Ariane Lebrilla
- Listed as
- architect, designer, engineer
- Firm
- Asd | Sky
- Based in
- San Francisco
- On San Francisco permits
- Aug 2021 to Oct 2026
261 permits since 2000 (architect on 255 permits, engineer on 5 permits, designer on 1 permit): 166 completed, 68 in progress, 5 never finaled, 22 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 261.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 1550 Bryant St | 9th floor: seismic bolting of existing phone boothsDetails
9th floor: seismic bolting of existing phone booths | $7,500 | |
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 550 Battery St | lobby/1st floor: revision to pa# 202604239962. added package, room 403 and storage room 404Details
lobby/1st floor: revision to pa# 202604239962. added package, room 403 and storage room 404 | ||
| Sep 18, 2026 | In progress filed Sep 2026, not yet issued | 600 California St | 9th floor: space suite: t.i. includes demo, construction of (n) non-str partitions and upgrades to existing restrooms. all new or revised meos, sprinklers and fire alarm work will be design-build and submitted separately(bldg is fully sprinklered)Details
9th floor: space suite: t.i. includes demo, construction of (n) non-str partitions and upgrades to existing restrooms. all new or revised meos, sprinklers and fire alarm work will be design-build and submitted separately(bldg is fully sprinklered) | $2,381,908 | |
| Sep 18, 2026 | In progress filed Sep 2026, not yet issued | 600 California St | 14th floor: t.i demo of non-structural partitions+ building new non-structural partitions. all new or revised meps and life safety work will design build and submitted separately. (bldg is fully sprinklered)Details
14th floor: t.i demo of non-structural partitions+ building new non-structural partitions. all new or revised meps and life safety work will design build and submitted separately. (bldg is fully sprinklered) | $1,063,722 | |
| Sep 16, 2026 | In progress filed Sep 2026, not yet issued | 400 Montgomery St | 4th fl: ti to include demo of non- structural parttitions and build new non- structural partitions. all new or revised hvac, electrical, plumbing and life safety work will be design- build and submitted for permit separately.Details
4th fl: ti to include demo of non- structural parttitions and build new non- structural partitions. all new or revised hvac, electrical, plumbing and life safety work will be design- build and submitted for permit separately. | $250,000 | |
| Sep 15, 2026 | In progress filed Sep 2026, not yet issued | 534 04th St | M C S Construction Services | tenant improvement to 1st and 2nd fl. new restrooms, workrooms, open office area, presentation room. building entry stair under sep permit 202608056135. mechanical, electrical, kplumbing, fire/life safety as required by above scope. nfpa 13 fire sprinkler to be provided.Details
tenant improvement to 1st and 2nd fl. new restrooms, workrooms, open office area, presentation room. building entry stair under sep permit 202608056135. mechanical, electrical, kplumbing, fire/life safety as required by above scope. nfpa 13 fire sprinkler to be provided. | $1,800,000 |
| Sep 11, 2026 | In progress filed Sep 2026, not yet issued | 300 Montgomery St | ste 200 2/f: t.i, includes seismic bolting of (e) phone booth.Details
ste 200 2/f: t.i, includes seismic bolting of (e) phone booth. | $7,500 | |
| Sep 10, 2026 | In progress filed Sep 2026, not yet issued | 600 California St | 5th fl: improvements include the demo of non-structural partitions and building new roof deck pedestal and pavers and planters, and exit access corridor. all new or revised meps and life safety work will design build and submitted separately. (bldg is fully sprinklered)Details
5th fl: improvements include the demo of non-structural partitions and building new roof deck pedestal and pavers and planters, and exit access corridor. all new or revised meps and life safety work will design build and submitted separately. (bldg is fully sprinklered) | $2,750,000 | |
| Sep 4, 2026 | In progress issued Sep 2026 | 200 Kansas St | Fog Line Builders Inc | 1/f: improvements include the demolishing of a non-rated exterior window & replacement with a non-rated glass sectional door.Details
1/f: improvements include the demolishing of a non-rated exterior window & replacement with a non-rated glass sectional door. | $15,000 |
| Aug 31, 2026 | In progress filed Aug 2026, not yet issued | 425 Market St | 29th floor: t.i. include demo of non-structural partitions and building. new non-structural partitions. all new or revised. mep and life safety work will be design build, and submitted for permit separately.Details
29th floor: t.i. include demo of non-structural partitions and building. new non-structural partitions. all new or revised. mep and life safety work will be design build, and submitted for permit separately. | $540,000 | |
| Aug 31, 2026 | In progress issued Sep 2026 | 534 04th St | M C S Construction Services | alteration to (e) 2 story office buildilng. 1st phase of ti project, limited to construction of (n) building entry and new interior communication stair. select soft demo, (n) floor openings and structural work. complete nfpa 13 system to be provide under separte. no additional plumbing fixtures.Details
alteration to (e) 2 story office buildilng. 1st phase of ti project, limited to construction of (n) building entry and new interior communication stair. select soft demo, (n) floor openings and structural work. complete nfpa 13 system to be provide under separte. no additional plumbing fixtures. | $210,000 |
| Aug 28, 2026 | In progress issued Sep 2026 | 90 New Montgomery St | Marchetti Group | 8th/f t.i. demo non-structural partition & install new partitions, dfh, interior glazing, millwork, break area plumbing, lighting & power/data outlets, all new or reused hvac, electrical, plumbing & life safetey will be design build & submitted separately (bldg is fully sprinklered)Details
8th/f t.i. demo non-structural partition & install new partitions, dfh, interior glazing, millwork, break area plumbing, lighting & power/data outlets, all new or reused hvac, electrical, plumbing & life safetey will be design build & submitted separately (bldg is fully sprinklered) | $500,000 |
| Aug 26, 2026 | In progress filed Aug 2026, not yet issued | 1700 Montgomery St | t.i. include the demolishing of non-structural partitions and building new non-structural partitions. all new or revised hvac,electrical,plumbing and life safety work will be design-build and submitted for permit separately. building is "not fully sprinklered"Details
t.i. include the demolishing of non-structural partitions and building new non-structural partitions. all new or revised hvac,electrical,plumbing and life safety work will be design-build and submitted for permit separately. building is "not fully sprinklered" | $650,000 | |
| Aug 25, 2026 | In progress issued Sep 2026 | 1 Embarcadero Center | Peacock Construction | 11th fl. suite 1150. t.i. includes demo of non structural partions and building new non structural partions. deferred mep fire protection and fire alarm (building is fully sprinklered)Details
11th fl. suite 1150. t.i. includes demo of non structural partions and building new non structural partions. deferred mep fire protection and fire alarm (building is fully sprinklered) | $362,527 |
| Aug 19, 2026 | In progress issued Aug 2026 | 1265 Battery St | Suffolk Constr Co. Inc. Dba Suffolk-Roel | 2/f: tenant improvement soft demo of non bearing partition and addition of new partitions, doors/frames, cabinetry, lighting and finishes. mep deferred.Details
2/f: tenant improvement soft demo of non bearing partition and addition of new partitions, doors/frames, cabinetry, lighting and finishes. mep deferred. | $2,300,000 |
| Aug 17, 2026 | In progress issued Sep 2026 | 1 Embarcadero Center | Vulcan Construction Inc | ste 3810 38/f: tenant improvement includes demo of non-structural partitions and building new non-structural partitions. all new or revised mep's and life safety work will be design build and submitted for permit separately. (building is fully sprinklered).Details
ste 3810 38/f: tenant improvement includes demo of non-structural partitions and building new non-structural partitions. all new or revised mep's and life safety work will be design build and submitted for permit separately. (building is fully sprinklered). | $245,000 |
| Aug 5, 2026 | In progress issued Aug 2026 | 534 04th St | M C S Construction Services | unit#534:interior demolition to remove previous tenants improvements including non-structural partitions,ceilings,finihes,casework and mep systems necessary to repare the space for a future tenant improvement application under separate permit.no structural work,no change to the exterior. ab-17Details
unit#534:interior demolition to remove previous tenants improvements including non-structural partitions,ceilings,finihes,casework and mep systems necessary to repare the space for a future tenant improvement application under separate permit.no structural work,no change to the exterior. ab-17 | $98,000 |
| Aug 4, 2026 | In progress issued Aug 2026 | 2 Henry Adams St | Sc Builders, Inc | ref pa 202606294074 - 4th & 5th fl ti includes structural anchoring of 24 phone booths and providing a new non-structural wall and door to enclose an existing room. no revision to the occupancy. no revisions to (e) meps or life safety. (bldg is fully sprinklered)Details
ref pa 202606294074 - 4th & 5th fl ti includes structural anchoring of 24 phone booths and providing a new non-structural wall and door to enclose an existing room. no revision to the occupancy. no revisions to (e) meps or life safety. (bldg is fully sprinklered) | $139,000 |
| Jul 28, 2026 | In progress issued Jul 2026 | 600 California St | Novo Construction Inc | 19/f & 20/f: interior demolition of non-structural partitions suspended ceiling, lighting, plumbing and finishes. ab-017Details
19/f & 20/f: interior demolition of non-structural partitions suspended ceiling, lighting, plumbing and finishes. ab-017 | $85,000 |
| Jul 13, 2026 | In progress issued Jul 2026 | 75 Broadway | Marchetti Group | 2nd fl/ ste# 201: t.i. included building new non-structural partitions, ceiling, lights, & millwork, all new or revised meps & life safety work will be design-build & submitted separately (bldg fully sprinklered)Details
2nd fl/ ste# 201: t.i. included building new non-structural partitions, ceiling, lights, & millwork, all new or revised meps & life safety work will be design-build & submitted separately (bldg fully sprinklered) | $1,400,000 |
| Jun 29, 2026 | In progress issued Jul 2026 | 2 Henry Adams St | Sc Builders, Inc | 4th & 5th fl - includes demo of non-struc'l partitions on 4th 5th fl in select area (n) lights, (n) carpet, paint and acoustic wall panels and refreshing existing millwork. all new or revised meps and life safety work will be deisng build and submitted separately. (bldg is fully sprinklered) pdrDetails
4th & 5th fl - includes demo of non-struc'l partitions on 4th 5th fl in select area (n) lights, (n) carpet, paint and acoustic wall panels and refreshing existing millwork. all new or revised meps and life safety work will be deisng build and submitted separately. (bldg is fully sprinklered) pdr | $454,400 |
| Jun 26, 2026 | In progress issued Jul 2026 | 550 Montgomery St | Marchetti Group | 8th floor: tenant improvement includes seismic bolting of existing phone boothsDetails
8th floor: tenant improvement includes seismic bolting of existing phone booths | |
| Jun 22, 2026 | In progress issued Jul 2026 | 185 Berry St | Hathaway Dinwiddie Co. | revisions from 202602266569 - permit set are clouded, tagged and include updates to restroom scope updates per architectural ceiling and wall changes, constructibility coordination.Details
revisions from 202602266569 - permit set are clouded, tagged and include updates to restroom scope updates per architectural ceiling and wall changes, constructibility coordination. | |
| Jun 8, 2026 | In progress issued Jul 2026 | 535 Mission St | Gci, Inc | 5floor; t.i. demo of non-str partitions and build new non str partitions. all new revised mep and life safety work will be design build and submitted separately. bldg is fully sprinkled.Details
5floor; t.i. demo of non-str partitions and build new non str partitions. all new revised mep and life safety work will be design build and submitted separately. bldg is fully sprinkled. | $721,000 |
| Jun 4, 2026 | In progress issued Aug 2026 | 1160 Battery St | West Coast Build Aka Fairway Constructio | 3/fl- ti includes demo of non strucrual partitions, addition of non structrual paritions, doors, frames, cabinerty and finishes. mep deferred. (east bldg)Details
3/fl- ti includes demo of non strucrual partitions, addition of non structrual paritions, doors, frames, cabinerty and finishes. mep deferred. (east bldg) | $4,900,000 |
| May 19, 2026 | In progress issued May 2026 | 1 Embarcadero Center | Field Construction Inc. | 5th flr. t.i. single tenant flr, demo and nonstructure partitions +building back non-str. partitions and finishes. all new or revised mep+ life safety work deferred submittal (bldg is fully sprinklered).Details
5th flr. t.i. single tenant flr, demo and nonstructure partitions +building back non-str. partitions and finishes. all new or revised mep+ life safety work deferred submittal (bldg is fully sprinklered). | $1,800,000 |
| May 15, 2026 | In progress filed May 2026, not yet issued | 85 02nd St | 2nd and 3rd floor: - revision to bpa: 202604219805. adding structural for the phone booths.Details
2nd and 3rd floor: - revision to bpa: 202604219805. adding structural for the phone booths. | ||
| Apr 23, 2026 | Completed final sign-off Aug 2026 | 1 Embarcadero Center | Peacock Construction | 20th floor/ suite 2050 t.i. include demo of non-structural partitions and building. new non-str partitions. all new or revise mep and life safety work will be design build and submitted separately. (bldg is fully sprinklered).Details
20th floor/ suite 2050 t.i. include demo of non-structural partitions and building. new non-str partitions. all new or revise mep and life safety work will be design build and submitted separately. (bldg is fully sprinklered). | $500,000 |
| Apr 21, 2026 | In progress issued May 2026 | 85 02nd St | Novo Construction Inc | 2nd & 3rd fl - ti includes demo of non-structural partitions and bldg new non-structural partitions. all new meps and life safety work will be design build and submitted for permit separately (bldg is fully sprinklered) ref pa 202603278389Details
2nd & 3rd fl - ti includes demo of non-structural partitions and bldg new non-structural partitions. all new meps and life safety work will be design build and submitted for permit separately (bldg is fully sprinklered) ref pa 202603278389 | $1,417,190 |
| Apr 21, 2026 | In progress filed Apr 2026, not yet issued | 85 02nd St | 1st fl/level 1 ti includes demo of non-structural partitions and building new non structural partitions. all new or revised meps and life safety work will be design build and submitted for permits separately (bldg is fully sprinklered) ref pa 202603278392Details
1st fl/level 1 ti includes demo of non-structural partitions and building new non structural partitions. all new or revised meps and life safety work will be design build and submitted for permits separately (bldg is fully sprinklered) ref pa 202603278392 | $600,000 | |
| Apr 20, 2026 | In progress issued Jun 2026 | 153 Townsend St | Singular Builders | 8th/f t.i. demo of non-structural partition, install new interior glazing storefront system. (bldg is fully sprinklerd)Details
8th/f t.i. demo of non-structural partition, install new interior glazing storefront system. (bldg is fully sprinklerd) | $42,600 |
| Apr 20, 2026 | In progress issued Sep 2026 | 405 Davis Ct | City Building Inc. | (leverl 1) t.i. includes interior re-finished of (e) residential tower main lobby. no change in use occupancy, occ. load or egress. replace in kind new front entry doors, new floor vocering and wall finishes. all new or revised mep's and life safety work will be design build and submited separately.Details
(leverl 1) t.i. includes interior re-finished of (e) residential tower main lobby. no change in use occupancy, occ. load or egress. replace in kind new front entry doors, new floor vocering and wall finishes. all new or revised mep's and life safety work will be design build and submited separately. | $340,000 |
| Apr 20, 2026 | In progress issued Jun 2026 | 153 Townsend St | Singular Builders | 9th/f t.i. demo of non-structural partitions, install new elevator lobby door. all new or revised meps or life safety work will be design build & submitted separately (bldg is fully sprinklerd)Details
9th/f t.i. demo of non-structural partitions, install new elevator lobby door. all new or revised meps or life safety work will be design build & submitted separately (bldg is fully sprinklerd) | $150,000 |
| Apr 17, 2026 | In progress issued May 2026 | 555 Montgomery St | Rudolph Commercial Interiors Inc, Rci | ste 1500 / 15/f: seismic bolting of phone booths.Details
ste 1500 / 15/f: seismic bolting of phone booths. | $5,000 |
| Apr 10, 2026 | In progress issued Sep 2026 | 440 Davis Ct | City Building Inc. | level 1, tenant improvment includes interior refinishes of e residential tower main lobby. no change in use occupancy, occ load or egrees. replace in kind new front entry doors. new floor covering and wall finishes. all new or revised meps and life safety work will be design build,submitted separateDetails
level 1, tenant improvment includes interior refinishes of e residential tower main lobby. no change in use occupancy, occ load or egrees. replace in kind new front entry doors. new floor covering and wall finishes. all new or revised meps and life safety work will be design build,submitted separate | $154,000 |
| Apr 1, 2026 | In progress issued Jun 2026 | 101 California St | Dpr Construction A | 15floor/suite 1500. includes demo + new construction of non-str partitions. glazing ceiling, fixtures, finishes, millwood and doors + hardware; mep to be permitted separately.Details
15floor/suite 1500. includes demo + new construction of non-str partitions. glazing ceiling, fixtures, finishes, millwood and doors + hardware; mep to be permitted separately. | $1,968,546 |
| Mar 27, 2026 | In progress issued Mar 2026 | 85 02nd St | Novo Construction Inc | 2nd & 3rd fl - ti including demo of non-structural partitions (bldg is fully sprinklered). existing ceiling. ceiling work to remain. no sprinkler work needed (ab017)Details
2nd & 3rd fl - ti including demo of non-structural partitions (bldg is fully sprinklered). existing ceiling. ceiling work to remain. no sprinkler work needed (ab017) | $106,000 |
| Mar 27, 2026 | In progress issued Mar 2026 | 85 02nd St | Novo Construction Inc | 1st fl - ti including demo of non-structural partitions (bldg is fully sprinklered). existing ceiling work to remain. no sprinkler work needed (ab017). improvement for build back under separate permitDetails
1st fl - ti including demo of non-structural partitions (bldg is fully sprinklered). existing ceiling work to remain. no sprinkler work needed (ab017). improvement for build back under separate permit | $50,000 |
| Mar 18, 2026 | In progress issued May 2026 | 260 California St | Field Construction Inc. | 6th fl, suite 600 ti to add card reader to existing suite/entry. all new or revised electrical and life safety work will be design - build and submitted for permit separately. no plumbing fixtures.Details
6th fl, suite 600 ti to add card reader to existing suite/entry. all new or revised electrical and life safety work will be design - build and submitted for permit separately. no plumbing fixtures. | $3,500 |
| Mar 18, 2026 | Completed final sign-off Jul 2026 | 260 California St | Wci-Gc Inc | 4th fl - ti include demo of non-structural partitions and building new non-structural partition. all new or revised. meps and life safety work will be design build and submitted separately. (bldg is fully sprinklered) restroom workDetails
4th fl - ti include demo of non-structural partitions and building new non-structural partition. all new or revised. meps and life safety work will be design build and submitted separately. (bldg is fully sprinklered) restroom work | $390,000 |
| Mar 12, 2026 | Completed final sign-off Sep 2026 | 88 Kearny St | Source Planning And Construction Inc | 20/f: revision to permit 202511109312. technical infeasibility request for men's restroom screen.Details
20/f: revision to permit 202511109312. technical infeasibility request for men's restroom screen. | |
| Mar 11, 2026 | Completed final sign-off Sep 2026 | 535 Mission St | M C S Construction Services | 6 fl- t.i. demo of non-structural partitions include bldging new non-str partitions. all new or revised mep under separate permit. life safety under separate permit. (bldg is fully sprinklered)Details
6 fl- t.i. demo of non-structural partitions include bldging new non-str partitions. all new or revised mep under separate permit. life safety under separate permit. (bldg is fully sprinklered) | $685,135 |
| Mar 11, 2026 | In progress issued Jun 2026 | 185 Berry St | Hathaway Dinwiddie Co. | ti for sierra located on levels 1, 5 & 6. selective demo of portion of (e) floor slabs at levels 5 & 6 to create 3 story, interconnected volume intended for "all-hands" assembly gatherings, work also includes construction of stadium-styled seating & associated stairs between level 4, 5 & communicatiDetails
ti for sierra located on levels 1, 5 & 6. selective demo of portion of (e) floor slabs at levels 5 & 6 to create 3 story, interconnected volume intended for "all-hands" assembly gatherings, work also includes construction of stadium-styled seating & associated stairs between level 4, 5 & communicati | $2,350,400 |
| Mar 11, 2026 | Completed final sign-off Sep 2026 | 160 Pine St | Rudolph Commercial Interiors Inc, Rci | 7/f-ste 710. ti include the demo fo non structural partition and bldg non-structural partitions. all new or revised meps and life safety work will be design build and submitted for permit separtely. bldg is fully sprinklerd.Details
7/f-ste 710. ti include the demo fo non structural partition and bldg non-structural partitions. all new or revised meps and life safety work will be design build and submitted for permit separtely. bldg is fully sprinklerd. | $650,000 |
| Mar 11, 2026 | Completed final sign-off Sep 2026 | 535 Mission St | M C S Construction Services | 3rd fl- suite 350 and suite 300. t.i. include bldging new non-str partitions. all new or revised mep under separate permit. life safety under separate permit.Details
3rd fl- suite 350 and suite 300. t.i. include bldging new non-str partitions. all new or revised mep under separate permit. life safety under separate permit. | $499,875 |
| Feb 27, 2026 | In progress issued Apr 2026 | 185 Berry St | Hathaway Dinwiddie Co. | interior improvement for sierra. located on levels 1 and 4 at 185 berry st in the wharfside building. the project is approximately 52,134 sf.Details
interior improvement for sierra. located on levels 1 and 4 at 185 berry st in the wharfside building. the project is approximately 52,134 sf. | $8,000,000 |
| Feb 26, 2026 | Completed final sign-off Aug 2026 | 88 Kearny St | Source Planning And Construction Inc | 4th fl - permit revision ti permit 202510288260 for remodel of existing communication stair and a technical infeasibility @ women's restroomsDetails
4th fl - permit revision ti permit 202510288260 for remodel of existing communication stair and a technical infeasibility @ women's restrooms | $12,000 |
| Feb 26, 2026 | In progress issued Apr 2026 | 185 Berry St | Hathaway Dinwiddie Co. | 6th fl: interior improvement for sierra in the wharfside of the building. approx 69,918 sqftDetails
6th fl: interior improvement for sierra in the wharfside of the building. approx 69,918 sqft | $15,855,932 |
| Feb 18, 2026 | In progress issued Mar 2026 | 650 Davis St | Marchetti Group | ground & 2nd fl - ti include new ceiling, lighting & finishes, mep,l/s & sprinklers work to be design build & filed under separate permit (bldg is fully sprinklered).Details
ground & 2nd fl - ti include new ceiling, lighting & finishes, mep,l/s & sprinklers work to be design build & filed under separate permit (bldg is fully sprinklered). | $350,000 |
| Feb 12, 2026 | In progress issued Mar 2026 | 120 Kearny St | Bcci Construction Company | ste 3400: t.i. includes soft demo of (e) non-str partitions building, new non-str partitions. meps to be sep permits. building is full sprinkled.Details
ste 3400: t.i. includes soft demo of (e) non-str partitions building, new non-str partitions. meps to be sep permits. building is full sprinkled. | $486,000 |
| Feb 11, 2026 | In progress filed Feb 2026, not yet issued | 205 Jackson St | ground floor:t.i. includes the demo of non-structural partitions & bldg new non-structural partitions. restrooms & lighting. all new or revised mep, life safety work will be design build & submitted for permit seperately.Details
ground floor:t.i. includes the demo of non-structural partitions & bldg new non-structural partitions. restrooms & lighting. all new or revised mep, life safety work will be design build & submitted for permit seperately. | $201,417 | |
| Feb 9, 2026 | In progress issued Mar 2026 | 185 Berry St | Hathaway Dinwiddie Co. | interior improvement for sierra, located on level 5 at 185 berry st. mep is included in the plans.Details
interior improvement for sierra, located on level 5 at 185 berry st. mep is included in the plans. | $13,383,368 |
| Jan 20, 2026 | In progress issued Jan 2026 | 185 Berry St | Hathaway Dinwiddie Co. | non structural demo on floors 1,4,5, & 6Details
non structural demo on floors 1,4,5, & 6 | $830,000 |
| Jan 20, 2026 | Completed final sign-off Aug 2026 | 4 Embarcadero Center | M C S Construction Services | 8th floor. t.i. including building of (n) non-structural partitions. all new or separately meps, life safety work will be design-buildg and submitted separately for permit. (bldg is fully sprinklered) no demo permit scope. spaced was delivered in shell condition. (demo permit under 202512091273)Details
8th floor. t.i. including building of (n) non-structural partitions. all new or separately meps, life safety work will be design-buildg and submitted separately for permit. (bldg is fully sprinklered) no demo permit scope. spaced was delivered in shell condition. (demo permit under 202512091273) | $420,166 |
| Dec 30, 2025 | Completed final sign-off May 2026 | 75 Broadway | Marchetti Group | 2nd fl suite 206: office tenant improvement. new non structural partitions, ceilings, lights & millwork. new or revised hvac, plumbing, electrical & life safety work to be design build & permitted separately. electrical t-24 added to this permit.Details
2nd fl suite 206: office tenant improvement. new non structural partitions, ceilings, lights & millwork. new or revised hvac, plumbing, electrical & life safety work to be design build & permitted separately. electrical t-24 added to this permit. | $490,000 |
| Dec 18, 2025 | In progress issued Jun 2026 | 153 Townsend St | Singular Builders | 1st floor: t.i. including the emo of non-structural partitions and building. new non-structural partitions: all new or revised mep and life safety work will be design-build and submitted separately. (bldg is fully sprinklered)Details
1st floor: t.i. including the emo of non-structural partitions and building. new non-structural partitions: all new or revised mep and life safety work will be design-build and submitted separately. (bldg is fully sprinklered) | $189,254 |
| Dec 17, 2025 | Completed final sign-off Aug 2026 | 4 Embarcadero Center | Bcci Construction Company | 8th floor: t.i. includes building of non structural partitions millwork and finishes. mep included. life safety work will be design build and submitted separetly. (building sprinklered)(demo pa #202512091273 by .Details
8th floor: t.i. includes building of non structural partitions millwork and finishes. mep included. life safety work will be design build and submitted separetly. (building sprinklered)(demo pa #202512091273 by . | $5,793,089 |
| Dec 16, 2025 | Completed final sign-off Apr 2026 | 600 Townsend St | Novo Construction Inc | 2/f: revision to permits 202507221305 and 202510298361 to add (11) phone rooms. structural details included.Details
2/f: revision to permits 202507221305 and 202510298361 to add (11) phone rooms. structural details included. | $20,000 |
| Dec 12, 2025 | Completed final sign-off Apr 2026 | 3 Embarcadero Center | Principal Builders Inc. | suite 2500. revision to 202507160935. clarifying the door's hardware etec for the egress. door number 2512.Details
suite 2500. revision to 202507160935. clarifying the door's hardware etec for the egress. door number 2512. | |
| Dec 11, 2025 | Completed final sign-off Aug 2026 | 88 Kearny St | Source Planning And Construction Inc | 3rd/f mep for t.i. 202510147260: mep for projectDetails
3rd/f mep for t.i. 202510147260: mep for project | $145,000 |
| Dec 11, 2025 | Completed final sign-off Apr 2026 | 117 Greenwich St | Hp Build | 1st and 2nd fl: revision to 20251017827. infill on 2nd floor. part of stair removal on 1st fl structural.Details
1st and 2nd fl: revision to 20251017827. infill on 2nd floor. part of stair removal on 1st fl structural. | $65,000 |
| Dec 11, 2025 | In progress filed Dec 2025, not yet issued | 500 Battery St | 1/f: demo of nonstructural partitions - demo only - ab-017Details
1/f: demo of nonstructural partitions - demo only - ab-017 | $45,513 | |
| Nov 25, 2025 | Completed final sign-off Sep 2026 | 88 Kearny St | Source Planning And Construction Inc | 6th fl - ti includes the building of new non-structural partitions. all new or revised meps, life safety work will be design build and submitted separately for permits. bldg is fully sprinklered. ref demo permit 202508263905Details
6th fl - ti includes the building of new non-structural partitions. all new or revised meps, life safety work will be design build and submitted separately for permits. bldg is fully sprinklered. ref demo permit 202508263905 | $1,243,215 |
| Nov 25, 2025 | Completed final sign-off May 2026 | 525 Market St | M C S Construction Services | 14/f suite 1460: t.i includes demo of non-structural partitions and build new non-structural partitions. all mep work will be fully engineered and included in this permit. all life safety work will be design-built and submitted separately. fully sprinklered building.Details
14/f suite 1460: t.i includes demo of non-structural partitions and build new non-structural partitions. all mep work will be fully engineered and included in this permit. all life safety work will be design-built and submitted separately. fully sprinklered building. | $550,000 |
| Nov 25, 2025 | Completed final sign-off Sep 2026 | 88 Kearny St | Source Planning And Construction Inc | 7th fl - t.i. includes the building of new non-structural partitions. all new or revised meps, life safety work will be design build and submitted separately for permits. bldg is fully sprinklered. ref demo permit 202508263899Details
7th fl - t.i. includes the building of new non-structural partitions. all new or revised meps, life safety work will be design build and submitted separately for permits. bldg is fully sprinklered. ref demo permit 202508263899 | $1,251,419 |
| Nov 17, 2025 | Completed final sign-off Jan 2026 | 100 California St | Bcci Construction Company | 4th fl - add new entry doorDetails
4th fl - add new entry door | $29,000 |
| Nov 13, 2025 | Completed final sign-off Mar 2026 | 1 Embarcadero Center | Source Planning And Construction Inc | 29th and 30 flr. communication stiar t.i. includes the remove of a non-egress interconnecting - stair and the infill of the slab opening. all new or revised life safety work will be design buildg and submitted separately. (bldg is fully sprinklered)Details
29th and 30 flr. communication stiar t.i. includes the remove of a non-egress interconnecting - stair and the infill of the slab opening. all new or revised life safety work will be design buildg and submitted separately. (bldg is fully sprinklered) | $198,000 |
| Nov 10, 2025 | Completed final sign-off Sep 2026 | 88 Kearny St | Source Planning And Construction Inc | 20/f. ti includes the building of new non-structural partitions. all new or revised meps and life safety work will be design build and submitted separately. bldg is fully sprinlerd. ref demo # 202508273960.Details
20/f. ti includes the building of new non-structural partitions. all new or revised meps and life safety work will be design build and submitted separately. bldg is fully sprinlerd. ref demo # 202508273960. | $777,000 |
| Nov 5, 2025 | In progress issued Dec 2025 | 650 Davis St | Marchetti Group | 2nd floor: revision to pa#202509115071. removal of 2 double doors from scope, construction of a wall.Details
2nd floor: revision to pa#202509115071. removal of 2 double doors from scope, construction of a wall. | |
| Nov 4, 2025 | Completed final sign-off Aug 2026 | 88 Kearny St | Source Planning And Construction Inc | 18th floor: t.i. includes building of new non-structural partitions: all new or revised mep and life safety work will be design-build and submitted for permit seperately. building is fully sprinklered. ref demo # 202508273958.Details
18th floor: t.i. includes building of new non-structural partitions: all new or revised mep and life safety work will be design-build and submitted for permit seperately. building is fully sprinklered. ref demo # 202508273958. | $734,582 |
| Oct 30, 2025 | Completed final sign-off Dec 2025 | 703 Market St | Build Group Inc. | 11th fl: tenant improvement includes the structural anchoring of 4 existing phone booths as required by sf fire dept, no revision to e mep or life safety. building fully sprinklered.Details
11th fl: tenant improvement includes the structural anchoring of 4 existing phone booths as required by sf fire dept, no revision to e mep or life safety. building fully sprinklered. | $25,000 |
| Oct 29, 2025 | Completed final sign-off Apr 2026 | 600 Townsend St | Novo Construction Inc | 2nd fl - revision to pa 202507221305 to enlarge office 21. remove all work in rooms 220, 230, 233. roomn 231 remove furniture walls and replace w/drywall partitionsDetails
2nd fl - revision to pa 202507221305 to enlarge office 21. remove all work in rooms 220, 230, 233. roomn 231 remove furniture walls and replace w/drywall partitions | $97,171 |
| Oct 29, 2025 | Completed final sign-off Apr 2026 | 650 Davis St | Marchetti Group | 2nd floor: commercial interior improvement at restrooms. partial non-structural demo, new nonstructural partitions, doors, frames, lighting, plumbing, interior finishes and new millwork. mep, l/s and sprinkler work to be design-built and filed seperately. bldg is fully sprinklered. barrier removal.Details
2nd floor: commercial interior improvement at restrooms. partial non-structural demo, new nonstructural partitions, doors, frames, lighting, plumbing, interior finishes and new millwork. mep, l/s and sprinkler work to be design-built and filed seperately. bldg is fully sprinklered. barrier removal. | $50,000 |
| Oct 28, 2025 | Completed final sign-off Aug 2026 | 88 Kearny St | Source Planning And Construction Inc | 4th/fl: ti improvement includes building of new non structural partitions. all new or revised meps and life safety work will be design build and submitted seperately (bldg is fully sprinklers).Details
4th/fl: ti improvement includes building of new non structural partitions. all new or revised meps and life safety work will be design build and submitted seperately (bldg is fully sprinklers). | $537,611 |
| Oct 21, 2025 | Completed final sign-off Apr 2026 | 117 Greenwich St | Hp Build | 1st/f t.i. demo non-structural partitions & build new non-structural partitions, all new or revised mep & life safety work will be design vuild & submitted separatelyDetails
1st/f t.i. demo non-structural partitions & build new non-structural partitions, all new or revised mep & life safety work will be design vuild & submitted separately | $750,000 |
| Oct 21, 2025 | Completed final sign-off Aug 2026 | 88 Kearny St | Source Planning And Construction Inc | 17th fl - ti includes building of new non-structural partitions. all new mep & life safety work will be design build and submitted for permit separately. bldg is fully sprinkleredDetails
17th fl - ti includes building of new non-structural partitions. all new mep & life safety work will be design build and submitted for permit separately. bldg is fully sprinklered | $959,611 |
| Oct 21, 2025 | Completed final sign-off May 2026 | 1 Embarcadero Center | Principal Builders Inc. | 32nd and 33rd floors: t.i. include the removal of non structural partitions and new non-structural partition, doors millwork and finishes. all new or revised hvac electrical, plumbing and life safety work will be design build and submitted separately. (bldg is fully sprinklered)Details
32nd and 33rd floors: t.i. include the removal of non structural partitions and new non-structural partition, doors millwork and finishes. all new or revised hvac electrical, plumbing and life safety work will be design build and submitted separately. (bldg is fully sprinklered) | |
| Oct 16, 2025 | Completed final sign-off Jan 2026 | 1 Bush St | Source Planning And Construction Inc | 8th fl - ti include the demo of non-structural partition and building new non-structural partition ny new or revised electrical life safety work will bnd submitted separatelyDetails
8th fl - ti include the demo of non-structural partition and building new non-structural partition ny new or revised electrical life safety work will bnd submitted separately | $77,958 |
| Oct 14, 2025 | Completed final sign-off Aug 2026 | 88 Kearny St | Source Planning And Construction Inc | 3rd fl. demo under 202508213610. t.i. includes the bldging of new non-structural partitions. all new or revised meps life safety/sprinklers will be design bldg and submitted. separately. (bldg is fully sprinklerd).Details
3rd fl. demo under 202508213610. t.i. includes the bldging of new non-structural partitions. all new or revised meps life safety/sprinklers will be design bldg and submitted. separately. (bldg is fully sprinklerd). | $832,402 |
| Sep 26, 2025 | Completed final sign-off Jan 2026 | 2 Embarcadero Center | M C S Construction Services | 23rd flr/suite 2350. t.i. includes demo of non-structure partitions, doors, bldg of new non str partions. doors and finishes. all new or revised meps, life safety work will be design-build and submitted for permit separately bldging is fully sprinkled.Details
23rd flr/suite 2350. t.i. includes demo of non-structure partitions, doors, bldg of new non str partions. doors and finishes. all new or revised meps, life safety work will be design-build and submitted for permit separately bldging is fully sprinkled. | $200,000 |
| Sep 18, 2025 | Completed final sign-off Apr 2026 | 535 Mission St | Gci, Inc | 4th fl, ste 400 meps for permit 202508072540 include revistion to 202508072540 and pages a0.00 coversheet, a0.02 egress plan and a1.00 construction plan (clarifying the wall type for mech permit)Details
4th fl, ste 400 meps for permit 202508072540 include revistion to 202508072540 and pages a0.00 coversheet, a0.02 egress plan and a1.00 construction plan (clarifying the wall type for mech permit) | $719,496 |
| Sep 17, 2025 | In progress filed Sep 2025, not yet issued | 555 Mission St | 16th floor: ti includes building of new non-structural partitions and millwork in the pantry. all new or revised mep's life safty work and sprinklers will be design-built and submitted for permit seperatly (bldg is fully sprinklered)Details
16th floor: ti includes building of new non-structural partitions and millwork in the pantry. all new or revised mep's life safty work and sprinklers will be design-built and submitted for permit seperatly (bldg is fully sprinklered) | $99,400 | |
| Sep 11, 2025 | Completed final sign-off Feb 2026 | 650 Davis St | Marchetti Group | 2nd fl - office ti, non-structural demo, non structural, partitions, doors/frames, lighting and interior finishes. meps, l/s & sprinklers work (if needed) to be deferreed submittal (bldg fully sprinklered)Details
2nd fl - office ti, non-structural demo, non structural, partitions, doors/frames, lighting and interior finishes. meps, l/s & sprinklers work (if needed) to be deferreed submittal (bldg fully sprinklered) | $53,000 |
| Sep 10, 2025 | Expired or cancelled withdrawn Aug 2026 | 1 Front St | 30th fl refer to pa 202507019916 for ti this permit filed to clarify the a3 occupancy and the assembly permit required (fully sprinklered bldg)Details
30th fl refer to pa 202507019916 for ti this permit filed to clarify the a3 occupancy and the assembly permit required (fully sprinklered bldg) | ||
| Aug 28, 2025 | In progress issued Sep 2025 | 1 Embarcadero Center | M C S Construction Services | 21st/f, ste# 2100: t.i. included demo of non-strutuctural partitions, build new non-structural partitions. all new or revised meps, sprinkler, life safety work will be design build & separate permitDetails
21st/f, ste# 2100: t.i. included demo of non-strutuctural partitions, build new non-structural partitions. all new or revised meps, sprinkler, life safety work will be design build & separate permit | $275,000 |
| Aug 27, 2025 | Completed final sign-off Mar 2026 | 88 Kearny St | Source Planning And Construction Inc | 11/fl- demo of non structrual partitions, suspended ceilings, lighting, plumbing, finishes, etc. (e) sprinkler heads will be turned up once the suspended accoustical ceiling has been removed. ref 202508143070Details
11/fl- demo of non structrual partitions, suspended ceilings, lighting, plumbing, finishes, etc. (e) sprinkler heads will be turned up once the suspended accoustical ceiling has been removed. ref 202508143070 | $58,000 |
| Aug 27, 2025 | Completed final sign-off Mar 2026 | 88 Kearny St | Source Planning And Construction Inc | 04/fl- demo of non structrual partitions, suspended ceilings, lighting, plumbing, finishes, etc. (e) sprinkler heads will be turned up once the suspended accoustical ceiling has been removed. ref 202508143070Details
04/fl- demo of non structrual partitions, suspended ceilings, lighting, plumbing, finishes, etc. (e) sprinkler heads will be turned up once the suspended accoustical ceiling has been removed. ref 202508143070 | $77,406 |
| Aug 27, 2025 | Completed final sign-off Dec 2025 | 88 Kearny St | Source Planning And Construction Inc | 17/fl- demo of non structrual partitions, suspended ceilings, lighting, plumbing, finishes, etc. (e) sprinkler heads will be turned up once the suspended accoustical ceiling has been removed. ref 202508143070Details
17/fl- demo of non structrual partitions, suspended ceilings, lighting, plumbing, finishes, etc. (e) sprinkler heads will be turned up once the suspended accoustical ceiling has been removed. ref 202508143070 | $59,000 |
| Aug 27, 2025 | Completed final sign-off Dec 2025 | 88 Kearny St | Source Planning And Construction Inc | 18/fl- demo of non structrual partitions, suspended ceilings, lighting, plumbing, finishes, etc. (e) sprinkler heads will be turned up once the suspended accoustical ceiling has been removed. ref 202508143070Details
18/fl- demo of non structrual partitions, suspended ceilings, lighting, plumbing, finishes, etc. (e) sprinkler heads will be turned up once the suspended accoustical ceiling has been removed. ref 202508143070 | $59,000 |
| Aug 27, 2025 | Completed final sign-off Dec 2025 | 88 Kearny St | Source Planning And Construction Inc | 20/fl- demo of non structrual partitions, suspended ceilings, lighting, plumbing, finishes, etc. (e) sprinkler heads will be turned up once the suspended accoustical ceiling has been removed. ref 202508143070Details
20/fl- demo of non structrual partitions, suspended ceilings, lighting, plumbing, finishes, etc. (e) sprinkler heads will be turned up once the suspended accoustical ceiling has been removed. ref 202508143070 | $59,000 |
| Aug 26, 2025 | Completed final sign-off Mar 2026 | 88 Kearny St | Source Planning And Construction Inc | 6th fl - demo of non structural partitions, suspended ceilings; lighting, plumbing, finishes etc; (e) sprinkler heads will be turned up once suspended accoustical ceiling has been removed; ref sprinkler drawings pa 202508143070Details
6th fl - demo of non structural partitions, suspended ceilings; lighting, plumbing, finishes etc; (e) sprinkler heads will be turned up once suspended accoustical ceiling has been removed; ref sprinkler drawings pa 202508143070 | $60,000 |
| Aug 26, 2025 | Completed final sign-off Dec 2025 | 88 Kearny St | Source Planning And Construction Inc | 7th fl - demo of non structural partitions, suspended ceilings; lighting, 0lumbing, finishes etc; (e) sprinkler heads will be turned uponce suspended ceiling ciling has been removed; ref sprinkler drawings pa 202508143070Details
7th fl - demo of non structural partitions, suspended ceilings; lighting, 0lumbing, finishes etc; (e) sprinkler heads will be turned uponce suspended ceiling ciling has been removed; ref sprinkler drawings pa 202508143070 | $60,000 |
| Aug 25, 2025 | Completed final sign-off Oct 2025 | 400 Montgomery St | M C S Construction Services | 9th floor: revision to pa #202503273214. adding a confernce room and a wellness room etc. mep deferred.Details
9th floor: revision to pa #202503273214. adding a confernce room and a wellness room etc. mep deferred. | |
| Aug 21, 2025 | Completed final sign-off Dec 2025 | 88 Kearny St | Source Planning And Construction Inc | 3rd/f: demo of non-structural partition, suspended ceiling, lighting, plumbing, finishes etc. e) sprinkler heads will be turned up once suspended ceiling has been removed. ref sprinkler dwg pa# 202508143070Details
3rd/f: demo of non-structural partition, suspended ceiling, lighting, plumbing, finishes etc. e) sprinkler heads will be turned up once suspended ceiling has been removed. ref sprinkler dwg pa# 202508143070 | $77,413 |
| Aug 12, 2025 | Completed final sign-off Jan 2026 | 535 Mission St | M C S Construction Services | 8th/f: t.i. demo of non structural partitions & building new non structural paritions. all new or revised life safety work will be design build & submitted separately. bldg fully sprinklerd.Details
8th/f: t.i. demo of non structural partitions & building new non structural paritions. all new or revised life safety work will be design build & submitted separately. bldg fully sprinklerd. | $765,000 |
| Aug 12, 2025 | Completed final sign-off Sep 2026 | 525 Market St | Bcci Construction Company | 30th fl- ti includes demo of non strucutral partitions & new structural partitions to create a common corridor. new plumbing fixtures millwork and finishes will be provided throughout the corridor and core restrooms. all new or revised life safety work will be design build and submitted seperately.Details
30th fl- ti includes demo of non strucutral partitions & new structural partitions to create a common corridor. new plumbing fixtures millwork and finishes will be provided throughout the corridor and core restrooms. all new or revised life safety work will be design build and submitted seperately. | $750,000 |
| Aug 11, 2025 | Completed final sign-off Jan 2026 | 535 Mission St | Gci, Inc | 11th fl - ti includes demo of non-structural partitions and build back new nonstructural partitions. all new or revised mep. life saftey & sprinklers will be design build & submitted separately (bldg is fully sprinklered)Details
11th fl - ti includes demo of non-structural partitions and build back new nonstructural partitions. all new or revised mep. life saftey & sprinklers will be design build & submitted separately (bldg is fully sprinklered) | $63,000 |
| Aug 7, 2025 | Completed final sign-off Apr 2026 | 535 Mission St | Gci, Inc | 4th fl, ste 400 ti demo of non-structural partitions and building (n) non-structural partitions (bldg is full sprinklered) meps under separate permit life safety & sprinklers under separate permit submitted separately, not included in cost valuation for this pa.Details
4th fl, ste 400 ti demo of non-structural partitions and building (n) non-structural partitions (bldg is full sprinklered) meps under separate permit life safety & sprinklers under separate permit submitted separately, not included in cost valuation for this pa. | $1,400,000 |
| Jul 28, 2025 | Completed final sign-off Jan 2026 | 251 Post St | Rudolph Commercial Interiors Inc, Rci | 6th floor/ suite 600: t.i. includes demo of non-structural partitions. all new or revised. mep, life safty will be design build and submitted for permit separatly.Details
6th floor/ suite 600: t.i. includes demo of non-structural partitions. all new or revised. mep, life safty will be design build and submitted for permit separatly. | $24,992 |
| Jul 22, 2025 | Completed final sign-off Nov 2025 | 88 Kearny St | Source Planning And Construction Inc | 14th flr/suite 1450: t.i. includes demo of non strutural partiions + building new non-str partitions. all new or revisions mep and life safety work + sprinkler will be design -build and submitted for permit separately. (bldg is fully sprinklered).Details
14th flr/suite 1450: t.i. includes demo of non strutural partiions + building new non-str partitions. all new or revisions mep and life safety work + sprinkler will be design -build and submitted for permit separately. (bldg is fully sprinklered). | $101,388 |