Block 0260, lot 001
425 California St
- City’s use
- Commercial Office
- Built
- 1968
- Stories
- 26
- Units
- 1
- Rooms
- 52 bathrooms
- Building
- 206,191 sq ft
- Lot
- 7,656 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 7, 2025 | In progress filed Aug 2025, not yet issued | 425 California St | install (4) additional antennas on (e) verizon wireless rooftop facilityDetails
install (4) additional antennas on (e) verizon wireless rooftop facility | $30,000 | |
| Nov 25, 2024 | Completed final sign-off Jul 2025 | 401 California St | Golden Gate Sign Company Inc. | new electric, single faced wall chase signDetails
new electric, single faced wall chase sign | $15,000 |
| Dec 29, 2023 | Completed final sign-off Jan 2024 | 425 California St | Bilcor Inc | 22/f: install (13) ceiling mount speaker strobes. install (3) smoke detectors. install (1) duct detector. install (2) control relays. arch ref ti# 202307111907 mech ref# 202311100583Details
22/f: install (13) ceiling mount speaker strobes. install (3) smoke detectors. install (1) duct detector. install (2) control relays. arch ref ti# 202307111907 mech ref# 202311100583 | $3,996 |
| Dec 18, 2023 | Completed final sign-off Mar 2024 | 425 California St | C B F Inc | ste #2200: new lighting and power. ref permit# 202307111907Details
ste #2200: new lighting and power. ref permit# 202307111907 | $159,286 |
| Dec 1, 2023 | Completed final sign-off Dec 2023 | 425 California St | Bilcor Inc | 7th floor. as-builts pa# 202310249290, install 1 additional speaker/ strobe. ref ti pa# 202307252868 & mech # 202309287579.Details
7th floor. as-builts pa# 202310249290, install 1 additional speaker/ strobe. ref ti pa# 202307252868 & mech # 202309287579. | $660 |
| Nov 10, 2023 | Completed final sign-off Mar 2024 | 425 California St | Matrix Hg Inc | 22nd fl - ti project using the (e) base building hvac system modificaitons to the air distribution system in the tenant space to suit architectural renovations, including replacement of vav dual duct boxes and installation of new ductwork for tenant it needs. project also includes installation fanDetails
22nd fl - ti project using the (e) base building hvac system modificaitons to the air distribution system in the tenant space to suit architectural renovations, including replacement of vav dual duct boxes and installation of new ductwork for tenant it needs. project also includes installation fan | $84,239 |
| Oct 31, 2023 | Completed final sign-off Jan 2024 | 425 California St | R L H Fire Protection Inc | ti improvement to (e) fire sprinkler system. ti 202307111907. relocated concealted sprinkler 59, added sprinkler 01, deleted sprinkler 07.Details
ti improvement to (e) fire sprinkler system. ti 202307111907. relocated concealted sprinkler 59, added sprinkler 01, deleted sprinkler 07. | $18,500 |
| Oct 24, 2023 | Completed final sign-off Dec 2023 | 425 California St | Bilcor Inc | install 15-ceiling mount strobes, ref bpa arch 202307252868 & mech 202309287579Details
install 15-ceiling mount strobes, ref bpa arch 202307252868 & mech 202309287579 | $9,900 |
| Sep 28, 2023 | Completed final sign-off Mar 2024 | 425 California St | M C S Construction Services | deferred mech and electrical. ref 202307252868 202308315717. mech, demo install newduct annd hvac equip, dual ductboxes, exhaust fans, ddc controls, air balance. ele new power and data new lighting and controlsDetails
deferred mech and electrical. ref 202307252868 202308315717. mech, demo install newduct annd hvac equip, dual ductboxes, exhaust fans, ddc controls, air balance. ele new power and data new lighting and controls | $150,000 |
| Aug 31, 2023 | Completed final sign-off Mar 2024 | 425 California St | M C S Construction Services | 7/f: revision to pa# 202307252868, revised mens's restroom layout, removal of extra convenience urinal to reflect normal building standard layout. mep and fire/life safety under separate permit.Details
7/f: revision to pa# 202307252868, revised mens's restroom layout, removal of extra convenience urinal to reflect normal building standard layout. mep and fire/life safety under separate permit. | |
| Aug 25, 2023 | Completed final sign-off Sep 2023 | 425 California St | Bilcor Inc | install 1 control relay, install 2 door holdersDetails
install 1 control relay, install 2 door holders | $1,998 |
| Aug 22, 2023 | Completed final sign-off Oct 2023 | 425 California St | Ayoob & Peery Plumbing Co Inc | 7/f: add (4), relocate (45) f/s per t.i., ref bpa#202307252868Details
7/f: add (4), relocate (45) f/s per t.i., ref bpa#202307252868 | $13,284 |
| Jul 25, 2023 | Completed final sign-off Mar 2024 | 425 California St | M C S Construction Services | interior tenant improvement: demo of non-structural partitions and finishes, new partitions, and finishes with accessibility uprgrades, mep and fire/life safety under separate permitDetails
interior tenant improvement: demo of non-structural partitions and finishes, new partitions, and finishes with accessibility uprgrades, mep and fire/life safety under separate permit | $374,888 |
| Jul 11, 2023 | Completed final sign-off Mar 2024 | 425 California St | Cahill Contractors Llc. | interior tentant improvement demolition of non-structural partitions, new partitons finishes and restroom accessibilty upgradesDetails
interior tentant improvement demolition of non-structural partitions, new partitons finishes and restroom accessibilty upgrades | $1,000,000 |
| Jun 22, 2023 | Never finaled issued Jun 2023, no final | 425 California St | Bilcor Inc | 24/f: install 1-flush mount call station and 1-sign, relocate 1-ceiling mount speaker strobe, ref two-way comm backbone 202301200441.Details
24/f: install 1-flush mount call station and 1-sign, relocate 1-ceiling mount speaker strobe, ref two-way comm backbone 202301200441. | $1,375 |
| Jun 8, 2023 | Never finaled issued Jun 2023, no final | 425 California St | Novo Construction Inc | suite 2400: mechanical & electrical t-24 compliance for t.i. under pa 202306019070. maher n/aDetails
suite 2400: mechanical & electrical t-24 compliance for t.i. under pa 202306019070. maher n/a | $50,000 |
| Jun 1, 2023 | Never finaled issued Jun 2023, no final | 425 California St | Novo Construction Inc | 24/f: interior t.i. demolition of non-structural partitions, new partitions, finishes, mechanical deferred.Details
24/f: interior t.i. demolition of non-structural partitions, new partitions, finishes, mechanical deferred. | $98,800 |
| Jan 20, 2023 | Completed final sign-off Mar 2023 | 425 California St | Bilcor Inc | install the following: (1) rath command center (2500-56xrc) includes (1) surface mount base station + (1) group of distribution modules; install (1) rath desk mount substation (2500-56xd), (1) command center system supervisors, (1) command center power commander, (1) command center battery backup...Details
install the following: (1) rath command center (2500-56xrc) includes (1) surface mount base station + (1) group of distribution modules; install (1) rath desk mount substation (2500-56xd), (1) command center system supervisors, (1) command center power commander, (1) command center battery backup... | $7,260 |
| Dec 22, 2022 | Completed final sign-off Oct 2023 | 401 California St | Cccs, Inc | installing of automatic door operators at both bank entrances. the project is solely for the purpose of removing barriers.Details
installing of automatic door operators at both bank entrances. the project is solely for the purpose of removing barriers. | $65,000 |
| Dec 13, 2022 | Completed final sign-off Dec 2022 | 425 California St | Bilcor Inc | install 1 ceiling mount speaker strobe ref 2022110545913, 202211106258Details
install 1 ceiling mount speaker strobe ref 2022110545913, 202211106258 | $660 |
| Nov 17, 2022 | Completed final sign-off Nov 2022 | 425 California St | R L H Fire Protection Inc | fire sprinkler relocate 5 add 1 and delete 1 sprinkler on the 16th fl.Details
fire sprinkler relocate 5 add 1 and delete 1 sprinkler on the 16th fl. | $2,000 |
| Nov 10, 2022 | Completed final sign-off Apr 2023 | 425 California St | Novo Construction Inc | ste 1600 - 16th flr - mechanical and electrical work for ti. ref pa 2022-1104-5913.Details
ste 1600 - 16th flr - mechanical and electrical work for ti. ref pa 2022-1104-5913. | $45,000 |
| Nov 4, 2022 | Completed final sign-off Apr 2023 | 425 California St | Novo Construction Inc | 16/f: t.i., demo nonstructural partitions, new partitions, finishes & restroom accessibility upgradesDetails
16/f: t.i., demo nonstructural partitions, new partitions, finishes & restroom accessibility upgrades | $313,000 |
| Sep 16, 2022 | Completed final sign-off Oct 2022 | 425 California St | Bilcor Inc | 12/f: install 4 ceiling mount speaker strobes. remove and replace 2 ceiling mount speaker strobes. ref arch 202208231104, mech 202209082051Details
12/f: install 4 ceiling mount speaker strobes. remove and replace 2 ceiling mount speaker strobes. ref arch 202208231104, mech 202209082051 | $3,960 |
| Sep 8, 2022 | Completed final sign-off Nov 2022 | 425 California St | Novo Construction Inc | suite 1250: mechanical & electrical work for t.i. ref bpa#202208231104Details
suite 1250: mechanical & electrical work for t.i. ref bpa#202208231104 | $35,000 |
| Sep 8, 2022 | Completed final sign-off Sep 2022 | 425 California St | Pioneer Fire Inc. | suite 1250: relocate 2 pendents, add 1 pendent. ref ti 202208231104Details
suite 1250: relocate 2 pendents, add 1 pendent. ref ti 202208231104 | $382 |
| Aug 23, 2022 | Completed final sign-off Nov 2022 | 425 California St | Novo Construction Inc | ste 1250: interior tenant improvement: demolition of non-structural partitions. new partitions, finishes, and lighting.Details
ste 1250: interior tenant improvement: demolition of non-structural partitions. new partitions, finishes, and lighting. | $124,250 |
| Jun 21, 2022 | Never finaled issued Dec 2022, no final | 425 California St | Ravig Inc Dba Salient Global Technologi | verizon: remove & replace 8 (e) antennas with 8 (n) antennas. remove & replace 4 (e) raycap 3315 surge suppressors with 4 (n) raycap. remove & replace 4 (e) 260 surge suppressors with 4 (n) raycap surge suppressors at equipment. remove & replace 4 (e) 6x12 hybrid cable.Details
verizon: remove & replace 8 (e) antennas with 8 (n) antennas. remove & replace 4 (e) raycap 3315 surge suppressors with 4 (n) raycap. remove & replace 4 (e) 260 surge suppressors with 4 (n) raycap surge suppressors at equipment. remove & replace 4 (e) 6x12 hybrid cable. | $40,000 |
| May 24, 2022 | Completed final sign-off Jun 2022 | 425 California St | Bilcor Inc | 20th fl ste 2000: fire life safety. install 6 ceiling mounts speaker strobes. ref arch pa# 202203281023. ref mech pa# 202205164286.Details
20th fl ste 2000: fire life safety. install 6 ceiling mounts speaker strobes. ref arch pa# 202203281023. ref mech pa# 202205164286. | $3,960 |
| May 16, 2022 | Completed final sign-off Jul 2022 | 425 California St | Novo Construction Inc | ste 2000: mep for tenant improvement to include: replace 5 existing mixing assemblies, exhaust fan. replace pneumatic control system. new lighting, controls, and power. ref pa# 202203281023.Details
ste 2000: mep for tenant improvement to include: replace 5 existing mixing assemblies, exhaust fan. replace pneumatic control system. new lighting, controls, and power. ref pa# 202203281023. | $25,000 |
| Apr 25, 2022 | Completed final sign-off Jun 2022 | 425 California St | Bilcor Inc | ste 2300: fire life safety - install 1 ceiling mount speaker strobe. arch ref pa# 202203240796.Details
ste 2300: fire life safety - install 1 ceiling mount speaker strobe. arch ref pa# 202203240796. | $660 |
| Apr 20, 2022 | Completed final sign-off Jun 2022 | 425 California St | Pioneer Fire Inc. | 20th/f-ste 2000: relocate existing pendents in order to update coverage for buildout. ref t.i. 202203281023Details
20th/f-ste 2000: relocate existing pendents in order to update coverage for buildout. ref t.i. 202203281023 | $1,500 |
| Apr 20, 2022 | Completed final sign-off Jun 2022 | 425 California St | Pioneer Fire Inc. | 23rd/f: relocate 2 pendent sprinker heads. add 2 pendent sprinker heads. ref t.i. 202203240796Details
23rd/f: relocate 2 pendent sprinker heads. add 2 pendent sprinker heads. ref t.i. 202203240796 | $2,000 |
| Apr 14, 2022 | Completed final sign-off Jun 2022 | 425 California St | Novo Construction Inc | 23/f: electrical for t.i., new power/signal devices new 2019 title 24 compliant lighting & controls. ref pa#202203240796.Details
23/f: electrical for t.i., new power/signal devices new 2019 title 24 compliant lighting & controls. ref pa#202203240796. | $5,000 |
| Mar 28, 2022 | Completed final sign-off Jun 2022 | 425 California St | Novo Construction Inc | ste 2000: interior tenant improvement: new non-structural partitions, doors, glazing frames & hardware. m.e.p., fiee safety under separate permit.Details
ste 2000: interior tenant improvement: new non-structural partitions, doors, glazing frames & hardware. m.e.p., fiee safety under separate permit. | $450,000 |
| Mar 24, 2022 | Completed final sign-off Jun 2022 | 425 California St | Novo Construction Inc | ste 2300. interior tenant improvement; minor updates new non structural partitions, finishes and lighting, mep, fire and life safety under sep permit.Details
ste 2300. interior tenant improvement; minor updates new non structural partitions, finishes and lighting, mep, fire and life safety under sep permit. | $305,000 |
| Mar 24, 2022 | Completed final sign-off Apr 2022 | 425 California St | Bilcor Inc | suite 2100: fire life safety: install 5 ceiling mount speaker strobes. ref pa 202111303282.Details
suite 2100: fire life safety: install 5 ceiling mount speaker strobes. ref pa 202111303282. | $3,300 |
| Mar 7, 2022 | Completed final sign-off Mar 2022 | 425 California St | Golden Gate Fire Protection Inc | suite 2100 21/f: relocate 12 pendent fire sprinklers on the 21/f. ref t.i. pa202201115771. maher n/aDetails
suite 2100 21/f: relocate 12 pendent fire sprinklers on the 21/f. ref t.i. pa202201115771. maher n/a | $6,000 |
| Jan 11, 2022 | Completed final sign-off May 2022 | 425 California St | Novo Construction Inc | ste:2100: mechanical and electrical work for tenant improvement on the 21st floor. ref arch 202111303282Details
ste:2100: mechanical and electrical work for tenant improvement on the 21st floor. ref arch 202111303282 | $175,000 |
| Dec 15, 2021 | Never finaled issued Dec 2021, no final | 425 California St | Bilcor Inc | suite 2025: install 2 ceiling mount speaker strobe fire life safety device. maher n/a.Details
suite 2025: install 2 ceiling mount speaker strobe fire life safety device. maher n/a. | $1,320 |
| Nov 30, 2021 | Completed final sign-off May 2022 | 425 California St | Novo Construction Inc | interior tenant improvement, new finishes and fixtures. new non struc tural partitions, finish upgrades in e restroom. mep, fire life safety under sep permitDetails
interior tenant improvement, new finishes and fixtures. new non struc tural partitions, finish upgrades in e restroom. mep, fire life safety under sep permit | $500,000 |
| Oct 19, 2021 | Completed final sign-off Feb 2022 | 425 California St | Gci, Inc | ste 2025. interior tenant improvement: new non structural partition, new finishes and lighting. mep & fire life safety under sep permitDetails
ste 2025. interior tenant improvement: new non structural partition, new finishes and lighting. mep & fire life safety under sep permit | $60,000 |
| Oct 14, 2021 | Never finaled issued Oct 2021, no final | 425 California St | Matrix Hg Inc | install new 1 ton mini split sytem to cool existing it closet. it closet is normally unoccupied.Details
install new 1 ton mini split sytem to cool existing it closet. it closet is normally unoccupied. | $16,494 |
| Sep 22, 2021 | Completed final sign-off Feb 2022 | 425 California St | Gci, Inc | 15/f: title 24 compliances: new lighting fixtures & controles w/in tenant space. 2 new duplex receptacles & teledate outlets in office, remove (e) air handing unit start, replace new vfd.Details
15/f: title 24 compliances: new lighting fixtures & controles w/in tenant space. 2 new duplex receptacles & teledate outlets in office, remove (e) air handing unit start, replace new vfd. | |
| Jul 22, 2021 | Completed final sign-off Feb 2022 | 425 California St | Gci, Inc | interior t.i.: mew finishes, fixtures & lighting. mep, fire and life safety uner separate permit.Details
interior t.i.: mew finishes, fixtures & lighting. mep, fire and life safety uner separate permit. | $130,000 |
| Apr 26, 2021 | Completed final sign-off Sep 2021 | 425 California St | R L H Fire Protection Inc | voluntary repair/replacement of diesel driven fire pump in kind including electric isolation of pump and connection of new pump to new controller. remove and replace existing pump housekeeping pad. electrical permit on deferred submittal.Details
voluntary repair/replacement of diesel driven fire pump in kind including electric isolation of pump and connection of new pump to new controller. remove and replace existing pump housekeeping pad. electrical permit on deferred submittal. | $209,154 |
| Jul 9, 2020 | Completed final sign-off Aug 2020 | 425 California St | Red Hawk Fire & Security Ca Llc | 14/f, suite 400: as built for relocation of existing smoke detectors to it/server room. ref pa #202002114112Details
14/f, suite 400: as built for relocation of existing smoke detectors to it/server room. ref pa #202002114112 | $7,800 |
| Mar 11, 2020 | Never finaled issued Mar 2020, no final | 425 California St | Novo Construction Inc | electrical work for ti at suite 400. ref arch #201912300898Details
electrical work for ti at suite 400. ref arch #201912300898 | $35,000 |
| Feb 21, 2020 | Completed final sign-off Aug 2020 | 425 California St | Novo Construction Inc | 4th fl, ste 410 ti demo of non-structural partitions & finishes, new non-structural partitions & finishes. mech & elec and fire life safety under separate permitDetails
4th fl, ste 410 ti demo of non-structural partitions & finishes, new non-structural partitions & finishes. mech & elec and fire life safety under separate permit | $139,000 |
| Feb 21, 2020 | Completed final sign-off Nov 2020 | 425 California St | Novo Construction Inc | 4th flr - mechanical work for tenant improvement at suite 400. ref arch 201912300898.Details
4th flr - mechanical work for tenant improvement at suite 400. ref arch 201912300898. | $22,000 |
| Feb 11, 2020 | Completed final sign-off Apr 2020 | 425 California St | Red Hawk Fire & Security Ca Llc | 14th fl, ste 1400 - as built for pa 2019-1227-0826 remove control from design. added 2 smoke detectors on floor plan for door holderDetails
14th fl, ste 1400 - as built for pa 2019-1227-0826 remove control from design. added 2 smoke detectors on floor plan for door holder | |
| Feb 11, 2020 | Completed final sign-off Apr 2020 | 425 California St | Golden Gate Fire Protection Inc | 4th fl - fire sprinklers, relocate 23 pendents, 1 upright in suite 400 4th fl upgrade end of line bracing ref ti 201912300898Details
4th fl - fire sprinklers, relocate 23 pendents, 1 upright in suite 400 4th fl upgrade end of line bracing ref ti 201912300898 | $12,000 |
| Feb 11, 2020 | Completed final sign-off Aug 2020 | 425 California St | Red Hawk Fire & Security Ca Llc | 14th fl, ste 400 - fire alarm ti add 10 speaker strobes & 1 speaker only ref pa 2019-1230-0898Details
14th fl, ste 400 - fire alarm ti add 10 speaker strobes & 1 speaker only ref pa 2019-1230-0898 | $7,800 |
| Feb 3, 2020 | Completed final sign-off Aug 2020 | 425 California St | Peacock Construction | t-24 electrical for work under pa# 201910174873Details
t-24 electrical for work under pa# 201910174873 | |
| Jan 28, 2020 | Completed final sign-off Feb 2020 | 425 California St | Matrix Hg Inc | mech for 1400: new air distribution added to serve new space, new vav boxes (10), and (1) new fsd added. ref pa #201910174872.Details
mech for 1400: new air distribution added to serve new space, new vav boxes (10), and (1) new fsd added. ref pa #201910174872. | $109,879 |
| Jan 15, 2020 | Never finaled issued Jan 2020, no final | 425 California St | Golden Gate Fire Protection Inc | ref pa# 201910174872; fire sprinklers as-built; new layout on fl. n/a maherDetails
ref pa# 201910174872; fire sprinklers as-built; new layout on fl. n/a maher | $1,000 |
| Dec 30, 2019 | Completed final sign-off Nov 2020 | 425 California St | Novo Construction Inc | interoir ti including demo of non structural partitions and finishes, new non structural partitions, millwork finishes. mech, elec, plumb, fire ls deferredDetails
interoir ti including demo of non structural partitions and finishes, new non structural partitions, millwork finishes. mech, elec, plumb, fire ls deferred | $565,650 |
| Dec 27, 2019 | Never finaled issued Jan 2020, no final | 425 California St | Red Hawk Fire & Security Ca Llc | fire alar ti on 14th fl add 14 speaker strobes, 1 duct detector for fsd with control, 1 control relay for smoke guard ref 201910174872Details
fire alar ti on 14th fl add 14 speaker strobes, 1 duct detector for fsd with control, 1 control relay for smoke guard ref 201910174872 | $13,000 |
| Dec 12, 2019 | Completed final sign-off Feb 2020 | 425 California St | Golden Gate Fire Protection Inc | 14/f: ref pa# 201910174872; fire sprinkers relocate 31 pendant sprinklers and 31 upright sprinklers on the 14th fl. n/a maherDetails
14/f: ref pa# 201910174872; fire sprinkers relocate 31 pendant sprinklers and 31 upright sprinklers on the 14th fl. n/a maher | $32,550 |
| Dec 11, 2019 | Completed final sign-off Feb 2020 | 425 California St | Mcclure Electric Inc | suite #1400: title 24 lighting only. reference pa# 2019-1017-4872Details
suite #1400: title 24 lighting only. reference pa# 2019-1017-4872 | |
| Nov 7, 2019 | Completed final sign-off Feb 2020 | 425 California St | Matrix Hg Inc | ste: 300 - ref pa# 201908169025; install (10) new vav boxes, (1) new fsd, and new air distribution to serve new space plan. n/a maherDetails
ste: 300 - ref pa# 201908169025; install (10) new vav boxes, (1) new fsd, and new air distribution to serve new space plan. n/a maher | $122,064 |
| Nov 5, 2019 | Completed final sign-off Feb 2020 | 425 California St | Mcclure Electric Inc | ste 300: title 24 lighting only. ref pa #201908169025Details
ste 300: title 24 lighting only. ref pa #201908169025 | |
| Oct 17, 2019 | Completed final sign-off Aug 2020 | 425 California St | Peacock Construction | suite 810. interior tenant improvement. demo of non-structural partitions, new non-structural partitions, millwork, new restrooms. mep and fire life safety under separate permitDetails
suite 810. interior tenant improvement. demo of non-structural partitions, new non-structural partitions, millwork, new restrooms. mep and fire life safety under separate permit | $141,660 |
| Oct 17, 2019 | Completed final sign-off Feb 2020 | 425 California St | Rossi Builders Inc. | suite 1400. interior tenant improvement. demo of non-structural partitions, new non-structural partitions, millwork, new restrooms. mep and fire life safety under separate permit. lobby, officesDetails
suite 1400. interior tenant improvement. demo of non-structural partitions, new non-structural partitions, millwork, new restrooms. mep and fire life safety under separate permit. lobby, offices | $1,200,000 |
| Oct 15, 2019 | Completed final sign-off Dec 2019 | 425 California St | Red Hawk Fire & Security Ca Llc | fire alarm suite 300 add 2 smoke det, 1 duct det for fsd w control, 1 relay for security interface, 1 relay for door holder, 2 sync modules, 16 ceiling speaker strobes, 2 speakers maher not reqDetails
fire alarm suite 300 add 2 smoke det, 1 duct det for fsd w control, 1 relay for security interface, 1 relay for door holder, 2 sync modules, 16 ceiling speaker strobes, 2 speakers maher not req | $1,700 |
| Sep 5, 2019 | Completed final sign-off Nov 2019 | 425 California St | Golden Gate Fire Protection Inc | fire sprinklers: relocate 32 pendent sprinklers and 30 uprights on the 3rd fl. ref ti #201908169025.Details
fire sprinklers: relocate 32 pendent sprinklers and 30 uprights on the 3rd fl. ref ti #201908169025. | $32,550 |
| Aug 16, 2019 | Completed final sign-off Feb 2020 | 425 California St | Rossi Builders Inc. | ti for suite 300: new non-structural partitions, millwork, new restrooms. mep and fire life safety under separate permit. maher naDetails
ti for suite 300: new non-structural partitions, millwork, new restrooms. mep and fire life safety under separate permit. maher na | $1,000,000 |
| Jul 23, 2019 | Completed final sign-off Aug 2019 | 425 California St | Golden Gate Fire Protection Inc | 26th flr, fire sprinklers. relocate 52 endents sprinklers and 4 uprights.ref pa 2019-0507-9944Details
26th flr, fire sprinklers. relocate 52 endents sprinklers and 4 uprights.ref pa 2019-0507-9944 | $29,400 |
| Jul 1, 2019 | Completed final sign-off Aug 2019 | 425 California St | Red Hawk Fire & Security Ca Llc | 26th fl - fire alarm ti - add 1 smoke detector, 18 speaker strobes & 12 speakers. ref pa 2019-0507-9944Details
26th fl - fire alarm ti - add 1 smoke detector, 18 speaker strobes & 12 speakers. ref pa 2019-0507-9944 | $15,000 |
| Jun 26, 2019 | Completed final sign-off Nov 2020 | 425 California St | Peacock Construction | 26th flr. t-24 mechanical and electrical for work for pa 201905079944Details
26th flr. t-24 mechanical and electrical for work for pa 201905079944 | |
| May 7, 2019 | Completed final sign-off Nov 2020 | 425 California St | Peacock Construction | tenant improvement demo of non structural partitoins, new finishes, lighting, mep, fire, ls, sprinkler under sep permitDetails
tenant improvement demo of non structural partitoins, new finishes, lighting, mep, fire, ls, sprinkler under sep permit | $1,000,000 |
| Nov 19, 2018 | Completed final sign-off May 2019 | 425 California St | Peacock Construction | building lobby improvements, new furring walls, finishes and security deskDetails
building lobby improvements, new furring walls, finishes and security desk | $100,000 |
| Apr 2, 2018 | Never finaled issued Aug 2019, no final | 425 California St | Ericsson Inc Dba E U S Inc | retain existing antennas. remove 8 remote radio units (rru) remove 8 existing rrus, install 16 rrus, elocate 8 e duplexes from shelter to antennas, retain 4 raycaps retain 4 existing hybrid cablesDetails
retain existing antennas. remove 8 remote radio units (rru) remove 8 existing rrus, install 16 rrus, elocate 8 e duplexes from shelter to antennas, retain 4 raycaps retain 4 existing hybrid cables | $25,000 |
| Feb 21, 2018 | Completed final sign-off Mar 2018 | 425 California St | Red Hawk Fire & Security Ca Llc | suite 1700 17th floor: fire alarm t.i. add 1 smoke detector for new door holder. n/a for maher. ref app#201708084229Details
suite 1700 17th floor: fire alarm t.i. add 1 smoke detector for new door holder. n/a for maher. ref app#201708084229 | $600 |
| Dec 5, 2017 | Completed final sign-off Jan 2018 | 425 California St | Red Hawk Fire & Security Ca Llc | fire alarm ti on 24th floor - relocate 3 speaker strobes & add 1 control relay for card reader. ref 2017-0921-9222. maher n/a.Details
fire alarm ti on 24th floor - relocate 3 speaker strobes & add 1 control relay for card reader. ref 2017-0921-9222. maher n/a. | $600 |
| Nov 21, 2017 | Completed final sign-off Jan 2018 | 425 California St | C B F Inc | partial scope - office tenant retrofit - lighting, power and signal, wiring, lightings and controls. ref pa 2017-0921-9222. maher naDetails
partial scope - office tenant retrofit - lighting, power and signal, wiring, lightings and controls. ref pa 2017-0921-9222. maher na | $22,500 |
| Nov 20, 2017 | Completed final sign-off Jan 2018 | 425 California St | Pioneer Fire Inc. | relocate 14 pendents ref pa 2017-0921-9222. n/a for maherDetails
relocate 14 pendents ref pa 2017-0921-9222. n/a for maher | $5,950 |
| Nov 7, 2017 | Completed final sign-off Dec 2017 | 425 California St | Red Hawk Fire & Security Ca Llc | fire alarm as built for app#201710252194. n/a for maherDetails
fire alarm as built for app#201710252194. n/a for maher | |
| Nov 6, 2017 | Completed final sign-off Jan 2018 | 425 California St | Red Hawk Fire & Security Ca Llc | 17th floor suite 1700 fire alarm per t.i. - replace 1 existing power supply with new, add 14 speaker strobes, replace 2 speaker strobes, add 4 ceiling speakers only & 1 duct detector w/control relay for f.s.d. ref pa #201708084229. n/a maher ordinanceDetails
17th floor suite 1700 fire alarm per t.i. - replace 1 existing power supply with new, add 14 speaker strobes, replace 2 speaker strobes, add 4 ceiling speakers only & 1 duct detector w/control relay for f.s.d. ref pa #201708084229. n/a maher ordinance | $13,000 |
| Oct 26, 2017 | Completed final sign-off Nov 2017 | 425 California St | Golden Gate Fire Protection Inc | 26th floor fire sprinklers - relcoate 3 pendent sprinklers. ref t.i. #201709279762. n/a maher ordianceDetails
26th floor fire sprinklers - relcoate 3 pendent sprinklers. ref t.i. #201709279762. n/a maher ordiance | $1,500 |
| Oct 25, 2017 | Completed final sign-off Dec 2017 | 425 California St | Red Hawk Fire & Security Ca Llc | 26th floor fire alarm t.i. - add 1 control relay for card reader & demo 1 strobe. ref pa #2017-0927-9762. n/a maher ordinanceDetails
26th floor fire alarm t.i. - add 1 control relay for card reader & demo 1 strobe. ref pa #2017-0927-9762. n/a maher ordinance | $600 |
| Oct 23, 2017 | Never finaled issued Nov 2017, no final | 425 California St | Clune Construction Company L P | 26th floor: install low pressure ductwork, install new supply grill, install new return grill, re balance to values shown on m2.1. ref app#201709279762. n/a for maherDetails
26th floor: install low pressure ductwork, install new supply grill, install new return grill, re balance to values shown on m2.1. ref app#201709279762. n/a for maher | $130,000 |
| Oct 17, 2017 | Completed final sign-off Jan 2018 | 425 California St | C B F Inc | partial - scope office tenant retrofit: lighting, power and signal, wiring, lightng and controls. ref pa 2017-0808-4229. maher naDetails
partial - scope office tenant retrofit: lighting, power and signal, wiring, lightng and controls. ref pa 2017-0808-4229. maher na | $32,000 |
| Oct 17, 2017 | Completed final sign-off Jan 2018 | 425 California St | Gci, Inc | suite 1700 - revision to pa #201708084229 - project includes providing one additional urinal at mens restroom. n/a maher ordinanceDetails
suite 1700 - revision to pa #201708084229 - project includes providing one additional urinal at mens restroom. n/a maher ordinance | |
| Oct 10, 2017 | Completed final sign-off Nov 2017 | 425 California St | R L H Fire Protection Inc | fire sprinkler permits. relocate 57 sprinklers on the 17th floor. t.i pa# 201708084229. maher naDetails
fire sprinkler permits. relocate 57 sprinklers on the 17th floor. t.i pa# 201708084229. maher na | $12,500 |
| Sep 27, 2017 | Completed final sign-off Jan 2018 | 425 California St | Clune Construction Company L P | 26th floor: t.i. includes new non-load bearing partitions, and relocation of extg light fixtures. n/a for maherDetails
26th floor: t.i. includes new non-load bearing partitions, and relocation of extg light fixtures. n/a for maher | $15,000 |
| Sep 21, 2017 | Completed final sign-off Jan 2018 | 425 California St | Gci, Inc | 24/f #2400- selective demo of (e) partitions, doors/frames, power/tile/data, lighting & millwork. construct (n) partitions, (n) power, (n) lighting fixtures, (n) millwork & finishes. minor ada upgrades to accessible restrooms. space is unoccupied. life safety & sprinkler modication as req underDetails
24/f #2400- selective demo of (e) partitions, doors/frames, power/tile/data, lighting & millwork. construct (n) partitions, (n) power, (n) lighting fixtures, (n) millwork & finishes. minor ada upgrades to accessible restrooms. space is unoccupied. life safety & sprinkler modication as req under | $200,000 |
| Aug 8, 2017 | Completed final sign-off Jan 2018 | 425 California St | Gci, Inc | suite demo partitions, doors/frames, power, ceilng/ltg, plmg fix. millwork & finishes. constctn of partitions power, ceilg/ltg, millwork & fnsh. nw buildout of accessible restrooms to achieve full barrier removal with associated ceiling, elec & finishes work. space is currentrly unoccupied.Details
suite demo partitions, doors/frames, power, ceilng/ltg, plmg fix. millwork & finishes. constctn of partitions power, ceilg/ltg, millwork & fnsh. nw buildout of accessible restrooms to achieve full barrier removal with associated ceiling, elec & finishes work. space is currentrly unoccupied. | $200,000 |
| Dec 7, 2016 | Completed final sign-off Dec 2016 | 425 California St | Skyline Construction | ste. 1200 - relocation of interior store front on 26th flDetails
ste. 1200 - relocation of interior store front on 26th fl | $5,000 |
| Nov 16, 2016 | Completed final sign-off Nov 2016 | 425 California St | Red Hawk Fire & Security Ca Llc | fire alarm ti on 2st floor. add (e) strobes & 1 speaker. ref pa 2016-0715-2504. maher naDetails
fire alarm ti on 2st floor. add (e) strobes & 1 speaker. ref pa 2016-0715-2504. maher na | $2,000 |
| Aug 17, 2016 | Completed final sign-off Mar 2017 | 425 California St | Red Hawk Fire & Security Ca Llc | 16th floor - fire alarm. add (20 speaker strobes in conference room. ref. t.i. #2015-0903-6040.Details
16th floor - fire alarm. add (20 speaker strobes in conference room. ref. t.i. #2015-0903-6040. | $1,000 |
| Aug 17, 2016 | Completed final sign-off Nov 2016 | 425 California St | Pioneer Fire Inc. | relocate (6) pendents and remove (1) pendents ti pa 2016-0630-1347Details
relocate (6) pendents and remove (1) pendents ti pa 2016-0630-1347 | $5,989 |
| Jul 26, 2016 | Never finaled issued Aug 2016, no final | 425 California St | Gci, Inc | modification of (e) hvac system to match new layout air balance maher naDetails
modification of (e) hvac system to match new layout air balance maher na | $4,000 |
| Jul 26, 2016 | Never finaled issued Aug 2016, no final | 425 California St | Gci, Inc | partial scope office ti retrofit: lighting, power, signal, wiring, lighting & receptacle controls maher naDetails
partial scope office ti retrofit: lighting, power, signal, wiring, lighting & receptacle controls maher na | |
| Jul 15, 2016 | Completed final sign-off Dec 2016 | 425 California St | San Francisco Commercial Builders Inc | 21st floor - remove (e) partition, new folding partition (e) conference room. convert (e) conference into two offices. open (e) conference room to main office. mechanical, plumbing, life safety and sprinkler under separate permit.Details
21st floor - remove (e) partition, new folding partition (e) conference room. convert (e) conference into two offices. open (e) conference room to main office. mechanical, plumbing, life safety and sprinkler under separate permit. | $100,000 |
| Jun 30, 2016 | Completed final sign-off Nov 2016 | 425 California St | Gci, Inc | 16th floor: build out 5 office with ele & ceiling lights; mep/fire/life safety deffered; maher na. ref t.i. 201509036040Details
16th floor: build out 5 office with ele & ceiling lights; mep/fire/life safety deffered; maher na. ref t.i. 201509036040 | $25,000 |
| Apr 13, 2016 | Completed final sign-off May 2017 | 425 California St | Wavcomm Inc | verizon wireless - remove (e) antenna - replace with (8) antennas; remove 16 7/8" coax, (3) hybrid cables, ret calbe; install (8) a2; install (1) 6/12 hybrid cable; insall (3) recaps & antennas (3) in equipment room. maher naDetails
verizon wireless - remove (e) antenna - replace with (8) antennas; remove 16 7/8" coax, (3) hybrid cables, ret calbe; install (8) a2; install (1) 6/12 hybrid cable; insall (3) recaps & antennas (3) in equipment room. maher na | $21,000 |
| Mar 25, 2016 | Completed final sign-off Oct 2016 | 425 California St | Acco Engineered Systems Inc. Dba Acco En | replace (e) chiller with new. same location and lighter weight. n/a ordinance #155-13Details
replace (e) chiller with new. same location and lighter weight. n/a ordinance #155-13 | $600,000 |
| Jan 20, 2016 | Completed final sign-off Jan 2016 | 425 California St | Red Hawk Fire & Security Ca Llc | 16th floor as-built revision: updated point to show actual field devices. n/a maher ordinanceDetails
16th floor as-built revision: updated point to show actual field devices. n/a maher ordinance | |
| Dec 28, 2015 | Completed final sign-off Apr 2017 | 425 California St | J And R Graphics Co | 3 fire evacuation plan signs for the 16th floor.Details
3 fire evacuation plan signs for the 16th floor. | $1,100 |
| Dec 4, 2015 | Completed final sign-off Mar 2016 | 425 California St | Peacock Construction | t-24 mechanical for work done under pa 2015-0903-6040. maher na adding one fsdDetails
t-24 mechanical for work done under pa 2015-0903-6040. maher na adding one fsd | $43,000 |
| Nov 12, 2015 | Completed final sign-off Dec 2015 | 425 California St | Golden Gate Fire Protection Inc | fire sprinklers: relocate 62 pendent sprinklers on the 16th floor. maher naDetails
fire sprinklers: relocate 62 pendent sprinklers on the 16th floor. maher na | $31,930 |
| Nov 6, 2015 | Completed final sign-off Mar 2016 | 425 California St | Peacock Construction | t-24 electrical for work done under pa#201509036040. n/a ordinance #155-13Details
t-24 electrical for work done under pa#201509036040. n/a ordinance #155-13 | $95,000 |
| Nov 4, 2015 | Never finaled issued Nov 2015, no final | 425 California St | Red Hawk Fire & Security Ca Llc | add 11 speaker/strobe, 3 strobes, 2 smokes, 2 control relays, 1 duct detector. maher naDetails
add 11 speaker/strobe, 3 strobes, 2 smokes, 2 control relays, 1 duct detector. maher na | $15,000 |
| Oct 22, 2015 | Completed final sign-off Oct 2015 | 425 California St | Red Hawk Fire & Security Ca Llc | 6/f: adding 2 new speaker/strobes to replace existing strobe only. no t.i. n/a ordinance #155-13Details
6/f: adding 2 new speaker/strobes to replace existing strobe only. no t.i. n/a ordinance #155-13 | $5,500 |
| Sep 3, 2015 | Completed final sign-off Mar 2016 | 425 California St | Peacock Construction | 16th floor demo of (e) partitions,doors,frames,power/tele/data, ceiling/lighting, plumb fixts & millwork. construction of (n) partitions,power/tele/date, ceiling & light fixts, millwork, finishes. new buildout of accessible restrms for full barrier removal. space is currently unoccupied. approvedDetails
16th floor demo of (e) partitions,doors,frames,power/tele/data, ceiling/lighting, plumb fixts & millwork. construction of (n) partitions,power/tele/date, ceiling & light fixts, millwork, finishes. new buildout of accessible restrms for full barrier removal. space is currently unoccupied. approved | $200,000 |
| Jul 7, 2015 | Completed final sign-off Jul 2015 | 425 California St | Golden Gate Fire Protection Inc | fire sprinkler only. relocate 7 fire sprinkler pendents for "metabiota" on the 2nd fl. ref #201505287343.Details
fire sprinkler only. relocate 7 fire sprinkler pendents for "metabiota" on the 2nd fl. ref #201505287343. | $3,500 |
| Jun 24, 2015 | Completed final sign-off Jan 2017 | 425 California St | Peacock Construction | t24 electric for work done under 201505287343. maher not reqDetails
t24 electric for work done under 201505287343. maher not req | $46,000 |
| Jun 22, 2015 | Completed final sign-off Jan 2016 | 425 California St | Field Construction Inc. | 19th floor - m.e.p. work for pa #2015.0529.7489. n/a maher ordinanceDetails
19th floor - m.e.p. work for pa #2015.0529.7489. n/a maher ordinance | $25,000 |
| Jun 18, 2015 | Completed final sign-off Jul 2015 | 425 California St | Red Hawk Fire & Security Ca Llc | adding 6 speaker/strobes to existing system. t.i. pa#201505287343. n/a ordinance #155-13Details
adding 6 speaker/strobes to existing system. t.i. pa#201505287343. n/a ordinance #155-13 | $5,500 |
| Jun 4, 2015 | Completed final sign-off Jul 2015 | 425 California St | Red Hawk Fire & Security Ca Llc | 19th floor: adding one new speaker/strobe to new conference room and removing 2 extg strobes. n/a for maher.Details
19th floor: adding one new speaker/strobe to new conference room and removing 2 extg strobes. n/a for maher. | $4,500 |
| May 29, 2015 | Completed final sign-off Jan 2016 | 425 California St | Field Construction Inc. | 19th floor: revision to app#201411181817 original of work with additional construction of 8 new offices. new electrical and light relocation. n/a for the maher.Details
19th floor: revision to app#201411181817 original of work with additional construction of 8 new offices. new electrical and light relocation. n/a for the maher. | $10,000 |
| May 28, 2015 | Completed final sign-off Nov 2015 | 425 California St | Peacock Construction | 2nd floor: project consists of minor demolition of partitions & finishes, & constructions of nw partitions, nw power nw tel/dat relocation of light fixtures & associated ceiling items, & reconfigure millwork & finishes. space is currently unoccupied. approved bldg smoke mngmnt consists of shutdownDetails
2nd floor: project consists of minor demolition of partitions & finishes, & constructions of nw partitions, nw power nw tel/dat relocation of light fixtures & associated ceiling items, & reconfigure millwork & finishes. space is currently unoccupied. approved bldg smoke mngmnt consists of shutdown | $57,660 |
| May 27, 2015 | Completed final sign-off Jul 2015 | 425 California St | J And R Graphics Co | 6th floor fire evacuation plan signs. total of three signs. n/a maherDetails
6th floor fire evacuation plan signs. total of three signs. n/a maher | $350 |
| Apr 22, 2015 | Completed final sign-off Aug 2015 | 425 California St | Peacock Construction | revision to pa#201503060137 to provide wall sconce j-box detail @ 2 hr. rated plaster elevator shaft wall. this is being provided per in field direction by fire inspector general james. n/a ordinance #155-13Details
revision to pa#201503060137 to provide wall sconce j-box detail @ 2 hr. rated plaster elevator shaft wall. this is being provided per in field direction by fire inspector general james. n/a ordinance #155-13 | |
| Apr 20, 2015 | Completed final sign-off Jul 2015 | 425 California St | Red Hawk Fire & Security Ca Llc | ref pa # 2015 0306 0137: adding 3 smoke detectors. 13 speakers /strobes, 2 strobes, 2 control relays & 2 interposing replaysDetails
ref pa # 2015 0306 0137: adding 3 smoke detectors. 13 speakers /strobes, 2 strobes, 2 control relays & 2 interposing replays | $7,500 |
| Apr 13, 2015 | Completed final sign-off May 2015 | 425 California St | J And R Graphics Co | three 19th floor fire evacuation plan signs. n/a maher ordinanceDetails
three 19th floor fire evacuation plan signs. n/a maher ordinance | $600 |
| Apr 1, 2015 | Completed final sign-off May 2015 | 425 California St | Golden Gate Fire Protection Inc | relocate 30 pendents; add 6 pendents. relocate 25 uprights and plug off 9 outlets. total 61 fire sprinklersDetails
relocate 30 pendents; add 6 pendents. relocate 25 uprights and plug off 9 outlets. total 61 fire sprinklers | $30,500 |
| Mar 26, 2015 | Completed final sign-off Apr 2015 | 425 California St | Red Hawk Fire & Security Ca Llc | adding 1 smoke detector, provide coverage for fsd, 1 control relay, interface to fsd, relocate a/v notification to cover new office rooms. revising pa#201501125440 t.i. pa#201411181817. n/a ordinance #155-13Details
adding 1 smoke detector, provide coverage for fsd, 1 control relay, interface to fsd, relocate a/v notification to cover new office rooms. revising pa#201501125440 t.i. pa#201411181817. n/a ordinance #155-13 | $500 |
| Mar 13, 2015 | Expired or cancelled cancelled Jan 2026 | 425 California St | Field Construction Inc. | revision to pa#201411181817 original scope of work with additional mechanical relief work at vestibule. n/a ordinance #155-13Details
revision to pa#201411181817 original scope of work with additional mechanical relief work at vestibule. n/a ordinance #155-13 | |
| Mar 6, 2015 | Completed final sign-off Aug 2015 | 425 California St | Peacock Construction | 6th floor: new partitions, nw power and teledata, nw ceiling and light fixtures & nw millwork & finishes. also includes new bld out of accessible restrms to achieve full barrier removal with associated ceiling, elec finish work. demo under permit #201411181812. space is vacant.Details
6th floor: new partitions, nw power and teledata, nw ceiling and light fixtures & nw millwork & finishes. also includes new bld out of accessible restrms to achieve full barrier removal with associated ceiling, elec finish work. demo under permit #201411181812. space is vacant. | $350,000 |
| Feb 12, 2015 | Never finaled issued Mar 2015, no final | 425 California St | Field Construction Inc. | 19th floor:revision to app#2014-1118-1817 for construction of 2 offices, one conference, 3 meeting rooms, one telecom and 1 copy room. life safety and sprinkler under separate permit. n/a for the maher.Details
19th floor:revision to app#2014-1118-1817 for construction of 2 offices, one conference, 3 meeting rooms, one telecom and 1 copy room. life safety and sprinkler under separate permit. n/a for the maher. | |
| Feb 4, 2015 | Completed final sign-off Apr 2015 | 425 California St | Pribuss Engineering Inc | 19th flr: fire sprinkler t.i. permit 201501125476 as built permit; old work relocate/change 48 heads, adds 6 heads total 54 heads; total of 3 added sprinklers maher n/aDetails
19th flr: fire sprinkler t.i. permit 201501125476 as built permit; old work relocate/change 48 heads, adds 6 heads total 54 heads; total of 3 added sprinklers maher n/a | |
| Jan 12, 2015 | Completed final sign-off May 2015 | 425 California St | Red Hawk Fire & Security Ca Llc | 19th floor - add to existing loop 13 speaker/strobes & 1 strobe also 2 smoke det's, 1 relay & 1 interposing relay. ref pa #2014.1118.1817. n/a maher ordinanceDetails
19th floor - add to existing loop 13 speaker/strobes & 1 strobe also 2 smoke det's, 1 relay & 1 interposing relay. ref pa #2014.1118.1817. n/a maher ordinance | $7,500 |
| Jan 12, 2015 | Completed final sign-off Apr 2015 | 425 California St | Pribuss Engineering Inc | fire sprinkler t.i. under permit# 2014-0811-3509. relocate or change 48 heads. add 3 heads. 51 heads total.Details
fire sprinkler t.i. under permit# 2014-0811-3509. relocate or change 48 heads. add 3 heads. 51 heads total. | $26,246 |
| Nov 21, 2014 | Completed final sign-off Dec 2014 | 425 California St | Red Hawk Fire & Security Ca Llc | submitting as-builts to reflect added dor holder and smoke detectors refer to permit 201409186662 noted by inspector on 11/17; maher n/aDetails
submitting as-builts to reflect added dor holder and smoke detectors refer to permit 201409186662 noted by inspector on 11/17; maher n/a | $200 |
| Nov 18, 2014 | Completed final sign-off Mar 2015 | 425 California St | Field Construction Inc. | 6th flr: project consist of demo of partitions, millwork, finishes & associated electrical, plumbing and ceiling work, including full demo of restrooms on a currently vacant floor, no modification of (e) mech or structural systems, path of travel docs are not provided per ab-017.; maher n/aDetails
6th flr: project consist of demo of partitions, millwork, finishes & associated electrical, plumbing and ceiling work, including full demo of restrooms on a currently vacant floor, no modification of (e) mech or structural systems, path of travel docs are not provided per ab-017.; maher n/a | $35,000 |
| Nov 18, 2014 | Completed final sign-off Jan 2016 | 425 California St | Field Construction Inc. | 19th flr: project consist of construction of (n) partitions,(n)power & tele/data,(n) ceiling & light fixtures, & (n) millwork & finishes, also include (n) buildout of accessible restrooms for full barrier removal w/assoc ceiling elect & finish. demo score under 201408113509. space is currentDetails
19th flr: project consist of construction of (n) partitions,(n)power & tele/data,(n) ceiling & light fixtures, & (n) millwork & finishes, also include (n) buildout of accessible restrooms for full barrier removal w/assoc ceiling elect & finish. demo score under 201408113509. space is current | $200,000 |
| Oct 7, 2014 | Never finaled issued Oct 2014, no final | 425 California St | evacuation plan on the 9th flDetails
evacuation plan on the 9th fl | $1,200 | |
| Sep 18, 2014 | Completed final sign-off Nov 2014 | 425 California St | Red Hawk Fire & Security Ca Llc | 9th flr: adding 8 speaker/strobes & (2) strobes to be tied into existing system. ref 201406249300; maher n/aDetails
9th flr: adding 8 speaker/strobes & (2) strobes to be tied into existing system. ref 201406249300; maher n/a | $7,500 |
| Aug 29, 2014 | Completed final sign-off Sep 2014 | 425 California St | Pribuss Engineering Inc | fire sprinkler ti 9th floor suite 950: add 3 , 31 relocate 31, total 34.ref app#201406249300. n/a for the maher ordinance #155-14Details
fire sprinkler ti 9th floor suite 950: add 3 , 31 relocate 31, total 34.ref app#201406249300. n/a for the maher ordinance #155-14 | $17,497 |
| Aug 11, 2014 | Expired or cancelled expired Apr 2016 | 425 California St | Field Construction Inc. | 19th flr: project consist of demo of partitions, millwork, finishes & associated elec, plumbing & ceiling work, including full demo of restrooms on a currently vacant floor, no modification of (e) mechanical or structural systems, path of travel documents are not required per ab 017; maher n/a.Details
19th flr: project consist of demo of partitions, millwork, finishes & associated elec, plumbing & ceiling work, including full demo of restrooms on a currently vacant floor, no modification of (e) mechanical or structural systems, path of travel documents are not required per ab 017; maher n/a. | $35,000 |
| Jul 10, 2014 | Completed final sign-off Feb 2015 | 425 California St | Red Hawk Fire & Security Ca Llc | 26th floor: adding one new strobe, 2 new relays and relocate 2 extg speakers. ref app#201406097834. n/a for the maher ordinance #155-13Details
26th floor: adding one new strobe, 2 new relays and relocate 2 extg speakers. ref app#201406097834. n/a for the maher ordinance #155-13 | $5,000 |
| Jul 1, 2014 | Completed final sign-off Jul 2014 | 425 California St | Red Hawk Fire & Security Ca Llc | revising drawingins to reflect change an address of 2 smoke detector and a change to the cd setting at 5 horn/strobes already approval under permit appl. 2014.05.30.7055. maher n/a.Details
revising drawingins to reflect change an address of 2 smoke detector and a change to the cd setting at 5 horn/strobes already approval under permit appl. 2014.05.30.7055. maher n/a. | $200 |
| Jun 24, 2014 | Completed final sign-off Dec 2014 | 425 California St | Field Construction Inc. | suite 950: demo of 2 tenant suites on 7th fl. new walls n elevator lobby, power and tele data, ceiling light fixtures and millwork & finishes. full demo of restrooms. buildout of access restrooms, full barrier removal with ceiling, elec, finishes. sp- fa sep. permitDetails
suite 950: demo of 2 tenant suites on 7th fl. new walls n elevator lobby, power and tele data, ceiling light fixtures and millwork & finishes. full demo of restrooms. buildout of access restrooms, full barrier removal with ceiling, elec, finishes. sp- fa sep. permit | $200,000 |
| Jun 19, 2014 | Completed final sign-off Jun 2014 | 425 California St | J And R Graphics Co | fire evacuation plan signs for 10/f & 11/f renovation. n/a ordinance #155-13. 6 totalDetails
fire evacuation plan signs for 10/f & 11/f renovation. n/a ordinance #155-13. 6 total | $1,000 |
| Jun 17, 2014 | Never finaled issued Jun 2014, no final | 425 California St | R L H Fire Protection Inc | 26th floor suite 2600 tenant imrpvement - relocate 7 heads. ref pa #2014.0609.7834. n/a maher ordinanceDetails
26th floor suite 2600 tenant imrpvement - relocate 7 heads. ref pa #2014.0609.7834. n/a maher ordinance | $3,598 |
| Jun 9, 2014 | Never finaled issued Jun 2014, no final | 425 California St | Skyline Construction | 26th flr: tenant improvement to include addition of one private office and separation wall at trading desk; compliance with ord 155-13 not requiredDetails
26th flr: tenant improvement to include addition of one private office and separation wall at trading desk; compliance with ord 155-13 not required | $8,000 |
| May 30, 2014 | Completed final sign-off Jul 2014 | 425 California St | Red Hawk Fire & Security Ca Llc | include adding (4) speakers/strobes, (2) strobe & (2) smokes with (2) control relays and (1) interpassjng relay. (1) duct detector for fsd reference mech pa#2014.0425.4172; compliance with ord 155-13 not requiredDetails
include adding (4) speakers/strobes, (2) strobe & (2) smokes with (2) control relays and (1) interpassjng relay. (1) duct detector for fsd reference mech pa#2014.0425.4172; compliance with ord 155-13 not required | $7,500 |
| Apr 25, 2014 | Expired or cancelled expired Apr 2016 | 425 California St | Matrix Hg Inc | replace (e) diffusers, re-zone based on partition changes. t.i.pa# 201402289577. n/a ordinance #155-13.Details
replace (e) diffusers, re-zone based on partition changes. t.i.pa# 201402289577. n/a ordinance #155-13. | $20,000 |
| Apr 21, 2014 | Completed final sign-off Jun 2014 | 425 California St | R L H Fire Protection Inc | fire sprinkler permit, relocate 41, add 19 and delete 25 pendent, sprinklers on the 10th floor, t.i. pa#201404039577. re-cal'd for flex drops. n/a ordinance #155-13Details
fire sprinkler permit, relocate 41, add 19 and delete 25 pendent, sprinklers on the 10th floor, t.i. pa#201404039577. re-cal'd for flex drops. n/a ordinance #155-13 | $30,840 |
| Mar 4, 2014 | Expired or cancelled expired Apr 2016 | 425 California St | Bcci Construction Company | 5th floor evac signage as required, 3 signs total.Details
5th floor evac signage as required, 3 signs total. | $500 |
| Feb 28, 2014 | Completed final sign-off Feb 2015 | 425 California St | Skyline Construction | t.i. full 10/f: selective demo. (n) ceiling/lighting, power/data/finishes, full demo of restrooms & (n) accessible restroom for barrier removal with (n) ceiling, lights, power,data & finishes. interior connecting staircase between 10/f & 11/f for same tenant. 11/f: minor work at (n) staircase area.Details
t.i. full 10/f: selective demo. (n) ceiling/lighting, power/data/finishes, full demo of restrooms & (n) accessible restroom for barrier removal with (n) ceiling, lights, power,data & finishes. interior connecting staircase between 10/f & 11/f for same tenant. 11/f: minor work at (n) staircase area. | $300,000 |
| Feb 10, 2014 | Expired or cancelled expired Apr 2016 | 425 California St | Bcci Construction Company | install and relocate grilles and air distribution. 48 new light fixtures. associated with 201311262828Details
install and relocate grilles and air distribution. 48 new light fixtures. associated with 201311262828 | $24,000 |
| Jan 24, 2014 | Completed final sign-off Feb 2014 | 425 California St | Red Hawk Fire & Security Ca Llc | 2nd floor: suite 200: adding 2 speakers, relocating one extg smoke det., and 4 speaker/strobes. t.i. app#201311262828. n/a for maher ordinance no. 155-13.Details
2nd floor: suite 200: adding 2 speakers, relocating one extg smoke det., and 4 speaker/strobes. t.i. app#201311262828. n/a for maher ordinance no. 155-13. | $7,000 |
| Jan 21, 2014 | Completed final sign-off Jul 2016 | 425 California St | Ayoob & Peery Plumbing Co Inc | 1 add, 6 relocate , and 1 remove. reference ti 2013.1126.2828Details
1 add, 6 relocate , and 1 remove. reference ti 2013.1126.2828 | $3,598 |
| Jan 2, 2014 | Completed final sign-off Feb 2014 | 425 California St | Cahill Const Service Inc | revision to app#201309126628. revised 4th and 18th floor evacuation plan signs. (6 signs)Details
revision to app#201309126628. revised 4th and 18th floor evacuation plan signs. (6 signs) | |
| Dec 20, 2013 | Completed final sign-off Mar 2014 | 425 California St | Ayoob & Peery Plumbing Co Inc | add & relocate fire sprinkler heads per tenant improvements (add 5) (relocate 54)) 5th floor. ref pa 201311010857Details
add & relocate fire sprinkler heads per tenant improvements (add 5) (relocate 54)) 5th floor. ref pa 201311010857 | $30,326 |
| Dec 19, 2013 | Completed final sign-off Mar 2014 | 425 California St | Red Hawk Fire & Security Ca Llc | 5th floor:t.i. work to include reloction of 1 extg smoke det., adding 15 speaker/strobes, adding 11 speakers, adding 2 new smoke det. and adding 1 duct det, 2 control relay, and 1 interposing relay. ti app#201311010857Details
5th floor:t.i. work to include reloction of 1 extg smoke det., adding 15 speaker/strobes, adding 11 speakers, adding 2 new smoke det. and adding 1 duct det, 2 control relay, and 1 interposing relay. ti app#201311010857 | $7,500 |
| Dec 6, 2013 | Completed final sign-off Dec 2014 | 425 California St | Bcci Construction Company | 5th floor - mechanical & electrical work associated with t.i.#201311010857 minor demo of hvac & new lighting.Details
5th floor - mechanical & electrical work associated with t.i.#201311010857 minor demo of hvac & new lighting. | $75,000 |
| Nov 26, 2013 | Completed final sign-off Feb 2014 | 425 California St | Bcci Construction Company | 2nd floor - demolitoin of full floor tenant suite, construction to include (n) tenant partitions, (n) power & tele/data, (n) eciling & light fixtures, (n) millwork & finishes. space is currently unoccupied, designbuild mech, elec, plbg life safety & sprinkler is under separate permit.Details
2nd floor - demolitoin of full floor tenant suite, construction to include (n) tenant partitions, (n) power & tele/data, (n) eciling & light fixtures, (n) millwork & finishes. space is currently unoccupied, designbuild mech, elec, plbg life safety & sprinkler is under separate permit. | $175,000 |
| Nov 15, 2013 | Completed final sign-off Oct 2015 | 425 California St | L.D. Strobel Co Ltd | verizon wireless proposes to replace 4 (e) 4' antennas w/ 4 (n) 4' aws antennas, 1 per sector, add 8 (n) rrh units, 4 (n) raycaps, hybrid cables & ret cables and one new conduit.Details
verizon wireless proposes to replace 4 (e) 4' antennas w/ 4 (n) 4' aws antennas, 1 per sector, add 8 (n) rrh units, 4 (n) raycaps, hybrid cables & ret cables and one new conduit. | $18,000 |
| Nov 1, 2013 | Completed final sign-off Mar 2014 | 425 California St | Bcci Construction Company | selective demolition of full floor tenant suite build out of 2 adjacent suites. new tenant and demising partitions, entry doors with associated corridor extension, new power and tele/data, ceiling and light fixt, millwork,finishes. accessible restrooms for full barrier removal. unoccupied space.Details
selective demolition of full floor tenant suite build out of 2 adjacent suites. new tenant and demising partitions, entry doors with associated corridor extension, new power and tele/data, ceiling and light fixt, millwork,finishes. accessible restrooms for full barrier removal. unoccupied space. | $276,000 |
| Oct 9, 2013 | Completed final sign-off Oct 2013 | 425 California St | Red Hawk Fire & Security Ca Llc | 4th floor:removing addition of duct detector to be replaced by smoke detector changed address of 2 devices all to be reflected on new set of drawings as requested by inspector. ref app#201309045880Details
4th floor:removing addition of duct detector to be replaced by smoke detector changed address of 2 devices all to be reflected on new set of drawings as requested by inspector. ref app#201309045880 | $50 |
| Sep 24, 2013 | Expired or cancelled expired Apr 2016 | 425 California St | Red Hawk Fire & Security Ca Llc | revised pa#201309197197 to include: remove (e) pull station to be replaced by emergency door release removing dd to sd, relay & interposing relay inside it room to control damper, change 3 ceiling speaker/strobe to wall mounted version, changed qty. of speaker to 3 & qty. of speaker/strobe to 14.Details
revised pa#201309197197 to include: remove (e) pull station to be replaced by emergency door release removing dd to sd, relay & interposing relay inside it room to control damper, change 3 ceiling speaker/strobe to wall mounted version, changed qty. of speaker to 3 & qty. of speaker/strobe to 14. | $200 |
| Sep 19, 2013 | Completed final sign-off Oct 2013 | 425 California St | Red Hawk Fire & Security Ca Llc | 18th floor-t.i scope-relocating 2 (e) smoke detectors, 1 (e) manual pull, adding 18 speaker/strobes, 8 speakers, 2 control relays, 3 interposing relays, 1 duct detector fan shutdown & fsd control. ref pa#201306199912Details
18th floor-t.i scope-relocating 2 (e) smoke detectors, 1 (e) manual pull, adding 18 speaker/strobes, 8 speakers, 2 control relays, 3 interposing relays, 1 duct detector fan shutdown & fsd control. ref pa#201306199912 | $7,500 |
| Sep 12, 2013 | Completed final sign-off Feb 2014 | 425 California St | Cahill Const Service Inc | 4th & 18th floors-evacuation sign/map-6 signs totalDetails
4th & 18th floors-evacuation sign/map-6 signs total | $1,000 |
| Sep 4, 2013 | Completed final sign-off Oct 2013 | 425 California St | Red Hawk Fire & Security Ca Llc | 4th floor suite 410 -t.i relocate 3 (e) speaker/strobes, add 2 speaker/strobes, 3 speakers, 1 smoke detector, 1 control module, 1 interposing relay for door holder control, 1 duct det, 2 control relay's & 2 interposing relay's for fire/smoke damper control into (e) system, ref ti #201307121736.Details
4th floor suite 410 -t.i relocate 3 (e) speaker/strobes, add 2 speaker/strobes, 3 speakers, 1 smoke detector, 1 control module, 1 interposing relay for door holder control, 1 duct det, 2 control relay's & 2 interposing relay's for fire/smoke damper control into (e) system, ref ti #201307121736. | $10,000 |
| Aug 23, 2013 | Never finaled issued Sep 2013, no final | 425 California St | Cahill Const Service Inc | title 24 mep. adding new fire smoke dampers andd smoke detection- reference application #201306199912Details
title 24 mep. adding new fire smoke dampers andd smoke detection- reference application #201306199912 | |
| Aug 23, 2013 | Expired or cancelled expired Apr 2016 | 425 California St | Cahill Const Service Inc | title 24/mep permits. ref app#201307121736Details
title 24/mep permits. ref app#201307121736 | |
| Jul 29, 2013 | Completed final sign-off Oct 2013 | 425 California St | Westates Mechanical Corporation Inc | 18th floor. relocate 56 pendent and add 9 upright heads. t.i. app201306199912Details
18th floor. relocate 56 pendent and add 9 upright heads. t.i. app201306199912 | $33,410 |
| Jul 12, 2013 | Expired or cancelled expired Apr 2016 | 425 California St | Cahill Const Service Inc | demolition of non structural interior walls. remodel 4th fl restrooms consisting of new fixtures, ceilings, finishes, minor remodel of suite 410 related to restroom modifications. create a new rated elevator lobby. mep, f/a and sprinklers separate permitDetails
demolition of non structural interior walls. remodel 4th fl restrooms consisting of new fixtures, ceilings, finishes, minor remodel of suite 410 related to restroom modifications. create a new rated elevator lobby. mep, f/a and sprinklers separate permit | $100,000 |
| Jun 19, 2013 | Completed final sign-off Dec 2013 | 425 California St | Cahill Contractors Inc | demolition of non-structural interior. remodel of office interior consisting of private office, conference rooms & support spaces. upgrade existing restrooms. mep under separate permits.Details
demolition of non-structural interior. remodel of office interior consisting of private office, conference rooms & support spaces. upgrade existing restrooms. mep under separate permits. | $365,000 |
| Apr 12, 2013 | Expired or cancelled expired Apr 2016 | 425 California St | J And R Graphics Co | replacing extg fire evacuation plan signs.Details
replacing extg fire evacuation plan signs. | $9,753 |
| Oct 10, 2012 | Completed final sign-off Mar 2013 | 401 California St | Frans Construction Inc. | minor interior remodel of existing chase bank, new offices, ceiling & finishes.Details
minor interior remodel of existing chase bank, new offices, ceiling & finishes. | $135,239 |
| Apr 19, 2011 | Completed final sign-off Apr 2016 | 425 California St | umberella permit on 2nd & 15th floor - compliance with high rise sprinkler ordinance #377-93, no work, completion for pa #200511047434.Details
umberella permit on 2nd & 15th floor - compliance with high rise sprinkler ordinance #377-93, no work, completion for pa #200511047434. | ||
| Feb 18, 2011 | Completed final sign-off Apr 2011 | 425 California St | Westates Mechanical Corporation Inc | revision to appl #201012015878 - add 2 pendent sprinklers.Details
revision to appl #201012015878 - add 2 pendent sprinklers. | $400 |
| Jan 28, 2011 | Completed final sign-off Apr 2011 | 425 California St | Diversified Fire Products | fire alarm ti 15th fl suite 1500. 2 smoke dampers, 1 pam relay, 14 speakers, 12 speaker/strobes/strobeDetails
fire alarm ti 15th fl suite 1500. 2 smoke dampers, 1 pam relay, 14 speakers, 12 speaker/strobes/strobe | $10,000 |
| Jan 19, 2011 | Completed final sign-off Apr 2011 | 425 California St | Stripe Inc. Dba Garnett Sign Studio | for 15th floor only - 1 stairwell & elevator evacuation map.Details
for 15th floor only - 1 stairwell & elevator evacuation map. | $1,500 |
| Jan 13, 2011 | Completed final sign-off Apr 2011 | 425 California St | Cahill Const Service Inc | 15th floor m.e.p - title 24, install new ductwork for perimeter & interior zones, new vavs, new lighting. ref pa #201012176944. no card readers on this permit.Details
15th floor m.e.p - title 24, install new ductwork for perimeter & interior zones, new vavs, new lighting. ref pa #201012176944. no card readers on this permit. | $100,000 |
| Dec 17, 2010 | Completed final sign-off Apr 2011 | 425 California St | Cahill Const Service Inc | 15th floor:tenant improvements consisting of offices including non bearing partitions, doors, side light glazing, new lighting,new power and new finishes.associated mechanical, electrical and fire life safety to be design built and performed under seperate permit. no structural work to be performed.Details
15th floor:tenant improvements consisting of offices including non bearing partitions, doors, side light glazing, new lighting,new power and new finishes.associated mechanical, electrical and fire life safety to be design built and performed under seperate permit. no structural work to be performed. | $350,000 |
| Dec 17, 2010 | Completed final sign-off May 2011 | 425 California St | Cahill Const Service Inc | 26th floor:tenant improvements consisting of offices including non bearing partitions, doors, side light glazing, new power and new finishes. no structural work to be performed.Details
26th floor:tenant improvements consisting of offices including non bearing partitions, doors, side light glazing, new power and new finishes. no structural work to be performed. | $50,000 |
| Dec 1, 2010 | Completed final sign-off Apr 2011 | 425 California St | Westates Mechanical Corporation Inc | install new fire sprinkler system at 15th fl from existing prv on that floorDetails
install new fire sprinkler system at 15th fl from existing prv on that floor | $31,500 |
| Sep 17, 2010 | Completed final sign-off Apr 2011 | 425 California St | create evacuation sign for the 24th floor ( qty 3)Details
create evacuation sign for the 24th floor ( qty 3) | $750 | |
| Sep 16, 2010 | Completed final sign-off Apr 2011 | 425 California St | Cahill Const Service Inc | 15th floor: full floor demolition of interior partitions, ceiling systems, plmg, fixtures, electrical outlets and associated components. sprinkler/fa under separate permits.Details
15th floor: full floor demolition of interior partitions, ceiling systems, plmg, fixtures, electrical outlets and associated components. sprinkler/fa under separate permits. | $40,000 |
| Sep 13, 2010 | Expired or cancelled expired Apr 2016 | 425 California St | Park Place Contractors, Jemcom | add 2 new antennas on new mount on roof. add new battery rach with 24 batteries and replace 3 existing cabinets with new inside existing verizon equipment room.Details
add 2 new antennas on new mount on roof. add new battery rach with 24 batteries and replace 3 existing cabinets with new inside existing verizon equipment room. | $20,000 |
| Aug 23, 2010 | Completed final sign-off Apr 2011 | 425 California St | Pribuss Engineering Inc | 24th floor-fire sprinkler tenant-relocate 58 headsDetails
24th floor-fire sprinkler tenant-relocate 58 heads | $14,500 |
| Aug 19, 2010 | Completed final sign-off Apr 2011 | 425 California St | Cahill Const Service Inc | 24th fl, mep. relocate supply ductwork run for perimeter and interior aones. install 1 new vav for interior zones. dmo and cap partial ductworks. furnish new 24x24 supply and return grilles. also related electrical/lighting per plansDetails
24th fl, mep. relocate supply ductwork run for perimeter and interior aones. install 1 new vav for interior zones. dmo and cap partial ductworks. furnish new 24x24 supply and return grilles. also related electrical/lighting per plans | $100,000 |
| Aug 18, 2010 | Completed final sign-off Apr 2011 | 425 California St | Diversified Fire Products | 24th floor - fire alarm t.i. for tenant, adding 1 control relay, 15 speaker/strobes, 1 smoke detector, 2 strobes.Details
24th floor - fire alarm t.i. for tenant, adding 1 control relay, 15 speaker/strobes, 1 smoke detector, 2 strobes. | $14,388 |
| Jun 4, 2010 | Completed final sign-off Apr 2011 | 425 California St | Cahill Const Service Inc | demo of 536 lineal ft of drywall partition apprx. 5,700 sqft of acoustic ceiling. install 480 lin.ft of drywall partition, 5,700 sqft of acoustic ceiling grid & tile. new doors & frames & lighting. upgrade the (e) restroom to fully compliant. mep; fire alarm; sprinkler; under separate permit.Details
demo of 536 lineal ft of drywall partition apprx. 5,700 sqft of acoustic ceiling. install 480 lin.ft of drywall partition, 5,700 sqft of acoustic ceiling grid & tile. new doors & frames & lighting. upgrade the (e) restroom to fully compliant. mep; fire alarm; sprinkler; under separate permit. | $410,000 |
| Mar 9, 2010 | Never finaled issued Mar 2010, no final | 401 California St | Golden Gate Sign Company Inc. | erect a electric single faced direct new signDetails
erect a electric single faced direct new sign | $2,500 |
| Jan 13, 2010 | Never finaled issued Jan 2010, no final | 401 California St | street space & mtaDetails
street space & mta | ||
| Dec 10, 2009 | Expired or cancelled expired Apr 2016 | 425 California St | Diversified Fire Products | fire alarm ti for chase bank at 401 california 1st fl: add 4 speaker/strobes, relocate existing notification of pull stationDetails
fire alarm ti for chase bank at 401 california 1st fl: add 4 speaker/strobes, relocate existing notification of pull station | $10,032 |
| Nov 13, 2009 | Completed final sign-off Aug 2010 | 401 California St | Anderson, Rowe & Buckley, Inc. | tenant improvments to the existing fire sprinkler system, 1st flDetails
tenant improvments to the existing fire sprinkler system, 1st fl | $2,600 |
| Nov 12, 2009 | Completed final sign-off Jul 2010 | 401 California St | Golden Gate Sign Company Inc. | work on #401 california st. erect a electric wall single faced sign.Details
work on #401 california st. erect a electric wall single faced sign. | $20,000 |
| Nov 12, 2009 | Completed final sign-off Jul 2010 | 401 California St | Golden Gate Sign Company Inc. | work on #425 california st. erect a electric wall single faced sign.Details
work on #425 california st. erect a electric wall single faced sign. | $65,000 |
| Aug 28, 2009 | Completed final sign-off Aug 2010 | 401 California St | Dbsi Inc Dba Design Build Solutions & In | 1st fl-revised scope of work. exterior glazing will be full height to match existing windows. rev. to pa# 2009.05.18.8573. no elect. work under this rev. work limited to 1st fl only- sprinkler and fire alarm-separte permitDetails
1st fl-revised scope of work. exterior glazing will be full height to match existing windows. rev. to pa# 2009.05.18.8573. no elect. work under this rev. work limited to 1st fl only- sprinkler and fire alarm-separte permit | $150,000 |
| Aug 19, 2009 | Completed final sign-off Sep 2010 | 401 California St | Dbsi Inc Dba Design Build Solutions & In | 1st floor-add electrical boxes and 9 pendent lights. change specs. on bcm office from wood frame to glazing system. reev. to pa# 2009.05.18.8573. work on 1st fl onlyDetails
1st floor-add electrical boxes and 9 pendent lights. change specs. on bcm office from wood frame to glazing system. reev. to pa# 2009.05.18.8573. work on 1st fl only | $2,500 |
| Jul 15, 2009 | Completed final sign-off Dec 2009 | 425 California St | Park Place Contractors, N S A Wireless Inc | add three antennas/ 1-per sector (new).Details
add three antennas/ 1-per sector (new). | $8,900 |
| May 18, 2009 | Completed final sign-off Sep 2010 | 401 California St | Dbsi Inc Dba Design Build Solutions & In | demolition of existing finishes, non structural partitions and millwork. rework includes new interior storefront at foyer, new finishes, minor electrical and mechanicalDetails
demolition of existing finishes, non structural partitions and millwork. rework includes new interior storefront at foyer, new finishes, minor electrical and mechanical | $100,000 |
| May 6, 2009 | Completed final sign-off Jan 2010 | 425 California St | Cahill Const Service Inc | replace main entry doors and glass panel above doors, modify existing canopy, reduce the number lights and modify 250 sf of sidewalkDetails
replace main entry doors and glass panel above doors, modify existing canopy, reduce the number lights and modify 250 sf of sidewalk | $176,000 |
| Mar 6, 2009 | Expired or cancelled expired Apr 2016 | 425 California St | Diversified Fire Products | fire alarm ti, elevator upgrade, 2 signal modules, 4 speakers, 4 phone jacksDetails
fire alarm ti, elevator upgrade, 2 signal modules, 4 speakers, 4 phone jacks | $14,400 |
| Dec 4, 2007 | Completed final sign-off Dec 2007 | 425 California St | Diversified Fire Products | 26th floor, suite 2600 - fire alarm t.i. for tech & conf. room. new speaker/strobe, new fsd/ahu controlled by an existing control relay.Details
26th floor, suite 2600 - fire alarm t.i. for tech & conf. room. new speaker/strobe, new fsd/ahu controlled by an existing control relay. | $5,800 |
| Oct 15, 2007 | Completed final sign-off Dec 2007 | 425 California St | Cahill Const Service Inc | 26th floor - demolish one partition, add three new partitions, recircuit (6) lights, modify hvac and new air handling unit. sprinkler work under seperate permit.Details
26th floor - demolish one partition, add three new partitions, recircuit (6) lights, modify hvac and new air handling unit. sprinkler work under seperate permit. | $18,000 |
| Apr 17, 2007 | Completed final sign-off Apr 2007 | 425 California St | J B 3 Enterprises Inc | per correction notice issued by district inspector to correct story count, adjust:200502024556 shows 15 story, 200602285589 adjsut to reflect 28 story, 200702214562 per b.i. patric o 'rierdenDetails
per correction notice issued by district inspector to correct story count, adjust:200502024556 shows 15 story, 200602285589 adjsut to reflect 28 story, 200702214562 per b.i. patric o 'rierden | |
| Feb 21, 2007 | Completed final sign-off Apr 2007 | 425 California St | J B 3 Enterprises Inc | renew for final only 200502024556 & 200602285589.Details
renew for final only 200502024556 & 200602285589. | |
| Oct 4, 2006 | Never finaled issued Oct 2006, no final | 401 California St | street space permitDetails
street space permit | ||
| Jul 12, 2006 | Completed final sign-off Aug 2006 | 425 California St | Cahill Const Service Inc | revision to appl#200605161658 hallway at restrooms mislabled as corridor. it should be a hallway as noted on attached plans.Details
revision to appl#200605161658 hallway at restrooms mislabled as corridor. it should be a hallway as noted on attached plans. | |
| Jun 22, 2006 | Expired or cancelled expired Jan 2008 | 425 California St | Pribuss Engineering Inc | oti-2, 11th floor, sp.Details
oti-2, 11th floor, sp. | $3,600 |
| Jun 20, 2006 | Completed final sign-off Aug 2006 | 425 California St | Cahill Const Service Inc | fire alarm upgrade to 11th fl of smoke detectors and notification appliances.Details
fire alarm upgrade to 11th fl of smoke detectors and notification appliances. | $6,177 |
Find contractors for work like this