Cahill Const Service Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Dec 2019
- Last 24 months
- 0 permits filed
276 permits since 2000: 212 completed, 22 never finaled, 42 expired or cancelled.
Of the 22 never-finaled permits, 3 are 5 to 10 years old, 19 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 276.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 23, 2019 | Completed final sign-off Dec 2021 | 2601 Mariposa St | exterior signage including iluminated kqed logo on metal panelDetails
exterior signage including iluminated kqed logo on metal panel | $10,000 |
| Dec 23, 2019 | Completed final sign-off Dec 2021 | 2601 Mariposa St | exterior signage including kqed logo on curtain wallDetails
exterior signage including kqed logo on curtain wall | $4,000 |
| Dec 23, 2019 | Completed final sign-off Dec 2021 | 2601 Mariposa St | exterior signage including building donor nameDetails
exterior signage including building donor name | $15,000 |
| Jun 7, 2019 | Completed final sign-off Sep 2019 | 150 Oak St | non-structural ti work, no change in use, interior remodel w/new non-structural partition wall & finishes, work shall be limited to the 3rd & 4th fl only. no exterior work.Details
non-structural ti work, no change in use, interior remodel w/new non-structural partition wall & finishes, work shall be limited to the 3rd & 4th fl only. no exterior work. | $230,000 |
| Jan 28, 2019 | Completed final sign-off Apr 2023 | 410 China Basin St | 100% affordable housing, to erect 4 stories, no basement, type v, 141 residential units with office & assembly building. (r-2,b,a-3)Details
100% affordable housing, to erect 4 stories, no basement, type v, 141 residential units with office & assembly building. (r-2,b,a-3) | $42,000,000 |
| Jul 3, 2018 | Completed final sign-off Jun 2024 | 2340 San Jose Av | per ord# 17-02, parallel process, to erect 9 stories, no basement, type i-b, 131 units residential affordable housing project. ** maher: disturbance of at least 50 cu.yd. of soil, to dph **Details
per ord# 17-02, parallel process, to erect 9 stories, no basement, type i-b, 131 units residential affordable housing project. ** maher: disturbance of at least 50 cu.yd. of soil, to dph ** | $55,000,000 |
| Feb 2, 2018 | Never finaled issued Apr 2018, no final | 2800 Turk Bl | replacement of 205 windows to west, tower, chapel wings & main. phase ii. max. u factor not to exceed 0.32. like for likeDetails
replacement of 205 windows to west, tower, chapel wings & main. phase ii. max. u factor not to exceed 0.32. like for like | $722,000 |
| Jan 12, 2018 | Completed final sign-off Feb 2020 | 3160 21st St | revision to 201311061271 revise construction type typo from va to vbDetails
revision to 201311061271 revise construction type typo from va to vb | |
| Dec 21, 2017 | Completed final sign-off Jun 2018 | 784 Kirkwood Av | priority permit. revision to app#201503302200. outdoor trash enclosures have been redesigned. overall, trash enclosures have reduced in size, shorter walls, no doors. due to installation on slope conditions, some of the cmu walls effectively become retaining walls and require a bldg permit. n/a maheDetails
priority permit. revision to app#201503302200. outdoor trash enclosures have been redesigned. overall, trash enclosures have reduced in size, shorter walls, no doors. due to installation on slope conditions, some of the cmu walls effectively become retaining walls and require a bldg permit. n/a mahe | |
| Dec 21, 2017 | Completed final sign-off Jun 2018 | 786 Jerrold Av | priority permit. revision to app#201503302180. outdoor trash enclosures have been redesigned. overall, trash enclosures have reduced in size, shorter walls, no roof, no doors. due to installation on slope conditions, some of the cmu walls effectively become retaining walls and require a bldg permit.Details
priority permit. revision to app#201503302180. outdoor trash enclosures have been redesigned. overall, trash enclosures have reduced in size, shorter walls, no roof, no doors. due to installation on slope conditions, some of the cmu walls effectively become retaining walls and require a bldg permit. | |
| Dec 21, 2017 | Completed final sign-off Jun 2018 | 1065 Oakdale Av | priority permit. revision to app#201503302207. outdoor trash enclosures have been redesigned. overall, the trash enclosures have reduced in size, shorter walls, no doors. due to installation on slope conditions, some of the cmu walls effectively become retaining walls and require a bldg permit.Details
priority permit. revision to app#201503302207. outdoor trash enclosures have been redesigned. overall, the trash enclosures have reduced in size, shorter walls, no doors. due to installation on slope conditions, some of the cmu walls effectively become retaining walls and require a bldg permit. | |
| Dec 11, 2017 | Completed final sign-off Dec 2017 | 1100 Market St | to obtain final inspection for work approved under pa#201404304601. all work is complete.Details
to obtain final inspection for work approved under pa#201404304601. all work is complete. | |
| Nov 27, 2017 | Expired or cancelled expired Jan 2026 | 2800 Turk Bl | accessibility upgrades consisting of the removal of an (e) non-compliant ramp on the 1st fl along with corridor and adjacent office plan re-configurations to accomodate new ramp length, fire under separate permit(s)Details
accessibility upgrades consisting of the removal of an (e) non-compliant ramp on the 1st fl along with corridor and adjacent office plan re-configurations to accomodate new ramp length, fire under separate permit(s) | $400,000 |
| Sep 29, 2017 | Completed final sign-off Nov 2017 | 1140 Folsom St | revision to pa#201411101145-s3 for roof construction details. n/a ordinance #155-13Details
revision to pa#201411101145-s3 for roof construction details. n/a ordinance #155-13 | $5,000 |
| Jul 26, 2017 | Completed final sign-off Oct 2019 | 1101 Connecticut St | revision to 201603172392-s3, update addendum schedule, update delete deferred submitals, merge lots 001a & 007 into new lot 076.Details
revision to 201603172392-s3, update addendum schedule, update delete deferred submitals, merge lots 001a & 007 into new lot 076. | |
| Jul 19, 2017 | Never finaled issued Jul 2017, no final | 1100 Market St | administrative only. no work assembly permit only for ground floor & penthouse. to calculate occupant load.Details
administrative only. no work assembly permit only for ground floor & penthouse. to calculate occupant load. | |
| Mar 28, 2017 | Never finaled issued Dec 2017, no final | 1100 Market St | erect 1 electric wall double faced signDetails
erect 1 electric wall double faced sign | $1,000 |
| Dec 16, 2016 | Completed final sign-off Nov 2018 | 1251 Turk St | revision to incorporate m.o.d. approvals to pa#201511162685.Details
revision to incorporate m.o.d. approvals to pa#201511162685. | |
| Mar 17, 2016 | Completed final sign-off Oct 2019 | 1101 Connecticut St | erect 5 story, 1 basement, 72 units, 100% affordable housing, located on two lots, 001a & 007.Details
erect 5 story, 1 basement, 72 units, 100% affordable housing, located on two lots, 001a & 007. | $21,800,000 |
| Jan 29, 2016 | Expired or cancelled withdrawn Nov 2016 | 10 Kennedy Pl | alter site to an alter site of 2014-12-05-3170/s. ref to 2013-09-27-7934/s. excavation for basement garage, concrete podium with 4 floors wood framing with elevator.Details
alter site to an alter site of 2014-12-05-3170/s. ref to 2013-09-27-7934/s. excavation for basement garage, concrete podium with 4 floors wood framing with elevator. | |
| Jan 7, 2016 | Never finaled issued Jan 2016, no final | 1140 Folsom St | fire builletin fs-04 required for 1140 folsom, site permit pa #201411101145; maher n/aDetails
fire builletin fs-04 required for 1140 folsom, site permit pa #201411101145; maher n/a | |
| Apr 10, 2015 | Completed final sign-off Sep 2017 | 1100 Market St | revision to pa# 2013/05/10/6635. repair fire & smoke damage to historic lobby. replace (e) doors with rated doors, replace laundry chute with rated laundry chute. ** maher: compliance with ordinance no# 155-13 not required **Details
revision to pa# 2013/05/10/6635. repair fire & smoke damage to historic lobby. replace (e) doors with rated doors, replace laundry chute with rated laundry chute. ** maher: compliance with ordinance no# 155-13 not required ** | $25,000 |
| Apr 8, 2015 | Never finaled issued Apr 2015, no final | 1645 Pacific Av | add new guardrail to the south roof in order to comply with osha requirements for window washing equipment. ref pa# 2011/10/14/6841. guard rail only for osha safety requirments; no new roof deck proposed or additional changes.Details
add new guardrail to the south roof in order to comply with osha requirements for window washing equipment. ref pa# 2011/10/14/6841. guard rail only for osha safety requirments; no new roof deck proposed or additional changes. | $70,000 |
| Feb 12, 2015 | Completed final sign-off Dec 2017 | 1100 Market St | to repair fire damage. replace damaged walls + ceilings on guestroom flr w/rated construction. incorporate guestroom bathrooms w/rated doors, replace (e) laundry chutes w/rated (n) chutes and doors. replace damaged wood sub-flr + concrete slab at 2nd fl w/(n) structural steel frame + concrete deck.Details
to repair fire damage. replace damaged walls + ceilings on guestroom flr w/rated construction. incorporate guestroom bathrooms w/rated doors, replace (e) laundry chutes w/rated (n) chutes and doors. replace damaged wood sub-flr + concrete slab at 2nd fl w/(n) structural steel frame + concrete deck. | $100,000 |
| Jul 2, 2014 | Completed final sign-off Oct 2014 | 536 Mission St | revision to permit 201404304585, additional 208 sq. ft. balcony enclosed.Details
revision to permit 201404304585, additional 208 sq. ft. balcony enclosed. | $14,000 |
| May 8, 2014 | Completed final sign-off Nov 2014 | 101 Howard St | portions 1st & 4th fl interior alteration to prov updated classroom& staff office space for university use. addition of restroom facilities to accommodate classrm uses&break space,no extrerior alterations,mep under separate permit. compliance with maher ordinance #155-13 not req.Details
portions 1st & 4th fl interior alteration to prov updated classroom& staff office space for university use. addition of restroom facilities to accommodate classrm uses&break space,no extrerior alterations,mep under separate permit. compliance with maher ordinance #155-13 not req. | $1,750,000 |
| Apr 30, 2014 | Completed final sign-off Sep 2014 | 536 Mission St | classroom & lecture hall renovtions to the mezzanine & 2nd floor of (e) bldg including (n) interior partitions, (n) finishes, (n) tiered concrete floor, (n) exterior windows & associated accessibility upgrades. no change in use or occupany.Details
classroom & lecture hall renovtions to the mezzanine & 2nd floor of (e) bldg including (n) interior partitions, (n) finishes, (n) tiered concrete floor, (n) exterior windows & associated accessibility upgrades. no change in use or occupany. | $984,000 |
| Apr 24, 2014 | Expired or cancelled withdrawn Apr 2014 | 536 Mission St | classroom and lecture hall renovations to the mezzanine & 2/f including (n) interior partitions, (n) finishes, (n) tiered concrete floor & associated accessibility upgrades. no change in use or occupancy, (n) exterior windows.Details
classroom and lecture hall renovations to the mezzanine & 2/f including (n) interior partitions, (n) finishes, (n) tiered concrete floor & associated accessibility upgrades. no change in use or occupancy, (n) exterior windows. | $984,000 |
| Jan 2, 2014 | Completed final sign-off Feb 2014 | 425 California St | revision to app#201309126628. revised 4th and 18th floor evacuation plan signs. (6 signs)Details
revision to app#201309126628. revised 4th and 18th floor evacuation plan signs. (6 signs) | |
| Dec 18, 2013 | Completed final sign-off Nov 2014 | 33 03rd St | voluntary structural upgrade @ 3rd street facade, addition of steel brace frames, planters & street trees. all work is exterior. compliance w/ ord no #155-13 not required. excavation <50 cu yd.Details
voluntary structural upgrade @ 3rd street facade, addition of steel brace frames, planters & street trees. all work is exterior. compliance w/ ord no #155-13 not required. excavation <50 cu yd. | $430,000 |
| Dec 5, 2013 | Completed final sign-off Apr 2014 | 536 Mission St | 3rd flr: renovation of classrooms in 3rd floor of existing building, new interior partitions and finishes, required accessibility upgrade. mechanical and electrical under separate permitDetails
3rd flr: renovation of classrooms in 3rd floor of existing building, new interior partitions and finishes, required accessibility upgrade. mechanical and electrical under separate permit | $1,000,000 |
| Sep 12, 2013 | Completed final sign-off Feb 2014 | 425 California St | 4th & 18th floors-evacuation sign/map-6 signs totalDetails
4th & 18th floors-evacuation sign/map-6 signs total | $1,000 |
| Aug 23, 2013 | Never finaled issued Sep 2013, no final | 425 California St | title 24 mep. adding new fire smoke dampers andd smoke detection- reference application #201306199912Details
title 24 mep. adding new fire smoke dampers andd smoke detection- reference application #201306199912 | |
| Aug 23, 2013 | Expired or cancelled expired Apr 2016 | 425 California St | title 24/mep permits. ref app#201307121736Details
title 24/mep permits. ref app#201307121736 | |
| Jul 23, 2013 | Completed final sign-off Sep 2014 | 536 Mission St | revision to 201304235197. furred wall to be added to 6th fl at e rated wallDetails
revision to 201304235197. furred wall to be added to 6th fl at e rated wall | $3,000 |
| Jul 12, 2013 | Expired or cancelled expired Apr 2016 | 425 California St | demolition of non structural interior walls. remodel 4th fl restrooms consisting of new fixtures, ceilings, finishes, minor remodel of suite 410 related to restroom modifications. create a new rated elevator lobby. mep, f/a and sprinklers separate permitDetails
demolition of non structural interior walls. remodel 4th fl restrooms consisting of new fixtures, ceilings, finishes, minor remodel of suite 410 related to restroom modifications. create a new rated elevator lobby. mep, f/a and sprinklers separate permit | $100,000 |
| Apr 23, 2013 | Completed final sign-off Aug 2013 | 536 Mission St | renovation to 4th fl of existing bldg including (n) interior partitions, (n) finishes, (n) exterior windows and associated accessibility upgrades. no change to use or occupancy. mech under seperate permit.Details
renovation to 4th fl of existing bldg including (n) interior partitions, (n) finishes, (n) exterior windows and associated accessibility upgrades. no change to use or occupancy. mech under seperate permit. | $1,142,000 |
| Feb 20, 2013 | Never finaled issued Feb 2013, no final | 701 Golden Gate Av | interior t.i. for bldg lobby and storage space on ground floor. work includes new partitions, flooring, finishes doors, lighting. full mep work under seperate permit. no exterior work. f/a and sprinkler under seperate permit.Details
interior t.i. for bldg lobby and storage space on ground floor. work includes new partitions, flooring, finishes doors, lighting. full mep work under seperate permit. no exterior work. f/a and sprinkler under seperate permit. | $40,000 |
| Jan 16, 2013 | Never finaled issued Jan 2013, no final | 101 Montgomery St | suite 450: title 24/mep only ref app 201211194476Details
suite 450: title 24/mep only ref app 201211194476 | $50,000 |
| Dec 10, 2012 | Never finaled issued Dec 2012, no final | 101 Montgomery St | ste. 1400: title 24/mep permits, reference application 201209210328, include new exhaust fan in the break room.Details
ste. 1400: title 24/mep permits, reference application 201209210328, include new exhaust fan in the break room. | $50,000 |
| Nov 19, 2012 | Completed final sign-off Feb 2013 | 101 Montgomery St | suite 450:t.i. consists of new non-load bearing walls, door, new lighting, new finishes. meps under separate permit.Details
suite 450:t.i. consists of new non-load bearing walls, door, new lighting, new finishes. meps under separate permit. | $250,000 |
| Nov 15, 2012 | Completed final sign-off Jul 2014 | 1645 Pacific Av | alteration to approved site permit #201110146841. deletion of proposed lightwell @ the east property line due to clarification from dbi on the code definition of a "lightwall" versus a "court". impact to layout of the adjacent unit on 2nd fl & up. addition of a 1 bedrm unit @ the 2nd fl unit #205bDetails
alteration to approved site permit #201110146841. deletion of proposed lightwell @ the east property line due to clarification from dbi on the code definition of a "lightwall" versus a "court". impact to layout of the adjacent unit on 2nd fl & up. addition of a 1 bedrm unit @ the 2nd fl unit #205b | $20,000 |
| Oct 18, 2012 | Completed final sign-off Jan 2013 | 101 Montgomery St | suite #400-title 24 mechanical & electrical for pa# 201209058990, install 2 new double duct vav's with new ductwork, install 2 new exhaust fans. modify (e) vav's for new floor planDetails
suite #400-title 24 mechanical & electrical for pa# 201209058990, install 2 new double duct vav's with new ductwork, install 2 new exhaust fans. modify (e) vav's for new floor plan | $50,000 |
| Sep 21, 2012 | Never finaled issued Oct 2012, no final | 101 Montgomery St | #350- title 24 mech and electrical for 201208086877Details
#350- title 24 mech and electrical for 201208086877 | $50,000 |
| Sep 21, 2012 | Completed final sign-off Jun 2013 | 101 Montgomery St | suite 1400: tenant improvement consisting of new non load bearing walls, doors, lighting, power, finishes. meps separate permitDetails
suite 1400: tenant improvement consisting of new non load bearing walls, doors, lighting, power, finishes. meps separate permit | $200,000 |
| Sep 5, 2012 | Never finaled issued Sep 2012, no final | 101 Montgomery St | 6th floor suite 650 mechanical work - title 24/meps, install new ductwork, new vavs, new lighting. ref pa #2012.0808.6873Details
6th floor suite 650 mechanical work - title 24/meps, install new ductwork, new vavs, new lighting. ref pa #2012.0808.6873 | $50,000 |
| Sep 5, 2012 | Completed final sign-off Jan 2013 | 101 Montgomery St | suite 400 tenant improvement consisting of new non-load bearing walls, doors, lighting, new power, & new finishes. meps under separate permit.sprinkler and fire alarm seperate permitDetails
suite 400 tenant improvement consisting of new non-load bearing walls, doors, lighting, new power, & new finishes. meps under separate permit.sprinkler and fire alarm seperate permit | $300,000 |
| Aug 8, 2012 | Completed final sign-off Jan 2013 | 101 Montgomery St | #350- tenant improvement consisting of new non-load bearing walls, doors, new lighting, new power & new finishes. meps under separate permit.Details
#350- tenant improvement consisting of new non-load bearing walls, doors, new lighting, new power & new finishes. meps under separate permit. | $150,000 |
| Aug 8, 2012 | Never finaled issued Aug 2012, no final | 101 Montgomery St | tenant improvement consisting of new non-load bearing walls, doors, new lighting, new power & new finishes. mep under seperate permit. sprinkler and lifesafety under seperate permitDetails
tenant improvement consisting of new non-load bearing walls, doors, new lighting, new power & new finishes. mep under seperate permit. sprinkler and lifesafety under seperate permit | $300,000 |
| May 22, 2012 | Never finaled issued May 2012, no final | 101 Montgomery St | title 24 meps. install new ductwork, install new vavs, install new lighting, reference pa 201203236741Details
title 24 meps. install new ductwork, install new vavs, install new lighting, reference pa 201203236741 | $100,000 |
| Apr 5, 2012 | Completed final sign-off Jul 2014 | 2455 Golden Gate Av | clarification of fdc locations and fire alarm monitoring to approved app#201008068321 s5r-1Details
clarification of fdc locations and fire alarm monitoring to approved app#201008068321 s5r-1 | |
| Mar 23, 2012 | Never finaled issued May 2012, no final | 101 Montgomery St | tenant improvement consisting of offices, load bearing and non load bearing walls, doors, new lighting, new power and new finishes. meps and life safety under sep permitDetails
tenant improvement consisting of offices, load bearing and non load bearing walls, doors, new lighting, new power and new finishes. meps and life safety under sep permit | $350,000 |
| Jan 27, 2012 | Completed final sign-off Mar 2012 | 101 Montgomery St | title 24, mechanical, and electrical for 201112050047Details
title 24, mechanical, and electrical for 201112050047 | $40,000 |
| Dec 5, 2011 | Completed final sign-off Mar 2012 | 101 Montgomery St | change of use-b (10-office) to b (67-dental office)-new walls, doors, ceiling, lighting & plumbing fixtures, floor & walls finishes, cabinets for a new dental ofice. mep work under separate permit.Details
change of use-b (10-office) to b (67-dental office)-new walls, doors, ceiling, lighting & plumbing fixtures, floor & walls finishes, cabinets for a new dental ofice. mep work under separate permit. | $200,000 |
| Nov 30, 2011 | Completed final sign-off Feb 2013 | 220 Golden Gate Av | mechanical revision only. add supply fan and duct work for stair pressurization. revision to pa# 2008/08/19/9494-s3, pa# 2010/12/16/6845.Details
mechanical revision only. add supply fan and duct work for stair pressurization. revision to pa# 2008/08/19/9494-s3, pa# 2010/12/16/6845. | $20,000 |
| Oct 14, 2011 | Completed final sign-off Nov 2014 | 1645 Pacific Av | to erect 6 story 38 unit residential/commercial/condominium building.Details
to erect 6 story 38 unit residential/commercial/condominium building. | $13,800,000 |
| Sep 27, 2011 | Completed final sign-off Dec 2011 | 101 Montgomery St | title 24 meps, new duct work new vavs, lightingDetails
title 24 meps, new duct work new vavs, lighting | $50,000 |
| Sep 27, 2011 | Completed final sign-off Mar 2012 | 101 Montgomery St | title 24 mep, new ductwork, new vavs, new lighting. ref 201108303577Details
title 24 mep, new ductwork, new vavs, new lighting. ref 201108303577 | $100,000 |
| Sep 27, 2011 | Never finaled issued Sep 2011, no final | 101 Montgomery St | title 24 meps, new ductwork, new vav, new lighting,reference #201108303578Details
title 24 meps, new ductwork, new vav, new lighting,reference #201108303578 | $100,000 |
| Sep 13, 2011 | Completed final sign-off Dec 2011 | 101 Montgomery St | 7th floor-tenant improvement consisting of new non structural partition walls, associated power & tel/data, outlets, plumbing, new ceiling, new lighting & new hvac. creating open offices & breakroom. demo under pa# 2010-0624-5179. m.e.p under seperate permitDetails
7th floor-tenant improvement consisting of new non structural partition walls, associated power & tel/data, outlets, plumbing, new ceiling, new lighting & new hvac. creating open offices & breakroom. demo under pa# 2010-0624-5179. m.e.p under seperate permit | $250,000 |
| Aug 30, 2011 | Completed final sign-off May 2012 | 101 Montgomery St | tenant improvement consisiting of office including non load bearing partitions, doors, glazing, finishes. sprinkler, fire alarm and meps sep permitDetails
tenant improvement consisiting of office including non load bearing partitions, doors, glazing, finishes. sprinkler, fire alarm and meps sep permit | $300,000 |
| Aug 30, 2011 | Completed final sign-off Mar 2012 | 101 Montgomery St | tenant improvements consisting of offices including non load bearing partitions, doors, glazing, finishes. life safety (fire alarm and sprinklers) and meps under sep permitDetails
tenant improvements consisting of offices including non load bearing partitions, doors, glazing, finishes. life safety (fire alarm and sprinklers) and meps under sep permit | $300,000 |
| Aug 9, 2011 | Completed final sign-off Nov 2011 | 101 Montgomery St | erect 3 electric illumination double faced project (blade) signs.Details
erect 3 electric illumination double faced project (blade) signs. | $25,000 |
| Aug 5, 2011 | Completed final sign-off Sep 2011 | 101 Montgomery St | revision to pa# 2011.03.23.2649 to show new accessible entrance into suite e incl. recessing middle door and reverse swingDetails
revision to pa# 2011.03.23.2649 to show new accessible entrance into suite e incl. recessing middle door and reverse swing | |
| Jul 18, 2011 | Completed final sign-off Sep 2011 | 101 Montgomery St | ground floor-lighting at street arcadeDetails
ground floor-lighting at street arcade | $35,000 |
| Jul 18, 2011 | Completed final sign-off Nov 2011 | 101 Montgomery St | erect 3 electric illumination sign, wall, single faced.Details
erect 3 electric illumination sign, wall, single faced. | $25,000 |
| May 25, 2011 | Completed final sign-off May 2012 | 101 Montgomery St | office ti on the 2nd floor elevator lobby and corridor, non load bearing partitions, doors, new lighting, new power and finishes. mep under separate permitDetails
office ti on the 2nd floor elevator lobby and corridor, non load bearing partitions, doors, new lighting, new power and finishes. mep under separate permit | $25,000 |
| May 10, 2011 | Completed final sign-off Jun 2011 | 101 Montgomery St | demolition of extg raised floor and finishes and extg millwork. space shall remain vacant until subsequent approvedbldg permit per sfbc ab-017.Details
demolition of extg raised floor and finishes and extg millwork. space shall remain vacant until subsequent approvedbldg permit per sfbc ab-017. | $10,000 |
| Apr 28, 2011 | Completed final sign-off Oct 2011 | 101 Montgomery St | minor demo and construction of new paritions, doors, millwork, finishes. minor lighting modications and new power data installationsDetails
minor demo and construction of new paritions, doors, millwork, finishes. minor lighting modications and new power data installations | $75,000 |
| Apr 27, 2011 | Completed final sign-off May 2012 | 101 Montgomery St | title 24 meps install new duct work, new vavs, new lighting, fef 201104073686Details
title 24 meps install new duct work, new vavs, new lighting, fef 201104073686 | $100,000 |
| Apr 19, 2011 | Completed final sign-off Jul 2014 | 2375 Golden Gate Av | revision to approved pa# 201103142016 (adjacent 2011-0311-1941 for minor changes in shoring & underpinning related to bldg pa# 2010-0806-8321Details
revision to approved pa# 201103142016 (adjacent 2011-0311-1941 for minor changes in shoring & underpinning related to bldg pa# 2010-0806-8321 | $4,500 |
| Apr 7, 2011 | Completed final sign-off Jul 2011 | 101 Montgomery St | 6th floor-t.i. consisting of offices including non load bearing partitions, doors, glazing & finishes. m.e.p. under seperate permits. demo pa# 2010-0624-5179Details
6th floor-t.i. consisting of offices including non load bearing partitions, doors, glazing & finishes. m.e.p. under seperate permits. demo pa# 2010-0624-5179 | $300,000 |
| Apr 7, 2011 | Never finaled issued May 2011, no final | 101 Montgomery St | remove (e) escalator & infill of opening with structural slab. escalator goes from 1st to 2nd floor only. t.i. & elevator install to be completed under pa #201011255422.Details
remove (e) escalator & infill of opening with structural slab. escalator goes from 1st to 2nd floor only. t.i. & elevator install to be completed under pa #201011255422. | $100,000 |
| Mar 23, 2011 | Completed final sign-off Sep 2011 | 101 Montgomery St | removal of existing entry doors, storefront and glazing for future tenants.install new entry doors, storefront, and glazing. seal interior doors between spaces 101c and 101e.Details
removal of existing entry doors, storefront and glazing for future tenants.install new entry doors, storefront, and glazing. seal interior doors between spaces 101c and 101e. | $50,000 |
| Mar 14, 2011 | Completed final sign-off Jul 2014 | 2375 Golden Gate Av | shoring & underpinning dor work related to (n) construction on neighboring site in conjunction with (n) bldg permit approved under site appl #201008068321.Details
shoring & underpinning dor work related to (n) construction on neighboring site in conjunction with (n) bldg permit approved under site appl #201008068321. | $25,000 |
| Mar 11, 2011 | Never finaled issued Mar 2011, no final | 2445 Golden Gate Av | shoring and underpinning for harney science bldg in prep for future construction. no other work.bldg permit approved under app#201008068321Details
shoring and underpinning for harney science bldg in prep for future construction. no other work.bldg permit approved under app#201008068321 | $10,000 |
| Jan 24, 2011 | Completed final sign-off Mar 2011 | 101 Montgomery St | 7th floor mep for pa 2010-1228-7510 title 24/mep install new duckwork, install new vav's, install new lighting. no fsd's and no card readers shown on this permit.Details
7th floor mep for pa 2010-1228-7510 title 24/mep install new duckwork, install new vav's, install new lighting. no fsd's and no card readers shown on this permit. | $175,262 |
| Jan 13, 2011 | Completed final sign-off May 2011 | 101 Montgomery St | 1st floor m.e.p. - title 24, install new ductwork, new vav, new lighting. ref pa #201007307841.Details
1st floor m.e.p. - title 24, install new ductwork, new vav, new lighting. ref pa #201007307841. | $20,000 |
| Jan 13, 2011 | Completed final sign-off Apr 2011 | 425 California St | 15th floor m.e.p - title 24, install new ductwork for perimeter & interior zones, new vavs, new lighting. ref pa #201012176944. no card readers on this permit.Details
15th floor m.e.p - title 24, install new ductwork for perimeter & interior zones, new vavs, new lighting. ref pa #201012176944. no card readers on this permit. | $100,000 |
| Dec 28, 2010 | Completed final sign-off Mar 2011 | 101 Montgomery St | 7th fl: tenant improvment consisiting of offices including non load bearing partitions, door, glazing, finishes. mep sep permit.Details
7th fl: tenant improvment consisiting of offices including non load bearing partitions, door, glazing, finishes. mep sep permit. | $250,000 |
| Dec 17, 2010 | Completed final sign-off Apr 2011 | 425 California St | 15th floor:tenant improvements consisting of offices including non bearing partitions, doors, side light glazing, new lighting,new power and new finishes.associated mechanical, electrical and fire life safety to be design built and performed under seperate permit. no structural work to be performed.Details
15th floor:tenant improvements consisting of offices including non bearing partitions, doors, side light glazing, new lighting,new power and new finishes.associated mechanical, electrical and fire life safety to be design built and performed under seperate permit. no structural work to be performed. | $350,000 |
| Dec 17, 2010 | Completed final sign-off May 2011 | 425 California St | 26th floor:tenant improvements consisting of offices including non bearing partitions, doors, side light glazing, new power and new finishes. no structural work to be performed.Details
26th floor:tenant improvements consisting of offices including non bearing partitions, doors, side light glazing, new power and new finishes. no structural work to be performed. | $50,000 |
| Nov 10, 2010 | Expired or cancelled expired Jul 2013 | 536 Mission St | renovation of outdoor plaza (1 level below street) includes new tiered, concrete seating, new planters & plantsDetails
renovation of outdoor plaza (1 level below street) includes new tiered, concrete seating, new planters & plants | $24,000 |
| Nov 9, 2010 | Completed final sign-off Dec 2010 | 101 Montgomery St | title 24 meps, relocate supply ductwork for new conf. room. add vav. work on the 27th and the 28th floors. paq# 2010.07.30.7835 for ti reference.Details
title 24 meps, relocate supply ductwork for new conf. room. add vav. work on the 27th and the 28th floors. paq# 2010.07.30.7835 for ti reference. | $15,000 |
| Oct 21, 2010 | Completed final sign-off Dec 2010 | 101 Montgomery St | 26th fl: title 24-meps, relocate supply ductwork for permiter and interior zones. install new vavs. demo and cap parital ductwork.Details
26th fl: title 24-meps, relocate supply ductwork for permiter and interior zones. install new vavs. demo and cap parital ductwork. | $50,000 |
| Oct 12, 2010 | Completed final sign-off Jan 2011 | 101 Montgomery St | 8th fl: title 24, mep's. relocate supply ductwork for perimeter and interior zones. new vavs, demo and cap partial ductworkDetails
8th fl: title 24, mep's. relocate supply ductwork for perimeter and interior zones. new vavs, demo and cap partial ductwork | $50,000 |
| Oct 12, 2010 | Completed final sign-off May 2011 | 101 Montgomery St | demo of ex non structural partitions, associated power and telecom outlets, plumbing and finishesDetails
demo of ex non structural partitions, associated power and telecom outlets, plumbing and finishes | $30,000 |
| Oct 12, 2010 | Completed final sign-off Dec 2010 | 101 Montgomery St | tenant improvement consisting of offices including non load bearing paritions, doors ide light glazing, new lighting, new power and finishes. associated mech, elec and fire is design build and performed under sep permit. no structural work.Details
tenant improvement consisting of offices including non load bearing paritions, doors ide light glazing, new lighting, new power and finishes. associated mech, elec and fire is design build and performed under sep permit. no structural work. | $400,000 |
| Sep 28, 2010 | Completed final sign-off Aug 2011 | 101 Montgomery St | demolition of non structural partitions associated power and telecom outlets, plmg, & finishes. also the demolition of extg ceiling system lighting fixtures,soffits, and associated ceiling system. new partition and double entry door, new ceiling, new lighting associated electrical and mechanical.Details
demolition of non structural partitions associated power and telecom outlets, plmg, & finishes. also the demolition of extg ceiling system lighting fixtures,soffits, and associated ceiling system. new partition and double entry door, new ceiling, new lighting associated electrical and mechanical. | $50,000 |
| Sep 22, 2010 | Completed final sign-off Dec 2010 | 101 Montgomery St | installation of graphic annunciator panel.Details
installation of graphic annunciator panel. | $25,000 |
| Sep 16, 2010 | Completed final sign-off Apr 2011 | 425 California St | 15th floor: full floor demolition of interior partitions, ceiling systems, plmg, fixtures, electrical outlets and associated components. sprinkler/fa under separate permits.Details
15th floor: full floor demolition of interior partitions, ceiling systems, plmg, fixtures, electrical outlets and associated components. sprinkler/fa under separate permits. | $40,000 |
| Sep 14, 2010 | Completed final sign-off May 2011 | 101 Montgomery St | demolition of extg non-structural partition, associated power and telecom outlets, plumbing, and finishes per ab-017Details
demolition of extg non-structural partition, associated power and telecom outlets, plumbing, and finishes per ab-017 | $40,000 |
| Aug 19, 2010 | Completed final sign-off Apr 2011 | 425 California St | 24th fl, mep. relocate supply ductwork run for perimeter and interior aones. install 1 new vav for interior zones. dmo and cap partial ductworks. furnish new 24x24 supply and return grilles. also related electrical/lighting per plansDetails
24th fl, mep. relocate supply ductwork run for perimeter and interior aones. install 1 new vav for interior zones. dmo and cap partial ductworks. furnish new 24x24 supply and return grilles. also related electrical/lighting per plans | $100,000 |
| Aug 19, 2010 | Completed final sign-off May 2011 | 101 Montgomery St | demo of existing non structural partitions associated power and telecom outlets, plumbing, and finishes. demo ex ceiling system, lighting fix, soffits, and associated ceiling items.fire sprnkler and alarm requires separate permits)Details
demo of existing non structural partitions associated power and telecom outlets, plumbing, and finishes. demo ex ceiling system, lighting fix, soffits, and associated ceiling items.fire sprnkler and alarm requires separate permits) | $50,000 |
| Jul 30, 2010 | Completed final sign-off Dec 2010 | 101 Montgomery St | 27th & 28th floor: demolition of existing stairs and infill fo opening. construction of new conference room @ 27th floor only.Details
27th & 28th floor: demolition of existing stairs and infill fo opening. construction of new conference room @ 27th floor only. | $150,000 |
| Jul 30, 2010 | Completed final sign-off May 2011 | 101 Montgomery St | 1st floor demolition of approx 50 lineal ft of drywall partition, demolition of 600 sp ft fo ceiling tile & carpe. demolition of concrete stairs & glass radius wall. install new unisex reatroom, 30 lineal ft of partition wall, carpet & ceiling tile.Details
1st floor demolition of approx 50 lineal ft of drywall partition, demolition of 600 sp ft fo ceiling tile & carpe. demolition of concrete stairs & glass radius wall. install new unisex reatroom, 30 lineal ft of partition wall, carpet & ceiling tile. | $163,000 |
| Jun 25, 2010 | Completed final sign-off Aug 2010 | 111 Taylor St | partial compliance with nov #201052697. remove debris and remove damaged portions of bldg subsequent permit for rebuild to follow. all work to be under licenced engineering supervision.Details
partial compliance with nov #201052697. remove debris and remove damaged portions of bldg subsequent permit for rebuild to follow. all work to be under licenced engineering supervision. | $20,000 |
| Jun 24, 2010 | Completed final sign-off Nov 2011 | 101 Montgomery St | remove mechanical equipment on the roof left over from the previous tenant. remove and replace section of roof for removal of materials. removal of 2-e-generators and 2-50 gal diesel fuel tanks, on roof.Details
remove mechanical equipment on the roof left over from the previous tenant. remove and replace section of roof for removal of materials. removal of 2-e-generators and 2-50 gal diesel fuel tanks, on roof. | $138,000 |
| Jun 24, 2010 | Completed final sign-off Sep 2010 | 101 Montgomery St | demolition only. remove 975 linear feet of drywall partitons, 26,000 sf of acoustic ceiling, remove doors and frames as noted (fire sprinkler and fire alarm under separate permit)Details
demolition only. remove 975 linear feet of drywall partitons, 26,000 sf of acoustic ceiling, remove doors and frames as noted (fire sprinkler and fire alarm under separate permit) | $132,000 |
| Jun 18, 2010 | Completed final sign-off Jan 2011 | 101 Montgomery St | office ti-18th fl. demo of approx. 525 lf of drywall partition, 10,00 sf of acoustic ceiling, install 788 lf of drywall partition, new acoustic clg, and new doors and franes. mep under separate permitDetails
office ti-18th fl. demo of approx. 525 lf of drywall partition, 10,00 sf of acoustic ceiling, install 788 lf of drywall partition, new acoustic clg, and new doors and franes. mep under separate permit | $550,000 |