Jennifer M Harding
- Listed as
- architect
- Firm
- Asd Sky
- Based in
- San Francisco
- On San Francisco permits
- Apr 2021 to Sep 2023
17 permits since 2000 (architect on 17 permits): 14 completed, 1 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 15, 2023 | Expired or cancelled withdrawn Jun 2025 | 1431 San Bruno Av | new motor for (e) sliding gate at (e) parking lot vehicle entrance. add pedestrian egress gate.Details
new motor for (e) sliding gate at (e) parking lot vehicle entrance. add pedestrian egress gate. | $7,800 | |
| May 17, 2023 | Completed final sign-off Dec 2023 | 901 Battery St | Gci, Inc | 3/f: t.i. includes demo of non-structural partitions and bldg new non-stru partitions. all new or revised mep's, sprinklers & alarm life safety work will be designed build and submitted separately (bldg is fully sprinklered) as part of scope.Details
3/f: t.i. includes demo of non-structural partitions and bldg new non-stru partitions. all new or revised mep's, sprinklers & alarm life safety work will be designed build and submitted separately (bldg is fully sprinklered) as part of scope. | $600,000 |
| Dec 15, 2022 | Completed final sign-off May 2023 | 505 Montgomery St | Hathaway Dinwiddie Co. | 7th fl - revision to pa 2022-0818-0781 changing a storage room to a ada compliant restroomDetails
7th fl - revision to pa 2022-0818-0781 changing a storage room to a ada compliant restroom | |
| Oct 18, 2022 | Never finaled issued Oct 2022, no final | 55 02nd St | Skyline Construction | 20/f ti provide a single- user restroom which includes demolishing of non-str partitions + building new non str partitions. . revised mep fire alarm life safety sprinklers under separate permited/deferredDetails
20/f ti provide a single- user restroom which includes demolishing of non-str partitions + building new non str partitions. . revised mep fire alarm life safety sprinklers under separate permited/deferred | $20,000 |
| Sep 13, 2022 | Completed final sign-off Jan 2023 | 1 Post St | Skyline Construction | 31st floor:t.i. includes demo of non structural partitions and buiding new non stuctural partitions. some new or revised meps, and fire alarm and sprinklers work will be design build and submitted seperately (bldg is fully sprinklered). (ref pa#201908088304)Details
31st floor:t.i. includes demo of non structural partitions and buiding new non stuctural partitions. some new or revised meps, and fire alarm and sprinklers work will be design build and submitted seperately (bldg is fully sprinklered). (ref pa#201908088304) | $500,000 |
| Aug 18, 2022 | Completed final sign-off May 2023 | 505 Montgomery St | Hathaway Dinwiddie Co. | 7/f: t.i.: demo of non-structural partitions and building new non-structural partitions.mep,fire l/s & f/s will be design buildn and submitted for permits separately.Details
7/f: t.i.: demo of non-structural partitions and building new non-structural partitions.mep,fire l/s & f/s will be design buildn and submitted for permits separately. | $848,172 |
| Jun 28, 2022 | Completed final sign-off Dec 2022 | 1 Market St | Gci, Inc | 2nd fl - demo of some non structural partitions ceiling flooring etc in areas where existing ceiling is to be removed. existing sprinkler heads shall be turned up under separate permit 2022-0817-6554. all revised mep life safety work will be design build & submitted separatelyDetails
2nd fl - demo of some non structural partitions ceiling flooring etc in areas where existing ceiling is to be removed. existing sprinkler heads shall be turned up under separate permit 2022-0817-6554. all revised mep life safety work will be design build & submitted separately | $8,000 |
| Jan 27, 2022 | Completed final sign-off Dec 2022 | 600 California St | Novo Construction Inc | 18/f. t.i includes building new non-structural partitions. all new or revised mep, sprinkler and fire alarm work will be design build and submitted separately. bldg is fully sprinklered.Details
18/f. t.i includes building new non-structural partitions. all new or revised mep, sprinkler and fire alarm work will be design build and submitted separately. bldg is fully sprinklered. | $957,000 |
| Aug 26, 2021 | Completed final sign-off Nov 2021 | 44 Montgomery St | Peacock Construction | 13/f: rev to pa202012281775-elimination of proposed wall and millwork in the open office from the scope. revise full height wall to partial height wall.Details
13/f: rev to pa202012281775-elimination of proposed wall and millwork in the open office from the scope. revise full height wall to partial height wall. | |
| Jul 23, 2021 | Completed final sign-off Jan 2022 | 600 Townsend St | Swinerton Builders | 5/f: t.i. -demo of non-structural partitions and building (n) non-structural partiions. mech-elect included.l/s &f/s work will be design build if needed and submitted sep. (e) bldg is fully sprinkled.Details
5/f: t.i. -demo of non-structural partitions and building (n) non-structural partiions. mech-elect included.l/s &f/s work will be design build if needed and submitted sep. (e) bldg is fully sprinkled. | $3,200,000 |
| Jul 21, 2021 | Completed final sign-off Dec 2022 | 1725 Montgomery St | Marchetti Group | g/f: t.i.: demo of non-structural partitions and building new non-structural partitions. all new or revised mep, ls etc will be design build and sbumitted if needed.Details
g/f: t.i.: demo of non-structural partitions and building new non-structural partitions. all new or revised mep, ls etc will be design build and sbumitted if needed. | $150,000 |
| Jul 21, 2021 | Completed final sign-off Nov 2021 | 1 Embarcadero Center | M C S Construction Services | 2nd fl. ti- to demo and construct non-structural partitons finishes, and suspended ceilings, mep, fire sprinkers and life safety deferredDetails
2nd fl. ti- to demo and construct non-structural partitons finishes, and suspended ceilings, mep, fire sprinkers and life safety deferred | $40,000 |
| Jul 15, 2021 | Expired or cancelled withdrawn Jun 2024 | 1550 Wallace Av | t.i (n) cannabis cultivation facility within (e) warehouse bldg approved conditional use, meps included; exterior work: (n) louver, 2 (n) bike parking; interior: (n) partitions, (n) ramp, (n) restrooms. structural and prefabDetails
t.i (n) cannabis cultivation facility within (e) warehouse bldg approved conditional use, meps included; exterior work: (n) louver, 2 (n) bike parking; interior: (n) partitions, (n) ramp, (n) restrooms. structural and prefab | $900,000 | |
| Jun 16, 2021 | Completed final sign-off Nov 2021 | 3 Embarcadero Center | 5th fl - demo of select non structural walls. build back of ceiling height walls. new door & card readers. relocation of exit sign. install of new hi/lo drinking fountainDetails
5th fl - demo of select non structural walls. build back of ceiling height walls. new door & card readers. relocation of exit sign. install of new hi/lo drinking fountain | $10,000 | |
| Jun 2, 2021 | Completed final sign-off Jan 2022 | 760 Market St | Novo Construction Inc | 2nd and 3rd flrs: interior t.i to include demolition of non structural partitions and millwork. new partitions and millwork. mep, life safety under separate permit.Details
2nd and 3rd flrs: interior t.i to include demolition of non structural partitions and millwork. new partitions and millwork. mep, life safety under separate permit. | $430,000 |
| May 25, 2021 | Completed final sign-off Mar 2022 | 1 Market St | Dpr Construction | 4/f interior ti includes demo and new non structural partitions.Details
4/f interior ti includes demo and new non structural partitions. | $126,000 |
| Apr 27, 2021 | Completed final sign-off May 2022 | 1160 Battery St | 2nd fl, east bldg: interior tenant improvement includes new non-load bearing partitions, ceiling, lighting, and finishes. replacement of finishes and fixtures at restroom.Details
2nd fl, east bldg: interior tenant improvement includes new non-load bearing partitions, ceiling, lighting, and finishes. replacement of finishes and fixtures at restroom. | $3,460,000 |