Block 3783, lot 008
600 Townsend St
- City’s use
- Commercial Office
- Built
- 1989
- Stories
- 5
- Rooms
- 10 bathrooms
- Building
- 215,875 sq ft
- Lot
- 43,312 sq ft
- Zoning
- M2
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 29, 2026 | In progress issued Sep 2026 | 600 Townsend St | Kr Johnston Construction Inc | modify hvac ductwork for new layout. add electrical outlets. modify lighting. ref pa# 202605070870Details
modify hvac ductwork for new layout. add electrical outlets. modify lighting. ref pa# 202605070870 | $20,000 |
| May 7, 2026 | In progress issued Aug 2026 | 600 Townsend St | Kr Johnston Construction Inc | project consists of modification of two (e) door swings, relocation of exterior door and installation of exterior steel stair. new millwork to be added in exterior courtyard mep will be deffered and provided by gc.Details
project consists of modification of two (e) door swings, relocation of exterior door and installation of exterior steel stair. new millwork to be added in exterior courtyard mep will be deffered and provided by gc. | $200,000 |
| May 7, 2026 | In progress issued Jun 2026 | 600 Townsend St | Kr Johnston Construction Inc | demolition of (e) non-structural partitions, non rated interior doors, and millwork to convert ste 100w and 105w into a new fitness room+ new offices. the renewed space will consist on non structural interior partitions, (n) finishes, new interior non rated doors, minimal millwork.Details
demolition of (e) non-structural partitions, non rated interior doors, and millwork to convert ste 100w and 105w into a new fitness room+ new offices. the renewed space will consist on non structural interior partitions, (n) finishes, new interior non rated doors, minimal millwork. | $1,400,000 |
| Apr 21, 2026 | In progress issued Jul 2026 | 600 Townsend St | Kr Johnston Construction Inc | scope of work includes restripe of existing violations to meet accessibility compliance under 2025 cbc 11b. minimal non structural storage reconfiguration to allow room for proper accessible parking stalls and aisles. no electrical or plumbing is expected in the scope.Details
scope of work includes restripe of existing violations to meet accessibility compliance under 2025 cbc 11b. minimal non structural storage reconfiguration to allow room for proper accessible parking stalls and aisles. no electrical or plumbing is expected in the scope. | $30,000 |
| Jan 22, 2026 | Completed final sign-off Jan 2026 | 600 Townsend St | Golden Gate Fire Protection Inc | 1st/f ste# 150: relocate 3 concealed pendents, ref to t.i. 202512040996Details
1st/f ste# 150: relocate 3 concealed pendents, ref to t.i. 202512040996 | $750 |
| Dec 30, 2025 | Completed final sign-off Jan 2026 | 600 Townsend St | Everon Llc | 2nd fl ref pa #2025-0722-1305: fire alarm ti. relocate 3 existing notification devices. demo 1 existing notification device. add 4 new notification devices.Details
2nd fl ref pa #2025-0722-1305: fire alarm ti. relocate 3 existing notification devices. demo 1 existing notification device. add 4 new notification devices. | $3,000 |
| Dec 17, 2025 | Completed final sign-off Feb 2026 | 600 Townsend St | Kr Johnston Construction Inc | 1/f suite 150: electrical and hvac into 2 new offices. ref t.i permit 202512040996Details
1/f suite 150: electrical and hvac into 2 new offices. ref t.i permit 202512040996 | $40,000 |
| Dec 16, 2025 | Completed final sign-off Apr 2026 | 600 Townsend St | Novo Construction Inc | 2/f: revision to permits 202507221305 and 202510298361 to add (11) phone rooms. structural details included.Details
2/f: revision to permits 202507221305 and 202510298361 to add (11) phone rooms. structural details included. | $20,000 |
| Dec 4, 2025 | Completed final sign-off Feb 2026 | 600 Townsend St | Kr Johnston Construction Inc | minimal finish demo and construction of new non bearing partitions to create 2 new rooms within e suite 150. no change of use or occupncy proposed. mep to be design build and provided by gc. ab 107 suite is vacant with no interior ada upgrades, deferred until future tenant occupancy.no accessibleDetails
minimal finish demo and construction of new non bearing partitions to create 2 new rooms within e suite 150. no change of use or occupncy proposed. mep to be design build and provided by gc. ab 107 suite is vacant with no interior ada upgrades, deferred until future tenant occupancy.no accessible | $115,000 |
| Nov 19, 2025 | Completed final sign-off Apr 2026 | 600 Townsend St | Novo Construction Inc | mechanical and electrical work for ti on 2nd fl ref pa 202507221305/202510298361Details
mechanical and electrical work for ti on 2nd fl ref pa 202507221305/202510298361 | $75,000 |
| Nov 17, 2025 | In progress issued Nov 2025 | 600 Townsend St | Eco Fire Sprinklers Inc | add 7 new sprinklers and relocate 8 existing sprinklers on the 2nd floor in area of work for t.i. builing pa# 202510298361Details
add 7 new sprinklers and relocate 8 existing sprinklers on the 2nd floor in area of work for t.i. builing pa# 202510298361 | $14,088 |
| Oct 29, 2025 | Completed final sign-off Apr 2026 | 600 Townsend St | Novo Construction Inc | 2nd fl - revision to pa 202507221305 to enlarge office 21. remove all work in rooms 220, 230, 233. roomn 231 remove furniture walls and replace w/drywall partitionsDetails
2nd fl - revision to pa 202507221305 to enlarge office 21. remove all work in rooms 220, 230, 233. roomn 231 remove furniture walls and replace w/drywall partitions | $97,171 |
| Jul 22, 2025 | Completed final sign-off Apr 2026 | 600 Townsend St | Novo Construction Inc | 2/f: t.i. selective demo of non-structural parttions. new partitions. upgrades at mens & womens restrooms. mep deferred.Details
2/f: t.i. selective demo of non-structural parttions. new partitions. upgrades at mens & womens restrooms. mep deferred. | $680,918 |
| May 8, 2025 | Completed final sign-off Jun 2025 | 600 Townsend St | change of planning use from (group b) wholesale showroom to (group b) office per 2025-001365 pca & 2025-000545 ofa to establish up to 213,400 sf of office use. no work or change of building occupancy classification.Details
change of planning use from (group b) wholesale showroom to (group b) office per 2025-001365 pca & 2025-000545 ofa to establish up to 213,400 sf of office use. no work or change of building occupancy classification. | ||
| Jul 11, 2024 | Completed final sign-off Mar 2025 | 600 Townsend St | Gci, Inc | 1st/f lobby t.i.: demo of non-structural partitions, ceilings, light fixtures, millwork & finishes. new construction of non-structural partitions, lighting, electrical & mech & finishes.Details
1st/f lobby t.i.: demo of non-structural partitions, ceilings, light fixtures, millwork & finishes. new construction of non-structural partitions, lighting, electrical & mech & finishes. | $650,000 |
| Sep 8, 2023 | Completed final sign-off Sep 2023 | 640 Townsend St | Anderson, Rowe & Buckley, Inc. | 1st fl - existing fire sprinkler system - tenant demo. relocate drop to upright sprinklers 24 speakersDetails
1st fl - existing fire sprinkler system - tenant demo. relocate drop to upright sprinklers 24 speakers | $15,000 |
| Nov 15, 2022 | Completed final sign-off Dec 2022 | 600 Townsend St | C C I Commercial Construction & Improv | revision to 202209071974 provide accessible door push botton,door operator at ments restroom door in lieu of modificaion of plumbing lines, water closets/toilet partition due to infeasibility of plumbing line modification. modify e private office config,no change area/ftprint.due to no shower availDetails
revision to 202209071974 provide accessible door push botton,door operator at ments restroom door in lieu of modificaion of plumbing lines, water closets/toilet partition due to infeasibility of plumbing line modification. modify e private office config,no change area/ftprint.due to no shower avail | $40,000 |
| Nov 10, 2022 | Completed final sign-off Feb 2023 | 600 Townsend St | Everon Llc | fire alarm t.i. on 3rd fl. add (3) smoke detectors and (2) wall mount horn strobes. ref permit 202209071974Details
fire alarm t.i. on 3rd fl. add (3) smoke detectors and (2) wall mount horn strobes. ref permit 202209071974 | $3,500 |
| Oct 21, 2022 | Completed final sign-off Nov 2022 | 600 Townsend St | Eco Fire Sprinklers Inc | relocate 2 existing pendent sprinklers and 3 pendent sprinkler for tenant improvement of 3rd floor hallway and bathrooms.Details
relocate 2 existing pendent sprinklers and 3 pendent sprinkler for tenant improvement of 3rd floor hallway and bathrooms. | $4,000 |
| Sep 7, 2022 | Completed final sign-off Dec 2022 | 600 Townsend St | C C I Commercial Construction & Improv | new hallway, 854sf; restroom improvement to meet current accessibility requirement (+/- 300sf).Details
new hallway, 854sf; restroom improvement to meet current accessibility requirement (+/- 300sf). | $196,000 |
| Jul 5, 2022 | Expired or cancelled cancelled Jan 2026 | 640 Townsend St | Ad Art Inc. | us bank (sign 1) non electric singled faced wall sign 3'5 " x12' x 7"Details
us bank (sign 1) non electric singled faced wall sign 3'5 " x12' x 7" | $3,000 |
| Jul 5, 2022 | Expired or cancelled cancelled Jan 2026 | 640 Townsend St | Ad Art Inc. | us bank ( sign 2) 2'3" x 4' non electric wall signDetails
us bank ( sign 2) 2'3" x 4' non electric wall sign | $5,000 |
| Dec 20, 2021 | Completed final sign-off Mar 2022 | 600 Townsend St | Aquamatic Fire Protection | as built for permit #202108236924Details
as built for permit #202108236924 | |
| Dec 1, 2021 | Completed final sign-off Feb 2022 | 600 Townsend St | Everon Llc | fire alarm t.i. on 2nd floor: add 1 control relay for av shutdown,add 1 hon/strobe,replace 1 stroke with honr/strobe.remove(3) & relocate (1) notification applicances. ref#201912109087Details
fire alarm t.i. on 2nd floor: add 1 control relay for av shutdown,add 1 hon/strobe,replace 1 stroke with honr/strobe.remove(3) & relocate (1) notification applicances. ref#201912109087 | $1,000 |
| Nov 15, 2021 | Completed final sign-off Mar 2022 | 600 Townsend St | Novo Construction Inc | administrative fire only permit to remove deferred submittal requirement of 2-way communication and requirement to comply with cfc 1010.1.9.13 locked elevator lobby must comply with 1010.19.10Details
administrative fire only permit to remove deferred submittal requirement of 2-way communication and requirement to comply with cfc 1010.1.9.13 locked elevator lobby must comply with 1010.19.10 | |
| Sep 22, 2021 | Completed final sign-off Dec 2021 | 600 Townsend St | Everon Llc | fire alarm t.i. on 5th floor. add 3 control relay for audio/visual shut down and relocate 5 and remove 4 notification appliances. ref app#202107234994Details
fire alarm t.i. on 5th floor. add 3 control relay for audio/visual shut down and relocate 5 and remove 4 notification appliances. ref app#202107234994 | $2,000 |
| Sep 14, 2021 | Completed final sign-off Dec 2021 | 600 Townsend St | Pribuss Engineering Inc | modify sprinker head locations to accomodate new ceiling and partition layout for existing office space on 5th fl. total sprinklers: 36Details
modify sprinker head locations to accomodate new ceiling and partition layout for existing office space on 5th fl. total sprinklers: 36 | $18,504 |
| Sep 2, 2021 | Completed final sign-off Mar 2022 | 600 Townsend St | Novo Construction Inc | 2/f: alt to vav boxes in air distribution and theremostats (no new equip). new power and data for taning froom and break room, new lighting. ref pa201912109087 for controls.Details
2/f: alt to vav boxes in air distribution and theremostats (no new equip). new power and data for taning froom and break room, new lighting. ref pa201912109087 for controls. | $15,000 |
| Aug 23, 2021 | Completed final sign-off Mar 2022 | 600 Townsend St | Aquamatic Fire Protection | ref to t.t. 2019 1210 9087. add/relocted and replace 7 sprinklersr for ti. no underground workDetails
ref to t.t. 2019 1210 9087. add/relocted and replace 7 sprinklersr for ti. no underground work | $4,500 |
| Jul 23, 2021 | Completed final sign-off Jan 2022 | 600 Townsend St | Swinerton Builders | 5/f: t.i. -demo of non-structural partitions and building (n) non-structural partiions. mech-elect included.l/s &f/s work will be design build if needed and submitted sep. (e) bldg is fully sprinkled.Details
5/f: t.i. -demo of non-structural partitions and building (n) non-structural partiions. mech-elect included.l/s &f/s work will be design build if needed and submitted sep. (e) bldg is fully sprinkled. | $3,200,000 |
| Jul 8, 2021 | Completed final sign-off Apr 2022 | 640 Townsend St | Alpha Architectural Signs & Lighting | re-face 1 existing single faced wall atm sign, sign d: "union bank, atm"Details
re-face 1 existing single faced wall atm sign, sign d: "union bank, atm" | $1,500 |
| Jul 8, 2021 | Completed final sign-off Apr 2022 | 640 Townsend St | Alpha Architectural Signs & Lighting | install 1 non illuminated single faced wall sign, sign c: "union bank, entrance on townsend st."Details
install 1 non illuminated single faced wall sign, sign c: "union bank, entrance on townsend st." | $1,500 |
| Jul 8, 2021 | Completed final sign-off Apr 2022 | 640 Townsend St | Alpha Architectural Signs & Lighting | install 1 illuminated single faced wall sign, sign f: "union bank logo"Details
install 1 illuminated single faced wall sign, sign f: "union bank logo" | $4,000 |
| Jul 8, 2021 | Completed final sign-off Apr 2022 | 640 Townsend St | Alpha Architectural Signs & Lighting | re-face 1 existing single faced wall sign, sign a: "union bank"Details
re-face 1 existing single faced wall sign, sign a: "union bank" | $2,000 |
| Mar 23, 2021 | Completed final sign-off Sep 2021 | 640 Townsend St | Phoenix Construction And Management | use of power door operators in lieu of level landing at doors.Details
use of power door operators in lieu of level landing at doors. | $10,000 |
| Dec 10, 2019 | Completed final sign-off Mar 2022 | 600 Townsend St | Novo Construction Inc | 2nd fl ti demo of non structural partitions, build non struc paritions including moveable. mep ls and sp separate permit. building fully sprinkleredDetails
2nd fl ti demo of non structural partitions, build non struc paritions including moveable. mep ls and sp separate permit. building fully sprinklered | $2,464,000 |
| Dec 9, 2019 | Never finaled issued Dec 2019, no final | 600 Townsend St | street space with sidewalk repair.Details
street space with sidewalk repair. | ||
| Aug 6, 2019 | Expired or cancelled cancelled Aug 2023 | 600 Townsend St | Red Hawk Fire & Security Ca Llc | 1st fl - fire alarm as-built drawing for pa 2018-1101-4785 per inspection notes dated 4/1/19Details
1st fl - fire alarm as-built drawing for pa 2018-1101-4785 per inspection notes dated 4/1/19 | |
| May 30, 2019 | Completed final sign-off Aug 2019 | 600 Townsend St | Red Hawk Fire & Security Ca Llc | basement - remove (e) conventional fire alarm panel, transfer (e) zones & connect to (e) addressable facu. replace 1 pull station with addressable. add 2 dual monitor modle for waterflow & temper. add 3 monitor module for temper valves shown on plan. no ref #Details
basement - remove (e) conventional fire alarm panel, transfer (e) zones & connect to (e) addressable facu. replace 1 pull station with addressable. add 2 dual monitor modle for waterflow & temper. add 3 monitor module for temper valves shown on plan. no ref # | $4,000 |
| Feb 15, 2019 | Never finaled issued Feb 2019, no final | 600 Townsend St | Mcclure Electric Inc | ref pa# 201812178512;title 24 lightingDetails
ref pa# 201812178512;title 24 lighting | |
| Jan 18, 2019 | Completed final sign-off Apr 2019 | 600 Townsend St | Red Hawk Fire & Security Ca Llc | ref pa# 201811014785; as built for lobby scope-addition (1) booster supply w/sync modul, add (2) smokes, (17) ceiling hornstrobes (9) strobes, add (9) new duct detctors, new control relaysDetails
ref pa# 201811014785; as built for lobby scope-addition (1) booster supply w/sync modul, add (2) smokes, (17) ceiling hornstrobes (9) strobes, add (9) new duct detctors, new control relays | $10,000 |
| Jan 14, 2019 | Completed final sign-off Mar 2019 | 600 Townsend St | Eco Fire Sprinklers Inc | suite #125: add 9 new pendents to accomodate new t.i walls / rooms in "area of work". ref: permit 201812178512.Details
suite #125: add 9 new pendents to accomodate new t.i walls / rooms in "area of work". ref: permit 201812178512. | $4,000 |
| Dec 17, 2018 | Completed final sign-off Apr 2019 | 600 Townsend St | C C I Commercial Construction & Improv | revision to permit #201810102750. suite 125: ti improvement to vacant suite including finishes, lighting, structural partitions. fire life safety, mep under separate permits.Details
revision to permit #201810102750. suite 125: ti improvement to vacant suite including finishes, lighting, structural partitions. fire life safety, mep under separate permits. | $300,000 |
| Nov 1, 2018 | Never finaled issued Nov 2018, no final | 600 Townsend St | Red Hawk Fire & Security Ca Llc | add 1 booster panel w/ trigger, add 1 control relay for door holdes (e), remove 8 (e) door holders, add 1 (n) somke detector & remove 5 (e), brew wall horn strobes, replace 29 (e) horn strobes & 8 (e) strobesDetails
add 1 booster panel w/ trigger, add 1 control relay for door holdes (e), remove 8 (e) door holders, add 1 (n) somke detector & remove 5 (e), brew wall horn strobes, replace 29 (e) horn strobes & 8 (e) strobes | $5,000 |
| Oct 22, 2018 | Completed final sign-off Mar 2019 | 600 Townsend St | Eco Fire Sprinklers Inc | suite 125. fire sprinklers. ref pa# 201810102750; relocate 12 pendants & add 2 new pendents to accomodate new wall & ceilingsDetails
suite 125. fire sprinklers. ref pa# 201810102750; relocate 12 pendants & add 2 new pendents to accomodate new wall & ceilings | $4,000 |
| Oct 10, 2018 | Completed final sign-off Oct 2018 | 600 Townsend St | Eco Fire Sprinklers Inc | cut back 6 (e) drops to accomadate new soffits & replace with 6 new tyco rfii concealed pendents ref 201808278381 maher naDetails
cut back 6 (e) drops to accomadate new soffits & replace with 6 new tyco rfii concealed pendents ref 201808278381 maher na | $2,000 |
| Oct 10, 2018 | Completed final sign-off Apr 2019 | 600 Townsend St | C C I Commercial Construction & Improv | suite 125: tenant improvement to vacant suite incl finishes, lights fixtures and non-structural partitions. fire life safety and mep under separate permits. maher n/aDetails
suite 125: tenant improvement to vacant suite incl finishes, lights fixtures and non-structural partitions. fire life safety and mep under separate permits. maher n/a | $850,000 |
| Aug 27, 2018 | Never finaled issued Oct 2018, no final | 600 Townsend St | C C I Commercial Construction & Improv | grnd flr - interior (main lobby) improvement: removal of interior finishes, light fixtures and doors. new finishes and interior glazing. mep/fire/life safety under sep permit maher naDetails
grnd flr - interior (main lobby) improvement: removal of interior finishes, light fixtures and doors. new finishes and interior glazing. mep/fire/life safety under sep permit maher na | $200,000 |
| Aug 10, 2018 | Never finaled issued Aug 2018, no final | 600 Townsend St | C B F Inc | 5th fl electrocal only: provide new lighting and branch circuiting to (e) and new panels. provide ca title 24 compliance forms. ref #201804186646. maher naDetails
5th fl electrocal only: provide new lighting and branch circuiting to (e) and new panels. provide ca title 24 compliance forms. ref #201804186646. maher na | $546,000 |
| Aug 9, 2018 | Completed final sign-off Aug 2018 | 600 Townsend St | Red Hawk Fire & Security Ca Llc | suite 150: add 2 ceiling horn strobes, add 1 new duct det. add 1 new high volt vontrol relay for fan shutdown, maher n/a.Details
suite 150: add 2 ceiling horn strobes, add 1 new duct det. add 1 new high volt vontrol relay for fan shutdown, maher n/a. | $2,000 |
| Aug 6, 2018 | Never finaled issued Aug 2018, no final | 600 Townsend St | Bay City Mechanical Inc | minor ductwork demolition. furnish and install 4 water sorce heat pumps. new ductwork and diffusers, controls and balancing. ref app#201804186646Details
minor ductwork demolition. furnish and install 4 water sorce heat pumps. new ductwork and diffusers, controls and balancing. ref app#201804186646 | $122,400 |
| Aug 2, 2018 | Never finaled issued Aug 2018, no final | 600 Townsend St | Mcclure Electric Inc | title 24 lighting only ref 201806293356Details
title 24 lighting only ref 201806293356 | |
| Jul 25, 2018 | Completed final sign-off Aug 2018 | 600 Townsend St | R L H Fire Protection Inc | 1st flr. fire sprinklers. 5 relocated pendents, 1 added, 1 deleted. ref t.i. 201709067028. maher n/a.Details
1st flr. fire sprinklers. 5 relocated pendents, 1 added, 1 deleted. ref t.i. 201709067028. maher n/a. | $1,500 |
| Jul 25, 2018 | Never finaled issued Jul 2018, no final | 600 Townsend St | Field Construction Inc. | install water source heat pump to serce remodeled tenant improvement spaces ref pa 2018-0629-3356Details
install water source heat pump to serce remodeled tenant improvement spaces ref pa 2018-0629-3356 | $27,000 |
| Jun 29, 2018 | Completed final sign-off Aug 2018 | 600 Townsend St | Field Construction Inc. | tenant improvement: new non-structural partitions, glazing doors/frames, hardware, ceiling system & light fixtures and electrical. fire life safety, mep under separate permit. all electrical & lighting shall comply with title 24Details
tenant improvement: new non-structural partitions, glazing doors/frames, hardware, ceiling system & light fixtures and electrical. fire life safety, mep under separate permit. all electrical & lighting shall comply with title 24 | $90,000 |
| Jun 20, 2018 | Completed final sign-off Aug 2018 | 600 Townsend St | Red Hawk Fire & Security Ca Llc | 5th flr: 3(n) booster power supplies. 3(n) sync output modules. (n) 48 ceiling hornstrobes, add 46 ceiling strobes, add 2 weatherproof hornstrobes, add 4 new strobes. removal of extg power supplies 2 modules 2 modules, 2, strobes 22, hornstrobes. ref app#201804186646 n/a for maherDetails
5th flr: 3(n) booster power supplies. 3(n) sync output modules. (n) 48 ceiling hornstrobes, add 46 ceiling strobes, add 2 weatherproof hornstrobes, add 4 new strobes. removal of extg power supplies 2 modules 2 modules, 2, strobes 22, hornstrobes. ref app#201804186646 n/a for maher | $10,000 |
| May 9, 2018 | Completed final sign-off May 2018 | 600 Townsend St | C C I Commercial Construction & Improv | revision to app#201803093339. remodel of 1 accessible parking space at ground level. n/a for maherDetails
revision to app#201803093339. remodel of 1 accessible parking space at ground level. n/a for maher | |
| Apr 26, 2018 | Completed final sign-off Jul 2018 | 600 Townsend St | Red Hawk Fire & Security Ca Llc | the addition of 64 sprinkler head relocate 17, ti cover new rooms as shown on plans maher na ref 201804186646Details
the addition of 64 sprinkler head relocate 17, ti cover new rooms as shown on plans maher na ref 201804186646 | $10,000 |
| Apr 18, 2018 | Completed final sign-off Oct 2018 | 600 Townsend St | Dome Construction Corp | 5th floor: tenant improvement of 40,000 square foot space. mep under separate appl. n/a for maherDetails
5th floor: tenant improvement of 40,000 square foot space. mep under separate appl. n/a for maher | $2,000,000 |
| Mar 9, 2018 | Completed final sign-off May 2018 | 600 Townsend St | C C I Commercial Construction & Improv | accessibily upgrade and new finishes to (e) ground flr restroom. fire life safety under sep permit. n/a for maher.Details
accessibily upgrade and new finishes to (e) ground flr restroom. fire life safety under sep permit. n/a for maher. | $18,000 |
| Oct 31, 2017 | Completed final sign-off Jan 2018 | 600 Townsend St | Red Hawk Fire & Security Ca Llc | 1st fl fa: (12) new ceiling hornstrobes, (8) new duct detectors w. (8) new control relays high amp, 1 control relay, demo 3 smokes, 2 door holders & 1 relay. ref pa #201709067028 maher naDetails
1st fl fa: (12) new ceiling hornstrobes, (8) new duct detectors w. (8) new control relays high amp, 1 control relay, demo 3 smokes, 2 door holders & 1 relay. ref pa #201709067028 maher na | $2,000 |
| Oct 19, 2017 | Completed final sign-off Jan 2018 | 600 Townsend St | C C I Commercial Construction & Improv | ground floor - mep - t-24 compliance for pa #201709067028. n/a maher ordinanceDetails
ground floor - mep - t-24 compliance for pa #201709067028. n/a maher ordinance | $70,000 |
| Oct 10, 2017 | Completed final sign-off Nov 2017 | 600 Townsend St | Eco Fire Sprinklers Inc | 1/f: install 7 new and relocate 11 (e) sprinklers and isntall in area of work for t.i. pa#201709067028. maher n/a.Details
1/f: install 7 new and relocate 11 (e) sprinklers and isntall in area of work for t.i. pa#201709067028. maher n/a. | $7,500 |
| Sep 6, 2017 | Completed final sign-off May 2025 | 600 Townsend St | True North Signs & Graphic Services | install 12 evacuation signs; n/a maherDetails
install 12 evacuation signs; n/a maher | $4,200 |
| Sep 6, 2017 | Completed final sign-off Jan 2018 | 600 Townsend St | C C I Commercial Construction & Improv | 1/f- tenant improvement to vacant g/f suite including finishes, lighting and non-structural partitions. fire life safety & mep. under seperate permits. n/a ordinance #155-13Details
1/f- tenant improvement to vacant g/f suite including finishes, lighting and non-structural partitions. fire life safety & mep. under seperate permits. n/a ordinance #155-13 | $900,000 |
| Aug 23, 2017 | Completed final sign-off Sep 2017 | 600 Townsend St | Eco Fire Sprinklers Inc | install 6 new sprinklers and relocate 8 sprinklers in area of work for ti ref 201703211969 maher not reqDetails
install 6 new sprinklers and relocate 8 sprinklers in area of work for ti ref 201703211969 maher not req | $4,500 |
| Jul 6, 2017 | Expired or cancelled cancelled Jan 2026 | 600 Townsend St | revision to original pa #201609278911 - omit original accessible restroom upgrade at 1st floor due to new accessible restrooms & showers at 1st floor were permitted, constructed & received certificate of occupancy under s separate bldg permit.Details
revision to original pa #201609278911 - omit original accessible restroom upgrade at 1st floor due to new accessible restrooms & showers at 1st floor were permitted, constructed & received certificate of occupancy under s separate bldg permit. | ||
| Jun 29, 2017 | Never finaled issued Jun 2017, no final | 600 Townsend St | C C I Commercial Construction & Improv | emergency lighting in common areas, garage, stairways throughout the building. lighting above the proposed elevator lift-electrical utility for elevator liftDetails
emergency lighting in common areas, garage, stairways throughout the building. lighting above the proposed elevator lift-electrical utility for elevator lift | $30,000 |
| Jun 9, 2017 | Completed final sign-off Jun 2017 | 600 Townsend St | Red Hawk Fire & Security Ca Llc | 1st fl: additional scope added under record set as builts: add two (2) control relays for two (2) fsd's (by others). add one (1) new duct detector & one (1) new pendant smoke to monitor new fsd's. ref. building t.i. #2017-0321-1969 and fire alarm #2017-0411-3691. maher naDetails
1st fl: additional scope added under record set as builts: add two (2) control relays for two (2) fsd's (by others). add one (1) new duct detector & one (1) new pendant smoke to monitor new fsd's. ref. building t.i. #2017-0321-1969 and fire alarm #2017-0411-3691. maher na | $6,000 |
| Apr 11, 2017 | Completed final sign-off Jun 2017 | 600 Townsend St | Red Hawk Fire & Security Ca Llc | 1/f- fire alarm, add (3) new wall strobes, (1) new smoke detector, (6) new wall hornstrobes. t.i. pa#2017-0321-1969. n/a ordinance #155-13Details
1/f- fire alarm, add (3) new wall strobes, (1) new smoke detector, (6) new wall hornstrobes. t.i. pa#2017-0321-1969. n/a ordinance #155-13 | $2,500 |
| Apr 4, 2017 | Completed final sign-off Oct 2017 | 600 Townsend St | C C I Commercial Construction & Improv | revision to pa#201609278911 - fill in the conc wapple coved area @ 1st floor, exterior door modification @ 1st floor, exterior door & window relocation /modificatoin @ 5th floor. proposed indoor landscape area @ 5th floor structural modification @ 1st & 5th floor. n/a maher ordinanceDetails
revision to pa#201609278911 - fill in the conc wapple coved area @ 1st floor, exterior door modification @ 1st floor, exterior door & window relocation /modificatoin @ 5th floor. proposed indoor landscape area @ 5th floor structural modification @ 1st & 5th floor. n/a maher ordinance | $25,000 |
| Mar 31, 2017 | Completed final sign-off May 2017 | 600 Townsend St | R L H Fire Protection Inc | 1/f- fire sprinkler permit, relocat 14, add 1 and delete 5 pendent sprinklers, t.i. pa#201703211969. n/a ordinance #155-13Details
1/f- fire sprinkler permit, relocat 14, add 1 and delete 5 pendent sprinklers, t.i. pa#201703211969. n/a ordinance #155-13 | $3,500 |
| Mar 21, 2017 | Completed final sign-off Jun 2017 | 600 Townsend St | Bcci Construction Company | ground floor tenan timprovement - finishes, lighting & non-structural partitions in management office & shower rooms & associated m.e.p. fire, l/s under separate permit. n/a maher ordinanceDetails
ground floor tenan timprovement - finishes, lighting & non-structural partitions in management office & shower rooms & associated m.e.p. fire, l/s under separate permit. n/a maher ordinance | $386,433 |
| Nov 2, 2016 | Completed final sign-off Dec 2016 | 600 Townsend St | R L H Fire Protection Inc | fire sprinkler permit - relocate install 129 pendents at exposed ceiling and 83 pendents at new ceiling on the 4th floor. ref pa 2016-0830-6410. maher naDetails
fire sprinkler permit - relocate install 129 pendents at exposed ceiling and 83 pendents at new ceiling on the 4th floor. ref pa 2016-0830-6410. maher na | $69,700 |
| Oct 31, 2016 | Completed final sign-off Dec 2016 | 600 Townsend St | Red Hawk Fire & Security Ca Llc | 24 new duct detectors for new fan coil units; 9 new notification devices; 1 new smoke detector. mech. 2016.1006.9647/ arch. 2016.0921.8399/2016.0830.6410 maher ord 155-13 not required.Details
24 new duct detectors for new fan coil units; 9 new notification devices; 1 new smoke detector. mech. 2016.1006.9647/ arch. 2016.0921.8399/2016.0830.6410 maher ord 155-13 not required. | $24,000 |
| Oct 28, 2016 | Never finaled issued Oct 2016, no final | 600 Townsend St | Bevilacqua & Sons | revisionto 201608185317 revise size of concrete equipment pad and related support steel accordinglyDetails
revisionto 201608185317 revise size of concrete equipment pad and related support steel accordingly | |
| Oct 24, 2016 | Never finaled issued Oct 2016, no final | 600 Townsend St | Sun Graphics | fabricate and install 4 emergency evacuation maps at 600 townsend street. floor 4.map signs are digital print. sub surface mounted to 1/8" non glare acrylic mounted to wall with vhb tape and silicone. n/a for maher.Details
fabricate and install 4 emergency evacuation maps at 600 townsend street. floor 4.map signs are digital print. sub surface mounted to 1/8" non glare acrylic mounted to wall with vhb tape and silicone. n/a for maher. | $620 |
| Oct 13, 2016 | Completed final sign-off Mar 2017 | 600 Townsend St | Skyline Construction | 4th floor: revision to 2016-0921-8399 and 2016-0830-6410 - omit door & change door swingDetails
4th floor: revision to 2016-0921-8399 and 2016-0830-6410 - omit door & change door swing | $2,000 |
| Oct 6, 2016 | Completed final sign-off Mar 2017 | 600 Townsend St | Skyline Construction | mechanical and electrical work for ti ref pa 2016-0921-8399 and 2016-0830-6410. maher na. install 21 new heatpumps.Details
mechanical and electrical work for ti ref pa 2016-0921-8399 and 2016-0830-6410. maher na. install 21 new heatpumps. | $350,000 |
| Sep 27, 2016 | Completed final sign-off Oct 2017 | 600 Townsend St | K C S West Inc. | voluntary strengthening of basement, 1st and 5th floor. new common entry at 1st floor. minor restroom remodel at 1st floor. concrete infill at 5th floor at rear of bldg. mep, life safety deferred.Details
voluntary strengthening of basement, 1st and 5th floor. new common entry at 1st floor. minor restroom remodel at 1st floor. concrete infill at 5th floor at rear of bldg. mep, life safety deferred. | $180,000 |
| Sep 27, 2016 | Completed final sign-off Oct 2016 | 600 Townsend St | Red Hawk Fire & Security Ca Llc | add 1 new wall mount & 1 new ceiling mount notification device at new break room 404. no mechanical changes assoiciated with this scopeDetails
add 1 new wall mount & 1 new ceiling mount notification device at new break room 404. no mechanical changes assoiciated with this scope | $2,000 |
| Sep 21, 2016 | Completed final sign-off Mar 2017 | 600 Townsend St | Skyline Construction | revision to 201608306410: new break roo 130 adjacent to room 125. new configuration of rooms 115,114,100, 103 & 104. room size reduction at room 113 & 114Details
revision to 201608306410: new break roo 130 adjacent to room 125. new configuration of rooms 115,114,100, 103 & 104. room size reduction at room 113 & 114 | |
| Aug 30, 2016 | Completed final sign-off Mar 2017 | 600 Townsend St | Skyline Construction | 4th flr: office remodeling with demo: remodeling includes new idf room, storages, offices, reception, conference rooms, mother's room, breakroom & 2 new restrooms, mep deffered submittal (mep submittal) maher ord 155-13 not required.Details
4th flr: office remodeling with demo: remodeling includes new idf room, storages, offices, reception, conference rooms, mother's room, breakroom & 2 new restrooms, mep deffered submittal (mep submittal) maher ord 155-13 not required. | $2,000,000 |
| Aug 19, 2016 | Never finaled issued Aug 2016, no final | 600 Townsend St | Skyline Construction | 4th flr: demo of (e) office space ab-017 maher naDetails
4th flr: demo of (e) office space ab-017 maher na | $10,000 |
| Aug 18, 2016 | Never finaled issued Oct 2016, no final | 600 Townsend St | Bevilacqua & Sons | demo & removal w/minor steel bracing of steel deck. replacement of hvac units with overall reduction in platform height. maher naDetails
demo & removal w/minor steel bracing of steel deck. replacement of hvac units with overall reduction in platform height. maher na | $75,000 |
| Aug 10, 2016 | Completed final sign-off Nov 2016 | 600 Townsend St | R L H Fire Protection Inc | 4th floor: fire sprinkler permit: relocate 4 and add 6 and delete 2 pendent sprinklers. t.i. app#201606270918 n/a for maher.Details
4th floor: fire sprinkler permit: relocate 4 and add 6 and delete 2 pendent sprinklers. t.i. app#201606270918 n/a for maher. | $6,500 |
| Aug 8, 2016 | Never finaled issued Aug 2016, no final | 600 Townsend St | Skyline Construction | 4th floor: mewchanical and electrical work for ti. ref pa 201606270918Details
4th floor: mewchanical and electrical work for ti. ref pa 201606270918 | $35,000 |
| Aug 2, 2016 | Completed final sign-off Aug 2016 | 600 Townsend St | Red Hawk Fire & Security Ca Llc | as-built - reflects approved matrix change from alarm to supervisory for all associated duct detectors & fsd smokes for all the floors. n/a maher ordinanceDetails
as-built - reflects approved matrix change from alarm to supervisory for all associated duct detectors & fsd smokes for all the floors. n/a maher ordinance | |
| Jul 19, 2016 | Completed final sign-off Nov 2016 | 600 Townsend St | Skyline Construction | 4/f- revision to pa 2016-0627-0918 to delete scope of work and change layout of previously approved pa 2016-0627-0918Details
4/f- revision to pa 2016-0627-0918 to delete scope of work and change layout of previously approved pa 2016-0627-0918 | |
| Jul 8, 2016 | Completed final sign-off Aug 2016 | 600 Townsend St | R L H Fire Protection Inc | 4th flr: fire sprinklers add 7 pendents, delete 6 pendents and 4 sidewall sprinklers ti 2016 0330 3483Details
4th flr: fire sprinklers add 7 pendents, delete 6 pendents and 4 sidewall sprinklers ti 2016 0330 3483 | $3,700 |
| Jun 30, 2016 | Completed final sign-off Aug 2016 | 600 Townsend St | Red Hawk Fire & Security Ca Llc | add 7 control relays, 22 new duct smoke detectors and 5 new interposing relays for fsd control and shutdown & 10 pendent smoke detectors for fsd shutdown. n/a for maher. ref. 201605167485Details
add 7 control relays, 22 new duct smoke detectors and 5 new interposing relays for fsd control and shutdown & 10 pendent smoke detectors for fsd shutdown. n/a for maher. ref. 201605167485 | $8,000 |
| Jun 27, 2016 | Never finaled issued Jul 2016, no final | 600 Townsend St | Skyline Construction | 4/f- remove (e) breakroom wall to open office, convert (e) training room to mail room, expansion of (e) breakroom, remodel restroom, new service room and storage. mech. elec. plumit deferred submittal. n/a ordinance #155-13Details
4/f- remove (e) breakroom wall to open office, convert (e) training room to mail room, expansion of (e) breakroom, remodel restroom, new service room and storage. mech. elec. plumit deferred submittal. n/a ordinance #155-13 | $65,000 |
| May 16, 2016 | Completed final sign-off Aug 2016 | 600 Townsend St | C C I Commercial Construction & Improv | new roof top equipment replace. 15 new fire rated damper through extg 2 hour fire rated shaft from 1st floor through 5th floor. n/a for maher. fire alarm deferred.Details
new roof top equipment replace. 15 new fire rated damper through extg 2 hour fire rated shaft from 1st floor through 5th floor. n/a for maher. fire alarm deferred. | $400,000 |
| Mar 30, 2016 | Completed final sign-off Jan 2017 | 600 Townsend St | Skyline Construction | 5th floor: structural for interior stair infill. maher naDetails
5th floor: structural for interior stair infill. maher na | $10,000 |
| Mar 9, 2016 | Never finaled issued Mar 2016, no final | 600 Townsend St | Red Hawk Fire & Security Ca Llc | add (8) new wall mount horn/strobes, add (9) new wall mount strobe, add (2) new control relays, (7) new duct smoke detectors, (2) new interposing relays. ref pa 2016-0204-8830 maher naDetails
add (8) new wall mount horn/strobes, add (9) new wall mount strobe, add (2) new control relays, (7) new duct smoke detectors, (2) new interposing relays. ref pa 2016-0204-8830 maher na | $13,000 |
| Mar 7, 2016 | Completed final sign-off Jul 2016 | 600 Townsend St | 2nd flr 5 evacuation plan; maher n/aDetails
2nd flr 5 evacuation plan; maher n/a | $2,250 | |
| Mar 1, 2016 | Completed final sign-off Nov 2016 | 600 Townsend St | Skyline Construction | mechanical and electrical work for tenant improvement. ref pa 2016-0104-6283. maher naDetails
mechanical and electrical work for tenant improvement. ref pa 2016-0104-6283. maher na | $25,000 |
| Feb 26, 2016 | Never finaled issued Feb 2016, no final | 600 Townsend St | Golden Gate Fire Protection Inc | 2nd flr: fire sprinklers: relocate 3 upright sprinklers. relocate 21 pendents. t.i. 201601046283. maher naDetails
2nd flr: fire sprinklers: relocate 3 upright sprinklers. relocate 21 pendents. t.i. 201601046283. maher na | $12,360 |
| Feb 4, 2016 | Completed final sign-off Mar 2016 | 600 Townsend St | C C I Commercial Construction & Improv | new duct detector, new constrol relay. 2nd floor install new 9000 cfm capacity osa in line fan to serve future 2nd floor tenant per t-24. provide 7.5 hp vfd for future capacity control. connect new fan into extg osa risers to 3rd floor. exterior intake louvers. cap old relief duct system.Details
new duct detector, new constrol relay. 2nd floor install new 9000 cfm capacity osa in line fan to serve future 2nd floor tenant per t-24. provide 7.5 hp vfd for future capacity control. connect new fan into extg osa risers to 3rd floor. exterior intake louvers. cap old relief duct system. | $1,000 |
| Jan 4, 2016 | Completed final sign-off Nov 2016 | 600 Townsend St | Skyline Construction | interior demolition, new non structural partitions to create dining area, pantry, multi-purpose room. mep., life safety & fire sprinkler under seperate permit. n/a ordinance #155-13 new public assembly area a-2Details
interior demolition, new non structural partitions to create dining area, pantry, multi-purpose room. mep., life safety & fire sprinkler under seperate permit. n/a ordinance #155-13 new public assembly area a-2 | $554,400 |
| Dec 29, 2015 | Completed final sign-off Feb 2016 | 640 Townsend St | Matrix Hg Inc | furnish and install one move-n-cool. n/a for maherDetails
furnish and install one move-n-cool. n/a for maher | $20,000 |
| Oct 27, 2015 | Completed final sign-off Feb 2016 | 600 Townsend St | C C I Commercial Construction & Improv | revision to app#201506290156. reduction of work.Details
revision to app#201506290156. reduction of work. | |
| Oct 2, 2015 | Completed final sign-off Jan 2016 | 600 Townsend St | non structural soft demo ab017Details
non structural soft demo ab017 | $5,000 | |
| Aug 24, 2015 | Never finaled issued Aug 2015, no final | 600 Townsend St | C C I Commercial Construction & Improv | infill concrete floor opening between 2nd, 3rd floorDetails
infill concrete floor opening between 2nd, 3rd floor | $5,000 |
| Jul 10, 2015 | Completed final sign-off Sep 2015 | 600 Townsend St | Red Hawk Fire & Security Ca Llc | add 6 smoke detectors and 2 control relays associated with existing fsd's and cooling units.Details
add 6 smoke detectors and 2 control relays associated with existing fsd's and cooling units. | $6,500 |
| Jun 29, 2015 | Completed final sign-off Feb 2016 | 600 Townsend St | C C I Commercial Construction & Improv | 2/f: demo of extg offices, corridor, server room and storage. removal of portion of extg wall for new window. n/a for maher.Details
2/f: demo of extg offices, corridor, server room and storage. removal of portion of extg wall for new window. n/a for maher. | $50,000 |
| Jun 4, 2015 | Completed final sign-off Jun 2015 | 600 Townsend St | Cisco Fire Sprinklers, Inc. | remove extg sprinkler drops and relocate sprinklers to lines for shell protection upgrade seismic bracing. up to 96 sprinklers. ref app#201504305060. n/a for maher.Details
remove extg sprinkler drops and relocate sprinklers to lines for shell protection upgrade seismic bracing. up to 96 sprinklers. ref app#201504305060. n/a for maher. | $4,000 |
| Jun 3, 2015 | Completed final sign-off Mar 2025 | 600 Townsend St | R L H Fire Protection Inc | install 12 new sprinklers at stair infill on the 2nd floor refer to pa #2015.0224.9137. n/a for maher.Details
install 12 new sprinklers at stair infill on the 2nd floor refer to pa #2015.0224.9137. n/a for maher. | $6,168 |
| May 21, 2015 | Never finaled issued Jun 2015, no final | 600 Townsend St | Anderson, Rowe & Buckley, Inc. | 3rd floor - mechanical & electrical work in existing mdf room. adding two movin cool units into existing room & fire rate (n) penetrations thru rated wall. n/a maher ordinanceDetails
3rd floor - mechanical & electrical work in existing mdf room. adding two movin cool units into existing room & fire rate (n) penetrations thru rated wall. n/a maher ordinance | $100,000 |
| May 8, 2015 | Completed final sign-off Jul 2015 | 600 Townsend St | Blue Bay Painting Contractor | 4th flr: minor demo to non structural partitions, (n) door to (e) office space. maher naDetails
4th flr: minor demo to non structural partitions, (n) door to (e) office space. maher na | $25,000 |
| Apr 30, 2015 | Completed final sign-off Sep 2015 | 600 Townsend St | C C I Commercial Construction & Improv | demo of e offices. server room and storage maher not req per ab-017Details
demo of e offices. server room and storage maher not req per ab-017 | $10,000 |
| Mar 20, 2015 | Expired or cancelled cancelled Jan 2026 | 600 Townsend St | #125- demolition of existing walls & doors per ab-17. n/a ordinance #155-13.Details
#125- demolition of existing walls & doors per ab-17. n/a ordinance #155-13. | $5,000 | |
| Mar 20, 2015 | Expired or cancelled cancelled Jan 2026 | 600 Townsend St | #150- demolition of existing walls & doors per ab-17. n/a ordinance #155-13.Details
#150- demolition of existing walls & doors per ab-17. n/a ordinance #155-13. | $5,000 | |
| Mar 20, 2015 | Never finaled issued May 2015, no final | 600 Townsend St | C C I Commercial Construction & Improv | #125- demolition of existing walls & doors per ab-17. n/a ordinance #155-13.Details
#125- demolition of existing walls & doors per ab-17. n/a ordinance #155-13. | $5,000 |
| Feb 24, 2015 | Never finaled issued Feb 2015, no final | 600 Townsend St | Dpr Construction | demo & infill non-exit stair connection between 2nd & 3rd floor . no change to exiting or occupancy. n/a maher ordinanceDetails
demo & infill non-exit stair connection between 2nd & 3rd floor . no change to exiting or occupancy. n/a maher ordinance | $150,000 |
| Oct 27, 2014 | Never finaled issued Oct 2014, no final | 600 Townsend St | California Roofing Co Inc | reroofingDetails
reroofing | $664,000 |
| Sep 19, 2014 | Completed final sign-off Sep 2014 | 600 Townsend St | Red Hawk Fire & Security Ca Llc | fire alarm ti on 2nd flr ref. appl. 201406309962 including 2 duct detectors, 2 control relays, 2 smoke detectors, 3 strobes, 3 horn/strobes; maher n/aDetails
fire alarm ti on 2nd flr ref. appl. 201406309962 including 2 duct detectors, 2 control relays, 2 smoke detectors, 3 strobes, 3 horn/strobes; maher n/a | $5,000 |
| Sep 2, 2014 | Completed final sign-off Sep 2014 | 600 Townsend St | R L H Fire Protection Inc | 2nd and 3rd floor:fire sprinkler permit. relocate 11 and add 7 pendents sprinklers . t.i. ref app#201406309963. n/a for the maher ordinance #155-13Details
2nd and 3rd floor:fire sprinkler permit. relocate 11 and add 7 pendents sprinklers . t.i. ref app#201406309963. n/a for the maher ordinance #155-13 | $9,252 |
| Jun 30, 2014 | Completed final sign-off Sep 2014 | 600 Townsend St | Dpr Construction | 2nd fl division from one tenant to multi tenant. wall of non exit connecting stair. maher- compliance with ordinance no. 155-13 not required.Details
2nd fl division from one tenant to multi tenant. wall of non exit connecting stair. maher- compliance with ordinance no. 155-13 not required. | $200,000 |
| May 28, 2014 | Completed final sign-off Jun 2025 | 600 Townsend St | Nu Rev Communications Inc. | modification to (e) att facility including 3 new rrus with a-2 units, installing 1 new dus41 unit inside an (e) cabinet, inside e equipment rack maher not requiredDetails
modification to (e) att facility including 3 new rrus with a-2 units, installing 1 new dus41 unit inside an (e) cabinet, inside e equipment rack maher not required | $5,000 |
| May 16, 2013 | Never finaled issued May 2013, no final | 600 Townsend St | street spaceDetails
street space | ||
| Apr 16, 2013 | Completed final sign-off Jul 2013 | 600 Townsend St | Makita Construction Inc. | enlarge (e) men's room at ground level by removing (e) storage rooms & add 2 new toilets & replace 2 urinalsDetails
enlarge (e) men's room at ground level by removing (e) storage rooms & add 2 new toilets & replace 2 urinals | $5,000 |
| Mar 25, 2013 | Never finaled issued Mar 2013, no final | 600 Townsend St | street spaceDetails
street space | ||
| Mar 12, 2013 | Completed final sign-off May 2013 | 600 Townsend St | Cci Com'l Constr & Improv**See 985808*** | suite #100-non bearing wall extention to (e) wall indicated by dash line. new pantry, new lighting. ada accessibility under pa# 2008-0225-5475Details
suite #100-non bearing wall extention to (e) wall indicated by dash line. new pantry, new lighting. ada accessibility under pa# 2008-0225-5475 | $50,000 |
| Sep 21, 2012 | Expired or cancelled withdrawn Jul 2017 | 600 Townsend St | Electric Tech Construction Inc | a modification of an (e) unmanned telecommunication facility consisting of adding a (n) mcpa unit.Details
a modification of an (e) unmanned telecommunication facility consisting of adding a (n) mcpa unit. | $2,000 |
| Jul 31, 2012 | Completed final sign-off Nov 2012 | 600 Townsend St | Novo Construction Inc | 1/f-4/f:seismic strengthening. unoccupied until accessibitily plans have been approved per pa# 2012-0606-1999 (ab-017)Details
1/f-4/f:seismic strengthening. unoccupied until accessibitily plans have been approved per pa# 2012-0606-1999 (ab-017) | $45,000 |
| Jul 11, 2012 | Never finaled issued Jul 2012, no final | 600 Townsend St | Novo Construction Inc | revision to pa#2012.06.13.2518 to upgrade existing elevator machine room to two hours rated and metal mesh. ref 2012.06.13.2518Details
revision to pa#2012.06.13.2518 to upgrade existing elevator machine room to two hours rated and metal mesh. ref 2012.06.13.2518 | |
| Jun 13, 2012 | Never finaled issued Jun 2012, no final | 600 Townsend St | Novo Construction Inc | replacement of 2 existing elevators and slight enlargement of existing shaft. building will remain vacant during construction.Details
replacement of 2 existing elevators and slight enlargement of existing shaft. building will remain vacant during construction. | $110,000 |
| Jun 6, 2012 | Never finaled issued Jun 2012, no final | 600 Townsend St | Novo Construction Inc | 1st/2nd/3rd/4th floors-demolition of elevators & shafts, per ab-017. building to remain vacantDetails
1st/2nd/3rd/4th floors-demolition of elevators & shafts, per ab-017. building to remain vacant | $250,000 |
| Sep 20, 2011 | Completed final sign-off Aug 2012 | 600 Townsend St | Intelligent Technologies & Services Inc | addition of 12 new smoke dtdectors and relocation of 3 (e) detectors to (e) pre action detection annd control system within 3rd fl qa/dev labDetails
addition of 12 new smoke dtdectors and relocation of 3 (e) detectors to (e) pre action detection annd control system within 3rd fl qa/dev lab | $1,375 |
| Jul 27, 2011 | Completed final sign-off Sep 2011 | 600 Townsend St | Cisco Fire Sprinklers, Inc. | 3rd floor adding fire sprinklers in mechanical because of addition of mech ducts in server room.Details
3rd floor adding fire sprinklers in mechanical because of addition of mech ducts in server room. | $3,500 |
| Oct 12, 2010 | Completed final sign-off Jun 2011 | 600 Townsend St | Transceive Communications Inc. | a modication to a e umanned telecommunication facility consisting of swapping (6ve) antennas w 6 (n) antennas, adding 6 n rets s(remote elec tilts) to antennas, ret powered by low voltage signaled through coax cable, add 6 n rrus, n 6601 rbs cabinet to n 19" rack and 3 n conduit run to support fiberDetails
a modication to a e umanned telecommunication facility consisting of swapping (6ve) antennas w 6 (n) antennas, adding 6 n rets s(remote elec tilts) to antennas, ret powered by low voltage signaled through coax cable, add 6 n rrus, n 6601 rbs cabinet to n 19" rack and 3 n conduit run to support fiber | $36,000 |
| May 11, 2010 | Expired or cancelled cancelled Jul 2017 | 600 Townsend St | Broken Arrow Communications Inc | a modification to an (e) telecommunications facility consisting of removing and replacing an (e) at&t antenna w/ (n) runs of coax cable. also adding a (n) 3206 rbs cabinet to an (e) equipment shelterDetails
a modification to an (e) telecommunications facility consisting of removing and replacing an (e) at&t antenna w/ (n) runs of coax cable. also adding a (n) 3206 rbs cabinet to an (e) equipment shelter | $25,000 |
| Nov 19, 2009 | Completed final sign-off Dec 2009 | 600 Townsend St | Bullard's Heating & Air Inc. | 4th fl: install new air conditioner in existing server room. provide all necessary components and installation for propel system functionalityDetails
4th fl: install new air conditioner in existing server room. provide all necessary components and installation for propel system functionality | $15,000 |
| Nov 10, 2009 | Completed final sign-off Dec 2009 | 600 Townsend St | Diversified Fire Products | 4th floor-fire alarm t.i for tenant aedelon-adding 1 relay, 1 smoke detector, 4 horn/strobes & 2 strobesDetails
4th floor-fire alarm t.i for tenant aedelon-adding 1 relay, 1 smoke detector, 4 horn/strobes & 2 strobes | $7,730 |
| Oct 26, 2009 | Completed final sign-off Dec 2009 | 600 Townsend St | Cisco Fire Sprinklers, Inc. | 4th floor-add 10 new fire sprinklers in (e) office space for new demising wallDetails
4th floor-add 10 new fire sprinklers in (e) office space for new demising wall | $3,500 |
| Sep 30, 2009 | Completed final sign-off Dec 2009 | 600 Townsend St | Cci Com'l Constr & Improv**See 985808*** | new demishing partition @ fouth floor level.Details
new demishing partition @ fouth floor level. | $50,000 |
| Jun 5, 2009 | Completed final sign-off Aug 2009 | 640 Townsend St | Arrow Sign Company | reface existing awningDetails
reface existing awning | $2,000 |
| Jun 5, 2009 | Completed final sign-off Aug 2009 | 640 Townsend St | Arrow Sign Company | 1 non illuminated signDetails
1 non illuminated sign | $6,500 |
| Jun 1, 2009 | Never finaled issued Jun 2009, no final | 600 Townsend St | street space onlyDetails
street space only | ||
| Apr 20, 2009 | Completed final sign-off Sep 2009 | 600 Townsend St | N S A Wireless Inc | modification to extg telecom facility consisting of repositioning 3 extg umts-1900 lines from antenna's position one to position tw0. remove extg tdma equipment and add 3 remote electronic tilts. no structural work.Details
modification to extg telecom facility consisting of repositioning 3 extg umts-1900 lines from antenna's position one to position tw0. remove extg tdma equipment and add 3 remote electronic tilts. no structural work. | $5,000 |
| Mar 2, 2009 | Never finaled issued Mar 2009, no final | 600 Townsend St | to obtain final inspection for work approved under pa #200804018423. all work has been completed.Details
to obtain final inspection for work approved under pa #200804018423. all work has been completed. | ||
| Jan 22, 2009 | Completed final sign-off Feb 2009 | 600 Townsend St | Cisco Fire Sprinklers, Inc. | 1st floor-relocate 2, add 5 new fire sprinkler in new server room addition - below new ceiling on (e) pipes & outlets.Details
1st floor-relocate 2, add 5 new fire sprinkler in new server room addition - below new ceiling on (e) pipes & outlets. | $3,000 |
| Jan 20, 2009 | Completed final sign-off Feb 2009 | 600 Townsend St | Bullard's Heating & Air Inc. | suite #125 - install new server room a/c & related ductwork.Details
suite #125 - install new server room a/c & related ductwork. | $20,000 |
| Dec 30, 2008 | Completed final sign-off Feb 2009 | 600 Townsend St | Diversified Fire Products | 1st floor-fire alarm t.i for aechelon; 1 control relay, 2 smoke detectors, 1 horn/strobeDetails
1st floor-fire alarm t.i for aechelon; 1 control relay, 2 smoke detectors, 1 horn/strobe | $5,990 |
| Dec 19, 2008 | Completed final sign-off Feb 2009 | 600 Townsend St | remove non bearing wall and ceilingDetails
remove non bearing wall and ceiling | $10,000 | |
| Nov 26, 2008 | Completed final sign-off Jan 2009 | 600 Townsend St | 5th floor, #547, 548 & 549 - reconfigure 3 existing rooms on 5th floor.Details
5th floor, #547, 548 & 549 - reconfigure 3 existing rooms on 5th floor. | $20,000 | |
| Sep 26, 2008 | Completed final sign-off Nov 2008 | 600 Townsend St | Intelligent Technologies & Services Inc | install pre-action detection system for 2nd floor server room.Details
install pre-action detection system for 2nd floor server room. | $6,000 |
| Sep 18, 2008 | Never finaled issued Sep 2008, no final | 600 Townsend St | Waterproofing Associates | reroofing.Details
reroofing. | $230,375 |
| Sep 12, 2008 | Completed final sign-off Oct 2008 | 600 Townsend St | 4th floor-install 3 approx 9'x14', 8'x11', 8'x11'-non loading bearing office wallsDetails
4th floor-install 3 approx 9'x14', 8'x11', 8'x11'-non loading bearing office walls | $8,000 | |
| Sep 11, 2008 | Never finaled filed Sep 2008, never issued | 600 Townsend St | install 1000 kw generator at the parking lot area for secondary for server roomDetails
install 1000 kw generator at the parking lot area for secondary for server room | $500,000 | |
| Aug 21, 2008 | Completed final sign-off May 2009 | 640 Townsend St | installation of protective partition and upgrade existing ada teller station. mech, elect, fire, sprinkler, life safety under separate permit.Details
installation of protective partition and upgrade existing ada teller station. mech, elect, fire, sprinkler, life safety under separate permit. | $12,750 | |
| Jul 15, 2008 | Completed final sign-off Apr 2009 | 600 Townsend St | addition of slabs on grade for mechanical equipment and construction of a structural frame to support proposed 2nd floor ups equipment/revision to app #200804179928.Details
addition of slabs on grade for mechanical equipment and construction of a structural frame to support proposed 2nd floor ups equipment/revision to app #200804179928. | $20,000 | |
| Jul 9, 2008 | Completed final sign-off Jan 2009 | 600 Townsend St | Pribuss Engineering Inc | fire sprinkler tenant improvement add ssp heads -34 & add ssv heads 6, total 40 heads.Details
fire sprinkler tenant improvement add ssp heads -34 & add ssv heads 6, total 40 heads. | $8,000 |
| Jul 9, 2008 | Completed final sign-off Nov 2008 | 600 Townsend St | Pribuss Engineering Inc | 2nd floor phase 2- fire sprinklers tenant improvement. removed 3, relocated 49, added 44 and change out 44. total 149 heads.Details
2nd floor phase 2- fire sprinklers tenant improvement. removed 3, relocated 49, added 44 and change out 44. total 149 heads. | $18,000 |
| Jul 3, 2008 | Never finaled issued Jul 2008, no final | 600 Townsend St | Pribuss Engineering Inc | 1st floor-fire sprinkler t.i. relocated 36 heads, added 28 heads, changed out 22 heads, total 86 heads.Details
1st floor-fire sprinkler t.i. relocated 36 heads, added 28 heads, changed out 22 heads, total 86 heads. | $14,300 |
| Jun 24, 2008 | Completed final sign-off Oct 2008 | 600 Townsend St | Diversified Fire Products | ti for fire alarm on the 1st floor in conf. rm. add 1 sync module and 14 hornstrobesDetails
ti for fire alarm on the 1st floor in conf. rm. add 1 sync module and 14 hornstrobes | $9,535 |
| Jun 17, 2008 | Completed final sign-off Sep 2008 | 600 Townsend St | t.i. offie space. lighting & power system. work consist of connecting power to new or relocate lights, fixtures, power outlets and tenant equipment. ref. application 200804179928.Details
t.i. offie space. lighting & power system. work consist of connecting power to new or relocate lights, fixtures, power outlets and tenant equipment. ref. application 200804179928. | $20,000 | |
| May 28, 2008 | Completed final sign-off Sep 2008 | 600 Townsend St | Diversified Fire Products | t.i. fire alard on 2nd floor south,2 input modules, 1 sync module, 9 control relays, 4 smoke detectors, 9 duct detectors. 1 power supplex, 28 horn/strobes.Details
t.i. fire alard on 2nd floor south,2 input modules, 1 sync module, 9 control relays, 4 smoke detectors, 9 duct detectors. 1 power supplex, 28 horn/strobes. | $24,199 |
| May 20, 2008 | Never finaled issued May 2008, no final | 600 Townsend St | Ad Art Inc. | erect 3 single faced, electric wall - same size.Details
erect 3 single faced, electric wall - same size. | |
| May 8, 2008 | Completed final sign-off Nov 2008 | 600 Townsend St | title 24, including mechanical, electrical & plumbing, ref to application 200804179928.Details
title 24, including mechanical, electrical & plumbing, ref to application 200804179928. | $20,000 | |
| Apr 17, 2008 | Completed final sign-off Oct 2008 | 600 Townsend St | 2nd floor(south)-interior remodeling; tenant improvement-new partition walls to create new offices, cooling tower and new generator. mep under seperate permit, generator under seperate permit.Details
2nd floor(south)-interior remodeling; tenant improvement-new partition walls to create new offices, cooling tower and new generator. mep under seperate permit, generator under seperate permit. | $1,180,000 | |
| Apr 1, 2008 | Expired or cancelled expired Aug 2009 | 600 Townsend St | Diversified Fire Products | 1st floor-fire alarm t.i. for k.i. showroomDetails
1st floor-fire alarm t.i. for k.i. showroom | $15,822 |
| Mar 26, 2008 | Completed final sign-off Oct 2008 | 600 Townsend St | interior tenant improvement for new conference space in an existing office buildingDetails
interior tenant improvement for new conference space in an existing office building | $670,000 | |
| Mar 25, 2008 | Never finaled issued Mar 2008, no final | 600 Townsend St | Pribuss Engineering Inc | ti for fire sprinler on the 2nd floor. add 81 new sprinkler heads and relocate 62 heads.Details
ti for fire sprinler on the 2nd floor. add 81 new sprinkler heads and relocate 62 heads. | $32,650 |
| Feb 25, 2008 | Completed final sign-off Oct 2008 | 600 Townsend St | interior tenant improvement for new conference space in an existing office bldg. construct new partition walls @ first floor.Details
interior tenant improvement for new conference space in an existing office bldg. construct new partition walls @ first floor. | $670,000 | |
| Jan 17, 2008 | Completed final sign-off Jan 2009 | 600 Townsend St | 3rd floor interior improvement. remove nonload bearing walls of 3 offices and relocate new glass windows and doorsDetails
3rd floor interior improvement. remove nonload bearing walls of 3 offices and relocate new glass windows and doors | $73,800 | |
| Jan 10, 2008 | Completed final sign-off Sep 2008 | 600 Townsend St | Diversified Fire Products | fire alarm t.i.for advent sofware - 2nd floor (1) syne module, 11- duct detectors, 42 horn strobes, 1 control relay, 2 power supplies, 5 smoke detectors, 10 strobes.Details
fire alarm t.i.for advent sofware - 2nd floor (1) syne module, 11- duct detectors, 42 horn strobes, 1 control relay, 2 power supplies, 5 smoke detectors, 10 strobes. | $30,000 |
| Dec 28, 2007 | Completed final sign-off Sep 2008 | 600 Townsend St | tenant improvement of office space, floor lighting and power system , connect power to new or relocating lighting fixtures, power outlets and equipment hookup, ref ti app 200712211128Details
tenant improvement of office space, floor lighting and power system , connect power to new or relocating lighting fixtures, power outlets and equipment hookup, ref ti app 200712211128 | $20,000 | |
| Dec 21, 2007 | Completed final sign-off Sep 2008 | 600 Townsend St | 2nd floor:ti for new offices. new non-load bearing walls to separate offices. 2 new handicap restrooms. new mechanical heating and air conditioning system. fire safety under separate permitDetails
2nd floor:ti for new offices. new non-load bearing walls to separate offices. 2 new handicap restrooms. new mechanical heating and air conditioning system. fire safety under separate permit | $1,550,000 | |
| Dec 10, 2007 | Completed final sign-off Mar 2008 | 600 Townsend St | sofi interior demo- noin structural partitions on the 2nd floorDetails
sofi interior demo- noin structural partitions on the 2nd floor | $10,000 | |
| Nov 28, 2007 | Completed final sign-off Jan 2009 | 600 Townsend St | cut & reinforced hole through from 3rd floor to 2nd floor, install open steel & concrect stair.Details
cut & reinforced hole through from 3rd floor to 2nd floor, install open steel & concrect stair. | $34,000 | |
| Oct 24, 2007 | Completed final sign-off Jul 2009 | 600 Townsend St | Sure Fire Protection | sprinkler modification: 1st floor,add 4 relocate 9Details
sprinkler modification: 1st floor,add 4 relocate 9 | $3,500 |
| Oct 11, 2007 | Completed final sign-off Mar 2008 | 600 Townsend St | demolish interior non-load bearing partitions and ceiling system within office space on the 1st floor. space to remain vacant until permit for ti is issued and completed. fire safety devices to remain fully operational while vacant.Details
demolish interior non-load bearing partitions and ceiling system within office space on the 1st floor. space to remain vacant until permit for ti is issued and completed. fire safety devices to remain fully operational while vacant. | $10,000 | |
| Sep 4, 2007 | Completed final sign-off Nov 2007 | 600 Townsend St | revision to permit # 2007/07/31/8236. construct a tel closet and some new electrical outlets.Details
revision to permit # 2007/07/31/8236. construct a tel closet and some new electrical outlets. | ||
| Aug 27, 2007 | Expired or cancelled expired Jan 2009 | 600 Townsend St | demolition of extg interior finishes construction of new nonbearing wall partition. installation of new finish. relocate lighting and title 24 lightingDetails
demolition of extg interior finishes construction of new nonbearing wall partition. installation of new finish. relocate lighting and title 24 lighting | $45,000 | |
| Aug 7, 2007 | Expired or cancelled cancelled Jan 2026 | 600 Townsend St | remodel of 3rd floor tenant space.Details
remodel of 3rd floor tenant space. | $100,000 | |
| Jul 31, 2007 | Expired or cancelled expired Jun 2009 | 600 Townsend St | 3rd floor-demo of existing interior finishes construction of non -bearing wall, relocate lighting, no exterior work. mep/life safety on seperate permit.Details
3rd floor-demo of existing interior finishes construction of non -bearing wall, relocate lighting, no exterior work. mep/life safety on seperate permit. | $100,000 | |
| Jun 27, 2007 | Completed final sign-off Jan 2008 | 600 Townsend St | Matrix Hg Inc | mechanical work for tenant improvement ducts and 1 new vavDetails
mechanical work for tenant improvement ducts and 1 new vav | $11,000 |
| Apr 27, 2007 | Never finaled issued Apr 2007, no final | 600 Townsend St | soft demo nov structural wall partition non structural workDetails
soft demo nov structural wall partition non structural work | $10,000 | |
| Apr 13, 2007 | Expired or cancelled expired May 2009 | 600 Townsend St | revision to 200602154640, cafe prep catering space, cafe for employee onlyDetails
revision to 200602154640, cafe prep catering space, cafe for employee only | $30,000 | |
| Apr 3, 2007 | Never finaled issued Apr 2007, no final | 600 Townsend St | street space and sidewalk permitDetails
street space and sidewalk permit | ||
| Feb 23, 2007 | Never finaled issued Feb 2007, no final | 600 Townsend St | Cci Com'l Constr & Improv**See 985808*** | oti-2 4th floor elDetails
oti-2 4th floor el | $5,000 |
| Feb 23, 2007 | Never finaled issued Feb 2007, no final | 600 Townsend St | Cci Com'l Constr & Improv**See 985808*** | oti-2 3rd floor elDetails
oti-2 3rd floor el | $5,000 |
| Dec 1, 2006 | Completed final sign-off Jan 2007 | 600 Townsend St | Fernandez & Durr Construction, Inc. | building final inspection per app #200409154175/200603166840Details
building final inspection per app #200409154175/200603166840 | |
| Dec 1, 2006 | Completed final sign-off Jan 2007 | 600 Townsend St | Fernandez & Durr Construction, Inc. | renew app #200501183379/200603166843Details
renew app #200501183379/200603166843 | |
| Nov 16, 2006 | Never finaled issued Nov 2006, no final | 600 Townsend St | Sure Fire Protection | 3rd floor/371e-due to new full height walls, relocate up right 12 total and one side wall. all heads (e), no adds.Details
3rd floor/371e-due to new full height walls, relocate up right 12 total and one side wall. all heads (e), no adds. | $6,000 |
| Nov 13, 2006 | Completed final sign-off Feb 2007 | 600 Townsend St | Cci Com'l Constr & Improv**See 985808*** | oti-1, 4th floor/penthouse, el, spDetails
oti-1, 4th floor/penthouse, el, sp | $25,000 |
| Oct 24, 2006 | Completed final sign-off Feb 2007 | 600 Townsend St | all emergency release card reader doors (ecr) to security panel location for connection to life safety system.Details
all emergency release card reader doors (ecr) to security panel location for connection to life safety system. | $10,000 | |
| Oct 13, 2006 | Never finaled issued Nov 2006, no final | 600 Townsend St | Cci Com'l Constr & Improv**See 985808*** | oti-1 3rd floor el, me, spDetails
oti-1 3rd floor el, me, sp | $41,000 |
| Jul 5, 2006 | Completed final sign-off Jun 2007 | 600 Townsend St | new stair at 5/f, structural work only under this permit. architectural work under approved appl#200602154640Details
new stair at 5/f, structural work only under this permit. architectural work under approved appl#200602154640 | $25,000 | |
| Jul 3, 2006 | Completed final sign-off Feb 2007 | 600 Townsend St | smoke detectors, audible / visual notification appliances. work @ 5th floor only under this permit.Details
smoke detectors, audible / visual notification appliances. work @ 5th floor only under this permit. | $40,000 | |
| Jul 3, 2006 | Completed final sign-off Feb 2007 | 600 Townsend St | smoke detector, audible visual notification appliances work on 4th floor onlyDetails
smoke detector, audible visual notification appliances work on 4th floor only | $40,000 | |
| Jul 3, 2006 | Completed final sign-off Feb 2007 | 600 Townsend St | smoke detectors. audible /visual appliances notification work on 3rd floor only under this permitDetails
smoke detectors. audible /visual appliances notification work on 3rd floor only under this permit | $40,000 | |
| Jun 8, 2006 | Completed final sign-off Feb 2007 | 600 Townsend St | Arrow Sign Company | to erect electrical signDetails
to erect electrical sign | |
| Jun 2, 2006 | Completed final sign-off Feb 2007 | 600 Townsend St | new mental framing new brace, new metal stud. revision to approved building pa# 2006/50/16/1757. revised wall bracing from p1000 unistrut to 2 1/2" x 20 gage metal tud member x 3'0" long.Details
new mental framing new brace, new metal stud. revision to approved building pa# 2006/50/16/1757. revised wall bracing from p1000 unistrut to 2 1/2" x 20 gage metal tud member x 3'0" long. | ||
| May 16, 2006 | Completed final sign-off Feb 2007 | 600 Townsend St | bracing for typical walls partition addendum to appl#200602154640.Details
bracing for typical walls partition addendum to appl#200602154640. | ||
| May 15, 2006 | Completed final sign-off Jun 2007 | 600 Townsend St | install five by 6 ft and new small opening/ref # #200602154640Details
install five by 6 ft and new small opening/ref # #200602154640 | $50,000 | |
| May 4, 2006 | Completed final sign-off Feb 2007 | 600 Townsend St | Dpw Inc. | modify (e) sprinkler systems on 3rd, 4th and 5th floor for new walls and ceiling configurations. install a pre-action system on the 3rd floorDetails
modify (e) sprinkler systems on 3rd, 4th and 5th floor for new walls and ceiling configurations. install a pre-action system on the 3rd floor | $90,000 |
| Apr 20, 2006 | Completed final sign-off Jun 2007 | 600 Townsend St | mechanical & electricalDetails
mechanical & electrical | $700,000 |