Timothy Mathison
- Listed as
- architect, attorney, designer, engineer
- Firm
- Tuan & Robinson Structural
- Based in
- San Francisco
- On San Francisco permits
- May 2004 to Aug 2018
108 permits since 2000 (engineer on 102 permits, architect on 5 permits, attorney on 1 permit, designer on 1 permit): 69 completed, 25 never finaled, 14 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 108.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 29, 2018 | Completed final sign-off Jul 2021 | 65 Brady St | Turner Construction Co | shoring for new construction on 30 otis street. (ref pa #2016-1128-3577 s)Details
shoring for new construction on 30 otis street. (ref pa #2016-1128-3577 s) | $725,000 |
| Aug 20, 2018 | Completed final sign-off Jul 2021 | 56 12th St | Turner Construction Co | shoring for new construction on 30 otis street. ref pa# 2016/11/28/3577-s.Details
shoring for new construction on 30 otis street. ref pa# 2016/11/28/3577-s. | $515,000 |
| Aug 20, 2018 | Never finaled issued Jan 2019, no final | 77 Brady St | Turner Construction Co | shoring for new construction on 30 otis street. ref pa# 2016/11/28/3577-s.Details
shoring for new construction on 30 otis street. ref pa# 2016/11/28/3577-s. | $115,000 |
| Aug 20, 2018 | Completed final sign-off Jul 2021 | 42 Otis St | Turner Construction Co | shoring for new construction on 30 otis street. ref pa# 2016/11/28/3577-s.Details
shoring for new construction on 30 otis street. ref pa# 2016/11/28/3577-s. | $475,000 |
| Aug 20, 2018 | Completed final sign-off Jul 2021 | 30 Otis St | Turner Construction Co | shoring & tiebacks for new construction on 30 otis street. ref pa# 2016/11/28/3577-s.Details
shoring & tiebacks for new construction on 30 otis street. ref pa# 2016/11/28/3577-s. | $750,000 |
| Aug 20, 2018 | Completed final sign-off Jul 2021 | 53 Colton St | Turner Construction Co | shoring for new construction on 30 otis street. ref pa# 2016/11/28/3577-s.Details
shoring for new construction on 30 otis street. ref pa# 2016/11/28/3577-s. | $325,000 |
| Aug 20, 2018 | Completed final sign-off Jul 2021 | 30 Otis St | Turner Construction Co | grading & excavation. an excavation of about 28' to 32.5' (2 basements & the varying foundation thicknesses) along otis street & about 40' to 44.5' along chase court & colusa place is anticipated to construct the below grade improvements. ref pa# 2016/11/28/3577-s.Details
grading & excavation. an excavation of about 28' to 32.5' (2 basements & the varying foundation thicknesses) along otis street & about 40' to 44.5' along chase court & colusa place is anticipated to construct the below grade improvements. ref pa# 2016/11/28/3577-s. | $1,500,000 |
| Aug 20, 2018 | Completed final sign-off Jul 2021 | 83 Brady St | Turner Construction Co | shoring for new construction on 30 otis street. ref pa# 2016/11/28/3577-s. ** disturbance of at least 50 cu. yd. of soil. route to dph **Details
shoring for new construction on 30 otis street. ref pa# 2016/11/28/3577-s. ** disturbance of at least 50 cu. yd. of soil. route to dph ** | $125,000 |
| Jul 3, 2018 | Completed final sign-off Mar 2021 | 272 Sutter St | temp lateral support of excavation for (n) construction by tie backs, wood lagging & internal bracing of existing concrete concrete retaining wall. maher applicable.Details
temp lateral support of excavation for (n) construction by tie backs, wood lagging & internal bracing of existing concrete concrete retaining wall. maher applicable. | $500,000 | |
| Jul 3, 2018 | Completed final sign-off Feb 2021 | 246 Sutter St | Hathaway Dinwiddie Co. | underpinning of (e) 6-story brick building. maher naDetails
underpinning of (e) 6-story brick building. maher na | $18,000 |
| Jul 3, 2018 | Completed final sign-off Feb 2021 | 266 Sutter St | Hathaway Dinwiddie Co. | underpinning of (e) 5-story brick building. maher naDetails
underpinning of (e) 5-story brick building. maher na | $40,000 |
| Jun 14, 2018 | Completed final sign-off May 2022 | 160 Folsom St | Lend Lease (Us) Construction Inc | garage entry ramp - excavation shoring system comprised of wood lagging system with soldier beams in addtion to the original shoring pa #2016-0621-0505 and excavation pa #2016-0621-0515. (ref pa #2014-0625-9481 s)Details
garage entry ramp - excavation shoring system comprised of wood lagging system with soldier beams in addtion to the original shoring pa #2016-0621-0505 and excavation pa #2016-0621-0515. (ref pa #2014-0625-9481 s) | $250,000 |
| Nov 16, 2017 | Completed final sign-off Sep 2020 | 950 Gough St | Build Group Inc. | shoring excavation for (n) construction (ref appln #201510281089-s)Details
shoring excavation for (n) construction (ref appln #201510281089-s) | $382,975 |
| Nov 16, 2017 | Never finaled issued Dec 2018, no final | 951 Eddy St | Granite Excavation & Demolition Inc, Build Group Inc. | excavation underpinning for (n) construction at 950 gough (ref appln #201510281089-s)Details
excavation underpinning for (n) construction at 950 gough (ref appln #201510281089-s) | $128,750 |
| Aug 1, 2017 | Expired or cancelled cancelled Jan 2026 | 2649 Folsom St | under-pinning & tie backs for adjacent shoring systems at 2675 folsom st.Details
under-pinning & tie backs for adjacent shoring systems at 2675 folsom st. | ||
| Aug 1, 2017 | Expired or cancelled cancelled Jan 2026 | 950 Treat Av | under-pinning & tie backs for adjacent shoring systems at 2675 folsom st.Details
under-pinning & tie backs for adjacent shoring systems at 2675 folsom st. | ||
| Aug 1, 2017 | Expired or cancelled cancelled Jan 2026 | 990 Treat Av | tie backs for adjacent shoring systems at 2675 folsom st.Details
tie backs for adjacent shoring systems at 2675 folsom st. | ||
| Aug 1, 2017 | Expired or cancelled suspend Aug 2025 | 2675 Folsom St | temp lateral support of excavation for new construction by means of soldier beam, lagging & tie backs. maher ordinance no. 155-13.Details
temp lateral support of excavation for new construction by means of soldier beam, lagging & tie backs. maher ordinance no. 155-13. | $750,000 | |
| Oct 31, 2016 | Never finaled issued Jun 2019, no final | 1208 Junipero Serra Bl | Webcor Construction Lp | temp shoring & excavation for new construction by means of soldier beams, lagging & tiebacksDetails
temp shoring & excavation for new construction by means of soldier beams, lagging & tiebacks | $1,000,000 |
| Oct 14, 2016 | Completed final sign-off Jun 2020 | 1174 Folsom St | Transworld Construction | shoring along folsom and clementina st frontage to support excavation and construction of 1174-1178 folsom under pa 2015-0826-5383Details
shoring along folsom and clementina st frontage to support excavation and construction of 1174-1178 folsom under pa 2015-0826-5383 | $124,000 |
| Oct 14, 2016 | Completed final sign-off Jun 2020 | 1180 Folsom St | Transworld Construction | shoring, tie-back and foundation extension to support excavation and construction of 1174-1178 folsom pa 2015-0826-5383Details
shoring, tie-back and foundation extension to support excavation and construction of 1174-1178 folsom pa 2015-0826-5383 | $136,800 |
| Oct 14, 2016 | Completed final sign-off Jun 2020 | 1168 Folsom St | Transworld Construction | shoring and tie-back to support excavation and construction of 1174-1178 folsom st pa 2015-0825-5383. maher naDetails
shoring and tie-back to support excavation and construction of 1174-1178 folsom st pa 2015-0825-5383. maher na | $150,000 |
| Aug 18, 2016 | Never finaled issued Aug 2016, no final | 150 Van Ness Av | Clark Construction Group Ca Lp | revision to ref pa 201604185012 - soil mix toe of soldier beam change f'c to 150psi to 2500psi maher naDetails
revision to ref pa 201604185012 - soil mix toe of soldier beam change f'c to 150psi to 2500psi maher na | |
| Jun 29, 2016 | Completed final sign-off Mar 2017 | 345 Taylor St | revision to pa 2016-0302-0975. scope revisions include cafe ti equipment layout. & mep work. minor modifications to lobby. no exterior work. remove acrylic sheet from beneath skylight. correct bottom step conditoin shown on base bpa noted above. compliance with maher ordinance no 155-13Details
revision to pa 2016-0302-0975. scope revisions include cafe ti equipment layout. & mep work. minor modifications to lobby. no exterior work. remove acrylic sheet from beneath skylight. correct bottom step conditoin shown on base bpa noted above. compliance with maher ordinance no 155-13 | $35,000 | |
| Jun 21, 2016 | Completed final sign-off May 2022 | 160 Folsom St | Lend Lease (Us) Construction Inc | shoring and underpinning for new construction at 160 folsom street ref app #201406259481s (maher ordinance - extended ord. no.155-13 exempted)Details
shoring and underpinning for new construction at 160 folsom street ref app #201406259481s (maher ordinance - extended ord. no.155-13 exempted) | $3,300,000 |
| Jun 21, 2016 | Completed final sign-off May 2022 | 160 Folsom St | Lend Lease (Us) Construction Inc | excavation for foundation of new construction @ 160 folsom street. ref pa# 2014/06/25/9481-s. grade excavate (maher ordinance - extended ord. no.155-13 exempted)Details
excavation for foundation of new construction @ 160 folsom street. ref pa# 2014/06/25/9481-s. grade excavate (maher ordinance - extended ord. no.155-13 exempted) | $3,200,000 |
| Jun 21, 2016 | Never finaled issued Apr 2017, no final | 221 Main St | Lend Lease (Us) Construction Inc | tiebacks for new construction at 160 folsom street ref appln #201406259481s - maher ordinance - extended - exemptedDetails
tiebacks for new construction at 160 folsom street ref appln #201406259481s - maher ordinance - extended - exempted | $500,000 |
| Jun 2, 2016 | Never finaled issued Aug 2017, no final | 121 Wisconsin St | James E Roberts-Obayashi Corporation | shoring/tiebacks for (n) construction at 88 arkansas st. ref #201511021443-s. ** maher: disturbance of at least 50 cu.yd.of soil; route to dph **Details
shoring/tiebacks for (n) construction at 88 arkansas st. ref #201511021443-s. ** maher: disturbance of at least 50 cu.yd.of soil; route to dph ** | $140,000 |
| Jun 2, 2016 | Never finaled issued May 2017, no final | 1550 17th St | James E Roberts-Obayashi Corporation | underpinning for (n) construction @ 88 arkansas st. ref #201511021443-s. ** maher: disturbance of at least 50 cu.yd. of soil: route to dph **Details
underpinning for (n) construction @ 88 arkansas st. ref #201511021443-s. ** maher: disturbance of at least 50 cu.yd. of soil: route to dph ** | $240,000 |
| Jun 2, 2016 | Completed final sign-off Mar 2022 | 88 Arkansas St | James E Roberts-Obayashi Corporation | excavation/shoring for (n) construction. ref #201511021443-s. ** maher: disturbance of at least 50 cu.yd. of soil; route to dph **Details
excavation/shoring for (n) construction. ref #201511021443-s. ** maher: disturbance of at least 50 cu.yd. of soil; route to dph ** | $300,000 |
| Apr 18, 2016 | Completed final sign-off Jul 2017 | 150 Van Ness Av | Kulchin-Condon Assoc Inc, Clark Construction Group Ca Lp | temporary lateral support of excavation for new consturction by means of soldier beams, wood lagging, tieback & rakers. refer to new construction pa# 2014/06/13/8394. ** maher: n/a **Details
temporary lateral support of excavation for new consturction by means of soldier beams, wood lagging, tieback & rakers. refer to new construction pa# 2014/06/13/8394. ** maher: n/a ** | $750,000 |
| Apr 18, 2016 | Completed final sign-off Jul 2017 | 55 Polk St | Kulchin-Condon Assoc Inc, Clark Construction Group Ca Lp | temporary lateral support of excavation for new consturction & long-term vertical support of (e) structure by means of solant drilled beams, wood lagging, tieback. (related to new construction pa# 2014/06/13/8394 for 150 van ness avenue). ** maher: n/a **Details
temporary lateral support of excavation for new consturction & long-term vertical support of (e) structure by means of solant drilled beams, wood lagging, tieback. (related to new construction pa# 2014/06/13/8394 for 150 van ness avenue). ** maher: n/a ** | $190,000 |
| Jul 10, 2015 | Completed final sign-off Apr 2019 | 1143 Post St | Charles Pankow Builders Ltd | shoring tiebacks at 1143 post. related to pa 201507101184 and 201112090400Details
shoring tiebacks at 1143 post. related to pa 201507101184 and 201112090400 | $56,000 |
| Jul 10, 2015 | Completed final sign-off Apr 2019 | 1133 Post St | Charles Pankow Builders Ltd | shoring tie backsDetails
shoring tie backs | $88,000 |
| Jan 6, 2015 | Completed final sign-off Mar 2017 | 235 Montgomery St | Hathaway Dinwiddie Co. | 235 montgomery underpinning for 350 bush shoring; ref. pa#201410219486Details
235 montgomery underpinning for 350 bush shoring; ref. pa#201410219486 | $22,000 |
| Dec 19, 2014 | Completed final sign-off Mar 2017 | 40 Belden St | Hathaway Dinwiddie Co. | underpinning for 350 bush street pa# 2014.1021.9486.Details
underpinning for 350 bush street pa# 2014.1021.9486. | $5,000 |
| Oct 21, 2014 | Completed final sign-off May 2017 | 350 Bush St | Hathaway Dinwiddie Co. | shoring & excavation, maher ordinanceDetails
shoring & excavation, maher ordinance | $100,000 |
| Sep 19, 2014 | Completed final sign-off Mar 2017 | 433 Kearny St | Hathaway Dinwiddie Co. | underpinning is st 433 kearny for shoring & excavation for new building at 500 pine st. maher n/aDetails
underpinning is st 433 kearny for shoring & excavation for new building at 500 pine st. maher n/a | $40,000 |
| Jul 28, 2014 | Never finaled issued Jul 2014, no final | 2155 Webster St | Plant Construction Company Lp | construction of 1 tower crane foundation & 1 man lift foundation at the basement level of the existing building. (reference site permit appl #2013-11-22-2660/s) all work performed with in existing property lines.Details
construction of 1 tower crane foundation & 1 man lift foundation at the basement level of the existing building. (reference site permit appl #2013-11-22-2660/s) all work performed with in existing property lines. | $100,000 |
| Jun 19, 2014 | Completed final sign-off Jul 2018 | 717 Beach St | Fisher Development Inc | revision to appl #201405216352 - addition to underpinning scope. n/a maher ordinanceDetails
revision to appl #201405216352 - addition to underpinning scope. n/a maher ordinance | $10,000 |
| Jun 17, 2014 | Completed final sign-off Sep 2016 | 1634 Pine St | Build Group Inc. | shoring for new construction at these addresses 1634, 1650 1656,1660,1670 & 1690 pine street, block 0647 lot 007,008,009,010,011 & 011a. ref# 2013-12-18-4508/s. ** maher: compliance with ordinance no# 155-13 required; route to dph **Details
shoring for new construction at these addresses 1634, 1650 1656,1660,1670 & 1690 pine street, block 0647 lot 007,008,009,010,011 & 011a. ref# 2013-12-18-4508/s. ** maher: compliance with ordinance no# 155-13 required; route to dph ** | $200,000 |
| Jun 17, 2014 | Never finaled issued Oct 2014, no final | 1745 California St | Build Group Inc. | underpinning for new construction @ 1634 pine street. ref pa# 2013/12/18/4508 's'. ** maher: compliance with ordinance no# 155-13 required; route to dph **Details
underpinning for new construction @ 1634 pine street. ref pa# 2013/12/18/4508 's'. ** maher: compliance with ordinance no# 155-13 required; route to dph ** | $200,000 |
| Jun 17, 2014 | Expired or cancelled expired May 2021 | 1765 California St | Build Group Inc. | underpinning for new construction @ 1634 pine street. ref pa# 2013/12/18/4508 's'. ** maher: compliance with ordinance no# 155-13 required; route to dph **Details
underpinning for new construction @ 1634 pine street. ref pa# 2013/12/18/4508 's'. ** maher: compliance with ordinance no# 155-13 required; route to dph ** | $175,000 |
| Jun 17, 2014 | Never finaled issued Oct 2014, no final | 1795 California St | Build Group Inc. | underpinning for new construction @ 1634 pine street. ref pa# 2013/12/18/4508 's'. ** maher: compliance with ordinance no# 155-13 required; route to dph **Details
underpinning for new construction @ 1634 pine street. ref pa# 2013/12/18/4508 's'. ** maher: compliance with ordinance no# 155-13 required; route to dph ** | $150,000 |
| Jun 17, 2014 | Completed final sign-off Sep 2016 | 1634 Pine St | Build Group Inc. | excavation for new construction at these addresses 1634, 1650 1656,1660,1670 & 1690 pine street, block 0647 lot 007,008,009,010,011 & 011a. ref# 2013-12-18-4508/s. ** maher:compliance with ordinance no# 155-13 required. route to dph **Details
excavation for new construction at these addresses 1634, 1650 1656,1660,1670 & 1690 pine street, block 0647 lot 007,008,009,010,011 & 011a. ref# 2013-12-18-4508/s. ** maher:compliance with ordinance no# 155-13 required. route to dph ** | $900,000 |
| Jun 16, 2014 | Completed final sign-off Aug 2017 | 2198 Market St | James E Roberts-Obayashi Corporation | temporary lateral support for adjacent new construction by means of soldier beam with tiebacks & wood lagging. shoring within muni / bart zone of influence along market street. ** maher: compliance with ordinance no# 155-13 applied. route to health **Details
temporary lateral support for adjacent new construction by means of soldier beam with tiebacks & wood lagging. shoring within muni / bart zone of influence along market street. ** maher: compliance with ordinance no# 155-13 applied. route to health ** | $250,000 |
| Jun 16, 2014 | Completed final sign-off Aug 2017 | 151 Sanchez St | James E Roberts-Obayashi Corporation | temporary lateral support for adjacent new construction by hand dug concrete piers, soldier beams, tiebacks & wood lagging. long term vertical support of (e) structure. shoring for 2198 market st under separate permit. ** maher: compliance with ordinance with no# 155-13 not required **Details
temporary lateral support for adjacent new construction by hand dug concrete piers, soldier beams, tiebacks & wood lagging. long term vertical support of (e) structure. shoring for 2198 market st under separate permit. ** maher: compliance with ordinance with no# 155-13 not required ** | $50,000 |
| Jun 13, 2014 | Completed final sign-off Sep 2015 | 333 Brannan St | Swinerton Builders | short term shoring of temporary power boxes to complete excavation & vertical construction. n/a ordinance #155-13.Details
short term shoring of temporary power boxes to complete excavation & vertical construction. n/a ordinance #155-13. | $14,000 |
| May 1, 2014 | Completed final sign-off Feb 2016 | 270 Brannan St | Silverado Contractors Inc | shoring cantilever soldier beams along brannan street frontage at site. accomodate for construction at 270 brannon app#201312174402. n/a for the maher ordinance #155-13Details
shoring cantilever soldier beams along brannan street frontage at site. accomodate for construction at 270 brannon app#201312174402. n/a for the maher ordinance #155-13 | $70,000 |
| Apr 23, 2014 | Completed final sign-off May 2019 | 555 Fulton St | Fulton Street Construction Inc | provide shoring per plans - ref to app #201501036062 for new bldg - compliance with ordinance no.155-13 required.Details
provide shoring per plans - ref to app #201501036062 for new bldg - compliance with ordinance no.155-13 required. | $1,700,000 |
| Apr 23, 2014 | Completed final sign-off Feb 2016 | 270 Brannan St | Charles Pankow Builders Ltd | installation of micropiles for new building construction. will comply with the maher ordinanace #155-13.Details
installation of micropiles for new building construction. will comply with the maher ordinanace #155-13. | $115,000 |
| Mar 18, 2014 | Completed final sign-off Oct 2015 | 355 Brannan St | Swinerton Builders | shoring and uderpinning due to new construction of adjacent bldg 345 brannan st. ref app#200810275193.Details
shoring and uderpinning due to new construction of adjacent bldg 345 brannan st. ref app#200810275193. | $80,000 |
| Mar 17, 2014 | Completed final sign-off Nov 2014 | 2715 Hyde St | Fisher Development Inc | underpinning to correct foundation along adjacent property where existing soil conditions have presented a hazard. scope of work to address a 26' long area. compliance with ordinance no. 155-13 not required. excation less than 50 cu. yd.Details
underpinning to correct foundation along adjacent property where existing soil conditions have presented a hazard. scope of work to address a 26' long area. compliance with ordinance no. 155-13 not required. excation less than 50 cu. yd. | $60,000 |
| Mar 11, 2014 | Completed final sign-off Oct 2015 | 7 Clarence Pl | Swinerton Builders | shoring & underpinning, refer to pa #201403110434. (pa #2008.1027.5193 for new construction of adjacent building 345 brannan st)Details
shoring & underpinning, refer to pa #201403110434. (pa #2008.1027.5193 for new construction of adjacent building 345 brannan st) | $40,000 |
| Mar 11, 2014 | Completed final sign-off Oct 2015 | 345 Brannan St | Swinerton Builders | excavation shoring, refer to pa #2008.1027.5193 new construction. (maher ordinance)Details
excavation shoring, refer to pa #2008.1027.5193 new construction. (maher ordinance) | $80,000 |
| Feb 18, 2014 | Completed final sign-off Feb 2016 | 150 Hayes St | Build Group Inc. | shoring and underpinning work on 150 hayes adjacent to 1019 polk street (refer to new construction pa# 201307051190 at 101 polk street).(compliance with maher ordinance no,.155-13 not required.)Details
shoring and underpinning work on 150 hayes adjacent to 1019 polk street (refer to new construction pa# 201307051190 at 101 polk street).(compliance with maher ordinance no,.155-13 not required.) | $20,000 |
| Feb 11, 2014 | Never finaled issued Apr 2014, no final | 425 Folsom St | Herrero Builders Incorporated | temporary shoring & excavation only. cantilever soldier beams wood lagging. no shoring work on adjacent properties.Details
temporary shoring & excavation only. cantilever soldier beams wood lagging. no shoring work on adjacent properties. | $500,000 |
| Nov 4, 2013 | Completed final sign-off Mar 2016 | 1415 Mission St | revision to 201304224104Details
revision to 201304224104 | ||
| Nov 4, 2013 | Never finaled issued Jan 2014, no final | 120 10th St | revision to 201304225111. relocate soldier bears onto 1415 mission. tiebacks with internal bracingDetails
revision to 201304225111. relocate soldier bears onto 1415 mission. tiebacks with internal bracing | ||
| Apr 22, 2013 | Never finaled issued Aug 2013, no final | 1453 Mission St | Build Group Inc. | tie backs as a result of adjacent new construction at 1415 mission street project. (ref pa#200810315586-s).Details
tie backs as a result of adjacent new construction at 1415 mission street project. (ref pa#200810315586-s). | $40,000 |
| Apr 22, 2013 | Completed final sign-off Mar 2016 | 1415 Mission St | Build Group Inc. | soil cement shoring as a result of the new construction on 1415 mission st project. (reference pa#200810315586s.Details
soil cement shoring as a result of the new construction on 1415 mission st project. (reference pa#200810315586s. | $400,000 |
| Apr 22, 2013 | Completed final sign-off Mar 2016 | 1415 Mission St | Build Group Inc. | excavation shoring for new construction on the same address-1415 mission st. (ref pa#200810315586s)Details
excavation shoring for new construction on the same address-1415 mission st. (ref pa#200810315586s) | $250,000 |
| Apr 22, 2013 | Never finaled issued Aug 2013, no final | 120 10th St | Build Group Inc. | underpinning & tie backss as a result of adjacent new construction at 1415 mission st project. (ref pa#200810315586s)Details
underpinning & tie backss as a result of adjacent new construction at 1415 mission st project. (ref pa#200810315586s) | $110,000 |
| Mar 19, 2013 | Completed final sign-off Nov 2014 | 2558 Mission St | Build Group Inc. | ref pa#2013-01-16-8124s. excavation and shoring for new construction at 2558 mission stDetails
ref pa#2013-01-16-8124s. excavation and shoring for new construction at 2558 mission st | $275,000 |
| Mar 19, 2013 | Completed final sign-off Nov 2014 | 2554 Mission St | Build Group Inc. | excavation underpinning for new construction at 2558 mission st. reference pa#2013/01/16/8124sDetails
excavation underpinning for new construction at 2558 mission st. reference pa#2013/01/16/8124s | $253,000 |
| Mar 19, 2013 | Completed final sign-off Nov 2014 | 2590 Mission St | Build Group Inc. | excavation underpinning for new construction at 2558 mission street (ref. app #201301168124s)Details
excavation underpinning for new construction at 2558 mission street (ref. app #201301168124s) | $151,000 |
| Mar 19, 2013 | Completed final sign-off Nov 2014 | 2558 Mission St | Build Group Inc. | shoring & tiebacks for new construction at 2558 mission st ref app #201301168124sDetails
shoring & tiebacks for new construction at 2558 mission st ref app #201301168124s | $65,000 |
| Oct 30, 2012 | Completed final sign-off Sep 2014 | 2121 03rd St | Build Group Inc. | construct foundation for tower crane for new building pa# 2011/11/17/9162.Details
construct foundation for tower crane for new building pa# 2011/11/17/9162. | $20,000 |
| Sep 12, 2012 | Never finaled issued Nov 2012, no final | 2161 03rd St | Build Group Inc. | temporary lateral support during adjacent new construction by underpinning piers and wood lagging. long-term verticl support of adjacent building footings by underpinning piers. (ref pa# 2011-1117-9162). no shoring or underpinning work on adjacent properties.Details
temporary lateral support during adjacent new construction by underpinning piers and wood lagging. long-term verticl support of adjacent building footings by underpinning piers. (ref pa# 2011-1117-9162). no shoring or underpinning work on adjacent properties. | |
| Sep 12, 2012 | Never finaled issued Nov 2012, no final | 500 19th St | Build Group Inc. | temporary slopes for access to adjacent new construction. (ref. pa #2011-1117-9162).Details
temporary slopes for access to adjacent new construction. (ref. pa #2011-1117-9162). | |
| Sep 12, 2012 | Never finaled issued Nov 2012, no final | 2121 03rd St | Build Group Inc. | temporary lateral support during new construction by soldier beams cantilevered & restrained by tiebacks, with wood lagging. encroachment of tiebacks from excavation shoring into city streets only. (ref. pa#2011-1117-9162)Details
temporary lateral support during new construction by soldier beams cantilevered & restrained by tiebacks, with wood lagging. encroachment of tiebacks from excavation shoring into city streets only. (ref. pa#2011-1117-9162) | |
| Apr 17, 2012 | Completed final sign-off Mar 2014 | 505 Howard St | Malcolm Drilling Co Inc | excavation & shoring for new building approved under pa# 2006/10/31/6514.Details
excavation & shoring for new building approved under pa# 2006/10/31/6514. | $311,000 |
| Mar 5, 2012 | Completed final sign-off Feb 2015 | 1945 Hyde St | Kevin Webb Construction Inc, Ace Drilling & Excavation | excavation and shoring for new car pit. no work on adjacent properties or public right of way. ref 201005172557Details
excavation and shoring for new car pit. no work on adjacent properties or public right of way. ref 201005172557 | $39,000 |
| Jan 17, 2012 | Expired or cancelled withdrawn Apr 2012 | 1945 Hyde St | Kevin Webb Construction Inc | underpinning inside building and temporary shoring at car pitDetails
underpinning inside building and temporary shoring at car pit | $30,000 |
| Nov 8, 2011 | Never finaled issued Jan 2012, no final | 474 Natoma St | Nibbi Bros Assoc Inc. | shoring as required for new construction approved under pa# 2008/10/06/3512-s. underpinning under separage permits. excavation shoring, soldier beams & tiebacks, braces & wood lagging.Details
shoring as required for new construction approved under pa# 2008/10/06/3512-s. underpinning under separage permits. excavation shoring, soldier beams & tiebacks, braces & wood lagging. | $65,000 |
| Nov 4, 2011 | Completed final sign-off Aug 2013 | 1075 Le Conte Av | Cahill Contractors Inc | install shoring system with tiebacks along 3rd street & le conte avenue. ref pa# 2010/07/19/6949.Details
install shoring system with tiebacks along 3rd street & le conte avenue. ref pa# 2010/07/19/6949. | $160,000 |
| Nov 4, 2011 | Completed final sign-off Aug 2013 | 6666 03rd St | Cahill Contractors Inc | install shoring system with tiebacks and underpinning to coordinate with 1075 le conte avenue construction. ref pa# 2010/07/19/6949.Details
install shoring system with tiebacks and underpinning to coordinate with 1075 le conte avenue construction. ref pa# 2010/07/19/6949. | $50,000 |
| Nov 4, 2011 | Completed final sign-off Aug 2013 | 1885 Bay Shore Bl | Cahill Contractors Inc | install shoring system with tiebacks and underpinning to coordinate with 1075 le conte avenue construction.Details
install shoring system with tiebacks and underpinning to coordinate with 1075 le conte avenue construction. | $25,000 |
| Aug 5, 2011 | Never finaled issued Nov 2011, no final | 1455 Market St | Swinerton Builders | provide soldier beams and soil mix panel or drilled shafts. note: this permit is only for installation of the vertical soldier beams partially on 1455 market st. property. excavation and shoring including internal bracing of soldier beams is under separate permit.Details
provide soldier beams and soil mix panel or drilled shafts. note: this permit is only for installation of the vertical soldier beams partially on 1455 market st. property. excavation and shoring including internal bracing of soldier beams is under separate permit. | $500,000 |
| Aug 5, 2011 | Never finaled issued Nov 2011, no final | 1411 Market St | Swinerton Builders | with reference to approved site permit p/a#200903234623-s. provide shoring . market st: tieback soldier beam & wood lagging, 10th st: tieback soldier beam with wood laggings soil mix cut off; jeesie st: cantilever soldier piles & wood lagging, west elevation: cantilever & internally braced soldierDetails
with reference to approved site permit p/a#200903234623-s. provide shoring . market st: tieback soldier beam & wood lagging, 10th st: tieback soldier beam with wood laggings soil mix cut off; jeesie st: cantilever soldier piles & wood lagging, west elevation: cantilever & internally braced soldier | $1,000,000 |
| Oct 7, 2010 | Completed final sign-off May 2012 | 1345 Turk St | Cahill Contractors Inc | temporary shoring up to 15' deep along turk st & west side of property. temporary shoring at pg&e vault in turk st sidewalk is deferred. orig. app#2008-01-23-3098, ref site permit # 2009-11-13-1168Details
temporary shoring up to 15' deep along turk st & west side of property. temporary shoring at pg&e vault in turk st sidewalk is deferred. orig. app#2008-01-23-3098, ref site permit # 2009-11-13-1168 | $90,000 |
| Dec 2, 2009 | Completed final sign-off Apr 2011 | 1737 Jackson St | underpinning as a result of adjacent new construction @ 1840 washington st pa# 2006.04.14.9027. underpinning with tieback and wood lagging. exactly same as expired pa#2007-1219-0883.Details
underpinning as a result of adjacent new construction @ 1840 washington st pa# 2006.04.14.9027. underpinning with tieback and wood lagging. exactly same as expired pa#2007-1219-0883. | $65,312 | |
| Dec 18, 2008 | Completed final sign-off Feb 2011 | 2139 Ofarrell St | Johnstone Moyer Inc | excavation, shoring design.Details
excavation, shoring design. | $100,000 |
| Nov 19, 2008 | Completed final sign-off Feb 2009 | 1763 Golden Gate Av | James E Roberts-Obayashi Corporation | ref. existing permit appl.#2008/0801/8220. new underpining at 1763 golden gate ave. for new construction at 850 broderick st.Details
ref. existing permit appl.#2008/0801/8220. new underpining at 1763 golden gate ave. for new construction at 850 broderick st. | $5,000 |
| Nov 19, 2008 | Completed final sign-off Feb 2009 | 850 Broderick St | James E Roberts-Obayashi Corporation | supplemental temporary shoring. reference existing permit#2008/0717/6958Details
supplemental temporary shoring. reference existing permit#2008/0717/6958 | $5,000 |
| Jun 27, 2008 | Expired or cancelled cancelled Feb 2012 | 433 Kearny St | underpinning of existing building for new construction on adjacent property (500 pine, 200011024683) no work in public right of way.Details
underpinning of existing building for new construction on adjacent property (500 pine, 200011024683) no work in public right of way. | $195,000 | |
| Mar 12, 2008 | Completed final sign-off Jan 2009 | 22 Minna St | underpinning and tiebacks as required by adjacent new construction. ref. pa# 2005/08/04/9463/sDetails
underpinning and tiebacks as required by adjacent new construction. ref. pa# 2005/08/04/9463/s | $50,000 | |
| Mar 12, 2008 | Completed final sign-off Jan 2009 | 545 Mission St | tiebacks only, extension under shaw alley and continuing under 545 mission as required for new construction. ref pa# 2005/08/04/9463/sDetails
tiebacks only, extension under shaw alley and continuing under 545 mission as required for new construction. ref pa# 2005/08/04/9463/s | $50,000 | |
| Mar 12, 2008 | Completed final sign-off Jan 2009 | 535 Mission St | Swinerton Builders | tieback soldier pile and wood lagging shoring with intermediate jet- grout or ground improvement between soldier piles during lagging placement. work proposed for preparation for site permit 2005/08/04/9463/sDetails
tieback soldier pile and wood lagging shoring with intermediate jet- grout or ground improvement between soldier piles during lagging placement. work proposed for preparation for site permit 2005/08/04/9463/s | $750,000 |
| Dec 28, 2007 | Never finaled issued Aug 2008, no final | 1455 Market St | at west elevation south end: soldier piles and wood lagging with new tiebacks and anchorage to existing shoring tierods.Details
at west elevation south end: soldier piles and wood lagging with new tiebacks and anchorage to existing shoring tierods. | $190,000 | |
| Dec 7, 2007 | Never finaled issued Jul 2008, no final | 1411 Market St | provide shoring per plan, approx 37 ft high soil-mix cut off soldier pile shoring wall on market street sidewalk. soil mix cut off soldier pile shoring in city sidewalk at north end with corner braces to reduce dewatering impact at market street, ref pa# 200707207084sDetails
provide shoring per plan, approx 37 ft high soil-mix cut off soldier pile shoring wall on market street sidewalk. soil mix cut off soldier pile shoring in city sidewalk at north end with corner braces to reduce dewatering impact at market street, ref pa# 200707207084s | $500,000 | |
| Sep 5, 2007 | Completed final sign-off Feb 2011 | 7 Almaden Ct | shoring & underpinning for new construction on adjacent property (ref# 200702224724s)Details
shoring & underpinning for new construction on adjacent property (ref# 200702224724s) | $11,000 | |
| Jul 23, 2007 | Completed final sign-off May 2009 | 1 Hawthorne St | Webcor Construction Lp | grading. excavation of entire property down to an elevation of 46' below street level/sidewalk shoring & underpinning under seperate permits.site permit#200509082369 under review.Details
grading. excavation of entire property down to an elevation of 46' below street level/sidewalk shoring & underpinning under seperate permits.site permit#200509082369 under review. | $150,000 |
| Jun 22, 2007 | Completed final sign-off Apr 2008 | 66 09th St | Cahill Contractors Inc | temporary shoring; reference pa#200606144063sDetails
temporary shoring; reference pa#200606144063s | $130,000 |
| Jun 19, 2007 | Completed final sign-off Apr 2008 | 1390 Mission St | Cahill Contractors Inc | installation of temporary shoring 6'-0" deep along mission street, 10th street and jessie street. new building site permit #200606144078.Details
installation of temporary shoring 6'-0" deep along mission street, 10th street and jessie street. new building site permit #200606144078. | $200,000 |
| Aug 24, 2006 | Never finaled issued Jan 2007, no final | 138 Hyde St | underpinning and shoringDetails
underpinning and shoring | $30,000 | |
| Jul 31, 2006 | Expired or cancelled expired Feb 2011 | 125 Hayes St | excavation, shoring, under pinning & tie back as required by adjacent new construction at 1 polk st. appl#200509223614Details
excavation, shoring, under pinning & tie back as required by adjacent new construction at 1 polk st. appl#200509223614 | $4,500 | |
| Jul 31, 2006 | Expired or cancelled expired Jan 2012 | 131 Hayes St | Swinerton Builders | excavation, shoring, underpinning & tie back as required by adjacent new construction at 1 polk st. appl#200509223614Details
excavation, shoring, underpinning & tie back as required by adjacent new construction at 1 polk st. appl#200509223614 | $4,500 |
| Jun 22, 2006 | Completed final sign-off Oct 2008 | 1325 Clement St | C. Overaa & Co | excavation & shoring & underpinning as required by adjacent new construction at 301 - 14th avenue, pa# 2005/11/29/9071.Details
excavation & shoring & underpinning as required by adjacent new construction at 301 - 14th avenue, pa# 2005/11/29/9071. | $30,000 |
| Mar 6, 2006 | Expired or cancelled withdrawn Jun 2006 | 22 Minna St | underpinning as a result of adjacent new construction pa# 2005/08/04/9463 's'.Details
underpinning as a result of adjacent new construction pa# 2005/08/04/9463 's'. | $200,000 |