Permit GraphShortlistSan Francisco building permits since 2000

Block 3721, lot 122

535 Mission St

City’s use
Commercial Office
Built
2014
Stories
27
Building
354,000 sq ft
Lot
16,308 sq ft
Zoning
C3O
Construction type
NA

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

The 200 most recent permits filed for this property.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 15, 2026In progress
issued Sep 2026
535 Mission StGci, Inc27/f: electrical only to relocate receptacles and outlets for phone booths approved under 202608076258.
Details
Permit
202609158140
Permit issued
Sep 16, 2026

27/f: electrical only to relocate receptacles and outlets for phone booths approved under 202608076258.

Open the permit page

$6,000
Aug 7, 2026In progress
issued Sep 2026
535 Mission StGci, Inc27th floor: minor non-structural demolition of new power, life safety & seismic requirements for 4 new phone booths.
Details
Permit
202608076258
Permit issued
Sep 9, 2026

27th floor: minor non-structural demolition of new power, life safety & seismic requirements for 4 new phone booths.

Open the permit page

$50,000
Aug 4, 2026In progress
issued Aug 2026
535 Mission StGci, Inc5th floor: mep deffered under 202606082732. mch: demo & revise existing ductwork & diffusers to accomodate new floor plan layout. finish & install new duct & diffusers to accomodate new layout. elec.: office ti retrofit-lighting fixtures & associated circuiting/controls, poser & signal.
Details
Permit
202608046029
Permit issued
Aug 11, 2026

5th floor: mep deffered under 202606082732. mch: demo & revise existing ductwork & diffusers to accomodate new floor plan layout. finish & install new duct & diffusers to accomodate new layout. elec.: office ti retrofit-lighting fixtures & associated circuiting/controls, poser & signal.

Open the permit page

$500,000
Jun 8, 2026In progress
issued Jul 2026
535 Mission StGci, Inc5floor; t.i. demo of non-str partitions and build new non str partitions. all new revised mep and life safety work will be design build and submitted separately. bldg is fully sprinkled.
Details
Permit
202606082732
Permit issued
Jul 8, 2026

5floor; t.i. demo of non-str partitions and build new non str partitions. all new revised mep and life safety work will be design build and submitted separately. bldg is fully sprinkled.

Open the permit page

$721,000
Apr 1, 2026Completed
final sign-off Sep 2026
535 Mission StM C S Construction Servicespa#: 202603117343. deferred mech and elect permit.mech demo + install new + relocate existing duct work =air terminals relocate + reuse existing vav boxes. demo and reconnect heating hot water + reheat boxes. elect lighting fixtures assoicate circuiting/controls. power+ signals devices +assoc wiring
Details
Permit
202604018647
Permit issued
Apr 1, 2026
Final sign-off
Sep 28, 2026

pa#: 202603117343. deferred mech and elect permit.mech demo + install new + relocate existing duct work =air terminals relocate + reuse existing vav boxes. demo and reconnect heating hot water + reheat boxes. elect lighting fixtures assoicate circuiting/controls. power+ signals devices +assoc wiring

Open the permit page

$400,000
Apr 1, 2026Completed
final sign-off Sep 2026
535 Mission StM C S Construction Services6th floor:ref permit#202603117365, defered mep, demo, install new & relocate existing ductwork & air terminals, relocate & reuse existing vav boxes. electrical lighting fixtures & assoc. circuiting/controls. power & signal devices & assoc. wiring.
Details
Permit
202604018673
Permit issued
Apr 1, 2026
Final sign-off
Sep 28, 2026

6th floor:ref permit#202603117365, defered mep, demo, install new & relocate existing ductwork & air terminals, relocate & reuse existing vav boxes. electrical lighting fixtures & assoc. circuiting/controls. power & signal devices & assoc. wiring.

Open the permit page

$700,000
Mar 11, 2026Completed
final sign-off Sep 2026
535 Mission StM C S Construction Services3rd fl- suite 350 and suite 300. t.i. include bldging new non-str partitions. all new or revised mep under separate permit. life safety under separate permit.
Details
Permit
202603117343
Permit issued
Mar 19, 2026
Final sign-off
Sep 28, 2026

3rd fl- suite 350 and suite 300. t.i. include bldging new non-str partitions. all new or revised mep under separate permit. life safety under separate permit.

Open the permit page

$499,875
Mar 11, 2026Completed
final sign-off Sep 2026
535 Mission StM C S Construction Services6 fl- t.i. demo of non-structural partitions include bldging new non-str partitions. all new or revised mep under separate permit. life safety under separate permit. (bldg is fully sprinklered)
Details
Permit
202603117365
Permit issued
Mar 19, 2026
Final sign-off
Sep 28, 2026

6 fl- t.i. demo of non-structural partitions include bldging new non-str partitions. all new or revised mep under separate permit. life safety under separate permit. (bldg is fully sprinklered)

Open the permit page

$685,135
Mar 6, 2026In progress
issued Mar 2026
535 Mission StGci, Increvision to pa 202512091303 for additional phone booth locations
Details
Permit
202603067057
Permit issued
Mar 12, 2026

revision to pa 202512091303 for additional phone booth locations

Open the permit page

$14,000
Mar 6, 2026In progress
issued Apr 2026
535 Mission StGci, Incprovide new transfer air grille, new duct & diffusers to serve new floor plan layout. rebalance existing terminal unit, diffusers as required for pressurization ventilation and exhaust req ref 202512091303
Details
Permit
202603067059
Permit issued
Apr 29, 2026

provide new transfer air grille, new duct & diffusers to serve new floor plan layout. rebalance existing terminal unit, diffusers as required for pressurization ventilation and exhaust req ref 202512091303

Open the permit page

$40,000
Jan 7, 2026Completed
final sign-off Feb 2026
535 Mission StBilcor Inc4th fl - install 2 call stations; sequence of operation remains unchanged; 2 way ecs backbone infracstructure pa 2021-0204-4085. 4th fl ref ti 202508072540
Details
Permit
202601073344
Permit issued
Jan 7, 2026
Final sign-off
Feb 4, 2026

4th fl - install 2 call stations; sequence of operation remains unchanged; 2 way ecs backbone infracstructure pa 2021-0204-4085. 4th fl ref ti 202508072540

Open the permit page

$1,000
Dec 17, 2025Completed
final sign-off Feb 2026
535 Mission StPioneer Fire Inc.relocate (1) pendents, (4) uprights, convert (4) pendents to uprights. 9th fl. ref pa# 2025-1209-1303
Details
Permit
202512171955
Permit issued
Dec 17, 2025
Final sign-off
Feb 2, 2026

relocate (1) pendents, (4) uprights, convert (4) pendents to uprights. 9th fl. ref pa# 2025-1209-1303

Open the permit page

$2,500
Dec 9, 2025Completed
final sign-off Feb 2026
535 Mission StSiemens Industry, Inc.4th floor. fire only work for the suite 400. remodel on floor 4 done under pa#: 202508072540. additions are 1 smoke detector, 3 duct detector, 2 modules, 19 speakers/strobes, and 6 strobes.
Details
Permit
202512091267
Permit issued
Dec 11, 2025
Final sign-off
Feb 20, 2026

4th floor. fire only work for the suite 400. remodel on floor 4 done under pa#: 202508072540. additions are 1 smoke detector, 3 duct detector, 2 modules, 19 speakers/strobes, and 6 strobes.

Open the permit page

$31,945
Dec 9, 2025In progress
issued Dec 2025
535 Mission StGci, Inc9th fl - commercial ti demo & construction of non-structural partitions, ceilings, finishes & furniture/equipment expansion of existing pantry/break area (not mirco-kitchen)
Details
Permit
202512091303
Permit issued
Dec 11, 2025

9th fl - commercial ti demo & construction of non-structural partitions, ceilings, finishes & furniture/equipment expansion of existing pantry/break area (not mirco-kitchen)

Open the permit page

$186,000
Dec 8, 2025Completed
final sign-off Jan 2026
535 Mission StGci, Inc11th floor: air distribution and ductwork for new floor layout. ref pa #202508112735
Details
Permit
202512081201
Permit issued
Dec 19, 2025
Final sign-off
Jan 16, 2026

11th floor: air distribution and ductwork for new floor layout. ref pa #202508112735

Open the permit page

Dec 3, 2025In progress
issued Dec 2025
535 Mission StSiemens Industry, Inc.8/f: additions of 2 speaker/strobes and 2 strobes for spect suite remodel done under pa202508122835
Details
Permit
202512030793
Permit issued
Dec 4, 2025

8/f: additions of 2 speaker/strobes and 2 strobes for spect suite remodel done under pa202508122835

Open the permit page

$3,165
Nov 5, 2025Completed
final sign-off Jan 2026
535 Mission StM C S Construction Services8th floor: revision to pa #202508122835. some revision to wall/reconfiguring for new t.i
Details
Permit
202511058953
Permit issued
Nov 19, 2025
Final sign-off
Jan 5, 2026

8th floor: revision to pa #202508122835. some revision to wall/reconfiguring for new t.i

Open the permit page

Oct 28, 2025Completed
final sign-off Dec 2025
535 Mission StPioneer Fire Inc.8th/fl: relocate 39 pendents 3 concealed pendents . convert 5 pendents to u right heads. remove 33 pendents. ref: 202508122835
Details
Permit
202510288263
Permit issued
Oct 29, 2025
Final sign-off
Dec 11, 2025

8th/fl: relocate 39 pendents 3 concealed pendents . convert 5 pendents to u right heads. remove 33 pendents. ref: 202508122835

Open the permit page

$11,942
Oct 15, 2025Completed
final sign-off Feb 2026
535 Mission StAnderson, Rowe & Buckley, Inc.4th fl - fire sprinkler ti relocate 99 ref pa 202508072540
Details
Permit
202510157364
Permit issued
Oct 17, 2025
Final sign-off
Feb 13, 2026

4th fl - fire sprinkler ti relocate 99 ref pa 202508072540

Open the permit page

$50,886
Sep 30, 2025Completed
final sign-off Jan 2026
535 Mission StM C S Construction Services8th floor: deferred mech and electrical permit ref app# 202508122835. mechanical- install 3 vav box with reheat, duct work for view floor layout. electrical-lighting fixtures & associated circuiting controls. power and signal devices and associated wiring.
Details
Permit
202509306372
Permit issued
Sep 30, 2025
Final sign-off
Jan 5, 2026

8th floor: deferred mech and electrical permit ref app# 202508122835. mechanical- install 3 vav box with reheat, duct work for view floor layout. electrical-lighting fixtures & associated circuiting controls. power and signal devices and associated wiring.

Open the permit page

$450,000
Sep 18, 2025Completed
final sign-off Apr 2026
535 Mission StGci, Inc4th fl, ste 400 meps for permit 202508072540 include revistion to 202508072540 and pages a0.00 coversheet, a0.02 egress plan and a1.00 construction plan (clarifying the wall type for mech permit)
Details
Permit
202509185568
Permit issued
Oct 10, 2025
Final sign-off
Apr 24, 2026

4th fl, ste 400 meps for permit 202508072540 include revistion to 202508072540 and pages a0.00 coversheet, a0.02 egress plan and a1.00 construction plan (clarifying the wall type for mech permit)

Open the permit page

$719,496
Sep 16, 2025Completed
final sign-off Dec 2025
535 Mission StPioneer Fire Inc.11th floor: relocate(1) pendent, convert(3) upgrights to pendents, remove(2) pendents.corresponding bpa#202508112735
Details
Permit
202509165347
Permit issued
Sep 16, 2025
Final sign-off
Dec 11, 2025

11th floor: relocate(1) pendent, convert(3) upgrights to pendents, remove(2) pendents.corresponding bpa#202508112735

Open the permit page

$1,250
Sep 11, 2025Completed
final sign-off Dec 2025
535 Mission StSiemens Industry, Inc.8th fl - fire only work for "spec suites" remodel done under pa 202508122835; additions are 28 speaker/strobes and 2 modules
Details
Permit
202509115045
Permit issued
Sep 11, 2025
Final sign-off
Dec 18, 2025

8th fl - fire only work for "spec suites" remodel done under pa 202508122835; additions are 28 speaker/strobes and 2 modules

Open the permit page

$28,108
Aug 26, 2025Completed
final sign-off Sep 2025
535 Mission StSiemens Industry, Inc.fire only work for floor 21 remodel under 202506309837, 1 speaker/strobe added and 2 existing speaker/strobes relocated
Details
Permit
202508263859
Permit issued
Aug 26, 2025
Final sign-off
Sep 3, 2025

fire only work for floor 21 remodel under 202506309837, 1 speaker/strobe added and 2 existing speaker/strobes relocated

Open the permit page

$2,883
Aug 13, 2025In progress
issued Aug 2025
535 Mission StSiemens Industry, Inc.floor 3; fire only work for the floor 3 conference center done under permit # 2025-0605-7981 additions are 1 module, 22 speaker/strobes and 2 strobes
Details
Permit
202508132890
Permit issued
Aug 14, 2025

floor 3; fire only work for the floor 3 conference center done under permit # 2025-0605-7981 additions are 1 module, 22 speaker/strobes and 2 strobes

Open the permit page

$22,985
Aug 12, 2025Completed
final sign-off Sep 2025
535 Mission StM C S Construction Services21st floor: deferred mechanical & electrical permit ref#202506309837. mechanical- provide new ductwork & air dist. to (e) vav's to accomodate new zones, rebalance (e) vav's electrical- new power & signal devices throughout. new 2022 t24 compliant lighting + controls
Details
Permit
202508122799
Permit issued
Aug 12, 2025
Final sign-off
Sep 25, 2025

21st floor: deferred mechanical & electrical permit ref#202506309837. mechanical- provide new ductwork & air dist. to (e) vav's to accomodate new zones, rebalance (e) vav's electrical- new power & signal devices throughout. new 2022 t24 compliant lighting + controls

Open the permit page

$50,000
Aug 12, 2025Completed
final sign-off Jan 2026
535 Mission StM C S Construction Services8th/f: t.i. demo of non structural partitions & building new non structural paritions. all new or revised life safety work will be design build & submitted separately. bldg fully sprinklerd.
Details
Permit
202508122835
Permit issued
Aug 27, 2025
Final sign-off
Jan 5, 2026

8th/f: t.i. demo of non structural partitions & building new non structural paritions. all new or revised life safety work will be design build & submitted separately. bldg fully sprinklerd.

Open the permit page

$765,000
Aug 11, 2025Completed
final sign-off Jan 2026
535 Mission StGci, Inc11th fl - ti includes demo of non-structural partitions and build back new nonstructural partitions. all new or revised mep. life saftey & sprinklers will be design build & submitted separately (bldg is fully sprinklered)
Details
Permit
202508112735
Permit issued
Aug 27, 2025
Final sign-off
Jan 16, 2026

11th fl - ti includes demo of non-structural partitions and build back new nonstructural partitions. all new or revised mep. life saftey & sprinklers will be design build & submitted separately (bldg is fully sprinklered)

Open the permit page

$63,000
Aug 7, 2025Completed
final sign-off Apr 2026
535 Mission StGci, Inc4th fl, ste 400 ti demo of non-structural partitions and building (n) non-structural partitions (bldg is full sprinklered) meps under separate permit life safety & sprinklers under separate permit submitted separately, not included in cost valuation for this pa.
Details
Permit
202508072540
Permit issued
Sep 12, 2025
Final sign-off
Apr 24, 2026

4th fl, ste 400 ti demo of non-structural partitions and building (n) non-structural partitions (bldg is full sprinklered) meps under separate permit life safety & sprinklers under separate permit submitted separately, not included in cost valuation for this pa.

Open the permit page

$1,400,000
Aug 4, 2025Completed
final sign-off Aug 2025
535 Mission StPioneer Fire Inc.21/fl- ref ti 202506309837- convert (5) uprights to pendents
Details
Permit
202508042196
Permit issued
Aug 5, 2025
Final sign-off
Aug 13, 2025

21/fl- ref ti 202506309837- convert (5) uprights to pendents

Open the permit page

$1,500
Jul 30, 2025Completed
final sign-off Jan 2026
535 Mission StGci, Inc3/f conference center - structural support for operable wall/partition.
Details
Permit
202507301968
Permit issued
Aug 15, 2025
Final sign-off
Jan 15, 2026

3/f conference center - structural support for operable wall/partition.

Open the permit page

Jul 18, 2025Completed
final sign-off Sep 2025
535 Mission StAyoob & Peery Plumbing Co Inc3rd fl: add 41, relocate 24 & change out 23 fire sprinkler per ti. job #25-644 ref pa # 2025-0605-7981
Details
Permit
202507181102
Permit issued
Jul 18, 2025
Final sign-off
Sep 19, 2025

3rd fl: add 41, relocate 24 & change out 23 fire sprinkler per ti. job #25-644 ref pa # 2025-0605-7981

Open the permit page

$45,895
Jul 11, 2025In progress
issued Jul 2025
535 Mission StSiemens Industry, Inc.fire alarm only work for the remodel on 12 flr done under pa#: 202501248998; additions are 33 speaker/strobes.
Details
Permit
202507110597
Permit issued
Jul 11, 2025

fire alarm only work for the remodel on 12 flr done under pa#: 202501248998; additions are 33 speaker/strobes.

Open the permit page

$31,715
Jun 30, 2025Completed
final sign-off Sep 2025
535 Mission StM C S Construction Services21st fl: non structural tenant improvements. (e) doors, partitions, ceilings and devices to remain except where indicated otherwise. no change to existing, restrooms or other core spaces. mep deferred
Details
Permit
202506309837
Permit issued
Jul 8, 2025
Final sign-off
Sep 25, 2025

21st fl: non structural tenant improvements. (e) doors, partitions, ceilings and devices to remain except where indicated otherwise. no change to existing, restrooms or other core spaces. mep deferred

Open the permit page

$146,000
Jun 24, 2025Completed
final sign-off Nov 2025
535 Mission StGci, Inc12th fl - mep for 202501248998
Details
Permit
202506249312
Permit issued
Jul 10, 2025
Final sign-off
Nov 13, 2025

12th fl - mep for 202501248998

Open the permit page

$650,000
Jun 6, 2025In progress
filed Jun 2025, not yet issued
535 Mission Stsuite 300: furniture / workstation layout.
Details
Permit
202506068154

suite 300: furniture / workstation layout.

Open the permit page

$1,500
Jun 5, 2025Completed
final sign-off Jan 2026
535 Mission StGci, Inc3rd fl conference ceneter: ti include demo of non structural partitions & building (n) non structural partitions. all new or revised mep included in this permit. life safety & fire alarm/sprinklers will be design build and submitted separately if needed. assembly area partition is deffered submittal
Details
Permit
202506057981
Permit issued
Jul 10, 2025
Final sign-off
Jan 15, 2026

3rd fl conference ceneter: ti include demo of non structural partitions & building (n) non structural partitions. all new or revised mep included in this permit. life safety & fire alarm/sprinklers will be design build and submitted separately if needed. assembly area partition is deffered submittal

Open the permit page

$987,000
May 20, 2025Completed
final sign-off Jul 2025
535 Mission St12/f: fire sprinkler permit - relocate 57, add 17, and delete 11 sprinklers. ti# 202501248998
Details
Permit
202505206832
Permit issued
May 20, 2025
Final sign-off
Jul 7, 2025

12/f: fire sprinkler permit - relocate 57, add 17, and delete 11 sprinklers. ti# 202501248998

Open the permit page

$21,500
Feb 18, 2025Completed
final sign-off Feb 2025
535 Mission StSiemens Industry, Inc.fire only work to obtain an "as-built" permit to indicate the additon of 1 duct detector for the floor 21st fl. tenant remodel, ref pa# 2024-1002-2156
Details
Permit
202502180453
Permit issued
Feb 18, 2025
Final sign-off
Feb 19, 2025

fire only work to obtain an "as-built" permit to indicate the additon of 1 duct detector for the floor 21st fl. tenant remodel, ref pa# 2024-1002-2156

Open the permit page

$2,679
Jan 24, 2025Completed
final sign-off Nov 2025
535 Mission StGci, Inc12th fl ti includes demo of non structural partitions and build n non str partitions. all mep life safety and sprinlers will be design build and submitted separately. fully sprinklered. restroom work included.
Details
Permit
202501248998
Permit issued
Apr 4, 2025
Final sign-off
Nov 13, 2025

12th fl ti includes demo of non structural partitions and build n non str partitions. all mep life safety and sprinlers will be design build and submitted separately. fully sprinklered. restroom work included.

Open the permit page

$1,273,134
Dec 17, 2024Completed
final sign-off Jan 2025
535 Mission StBilcor Inc21/f-install new call stations w/mushroom button (flush mount)
Details
Permit
202412176962
Permit issued
Dec 19, 2024
Final sign-off
Jan 29, 2025

21/f-install new call stations w/mushroom button (flush mount)

Open the permit page

$2,664
Dec 5, 2024Completed
final sign-off Feb 2025
535 Mission StM C S Construction Services21st fl - deferred electrical & mechanical permit ref 202410022156 mechanical. provide new ductwork & air dist to (e) vavs on 21st nstall 1 new whsp; elecrical new signal devices throughout space. new 2022 t24 compliant lighting & controls
Details
Permit
202412056256
Permit issued
Dec 11, 2024
Final sign-off
Feb 21, 2025

21st fl - deferred electrical & mechanical permit ref 202410022156 mechanical. provide new ductwork & air dist to (e) vavs on 21st nstall 1 new whsp; elecrical new signal devices throughout space. new 2022 t24 compliant lighting & controls

Open the permit page

$325,000
Dec 3, 2024Completed
final sign-off Feb 2025
535 Mission StSiemens Industry, Inc.21st fl - fire only work for the 21 tenant remodel; additions are 26 speaker/strobes and 2 strobes ref pa 202410022156
Details
Permit
202412035980
Permit issued
Dec 3, 2024
Final sign-off
Feb 19, 2025

21st fl - fire only work for the 21 tenant remodel; additions are 26 speaker/strobes and 2 strobes ref pa 202410022156

Open the permit page

$26,230
Nov 22, 2024Completed
final sign-off Dec 2024
535 Mission StPioneer Fire Inc.21st floor. relocate and replace (2) pendents, relocate (33) pendants. general contractor pa ref#: 202410022156
Details
Permit
202411225546
Permit issued
Nov 22, 2024
Final sign-off
Dec 12, 2024

21st floor. relocate and replace (2) pendents, relocate (33) pendants. general contractor pa ref#: 202410022156

Open the permit page

$8,750
Oct 2, 2024Completed
final sign-off Feb 2025
535 Mission StM C S Construction Services21st fl interior tenant improvement. new partitons, doors, ceilings, finishes. no change to restrooms, mep deferred.
Details
Permit
202410022156
Permit issued
Oct 24, 2024
Final sign-off
Feb 21, 2025

21st fl interior tenant improvement. new partitons, doors, ceilings, finishes. no change to restrooms, mep deferred.

Open the permit page

$1,500,000
Sep 11, 2024In progress
issued Sep 2024
535 Mission StBilcor Incinstall (4) call stations. two way infrastructure permit #202102044085. 24/f: arch ti# 202403288831. 25/f: arch ti# 202403208246. fls permit# 202409060206.
Details
Permit
202409110507
Permit issued
Sep 11, 2024

install (4) call stations. two way infrastructure permit #202102044085. 24/f: arch ti# 202403288831. 25/f: arch ti# 202403208246. fls permit# 202409060206.

Open the permit page

$2,664
Sep 6, 2024Completed
final sign-off Oct 2024
535 Mission StSiemens Industry, Inc.fire only work for the floor 24 & 25 remodels icluding an interconnecting stair additions are 2 smoke detectors, 1 duct detector, 1 module, 3 speakers, 14 speaker/strobes and 5 strobes 6 smoke detectors and 5 speakers (strobes are relocated ref permit app # 202403288831 and 202404220486
Details
Permit
202409060206
Permit issued
Sep 6, 2024
Final sign-off
Oct 16, 2024

fire only work for the floor 24 & 25 remodels icluding an interconnecting stair additions are 2 smoke detectors, 1 duct detector, 1 module, 3 speakers, 14 speaker/strobes and 5 strobes 6 smoke detectors and 5 speakers (strobes are relocated ref permit app # 202403288831 and 202404220486

Open the permit page

$27,165
Jun 12, 2024In progress
issued Jul 2024
535 Mission StSkyline Construction25th floor- revison 202404220473. no changes to physical locations for (e) fire smoke dampers. no (n) fire smoke dampers. only changes for function and sequence as listed in smoke control narrative. ref pa# 202404220486.
Details
Permit
202406124288
Permit issued
Jul 9, 2024

25th floor- revison 202404220473. no changes to physical locations for (e) fire smoke dampers. no (n) fire smoke dampers. only changes for function and sequence as listed in smoke control narrative. ref pa# 202404220486.

Open the permit page

Jun 12, 2024In progress
issued Jul 2024
535 Mission StSkyline Construction24th floor- revison 202405011154. no changes to physical locations for (e) fire smoke dampers. no (n) fire smoke dampers. only changes for function and sequence as listed in smoke control narrative. ref pa# 202404220486.
Details
Permit
202406124312
Permit issued
Jul 9, 2024

24th floor- revison 202405011154. no changes to physical locations for (e) fire smoke dampers. no (n) fire smoke dampers. only changes for function and sequence as listed in smoke control narrative. ref pa# 202404220486.

Open the permit page

May 3, 2024Completed
final sign-off Sep 2024
535 Mission St24th fl - fire sprinkler permit relocate 32, add 5 and delete 4 pendent sprinklers. ref pa 202403288831
Details
Permit
202405031337
Permit issued
May 3, 2024
Final sign-off
Sep 12, 2024

24th fl - fire sprinkler permit relocate 32, add 5 and delete 4 pendent sprinklers. ref pa 202403288831

Open the permit page

$10,500
May 1, 2024Completed
final sign-off Jan 2025
535 Mission StSkyline Constructionref 202403288831- office ti for mep trade work to include hvac,light fixtures, and controls power and signal devices.
Details
Permit
202405011154
Permit issued
May 21, 2024
Final sign-off
Jan 22, 2025

ref 202403288831- office ti for mep trade work to include hvac,light fixtures, and controls power and signal devices.

Open the permit page

$195,000
Apr 25, 2024Completed
final sign-off Dec 2024
535 Mission StCity Mechanical Increvision to pa#202109027705 and 2021706219962 to revise #2 for new duct layout on level 6,9,20,21,& 24.
Details
Permit
202404250729
Permit issued
May 21, 2024
Final sign-off
Dec 2, 2024

revision to pa#202109027705 and 2021706219962 to revise #2 for new duct layout on level 6,9,20,21,& 24.

Open the permit page

Apr 23, 2024Completed
final sign-off May 2024
535 Mission St25/f: fire sprinkler - relocate 31, add 6, and delete 4 sprinkler. ref ti permit 202403208246
Details
Permit
202404230565
Permit issued
Apr 23, 2024
Final sign-off
May 31, 2024

25/f: fire sprinkler - relocate 31, add 6, and delete 4 sprinkler. ref ti permit 202403208246

Open the permit page

$10,500
Apr 22, 2024Completed
final sign-off Jan 2025
535 Mission StSkyline Constructioninstallation of non egress inter connecting stairway between 24th and 25th fl. revision to 202403208246. defer mep and life safety system under sep permit
Details
Permit
202404220486
Permit issued
May 22, 2024
Final sign-off
Jan 29, 2025

installation of non egress inter connecting stairway between 24th and 25th fl. revision to 202403208246. defer mep and life safety system under sep permit

Open the permit page

$200,000
Apr 22, 2024Completed
final sign-off Jan 2025
535 Mission StSkyline Construction25th/f: ref ti office 202403208246 for mep trade work.
Details
Permit
202404220473
Permit issued
Apr 25, 2024
Final sign-off
Jan 29, 2025

25th/f: ref ti office 202403208246 for mep trade work.

Open the permit page

$200,000
Mar 28, 2024Completed
final sign-off Jan 2025
535 Mission StSkyline Construction24th fl: interior tenant improvement of existing office. minor demolition of some existing walls and ceilings. mep deferred for separate permit.
Details
Permit
202403288831
Permit issued
Apr 22, 2024
Final sign-off
Jan 22, 2025

24th fl: interior tenant improvement of existing office. minor demolition of some existing walls and ceilings. mep deferred for separate permit.

Open the permit page

$1,500,000
Mar 20, 2024Completed
final sign-off Jan 2025
535 Mission StSkyline Construction25th fl - interior tenant improvement of existing office; demolition of existing walls and ceilings (minor demo); deferred mep on separate permit
Details
Permit
202403208246
Permit issued
Apr 1, 2024
Final sign-off
Jan 29, 2025

25th fl - interior tenant improvement of existing office; demolition of existing walls and ceilings (minor demo); deferred mep on separate permit

Open the permit page

$1,500,000
Jan 5, 2024Completed
final sign-off Apr 2024
535 Mission StSiemens Industry, Inc.11th fl - fire only work for the "spec suite" remodel. additions are 25 speaker/strobes and 4 strobes. ref pa 202309015772
Details
Permit
202401053483
Permit issued
Jan 5, 2024
Final sign-off
Apr 19, 2024

11th fl - fire only work for the "spec suite" remodel. additions are 25 speaker/strobes and 4 strobes. ref pa 202309015772

Open the permit page

$26,510
Dec 12, 2023Completed
final sign-off Apr 2024
535 Mission StGci, Inc11/f: mechanical- demo existing duct & hvac equipment, install new duct & hvac, install insulation, air balance, controls. re pa# 202309015772.
Details
Permit
202312122345
Permit issued
Dec 21, 2023
Final sign-off
Apr 22, 2024

11/f: mechanical- demo existing duct & hvac equipment, install new duct & hvac, install insulation, air balance, controls. re pa# 202309015772.

Open the permit page

$126,000
Nov 30, 2023Completed
final sign-off Apr 2024
535 Mission StGci, Inc11th fl - electrical power, lighting & signal ref pa 2023-0901-5772
Details
Permit
202311301660
Permit issued
Jan 3, 2024
Final sign-off
Apr 22, 2024

11th fl - electrical power, lighting & signal ref pa 2023-0901-5772

Open the permit page

$320,000
Oct 19, 2023Completed
final sign-off Jan 2024
535 Mission StPioneer Fire Inc.11/f: relocate 35 pendents, add 4 pendents. convert 6 uprights to pendents, relocate 23 uprights. remove 6 pendents gc 202309015772
Details
Permit
202310198985
Permit issued
Oct 19, 2023
Final sign-off
Jan 24, 2024

11/f: relocate 35 pendents, add 4 pendents. convert 6 uprights to pendents, relocate 23 uprights. remove 6 pendents gc 202309015772

Open the permit page

$9,600
Sep 1, 2023Completed
final sign-off May 2024
535 Mission StGci, Inc11th fl: t.i includes the demo of non-str partitions and building new non-structural partitions. all new or revised hvac electrical, plumbing and life safety/prinkler work will be design build and submitted for permit separately. building is fully sprinklered.
Details
Permit
202309015772
Permit issued
Oct 12, 2023
Final sign-off
May 3, 2024

11th fl: t.i includes the demo of non-str partitions and building new non-structural partitions. all new or revised hvac electrical, plumbing and life safety/prinkler work will be design build and submitted for permit separately. building is fully sprinklered.

Open the permit page

$1,273,134
May 16, 2023Completed
final sign-off May 2023
535 Mission StGolden Gate Fire Protection Incsuite 2250: f/s, relocate (5) pendants, (4) uprights. ref t.i. bpa#202303103421
Details
Permit
202305167835
Permit issued
May 17, 2023
Final sign-off
May 30, 2023

suite 2250: f/s, relocate (5) pendants, (4) uprights. ref t.i. bpa#202303103421

Open the permit page

$5,580
May 10, 2023Completed
final sign-off Aug 2023
535 Mission StM C S Construction Services22/f suite 2250: deferred mechanical and electrical. ref permit 202303103421
Details
Permit
202305107475
Permit issued
May 11, 2023
Final sign-off
Aug 23, 2023

22/f suite 2250: deferred mechanical and electrical. ref permit 202303103421

Open the permit page

$120,000
Apr 21, 2023Never finaled
issued Apr 2023, no final
535 Mission StSiemens Industry, Inc.fire only work for the suite 2250 remodel on floor 22; 7 speaker/strobes are added, as welll as teh relocation of 1 smoke detector and module, ref#202303103421
Details
Permit
202304216221
Permit issued
Apr 21, 2023

fire only work for the suite 2250 remodel on floor 22; 7 speaker/strobes are added, as welll as teh relocation of 1 smoke detector and module, ref#202303103421

Open the permit page

$7,447
Mar 10, 2023Completed
final sign-off Aug 2023
535 Mission StM C S Construction Services22nd fl, ste 2250 interior ti including non structural demo. non structural (n) partitions, doors, millwork and finishes
Details
Permit
202303103421
Permit issued
Apr 3, 2023
Final sign-off
Aug 23, 2023

22nd fl, ste 2250 interior ti including non structural demo. non structural (n) partitions, doors, millwork and finishes

Open the permit page

$592,524
Jan 17, 2023Completed
final sign-off Feb 2025
535 Mission StM C S Construction Servicesdeferred electrical + mechanical. reference permit # 202210043657.
Details
Permit
202301170216
Permit issued
Jan 17, 2023
Final sign-off
Feb 27, 2025

deferred electrical + mechanical. reference permit # 202210043657.

Open the permit page

$28,000
Jan 5, 2023Completed
final sign-off Jan 2023
535 Mission StGolden Gate Fire Protection Incste 2200 - fire sprinklers; relocate 10 pendents. ref pa 2022-1004-3657
Details
Permit
202301059699
Permit issued
Jan 5, 2023
Final sign-off
Jan 13, 2023

ste 2200 - fire sprinklers; relocate 10 pendents. ref pa 2022-1004-3657

Open the permit page

$5,250
Oct 4, 2022Completed
final sign-off Feb 2025
535 Mission StM C S Construction Servicesnew non structural partitions, glass, doors, millwork and finishes. mep, l/s sprinklers deferred. no change in occupancy, use or area.
Details
Permit
202210043657
Permit issued
Nov 16, 2022
Final sign-off
Feb 27, 2025

new non structural partitions, glass, doors, millwork and finishes. mep, l/s sprinklers deferred. no change in occupancy, use or area.

Open the permit page

$110,000
Jul 29, 2022Completed
final sign-off Nov 2024
535 Mission StCa United Mechanical, Incinstall 2 new filtration system for(2) existing cooling towers on the roof.
Details
Permit
202207299581
Permit issued
Aug 26, 2022
Final sign-off
Nov 27, 2024

install 2 new filtration system for(2) existing cooling towers on the roof.

Open the permit page

$80,000
Dec 22, 2021Completed
final sign-off Mar 2022
535 Mission StSiemens Industry, Inc.fire-only. add 25 smoke detectors and 96 modules on flrs 2 thru 26 for fsd installations in new it closets. ref pa 201706219962 and 202109027705.
Details
Permit
202112224937
Permit issued
Feb 25, 2022
Final sign-off
Mar 14, 2022

fire-only. add 25 smoke detectors and 96 modules on flrs 2 thru 26 for fsd installations in new it closets. ref pa 201706219962 and 202109027705.

Open the permit page

$54,275
Oct 28, 2021Completed
final sign-off Nov 2021
535 Mission StSiemens Industry, Inc.fire only work for the partial area remodel on 24th floor. addition sare 3 speaker / strobes as well as the relocation of a door release module (to 25th floor). ref pa# 202109108195.
Details
Permit
202110281320
Permit issued
Oct 28, 2021
Final sign-off
Nov 29, 2021

fire only work for the partial area remodel on 24th floor. addition sare 3 speaker / strobes as well as the relocation of a door release module (to 25th floor). ref pa# 202109108195.

Open the permit page

$1,905
Oct 18, 2021Completed
final sign-off Oct 2021
535 Mission Stfire sprinkler permit. relocate 6 & delete 1 pendent sprinkler. t.i. #202109108195
Details
Permit
202110180607
Permit issued
Oct 18, 2021
Final sign-off
Oct 20, 2021

fire sprinkler permit. relocate 6 & delete 1 pendent sprinkler. t.i. #202109108195

Open the permit page

$1,500
Sep 10, 2021Completed
final sign-off Dec 2021
535 Mission StSkyline Construction24th fl: ti add two (2) new conference rooms and reception area. demolition of non-structural partitions. new non-structural partitions /glazing new lighting and ceiling.
Details
Permit
202109108195
Permit issued
Sep 28, 2021
Final sign-off
Dec 22, 2021

24th fl: ti add two (2) new conference rooms and reception area. demolition of non-structural partitions. new non-structural partitions /glazing new lighting and ceiling.

Open the permit page

$165,000
Sep 2, 2021Completed
final sign-off Dec 2024
535 Mission StCity Mechanical Increcommencement & completion of work approved under prevous permit application 201706219962.
Details
Permit
202109027705
Permit issued
Sep 2, 2021
Final sign-off
Dec 2, 2024

recommencement & completion of work approved under prevous permit application 201706219962.

Open the permit page

$10,000
Jun 29, 2021Completed
final sign-off Aug 2021
535 Mission StBilcor Inc28/f: fire life safety: install (2) new call stations rath 2400 - 808nspm w/ mushroom button .
Details
Permit
202106293418
Permit issued
Jun 29, 2021
Final sign-off
Aug 9, 2021

28/f: fire life safety: install (2) new call stations rath 2400 - 808nspm w/ mushroom button .

Open the permit page

$1,320
Feb 4, 2021Completed
final sign-off Apr 2021
535 Mission StBilcor Incfire life safety: installation of new two-way emergency communication. install - (1) command center, (1) base station, (1) group of distribution modules, (1) sub-base station, (1) command center system supervisor, (1) ups back up, (5) back up battery modules, (1) relay control card, (1) remote tou..
Details
Permit
202102044085
Permit issued
Mar 9, 2021
Final sign-off
Apr 19, 2021

fire life safety: installation of new two-way emergency communication. install - (1) command center, (1) base station, (1) group of distribution modules, (1) sub-base station, (1) command center system supervisor, (1) ups back up, (5) back up battery modules, (1) relay control card, (1) remote tou..

Open the permit page

$9,900
Feb 12, 2020Never finaled
issued Feb 2020, no final
535 Mission StTracy Sign Incinstall (6) window non-electric vinly sign "one medical".
Details
Permit
202002124249
Permit issued
Feb 13, 2020

install (6) window non-electric vinly sign "one medical".

Open the permit page

$1,500
Feb 12, 2020Never finaled
issued Feb 2020, no final
535 Mission StTracy Sign Incinstall 1 non electric projecting double faced blade sign "one medical"
Details
Permit
202002124252
Permit issued
Feb 13, 2020

install 1 non electric projecting double faced blade sign "one medical"

Open the permit page

$1,800
Feb 12, 2020Never finaled
issued Feb 2020, no final
535 Mission StTracy Sign Incinstall interior non-electric sign "one medical"
Details
Permit
202002124250
Permit issued
Feb 13, 2020

install interior non-electric sign "one medical"

Open the permit page

$1,800
Feb 12, 2020Never finaled
issued Feb 2020, no final
535 Mission StTracy Sign Incinstall (1) non-electric vinyl sign "one medical".
Details
Permit
202002124247
Permit issued
Feb 13, 2020

install (1) non-electric vinyl sign "one medical".

Open the permit page

$1,500
Dec 6, 2019Completed
final sign-off Apr 2020
535 Mission StSiemens Industry, Inc.7th fl - fire alarm work for the restroom additions - 1 speaker/strobe is added. ref pa 2019-1003-3430
Details
Permit
201912068821
Permit issued
Dec 6, 2019
Final sign-off
Apr 9, 2020

7th fl - fire alarm work for the restroom additions - 1 speaker/strobe is added. ref pa 2019-1003-3430

Open the permit page

$635
Nov 18, 2019Expired or cancelled
cancelled Jan 2020
535 Mission StGolden Gate Fire Protection Inc7th flr fire sprniklers. ref pa# 201910033430; fire sprinklers, relocate (2) cancelled pendents in the zillow cafe area & relocate 1 cancelled pendent in the restroom
Details
Permit
201911187502
Permit issued
Nov 18, 2019

7th flr fire sprniklers. ref pa# 201910033430; fire sprinklers, relocate (2) cancelled pendents in the zillow cafe area & relocate 1 cancelled pendent in the restroom

Open the permit page

$1,500
Oct 3, 2019Completed
final sign-off Oct 2020
535 Mission StPeacock Constructionalteration of clean up room sink to an all gender restroom. modification to e coffee bar to accomodate new equipment and seating
Details
Permit
201910033430
Permit issued
Oct 10, 2019
Final sign-off
Oct 14, 2020

alteration of clean up room sink to an all gender restroom. modification to e coffee bar to accomodate new equipment and seating

Open the permit page

$218,000
Jun 26, 2019Completed
final sign-off Dec 2024
535 Mission StCity Mechanical Incverizon das telecom room hvac. improvements for 2, 3, 4, 5, 7, 8 10, 11, 12, 14, 15, 16, 18, 19, 22, 23, 25 & 26 ventilation system installationfor data closets
Details
Permit
201906264424
Permit issued
Jul 9, 2019
Final sign-off
Dec 2, 2024

verizon das telecom room hvac. improvements for 2, 3, 4, 5, 7, 8 10, 11, 12, 14, 15, 16, 18, 19, 22, 23, 25 & 26 ventilation system installationfor data closets

Open the permit page

$20,000
Jun 13, 2018Completed
final sign-off Aug 2018
535 Mission StDpr Construction14th fl change to interior fit-out (e)busines space - relocate, security, door the work includes, non-load bearing partitions, refinish soffits & low voltage for security door hardware. cbc 1010.1.9.9. no changes to existing core or structure. floor is single tenant occupied- upgrading two way com.
Details
Permit
201806131765
Permit issued
Jun 19, 2018
Final sign-off
Aug 30, 2018

14th fl change to interior fit-out (e)busines space - relocate, security, door the work includes, non-load bearing partitions, refinish soffits & low voltage for security door hardware. cbc 1010.1.9.9. no changes to existing core or structure. floor is single tenant occupied- upgrading two way com.

Open the permit page

$32,000
Apr 25, 2018Completed
final sign-off Sep 2019
535 Mission StNovo Construction Inc26th floor: revision to app#201712277475 to reconfigure restroom stalls in mens and women's.
Details
Permit
201804257361
Permit issued
Apr 26, 2018
Final sign-off
Sep 27, 2019

26th floor: revision to app#201712277475 to reconfigure restroom stalls in mens and women's.

Open the permit page

Mar 2, 2018Completed
final sign-off Mar 2018
535 Mission StSiemens Industry, Inc.fire alarm work for the "matrix partners" remodel on floor 26; additions are 2 speakers and 4 speaker/strobes. ref pa 2017-1227-7475
Details
Permit
201803022663
Permit issued
Mar 5, 2018
Final sign-off
Mar 23, 2018

fire alarm work for the "matrix partners" remodel on floor 26; additions are 2 speakers and 4 speaker/strobes. ref pa 2017-1227-7475

Open the permit page

$3,600
Jan 29, 2018Completed
final sign-off Mar 2018
535 Mission St26th floor: fire sprinkler permit - relocate 17, add 3 and delete 6 pendent sprinkler on the 26th flr, ti 201712277475 maher na
Details
Permit
201801299777
Permit issued
Jan 29, 2018
Final sign-off
Mar 19, 2018

26th floor: fire sprinkler permit - relocate 17, add 3 and delete 6 pendent sprinkler on the 26th flr, ti 201712277475 maher na

Open the permit page

$6,000
Jan 8, 2018Completed
final sign-off Nov 2019
535 Mission StNovo Construction Incmechanical and electrical work for ti ref pa 2017-1227-7475
Details
Permit
201801088014
Permit issued
Jan 24, 2018
Final sign-off
Nov 13, 2019

mechanical and electrical work for ti ref pa 2017-1227-7475

Open the permit page

$60,000
Dec 27, 2017Never finaled
issued Jan 2018, no final
535 Mission StNovo Construction Inc26th ti - includes new partitions, ceilings, finishes. mep under sep permit
Details
Permit
201712277475
Permit issued
Jan 2, 2018

26th ti - includes new partitions, ceilings, finishes. mep under sep permit

Open the permit page

$375,600
Sep 11, 2017Completed
final sign-off Dec 2017
535 Mission StSiemens Industry, Inc.as built permit for the fire alarm devices added to both floors 9 and 10 for "zillow" remodels. the added devices - 2 smoke detectors and 2 duct detectors, were tested by the sffd but the inspectro requested this as built permit for final approval. ref pa 2017-0419-4297, 9th fl
Details
Permit
201709117588
Permit issued
Sep 11, 2017
Final sign-off
Dec 4, 2017

as built permit for the fire alarm devices added to both floors 9 and 10 for "zillow" remodels. the added devices - 2 smoke detectors and 2 duct detectors, were tested by the sffd but the inspectro requested this as built permit for final approval. ref pa 2017-0419-4297, 9th fl

Open the permit page

$2,440
Jun 21, 2017Expired or cancelled
expired Dec 2024
535 Mission StCity Mechanical Incfloor 6,9,17,20,21,24- hvac improvements, installation of mechanical vantilation system for data closets.
Details
Permit
201706219962
Permit issued
Jul 18, 2017

floor 6,9,17,20,21,24- hvac improvements, installation of mechanical vantilation system for data closets.

Open the permit page

$20,000
Jun 16, 2017Never finaled
issued Jun 2017, no final
535 Mission StThomas Swan Sign Co Inc8 evacuation plan maps for 9th and 10th floors
Details
Permit
201706169545
Permit issued
Jun 16, 2017

8 evacuation plan maps for 9th and 10th floors

Open the permit page

$3,200
Jun 2, 2017Never finaled
issued Jun 2017, no final
535 Mission StSiemens Industry, Inc.fire alarm work for the "zillow" remodels on floors 9 and 10; additions are 5 smoke detectors, 2 duct detectors, 12 relay modules, 2 strobe power supplies, 4 speakers, and 59 speaker/strobes. ref pa 2017-0419-4297 (10th floor) and 2017-0419-4298 (9th floor)
Details
Permit
201706028208
Permit issued
Jun 2, 2017

fire alarm work for the "zillow" remodels on floors 9 and 10; additions are 5 smoke detectors, 2 duct detectors, 12 relay modules, 2 strobe power supplies, 4 speakers, and 59 speaker/strobes. ref pa 2017-0419-4297 (10th floor) and 2017-0419-4298 (9th floor)

Open the permit page

$38,440
May 30, 2017Completed
final sign-off Oct 2017
535 Mission St10th flr: fire sprinkler - relocate 25 add 4 upright sprinklers. install 11 new pendent sprinklers. ti 201704194298
Details
Permit
201705307853
Permit issued
May 30, 2017
Final sign-off
Oct 11, 2017

10th flr: fire sprinkler - relocate 25 add 4 upright sprinklers. install 11 new pendent sprinklers. ti 201704194298

Open the permit page

$12,000
May 30, 2017Completed
final sign-off Oct 2017
535 Mission St9th flr: fire sprinkler - relocate 27 add 2 upright sprinklers. install 11 new pendent sprinklers. ti 201704194298
Details
Permit
201705307850
Permit issued
May 30, 2017
Final sign-off
Oct 11, 2017

9th flr: fire sprinkler - relocate 27 add 2 upright sprinklers. install 11 new pendent sprinklers. ti 201704194298

Open the permit page

$12,000
May 12, 2017Completed
final sign-off Dec 2017
535 Mission StSkyline Constructionmechanical work for ti on 9th & 10th floor. ref pa 2017-0419-4298 & 2017-0419-4297. fire alarm for fsds deferred.
Details
Permit
201705126458
Permit issued
May 15, 2017
Final sign-off
Dec 20, 2017

mechanical work for ti on 9th & 10th floor. ref pa 2017-0419-4298 & 2017-0419-4297. fire alarm for fsds deferred.

Open the permit page

$275,000
May 12, 2017Completed
final sign-off Dec 2017
535 Mission StSkyline Constructionelectrical work for ti on 9th & 10th floor. ref pa 2017-0419-4298 & 2017-0419-4297
Details
Permit
201705126460
Permit issued
May 23, 2017
Final sign-off
Dec 20, 2017

electrical work for ti on 9th & 10th floor. ref pa 2017-0419-4298 & 2017-0419-4297

Open the permit page

$150,000
Apr 19, 2017Completed
final sign-off Feb 2018
535 Mission StSkyline Constructioninterior tenant improvement consistency of non structural interior partitions, ceiling, millwork and finishes. mep under sep permit
Details
Permit
201704194297
Permit issued
May 1, 2017
Final sign-off
Feb 23, 2018

interior tenant improvement consistency of non structural interior partitions, ceiling, millwork and finishes. mep under sep permit

Open the permit page

$500,000
Apr 19, 2017Completed
final sign-off Feb 2018
535 Mission StSkyline Constructioninterior tenant improvement consistency of constructural interior partitions, ceiling, millwork, and finishes. mep under sep permit
Details
Permit
201704194298
Permit issued
May 1, 2017
Final sign-off
Feb 23, 2018

interior tenant improvement consistency of constructural interior partitions, ceiling, millwork, and finishes. mep under sep permit

Open the permit page

$500,000
Oct 4, 2016Completed
final sign-off Dec 2016
535 Mission StSkyline Constructionrevision to pa 2016-0119-7336 to remove com closet room from scope and revise copy room. ref pa 2016-0119-7336
Details
Permit
201610049491
Permit issued
Oct 18, 2016
Final sign-off
Dec 22, 2016

revision to pa 2016-0119-7336 to remove com closet room from scope and revise copy room. ref pa 2016-0119-7336

Open the permit page

Sep 19, 2016Never finaled
issued Sep 2016, no final
535 Mission StNovo Construction Inctenant improvement consisting of replacing doos, providing new rated glazing and finishes at the vestibule on floors 3-8
Details
Permit
201609198056
Permit issued
Sep 21, 2016

tenant improvement consisting of replacing doos, providing new rated glazing and finishes at the vestibule on floors 3-8

Open the permit page

$15,000
Aug 26, 2016Completed
final sign-off Oct 2016
535 Mission StC B F Incpartial scope - office tenat retrofit - lighting, power, and signal wiring, lighting and receptacle controls. ref pa 2016-0622-0596
Details
Permit
201608266070
Permit issued
Sep 1, 2016
Final sign-off
Oct 20, 2016

partial scope - office tenat retrofit - lighting, power, and signal wiring, lighting and receptacle controls. ref pa 2016-0622-0596

Open the permit page

$30,000
Aug 3, 2016Completed
final sign-off Jun 2017
535 Mission StArrow Sign Companyinstall (1) projecting double-faced sign
Details
Permit
201608034054
Permit issued
Sep 22, 2016
Final sign-off
Jun 16, 2017

install (1) projecting double-faced sign

Open the permit page

$8,000
Jul 6, 2016Never finaled
issued Jul 2016, no final
535 Mission StSiemens Industry, Inc.24th flr: fire alarm - add 1 smoke detector and 2 relay modules. as built for 2016.0322.2798. reference ti 2016.0119.7336
Details
Permit
201607061616
Permit issued
Jul 7, 2016

24th flr: fire alarm - add 1 smoke detector and 2 relay modules. as built for 2016.0322.2798. reference ti 2016.0119.7336

Open the permit page

$1,630
Jun 22, 2016Completed
final sign-off Oct 2016
535 Mission StField Construction Inc.3rd floor - tenant interior improvement consisting of non-structural ceiling,mechanical, power/signal and finishes.fire like safety /mep seperate permit
Details
Permit
201606220596
Permit issued
Jun 24, 2016
Final sign-off
Oct 20, 2016

3rd floor - tenant interior improvement consisting of non-structural ceiling,mechanical, power/signal and finishes.fire like safety /mep seperate permit

Open the permit page

$50,000
Jun 20, 2016Completed
final sign-off Jul 2016
535 Mission StPribuss Engineering Incfire sprinkler ti relocate 5 heads
Details
Permit
201606200405
Permit issued
Jul 11, 2016
Final sign-off
Jul 19, 2016

fire sprinkler ti relocate 5 heads

Open the permit page

$2,576
Apr 12, 2016Never finaled
issued Jul 2016, no final
535 Mission StCommunication Technology Services Llcverizon: garage level -install an indoor distributed antenna system. to include minor equipment associated with system.
Details
Permit
201604124539
Permit issued
Jul 20, 2016

verizon: garage level -install an indoor distributed antenna system. to include minor equipment associated with system.

Open the permit page

$15,000
Mar 29, 2016Completed
final sign-off May 2016
535 Mission StSiemens Industry, Inc.fire alarm work for the "lippincott" ti remodel on floor 23; additions are 2 modules, 1 speaker and 16 speaker strobes. ref pa 2015-1105-1804.
Details
Permit
201603293269
Permit issued
Mar 29, 2016
Final sign-off
May 10, 2016

fire alarm work for the "lippincott" ti remodel on floor 23; additions are 2 modules, 1 speaker and 16 speaker strobes. ref pa 2015-1105-1804.

Open the permit page

$9,500
Mar 22, 2016Completed
final sign-off Sep 2016
535 Mission StSiemens Industry, Inc.fire alarm work for the shearm and stearling ti remodel on floor 24. additions are 2 smoke detectors, 2 duct detectors, 5 modules, 1 strobe power supply, 10 speakers, 17 speaker/strobes
Details
Permit
201603222798
Permit issued
Mar 23, 2016
Final sign-off
Sep 13, 2016

fire alarm work for the shearm and stearling ti remodel on floor 24. additions are 2 smoke detectors, 2 duct detectors, 5 modules, 1 strobe power supply, 10 speakers, 17 speaker/strobes

Open the permit page

$20,400
Mar 22, 2016Completed
final sign-off Sep 2016
535 Mission StSiemens Industry, Inc.fire alarm work for shearman and sterling ti remodel on floor 25. additions are 3 smoke detectors, 2 duct detectors, 5 modules, 1 strobe power supply, 6 speakers, 19 speaker/strobes
Details
Permit
201603222797
Permit issued
Mar 23, 2016
Final sign-off
Sep 13, 2016

fire alarm work for shearman and sterling ti remodel on floor 25. additions are 3 smoke detectors, 2 duct detectors, 5 modules, 1 strobe power supply, 6 speakers, 19 speaker/strobes

Open the permit page

$20,000
Mar 21, 2016Completed
final sign-off Apr 2016
535 Mission StSiemens Industry, Inc.fire alarm work for the "one medical group: ti remodel on floor 1; additions are 1 duct detector, 4 modules, 15 speaker/strobes, and 1 strobe.
Details
Permit
201603212527
Permit issued
Mar 21, 2016
Final sign-off
Apr 19, 2016

fire alarm work for the "one medical group: ti remodel on floor 1; additions are 1 duct detector, 4 modules, 15 speaker/strobes, and 1 strobe.

Open the permit page

$10,600
Mar 1, 2016Never finaled
issued Apr 2016, no final
535 Mission StPeacock Constructionrevise 1 hr rated partition separating reception area 2300 and adjacent office area to east to be non rated per dbi inspector kevin mchugh - not needed. refer to existing pa 2015-1105-1804
Details
Permit
201603010850
Permit issued
Apr 27, 2016

revise 1 hr rated partition separating reception area 2300 and adjacent office area to east to be non rated per dbi inspector kevin mchugh - not needed. refer to existing pa 2015-1105-1804

Open the permit page

Feb 29, 2016Never finaled
issued Mar 2016, no final
535 Mission StViking Sign Installationsinstall projecting electric double faced sign
Details
Permit
201602290695
Permit issued
Mar 2, 2016

install projecting electric double faced sign

Open the permit page

$5,000
Feb 26, 2016Never finaled
issued Feb 2016, no final
535 Mission St24th & 25th floor fire sprinkler permit relocate 175, add 27, delete 6 pendent sprnklers and relocate 1, delete 18 uprigh sprinklers. ref pa 2015-1018-1035
Details
Permit
201602260612
Permit issued
Feb 26, 2016

24th & 25th floor fire sprinkler permit relocate 175, add 27, delete 6 pendent sprnklers and relocate 1, delete 18 uprigh sprinklers. ref pa 2015-1018-1035

Open the permit page

$40,000
Feb 23, 2016Completed
final sign-off Mar 2016
535 Mission StPribuss Engineering Incfire sprinker ti under 201601116811. relocate/change 24 heads, add 9, total 33- plug 7 heads- using flex heads-
Details
Permit
201602230294
Permit issued
Feb 23, 2016
Final sign-off
Mar 28, 2016

fire sprinker ti under 201601116811. relocate/change 24 heads, add 9, total 33- plug 7 heads- using flex heads-

Open the permit page

$16,980
Feb 12, 2016Completed
final sign-off Feb 2016
535 Mission StSiemens Industry, Inc.fire alarm revisions to acquire an "as-built" permit for the "corridor/spec suite" ti remodel on floor 23; additions were 1 duct detector and relay module, as well as the deletion of 1 smoke detector. ref pa 2015-1117-2800.
Details
Permit
201602129456
Permit issued
Feb 12, 2016
Final sign-off
Feb 19, 2016

fire alarm revisions to acquire an "as-built" permit for the "corridor/spec suite" ti remodel on floor 23; additions were 1 duct detector and relay module, as well as the deletion of 1 smoke detector. ref pa 2015-1117-2800.

Open the permit page

$500
Feb 11, 2016Completed
final sign-off Mar 2016
535 Mission StGolden Gate Fire Protection Inc23/f: fire sprinkler only, ref pa 2015-1117-2800, relocate 17 pendents; add 7 lpendents, relocate 42 uprights, add 1 plug off 16 pendents, total 67 heads
Details
Permit
201602119333
Permit issued
Feb 11, 2016
Final sign-off
Mar 24, 2016

23/f: fire sprinkler only, ref pa 2015-1117-2800, relocate 17 pendents; add 7 lpendents, relocate 42 uprights, add 1 plug off 16 pendents, total 67 heads

Open the permit page

$33,500
Feb 1, 2016Completed
final sign-off Dec 2016
535 Mission StSkyline Constructionflrs: 24/25: mechanical and plumbing work for tenant improvement on the 24th & 25th flrs: ref. app. # 201601197336
Details
Permit
201602018455
Permit issued
Feb 10, 2016
Final sign-off
Dec 21, 2016

flrs: 24/25: mechanical and plumbing work for tenant improvement on the 24th & 25th flrs: ref. app. # 201601197336

Open the permit page

$25,000
Feb 1, 2016Completed
final sign-off Dec 2016
535 Mission StSkyline Constructionflrs: 24 & 25: lighting/electrical work for tenant improvement (ref. 201601197336); mechanical under separate permit.
Details
Permit
201602018454
Permit issued
Feb 5, 2016
Final sign-off
Dec 21, 2016

flrs: 24 & 25: lighting/electrical work for tenant improvement (ref. 201601197336); mechanical under separate permit.

Open the permit page

$25,000
Jan 19, 2016Completed
final sign-off Dec 2016
535 Mission StSkyline Construction24th and 25th floor: full floor office t.i. including non-bearing partitions, ceilings and finishes. mep & life safety deferred.
Details
Permit
201601197336
Permit issued
Jan 26, 2016
Final sign-off
Dec 19, 2016

24th and 25th floor: full floor office t.i. including non-bearing partitions, ceilings and finishes. mep & life safety deferred.

Open the permit page

$1,000,000
Jan 13, 2016Completed
final sign-off Feb 2016
535 Mission StSiemens Industry, Inc.fire alarm work for corridor spec suite ti remodel on floor 23, additions are 7 smoke detectors, 7 duct detectors, 9 modules, 1 strobe power supply, 11 speaker/strobe, 2 speakers
Details
Permit
201601137041
Permit issued
Jan 14, 2016
Final sign-off
Feb 19, 2016

fire alarm work for corridor spec suite ti remodel on floor 23, additions are 7 smoke detectors, 7 duct detectors, 9 modules, 1 strobe power supply, 11 speaker/strobe, 2 speakers

Open the permit page

$16,900
Jan 13, 2016Completed
final sign-off Feb 2016
535 Mission StSiemens Industry, Inc.fire alarm work for matrix partners phase 2 ti remodel on floor 26. addition of 3 smoke detectors, 1 duct detector, 1 module, 8 speaker/strobes. ref app#201510281035
Details
Permit
201601137040
Permit issued
Jan 14, 2016
Final sign-off
Feb 16, 2016

fire alarm work for matrix partners phase 2 ti remodel on floor 26. addition of 3 smoke detectors, 1 duct detector, 1 module, 8 speaker/strobes. ref app#201510281035

Open the permit page

$6,900
Jan 11, 2016Completed
final sign-off Sep 2016
535 Mission StSwinerton Buildersnew partition, suspended ceiling, fiishes, restrooms, mechanical, plumbing, electrical, lighting & structural. no exterior work or changes (except mechanical equiment pad at 2nd floor roof)
Details
Permit
201601116811
Permit issued
Feb 5, 2016
Final sign-off
Sep 9, 2016

new partition, suspended ceiling, fiishes, restrooms, mechanical, plumbing, electrical, lighting & structural. no exterior work or changes (except mechanical equiment pad at 2nd floor roof)

Open the permit page

$730,000
Dec 30, 2015Completed
final sign-off Jan 2016
535 Mission StGolden Gate Fire Protection Incfire sprinkler only - relocate 21 pendents, add 1 pendent. relocate 8 uprights f or 23rd floor spec suite & lobby/corridor. plug 7 ref pa 2015-1117-2800
Details
Permit
201512306101
Permit issued
Dec 30, 2015
Final sign-off
Jan 14, 2016

fire sprinkler only - relocate 21 pendents, add 1 pendent. relocate 8 uprights f or 23rd floor spec suite & lobby/corridor. plug 7 ref pa 2015-1117-2800

Open the permit page

$15,000
Dec 7, 2015Never finaled
issued Dec 2015, no final
535 Mission StGarnett Signs Llc23rd floor - (4) evacuation maps
Details
Permit
201512074301
Permit issued
Dec 7, 2015

23rd floor - (4) evacuation maps

Open the permit page

$1,200
Nov 17, 2015Completed
final sign-off Mar 2016
535 Mission StPeacock Constructioninterior ti to elevator lobby, multi-tenant corridor & tenant suite; including new offices, conference room, break room, lighting & power. life safety, sprinkler under separate permit
Details
Permit
201511172800
Permit issued
Nov 23, 2015
Final sign-off
Mar 7, 2016

interior ti to elevator lobby, multi-tenant corridor & tenant suite; including new offices, conference room, break room, lighting & power. life safety, sprinkler under separate permit

Open the permit page

$325,000
Nov 13, 2015Completed
final sign-off Dec 2015
535 Mission St11th fire sprinkler permit - revision to pa #201510139483 - relocate 2 pendents & 4 upright sprinklers. ti #201510301345.
Details
Permit
201511132558
Permit issued
Nov 13, 2015
Final sign-off
Dec 8, 2015

11th fire sprinkler permit - revision to pa #201510139483 - relocate 2 pendents & 4 upright sprinklers. ti #201510301345.

Open the permit page

$1,200
Nov 13, 2015Completed
final sign-off Jan 2016
535 Mission St26th floor fire sprinkler permit - relocate 10 & add 1 pendent sprinkler. relocate 3 & delete 6 upright sprinklers. ti #201510281035.
Details
Permit
201511132561
Permit issued
Nov 13, 2015
Final sign-off
Jan 27, 2016

26th floor fire sprinkler permit - relocate 10 & add 1 pendent sprinkler. relocate 3 & delete 6 upright sprinklers. ti #201510281035.

Open the permit page

$2,900
Nov 5, 2015Completed
final sign-off Mar 2017
535 Mission StPeacock Construction23rd floor: t.i. including partitions and ceilings. life safety deferred.
Details
Permit
201511051804
Permit issued
Feb 10, 2016
Final sign-off
Mar 22, 2017

23rd floor: t.i. including partitions and ceilings. life safety deferred.

Open the permit page

$350,000
Oct 30, 2015Completed
final sign-off Feb 2016
535 Mission StSwinerton Buildersrevision to pa#201508275442 to eliminate (2) offices, add (2) conference rooms, demo (e) elevator lobby doors and replace with new, add dishwasher, revise lighting, power & communications. life safety/sprinkler deferred.
Details
Permit
201510301345
Permit issued
Nov 12, 2015
Final sign-off
Feb 18, 2016

revision to pa#201508275442 to eliminate (2) offices, add (2) conference rooms, demo (e) elevator lobby doors and replace with new, add dishwasher, revise lighting, power & communications. life safety/sprinkler deferred.

Open the permit page

$273,547
Oct 28, 2015Completed
final sign-off Apr 2016
535 Mission StNovo Construction Incremodel of 3993 sq ft of (e) shell space on the 26th floor. installation of partitions, ceiling finishes and related mep scope. l/s under separate permit.
Details
Permit
201510281035
Permit issued
Oct 29, 2015
Final sign-off
Apr 13, 2016

remodel of 3993 sq ft of (e) shell space on the 26th floor. installation of partitions, ceiling finishes and related mep scope. l/s under separate permit.

Open the permit page

$479,160
Oct 23, 2015Completed
final sign-off Jan 2016
535 Mission St26th floor: fire sprinklers - install 67 new pedents, relocate 4 and 2 uprights. ref pa 20215 0930 8395
Details
Permit
201510230665
Permit issued
Oct 26, 2015
Final sign-off
Jan 27, 2016

26th floor: fire sprinklers - install 67 new pedents, relocate 4 and 2 uprights. ref pa 20215 0930 8395

Open the permit page

$13,400
Oct 20, 2015Never finaled
issued Oct 2015, no final
535 Mission StSiemens Industry, Inc.fire alarm work for the "matrix partners" ti remodel on floor 26; additions are 1 smoke detector, 3 duct detectors, 6 modules, 1 strobe power supply, 3 speakers, 17 speaker/strobes, and 3 strobes ref pa 2015-0930/8395
Details
Permit
201510200151
Permit issued
Oct 20, 2015

fire alarm work for the "matrix partners" ti remodel on floor 26; additions are 1 smoke detector, 3 duct detectors, 6 modules, 1 strobe power supply, 3 speakers, 17 speaker/strobes, and 3 strobes ref pa 2015-0930/8395

Open the permit page

$18,900
Oct 13, 2015Completed
final sign-off Dec 2015
535 Mission Stfire sprinkler permit. relocate 10 and add 2 on 11th floor, ste 1100. ti 2015-0827-5442
Details
Permit
201510139483
Permit issued
Oct 16, 2015
Final sign-off
Dec 8, 2015

fire sprinkler permit. relocate 10 and add 2 on 11th floor, ste 1100. ti 2015-0827-5442

Open the permit page

$2,400
Sep 30, 2015Expired or cancelled
cancelled Mar 2016
535 Mission StNovo Construction Incremodel of 3,993 sq ft of (e) shell space on the 26th floor at 535 mission st. installation of partitions, ceilings, finishes and related mep scope
Details
Permit
201509308395
Permit issued
Sep 30, 2015

remodel of 3,993 sq ft of (e) shell space on the 26th floor at 535 mission st. installation of partitions, ceilings, finishes and related mep scope

Open the permit page

$307,461
Sep 30, 2015Never finaled
issued Sep 2015, no final
535 Mission StGarnett Signs Llc4 evac maps for 22nd floor
Details
Permit
201509308402
Permit issued
Sep 30, 2015

4 evac maps for 22nd floor

Open the permit page

$1,200
Sep 22, 2015Completed
final sign-off Oct 2015
535 Mission StSiemens Industry, Inc.fire alarm work for the corridor ti remodel floor 22. additions are 4smoke det, 7 modules, 1 strobe power supply, 4 speaker strobes. ref ti 2015-0807-3686.
Details
Permit
201509227619
Permit issued
Sep 22, 2015
Final sign-off
Oct 30, 2015

fire alarm work for the corridor ti remodel floor 22. additions are 4smoke det, 7 modules, 1 strobe power supply, 4 speaker strobes. ref ti 2015-0807-3686.

Open the permit page

$8,500
Sep 22, 2015Completed
final sign-off Oct 2015
535 Mission StSiemens Industry, Inc.fire alarm work for the suite 2200 ti remodel floor 22. additions are 1 smoke det, 2 duct detectors, 2 modules, 1 speaker, 16 speaker strobes. ref ti 2015-0807-3685.
Details
Permit
201509227618
Permit issued
Sep 22, 2015
Final sign-off
Oct 30, 2015

fire alarm work for the suite 2200 ti remodel floor 22. additions are 1 smoke det, 2 duct detectors, 2 modules, 1 speaker, 16 speaker strobes. ref ti 2015-0807-3685.

Open the permit page

$12,000
Sep 18, 2015Completed
final sign-off Oct 2015
535 Mission StSiemens Industry, Inc.fire alarm work for the suite 2210 ti remodel on floor 22. 1 smoke detector, 1 module, and 6 speaker /strobes
Details
Permit
201509187362
Permit issued
Sep 18, 2015
Final sign-off
Oct 30, 2015

fire alarm work for the suite 2210 ti remodel on floor 22. 1 smoke detector, 1 module, and 6 speaker /strobes

Open the permit page

$4,100
Sep 15, 2015Completed
final sign-off Oct 2015
535 Mission StGolden Gate Fire Protection Inc22nd floor fire sprinkler only - #2200 - 17 uprights add, relocate 9 pendents (ref #2015-0807-3685). corridor - relocate 13, add 1 pendent ( ref #2015-0807-3686). #2210 - relocate 53 pendents, add 2 pendents (ref #2015-0827-5443).
Details
Permit
201509156965
Permit issued
Oct 1, 2015
Final sign-off
Oct 30, 2015

22nd floor fire sprinkler only - #2200 - 17 uprights add, relocate 9 pendents (ref #2015-0807-3685). corridor - relocate 13, add 1 pendent ( ref #2015-0807-3686). #2210 - relocate 53 pendents, add 2 pendents (ref #2015-0827-5443).

Open the permit page

$47,500
Sep 15, 2015Completed
final sign-off Dec 2015
535 Mission StSiemens Industry, Inc.11th floor - fire alarm work for the "spec suite" on floor 11; addditions are 1 smoke detector, 3 duct detectors, 1 strobe power supply, 5 modules, and 16 speaker/strobes. ref pa 2015-0827-5442
Details
Permit
201509156923
Permit issued
Sep 17, 2015
Final sign-off
Dec 8, 2015

11th floor - fire alarm work for the "spec suite" on floor 11; addditions are 1 smoke detector, 3 duct detectors, 1 strobe power supply, 5 modules, and 16 speaker/strobes. ref pa 2015-0827-5442

Open the permit page

$13,800
Aug 27, 2015Completed
final sign-off Feb 2016
535 Mission StSwinerton Buildersinterior t.i. to 11/f, new office, lighting and power. fire/life safety and sprinkler under seperate permit.
Details
Permit
201508275442
Permit issued
Sep 2, 2015
Final sign-off
Feb 18, 2016

interior t.i. to 11/f, new office, lighting and power. fire/life safety and sprinkler under seperate permit.

Open the permit page

$625,500
Aug 27, 2015Completed
final sign-off Mar 2016
535 Mission StPeacock Constructionspec suite#2210- interior t.i. on 22/f, new office, lighting and power. fire/life safety and sprinkler under seperate permit.
Details
Permit
201508275443
Permit issued
Sep 2, 2015
Final sign-off
Mar 7, 2016

spec suite#2210- interior t.i. on 22/f, new office, lighting and power. fire/life safety and sprinkler under seperate permit.

Open the permit page

$196,250
Aug 25, 2015Never finaled
issued Sep 2015, no final
535 Mission StNovo Construction Incremodel of (e) whole floor. shell space on 26th floor at 535 mission st to provide for (2) two tenant suites, 1 tenant suite shell space, and egress corridors
Details
Permit
201508255186
Permit issued
Sep 22, 2015

remodel of (e) whole floor. shell space on 26th floor at 535 mission st to provide for (2) two tenant suites, 1 tenant suite shell space, and egress corridors

Open the permit page

$690,600
Aug 13, 2015Never finaled
issued Aug 2015, no final
535 Mission StSiemens Industry, Inc.21st floor: fire alarm work for "solarwinds". t.i. additions are 1 smoke detector, 2 duct detectors, 5 modules, 1 strobe power supply, 28 speaker/strobes, and 1 speaker. ref app#201506199398.
Details
Permit
201508134117
Permit issued
Aug 13, 2015

21st floor: fire alarm work for "solarwinds". t.i. additions are 1 smoke detector, 2 duct detectors, 5 modules, 1 strobe power supply, 28 speaker/strobes, and 1 speaker. ref app#201506199398.

Open the permit page

$19,600
Aug 7, 2015Completed
final sign-off Aug 2015
535 Mission St21st flr: fire sprinkler permit, install 60 new pendants, relocate 11 uprights and add 2 uprights, ref. t.i. #201506199398.
Details
Permit
201508073626
Permit issued
Aug 14, 2015
Final sign-off
Aug 25, 2015

21st flr: fire sprinkler permit, install 60 new pendants, relocate 11 uprights and add 2 uprights, ref. t.i. #201506199398.

Open the permit page

$37,522
Aug 7, 2015Completed
final sign-off Mar 2016
535 Mission StPeacock Constructioncorridor- interior t.i. to add floor multi-tenant corridor, floor is unoccupied. mechanical & electrical included. life safety and sprinkler under seperate permit.
Details
Permit
201508073686
Permit issued
Aug 13, 2015
Final sign-off
Mar 7, 2016

corridor- interior t.i. to add floor multi-tenant corridor, floor is unoccupied. mechanical & electrical included. life safety and sprinkler under seperate permit.

Open the permit page

$125,000
Aug 7, 2015Never finaled
issued Aug 2015, no final
535 Mission StPeacock Construction#2200- interior t.i. to 22/f including partitions, electrical, plumbing, mechanical. life safety and sprinkler under seperate permit.
Details
Permit
201508073685
Permit issued
Aug 13, 2015

#2200- interior t.i. to 22/f including partitions, electrical, plumbing, mechanical. life safety and sprinkler under seperate permit.

Open the permit page

$925,000
Jul 20, 2015Completed
final sign-off Aug 2015
535 Mission StSiemens Industry, Inc.flrs: 14,15 &16: fire alarm work "wework"t.i. remodels,additions are 3 smoke detectors,8duct detectors,12 modules,3 strobe power supplies,4 speakers,92 speaker/strobes & 30 strobes, ref. permit 201504204014(fl4),201504204013(flr5),201504204012(fl16).
Details
Permit
201507201888
Permit issued
Jul 21, 2015
Final sign-off
Aug 7, 2015

flrs: 14,15 &16: fire alarm work "wework"t.i. remodels,additions are 3 smoke detectors,8duct detectors,12 modules,3 strobe power supplies,4 speakers,92 speaker/strobes & 30 strobes, ref. permit 201504204014(fl4),201504204013(flr5),201504204012(fl16).

Open the permit page

$78,000
Jun 19, 2015Completed
final sign-off Dec 2015
535 Mission StSwinerton Buildersinterior t.i. to 21/f, new offices, conference rooms, new finishes, lighting, mechanical, power. fire/life safety and sprinkler under seperate permite.
Details
Permit
201506199398
Permit issued
Jul 22, 2015
Final sign-off
Dec 18, 2015

interior t.i. to 21/f, new offices, conference rooms, new finishes, lighting, mechanical, power. fire/life safety and sprinkler under seperate permite.

Open the permit page

$636,300
Jun 8, 2015Completed
final sign-off Jun 2015
535 Mission StPribuss Engineering Inc6th flr: fire sprinkler t.i. under gc permit; plugging one head.
Details
Permit
201506088330
Permit issued
Jun 8, 2015
Final sign-off
Jun 17, 2015

6th flr: fire sprinkler t.i. under gc permit; plugging one head.

Open the permit page

$515
May 26, 2015Completed
final sign-off Jun 2015
535 Mission StAyoob & Peery Plumbing Co Inc16th: add and relocate fire sprinkler per t.i. 62 added, 86 relocate. ref app#201504204012
Details
Permit
201505267107
Permit issued
May 26, 2015
Final sign-off
Jun 17, 2015

16th: add and relocate fire sprinkler per t.i. 62 added, 86 relocate. ref app#201504204012

Open the permit page

$76,072
May 26, 2015Completed
final sign-off Jul 2015
535 Mission StAyoob & Peery Plumbing Co Inc14th: add and relocate fire sprinklers: 27 added, 24 relocate, 4 remove. ref app#201504204014
Details
Permit
201505267106
Permit issued
May 26, 2015
Final sign-off
Jul 9, 2015

14th: add and relocate fire sprinklers: 27 added, 24 relocate, 4 remove. ref app#201504204014

Open the permit page

$26,214
May 26, 2015Completed
final sign-off Jun 2015
535 Mission StAyoob & Peery Plumbing Co Inc15th: add and relocate fire sprinkler per t.i. 61 added, 86 relocate. ref app#201504204013
Details
Permit
201505267105
Permit issued
May 26, 2015
Final sign-off
Jun 24, 2015

15th: add and relocate fire sprinkler per t.i. 61 added, 86 relocate. ref app#201504204013

Open the permit page

$75,558
May 22, 2015Completed
final sign-off Jul 2015
535 Mission StSiemens Industry, Inc.fire alarm work for wework ti remodels on floors 17 and 18. additions are 1 smoke detector, 4 duct detectors, 8 modules, 2 strobe power supplies , 10 speakers, 58 speaker/strobes, 19 strobes ref 201503160896, 201503160895
Details
Permit
201505226964
Permit issued
May 22, 2015
Final sign-off
Jul 9, 2015

fire alarm work for wework ti remodels on floors 17 and 18. additions are 1 smoke detector, 4 duct detectors, 8 modules, 2 strobe power supplies , 10 speakers, 58 speaker/strobes, 19 strobes ref 201503160896, 201503160895

Open the permit page

$51,800
May 12, 2015Never finaled
issued May 2015, no final
535 Mission StNovo Construction Inc14th floor: revision to app201504204014 to correct smoke control report date. ref arch #201504204014
Details
Permit
201505126050
Permit issued
May 19, 2015

14th floor: revision to app201504204014 to correct smoke control report date. ref arch #201504204014

Open the permit page

May 12, 2015Never finaled
issued May 2015, no final
535 Mission StNovo Construction Inc16th floor: revision to app#201504204012 to correct smoke control report date. ref app#201504204013
Details
Permit
201505126049
Permit issued
May 19, 2015

16th floor: revision to app#201504204012 to correct smoke control report date. ref app#201504204013

Open the permit page

May 12, 2015Never finaled
issued May 2015, no final
535 Mission StNovo Construction Inc15th floor: revision to app#201504204013 to correct smoke control report date. ref app#201504204013
Details
Permit
201505126048
Permit issued
May 19, 2015

15th floor: revision to app#201504204013 to correct smoke control report date. ref app#201504204013

Open the permit page

Apr 28, 2015Completed
final sign-off Jan 2016
535 Mission StNovo Construction Incmechanical and electrical work for tenant improvement on the 16th fl. ref 201504204012
Details
Permit
201504284751
Permit issued
May 19, 2015
Final sign-off
Jan 12, 2016

mechanical and electrical work for tenant improvement on the 16th fl. ref 201504204012

Open the permit page

$150,000
Apr 28, 2015Completed
final sign-off Jan 2016
535 Mission StNovo Construction Incmechanical and electrical work for t.i. ref app#201504204014.
Details
Permit
201504284750
Permit issued
May 19, 2015
Final sign-off
Jan 12, 2016

mechanical and electrical work for t.i. ref app#201504204014.

Open the permit page

$150,000
Apr 28, 2015Completed
final sign-off Jan 2016
535 Mission StNovo Construction Inc15th flr: mechanical & electrical work for ti 2015 0420 4012
Details
Permit
201504284752
Permit issued
May 19, 2015
Final sign-off
Jan 12, 2016

15th flr: mechanical & electrical work for ti 2015 0420 4012

Open the permit page

$150,000
Apr 20, 2015Completed
final sign-off Jan 2016
535 Mission StNovo Construction Inc15th flr: ti- new non load bearing partitions, ceilings, lighting and finishes. mep under separate permit
Details
Permit
201504204013
Permit issued
Apr 24, 2015
Final sign-off
Jan 5, 2016

15th flr: ti- new non load bearing partitions, ceilings, lighting and finishes. mep under separate permit

Open the permit page

$450,000
Apr 20, 2015Completed
final sign-off Jan 2016
535 Mission StNovo Construction Inc16th flr: ti - full floor of interior non load bearing partitions, partial ceilings, lighting and finishes, mep under separate permit.
Details
Permit
201504204012
Permit issued
Apr 24, 2015
Final sign-off
Jan 5, 2016

16th flr: ti - full floor of interior non load bearing partitions, partial ceilings, lighting and finishes, mep under separate permit.

Open the permit page

$450,000
Apr 20, 2015Never finaled
issued Apr 2015, no final
535 Mission StNovo Construction Inc14th flr: ti- new non load bearing partitions, ceilings, lighting and finishes. mep under separate permit.
Details
Permit
201504204014
Permit issued
Apr 24, 2015

14th flr: ti- new non load bearing partitions, ceilings, lighting and finishes. mep under separate permit.

Open the permit page

$400,000
Apr 14, 2015Completed
final sign-off May 2015
535 Mission StAyoob & Peery Plumbing Co Incadd and relocate fire sprinkler per tenant improvements 66 added, 75 relocate. pa 201503160895
Details
Permit
201504143608
Permit issued
Apr 15, 2015
Final sign-off
May 14, 2015

add and relocate fire sprinkler per tenant improvements 66 added, 75 relocate. pa 201503160895

Open the permit page

$72,474
Apr 14, 2015Never finaled
issued Apr 2015, no final
535 Mission StAyoob & Peery Plumbing Co Inc17th floor sprinkler t.i.: add and relocate fire sprinklers per tenant improvement 59 added, 67 relocated ref 201503160896
Details
Permit
201504143606
Permit issued
Apr 15, 2015

17th floor sprinkler t.i.: add and relocate fire sprinklers per tenant improvement 59 added, 67 relocated ref 201503160896

Open the permit page

$64,764
Apr 8, 2015Completed
final sign-off May 2015
535 Mission StAyoob & Peery Plumbing Co Inc20th floor: add & relocate fire sprinklers per t.i. 65 add, 72 relocates. t.i. pa# 201502178408
Details
Permit
201504083107
Permit issued
Apr 8, 2015
Final sign-off
May 18, 2015

20th floor: add & relocate fire sprinklers per t.i. 65 add, 72 relocates. t.i. pa# 201502178408

Open the permit page

$70,418
Apr 8, 2015Completed
final sign-off Apr 2015
535 Mission StAyoob & Peery Plumbing Co Incadd & relocate fire sprinklers per t.i. 64 add, 72 relocate. t.i. pa# 201502178407
Details
Permit
201504083100
Permit issued
Apr 8, 2015
Final sign-off
Apr 30, 2015

add & relocate fire sprinklers per t.i. 64 add, 72 relocate. t.i. pa# 201502178407

Open the permit page

$69,904
Apr 2, 2015Completed
final sign-off May 2015
535 Mission StSiemens Industry, Inc.19th & 20 flr: fire alarm work for ti - "wework" - additions are 4 duct detectors, 4 modules, 49 speaker/strobes, 22 strobes and 20 speakers.
Details
Permit
201504022586
Permit issued
Apr 2, 2015
Final sign-off
May 28, 2015

19th & 20 flr: fire alarm work for ti - "wework" - additions are 4 duct detectors, 4 modules, 49 speaker/strobes, 22 strobes and 20 speakers.

Open the permit page

$49,500
Mar 18, 2015Completed
final sign-off Jan 2016
535 Mission StNovo Construction Incmechanical and elec work for ti on the 18th fl
Details
Permit
201503181192
Permit issued
Mar 19, 2015
Final sign-off
Jan 12, 2016

mechanical and elec work for ti on the 18th fl

Open the permit page

$250,000
Mar 18, 2015Completed
final sign-off Jan 2016
535 Mission StNovo Construction Incmechanical and electric work ti on the 17th fl ref 201503160896
Details
Permit
201503181195
Permit issued
Mar 31, 2015
Final sign-off
Jan 12, 2016

mechanical and electric work ti on the 17th fl ref 201503160896

Open the permit page

$250,000
Mar 16, 2015Completed
final sign-off Jan 2016
535 Mission StNovo Construction Incti to include new non-load bearing partitions, partial ceiling, lighting and finishes. mep & life saftey under seperate permit
Details
Permit
201503160896
Permit issued
Mar 16, 2015
Final sign-off
Jan 5, 2016

ti to include new non-load bearing partitions, partial ceiling, lighting and finishes. mep & life saftey under seperate permit

Open the permit page

$60,000
Mar 16, 2015Completed
final sign-off Jan 2016
535 Mission StNovo Construction Inc18th floor:ti to include new non-load bearing partitions ceiling, lighting and finishes mep & life saftey under seperate permit
Details
Permit
201503160895
Permit issued
Mar 16, 2015
Final sign-off
Jan 5, 2016

18th floor:ti to include new non-load bearing partitions ceiling, lighting and finishes mep & life saftey under seperate permit

Open the permit page

$50,000
Feb 19, 2015Completed
final sign-off Jan 2016
535 Mission StNovo Construction Inc20th floor: mechanical and electrical work for t.i. ref app#201502178408
Details
Permit
201502198673
Permit issued
Mar 3, 2015
Final sign-off
Jan 12, 2016

20th floor: mechanical and electrical work for t.i. ref app#201502178408

Open the permit page

$100,000
Feb 19, 2015Completed
final sign-off Apr 2019
535 Mission StNovo Construction Inc19th floor: mechanical and electrical work for t.i. ref app#201502178407
Details
Permit
201502198670
Permit issued
Mar 3, 2015
Final sign-off
Apr 30, 2019

19th floor: mechanical and electrical work for t.i. ref app#201502178407

Open the permit page

$100,000
Feb 18, 2015Completed
final sign-off Mar 2015
535 Mission Stfire sprinkler permit, relocate 2 pendents and 2 uprights, add 11 pendents and 2 uprights. t.i. pa# 201412194156
Details
Permit
201502188554
Permit issued
Feb 18, 2015
Final sign-off
Mar 5, 2015

fire sprinkler permit, relocate 2 pendents and 2 uprights, add 11 pendents and 2 uprights. t.i. pa# 201412194156

Open the permit page

$8,224
Feb 17, 2015Completed
final sign-off Jan 2016
535 Mission StNovo Construction Inctenant improvement to include new non load bearing partitions, partial ceilings, lighting and finishes. mep and life safety under separate permit
Details
Permit
201502178407
Permit issued
Feb 17, 2015
Final sign-off
Jan 5, 2016

tenant improvement to include new non load bearing partitions, partial ceilings, lighting and finishes. mep and life safety under separate permit

Open the permit page

$250,000
Feb 17, 2015Completed
final sign-off Jan 2016
535 Mission StNovo Construction Inctenant improvement to include interior non load bearing partitions, partial ceilings, lighting, and finishes. mep and life safety sep permit
Details
Permit
201502178408
Permit issued
Feb 17, 2015
Final sign-off
Jan 5, 2016

tenant improvement to include interior non load bearing partitions, partial ceilings, lighting, and finishes. mep and life safety sep permit

Open the permit page

$250,000
Jan 29, 2015Completed
final sign-off Mar 2015
535 Mission StSiemens Industry, Inc.fire alarm work for the envivio ti remodel on floor 27. additions are 1 smoke detector, 1 duct detector, 2 modules, 11 speaker 272 speakers
Details
Permit
201501296940
Permit issued
Jan 29, 2015
Final sign-off
Mar 23, 2015

fire alarm work for the envivio ti remodel on floor 27. additions are 1 smoke detector, 1 duct detector, 2 modules, 11 speaker 272 speakers

Open the permit page

$8,500
Jan 13, 2015Completed
final sign-off Mar 2015
535 Mission StGci, Inc27th floor - mep work includes fire life safety, power data rouch in & light fixtures. (7) new vav boxex added (1) new transfer fan, (1) heat pump (1) new fsd to serve elevator. sink/fridge connection in break room to heat pump. ref pa #2014.1219.4156.
Details
Permit
201501135581
Permit issued
Jan 14, 2015
Final sign-off
Mar 19, 2015

27th floor - mep work includes fire life safety, power data rouch in & light fixtures. (7) new vav boxex added (1) new transfer fan, (1) heat pump (1) new fsd to serve elevator. sink/fridge connection in break room to heat pump. ref pa #2014.1219.4156.

Open the permit page

$330,000
Dec 19, 2014Completed
final sign-off Jun 2015
535 Mission StGci, Inc27th floor tenant improvement approx 2590 sf - new office, break room & conference rooms, new lighting & finishes. fire life safety & mep under separate permit.
Details
Permit
201412194156
Permit issued
Jan 9, 2015
Final sign-off
Jun 8, 2015

27th floor tenant improvement approx 2590 sf - new office, break room & conference rooms, new lighting & finishes. fire life safety & mep under separate permit.

Open the permit page

$465,000
Nov 14, 2014Completed
final sign-off Dec 2014
535 Mission StEagle Bay Enterprises, Inc (Dba Garnettinstall 24 evacation signs from floor 3 to floor 8. 4 signs per floor.
Details
Permit
201411141479
Permit issued
Nov 14, 2014
Final sign-off
Dec 22, 2014

install 24 evacation signs from floor 3 to floor 8. 4 signs per floor.

Open the permit page

$7,200
Oct 27, 2014Completed
final sign-off Jan 2015
535 Mission StArrow Sign Companyinstall one interior illuminated electric sign.
Details
Permit
201410279977
Permit issued
Oct 29, 2014
Final sign-off
Jan 15, 2015

install one interior illuminated electric sign.

Open the permit page

$35,000
Oct 22, 2014Completed
final sign-off Dec 2014
535 Mission StSiemens Industry, Inc.fire alarm work the "suite 1200" t.i. project on floor 12; additions are 1 smoke detector, 3 duct detectors, 2 relay modules, 15 speakers, 10 speaker/strobes and 6 strobes. ref pa 201408295025
Details
Permit
201410229536
Permit issued
Oct 22, 2014
Final sign-off
Dec 22, 2014

fire alarm work the "suite 1200" t.i. project on floor 12; additions are 1 smoke detector, 3 duct detectors, 2 relay modules, 15 speakers, 10 speaker/strobes and 6 strobes. ref pa 201408295025

Open the permit page

$18,000
Oct 16, 2014Completed
final sign-off Nov 2014
535 Mission Stfire sprinkler relocate 11 and 4 pendent sprinklers on 12th fl 201408295025
Details
Permit
201410169116
Permit issued
Oct 16, 2014
Final sign-off
Nov 14, 2014

fire sprinkler relocate 11 and 4 pendent sprinklers on 12th fl 201408295025

Open the permit page

$7,710
Oct 15, 2014Completed
final sign-off Dec 2014
535 Mission StSiemens Industry, Inc.6th floor: fire alarm as-built for "trulia" remodel. additions are 3 smoke detectors and 1 relay module. initial fire alarm work done under permit appl 2014.0729.2370.
Details
Permit
201410158896
Permit issued
Oct 15, 2014
Final sign-off
Dec 15, 2014

6th floor: fire alarm as-built for "trulia" remodel. additions are 3 smoke detectors and 1 relay module. initial fire alarm work done under permit appl 2014.0729.2370.

Open the permit page

$1,900
Oct 15, 2014Completed
final sign-off Dec 2014
535 Mission StSiemens Industry, Inc.8th floor fire alarm "as built" work for "trulia" remodel - additoins re 3 smoke detectors & 1 relay module. initial fire alarm work done unde rpa #2014.0729.2369. ref pa #2014.0610.7908.
Details
Permit
201410158915
Permit issued
Oct 15, 2014
Final sign-off
Dec 15, 2014

8th floor fire alarm "as built" work for "trulia" remodel - additoins re 3 smoke detectors & 1 relay module. initial fire alarm work done unde rpa #2014.0729.2369. ref pa #2014.0610.7908.

Open the permit page

$1,900
Oct 15, 2014Completed
final sign-off Dec 2014
535 Mission StSiemens Industry, Inc.5th floor: fire alarm "as-built"for "traulia" remodel. additions are 3 smoke detectors and 1 relay module. initial fire alarm work done under permit app. 2014.0729.2368.
Details
Permit
201410158894
Permit issued
Oct 15, 2014
Final sign-off
Dec 15, 2014

5th floor: fire alarm "as-built"for "traulia" remodel. additions are 3 smoke detectors and 1 relay module. initial fire alarm work done under permit app. 2014.0729.2368.

Open the permit page

$1,900
Oct 14, 2014Completed
final sign-off Feb 2015
535 Mission StIlluminated Creations Dba Ellis & Ellisinstall one illuminated monument sign.
Details
Permit
201410148801
Permit issued
Oct 21, 2014
Final sign-off
Feb 10, 2015

install one illuminated monument sign.

Open the permit page

$6,000
Oct 14, 2014Completed
final sign-off Dec 2014
535 Mission StSiemens Industry, Inc.4th floor:fire alarm as built work for "trulia" remodel, additions are 3 smoke detectors and 1 relay module. initioal fire alarm work was done under permit app#201407171453. ref app#201405206198.
Details
Permit
201410148707
Permit issued
Oct 14, 2014
Final sign-off
Dec 15, 2014

4th floor:fire alarm as built work for "trulia" remodel, additions are 3 smoke detectors and 1 relay module. initioal fire alarm work was done under permit app#201407171453. ref app#201405206198.

Open the permit page

$1,900
Oct 14, 2014Completed
final sign-off Dec 2014
535 Mission StSiemens Industry, Inc.3rd floor: fire alarm as built work for "trulia" remodel, additions are 3 smoke detectors and 1 relay module. initial fire alarm work was done under permit app#201407171452. ref app#201405206199.
Details
Permit
201410148708
Permit issued
Oct 14, 2014
Final sign-off
Dec 15, 2014

3rd floor: fire alarm as built work for "trulia" remodel, additions are 3 smoke detectors and 1 relay module. initial fire alarm work was done under permit app#201407171452. ref app#201405206199.

Open the permit page

$1,900
Oct 7, 2014Completed
final sign-off Nov 2014
535 Mission StSiemens Industry, Inc.7th floor: fire alarm work for the trulia t.i. additions are 17 smoke detectors, 6 duct detectors, 24 speaker/strobes, 10 speakers, and 1 strobe power supply and 18 modules. ref app#201406107907.
Details
Permit
201410078336
Permit issued
Nov 4, 2014
Final sign-off
Nov 12, 2014

7th floor: fire alarm work for the trulia t.i. additions are 17 smoke detectors, 6 duct detectors, 24 speaker/strobes, 10 speakers, and 1 strobe power supply and 18 modules. ref app#201406107907.

Open the permit page

$23,200
Oct 3, 2014Completed
final sign-off Dec 2014
535 Mission StSwinerton Buildersrevision to 201405206199 to include fire smoke damper at passenger elevator lobby
Details
Permit
201410038012
Permit issued
Oct 10, 2014
Final sign-off
Dec 3, 2014

revision to 201405206199 to include fire smoke damper at passenger elevator lobby

Open the permit page

$1,000
Oct 3, 2014Completed
final sign-off Dec 2014
535 Mission StSwinerton Buildersrevision to permit 201406107907 to include fire smoke damper at passenger elevator lobby. floor 7
Details
Permit
201410038087
Permit issued
Oct 15, 2014
Final sign-off
Dec 10, 2014

revision to permit 201406107907 to include fire smoke damper at passenger elevator lobby. floor 7

Open the permit page

$1,000
Oct 3, 2014Completed
final sign-off Dec 2014
535 Mission StSwinerton Buildersrevision to permit 201406107906 to include fire smoke damper at passenger elevator lobby. floor 6
Details
Permit
201410038083
Permit issued
Oct 10, 2014
Final sign-off
Dec 3, 2014

revision to permit 201406107906 to include fire smoke damper at passenger elevator lobby. floor 6

Open the permit page

$1,000
Oct 3, 2014Completed
final sign-off Dec 2014
535 Mission StSwinerton Buildersrevision to 201405206198 to include fire smoke damper at passenger elevator lobby
Details
Permit
201410038010
Permit issued
Oct 15, 2014
Final sign-off
Dec 3, 2014

revision to 201405206198 to include fire smoke damper at passenger elevator lobby

Open the permit page

$1,000
Oct 3, 2014Completed
final sign-off Dec 2014
535 Mission StSwinerton Buildersrevision to 201405206196 to include fire smoke damper at passenger elevator lobby
Details
Permit
201410038008
Permit issued
Oct 10, 2014
Final sign-off
Dec 3, 2014

revision to 201405206196 to include fire smoke damper at passenger elevator lobby

Open the permit page

$1,000
Oct 3, 2014Completed
final sign-off Dec 2014
535 Mission StSwinerton Buildersrevision to permit 201406107908 to include fire smoke damper at passenger elevator lobby. floor 8
Details
Permit
201410038088
Permit issued
Oct 10, 2014
Final sign-off
Dec 3, 2014

revision to permit 201406107908 to include fire smoke damper at passenger elevator lobby. floor 8

Open the permit page

$1,000

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Siemens Industry, Inc. (42), Novo Construction Inc (24), Gci, Inc (20), Skyline Construction (16), M C S Construction Services (15), Swinerton Builders (10), Ayoob & Peery Plumbing Co Inc (8), Peacock Construction (7), Golden Gate Fire Protection Inc (6), Pioneer Fire Inc. (6), Bilcor Inc (5), City Mechanical Inc (4), Tracy Sign Inc (4), Pribuss Engineering Inc (3), Arrow Sign Company (2), Garnett Signs Llc (2), Anderson, Rowe & Buckley, Inc., C B F Inc, Ca United Mechanical, Inc, Communication Technology Services Llc, Dpr Construction, Eagle Bay Enterprises, Inc (Dba Garnett, Field Construction Inc., Illuminated Creations Dba Ellis & Ellis, Thomas Swan Sign Co Inc, Viking Sign Installations
Architects
Ariane Lebrilla (10), Stanley Lew (7), Adam Murphy (4), Jason Sayner (3), Andrew Mangan (2), Gene P. Pena (2), Matthew Pietras (2), Seth Hanley (2), Victoria Salgado (2), George S Soskin, George Soskin, Ha-Pui Iris Chan, Robbin Mcdonald, Sashikala Murthy, Tim Murphy, William Hadinger
Engineers
Alexander Joseph Pacheco (10), Amit Wadhwa (8), Ivano Russo (4), Elizabeth Allen (3), Matthew Pietras (3), Meng Hsiu Chen (3), Stephen Shaffer (3), William Hadinger (3), Levi Abarte (2), Marc Andrew Steyer (2), Rudolfo P Bustos Iii (2), Sherry Chaumpluke (2), Xuong Quach (2), Dean Macy, Fabian Serkis, Habtom Tewelde, Jesus B Cabellon Jr, Sherry Chaumpluke, Timothy Mcpartland
Authorized agents
Christina Nguyen, Dillon Peisson
Designers
Ronald Demartini (5), Andrew Erickson (2), John Walsh, Justin Martinkovk, Peter Mchugh, Rlh Fire Protection, Robert Buckley

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.