final | 345 Taylor St | Alpha Architectural Signs & Lighting | install electric double faced wall sign--reface existing projecting sign outside 2nd & 3rd floors.Details
install electric double faced wall sign--reface existing projecting sign outside 2nd & 3rd floors. | $3,000 |
| May 13, 2016 | Completed final sign-off Mar 2017 | 345 Taylor St | scope consists of new lighting layout in hotel lobby and fitness room, and upgrading the plumbing, mechanical and electrical in lobby restrooms. reference permit 201603020975; no change to occupancy or egress; maher n/aDetails
scope consists of new lighting layout in hotel lobby and fitness room, and upgrading the plumbing, mechanical and electrical in lobby restrooms. reference permit 201603020975; no change to occupancy or egress; maher n/a | $97,500 | |
| May 4, 2016 | Expired or cancelled withdrawn Jun 2016 | 345 Taylor St | upgrade electrical & plumbing fixtures in 7 ada rooms (on levels 5-9) and upgradeing 12 rooms with hearing impaired capabilities. maher naDetails
upgrade electrical & plumbing fixtures in 7 ada rooms (on levels 5-9) and upgradeing 12 rooms with hearing impaired capabilities. maher na | $14,000 | |
| Mar 30, 2016 | Completed final sign-off May 2016 | 345 Taylor St | 9th floor - revision to pa #201602038695: scope of work is interior renovation of (e) non-accessible hotel guest bathrooms work includes removal & replacement of (e) plumbing fixtures & finishes in (4) bathrooms #912, #915, 916, 917. no change to occupancy or egress.Details
9th floor - revision to pa #201602038695: scope of work is interior renovation of (e) non-accessible hotel guest bathrooms work includes removal & replacement of (e) plumbing fixtures & finishes in (4) bathrooms #912, #915, 916, 917. no change to occupancy or egress. | $15,000 | |
| Mar 29, 2016 | Expired or cancelled cancelled Jul 2016 | 345 Taylor St | the scope includes upgrading (7) existing rooms to full ada compliance (level 5-9). no exterior work or change of occupancy. mep under separate permit.Details
the scope includes upgrading (7) existing rooms to full ada compliance (level 5-9). no exterior work or change of occupancy. mep under separate permit. | $78,000 | |
| Mar 2, 2016 | Completed final sign-off Mar 2017 | 345 Taylor St | scope consists of the reconfiguration of lobby restrooms, lobby area and fitness room. no change to occupancy or egress. no exterior work. mep under separate permit. maher naDetails
scope consists of the reconfiguration of lobby restrooms, lobby area and fitness room. no change to occupancy or egress. no exterior work. mep under separate permit. maher na | $320,000 | |
| Feb 19, 2016 | Completed final sign-off Oct 2016 | 345 Taylor St | scope consists of infilling extg door, creating new interior wall opening in meeting room and painting bldg exterior. no change to occupancy or egress. no mep scope. n/a for maherDetails
scope consists of infilling extg door, creating new interior wall opening in meeting room and painting bldg exterior. no change to occupancy or egress. no mep scope. n/a for maher | $3,200 | |
| Feb 3, 2016 | Completed final sign-off May 2016 | 345 Taylor St | Angotti & Reilly Inc. | interior renovation of existing non-accessible hotel guest bathrooms. work includes removal & replacement of (e) plumbing fixtures & finishes in bathrooms.no change to occupancy or egress. maher n/aDetails
interior renovation of existing non-accessible hotel guest bathrooms. work includes removal & replacement of (e) plumbing fixtures & finishes in bathrooms.no change to occupancy or egress. maher n/a | $132,000 |
| Sep 26, 2013 | Never finaled issued Sep 2013, no final | 345 Taylor St | street spaceDetails
street space | ||
| Sep 10, 2013 | Never finaled issued Sep 2013, no final | 345 Taylor St | street spaceDetails
street space | ||
| Nov 21, 2012 | Never finaled issued Nov 2012, no final | 345 Taylor St | street space and mta parkingDetails
street space and mta parking | ||
| Sep 24, 2012 | Never finaled issued Sep 2012, no final | 345 Taylor St | street space w/metersDetails
street space w/meters | ||
| Apr 12, 2012 | Never finaled issued Apr 2012, no final | 345 Taylor St | street space permitDetails
street space permit | ||
| Apr 10, 2012 | Completed final sign-off Jan 2013 | 345 Taylor St | Pioneer Fire Inc. | expansion to existing fire sprinkelr system. remove 2 sprinklers, add 16 sprinklers (penthouse)Details
expansion to existing fire sprinkelr system. remove 2 sprinklers, add 16 sprinklers (penthouse) | $8,000 |
| Feb 21, 2012 | Never finaled issued Feb 2012, no final | 345 Taylor St | Sanders Construction Company | revision to pa #2010.07.26.7467-r2: added utility closet.Details
revision to pa #2010.07.26.7467-r2: added utility closet. | $2,000 |
| Jul 12, 2011 | Never finaled issued Jul 2011, no final | 345 Taylor St | Pioneer Fire Inc. | umbrella permit - report only, compliance with higherise sprinkler ordinance #377-93. work complete apn 2011.06.28.9047. previous work apn 2006.11.21.8266 & 2005.11.21.8678.Details
umbrella permit - report only, compliance with higherise sprinkler ordinance #377-93. work complete apn 2011.06.28.9047. previous work apn 2006.11.21.8266 & 2005.11.21.8678. | |
| Jun 28, 2011 | Completed final sign-off Jul 2011 | 345 Taylor St | Pioneer Fire Inc. | relocate 2 pendent fire sprinklers, add 8 fire sprinklersDetails
relocate 2 pendent fire sprinklers, add 8 fire sprinklers | $7,000 |
| Feb 18, 2011 | Never finaled issued Feb 2011, no final | 345 Taylor St | Diversified Fire Products | 1st floor-monitoring new range guard.Details
1st floor-monitoring new range guard. | $1,500 |
| Jan 14, 2011 | Completed final sign-off Apr 2011 | 345 Taylor St | Pyro-Comm Systems, Inc. | add 2 smoke detectors on 1st floor lobby for alternate recall and 1 in the elevator machine room for primary recall and activation of firemans hatDetails
add 2 smoke detectors on 1st floor lobby for alternate recall and 1 in the elevator machine room for primary recall and activation of firemans hat | $5,000 |
| Jan 4, 2011 | Never finaled issued Jan 2011, no final | 345 Taylor St | Tyco Integrated Security | connect ansul system installed by others in the kitchen to extg control panel for monitoring.Details
connect ansul system installed by others in the kitchen to extg control panel for monitoring. | $3,600 |
| Jul 26, 2010 | Completed final sign-off Feb 2013 | 345 Taylor St | Sanders Construction Company | demo (e) penthouse dwelling unit and replace with new penthouse dwelling unit. the unit is owner occupied.Details
demo (e) penthouse dwelling unit and replace with new penthouse dwelling unit. the unit is owner occupied. | $180,000 |
| Jun 30, 2010 | Never finaled issued Jun 2010, no final | 345 Taylor St | International Fire Equip | upgrade existing fire system to ul 300Details
upgrade existing fire system to ul 300 | $4,000 |
| Nov 21, 2006 | Completed final sign-off Nov 2006 | 345 Taylor St | Fire Protection Retrofit Specialist | as built drawing for 200611218678Details
as built drawing for 200611218678 | |
| Nov 21, 2005 | Completed final sign-off Nov 2006 | 345 Taylor St | Fire Protection Retrofit Specialist | to install fire sprinkler system to comply wtih ord#377-93-high rise ordinace existing ug + riser.Details
to install fire sprinkler system to comply wtih ord#377-93-high rise ordinace existing ug + riser. | $45,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Fire & Security & Alarm Co/ F.S.A.C. (3), Pioneer Fire Inc. (3), Alpha Architectural Signs & Lighting (2), Fire Protection Retrofit Specialist (2), Sanders Construction Company (2), Zebra Awning Co Inc (2), Angotti & Reilly Inc., Diversified Fire Products, International Fire Equip, O'connor Plumbing & Fire Protection, Pyro-Comm Systems, Inc., Tyco Integrated Security
- Architects
- Michael Stanton (10), James Benjamin, Patric Darren Mcmurtrie
- Engineers
- Mark Robison (2), Tuan & Robinson
- Authorized agent-otherss
- Michael Stanton
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.