Alan Wright
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Oak Hill Engineering
- Based in
- Concord
- On San Francisco permits
- Oct 2004 to Feb 2023
43 permits since 2000 (engineer on 38 permits, architect on 4 permits, authorized agent-others on 1 permit): 38 completed, 5 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 23, 2023 | Completed final sign-off May 2023 | 101 Montgomery St | Novo Construction Inc | 17th fl - mechanical and electrical work for ti at suite 1700. ref arch pa 2023-0126-0779Details
17th fl - mechanical and electrical work for ti at suite 1700. ref arch pa 2023-0126-0779 | $155,000 |
| Feb 2, 2023 | Never finaled issued Feb 2023, no final | 455 Market St | Matrix Hg Inc | hvac tenant improvement install new ater source heat pump, install ceiling plunum, mounted exhaust fan install carbon dioxide sensor. convert e control system to ddc. provide air balancer. base building hvac system remains unchangedDetails
hvac tenant improvement install new ater source heat pump, install ceiling plunum, mounted exhaust fan install carbon dioxide sensor. convert e control system to ddc. provide air balancer. base building hvac system remains unchanged | $149,417 |
| Dec 21, 2022 | Completed final sign-off Oct 2023 | 601 California St | Peacock Construction | suite #300: remove and dispose water source heat pump, remove all associated ductwork, piping controls, relocate two existing supply diffusers, install demand cntrol sensors. relocate temp sensors. provide balance for air distribution. the base building hvac system remains unchanged.Details
suite #300: remove and dispose water source heat pump, remove all associated ductwork, piping controls, relocate two existing supply diffusers, install demand cntrol sensors. relocate temp sensors. provide balance for air distribution. the base building hvac system remains unchanged. | $75,000 |
| Nov 10, 2022 | Completed final sign-off Apr 2023 | 425 California St | Novo Construction Inc | ste 1600 - 16th flr - mechanical and electrical work for ti. ref pa 2022-1104-5913.Details
ste 1600 - 16th flr - mechanical and electrical work for ti. ref pa 2022-1104-5913. | $45,000 |
| Nov 9, 2022 | Completed final sign-off Jun 2023 | 111 Sutter St | Peacock Construction | 4th fl: mech and electrical for ti. new heat pumps, duct work, exhaust grills. no new fine dampers and fds. new power and signal devices. red pa#202208049891.Details
4th fl: mech and electrical for ti. new heat pumps, duct work, exhaust grills. no new fine dampers and fds. new power and signal devices. red pa#202208049891. | $75,000 |
| Sep 8, 2022 | Completed final sign-off Nov 2022 | 425 California St | Novo Construction Inc | suite 1250: mechanical & electrical work for t.i. ref bpa#202208231104Details
suite 1250: mechanical & electrical work for t.i. ref bpa#202208231104 | $35,000 |
| Jul 13, 2022 | Completed final sign-off Dec 2022 | 1 Daniel Burnham Ct | Rossi Builders Inc. | 2nd fl ste 262: mep for pa# 202205124100.Details
2nd fl ste 262: mep for pa# 202205124100. | |
| May 16, 2022 | Completed final sign-off Jul 2022 | 425 California St | Novo Construction Inc | ste 2000: mep for tenant improvement to include: replace 5 existing mixing assemblies, exhaust fan. replace pneumatic control system. new lighting, controls, and power. ref pa# 202203281023.Details
ste 2000: mep for tenant improvement to include: replace 5 existing mixing assemblies, exhaust fan. replace pneumatic control system. new lighting, controls, and power. ref pa# 202203281023. | $25,000 |
| Mar 22, 2022 | Completed final sign-off Feb 2023 | 33 New Montgomery St | Peacock Construction | ste 350: mechanical & electrical work for tenant improvement. replace low pressure distrubution ductwork. install new distribution ductwork. relocate vav-2. new exhaust fans. relocate 4 vav unit thermostats. provide lighting for t.i. ref pa# 202201055400.Details
ste 350: mechanical & electrical work for tenant improvement. replace low pressure distrubution ductwork. install new distribution ductwork. relocate vav-2. new exhaust fans. relocate 4 vav unit thermostats. provide lighting for t.i. ref pa# 202201055400. | $15,000 |
| Mar 22, 2022 | Completed final sign-off Apr 2023 | 33 New Montgomery St | Peacock Construction | basement/fitness center: mechanical & electrical work for tenant improvement to include replacement of water source heat pump. new exhaust system. revision to (e) ductwork. provide lighting of fitness gym space. ref pa# 202112094084 & 202205063684Details
basement/fitness center: mechanical & electrical work for tenant improvement to include replacement of water source heat pump. new exhaust system. revision to (e) ductwork. provide lighting of fitness gym space. ref pa# 202112094084 & 202205063684 | $20,000 |
| Jan 11, 2022 | Completed final sign-off May 2022 | 425 California St | Novo Construction Inc | ste:2100: mechanical and electrical work for tenant improvement on the 21st floor. ref arch 202111303282Details
ste:2100: mechanical and electrical work for tenant improvement on the 21st floor. ref arch 202111303282 | $175,000 |
| Jul 28, 2021 | Completed final sign-off Feb 2022 | 1601 19th Av | Matrix Hg Inc | replace 2 castiron hot water boilers with 2 new castiron boilers. reconfigure piping to accommodate new boilers. install new 80 gallon vertical buffer tank and pipe to the new boiler.Details
replace 2 castiron hot water boilers with 2 new castiron boilers. reconfigure piping to accommodate new boilers. install new 80 gallon vertical buffer tank and pipe to the new boiler. | $126,019 |
| Dec 8, 2020 | Completed final sign-off Apr 2021 | 620 Davis St | Field Construction Inc. | tenant improvement: demo of non-load bearing partitions, doors, millwork, glazing, power lighting, plumbing & finishes. new partitions, door and hardware, glazing, power, plumbing, ceiling, lighting, finishes & millwork.Details
tenant improvement: demo of non-load bearing partitions, doors, millwork, glazing, power lighting, plumbing & finishes. new partitions, door and hardware, glazing, power, plumbing, ceiling, lighting, finishes & millwork. | $455,745 |
| Sep 5, 2020 | Completed final sign-off Dec 2020 | 601 California St | Peacock Construction | suite 617: electrical title 24 & mechanical engineer drawings for work under bpa#201912311056Details
suite 617: electrical title 24 & mechanical engineer drawings for work under bpa#201912311056 | $25,000 |
| Jul 22, 2020 | Completed final sign-off Dec 2020 | 180 Montgomery St | Matrix Hg Inc | #1850: hvac air distribution modification for t.i.Details
#1850: hvac air distribution modification for t.i. | $30,001 |
| Mar 12, 2020 | Completed final sign-off Aug 2020 | 601 California St | Peacock Construction | suite 700 on fl 7. t-24 mechanical for work under pa #201912189863.Details
suite 700 on fl 7. t-24 mechanical for work under pa #201912189863. | |
| Mar 2, 2020 | Completed final sign-off Mar 2021 | 601 California St | Peacock Construction | t-24 mechanical for work under pa# 202001162034Details
t-24 mechanical for work under pa# 202001162034 | $31,000 |
| Jan 17, 2020 | Completed final sign-off Oct 2020 | 150 Pacific Av | Field Construction Inc. | modify (e) hvac system dict work and reuse (e) heat pumps for new layout, new power for clubhouse & conference room, new lighting and controlsDetails
modify (e) hvac system dict work and reuse (e) heat pumps for new layout, new power for clubhouse & conference room, new lighting and controls | $150,000 |
| Oct 25, 2019 | Completed final sign-off May 2020 | 1 Market St | Field Construction Inc. | provide hvac power and lighting for tenant improvement (title 24 compliance) ref 201908027701 maher not reqDetails
provide hvac power and lighting for tenant improvement (title 24 compliance) ref 201908027701 maher not req | $500,000 |
| Oct 18, 2019 | Completed final sign-off Mar 2020 | 180 Montgomery St | Matrix Hg Inc | 19/f ste1900: modify duct work for office, add (1) diffuser, insulate ductowrkDetails
19/f ste1900: modify duct work for office, add (1) diffuser, insulate ductowrk | $15,469 |
| Oct 17, 2019 | Completed final sign-off Jul 2022 | 111 Sutter St | Gci, Inc | 6/f, 12/f,13/f: title 24 compliance, mech & electrical improvements. ref t.i. pa201908057897, 201908057898, 201908057899. maher n/a.Details
6/f, 12/f,13/f: title 24 compliance, mech & electrical improvements. ref t.i. pa201908057897, 201908057898, 201908057899. maher n/a. | $1,200,000 |
| Jul 15, 2019 | Completed final sign-off Aug 2020 | 345 California St | Gci, Inc | 17/f 1750: mechanical and electrical: ref app# 201906052544. demo vav and new vav. lighting and title 24. n/a for maherDetails
17/f 1750: mechanical and electrical: ref app# 201906052544. demo vav and new vav. lighting and title 24. n/a for maher | $120,000 |
| Apr 10, 2019 | Never finaled issued Apr 2019, no final | 33 New Montgomery St | Peacock Construction | 4th floor: t-24 mechanical and electrical for work under app#201902193217. n/a for maherDetails
4th floor: t-24 mechanical and electrical for work under app#201902193217. n/a for maher | |
| Oct 4, 2018 | Completed final sign-off Dec 2018 | 180 Montgomery St | Matrix Hg Inc | suite 1500: redistribution of vavs & ddc controls upgrade. ref t.i. pa201806293357. maher n/a.Details
suite 1500: redistribution of vavs & ddc controls upgrade. ref t.i. pa201806293357. maher n/a. | $28,000 |
| Aug 23, 2017 | Completed final sign-off Nov 2017 | 180 Montgomery St | Matrix Hg Inc | 21st floor ste 2100 - demo existing crac unit, install new exhaust fan & new transfer duct. ref pa #201705045668.Details
21st floor ste 2100 - demo existing crac unit, install new exhaust fan & new transfer duct. ref pa #201705045668. | $9,729 |
| Apr 25, 2017 | Completed final sign-off Jul 2017 | 180 Montgomery St | Matrix Hg Inc | suite #2380 - replace existing vav boxes w/new add new controls, modify duct for new layout, addition of one fsd where duct connection is modified at corridor. ref pa #2017-0207-8837. fire alarm for fsd deferred.Details
suite #2380 - replace existing vav boxes w/new add new controls, modify duct for new layout, addition of one fsd where duct connection is modified at corridor. ref pa #2017-0207-8837. fire alarm for fsd deferred. | $25,000 |
| Mar 23, 2016 | Never finaled issued Mar 2016, no final | 101 Montgomery St | Gci, Inc | #2425 & #2450 mechanical work - new heating vav box, connect inlet duct, relocate diffuser, remove split system fan coil. ref pa 2016-0126-8031Details
#2425 & #2450 mechanical work - new heating vav box, connect inlet duct, relocate diffuser, remove split system fan coil. ref pa 2016-0126-8031 | |
| Jun 17, 2015 | Completed final sign-off Sep 2015 | 433 California St | Matrix Hg Inc | roof level - replace existing r-11 centrifugal chiller with new r-134a high efficiency helical rotary chiller in the same location. connect to existing electrical service, revise piping as required to accommodate the new chiller. provide new insulation on all new chilled water piping. n/a maher ordiDetails
roof level - replace existing r-11 centrifugal chiller with new r-134a high efficiency helical rotary chiller in the same location. connect to existing electrical service, revise piping as required to accommodate the new chiller. provide new insulation on all new chilled water piping. n/a maher ordi | $125,000 |
| Mar 26, 2015 | Completed final sign-off May 2015 | 536 Mission St | Matrix Hg Inc | revision to pa#201411131352, install split system to roof & 5/f av room.Details
revision to pa#201411131352, install split system to roof & 5/f av room. | $8,000 |
| Feb 10, 2015 | Never finaled issued Feb 2015, no final | 536 Mission St | Matrix Hg Inc | remove all distribution ductwork on the flr.install a ddc variable air volume distribution sys & new hot water reheat distribution to all zones, relocate one supply diffuser in 1st floor lounge. provide new supply & return air @ 6th flr lounge 6200, replace vav box modify ductwork, provide air/waterDetails
remove all distribution ductwork on the flr.install a ddc variable air volume distribution sys & new hot water reheat distribution to all zones, relocate one supply diffuser in 1st floor lounge. provide new supply & return air @ 6th flr lounge 6200, replace vav box modify ductwork, provide air/water | $180,000 |
| Dec 9, 2014 | Completed final sign-off Dec 2014 | 180 Montgomery St | Matrix Hg Inc | 16th flr: replace 3 (e) vav boxes w/new cooling only boxes w/ddc controls, convert 4 (e) vav boxes to ddc controls,relocate (e) diffusers to accommodate new portion layout; balance whole suite;t.i. 201411252432Details
16th flr: replace 3 (e) vav boxes w/new cooling only boxes w/ddc controls, convert 4 (e) vav boxes to ddc controls,relocate (e) diffusers to accommodate new portion layout; balance whole suite;t.i. 201411252432 | $30,000 |
| Sep 11, 2014 | Completed final sign-off Dec 2014 | 731 Market St | Matrix Hg Inc | revision to previously submitted mechanical dwgs, orig permit no. 201406279804.Details
revision to previously submitted mechanical dwgs, orig permit no. 201406279804. | $65,000 |
| Jul 14, 2014 | Completed final sign-off Aug 2014 | 536 Mission St | Matrix Hg Inc | (r) opposed blade damper total 16. reroute 3 return air duct risers to avoid conflict with architectural wall revisions. new sound attenuators in relocated risers. install ceiling hung fan for transfering air from lecture hall 2202 to serve green rm. reoute existing elevator hoistway venting fromDetails
(r) opposed blade damper total 16. reroute 3 return air duct risers to avoid conflict with architectural wall revisions. new sound attenuators in relocated risers. install ceiling hung fan for transfering air from lecture hall 2202 to serve green rm. reoute existing elevator hoistway venting from | $50,000 |
| Jun 30, 2014 | Completed final sign-off Sep 2014 | 600 Townsend St | Dpr Construction | 2nd fl division from one tenant to multi tenant. wall of non exit connecting stair. maher- compliance with ordinance no. 155-13 not required.Details
2nd fl division from one tenant to multi tenant. wall of non exit connecting stair. maher- compliance with ordinance no. 155-13 not required. | $200,000 |
| Jun 16, 2014 | Completed final sign-off Sep 2014 | 201 Spear St | Bcci Construction Company | lighting and mechanical work associated with approved permit 201406057583; compliance with ord 155-13 not required.Details
lighting and mechanical work associated with approved permit 201406057583; compliance with ord 155-13 not required. | $108,000 |
| Oct 28, 2013 | Never finaled issued Oct 2013, no final | 933 20th St | San Francisco Heating And Cooling | 2 furnaces 95%, 2 evap coils for display, 2 acid neutralizers, 2 duct systems, saddles, 2 return air pulling outside air.Details
2 furnaces 95%, 2 evap coils for display, 2 acid neutralizers, 2 duct systems, saddles, 2 return air pulling outside air. | $8,000 |
| Aug 5, 2013 | Completed final sign-off Dec 2013 | 180 Montgomery St | Hathaway Dinwiddie Co. | 4th floor - f.i new vav boxes (18), 2 exhaust fans, 2 f.s.d.s., new lighting & new power outlets. ref pa #2013.06.19.9899Details
4th floor - f.i new vav boxes (18), 2 exhaust fans, 2 f.s.d.s., new lighting & new power outlets. ref pa #2013.06.19.9899 | $150,000 |
| Mar 30, 2012 | Completed final sign-off Jan 2014 | 180 Montgomery St | Hathaway Dinwiddie Co. | 9/f- hvac and electrical work to be completed in association with tenant improvement being completed under pa# 201202234680. remove existing vav boxes and install 17 new vav boxes and 1 exhaust fan. new lights throughoutDetails
9/f- hvac and electrical work to be completed in association with tenant improvement being completed under pa# 201202234680. remove existing vav boxes and install 17 new vav boxes and 1 exhaust fan. new lights throughout | $150,000 |
| Jun 17, 2011 | Completed final sign-off Aug 2012 | 5150 Mission St | Matrix Hg Inc | remove extg hvac equipment and replace with three 5 ton gas package hvac unit, one 3 ton gas package hvac unit, and 2 exhuast fans.Details
remove extg hvac equipment and replace with three 5 ton gas package hvac unit, one 3 ton gas package hvac unit, and 2 exhuast fans. | $307,000 |
| Nov 19, 2010 | Completed final sign-off Mar 2011 | 210 11th St | Air Perfection Heating & Air Condition | installation of new heat pumps. reference to p.a. 2010 0415 0352Details
installation of new heat pumps. reference to p.a. 2010 0415 0352 | $3,000 |
| Jun 11, 2009 | Completed final sign-off Aug 2009 | 101 Montgomery St | Cahill Const Service Inc | 12th floor mechanical only - change grills for new ceiling grid, add one cooling vav box; relocate thermostats & balance system as noted. ref pa #200904247015.Details
12th floor mechanical only - change grills for new ceiling grid, add one cooling vav box; relocate thermostats & balance system as noted. ref pa #200904247015. | $22,000 |
| Jan 9, 2007 | Completed final sign-off Mar 2007 | 101 Montgomery St | Cahill Const Service Inc | oti-2 25/f meDetails
oti-2 25/f me | $60,000 |
| Oct 6, 2004 | Completed final sign-off Mar 2005 | 600 Montgomery St | oti-2, 32nd fl, el, meDetails
oti-2, 32nd fl, el, me | $100,000 |