Jamal Zumot
- Listed as
- authorized agent-others, engineer
- Firm
- K12 Architects, Inc
- Based in
- Sacramento
- On San Francisco permits
- May 2006 to Jan 2014
11 permits since 2000 (authorized agent-others on 10 permits, engineer on 1 permit): 9 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 23, 2014 | Completed final sign-off Dec 2015 | 367 Bay Shore Bl | Roebuck Construction | to erect 1 story, restroom for car wash / commercial building. ** maher: compliance with ordinance no. 155-13 not required. **Details
to erect 1 story, restroom for car wash / commercial building. ** maher: compliance with ordinance no. 155-13 not required. ** | $25,000 |
| Sep 12, 2012 | Never finaled issued Nov 2012, no final | 500 19th St | Build Group Inc. | temporary slopes for access to adjacent new construction. (ref. pa #2011-1117-9162).Details
temporary slopes for access to adjacent new construction. (ref. pa #2011-1117-9162). | |
| Aug 8, 2012 | Completed final sign-off Aug 2013 | 1604 Jackson St | Cahill Contractors Inc, Granite Excavation & Demolition Inc | shoring a protion of the south side of the proposed 1645 pacific ave. project site using a permanent tiedback underpinning system. the tieback will be double corrosion protected.Details
shoring a protion of the south side of the proposed 1645 pacific ave. project site using a permanent tiedback underpinning system. the tieback will be double corrosion protected. | $4,000 |
| Aug 1, 2012 | Completed final sign-off Oct 2014 | 1800 Van Ness Av | Build Group Inc. | construct foundation for tower crane for new building pa# 2012/02/21/4559.Details
construct foundation for tower crane for new building pa# 2012/02/21/4559. | $20,000 |
| Feb 21, 2012 | Completed final sign-off Oct 2012 | 1800 Van Ness Av | Build Group Inc. | demolish 2 stories, type 5, retail/office building.Details
demolish 2 stories, type 5, retail/office building. | $156,108 |
| Feb 21, 2012 | Completed final sign-off Nov 2014 | 1800 Van Ness Av | Build Group Inc. | erect 8 stories, 98 dwelling units, 2 basements, type 1 new building.Details
erect 8 stories, 98 dwelling units, 2 basements, type 1 new building. | $33,972,170 |
| Dec 16, 2011 | Completed final sign-off Oct 2014 | 427 31st Av | erect 4 stories, 2 dwelling units, type 5-b building.Details
erect 4 stories, 2 dwelling units, type 5-b building. | $450,000 | |
| Nov 18, 2011 | Expired or cancelled cancelled Feb 2012 | 77 Van Ness Av | for record purposes only: change handwritte plan check comment on issued permit 2011-09-19-5011 to read "modular walls are not permitted". remove handwritten plan check comment indicating "modular cabinets are not permitted."Details
for record purposes only: change handwritte plan check comment on issued permit 2011-09-19-5011 to read "modular walls are not permitted". remove handwritten plan check comment indicating "modular cabinets are not permitted." | ||
| Oct 14, 2011 | Completed final sign-off Nov 2014 | 1645 Pacific Av | Cahill Const Service Inc | to erect 6 story 38 unit residential/commercial/condominium building.Details
to erect 6 story 38 unit residential/commercial/condominium building. | $13,800,000 |
| Jun 9, 2011 | Completed final sign-off Nov 2012 | 2754 Vallejo St | 1 story addition at rear on grade(bsmt level only).fill in recessed exterior stair at rear of bldg from 1/fl to grade.new bay window at 2/fl living room. new windows at side of the bldg.the new side windows are not visible from front.Details
1 story addition at rear on grade(bsmt level only).fill in recessed exterior stair at rear of bldg from 1/fl to grade.new bay window at 2/fl living room. new windows at side of the bldg.the new side windows are not visible from front. | $150,000 | |
| May 1, 2006 | Completed final sign-off Nov 2013 | 3500 19th St | to erect 5 story, 17 units residential, retail, and garage building.Details
to erect 5 story, 17 units residential, retail, and garage building. | $2,150,000 |