Permit GraphShortlistSan Francisco building permits since 2000

Block 0260, lot 001

425 California St

City’s use
Commercial Office
Built
1968
Stories
26
Units
1
Rooms
52 bathrooms
Building
206,191 sq ft
Lot
7,656 sq ft
Zoning
C3O
Construction type
A

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

The 200 most recent permits filed for this property.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Aug 7, 2025In progress
filed Aug 2025, not yet issued
425 California Stinstall (4) additional antennas on (e) verizon wireless rooftop facility
Details
Permit
202508072597

install (4) additional antennas on (e) verizon wireless rooftop facility

Open the permit page

$30,000
Nov 25, 2024Completed
final sign-off Jul 2025
401 California StGolden Gate Sign Company Inc.new electric, single faced wall chase sign
Details
Permit
202411255624
Permit issued
Nov 26, 2024
Final sign-off
Jul 11, 2025

new electric, single faced wall chase sign

Open the permit page

$15,000
Dec 29, 2023Completed
final sign-off Jan 2024
425 California StBilcor Inc22/f: install (13) ceiling mount speaker strobes. install (3) smoke detectors. install (1) duct detector. install (2) control relays. arch ref ti# 202307111907 mech ref# 202311100583
Details
Permit
202312293284
Permit issued
Dec 29, 2023
Final sign-off
Jan 22, 2024

22/f: install (13) ceiling mount speaker strobes. install (3) smoke detectors. install (1) duct detector. install (2) control relays. arch ref ti# 202307111907 mech ref# 202311100583

Open the permit page

$3,996
Dec 18, 2023Completed
final sign-off Mar 2024
425 California StC B F Incste #2200: new lighting and power. ref permit# 202307111907
Details
Permit
202312182660
Permit issued
Dec 18, 2023
Final sign-off
Mar 27, 2024

ste #2200: new lighting and power. ref permit# 202307111907

Open the permit page

$159,286
Dec 1, 2023Completed
final sign-off Dec 2023
425 California StBilcor Inc7th floor. as-builts pa# 202310249290, install 1 additional speaker/ strobe. ref ti pa# 202307252868 & mech # 202309287579.
Details
Permit
202312011744
Permit issued
Dec 1, 2023
Final sign-off
Dec 26, 2023

7th floor. as-builts pa# 202310249290, install 1 additional speaker/ strobe. ref ti pa# 202307252868 & mech # 202309287579.

Open the permit page

$660
Nov 10, 2023Completed
final sign-off Mar 2024
425 California StMatrix Hg Inc22nd fl - ti project using the (e) base building hvac system modificaitons to the air distribution system in the tenant space to suit architectural renovations, including replacement of vav dual duct boxes and installation of new ductwork for tenant it needs. project also includes installation fan
Details
Permit
202311100583
Permit issued
Nov 17, 2023
Final sign-off
Mar 27, 2024

22nd fl - ti project using the (e) base building hvac system modificaitons to the air distribution system in the tenant space to suit architectural renovations, including replacement of vav dual duct boxes and installation of new ductwork for tenant it needs. project also includes installation fan

Open the permit page

$84,239
Oct 31, 2023Completed
final sign-off Jan 2024
425 California Stti improvement to (e) fire sprinkler system. ti 202307111907. relocated concealted sprinkler 59, added sprinkler 01, deleted sprinkler 07.
Details
Permit
202310319823
Permit issued
Nov 3, 2023
Final sign-off
Jan 24, 2024

ti improvement to (e) fire sprinkler system. ti 202307111907. relocated concealted sprinkler 59, added sprinkler 01, deleted sprinkler 07.

Open the permit page

$18,500
Oct 24, 2023Completed
final sign-off Dec 2023
425 California StBilcor Incinstall 15-ceiling mount strobes, ref bpa arch 202307252868 & mech 202309287579
Details
Permit
202310249290
Permit issued
Oct 24, 2023
Final sign-off
Dec 26, 2023

install 15-ceiling mount strobes, ref bpa arch 202307252868 & mech 202309287579

Open the permit page

$9,900
Sep 28, 2023Completed
final sign-off Mar 2024
425 California StM C S Construction Servicesdeferred mech and electrical. ref 202307252868 202308315717. mech, demo install newduct annd hvac equip, dual ductboxes, exhaust fans, ddc controls, air balance. ele new power and data new lighting and controls
Details
Permit
202309287579
Permit issued
Sep 28, 2023
Final sign-off
Mar 13, 2024

deferred mech and electrical. ref 202307252868 202308315717. mech, demo install newduct annd hvac equip, dual ductboxes, exhaust fans, ddc controls, air balance. ele new power and data new lighting and controls

Open the permit page

$150,000
Aug 31, 2023Completed
final sign-off Mar 2024
425 California StM C S Construction Services7/f: revision to pa# 202307252868, revised mens's restroom layout, removal of extra convenience urinal to reflect normal building standard layout. mep and fire/life safety under separate permit.
Details
Permit
202308315717
Permit issued
Sep 6, 2023
Final sign-off
Mar 13, 2024

7/f: revision to pa# 202307252868, revised mens's restroom layout, removal of extra convenience urinal to reflect normal building standard layout. mep and fire/life safety under separate permit.

Open the permit page

Aug 25, 2023Completed
final sign-off Sep 2023
425 California StBilcor Incinstall 1 control relay, install 2 door holders
Details
Permit
202308255248
Permit issued
Aug 31, 2023
Final sign-off
Sep 8, 2023

install 1 control relay, install 2 door holders

Open the permit page

$1,998
Aug 22, 2023Completed
final sign-off Oct 2023
425 California StAyoob & Peery Plumbing Co Inc7/f: add (4), relocate (45) f/s per t.i., ref bpa#202307252868
Details
Permit
202308224917
Permit issued
Aug 22, 2023
Final sign-off
Oct 23, 2023

7/f: add (4), relocate (45) f/s per t.i., ref bpa#202307252868

Open the permit page

$13,284
Jul 25, 2023Completed
final sign-off Mar 2024
425 California StM C S Construction Servicesinterior tenant improvement: demo of non-structural partitions and finishes, new partitions, and finishes with accessibility uprgrades, mep and fire/life safety under separate permit
Details
Permit
202307252868
Permit issued
Aug 3, 2023
Final sign-off
Mar 13, 2024

interior tenant improvement: demo of non-structural partitions and finishes, new partitions, and finishes with accessibility uprgrades, mep and fire/life safety under separate permit

Open the permit page

$374,888
Jul 11, 2023Completed
final sign-off Mar 2024
425 California StCahill Contractors Llc.interior tentant improvement demolition of non-structural partitions, new partitons finishes and restroom accessibilty upgrades
Details
Permit
202307111907
Permit issued
Jul 28, 2023
Final sign-off
Mar 27, 2024

interior tentant improvement demolition of non-structural partitions, new partitons finishes and restroom accessibilty upgrades

Open the permit page

$1,000,000
Jun 22, 2023Never finaled
issued Jun 2023, no final
425 California StBilcor Inc24/f: install 1-flush mount call station and 1-sign, relocate 1-ceiling mount speaker strobe, ref two-way comm backbone 202301200441.
Details
Permit
202306220588
Permit issued
Jun 22, 2023

24/f: install 1-flush mount call station and 1-sign, relocate 1-ceiling mount speaker strobe, ref two-way comm backbone 202301200441.

Open the permit page

$1,375
Jun 8, 2023Never finaled
issued Jun 2023, no final
425 California StNovo Construction Incsuite 2400: mechanical & electrical t-24 compliance for t.i. under pa 202306019070. maher n/a
Details
Permit
202306089567
Permit issued
Jun 9, 2023

suite 2400: mechanical & electrical t-24 compliance for t.i. under pa 202306019070. maher n/a

Open the permit page

$50,000
Jun 1, 2023Never finaled
issued Jun 2023, no final
425 California StNovo Construction Inc24/f: interior t.i. demolition of non-structural partitions, new partitions, finishes, mechanical deferred.
Details
Permit
202306019070
Permit issued
Jun 8, 2023

24/f: interior t.i. demolition of non-structural partitions, new partitions, finishes, mechanical deferred.

Open the permit page

$98,800
Jan 20, 2023Completed
final sign-off Mar 2023
425 California StBilcor Incinstall the following: (1) rath command center (2500-56xrc) includes (1) surface mount base station + (1) group of distribution modules; install (1) rath desk mount substation (2500-56xd), (1) command center system supervisors, (1) command center power commander, (1) command center battery backup...
Details
Permit
202301200441
Permit issued
Jan 20, 2023
Final sign-off
Mar 17, 2023

install the following: (1) rath command center (2500-56xrc) includes (1) surface mount base station + (1) group of distribution modules; install (1) rath desk mount substation (2500-56xd), (1) command center system supervisors, (1) command center power commander, (1) command center battery backup...

Open the permit page

$7,260
Dec 22, 2022Completed
final sign-off Oct 2023
401 California StCccs, Incinstalling of automatic door operators at both bank entrances. the project is solely for the purpose of removing barriers.
Details
Permit
202212228989
Permit issued
Mar 3, 2023
Final sign-off
Oct 17, 2023

installing of automatic door operators at both bank entrances. the project is solely for the purpose of removing barriers.

Open the permit page

$65,000
Dec 13, 2022Completed
final sign-off Dec 2022
425 California StBilcor Incinstall 1 ceiling mount speaker strobe ref 2022110545913, 202211106258
Details
Permit
202212138161
Permit issued
Dec 13, 2022
Final sign-off
Dec 30, 2022

install 1 ceiling mount speaker strobe ref 2022110545913, 202211106258

Open the permit page

$660
Nov 17, 2022Completed
final sign-off Nov 2022
425 California Stfire sprinkler relocate 5 add 1 and delete 1 sprinkler on the 16th fl.
Details
Permit
202211176736
Permit issued
Nov 18, 2022
Final sign-off
Nov 30, 2022

fire sprinkler relocate 5 add 1 and delete 1 sprinkler on the 16th fl.

Open the permit page

$2,000
Nov 10, 2022Completed
final sign-off Apr 2023
425 California StNovo Construction Incste 1600 - 16th flr - mechanical and electrical work for ti. ref pa 2022-1104-5913.
Details
Permit
202211106258
Permit issued
Nov 15, 2022
Final sign-off
Apr 25, 2023

ste 1600 - 16th flr - mechanical and electrical work for ti. ref pa 2022-1104-5913.

Open the permit page

$45,000
Nov 4, 2022Completed
final sign-off Apr 2023
425 California StNovo Construction Inc16/f: t.i., demo nonstructural partitions, new partitions, finishes & restroom accessibility upgrades
Details
Permit
202211045913
Permit issued
Nov 10, 2022
Final sign-off
Apr 25, 2023

16/f: t.i., demo nonstructural partitions, new partitions, finishes & restroom accessibility upgrades

Open the permit page

$313,000
Sep 16, 2022Completed
final sign-off Oct 2022
425 California StBilcor Inc12/f: install 4 ceiling mount speaker strobes. remove and replace 2 ceiling mount speaker strobes. ref arch 202208231104, mech 202209082051
Details
Permit
202209162586
Permit issued
Sep 20, 2022
Final sign-off
Oct 3, 2022

12/f: install 4 ceiling mount speaker strobes. remove and replace 2 ceiling mount speaker strobes. ref arch 202208231104, mech 202209082051

Open the permit page

$3,960
Sep 8, 2022Completed
final sign-off Sep 2022
425 California StPioneer Fire Inc.suite 1250: relocate 2 pendents, add 1 pendent. ref ti 202208231104
Details
Permit
202209082043
Permit issued
Sep 8, 2022
Final sign-off
Sep 23, 2022

suite 1250: relocate 2 pendents, add 1 pendent. ref ti 202208231104

Open the permit page

$382
Sep 8, 2022Completed
final sign-off Nov 2022
425 California StNovo Construction Incsuite 1250: mechanical & electrical work for t.i. ref bpa#202208231104
Details
Permit
202209082051
Permit issued
Sep 8, 2022
Final sign-off
Nov 17, 2022

suite 1250: mechanical & electrical work for t.i. ref bpa#202208231104

Open the permit page

$35,000
Aug 23, 2022Completed
final sign-off Nov 2022
425 California StNovo Construction Incste 1250: interior tenant improvement: demolition of non-structural partitions. new partitions, finishes, and lighting.
Details
Permit
202208231104
Permit issued
Aug 30, 2022
Final sign-off
Nov 17, 2022

ste 1250: interior tenant improvement: demolition of non-structural partitions. new partitions, finishes, and lighting.

Open the permit page

$124,250
Jun 21, 2022Never finaled
issued Dec 2022, no final
425 California StRavig Inc Dba Salient Global Technologiverizon: remove & replace 8 (e) antennas with 8 (n) antennas. remove & replace 4 (e) raycap 3315 surge suppressors with 4 (n) raycap. remove & replace 4 (e) 260 surge suppressors with 4 (n) raycap surge suppressors at equipment. remove & replace 4 (e) 6x12 hybrid cable.
Details
Permit
202206216653
Permit issued
Dec 1, 2022

verizon: remove & replace 8 (e) antennas with 8 (n) antennas. remove & replace 4 (e) raycap 3315 surge suppressors with 4 (n) raycap. remove & replace 4 (e) 260 surge suppressors with 4 (n) raycap surge suppressors at equipment. remove & replace 4 (e) 6x12 hybrid cable.

Open the permit page

$40,000
May 24, 2022Completed
final sign-off Jun 2022
425 California StBilcor Inc20th fl ste 2000: fire life safety. install 6 ceiling mounts speaker strobes. ref arch pa# 202203281023. ref mech pa# 202205164286.
Details
Permit
202205244889
Permit issued
May 24, 2022
Final sign-off
Jun 15, 2022

20th fl ste 2000: fire life safety. install 6 ceiling mounts speaker strobes. ref arch pa# 202203281023. ref mech pa# 202205164286.

Open the permit page

$3,960
May 16, 2022Completed
final sign-off Jul 2022
425 California StNovo Construction Incste 2000: mep for tenant improvement to include: replace 5 existing mixing assemblies, exhaust fan. replace pneumatic control system. new lighting, controls, and power. ref pa# 202203281023.
Details
Permit
202205164286
Permit issued
May 17, 2022
Final sign-off
Jul 25, 2022

ste 2000: mep for tenant improvement to include: replace 5 existing mixing assemblies, exhaust fan. replace pneumatic control system. new lighting, controls, and power. ref pa# 202203281023.

Open the permit page

$25,000
Apr 25, 2022Completed
final sign-off Jun 2022
425 California StBilcor Incste 2300: fire life safety - install 1 ceiling mount speaker strobe. arch ref pa# 202203240796.
Details
Permit
202204252881
Permit issued
Apr 25, 2022
Final sign-off
Jun 9, 2022

ste 2300: fire life safety - install 1 ceiling mount speaker strobe. arch ref pa# 202203240796.

Open the permit page

$660
Apr 20, 2022Completed
final sign-off Jun 2022
425 California StPioneer Fire Inc.20th/f-ste 2000: relocate existing pendents in order to update coverage for buildout. ref t.i. 202203281023
Details
Permit
202204202618
Permit issued
Apr 20, 2022
Final sign-off
Jun 9, 2022

20th/f-ste 2000: relocate existing pendents in order to update coverage for buildout. ref t.i. 202203281023

Open the permit page

$1,500
Apr 20, 2022Completed
final sign-off Jun 2022
425 California StPioneer Fire Inc.23rd/f: relocate 2 pendent sprinker heads. add 2 pendent sprinker heads. ref t.i. 202203240796
Details
Permit
202204202617
Permit issued
Apr 20, 2022
Final sign-off
Jun 9, 2022

23rd/f: relocate 2 pendent sprinker heads. add 2 pendent sprinker heads. ref t.i. 202203240796

Open the permit page

$2,000
Apr 14, 2022Completed
final sign-off Jun 2022
425 California StNovo Construction Inc23/f: electrical for t.i., new power/signal devices new 2019 title 24 compliant lighting & controls. ref pa#202203240796.
Details
Permit
202204142205
Permit issued
Apr 14, 2022
Final sign-off
Jun 1, 2022

23/f: electrical for t.i., new power/signal devices new 2019 title 24 compliant lighting & controls. ref pa#202203240796.

Open the permit page

$5,000
Mar 28, 2022Completed
final sign-off Jun 2022
425 California StNovo Construction Incste 2000: interior tenant improvement: new non-structural partitions, doors, glazing frames & hardware. m.e.p., fiee safety under separate permit.
Details
Permit
202203281023
Permit issued
Apr 7, 2022
Final sign-off
Jun 22, 2022

ste 2000: interior tenant improvement: new non-structural partitions, doors, glazing frames & hardware. m.e.p., fiee safety under separate permit.

Open the permit page

$450,000
Mar 24, 2022Completed
final sign-off Apr 2022
425 California StBilcor Incsuite 2100: fire life safety: install 5 ceiling mount speaker strobes. ref pa 202111303282.
Details
Permit
202203240754
Permit issued
Mar 24, 2022
Final sign-off
Apr 18, 2022

suite 2100: fire life safety: install 5 ceiling mount speaker strobes. ref pa 202111303282.

Open the permit page

$3,300
Mar 24, 2022Completed
final sign-off Jun 2022
425 California StNovo Construction Incste 2300. interior tenant improvement; minor updates new non structural partitions, finishes and lighting, mep, fire and life safety under sep permit.
Details
Permit
202203240796
Permit issued
Apr 7, 2022
Final sign-off
Jun 1, 2022

ste 2300. interior tenant improvement; minor updates new non structural partitions, finishes and lighting, mep, fire and life safety under sep permit.

Open the permit page

$305,000
Mar 7, 2022Completed
final sign-off Mar 2022
425 California StGolden Gate Fire Protection Incsuite 2100 21/f: relocate 12 pendent fire sprinklers on the 21/f. ref t.i. pa202201115771. maher n/a
Details
Permit
202203079345
Permit issued
Mar 7, 2022
Final sign-off
Mar 30, 2022

suite 2100 21/f: relocate 12 pendent fire sprinklers on the 21/f. ref t.i. pa202201115771. maher n/a

Open the permit page

$6,000
Jan 11, 2022Completed
final sign-off May 2022
425 California StNovo Construction Incste:2100: mechanical and electrical work for tenant improvement on the 21st floor. ref arch 202111303282
Details
Permit
202201115771
Permit issued
Jan 18, 2022
Final sign-off
May 25, 2022

ste:2100: mechanical and electrical work for tenant improvement on the 21st floor. ref arch 202111303282

Open the permit page

$175,000
Dec 15, 2021Never finaled
issued Dec 2021, no final
425 California StBilcor Incsuite 2025: install 2 ceiling mount speaker strobe fire life safety device. maher n/a.
Details
Permit
202112154448
Permit issued
Dec 15, 2021

suite 2025: install 2 ceiling mount speaker strobe fire life safety device. maher n/a.

Open the permit page

$1,320
Nov 30, 2021Completed
final sign-off May 2022
425 California StNovo Construction Incinterior tenant improvement, new finishes and fixtures. new non struc tural partitions, finish upgrades in e restroom. mep, fire life safety under sep permit
Details
Permit
202111303282
Permit issued
Jan 18, 2022
Final sign-off
May 25, 2022

interior tenant improvement, new finishes and fixtures. new non struc tural partitions, finish upgrades in e restroom. mep, fire life safety under sep permit

Open the permit page

$500,000
Oct 19, 2021Completed
final sign-off Feb 2022
425 California StGci, Incste 2025. interior tenant improvement: new non structural partition, new finishes and lighting. mep & fire life safety under sep permit
Details
Permit
202110190742
Permit issued
Dec 20, 2021
Final sign-off
Feb 9, 2022

ste 2025. interior tenant improvement: new non structural partition, new finishes and lighting. mep & fire life safety under sep permit

Open the permit page

$60,000
Oct 14, 2021Never finaled
issued Oct 2021, no final
425 California StMatrix Hg Incinstall new 1 ton mini split sytem to cool existing it closet. it closet is normally unoccupied.
Details
Permit
202110140475
Permit issued
Oct 18, 2021

install new 1 ton mini split sytem to cool existing it closet. it closet is normally unoccupied.

Open the permit page

$16,494
Sep 22, 2021Completed
final sign-off Feb 2022
425 California StGci, Inc15/f: title 24 compliances: new lighting fixtures & controles w/in tenant space. 2 new duplex receptacles & teledate outlets in office, remove (e) air handing unit start, replace new vfd.
Details
Permit
202109228926
Permit issued
Oct 18, 2021
Final sign-off
Feb 9, 2022

15/f: title 24 compliances: new lighting fixtures & controles w/in tenant space. 2 new duplex receptacles & teledate outlets in office, remove (e) air handing unit start, replace new vfd.

Open the permit page

Jul 22, 2021Completed
final sign-off Feb 2022
425 California StGci, Incinterior t.i.: mew finishes, fixtures & lighting. mep, fire and life safety uner separate permit.
Details
Permit
202107224890
Permit issued
Sep 23, 2021
Final sign-off
Feb 9, 2022

interior t.i.: mew finishes, fixtures & lighting. mep, fire and life safety uner separate permit.

Open the permit page

$130,000
Apr 26, 2021Completed
final sign-off Sep 2021
425 California Stvoluntary repair/replacement of diesel driven fire pump in kind including electric isolation of pump and connection of new pump to new controller. remove and replace existing pump housekeeping pad. electrical permit on deferred submittal.
Details
Permit
202104269363
Permit issued
May 20, 2021
Final sign-off
Sep 29, 2021

voluntary repair/replacement of diesel driven fire pump in kind including electric isolation of pump and connection of new pump to new controller. remove and replace existing pump housekeeping pad. electrical permit on deferred submittal.

Open the permit page

$209,154
Jul 9, 2020Completed
final sign-off Aug 2020
425 California StRed Hawk Fire & Security Ca Llc14/f, suite 400: as built for relocation of existing smoke detectors to it/server room. ref pa #202002114112
Details
Permit
202007099905
Permit issued
Jul 15, 2020
Final sign-off
Aug 17, 2020

14/f, suite 400: as built for relocation of existing smoke detectors to it/server room. ref pa #202002114112

Open the permit page

$7,800
Mar 11, 2020Never finaled
issued Mar 2020, no final
425 California StNovo Construction Incelectrical work for ti at suite 400. ref arch #201912300898
Details
Permit
202003116772
Permit issued
Mar 13, 2020

electrical work for ti at suite 400. ref arch #201912300898

Open the permit page

$35,000
Feb 21, 2020Completed
final sign-off Nov 2020
425 California StNovo Construction Inc4th flr - mechanical work for tenant improvement at suite 400. ref arch 201912300898.
Details
Permit
202002215046
Permit issued
Mar 9, 2020
Final sign-off
Nov 20, 2020

4th flr - mechanical work for tenant improvement at suite 400. ref arch 201912300898.

Open the permit page

$22,000
Feb 21, 2020Completed
final sign-off Aug 2020
425 California StNovo Construction Inc4th fl, ste 410 ti demo of non-structural partitions & finishes, new non-structural partitions & finishes. mech & elec and fire life safety under separate permit
Details
Permit
202002215095
Permit issued
Feb 26, 2020
Final sign-off
Aug 7, 2020

4th fl, ste 410 ti demo of non-structural partitions & finishes, new non-structural partitions & finishes. mech & elec and fire life safety under separate permit

Open the permit page

$139,000
Feb 11, 2020Completed
final sign-off Aug 2020
425 California StRed Hawk Fire & Security Ca Llc14th fl, ste 400 - fire alarm ti add 10 speaker strobes & 1 speaker only ref pa 2019-1230-0898
Details
Permit
202002114112
Permit issued
Feb 14, 2020
Final sign-off
Aug 10, 2020

14th fl, ste 400 - fire alarm ti add 10 speaker strobes & 1 speaker only ref pa 2019-1230-0898

Open the permit page

$7,800
Feb 11, 2020Completed
final sign-off Apr 2020
425 California StRed Hawk Fire & Security Ca Llc14th fl, ste 1400 - as built for pa 2019-1227-0826 remove control from design. added 2 smoke detectors on floor plan for door holder
Details
Permit
202002114110
Permit issued
Feb 14, 2020
Final sign-off
Apr 30, 2020

14th fl, ste 1400 - as built for pa 2019-1227-0826 remove control from design. added 2 smoke detectors on floor plan for door holder

Open the permit page

Feb 11, 2020Completed
final sign-off Apr 2020
425 California StGolden Gate Fire Protection Inc4th fl - fire sprinklers, relocate 23 pendents, 1 upright in suite 400 4th fl upgrade end of line bracing ref ti 201912300898
Details
Permit
202002114065
Permit issued
Feb 11, 2020
Final sign-off
Apr 30, 2020

4th fl - fire sprinklers, relocate 23 pendents, 1 upright in suite 400 4th fl upgrade end of line bracing ref ti 201912300898

Open the permit page

$12,000
Feb 3, 2020Completed
final sign-off Aug 2020
425 California StPeacock Constructiont-24 electrical for work under pa# 201910174873
Details
Permit
202002033330
Permit issued
Feb 3, 2020
Final sign-off
Aug 6, 2020

t-24 electrical for work under pa# 201910174873

Open the permit page

Jan 28, 2020Completed
final sign-off Feb 2020
425 California StMatrix Hg Incmech for 1400: new air distribution added to serve new space, new vav boxes (10), and (1) new fsd added. ref pa #201910174872.
Details
Permit
202001282890
Permit issued
Jan 28, 2020
Final sign-off
Feb 18, 2020

mech for 1400: new air distribution added to serve new space, new vav boxes (10), and (1) new fsd added. ref pa #201910174872.

Open the permit page

$109,879
Jan 15, 2020Never finaled
issued Jan 2020, no final
425 California StGolden Gate Fire Protection Incref pa# 201910174872; fire sprinklers as-built; new layout on fl. n/a maher
Details
Permit
202001151895
Permit issued
Jan 15, 2020

ref pa# 201910174872; fire sprinklers as-built; new layout on fl. n/a maher

Open the permit page

$1,000
Dec 30, 2019Completed
final sign-off Nov 2020
425 California StNovo Construction Incinteroir ti including demo of non structural partitions and finishes, new non structural partitions, millwork finishes. mech, elec, plumb, fire ls deferred
Details
Permit
201912300898
Permit issued
Jan 23, 2020
Final sign-off
Nov 16, 2020

interoir ti including demo of non structural partitions and finishes, new non structural partitions, millwork finishes. mech, elec, plumb, fire ls deferred

Open the permit page

$565,650
Dec 27, 2019Never finaled
issued Jan 2020, no final
425 California StRed Hawk Fire & Security Ca Llcfire alar ti on 14th fl add 14 speaker strobes, 1 duct detector for fsd with control, 1 control relay for smoke guard ref 201910174872
Details
Permit
201912270826
Permit issued
Jan 10, 2020

fire alar ti on 14th fl add 14 speaker strobes, 1 duct detector for fsd with control, 1 control relay for smoke guard ref 201910174872

Open the permit page

$13,000
Dec 12, 2019Completed
final sign-off Feb 2020
425 California StGolden Gate Fire Protection Inc14/f: ref pa# 201910174872; fire sprinkers relocate 31 pendant sprinklers and 31 upright sprinklers on the 14th fl. n/a maher
Details
Permit
201912129325
Permit issued
Dec 12, 2019
Final sign-off
Feb 1, 2020

14/f: ref pa# 201910174872; fire sprinkers relocate 31 pendant sprinklers and 31 upright sprinklers on the 14th fl. n/a maher

Open the permit page

$32,550
Dec 11, 2019Completed
final sign-off Feb 2020
425 California StMcclure Electric Incsuite #1400: title 24 lighting only. reference pa# 2019-1017-4872
Details
Permit
201912119190
Permit issued
Dec 11, 2019
Final sign-off
Feb 3, 2020

suite #1400: title 24 lighting only. reference pa# 2019-1017-4872

Open the permit page

Nov 7, 2019Completed
final sign-off Feb 2020
425 California StMatrix Hg Incste: 300 - ref pa# 201908169025; install (10) new vav boxes, (1) new fsd, and new air distribution to serve new space plan. n/a maher
Details
Permit
201911076711
Permit issued
Nov 7, 2019
Final sign-off
Feb 10, 2020

ste: 300 - ref pa# 201908169025; install (10) new vav boxes, (1) new fsd, and new air distribution to serve new space plan. n/a maher

Open the permit page

$122,064
Nov 5, 2019Completed
final sign-off Feb 2020
425 California StMcclure Electric Incste 300: title 24 lighting only. ref pa #201908169025
Details
Permit
201911056418
Permit issued
Nov 5, 2019
Final sign-off
Feb 10, 2020

ste 300: title 24 lighting only. ref pa #201908169025

Open the permit page

Oct 17, 2019Completed
final sign-off Feb 2020
425 California StRossi Builders Inc.suite 1400. interior tenant improvement. demo of non-structural partitions, new non-structural partitions, millwork, new restrooms. mep and fire life safety under separate permit. lobby, offices
Details
Permit
201910174872
Permit issued
Nov 25, 2019
Final sign-off
Feb 18, 2020

suite 1400. interior tenant improvement. demo of non-structural partitions, new non-structural partitions, millwork, new restrooms. mep and fire life safety under separate permit. lobby, offices

Open the permit page

$1,200,000
Oct 17, 2019Completed
final sign-off Aug 2020
425 California StPeacock Constructionsuite 810. interior tenant improvement. demo of non-structural partitions, new non-structural partitions, millwork, new restrooms. mep and fire life safety under separate permit
Details
Permit
201910174873
Permit issued
Dec 17, 2019
Final sign-off
Aug 6, 2020

suite 810. interior tenant improvement. demo of non-structural partitions, new non-structural partitions, millwork, new restrooms. mep and fire life safety under separate permit

Open the permit page

$141,660
Oct 15, 2019Completed
final sign-off Dec 2019
425 California StRed Hawk Fire & Security Ca Llcfire alarm suite 300 add 2 smoke det, 1 duct det for fsd w control, 1 relay for security interface, 1 relay for door holder, 2 sync modules, 16 ceiling speaker strobes, 2 speakers maher not req
Details
Permit
201910154458
Permit issued
Oct 22, 2019
Final sign-off
Dec 5, 2019

fire alarm suite 300 add 2 smoke det, 1 duct det for fsd w control, 1 relay for security interface, 1 relay for door holder, 2 sync modules, 16 ceiling speaker strobes, 2 speakers maher not req

Open the permit page

$1,700
Sep 5, 2019Completed
final sign-off Nov 2019
425 California StGolden Gate Fire Protection Incfire sprinklers: relocate 32 pendent sprinklers and 30 uprights on the 3rd fl. ref ti #201908169025.
Details
Permit
201909050700
Permit issued
Sep 19, 2019
Final sign-off
Nov 1, 2019

fire sprinklers: relocate 32 pendent sprinklers and 30 uprights on the 3rd fl. ref ti #201908169025.

Open the permit page

$32,550
Aug 16, 2019Completed
final sign-off Feb 2020
425 California StRossi Builders Inc.ti for suite 300: new non-structural partitions, millwork, new restrooms. mep and fire life safety under separate permit. maher na
Details
Permit
201908169025
Permit issued
Sep 5, 2019
Final sign-off
Feb 10, 2020

ti for suite 300: new non-structural partitions, millwork, new restrooms. mep and fire life safety under separate permit. maher na

Open the permit page

$1,000,000
Jul 23, 2019Completed
final sign-off Aug 2019
425 California StGolden Gate Fire Protection Inc26th flr, fire sprinklers. relocate 52 endents sprinklers and 4 uprights.ref pa 2019-0507-9944
Details
Permit
201907236611
Permit issued
Jul 24, 2019
Final sign-off
Aug 16, 2019

26th flr, fire sprinklers. relocate 52 endents sprinklers and 4 uprights.ref pa 2019-0507-9944

Open the permit page

$29,400
Jul 1, 2019Completed
final sign-off Aug 2019
425 California StRed Hawk Fire & Security Ca Llc26th fl - fire alarm ti - add 1 smoke detector, 18 speaker strobes & 12 speakers. ref pa 2019-0507-9944
Details
Permit
201907014810
Permit issued
Aug 2, 2019
Final sign-off
Aug 16, 2019

26th fl - fire alarm ti - add 1 smoke detector, 18 speaker strobes & 12 speakers. ref pa 2019-0507-9944

Open the permit page

$15,000
Jun 26, 2019Completed
final sign-off Nov 2020
425 California StPeacock Construction26th flr. t-24 mechanical and electrical for work for pa 201905079944
Details
Permit
201906264512
Permit issued
Jun 28, 2019
Final sign-off
Nov 23, 2020

26th flr. t-24 mechanical and electrical for work for pa 201905079944

Open the permit page

May 7, 2019Completed
final sign-off Nov 2020
425 California StPeacock Constructiontenant improvement demo of non structural partitoins, new finishes, lighting, mep, fire, ls, sprinkler under sep permit
Details
Permit
201905079944
Permit issued
May 14, 2019
Final sign-off
Nov 23, 2020

tenant improvement demo of non structural partitoins, new finishes, lighting, mep, fire, ls, sprinkler under sep permit

Open the permit page

$1,000,000
Nov 19, 2018Completed
final sign-off May 2019
425 California StPeacock Constructionbuilding lobby improvements, new furring walls, finishes and security desk
Details
Permit
201811196296
Permit issued
Nov 20, 2018
Final sign-off
May 30, 2019

building lobby improvements, new furring walls, finishes and security desk

Open the permit page

$100,000
Apr 2, 2018Never finaled
issued Aug 2019, no final
425 California StEricsson Inc Dba E U S Incretain existing antennas. remove 8 remote radio units (rru) remove 8 existing rrus, install 16 rrus, elocate 8 e duplexes from shelter to antennas, retain 4 raycaps retain 4 existing hybrid cables
Details
Permit
201804025195
Permit issued
Aug 19, 2019

retain existing antennas. remove 8 remote radio units (rru) remove 8 existing rrus, install 16 rrus, elocate 8 e duplexes from shelter to antennas, retain 4 raycaps retain 4 existing hybrid cables

Open the permit page

$25,000
Feb 21, 2018Completed
final sign-off Mar 2018
425 California StRed Hawk Fire & Security Ca Llcsuite 1700 17th floor: fire alarm t.i. add 1 smoke detector for new door holder. n/a for maher. ref app#201708084229
Details
Permit
201802211854
Permit issued
Feb 22, 2018
Final sign-off
Mar 6, 2018

suite 1700 17th floor: fire alarm t.i. add 1 smoke detector for new door holder. n/a for maher. ref app#201708084229

Open the permit page

$600
Dec 5, 2017Completed
final sign-off Jan 2018
425 California StRed Hawk Fire & Security Ca Llcfire alarm ti on 24th floor - relocate 3 speaker strobes & add 1 control relay for card reader. ref 2017-0921-9222. maher n/a.
Details
Permit
201712055490
Permit issued
Dec 5, 2017
Final sign-off
Jan 8, 2018

fire alarm ti on 24th floor - relocate 3 speaker strobes & add 1 control relay for card reader. ref 2017-0921-9222. maher n/a.

Open the permit page

$600
Nov 21, 2017Completed
final sign-off Jan 2018
425 California StC B F Incpartial scope - office tenant retrofit - lighting, power and signal, wiring, lightings and controls. ref pa 2017-0921-9222. maher na
Details
Permit
201711214476
Permit issued
Nov 21, 2017
Final sign-off
Jan 16, 2018

partial scope - office tenant retrofit - lighting, power and signal, wiring, lightings and controls. ref pa 2017-0921-9222. maher na

Open the permit page

$22,500
Nov 20, 2017Completed
final sign-off Jan 2018
425 California StPioneer Fire Inc.relocate 14 pendents ref pa 2017-0921-9222. n/a for maher
Details
Permit
201711204396
Permit issued
Nov 20, 2017
Final sign-off
Jan 19, 2018

relocate 14 pendents ref pa 2017-0921-9222. n/a for maher

Open the permit page

$5,950
Nov 7, 2017Completed
final sign-off Dec 2017
425 California StRed Hawk Fire & Security Ca Llcfire alarm as built for app#201710252194. n/a for maher
Details
Permit
201711073374
Permit issued
Nov 28, 2017
Final sign-off
Dec 21, 2017

fire alarm as built for app#201710252194. n/a for maher

Open the permit page

Nov 6, 2017Completed
final sign-off Jan 2018
425 California StRed Hawk Fire & Security Ca Llc17th floor suite 1700 fire alarm per t.i. - replace 1 existing power supply with new, add 14 speaker strobes, replace 2 speaker strobes, add 4 ceiling speakers only & 1 duct detector w/control relay for f.s.d. ref pa #201708084229. n/a maher ordinance
Details
Permit
201711063136
Permit issued
Nov 6, 2017
Final sign-off
Jan 16, 2018

17th floor suite 1700 fire alarm per t.i. - replace 1 existing power supply with new, add 14 speaker strobes, replace 2 speaker strobes, add 4 ceiling speakers only & 1 duct detector w/control relay for f.s.d. ref pa #201708084229. n/a maher ordinance

Open the permit page

$13,000
Oct 26, 2017Completed
final sign-off Nov 2017
425 California StGolden Gate Fire Protection Inc26th floor fire sprinklers - relcoate 3 pendent sprinklers. ref t.i. #201709279762. n/a maher ordiance
Details
Permit
201710262342
Permit issued
Oct 26, 2017
Final sign-off
Nov 13, 2017

26th floor fire sprinklers - relcoate 3 pendent sprinklers. ref t.i. #201709279762. n/a maher ordiance

Open the permit page

$1,500
Oct 25, 2017Completed
final sign-off Dec 2017
425 California StRed Hawk Fire & Security Ca Llc26th floor fire alarm t.i. - add 1 control relay for card reader & demo 1 strobe. ref pa #2017-0927-9762. n/a maher ordinance
Details
Permit
201710252194
Permit issued
Oct 26, 2017
Final sign-off
Dec 4, 2017

26th floor fire alarm t.i. - add 1 control relay for card reader & demo 1 strobe. ref pa #2017-0927-9762. n/a maher ordinance

Open the permit page

$600
Oct 23, 2017Never finaled
issued Nov 2017, no final
425 California StClune Construction Company L P26th floor: install low pressure ductwork, install new supply grill, install new return grill, re balance to values shown on m2.1. ref app#201709279762. n/a for maher
Details
Permit
201710232013
Permit issued
Nov 8, 2017

26th floor: install low pressure ductwork, install new supply grill, install new return grill, re balance to values shown on m2.1. ref app#201709279762. n/a for maher

Open the permit page

$130,000
Oct 17, 2017Completed
final sign-off Jan 2018
425 California StC B F Incpartial - scope office tenant retrofit: lighting, power and signal, wiring, lightng and controls. ref pa 2017-0808-4229. maher na
Details
Permit
201710171385
Permit issued
Oct 17, 2017
Final sign-off
Jan 10, 2018

partial - scope office tenant retrofit: lighting, power and signal, wiring, lightng and controls. ref pa 2017-0808-4229. maher na

Open the permit page

$32,000
Oct 17, 2017Completed
final sign-off Jan 2018
425 California StGci, Incsuite 1700 - revision to pa #201708084229 - project includes providing one additional urinal at mens restroom. n/a maher ordinance
Details
Permit
201710171421
Permit issued
Oct 30, 2017
Final sign-off
Jan 10, 2018

suite 1700 - revision to pa #201708084229 - project includes providing one additional urinal at mens restroom. n/a maher ordinance

Open the permit page

Oct 10, 2017Completed
final sign-off Nov 2017
425 California Stfire sprinkler permits. relocate 57 sprinklers on the 17th floor. t.i pa# 201708084229. maher na
Details
Permit
201710100743
Permit issued
Nov 3, 2017
Final sign-off
Nov 15, 2017

fire sprinkler permits. relocate 57 sprinklers on the 17th floor. t.i pa# 201708084229. maher na

Open the permit page

$12,500
Sep 27, 2017Completed
final sign-off Jan 2018
425 California StClune Construction Company L P26th floor: t.i. includes new non-load bearing partitions, and relocation of extg light fixtures. n/a for maher
Details
Permit
201709279762
Permit issued
Sep 29, 2017
Final sign-off
Jan 24, 2018

26th floor: t.i. includes new non-load bearing partitions, and relocation of extg light fixtures. n/a for maher

Open the permit page

$15,000
Sep 21, 2017Completed
final sign-off Jan 2018
425 California StGci, Inc24/f #2400- selective demo of (e) partitions, doors/frames, power/tile/data, lighting & millwork. construct (n) partitions, (n) power, (n) lighting fixtures, (n) millwork & finishes. minor ada upgrades to accessible restrooms. space is unoccupied. life safety & sprinkler modication as req under
Details
Permit
201709219222
Permit issued
Oct 30, 2017
Final sign-off
Jan 16, 2018

24/f #2400- selective demo of (e) partitions, doors/frames, power/tile/data, lighting & millwork. construct (n) partitions, (n) power, (n) lighting fixtures, (n) millwork & finishes. minor ada upgrades to accessible restrooms. space is unoccupied. life safety & sprinkler modication as req under

Open the permit page

$200,000
Aug 8, 2017Completed
final sign-off Jan 2018
425 California StGci, Incsuite demo partitions, doors/frames, power, ceilng/ltg, plmg fix. millwork & finishes. constctn of partitions power, ceilg/ltg, millwork & fnsh. nw buildout of accessible restrooms to achieve full barrier removal with associated ceiling, elec & finishes work. space is currentrly unoccupied.
Details
Permit
201708084229
Permit issued
Sep 15, 2017
Final sign-off
Jan 10, 2018

suite demo partitions, doors/frames, power, ceilng/ltg, plmg fix. millwork & finishes. constctn of partitions power, ceilg/ltg, millwork & fnsh. nw buildout of accessible restrooms to achieve full barrier removal with associated ceiling, elec & finishes work. space is currentrly unoccupied.

Open the permit page

$200,000
Dec 7, 2016Completed
final sign-off Dec 2016
425 California StSkyline Constructionste. 1200 - relocation of interior store front on 26th fl
Details
Permit
201612074333
Permit issued
Dec 7, 2016
Final sign-off
Dec 22, 2016

ste. 1200 - relocation of interior store front on 26th fl

Open the permit page

$5,000
Nov 16, 2016Completed
final sign-off Nov 2016
425 California StRed Hawk Fire & Security Ca Llcfire alarm ti on 2st floor. add (e) strobes & 1 speaker. ref pa 2016-0715-2504. maher na
Details
Permit
201611162894
Permit issued
Nov 16, 2016
Final sign-off
Nov 23, 2016

fire alarm ti on 2st floor. add (e) strobes & 1 speaker. ref pa 2016-0715-2504. maher na

Open the permit page

$2,000
Aug 17, 2016Completed
final sign-off Mar 2017
425 California StRed Hawk Fire & Security Ca Llc16th floor - fire alarm. add (20 speaker strobes in conference room. ref. t.i. #2015-0903-6040.
Details
Permit
201608175282
Permit issued
Aug 17, 2016
Final sign-off
Mar 22, 2017

16th floor - fire alarm. add (20 speaker strobes in conference room. ref. t.i. #2015-0903-6040.

Open the permit page

$1,000
Aug 17, 2016Completed
final sign-off Nov 2016
425 California StPioneer Fire Inc.relocate (6) pendents and remove (1) pendents ti pa 2016-0630-1347
Details
Permit
201608175228
Permit issued
Aug 17, 2016
Final sign-off
Nov 8, 2016

relocate (6) pendents and remove (1) pendents ti pa 2016-0630-1347

Open the permit page

$5,989
Jul 26, 2016Never finaled
issued Aug 2016, no final
425 California StGci, Incmodification of (e) hvac system to match new layout air balance maher na
Details
Permit
201607263345
Permit issued
Aug 10, 2016

modification of (e) hvac system to match new layout air balance maher na

Open the permit page

$4,000
Jul 26, 2016Never finaled
issued Aug 2016, no final
425 California StGci, Incpartial scope office ti retrofit: lighting, power, signal, wiring, lighting & receptacle controls maher na
Details
Permit
201607263347
Permit issued
Aug 10, 2016

partial scope office ti retrofit: lighting, power, signal, wiring, lighting & receptacle controls maher na

Open the permit page

Jul 15, 2016Completed
final sign-off Dec 2016
425 California StSan Francisco Commercial Builders Inc21st floor - remove (e) partition, new folding partition (e) conference room. convert (e) conference into two offices. open (e) conference room to main office. mechanical, plumbing, life safety and sprinkler under separate permit.
Details
Permit
201607152504
Permit issued
Sep 12, 2016
Final sign-off
Dec 14, 2016

21st floor - remove (e) partition, new folding partition (e) conference room. convert (e) conference into two offices. open (e) conference room to main office. mechanical, plumbing, life safety and sprinkler under separate permit.

Open the permit page

$100,000
Jun 30, 2016Completed
final sign-off Nov 2016
425 California StGci, Inc16th floor: build out 5 office with ele & ceiling lights; mep/fire/life safety deffered; maher na. ref t.i. 201509036040
Details
Permit
201606301347
Permit issued
Jul 7, 2016
Final sign-off
Nov 17, 2016

16th floor: build out 5 office with ele & ceiling lights; mep/fire/life safety deffered; maher na. ref t.i. 201509036040

Open the permit page

$25,000
Apr 13, 2016Completed
final sign-off May 2017
425 California StWavcomm Incverizon wireless - remove (e) antenna - replace with (8) antennas; remove 16 7/8" coax, (3) hybrid cables, ret calbe; install (8) a2; install (1) 6/12 hybrid cable; insall (3) recaps & antennas (3) in equipment room. maher na
Details
Permit
201604134691
Permit issued
Nov 7, 2016
Final sign-off
May 23, 2017

verizon wireless - remove (e) antenna - replace with (8) antennas; remove 16 7/8" coax, (3) hybrid cables, ret calbe; install (8) a2; install (1) 6/12 hybrid cable; insall (3) recaps & antennas (3) in equipment room. maher na

Open the permit page

$21,000
Mar 25, 2016Completed
final sign-off Oct 2016
425 California StAcco Engineered Systems Inc. Dba Acco Enreplace (e) chiller with new. same location and lighter weight. n/a ordinance #155-13
Details
Permit
201603253104
Permit issued
Mar 28, 2016
Final sign-off
Oct 6, 2016

replace (e) chiller with new. same location and lighter weight. n/a ordinance #155-13

Open the permit page

$600,000
Jan 20, 2016Completed
final sign-off Jan 2016
425 California StRed Hawk Fire & Security Ca Llc16th floor as-built revision: updated point to show actual field devices. n/a maher ordinance
Details
Permit
201601207416
Permit issued
Jan 20, 2016
Final sign-off
Jan 27, 2016

16th floor as-built revision: updated point to show actual field devices. n/a maher ordinance

Open the permit page

Dec 28, 2015Completed
final sign-off Apr 2017
425 California StJ And R Graphics Co3 fire evacuation plan signs for the 16th floor.
Details
Permit
201512285956
Permit issued
Dec 28, 2015
Final sign-off
Apr 10, 2017

3 fire evacuation plan signs for the 16th floor.

Open the permit page

$1,100
Dec 4, 2015Completed
final sign-off Mar 2016
425 California StPeacock Constructiont-24 mechanical for work done under pa 2015-0903-6040. maher na adding one fsd
Details
Permit
201512044247
Permit issued
Dec 7, 2015
Final sign-off
Mar 29, 2016

t-24 mechanical for work done under pa 2015-0903-6040. maher na adding one fsd

Open the permit page

$43,000
Nov 12, 2015Completed
final sign-off Dec 2015
425 California StGolden Gate Fire Protection Incfire sprinklers: relocate 62 pendent sprinklers on the 16th floor. maher na
Details
Permit
201511122352
Permit issued
Nov 12, 2015
Final sign-off
Dec 2, 2015

fire sprinklers: relocate 62 pendent sprinklers on the 16th floor. maher na

Open the permit page

$31,930
Nov 6, 2015Completed
final sign-off Mar 2016
425 California StPeacock Constructiont-24 electrical for work done under pa#201509036040. n/a ordinance #155-13
Details
Permit
201511061996
Permit issued
Nov 6, 2015
Final sign-off
Mar 29, 2016

t-24 electrical for work done under pa#201509036040. n/a ordinance #155-13

Open the permit page

$95,000
Nov 4, 2015Never finaled
issued Nov 2015, no final
425 California StRed Hawk Fire & Security Ca Llcadd 11 speaker/strobe, 3 strobes, 2 smokes, 2 control relays, 1 duct detector. maher na
Details
Permit
201511041653
Permit issued
Nov 4, 2015

add 11 speaker/strobe, 3 strobes, 2 smokes, 2 control relays, 1 duct detector. maher na

Open the permit page

$15,000
Oct 22, 2015Completed
final sign-off Oct 2015
425 California StRed Hawk Fire & Security Ca Llc6/f: adding 2 new speaker/strobes to replace existing strobe only. no t.i. n/a ordinance #155-13
Details
Permit
201510220517
Permit issued
Oct 27, 2015
Final sign-off
Oct 30, 2015

6/f: adding 2 new speaker/strobes to replace existing strobe only. no t.i. n/a ordinance #155-13

Open the permit page

$5,500
Sep 3, 2015Completed
final sign-off Mar 2016
425 California StPeacock Construction16th floor demo of (e) partitions,doors,frames,power/tele/data, ceiling/lighting, plumb fixts & millwork. construction of (n) partitions,power/tele/date, ceiling & light fixts, millwork, finishes. new buildout of accessible restrms for full barrier removal. space is currently unoccupied. approved
Details
Permit
201509036040
Permit issued
Sep 30, 2015
Final sign-off
Mar 29, 2016

16th floor demo of (e) partitions,doors,frames,power/tele/data, ceiling/lighting, plumb fixts & millwork. construction of (n) partitions,power/tele/date, ceiling & light fixts, millwork, finishes. new buildout of accessible restrms for full barrier removal. space is currently unoccupied. approved

Open the permit page

$200,000
Jul 7, 2015Completed
final sign-off Jul 2015
425 California StGolden Gate Fire Protection Incfire sprinkler only. relocate 7 fire sprinkler pendents for "metabiota" on the 2nd fl. ref #201505287343.
Details
Permit
201507070755
Permit issued
Jul 7, 2015
Final sign-off
Jul 15, 2015

fire sprinkler only. relocate 7 fire sprinkler pendents for "metabiota" on the 2nd fl. ref #201505287343.

Open the permit page

$3,500
Jun 24, 2015Completed
final sign-off Jan 2017
425 California StPeacock Constructiont24 electric for work done under 201505287343. maher not req
Details
Permit
201506249844
Permit issued
Jun 30, 2015
Final sign-off
Jan 27, 2017

t24 electric for work done under 201505287343. maher not req

Open the permit page

$46,000
Jun 22, 2015Completed
final sign-off Jan 2016
425 California StField Construction Inc.19th floor - m.e.p. work for pa #2015.0529.7489. n/a maher ordinance
Details
Permit
201506229528
Permit issued
Jun 22, 2015
Final sign-off
Jan 4, 2016

19th floor - m.e.p. work for pa #2015.0529.7489. n/a maher ordinance

Open the permit page

$25,000
Jun 18, 2015Completed
final sign-off Jul 2015
425 California StRed Hawk Fire & Security Ca Llcadding 6 speaker/strobes to existing system. t.i. pa#201505287343. n/a ordinance #155-13
Details
Permit
201506189259
Permit issued
Jun 18, 2015
Final sign-off
Jul 15, 2015

adding 6 speaker/strobes to existing system. t.i. pa#201505287343. n/a ordinance #155-13

Open the permit page

$5,500
Jun 4, 2015Completed
final sign-off Jul 2015
425 California StRed Hawk Fire & Security Ca Llc19th floor: adding one new speaker/strobe to new conference room and removing 2 extg strobes. n/a for maher.
Details
Permit
201506048046
Permit issued
Jun 4, 2015
Final sign-off
Jul 9, 2015

19th floor: adding one new speaker/strobe to new conference room and removing 2 extg strobes. n/a for maher.

Open the permit page

$4,500
May 29, 2015Completed
final sign-off Jan 2016
425 California StField Construction Inc.19th floor: revision to app#201411181817 original of work with additional construction of 8 new offices. new electrical and light relocation. n/a for the maher.
Details
Permit
201505297489
Permit issued
May 29, 2015
Final sign-off
Jan 4, 2016

19th floor: revision to app#201411181817 original of work with additional construction of 8 new offices. new electrical and light relocation. n/a for the maher.

Open the permit page

$10,000
May 28, 2015Completed
final sign-off Nov 2015
425 California StPeacock Construction2nd floor: project consists of minor demolition of partitions & finishes, & constructions of nw partitions, nw power nw tel/dat relocation of light fixtures & associated ceiling items, & reconfigure millwork & finishes. space is currently unoccupied. approved bldg smoke mngmnt consists of shutdown
Details
Permit
201505287343
Permit issued
Jun 1, 2015
Final sign-off
Nov 9, 2015

2nd floor: project consists of minor demolition of partitions & finishes, & constructions of nw partitions, nw power nw tel/dat relocation of light fixtures & associated ceiling items, & reconfigure millwork & finishes. space is currently unoccupied. approved bldg smoke mngmnt consists of shutdown

Open the permit page

$57,660
May 27, 2015Completed
final sign-off Jul 2015
425 California StJ And R Graphics Co6th floor fire evacuation plan signs. total of three signs. n/a maher
Details
Permit
201505277229
Permit issued
May 27, 2015
Final sign-off
Jul 9, 2015

6th floor fire evacuation plan signs. total of three signs. n/a maher

Open the permit page

$350
Apr 22, 2015Completed
final sign-off Aug 2015
425 California StPeacock Constructionrevision to pa#201503060137 to provide wall sconce j-box detail @ 2 hr. rated plaster elevator shaft wall. this is being provided per in field direction by fire inspector general james. n/a ordinance #155-13
Details
Permit
201504224347
Permit issued
Apr 24, 2015
Final sign-off
Aug 11, 2015

revision to pa#201503060137 to provide wall sconce j-box detail @ 2 hr. rated plaster elevator shaft wall. this is being provided per in field direction by fire inspector general james. n/a ordinance #155-13

Open the permit page

Apr 20, 2015Completed
final sign-off Jul 2015
425 California StRed Hawk Fire & Security Ca Llcref pa # 2015 0306 0137: adding 3 smoke detectors. 13 speakers /strobes, 2 strobes, 2 control relays & 2 interposing replays
Details
Permit
201504204039
Permit issued
Apr 20, 2015
Final sign-off
Jul 8, 2015

ref pa # 2015 0306 0137: adding 3 smoke detectors. 13 speakers /strobes, 2 strobes, 2 control relays & 2 interposing replays

Open the permit page

$7,500
Apr 13, 2015Completed
final sign-off May 2015
425 California StJ And R Graphics Cothree 19th floor fire evacuation plan signs. n/a maher ordinance
Details
Permit
201504133435
Permit issued
Apr 13, 2015
Final sign-off
May 11, 2015

three 19th floor fire evacuation plan signs. n/a maher ordinance

Open the permit page

$600
Apr 1, 2015Completed
final sign-off May 2015
425 California StGolden Gate Fire Protection Increlocate 30 pendents; add 6 pendents. relocate 25 uprights and plug off 9 outlets. total 61 fire sprinklers
Details
Permit
201504012518
Permit issued
Apr 2, 2015
Final sign-off
May 14, 2015

relocate 30 pendents; add 6 pendents. relocate 25 uprights and plug off 9 outlets. total 61 fire sprinklers

Open the permit page

$30,500
Mar 26, 2015Completed
final sign-off Apr 2015
425 California StRed Hawk Fire & Security Ca Llcadding 1 smoke detector, provide coverage for fsd, 1 control relay, interface to fsd, relocate a/v notification to cover new office rooms. revising pa#201501125440 t.i. pa#201411181817. n/a ordinance #155-13
Details
Permit
201503261915
Permit issued
Mar 26, 2015
Final sign-off
Apr 30, 2015

adding 1 smoke detector, provide coverage for fsd, 1 control relay, interface to fsd, relocate a/v notification to cover new office rooms. revising pa#201501125440 t.i. pa#201411181817. n/a ordinance #155-13

Open the permit page

$500
Mar 13, 2015Expired or cancelled
cancelled Jan 2026
425 California StField Construction Inc.revision to pa#201411181817 original scope of work with additional mechanical relief work at vestibule. n/a ordinance #155-13
Details
Permit
201503130754

revision to pa#201411181817 original scope of work with additional mechanical relief work at vestibule. n/a ordinance #155-13

Open the permit page

Mar 6, 2015Completed
final sign-off Aug 2015
425 California StPeacock Construction6th floor: new partitions, nw power and teledata, nw ceiling and light fixtures & nw millwork & finishes. also includes new bld out of accessible restrms to achieve full barrier removal with associated ceiling, elec finish work. demo under permit #201411181812. space is vacant.
Details
Permit
201503060137
Permit issued
Mar 9, 2015
Final sign-off
Aug 6, 2015

6th floor: new partitions, nw power and teledata, nw ceiling and light fixtures & nw millwork & finishes. also includes new bld out of accessible restrms to achieve full barrier removal with associated ceiling, elec finish work. demo under permit #201411181812. space is vacant.

Open the permit page

$350,000
Feb 12, 2015Never finaled
issued Mar 2015, no final
425 California StField Construction Inc.19th floor:revision to app#2014-1118-1817 for construction of 2 offices, one conference, 3 meeting rooms, one telecom and 1 copy room. life safety and sprinkler under separate permit. n/a for the maher.
Details
Permit
201502128229
Permit issued
Mar 5, 2015

19th floor:revision to app#2014-1118-1817 for construction of 2 offices, one conference, 3 meeting rooms, one telecom and 1 copy room. life safety and sprinkler under separate permit. n/a for the maher.

Open the permit page

Feb 4, 2015Completed
final sign-off Apr 2015
425 California StPribuss Engineering Inc19th flr: fire sprinkler t.i. permit 201501125476 as built permit; old work relocate/change 48 heads, adds 6 heads total 54 heads; total of 3 added sprinklers maher n/a
Details
Permit
201502047449
Permit issued
Feb 4, 2015
Final sign-off
Apr 3, 2015

19th flr: fire sprinkler t.i. permit 201501125476 as built permit; old work relocate/change 48 heads, adds 6 heads total 54 heads; total of 3 added sprinklers maher n/a

Open the permit page

Jan 12, 2015Completed
final sign-off Apr 2015
425 California StPribuss Engineering Incfire sprinkler t.i. under permit# 2014-0811-3509. relocate or change 48 heads. add 3 heads. 51 heads total.
Details
Permit
201501125476
Permit issued
Jan 12, 2015
Final sign-off
Apr 10, 2015

fire sprinkler t.i. under permit# 2014-0811-3509. relocate or change 48 heads. add 3 heads. 51 heads total.

Open the permit page

$26,246
Jan 12, 2015Completed
final sign-off May 2015
425 California StRed Hawk Fire & Security Ca Llc19th floor - add to existing loop 13 speaker/strobes & 1 strobe also 2 smoke det's, 1 relay & 1 interposing relay. ref pa #2014.1118.1817. n/a maher ordinance
Details
Permit
201501125440
Permit issued
Jan 12, 2015
Final sign-off
May 1, 2015

19th floor - add to existing loop 13 speaker/strobes & 1 strobe also 2 smoke det's, 1 relay & 1 interposing relay. ref pa #2014.1118.1817. n/a maher ordinance

Open the permit page

$7,500
Nov 21, 2014Completed
final sign-off Dec 2014
425 California StRed Hawk Fire & Security Ca Llcsubmitting as-builts to reflect added dor holder and smoke detectors refer to permit 201409186662 noted by inspector on 11/17; maher n/a
Details
Permit
201411212181
Permit issued
Nov 21, 2014
Final sign-off
Dec 2, 2014

submitting as-builts to reflect added dor holder and smoke detectors refer to permit 201409186662 noted by inspector on 11/17; maher n/a

Open the permit page

$200
Nov 18, 2014Completed
final sign-off Jan 2016
425 California StField Construction Inc.19th flr: project consist of construction of (n) partitions,(n)power & tele/data,(n) ceiling & light fixtures, & (n) millwork & finishes, also include (n) buildout of accessible restrooms for full barrier removal w/assoc ceiling elect & finish. demo score under 201408113509. space is current
Details
Permit
201411181817
Permit issued
Dec 19, 2014
Final sign-off
Jan 4, 2016

19th flr: project consist of construction of (n) partitions,(n)power & tele/data,(n) ceiling & light fixtures, & (n) millwork & finishes, also include (n) buildout of accessible restrooms for full barrier removal w/assoc ceiling elect & finish. demo score under 201408113509. space is current

Open the permit page

$200,000
Nov 18, 2014Completed
final sign-off Mar 2015
425 California StField Construction Inc.6th flr: project consist of demo of partitions, millwork, finishes & associated electrical, plumbing and ceiling work, including full demo of restrooms on a currently vacant floor, no modification of (e) mech or structural systems, path of travel docs are not provided per ab-017.; maher n/a
Details
Permit
201411181812
Permit issued
Feb 10, 2015
Final sign-off
Mar 27, 2015

6th flr: project consist of demo of partitions, millwork, finishes & associated electrical, plumbing and ceiling work, including full demo of restrooms on a currently vacant floor, no modification of (e) mech or structural systems, path of travel docs are not provided per ab-017.; maher n/a

Open the permit page

$35,000
Oct 7, 2014Never finaled
issued Oct 2014, no final
425 California Stevacuation plan on the 9th fl
Details
Permit
201410078273
Permit issued
Oct 7, 2014

evacuation plan on the 9th fl

Open the permit page

$1,200
Sep 18, 2014Completed
final sign-off Nov 2014
425 California StRed Hawk Fire & Security Ca Llc9th flr: adding 8 speaker/strobes & (2) strobes to be tied into existing system. ref 201406249300; maher n/a
Details
Permit
201409186662
Permit issued
Sep 18, 2014
Final sign-off
Nov 24, 2014

9th flr: adding 8 speaker/strobes & (2) strobes to be tied into existing system. ref 201406249300; maher n/a

Open the permit page

$7,500
Aug 29, 2014Completed
final sign-off Sep 2014
425 California StPribuss Engineering Incfire sprinkler ti 9th floor suite 950: add 3 , 31 relocate 31, total 34.ref app#201406249300. n/a for the maher ordinance #155-14
Details
Permit
201408295092
Permit issued
Sep 2, 2014
Final sign-off
Sep 29, 2014

fire sprinkler ti 9th floor suite 950: add 3 , 31 relocate 31, total 34.ref app#201406249300. n/a for the maher ordinance #155-14

Open the permit page

$17,497
Aug 11, 2014Expired or cancelled
expired Apr 2016
425 California StField Construction Inc.19th flr: project consist of demo of partitions, millwork, finishes & associated elec, plumbing & ceiling work, including full demo of restrooms on a currently vacant floor, no modification of (e) mechanical or structural systems, path of travel documents are not required per ab 017; maher n/a.
Details
Permit
201408113509
Permit issued
Sep 29, 2014

19th flr: project consist of demo of partitions, millwork, finishes & associated elec, plumbing & ceiling work, including full demo of restrooms on a currently vacant floor, no modification of (e) mechanical or structural systems, path of travel documents are not required per ab 017; maher n/a.

Open the permit page

$35,000
Jul 10, 2014Completed
final sign-off Feb 2015
425 California StRed Hawk Fire & Security Ca Llc26th floor: adding one new strobe, 2 new relays and relocate 2 extg speakers. ref app#201406097834. n/a for the maher ordinance #155-13
Details
Permit
201407100856
Permit issued
Jul 10, 2014
Final sign-off
Feb 20, 2015

26th floor: adding one new strobe, 2 new relays and relocate 2 extg speakers. ref app#201406097834. n/a for the maher ordinance #155-13

Open the permit page

$5,000
Jul 1, 2014Completed
final sign-off Jul 2014
425 California StRed Hawk Fire & Security Ca Llcrevising drawingins to reflect change an address of 2 smoke detector and a change to the cd setting at 5 horn/strobes already approval under permit appl. 2014.05.30.7055. maher n/a.
Details
Permit
201407010161
Permit issued
Jul 1, 2014
Final sign-off
Jul 1, 2014

revising drawingins to reflect change an address of 2 smoke detector and a change to the cd setting at 5 horn/strobes already approval under permit appl. 2014.05.30.7055. maher n/a.

Open the permit page

$200
Jun 24, 2014Completed
final sign-off Dec 2014
425 California StField Construction Inc.suite 950: demo of 2 tenant suites on 7th fl. new walls n elevator lobby, power and tele data, ceiling light fixtures and millwork & finishes. full demo of restrooms. buildout of access restrooms, full barrier removal with ceiling, elec, finishes. sp- fa sep. permit
Details
Permit
201406249300
Permit issued
Aug 21, 2014
Final sign-off
Dec 22, 2014

suite 950: demo of 2 tenant suites on 7th fl. new walls n elevator lobby, power and tele data, ceiling light fixtures and millwork & finishes. full demo of restrooms. buildout of access restrooms, full barrier removal with ceiling, elec, finishes. sp- fa sep. permit

Open the permit page

$200,000
Jun 19, 2014Completed
final sign-off Jun 2014
425 California StJ And R Graphics Cofire evacuation plan signs for 10/f & 11/f renovation. n/a ordinance #155-13. 6 total
Details
Permit
201406198848
Permit issued
Jun 19, 2014
Final sign-off
Jun 23, 2014

fire evacuation plan signs for 10/f & 11/f renovation. n/a ordinance #155-13. 6 total

Open the permit page

$1,000
Jun 17, 2014Never finaled
issued Jun 2014, no final
425 California St26th floor suite 2600 tenant imrpvement - relocate 7 heads. ref pa #2014.0609.7834. n/a maher ordinance
Details
Permit
201406178575
Permit issued
Jun 17, 2014

26th floor suite 2600 tenant imrpvement - relocate 7 heads. ref pa #2014.0609.7834. n/a maher ordinance

Open the permit page

$3,598
Jun 9, 2014Never finaled
issued Jun 2014, no final
425 California StSkyline Construction26th flr: tenant improvement to include addition of one private office and separation wall at trading desk; compliance with ord 155-13 not required
Details
Permit
201406097834
Permit issued
Jun 10, 2014

26th flr: tenant improvement to include addition of one private office and separation wall at trading desk; compliance with ord 155-13 not required

Open the permit page

$8,000
May 30, 2014Completed
final sign-off Jul 2014
425 California StRed Hawk Fire & Security Ca Llcinclude adding (4) speakers/strobes, (2) strobe & (2) smokes with (2) control relays and (1) interpassjng relay. (1) duct detector for fsd reference mech pa#2014.0425.4172; compliance with ord 155-13 not required
Details
Permit
201405307055
Permit issued
May 30, 2014
Final sign-off
Jul 1, 2014

include adding (4) speakers/strobes, (2) strobe & (2) smokes with (2) control relays and (1) interpassjng relay. (1) duct detector for fsd reference mech pa#2014.0425.4172; compliance with ord 155-13 not required

Open the permit page

$7,500
Apr 25, 2014Expired or cancelled
expired Apr 2016
425 California StMatrix Hg Increplace (e) diffusers, re-zone based on partition changes. t.i.pa# 201402289577. n/a ordinance #155-13.
Details
Permit
201404254172
Permit issued
Apr 28, 2014

replace (e) diffusers, re-zone based on partition changes. t.i.pa# 201402289577. n/a ordinance #155-13.

Open the permit page

$20,000
Apr 21, 2014Completed
final sign-off Jun 2014
425 California Stfire sprinkler permit, relocate 41, add 19 and delete 25 pendent, sprinklers on the 10th floor, t.i. pa#201404039577. re-cal'd for flex drops. n/a ordinance #155-13
Details
Permit
201404213697
Permit issued
Apr 21, 2014
Final sign-off
Jun 30, 2014

fire sprinkler permit, relocate 41, add 19 and delete 25 pendent, sprinklers on the 10th floor, t.i. pa#201404039577. re-cal'd for flex drops. n/a ordinance #155-13

Open the permit page

$30,840
Mar 4, 2014Expired or cancelled
expired Apr 2016
425 California StBcci Construction Company5th floor evac signage as required, 3 signs total.
Details
Permit
201403049780
Permit issued
Mar 4, 2014

5th floor evac signage as required, 3 signs total.

Open the permit page

$500
Feb 28, 2014Completed
final sign-off Feb 2015
425 California StSkyline Constructiont.i. full 10/f: selective demo. (n) ceiling/lighting, power/data/finishes, full demo of restrooms & (n) accessible restroom for barrier removal with (n) ceiling, lights, power,data & finishes. interior connecting staircase between 10/f & 11/f for same tenant. 11/f: minor work at (n) staircase area.
Details
Permit
201402289577
Permit issued
Mar 24, 2014
Final sign-off
Feb 27, 2015

t.i. full 10/f: selective demo. (n) ceiling/lighting, power/data/finishes, full demo of restrooms & (n) accessible restroom for barrier removal with (n) ceiling, lights, power,data & finishes. interior connecting staircase between 10/f & 11/f for same tenant. 11/f: minor work at (n) staircase area.

Open the permit page

$300,000
Feb 10, 2014Expired or cancelled
expired Apr 2016
425 California StBcci Construction Companyinstall and relocate grilles and air distribution. 48 new light fixtures. associated with 201311262828
Details
Permit
201402108196
Permit issued
Feb 10, 2014

install and relocate grilles and air distribution. 48 new light fixtures. associated with 201311262828

Open the permit page

$24,000
Jan 24, 2014Completed
final sign-off Feb 2014
425 California StRed Hawk Fire & Security Ca Llc2nd floor: suite 200: adding 2 speakers, relocating one extg smoke det., and 4 speaker/strobes. t.i. app#201311262828. n/a for maher ordinance no. 155-13.
Details
Permit
201401246977
Permit issued
Jan 24, 2014
Final sign-off
Feb 26, 2014

2nd floor: suite 200: adding 2 speakers, relocating one extg smoke det., and 4 speaker/strobes. t.i. app#201311262828. n/a for maher ordinance no. 155-13.

Open the permit page

$7,000
Jan 21, 2014Completed
final sign-off Jul 2016
425 California StAyoob & Peery Plumbing Co Inc1 add, 6 relocate , and 1 remove. reference ti 2013.1126.2828
Details
Permit
201401216666
Permit issued
Jan 21, 2014
Final sign-off
Jul 29, 2016

1 add, 6 relocate , and 1 remove. reference ti 2013.1126.2828

Open the permit page

$3,598
Jan 2, 2014Completed
final sign-off Feb 2014
425 California StCahill Const Service Increvision to app#201309126628. revised 4th and 18th floor evacuation plan signs. (6 signs)
Details
Permit
201401025465
Permit issued
Jan 8, 2014
Final sign-off
Feb 11, 2014

revision to app#201309126628. revised 4th and 18th floor evacuation plan signs. (6 signs)

Open the permit page

Dec 20, 2013Completed
final sign-off Mar 2014
425 California StAyoob & Peery Plumbing Co Incadd & relocate fire sprinkler heads per tenant improvements (add 5) (relocate 54)) 5th floor. ref pa 201311010857
Details
Permit
201312204703
Permit issued
Dec 20, 2013
Final sign-off
Mar 6, 2014

add & relocate fire sprinkler heads per tenant improvements (add 5) (relocate 54)) 5th floor. ref pa 201311010857

Open the permit page

$30,326
Dec 19, 2013Completed
final sign-off Mar 2014
425 California StRed Hawk Fire & Security Ca Llc5th floor:t.i. work to include reloction of 1 extg smoke det., adding 15 speaker/strobes, adding 11 speakers, adding 2 new smoke det. and adding 1 duct det, 2 control relay, and 1 interposing relay. ti app#201311010857
Details
Permit
201312194550
Permit issued
Dec 19, 2013
Final sign-off
Mar 13, 2014

5th floor:t.i. work to include reloction of 1 extg smoke det., adding 15 speaker/strobes, adding 11 speakers, adding 2 new smoke det. and adding 1 duct det, 2 control relay, and 1 interposing relay. ti app#201311010857

Open the permit page

$7,500
Dec 6, 2013Completed
final sign-off Dec 2014
425 California StBcci Construction Company5th floor - mechanical & electrical work associated with t.i.#201311010857 minor demo of hvac & new lighting.
Details
Permit
201312063524
Permit issued
Dec 9, 2013
Final sign-off
Dec 26, 2014

5th floor - mechanical & electrical work associated with t.i.#201311010857 minor demo of hvac & new lighting.

Open the permit page

$75,000
Nov 26, 2013Completed
final sign-off Feb 2014
425 California StBcci Construction Company2nd floor - demolitoin of full floor tenant suite, construction to include (n) tenant partitions, (n) power & tele/data, (n) eciling & light fixtures, (n) millwork & finishes. space is currently unoccupied, designbuild mech, elec, plbg life safety & sprinkler is under separate permit.
Details
Permit
201311262828
Permit issued
Dec 23, 2013
Final sign-off
Feb 27, 2014

2nd floor - demolitoin of full floor tenant suite, construction to include (n) tenant partitions, (n) power & tele/data, (n) eciling & light fixtures, (n) millwork & finishes. space is currently unoccupied, designbuild mech, elec, plbg life safety & sprinkler is under separate permit.

Open the permit page

$175,000
Nov 15, 2013Completed
final sign-off Oct 2015
425 California StL.D. Strobel Co Ltdverizon wireless proposes to replace 4 (e) 4' antennas w/ 4 (n) 4' aws antennas, 1 per sector, add 8 (n) rrh units, 4 (n) raycaps, hybrid cables & ret cables and one new conduit.
Details
Permit
201311152059
Permit issued
Jun 19, 2015
Final sign-off
Oct 6, 2015

verizon wireless proposes to replace 4 (e) 4' antennas w/ 4 (n) 4' aws antennas, 1 per sector, add 8 (n) rrh units, 4 (n) raycaps, hybrid cables & ret cables and one new conduit.

Open the permit page

$18,000
Nov 1, 2013Completed
final sign-off Mar 2014
425 California StBcci Construction Companyselective demolition of full floor tenant suite build out of 2 adjacent suites. new tenant and demising partitions, entry doors with associated corridor extension, new power and tele/data, ceiling and light fixt, millwork,finishes. accessible restrooms for full barrier removal. unoccupied space.
Details
Permit
201311010857
Permit issued
Nov 21, 2013
Final sign-off
Mar 18, 2014

selective demolition of full floor tenant suite build out of 2 adjacent suites. new tenant and demising partitions, entry doors with associated corridor extension, new power and tele/data, ceiling and light fixt, millwork,finishes. accessible restrooms for full barrier removal. unoccupied space.

Open the permit page

$276,000
Oct 9, 2013Completed
final sign-off Oct 2013
425 California StRed Hawk Fire & Security Ca Llc4th floor:removing addition of duct detector to be replaced by smoke detector changed address of 2 devices all to be reflected on new set of drawings as requested by inspector. ref app#201309045880
Details
Permit
201310098820
Permit issued
Oct 9, 2013
Final sign-off
Oct 24, 2013

4th floor:removing addition of duct detector to be replaced by smoke detector changed address of 2 devices all to be reflected on new set of drawings as requested by inspector. ref app#201309045880

Open the permit page

$50
Sep 24, 2013Expired or cancelled
expired Apr 2016
425 California StRed Hawk Fire & Security Ca Llcrevised pa#201309197197 to include: remove (e) pull station to be replaced by emergency door release removing dd to sd, relay & interposing relay inside it room to control damper, change 3 ceiling speaker/strobe to wall mounted version, changed qty. of speaker to 3 & qty. of speaker/strobe to 14.
Details
Permit
201309247550
Permit issued
Sep 24, 2013

revised pa#201309197197 to include: remove (e) pull station to be replaced by emergency door release removing dd to sd, relay & interposing relay inside it room to control damper, change 3 ceiling speaker/strobe to wall mounted version, changed qty. of speaker to 3 & qty. of speaker/strobe to 14.

Open the permit page

$200
Sep 19, 2013Completed
final sign-off Oct 2013
425 California StRed Hawk Fire & Security Ca Llc18th floor-t.i scope-relocating 2 (e) smoke detectors, 1 (e) manual pull, adding 18 speaker/strobes, 8 speakers, 2 control relays, 3 interposing relays, 1 duct detector fan shutdown & fsd control. ref pa#201306199912
Details
Permit
201309197197
Permit issued
Sep 19, 2013
Final sign-off
Oct 31, 2013

18th floor-t.i scope-relocating 2 (e) smoke detectors, 1 (e) manual pull, adding 18 speaker/strobes, 8 speakers, 2 control relays, 3 interposing relays, 1 duct detector fan shutdown & fsd control. ref pa#201306199912

Open the permit page

$7,500
Sep 12, 2013Completed
final sign-off Feb 2014
425 California StCahill Const Service Inc4th & 18th floors-evacuation sign/map-6 signs total
Details
Permit
201309126628
Permit issued
Sep 18, 2013
Final sign-off
Feb 11, 2014

4th & 18th floors-evacuation sign/map-6 signs total

Open the permit page

$1,000
Sep 4, 2013Completed
final sign-off Oct 2013
425 California StRed Hawk Fire & Security Ca Llc4th floor suite 410 -t.i relocate 3 (e) speaker/strobes, add 2 speaker/strobes, 3 speakers, 1 smoke detector, 1 control module, 1 interposing relay for door holder control, 1 duct det, 2 control relay's & 2 interposing relay's for fire/smoke damper control into (e) system, ref ti #201307121736.
Details
Permit
201309045880
Permit issued
Sep 4, 2013
Final sign-off
Oct 31, 2013

4th floor suite 410 -t.i relocate 3 (e) speaker/strobes, add 2 speaker/strobes, 3 speakers, 1 smoke detector, 1 control module, 1 interposing relay for door holder control, 1 duct det, 2 control relay's & 2 interposing relay's for fire/smoke damper control into (e) system, ref ti #201307121736.

Open the permit page

$10,000
Aug 23, 2013Never finaled
issued Sep 2013, no final
425 California StCahill Const Service Inctitle 24 mep. adding new fire smoke dampers andd smoke detection- reference application #201306199912
Details
Permit
201308235105
Permit issued
Sep 24, 2013

title 24 mep. adding new fire smoke dampers andd smoke detection- reference application #201306199912

Open the permit page

Aug 23, 2013Expired or cancelled
expired Apr 2016
425 California StCahill Const Service Inctitle 24/mep permits. ref app#201307121736
Details
Permit
201308235099
Permit issued
Sep 18, 2013

title 24/mep permits. ref app#201307121736

Open the permit page

Jul 29, 2013Completed
final sign-off Oct 2013
425 California StWestates Mechanical Corporation Inc18th floor. relocate 56 pendent and add 9 upright heads. t.i. app201306199912
Details
Permit
201307292984
Permit issued
Aug 7, 2013
Final sign-off
Oct 8, 2013

18th floor. relocate 56 pendent and add 9 upright heads. t.i. app201306199912

Open the permit page

$33,410
Jul 12, 2013Expired or cancelled
expired Apr 2016
425 California StCahill Const Service Incdemolition of non structural interior walls. remodel 4th fl restrooms consisting of new fixtures, ceilings, finishes, minor remodel of suite 410 related to restroom modifications. create a new rated elevator lobby. mep, f/a and sprinklers separate permit
Details
Permit
201307121736
Permit issued
Jul 29, 2013

demolition of non structural interior walls. remodel 4th fl restrooms consisting of new fixtures, ceilings, finishes, minor remodel of suite 410 related to restroom modifications. create a new rated elevator lobby. mep, f/a and sprinklers separate permit

Open the permit page

$100,000
Jun 19, 2013Completed
final sign-off Dec 2013
425 California StCahill Contractors Incdemolition of non-structural interior. remodel of office interior consisting of private office, conference rooms & support spaces. upgrade existing restrooms. mep under separate permits.
Details
Permit
201306199912
Permit issued
Jun 21, 2013
Final sign-off
Dec 17, 2013

demolition of non-structural interior. remodel of office interior consisting of private office, conference rooms & support spaces. upgrade existing restrooms. mep under separate permits.

Open the permit page

$365,000
Apr 12, 2013Expired or cancelled
expired Apr 2016
425 California StJ And R Graphics Coreplacing extg fire evacuation plan signs.
Details
Permit
201304124423
Permit issued
Apr 12, 2013

replacing extg fire evacuation plan signs.

Open the permit page

$9,753
Oct 10, 2012Completed
final sign-off Mar 2013
401 California StFrans Construction Inc.minor interior remodel of existing chase bank, new offices, ceiling & finishes.
Details
Permit
201210101671
Permit issued
Jan 17, 2013
Final sign-off
Mar 8, 2013

minor interior remodel of existing chase bank, new offices, ceiling & finishes.

Open the permit page

$135,239
Apr 19, 2011Completed
final sign-off Apr 2016
425 California Stumberella permit on 2nd & 15th floor - compliance with high rise sprinkler ordinance #377-93, no work, completion for pa #200511047434.
Details
Permit
201104194367
Permit issued
Apr 19, 2011
Final sign-off
Apr 29, 2016

umberella permit on 2nd & 15th floor - compliance with high rise sprinkler ordinance #377-93, no work, completion for pa #200511047434.

Open the permit page

Feb 18, 2011Completed
final sign-off Apr 2011
425 California StWestates Mechanical Corporation Increvision to appl #201012015878 - add 2 pendent sprinklers.
Details
Permit
201102180577
Permit issued
Feb 22, 2011
Final sign-off
Apr 5, 2011

revision to appl #201012015878 - add 2 pendent sprinklers.

Open the permit page

$400
Jan 28, 2011Completed
final sign-off Apr 2011
425 California StDiversified Fire Productsfire alarm ti 15th fl suite 1500. 2 smoke dampers, 1 pam relay, 14 speakers, 12 speaker/strobes/strobe
Details
Permit
201101289203
Permit issued
Jan 28, 2011
Final sign-off
Apr 5, 2011

fire alarm ti 15th fl suite 1500. 2 smoke dampers, 1 pam relay, 14 speakers, 12 speaker/strobes/strobe

Open the permit page

$10,000
Jan 19, 2011Completed
final sign-off Apr 2011
425 California StStripe Inc. Dba Garnett Sign Studiofor 15th floor only - 1 stairwell & elevator evacuation map.
Details
Permit
201101198608
Permit issued
Jan 24, 2011
Final sign-off
Apr 5, 2011

for 15th floor only - 1 stairwell & elevator evacuation map.

Open the permit page

$1,500
Jan 13, 2011Completed
final sign-off Apr 2011
425 California StCahill Const Service Inc15th floor m.e.p - title 24, install new ductwork for perimeter & interior zones, new vavs, new lighting. ref pa #201012176944. no card readers on this permit.
Details
Permit
201101138336
Permit issued
Jan 26, 2011
Final sign-off
Apr 5, 2011

15th floor m.e.p - title 24, install new ductwork for perimeter & interior zones, new vavs, new lighting. ref pa #201012176944. no card readers on this permit.

Open the permit page

$100,000
Dec 17, 2010Completed
final sign-off May 2011
425 California StCahill Const Service Inc26th floor:tenant improvements consisting of offices including non bearing partitions, doors, side light glazing, new power and new finishes. no structural work to be performed.
Details
Permit
201012176949
Permit issued
Dec 28, 2010
Final sign-off
May 23, 2011

26th floor:tenant improvements consisting of offices including non bearing partitions, doors, side light glazing, new power and new finishes. no structural work to be performed.

Open the permit page

$50,000
Dec 17, 2010Completed
final sign-off Apr 2011
425 California StCahill Const Service Inc15th floor:tenant improvements consisting of offices including non bearing partitions, doors, side light glazing, new lighting,new power and new finishes.associated mechanical, electrical and fire life safety to be design built and performed under seperate permit. no structural work to be performed.
Details
Permit
201012176944
Permit issued
Dec 22, 2010
Final sign-off
Apr 5, 2011

15th floor:tenant improvements consisting of offices including non bearing partitions, doors, side light glazing, new lighting,new power and new finishes.associated mechanical, electrical and fire life safety to be design built and performed under seperate permit. no structural work to be performed.

Open the permit page

$350,000
Dec 1, 2010Completed
final sign-off Apr 2011
425 California StWestates Mechanical Corporation Incinstall new fire sprinkler system at 15th fl from existing prv on that floor
Details
Permit
201012015878
Permit issued
Dec 1, 2010
Final sign-off
Apr 5, 2011

install new fire sprinkler system at 15th fl from existing prv on that floor

Open the permit page

$31,500
Sep 17, 2010Completed
final sign-off Apr 2011
425 California Stcreate evacuation sign for the 24th floor ( qty 3)
Details
Permit
201009171085
Permit issued
Sep 17, 2010
Final sign-off
Apr 5, 2011

create evacuation sign for the 24th floor ( qty 3)

Open the permit page

$750
Sep 16, 2010Completed
final sign-off Apr 2011
425 California StCahill Const Service Inc15th floor: full floor demolition of interior partitions, ceiling systems, plmg, fixtures, electrical outlets and associated components. sprinkler/fa under separate permits.
Details
Permit
201009161033
Permit issued
Sep 16, 2010
Final sign-off
Apr 5, 2011

15th floor: full floor demolition of interior partitions, ceiling systems, plmg, fixtures, electrical outlets and associated components. sprinkler/fa under separate permits.

Open the permit page

$40,000
Sep 13, 2010Expired or cancelled
expired Apr 2016
425 California StPark Place Contractors, Jemcomadd 2 new antennas on new mount on roof. add new battery rach with 24 batteries and replace 3 existing cabinets with new inside existing verizon equipment room.
Details
Permit
201009130752
Permit issued
Mar 7, 2011

add 2 new antennas on new mount on roof. add new battery rach with 24 batteries and replace 3 existing cabinets with new inside existing verizon equipment room.

Open the permit page

$20,000
Aug 23, 2010Completed
final sign-off Apr 2011
425 California StPribuss Engineering Inc24th floor-fire sprinkler tenant-relocate 58 heads
Details
Permit
201008239345
Permit issued
Aug 23, 2010
Final sign-off
Apr 5, 2011

24th floor-fire sprinkler tenant-relocate 58 heads

Open the permit page

$14,500
Aug 19, 2010Completed
final sign-off Apr 2011
425 California StCahill Const Service Inc24th fl, mep. relocate supply ductwork run for perimeter and interior aones. install 1 new vav for interior zones. dmo and cap partial ductworks. furnish new 24x24 supply and return grilles. also related electrical/lighting per plans
Details
Permit
201008199123
Permit issued
Aug 19, 2010
Final sign-off
Apr 5, 2011

24th fl, mep. relocate supply ductwork run for perimeter and interior aones. install 1 new vav for interior zones. dmo and cap partial ductworks. furnish new 24x24 supply and return grilles. also related electrical/lighting per plans

Open the permit page

$100,000
Aug 18, 2010Completed
final sign-off Apr 2011
425 California StDiversified Fire Products24th floor - fire alarm t.i. for tenant, adding 1 control relay, 15 speaker/strobes, 1 smoke detector, 2 strobes.
Details
Permit
201008189009
Permit issued
Aug 18, 2010
Final sign-off
Apr 5, 2011

24th floor - fire alarm t.i. for tenant, adding 1 control relay, 15 speaker/strobes, 1 smoke detector, 2 strobes.

Open the permit page

$14,388
Jun 4, 2010Completed
final sign-off Apr 2011
425 California StCahill Const Service Incdemo of 536 lineal ft of drywall partition apprx. 5,700 sqft of acoustic ceiling. install 480 lin.ft of drywall partition, 5,700 sqft of acoustic ceiling grid & tile. new doors & frames & lighting. upgrade the (e) restroom to fully compliant. mep; fire alarm; sprinkler; under separate permit.
Details
Permit
201006043822
Permit issued
Aug 3, 2010
Final sign-off
Apr 5, 2011

demo of 536 lineal ft of drywall partition apprx. 5,700 sqft of acoustic ceiling. install 480 lin.ft of drywall partition, 5,700 sqft of acoustic ceiling grid & tile. new doors & frames & lighting. upgrade the (e) restroom to fully compliant. mep; fire alarm; sprinkler; under separate permit.

Open the permit page

$410,000
Mar 9, 2010Never finaled
issued Mar 2010, no final
401 California StGolden Gate Sign Company Inc.erect a electric single faced direct new sign
Details
Permit
201003097838
Permit issued
Mar 10, 2010

erect a electric single faced direct new sign

Open the permit page

$2,500
Jan 13, 2010Never finaled
issued Jan 2010, no final
401 California Ststreet space & mta
Details
Permit
M188153
Permit issued
Jan 13, 2010

street space & mta

Open the permit page

Dec 10, 2009Expired or cancelled
expired Apr 2016
425 California StDiversified Fire Productsfire alarm ti for chase bank at 401 california 1st fl: add 4 speaker/strobes, relocate existing notification of pull station
Details
Permit
200912102959
Permit issued
Dec 10, 2009

fire alarm ti for chase bank at 401 california 1st fl: add 4 speaker/strobes, relocate existing notification of pull station

Open the permit page

$10,032
Nov 13, 2009Completed
final sign-off Aug 2010
401 California StAnderson, Rowe & Buckley, Inc.tenant improvments to the existing fire sprinkler system, 1st fl
Details
Permit
200911131206
Permit issued
Nov 13, 2009
Final sign-off
Aug 30, 2010

tenant improvments to the existing fire sprinkler system, 1st fl

Open the permit page

$2,600
Nov 12, 2009Completed
final sign-off Jul 2010
401 California StGolden Gate Sign Company Inc.work on #425 california st. erect a electric wall single faced sign.
Details
Permit
200911121057
Permit issued
Feb 19, 2010
Final sign-off
Jul 14, 2010

work on #425 california st. erect a electric wall single faced sign.

Open the permit page

$65,000
Nov 12, 2009Completed
final sign-off Jul 2010
401 California StGolden Gate Sign Company Inc.work on #401 california st. erect a electric wall single faced sign.
Details
Permit
200911121060
Permit issued
Feb 19, 2010
Final sign-off
Jul 14, 2010

work on #401 california st. erect a electric wall single faced sign.

Open the permit page

$20,000
Aug 28, 2009Completed
final sign-off Aug 2010
401 California StDbsi Inc Dba Design Build Solutions & In1st fl-revised scope of work. exterior glazing will be full height to match existing windows. rev. to pa# 2009.05.18.8573. no elect. work under this rev. work limited to 1st fl only- sprinkler and fire alarm-separte permit
Details
Permit
200908285790
Permit issued
Jun 18, 2010
Final sign-off
Aug 30, 2010

1st fl-revised scope of work. exterior glazing will be full height to match existing windows. rev. to pa# 2009.05.18.8573. no elect. work under this rev. work limited to 1st fl only- sprinkler and fire alarm-separte permit

Open the permit page

$150,000
Aug 19, 2009Completed
final sign-off Sep 2010
401 California StDbsi Inc Dba Design Build Solutions & In1st floor-add electrical boxes and 9 pendent lights. change specs. on bcm office from wood frame to glazing system. reev. to pa# 2009.05.18.8573. work on 1st fl only
Details
Permit
200908195136
Permit issued
Jun 18, 2010
Final sign-off
Sep 2, 2010

1st floor-add electrical boxes and 9 pendent lights. change specs. on bcm office from wood frame to glazing system. reev. to pa# 2009.05.18.8573. work on 1st fl only

Open the permit page

$2,500
Jul 15, 2009Completed
final sign-off Dec 2009
425 California StPark Place Contractors, N S A Wireless Incadd three antennas/ 1-per sector (new).
Details
Permit
200907152676
Permit issued
Aug 18, 2009
Final sign-off
Dec 23, 2009

add three antennas/ 1-per sector (new).

Open the permit page

$8,900
May 18, 2009Completed
final sign-off Sep 2010
401 California StDbsi Inc Dba Design Build Solutions & Indemolition of existing finishes, non structural partitions and millwork. rework includes new interior storefront at foyer, new finishes, minor electrical and mechanical
Details
Permit
200905188573
Permit issued
Aug 19, 2009
Final sign-off
Sep 2, 2010

demolition of existing finishes, non structural partitions and millwork. rework includes new interior storefront at foyer, new finishes, minor electrical and mechanical

Open the permit page

$100,000
May 6, 2009Completed
final sign-off Jan 2010
425 California StCahill Const Service Increplace main entry doors and glass panel above doors, modify existing canopy, reduce the number lights and modify 250 sf of sidewalk
Details
Permit
200905067776
Permit issued
Sep 2, 2009
Final sign-off
Jan 28, 2010

replace main entry doors and glass panel above doors, modify existing canopy, reduce the number lights and modify 250 sf of sidewalk

Open the permit page

$176,000
Mar 6, 2009Expired or cancelled
expired Apr 2016
425 California StDiversified Fire Productsfire alarm ti, elevator upgrade, 2 signal modules, 4 speakers, 4 phone jacks
Details
Permit
200903063528
Permit issued
Mar 6, 2009

fire alarm ti, elevator upgrade, 2 signal modules, 4 speakers, 4 phone jacks

Open the permit page

$14,400
Dec 4, 2007Completed
final sign-off Dec 2007
425 California StDiversified Fire Products26th floor, suite 2600 - fire alarm t.i. for tech & conf. room. new speaker/strobe, new fsd/ahu controlled by an existing control relay.
Details
Permit
200712049531
Permit issued
Dec 4, 2007
Final sign-off
Dec 31, 2007

26th floor, suite 2600 - fire alarm t.i. for tech & conf. room. new speaker/strobe, new fsd/ahu controlled by an existing control relay.

Open the permit page

$5,800
Oct 15, 2007Completed
final sign-off Dec 2007
425 California StCahill Const Service Inc26th floor - demolish one partition, add three new partitions, recircuit (6) lights, modify hvac and new air handling unit. sprinkler work under seperate permit.
Details
Permit
200710155343
Permit issued
Nov 1, 2007
Final sign-off
Dec 31, 2007

26th floor - demolish one partition, add three new partitions, recircuit (6) lights, modify hvac and new air handling unit. sprinkler work under seperate permit.

Open the permit page

$18,000
Apr 17, 2007Completed
final sign-off Apr 2007
425 California StJ B 3 Enterprises Incper correction notice issued by district inspector to correct story count, adjust:200502024556 shows 15 story, 200602285589 adjsut to reflect 28 story, 200702214562 per b.i. patric o 'rierden
Details
Permit
200704179011
Permit issued
Apr 17, 2007
Final sign-off
Apr 18, 2007

per correction notice issued by district inspector to correct story count, adjust:200502024556 shows 15 story, 200602285589 adjsut to reflect 28 story, 200702214562 per b.i. patric o 'rierden

Open the permit page

Feb 21, 2007Completed
final sign-off Apr 2007
425 California StJ B 3 Enterprises Increnew for final only 200502024556 & 200602285589.
Details
Permit
200702214562
Permit issued
Feb 21, 2007
Final sign-off
Apr 18, 2007

renew for final only 200502024556 & 200602285589.

Open the permit page

Oct 4, 2006Never finaled
issued Oct 2006, no final
401 California Ststreet space permit
Details
Permit
M44042
Permit issued
Oct 4, 2006

street space permit

Open the permit page

Jul 12, 2006Completed
final sign-off Aug 2006
425 California StCahill Const Service Increvision to appl#200605161658 hallway at restrooms mislabled as corridor. it should be a hallway as noted on attached plans.
Details
Permit
200607126266
Permit issued
Jul 12, 2006
Final sign-off
Aug 2, 2006

revision to appl#200605161658 hallway at restrooms mislabled as corridor. it should be a hallway as noted on attached plans.

Open the permit page

Jun 22, 2006Expired or cancelled
expired Jan 2008
425 California StPribuss Engineering Incoti-2, 11th floor, sp.
Details
Permit
200606224726
Permit issued
Jun 22, 2006

oti-2, 11th floor, sp.

Open the permit page

$3,600
Jun 20, 2006Completed
final sign-off Aug 2006
425 California StCahill Const Service Incfire alarm upgrade to 11th fl of smoke detectors and notification appliances.
Details
Permit
200606204460
Permit issued
Jun 20, 2006
Final sign-off
Aug 2, 2006

fire alarm upgrade to 11th fl of smoke detectors and notification appliances.

Open the permit page

$6,177

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Red Hawk Fire & Security Ca Llc (32), Novo Construction Inc (16), Cahill Const Service Inc (15), Bilcor Inc (12), Peacock Construction (12), Golden Gate Fire Protection Inc (10), Gci, Inc (9), Field Construction Inc. (8), Bcci Construction Company (5), Diversified Fire Products (5), J And R Graphics Co (5), Matrix Hg Inc (5), Pioneer Fire Inc. (5), Pribuss Engineering Inc (5), Golden Gate Sign Company Inc. (4), Ayoob & Peery Plumbing Co Inc (3), C B F Inc (3), Dbsi Inc Dba Design Build Solutions & In (3), M C S Construction Services (3), Skyline Construction (3), Westates Mechanical Corporation Inc (3), Clune Construction Company L P (2), J B 3 Enterprises Inc (2), Mcclure Electric Inc (2), Park Place Contractors (2), Rossi Builders Inc. (2), Acco Engineered Systems Inc. Dba Acco En, Anderson, Rowe & Buckley, Inc., Cahill Contractors Inc, Cahill Contractors Llc., Cccs, Inc, Ericsson Inc Dba E U S Inc, Frans Construction Inc., Jemcom, L.D. Strobel Co Ltd, N S A Wireless Inc, Ravig Inc Dba Salient Global Technologi, San Francisco Commercial Builders Inc, Stripe Inc. Dba Garnett Sign Studio, Wavcomm Inc
Architects
Stanley H Lew (16), Martha Breed (11), Claudette Bleijenberg (3), Adriana Daringa, Anthony Siros, Daniel Huntsman, Douglas Dohan, Douglas Zucker, Kelda Gragg, Martha Breed, Michael R. Downey, Roger Wong, Virginie Manichon
Engineers
Stephen Shafter (6), Alan Wright (4), Kevin Carter (4), Alexander Joseph Pacheco (2), Amit Wadhwa (2), Brad Hollub (2), Glen Hunt, James R. Spore, Jordan Malabed, Martha Breed, Paul Mcdonald, Prabhjeet Grewal, Steven Terry, Xuong Quach, Zhen Chao Xiong
Authorized agents
Alex Wong (4)
Designers
John Walsh (3)
Pmt consultant/expediters
Christina Nguyen

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.