Adam Murphy
- Listed as
- architect, authorized agent-others, engineer, pmt consultant/expediter
- Firm
- Huntsman Ag
- Based in
- San Francisco
- On San Francisco permits
- Jun 2016 to Oct 2026
166 permits since 2000 (architect on 163 permits, authorized agent-others on 2 permits, engineer on 1 permit, pmt consultant/expediter on 1 permit): 93 completed, 56 in progress, 5 never finaled, 12 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 166.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 4 Embarcadero Center | Skyline Construction | 19th fl - ti of (e) office (485 sq ft). demolition of 2 enclosed offices and construction of four small enclosed offices. includes partitions, lighting and finishesDetails
19th fl - ti of (e) office (485 sq ft). demolition of 2 enclosed offices and construction of four small enclosed offices. includes partitions, lighting and finishes | $73,320 |
| Sep 29, 2026 | In progress filed Sep 2026, not yet issued | 600 Montgomery St | 33rd floor: demolition of non-structural interior partition, ceilings and finishes of existing office. existing life safety including sprinkler piping and heads to remain intact & operational throught demolition. no change in occupancy, use, or area.Details
33rd floor: demolition of non-structural interior partition, ceilings and finishes of existing office. existing life safety including sprinkler piping and heads to remain intact & operational throught demolition. no change in occupancy, use, or area. | $47,583 | |
| Sep 9, 2026 | In progress issued Sep 2026 | 555 California St | Sc Builders, Inc | 17th fl new non structural partitoins, glazing millwork, ceilings, lighting, electrical and finishesDetails
17th fl new non structural partitoins, glazing millwork, ceilings, lighting, electrical and finishes | $1,068,636 |
| Sep 4, 2026 | In progress filed Sep 2026, not yet issued | 100 Montgomery St | 11th fl - ti of a full floor suite.Details
11th fl - ti of a full floor suite. | $2,316,730 | |
| Aug 21, 2026 | In progress issued Aug 2026 | 555 California St | Sc Builders, Inc | 45/f: demolition of non structural partitions, glazing, millwork, ceilings lighting, electrical, and finishes. ste to be demolished to "warm shell" condition for fture tenant buildout.Details
45/f: demolition of non structural partitions, glazing, millwork, ceilings lighting, electrical, and finishes. ste to be demolished to "warm shell" condition for fture tenant buildout. | $581,000 |
| Aug 21, 2026 | In progress issued Aug 2026 | 611 Front St | Gci, Inc | t.i improvement 2nd floor.Details
t.i improvement 2nd floor. | $150,000 |
| Aug 12, 2026 | In progress issued Aug 2026 | 555 California St | Sc Builders, Inc | 17th fl tenant improvment for new demising wall to create 2 suites.Details
17th fl tenant improvment for new demising wall to create 2 suites. | $810,960 |
| Aug 11, 2026 | In progress issued Aug 2026 | 555 California St | Sc Builders, Inc | revision to pa # 202510157422 (23rd floor) - rating of (e) riser closet (addition of fire rated wall), mechanical scope change (change in duct routing)Details
revision to pa # 202510157422 (23rd floor) - rating of (e) riser closet (addition of fire rated wall), mechanical scope change (change in duct routing) | |
| Aug 5, 2026 | In progress issued Sep 2026 | 1725 03rd St | Dpr Construction A | partial floor tenant improvement of the 3rd floor.Details
partial floor tenant improvement of the 3rd floor. | $847,440 |
| Jul 15, 2026 | Completed final sign-off Aug 2026 | 300 Howard St | Gci, Inc | barrier removal. path of travel and exit access improvements in basement parking garage levels b1,b2, and b3.Details
barrier removal. path of travel and exit access improvements in basement parking garage levels b1,b2, and b3. | $10,000 |
| Jul 1, 2026 | In progress issued Jul 2026 | 555 California St | Sc Builders, Inc | revision to 202605221774 to include the removal of existing communicating stair between the 19th and 20th fl and infilling the restaurant 2fl openingDetails
revision to 202605221774 to include the removal of existing communicating stair between the 19th and 20th fl and infilling the restaurant 2fl opening | $100,000 |
| Jun 29, 2026 | In progress issued Jul 2026 | 505 Brannan St | Novo Construction Inc | selective tenant improvement demolition of non structural partitons and doors. new lighting and finishes for open office on the 4th and 5th fl m/e deferred.Details
selective tenant improvement demolition of non structural partitons and doors. new lighting and finishes for open office on the 4th and 5th fl m/e deferred. | $94,000 |
| May 28, 2026 | In progress issued Aug 2026 | 50 California St | Sc Builders, Inc | unit# 3151: full floor tenant expansion into adjacent vacant space demo of non-load bearing partitions, finishes, ceiling, and lights, constrution of non-load bearing partitions, millwork, finishes, ceilings and lights.Details
unit# 3151: full floor tenant expansion into adjacent vacant space demo of non-load bearing partitions, finishes, ceiling, and lights, constrution of non-load bearing partitions, millwork, finishes, ceilings and lights. | $1,308,872 |
| May 22, 2026 | In progress issued Jun 2026 | 555 California St | Sc Builders, Inc | 19th & 20th foors: demolition of non-structrual partitions glazing, millwork, ceilings, lighting, electrical, and finishes.Details
19th & 20th foors: demolition of non-structrual partitions glazing, millwork, ceilings, lighting, electrical, and finishes. | $1,485,000 |
| May 4, 2026 | Completed final sign-off Jun 2026 | 555 California St | Principal Builders Inc. | 38/fl- partial interior demo includes non structural , partitions, ceilings, lighting, finishes, doors, frames, hardware and milwork.Details
38/fl- partial interior demo includes non structural , partitions, ceilings, lighting, finishes, doors, frames, hardware and milwork. | $49,000 |
| Apr 30, 2026 | Completed final sign-off Jul 2026 | 199 Fremont St | Gci, Inc | level 1 and 2. revision to 202311291553. add draft curtains in alignment w/deferred sprinkler scope (detail #7).Details
level 1 and 2. revision to 202311291553. add draft curtains in alignment w/deferred sprinkler scope (detail #7). | $10,000 |
| Apr 29, 2026 | In progress filed Apr 2026, not yet issued | 50 California St | construction of new roof terrace over (e) roof above 2/f.Details
construction of new roof terrace over (e) roof above 2/f. | $1,000,000 | |
| Apr 29, 2026 | In progress issued Sep 2026 | 50 California St | Skyline Construction | 2/fl- ti to include non structrual demo and construction of (n) conference center,gym, and lounge.Details
2/fl- ti to include non structrual demo and construction of (n) conference center,gym, and lounge. | $3,790,509 |
| Apr 8, 2026 | In progress issued May 2026 | 555 California St | Sc Builders, Inc | 11th fl - demo of non-structural partitions, glazin, millwork, ceilings, lighting, electrical and finishes. abatement throughout and installation of general lighting throughoutDetails
11th fl - demo of non-structural partitions, glazin, millwork, ceilings, lighting, electrical and finishes. abatement throughout and installation of general lighting throughout | $990,000 |
| Apr 6, 2026 | Completed final sign-off Aug 2026 | 555 California St | Sc Builders, Inc | 17th floor: demolition of non-strucutral partitions, glazing, millwork, ceilings, lighting electrical, and finishes.Details
17th floor: demolition of non-strucutral partitions, glazing, millwork, ceilings, lighting electrical, and finishes. | $947,000 |
| Apr 6, 2026 | In progress issued Apr 2026 | 555 California St | Rossi Builders Inc. | ste 3360 33rd flr: consists of demolition and construction of non-structural partitions, glazing, doors, ceilings, lighting, finishes, and power.Details
ste 3360 33rd flr: consists of demolition and construction of non-structural partitions, glazing, doors, ceilings, lighting, finishes, and power. | $408,300 |
| Apr 1, 2026 | In progress issued Apr 2026 | 555 California St | Rossi Builders Inc. | ste 3350: prjoect consists of demolition and construction of non- structural partitions, glazing, doors, ceilings, lighting, finishes, and electrical.Details
ste 3350: prjoect consists of demolition and construction of non- structural partitions, glazing, doors, ceilings, lighting, finishes, and electrical. | $252,050 |
| Mar 31, 2026 | In progress issued Apr 2026 | 555 California St | Rossi Builders Inc. | 23/fl-suite 2300 for ti to include construction of (n) non structrual partitions, glazing, doors, ceilings, lights, finishes, and electrical. no change in occupancy or use or square footage.Details
23/fl-suite 2300 for ti to include construction of (n) non structrual partitions, glazing, doors, ceilings, lights, finishes, and electrical. no change in occupancy or use or square footage. | $1,120,932 |
| Mar 10, 2026 | Completed final sign-off Aug 2026 | 3 Embarcadero Center | Vulcan Construction Inc | 8/f: interior demolition of non-structural partitions, doors, millwork, ceilings, flooring, finishes, hvac, electrical, plumbing & equipment. restroom remodel. new demising tenant partitions and tenant suite doors. new common corridor and elevator lobby finishes and ceiling.Details
8/f: interior demolition of non-structural partitions, doors, millwork, ceilings, flooring, finishes, hvac, electrical, plumbing & equipment. restroom remodel. new demising tenant partitions and tenant suite doors. new common corridor and elevator lobby finishes and ceiling. | $300,000 |
| Mar 9, 2026 | Completed final sign-off Jul 2026 | 555 California St | Rossi Builders Inc. | 23rd floor ste 2325: construction of new non-structural partitions, glazing, doors, millwork, ceiling, lighting, pwer and finishes. there will be no change in occupancy, use, or floor area. prior building demolished under pa #202508284089.Details
23rd floor ste 2325: construction of new non-structural partitions, glazing, doors, millwork, ceiling, lighting, pwer and finishes. there will be no change in occupancy, use, or floor area. prior building demolished under pa #202508284089. | $1,259,852 |
| Feb 13, 2026 | In progress issued Mar 2026 | 535 Washington St | Hathaway Dinwiddie Co. | revise pa #202204111970 and 202507080363 to document approved code equivalency for panic hardware at exit gates of redwood park.Details
revise pa #202204111970 and 202507080363 to document approved code equivalency for panic hardware at exit gates of redwood park. | |
| Feb 3, 2026 | In progress filed Feb 2026, not yet issued | 2 Embarcadero Center | M C S Construction Services | revision to pa #2025-0414-4331: removing deferred mechanicalDetails
revision to pa #2025-0414-4331: removing deferred mechanical | |
| Jan 27, 2026 | In progress issued Sep 2026 | 555 California St | Principal Builders Inc. | partial ti on the 39th fl i9ncouding non strucutral demo of exiting partitions, finishes, millwork, ceilings, new construction of open offices, meeting rooms, break areas.Details
partial ti on the 39th fl i9ncouding non strucutral demo of exiting partitions, finishes, millwork, ceilings, new construction of open offices, meeting rooms, break areas. | $588,286 |
| Jan 27, 2026 | In progress issued May 2026 | 555 California St | Principal Builders Inc. | partial ti on the 38th fl including non strucutral partitions, finishes, millwork, ceilings, new construction of open offices, operable partitions, meeting rooms, break areas.Details
partial ti on the 38th fl including non strucutral partitions, finishes, millwork, ceilings, new construction of open offices, operable partitions, meeting rooms, break areas. | $1,170,366 |
| Jan 20, 2026 | In progress issued Sep 2026 | 555 California St | Principal Builders Inc. | 40th fl - non-structural partitions, finishes, millwork, ceilings for new open office, meeting rooms & break areasDetails
40th fl - non-structural partitions, finishes, millwork, ceilings for new open office, meeting rooms & break areas | $1,198,400 |
| Jan 16, 2026 | Completed final sign-off Jul 2026 | 315 Montgomery St | Sc Builders, Inc | level 17: ti, demo of (e) & construction of (n) partitions, millwork, lighting, & finishes.Details
level 17: ti, demo of (e) & construction of (n) partitions, millwork, lighting, & finishes. | $958,720 |
| Jan 14, 2026 | In progress issued Sep 2026 | 555 California St | Principal Builders Inc. | 41/fl- new communicating stair between floors 40 and 41.Details
41/fl- new communicating stair between floors 40 and 41. | $42,600 |
| Jan 14, 2026 | In progress issued Sep 2026 | 555 California St | Principal Builders Inc. | 39/fl- removal of (e) communicating stair between floors 39 and 40 and infill opening in 40th floorDetails
39/fl- removal of (e) communicating stair between floors 39 and 40 and infill opening in 40th floor | $15,000 |
| Dec 16, 2025 | In progress issued Sep 2026 | 555 California St | Principal Builders Inc. | l41: ti. non-structural partitions, finishes, millwork, ceilings for new offices, meeting rooms and break areas.Details
l41: ti. non-structural partitions, finishes, millwork, ceilings for new offices, meeting rooms and break areas. | $5,419,764 |
| Dec 9, 2025 | In progress issued Dec 2025 | 535 Mission St | Gci, Inc | 9th fl - commercial ti demo & construction of non-structural partitions, ceilings, finishes & furniture/equipment expansion of existing pantry/break area (not mirco-kitchen)Details
9th fl - commercial ti demo & construction of non-structural partitions, ceilings, finishes & furniture/equipment expansion of existing pantry/break area (not mirco-kitchen) | $186,000 |
| Dec 4, 2025 | Expired or cancelled withdrawn Feb 2026 | 300 Howard St | 2/f: new fitness area, golf simulator, restrooms, locker rooms, assembly spaces, pantry, and conference rooms.Details
2/f: new fitness area, golf simulator, restrooms, locker rooms, assembly spaces, pantry, and conference rooms. | $2,959,620 | |
| Dec 1, 2025 | In progress issued Dec 2025 | 555 California St | Bcci Construction Company | 45th fl - tenant improvement partitions, ceiing & finishesDetails
45th fl - tenant improvement partitions, ceiing & finishes | $5,314,000 |
| Nov 5, 2025 | In progress filed Nov 2025, not yet issued | 600 Montgomery St | 27th floor: revision to 202406073981 for mechnical & dph review of additional piece of equipment( counter top ventless unox speed oven) at level 27 room 2705 -pantryDetails
27th floor: revision to 202406073981 for mechnical & dph review of additional piece of equipment( counter top ventless unox speed oven) at level 27 room 2705 -pantry | ||
| Oct 30, 2025 | In progress issued Jun 2026 | 555 California St | plaza level: permit to abate sffd nov 2504-0245 for permanent tent (membrane structure) adjacent to 555 californiaDetails
plaza level: permit to abate sffd nov 2504-0245 for permanent tent (membrane structure) adjacent to 555 california | $150,000 | |
| Oct 17, 2025 | In progress issued Oct 2025 | 555 California St | Sc Builders, Inc | 31st floor: demolition of non-structural partitions, glazing, mill work, ceilings, lighting, electrical fixtures, and finishes. suite to be demolished to warm shell condition for future tenant use and build out.Details
31st floor: demolition of non-structural partitions, glazing, mill work, ceilings, lighting, electrical fixtures, and finishes. suite to be demolished to warm shell condition for future tenant use and build out. | $400,000 |
| Oct 15, 2025 | In progress issued Oct 2025 | 555 California St | Sc Builders, Inc | 23/f: demolition of non-structural partitions and doors/frames, construction of demising partitions, non-rated multi tenant hallway and buildback of restrooms, passenger elevator lobby and freight elevator lobby. no change in occupancy, use or flr area. ref pa# 202508284089.Details
23/f: demolition of non-structural partitions and doors/frames, construction of demising partitions, non-rated multi tenant hallway and buildback of restrooms, passenger elevator lobby and freight elevator lobby. no change in occupancy, use or flr area. ref pa# 202508284089. | $2,891,600 |
| Sep 26, 2025 | Completed final sign-off Jan 2026 | 2 Embarcadero Center | M C S Construction Services | 23rd flr/suite 2350. t.i. includes demo of non-structure partitions, doors, bldg of new non str partions. doors and finishes. all new or revised meps, life safety work will be design-build and submitted for permit separately bldging is fully sprinkled.Details
23rd flr/suite 2350. t.i. includes demo of non-structure partitions, doors, bldg of new non str partions. doors and finishes. all new or revised meps, life safety work will be design-build and submitted for permit separately bldging is fully sprinkled. | $200,000 |
| Sep 26, 2025 | Completed final sign-off Dec 2025 | 555 California St | Sc Builders, Inc | demo of non structural partitions glazing millwork, ceilings lighting electrical and finishesDetails
demo of non structural partitions glazing millwork, ceilings lighting electrical and finishes | $400,000 |
| Sep 8, 2025 | Completed final sign-off Dec 2025 | 275 Battery St | Kr Johnston Construction Inc | 7th floor:interior tenant improvement minor alternations to existing suite 700. includes demolition and construction of non-structural partitions, doors and finishes. no change in occupancy, use or area.Details
7th floor:interior tenant improvement minor alternations to existing suite 700. includes demolition and construction of non-structural partitions, doors and finishes. no change in occupancy, use or area. | $204,482 |
| Sep 5, 2025 | Completed final sign-off Jan 2026 | 1 Embarcadero Center | M C S Construction Services | suite 2020 on 20/f: selective demolition of wiremold. construction of non-structural partitions, doors, lights, casework and finishes. no change in occupancy, use or area.Details
suite 2020 on 20/f: selective demolition of wiremold. construction of non-structural partitions, doors, lights, casework and finishes. no change in occupancy, use or area. | $41,400 |
| Aug 29, 2025 | In progress issued Sep 2025 | 4 Embarcadero Center | M C S Construction Services | 26th fl- demolition of (e) non structural partitions, doors, finishes, ceiling grid & tiles, lighting & construction of (n) non structural partitions, glazing, doors, ceiling. lighting, power & finishes. no change in occupancy, use or area.Details
26th fl- demolition of (e) non structural partitions, doors, finishes, ceiling grid & tiles, lighting & construction of (n) non structural partitions, glazing, doors, ceiling. lighting, power & finishes. no change in occupancy, use or area. | $425,000 |
| Aug 28, 2025 | Completed final sign-off Apr 2026 | 555 California St | Sc Builders, Inc | 23rd floor. full floor demolition of interior non structural partitions, doors/frames, glazing, millwork, ceilings, lighting, electrical, and finishes, fire proofing and asbestos abatement.Details
23rd floor. full floor demolition of interior non structural partitions, doors/frames, glazing, millwork, ceilings, lighting, electrical, and finishes, fire proofing and asbestos abatement. | $420,000 |
| Aug 13, 2025 | In progress issued Aug 2025 | 2 Embarcadero Center | M C S Construction Services | 22nd fl, ste 2210 revision to pa 202504144331 includes additional 410 sq ft of ti w/selective demo of non structural partitions, lights, finishes; construction of non-structural partitions, lights, doors, windows and finishesDetails
22nd fl, ste 2210 revision to pa 202504144331 includes additional 410 sq ft of ti w/selective demo of non structural partitions, lights, finishes; construction of non-structural partitions, lights, doors, windows and finishes | $35,000 |
| Aug 7, 2025 | Completed final sign-off Apr 2026 | 535 Mission St | Gci, Inc | 4th fl, ste 400 ti demo of non-structural partitions and building (n) non-structural partitions (bldg is full sprinklered) meps under separate permit life safety & sprinklers under separate permit submitted separately, not included in cost valuation for this pa.Details
4th fl, ste 400 ti demo of non-structural partitions and building (n) non-structural partitions (bldg is full sprinklered) meps under separate permit life safety & sprinklers under separate permit submitted separately, not included in cost valuation for this pa. | $1,400,000 |
| Aug 1, 2025 | In progress issued Aug 2025 | 180 Montgomery St | Bevilacqua & Sons | 2/f -t.i. of (e) full floor suite on the 2nd flr. demo of non-structural partitions. new non-structural partitions doors, ceilings, millwork, finishes, m.e.p., and light fixtures.Details
2/f -t.i. of (e) full floor suite on the 2nd flr. demo of non-structural partitions. new non-structural partitions doors, ceilings, millwork, finishes, m.e.p., and light fixtures. | $1,011,466 |
| Jul 24, 2025 | Completed final sign-off Aug 2026 | 1750 Cesar Chavez St | Opi Commercial Builders | unit a, t.i. of (e) warehouse suite. scope include non-structural demolition, new non-structural partitions, ceilings, finishs, light fixtures, and door.Details
unit a, t.i. of (e) warehouse suite. scope include non-structural demolition, new non-structural partitions, ceilings, finishs, light fixtures, and door. | $1,985,920 |
| Jul 16, 2025 | Completed final sign-off Apr 2026 | 3 Embarcadero Center | Principal Builders Inc. | 25th fl,ste 2500 -ti includes demo of non structural partitions & building new non structural partitions.(n) operable partition; upgrades incude (n) millwork, lighting & finishes throuhgout. all (n) or revised meps under separate permmit. bldg fully sprinklered. (lifeDetails
25th fl,ste 2500 -ti includes demo of non structural partitions & building new non structural partitions.(n) operable partition; upgrades incude (n) millwork, lighting & finishes throuhgout. all (n) or revised meps under separate permmit. bldg fully sprinklered. (life | $3,678,028 |
| Jul 8, 2025 | In progress issued Aug 2025 | 1 Maritime Pz | Gci, Inc | 24th/f & 23rd/f: interconnection stairs connecting 23rd & 24th fl & restroom upgradesDetails
24th/f & 23rd/f: interconnection stairs connecting 23rd & 24th fl & restroom upgrades | $100,125 |
| Jul 8, 2025 | In progress issued Aug 2025 | 1 Maritime Pz | Gci, Inc | 24th/f: t.i. interior non-structural partitions, ceiling grid, tile, light, millwork & finishes.Details
24th/f: t.i. interior non-structural partitions, ceiling grid, tile, light, millwork & finishes. | $2,339,876 |
| Jun 24, 2025 | Completed final sign-off Sep 2025 | 600 Battery St | Bcci Construction Company | revision to 20241125662. additonal modification of millwork in the break room and updated outlets for the conference room. mep deferredDetails
revision to 20241125662. additonal modification of millwork in the break room and updated outlets for the conference room. mep deferred | $5,000 |
| Jun 23, 2025 | Completed final sign-off Nov 2025 | 3 Embarcadero Center | Principal Builders Inc. | 26/f: installation of new non-structural partitions & glazing for new multipurpose room, conference room, & catering counter space.Details
26/f: installation of new non-structural partitions & glazing for new multipurpose room, conference room, & catering counter space. | $957,720 |
| Jun 17, 2025 | Expired or cancelled withdrawn Jul 2025 | 1750 Cesar Chavez St | for suite a; t.i. of existing warehouse suite. scope includes: new non-structural partitions, ceilings, finishes, light fixtures and doors. change of occupancy.Details
for suite a; t.i. of existing warehouse suite. scope includes: new non-structural partitions, ceilings, finishes, light fixtures and doors. change of occupancy. | $1,985,920 | |
| Jun 5, 2025 | Completed final sign-off Feb 2026 | 600 Montgomery St | Principal Builders Inc. | 25/f: tenant improvement: new interior non-structural partitions. power outlets.Details
25/f: tenant improvement: new interior non-structural partitions. power outlets. | $1,944,000 |
| Jun 5, 2025 | Completed final sign-off Jan 2026 | 535 Mission St | Gci, Inc | 3rd fl conference ceneter: ti include demo of non structural partitions & building (n) non structural partitions. all new or revised mep included in this permit. life safety & fire alarm/sprinklers will be design build and submitted separately if needed. assembly area partition is deffered submittalDetails
3rd fl conference ceneter: ti include demo of non structural partitions & building (n) non structural partitions. all new or revised mep included in this permit. life safety & fire alarm/sprinklers will be design build and submitted separately if needed. assembly area partition is deffered submittal | $987,000 |
| Jun 2, 2025 | Completed final sign-off Oct 2025 | 400 Howard St | Sc Builders, Inc | 4th flr - permit revision to 202504023527 - deconfiguration of non-structural demising partitions, light fixtures of ceiling assembly, millwork, plumbing, power outlets and finishes and structuralDetails
4th flr - permit revision to 202504023527 - deconfiguration of non-structural demising partitions, light fixtures of ceiling assembly, millwork, plumbing, power outlets and finishes and structural | |
| May 9, 2025 | In progress issued Aug 2025 | 555 California St | Bcci Construction Company | 52nd fl: tenant improvement. new partitions, ceilings, finishes with associated mepDetails
52nd fl: tenant improvement. new partitions, ceilings, finishes with associated mep | $4,360,000 |
| May 9, 2025 | Completed final sign-off Aug 2025 | 4 Embarcadero Center | Skyline Construction | 14th fl- tenant improvements of restrooms. work includes non structural demolition and construction of new restrooms and drinking fountain. no change in occupancy, use or area. existing path of travel documentation included for current code cycle approval: bldg entry and route, parking, ground flDetails
14th fl- tenant improvements of restrooms. work includes non structural demolition and construction of new restrooms and drinking fountain. no change in occupancy, use or area. existing path of travel documentation included for current code cycle approval: bldg entry and route, parking, ground fl | $193,104 |
| May 9, 2025 | Completed final sign-off Aug 2025 | 4 Embarcadero Center | Skyline Construction | 13th/f: t.i. of restrooms services: construction of new restrooms. no change in occupancy, use or area. mep deferred.Details
13th/f: t.i. of restrooms services: construction of new restrooms. no change in occupancy, use or area. mep deferred. | $90,346 |
| May 8, 2025 | In progress issued May 2025 | 1725 03rd St | Dpr Construction A | 11 th floor: revision to pa#202410092681. minor lighting, electrical, mechanical and finishes updates. no impact on occupancy or exiting. ref pa #202503273175Details
11 th floor: revision to pa#202410092681. minor lighting, electrical, mechanical and finishes updates. no impact on occupancy or exiting. ref pa #202503273175 | |
| May 7, 2025 | In progress issued May 2025 | 1655 03rd St | Dpr Construction A | 7/fl- revision 2 to 202410092683. updates to trainng room. scren and niche sizes removal of room schedules modified lighting . ref 202504184789Details
7/fl- revision 2 to 202410092683. updates to trainng room. scren and niche sizes removal of room schedules modified lighting . ref 202504184789 | |
| Apr 21, 2025 | In progress issued May 2025 | 1725 03rd St | Dpr Construction A | cafe-mb4-revision 202410092679- revised smoke control matrix and minor updated per field conditions.Details
cafe-mb4-revision 202410092679- revised smoke control matrix and minor updated per field conditions. | |
| Apr 18, 2025 | In progress issued May 2025 | 1655 03rd St | Dpr Construction A | forum mb3, 7th and 8th floors: revision to pa# 202410092683: revised smoke control matrix and minor update per field conditions.Details
forum mb3, 7th and 8th floors: revision to pa# 202410092683: revised smoke control matrix and minor update per field conditions. | |
| Apr 17, 2025 | Completed final sign-off Jun 2025 | 415 Mission St | Hathaway Dinwiddie Co. | 11th fl: new multi-faith room. new finishes, mechanical & electricalDetails
11th fl: new multi-faith room. new finishes, mechanical & electrical | $243,000 |
| Apr 14, 2025 | In progress issued Apr 2025 | 2 Embarcadero Center | M C S Construction Services | tenant improvement of suite 2210 on the 22nd fl includes: selective demo of non structural partitions, lights, finishes. construction of non structural partitions, lights, doors, windows, finishes. no change in occupancy use or area.Details
tenant improvement of suite 2210 on the 22nd fl includes: selective demo of non structural partitions, lights, finishes. construction of non structural partitions, lights, doors, windows, finishes. no change in occupancy use or area. | $75,424 |
| Apr 9, 2025 | Completed final sign-off Sep 2025 | 600 Battery St | Bcci Construction Company | revision to 202411255662: additional roof heater & support, modification of millwork in the break room, new furred wall for updated conference roomDetails
revision to 202411255662: additional roof heater & support, modification of millwork in the break room, new furred wall for updated conference room | $14,800 |
| Apr 2, 2025 | Completed final sign-off Oct 2025 | 400 Howard St | Sc Builders, Inc | 4th fl t.i.work includes interoir non structural demo of partitons, light fixtures, ceiling assembly, millwork, plumbing and finishes. build back non structural demising partitons, light fixtures,ceiling assembly, power outlets, finishesDetails
4th fl t.i.work includes interoir non structural demo of partitons, light fixtures, ceiling assembly, millwork, plumbing and finishes. build back non structural demising partitons, light fixtures,ceiling assembly, power outlets, finishes | $3,283,298 |
| Mar 27, 2025 | In progress issued May 2025 | 1725 03rd St | Dpr Construction A | 11th/fl: revision to pa#2024-1009-2681. minor adjustments to non-structrural partitions/doors, lightening, finishes and clarification of design intent. no effect on occupancy/exitingDetails
11th/fl: revision to pa#2024-1009-2681. minor adjustments to non-structrural partitions/doors, lightening, finishes and clarification of design intent. no effect on occupancy/exiting | |
| Mar 25, 2025 | Completed final sign-off Jul 2025 | 555 California St | Novo Construction Inc | ste 5200: demolition on non structural partitions, glazing, millworks, ceilings, lighting and finishes. ab-017Details
ste 5200: demolition on non structural partitions, glazing, millworks, ceilings, lighting and finishes. ab-017 | $125,000 |
| Mar 25, 2025 | Completed final sign-off Nov 2025 | 555 California St | Novo Construction Inc | 49th fl of demo of existing non structural partitions, doors, finishe, ceiling crid and tiles,lighting and power. new non structural partitions, glazing, doors, ceilings, lighting, finishes, power. no change in occupancy, use, areaDetails
49th fl of demo of existing non structural partitions, doors, finishe, ceiling crid and tiles,lighting and power. new non structural partitions, glazing, doors, ceilings, lighting, finishes, power. no change in occupancy, use, area | $662,430 |
| Mar 4, 2025 | Completed final sign-off Nov 2025 | 555 California St | Bcci Construction Company | 33rd fl - office ti to inlcude demo, arch & mep. partial floor buildout. 11,555 sfDetails
33rd fl - office ti to inlcude demo, arch & mep. partial floor buildout. 11,555 sf | $2,300,000 |
| Feb 18, 2025 | Completed final sign-off Feb 2026 | 600 Montgomery St | Principal Builders Inc. | 25/f: interior demo of (e) non structural partitions, doors, millwork, ceilings, flooring, and other finishes, hvac, electrical lighting, plumbing equipment. per sfdbi ab-17. no change in occupancy, use, or area.Details
25/f: interior demo of (e) non structural partitions, doors, millwork, ceilings, flooring, and other finishes, hvac, electrical lighting, plumbing equipment. per sfdbi ab-17. no change in occupancy, use, or area. | $25,692 |
| Feb 12, 2025 | Completed final sign-off Nov 2025 | 600 Montgomery St | Hathaway Dinwiddie Co. | 35/f: t.i.: demo of (e) non-structural interior partitions, ceilings & finishes. construction on (n) non-structural interior partiions, ceilings, lighting fixtures.Details
35/f: t.i.: demo of (e) non-structural interior partitions, ceilings & finishes. construction on (n) non-structural interior partiions, ceilings, lighting fixtures. | $906,459 |
| Feb 7, 2025 | Completed final sign-off May 2025 | 2 Embarcadero Center | M C S Construction Services | ste 1630: selective demo of millwork, non structural walls, power outlets, & finishes. construction of non structural partitions, doors/ store-fronts, electrical, millwork & finishes. no change in occupancy, use in area. mep deferredDetails
ste 1630: selective demo of millwork, non structural walls, power outlets, & finishes. construction of non structural partitions, doors/ store-fronts, electrical, millwork & finishes. no change in occupancy, use in area. mep deferred | $498,278 |
| Jan 31, 2025 | Completed final sign-off Jul 2025 | 555 California St | Clune Construction Company L P | 33rd fl - this project consists of demolition of non-structural partitions, no-plumbing renovation of the break area, millwork, lighting and finishes within a single suite. includes construction of tv niches, millwork, finishes, 2 light fixtures. there will be no change in occupancy or use.Details
33rd fl - this project consists of demolition of non-structural partitions, no-plumbing renovation of the break area, millwork, lighting and finishes within a single suite. includes construction of tv niches, millwork, finishes, 2 light fixtures. there will be no change in occupancy or use. | $493,359 |
| Jan 24, 2025 | Completed final sign-off Nov 2025 | 535 Mission St | Gci, Inc | 12th fl ti includes demo of non structural partitions and build n non str partitions. all mep life safety and sprinlers will be design build and submitted separately. fully sprinklered. restroom work included.Details
12th fl ti includes demo of non structural partitions and build n non str partitions. all mep life safety and sprinlers will be design build and submitted separately. fully sprinklered. restroom work included. | $1,273,134 |
| Dec 11, 2024 | Completed final sign-off Feb 2025 | 555 California St | Bcci Construction Company | 33rd flr demo of non-structural partitions, lighting, electrical and finishes.Details
33rd flr demo of non-structural partitions, lighting, electrical and finishes. | $75,000 |
| Nov 25, 2024 | Completed final sign-off Sep 2025 | 600 Battery St | Bcci Construction Company | new heaters & supports @ (e) roof terrace. electrical deferred under separate permit 202009023304Details
new heaters & supports @ (e) roof terrace. electrical deferred under separate permit 202009023304 | $5,112 |
| Oct 24, 2024 | Completed final sign-off Nov 2025 | 505 Brannan St | Novo Construction Inc | ti to construct partial shade structure on (e) roof deck. there is no change in occupant load, egress, occupancy, use or area. work include structural footing to support shade structure. shade structure is under separate permit.Details
ti to construct partial shade structure on (e) roof deck. there is no change in occupant load, egress, occupancy, use or area. work include structural footing to support shade structure. shade structure is under separate permit. | $44,872 |
| Oct 24, 2024 | Completed final sign-off Nov 2024 | 505 Sansome St | Hathaway Dinwiddie Co. | revision to pa# 202407307575, change of planter layout at south east corner of building. rev3 to original pa202202077476Details
revision to pa# 202407307575, change of planter layout at south east corner of building. rev3 to original pa202202077476 | |
| Oct 23, 2024 | In progress issued Nov 2024 | 1655 03rd St | Dpr Construction A | 2nd fl, mb 3 ti demo (e) & (n) non-structural partitions, doors, millwork, finishes. no mechanical work. no electrical workDetails
2nd fl, mb 3 ti demo (e) & (n) non-structural partitions, doors, millwork, finishes. no mechanical work. no electrical work | $98,832 |
| Oct 16, 2024 | In progress issued Oct 2024 | 600 Montgomery St | Hathaway Dinwiddie Co. | lobby tenant improvment for new exhibition hall on the 1st flr (annex) with new non-structural partitions, floor finishes, millwork and restrooms. mep deferred.Details
lobby tenant improvment for new exhibition hall on the 1st flr (annex) with new non-structural partitions, floor finishes, millwork and restrooms. mep deferred. | $400,000 |
| Oct 9, 2024 | In progress issued Jan 2025 | 1655 03rd St | Dpr Construction A | 7&8/fl-mb3- ti demo non structrual paritions. (n) non structural partitions doors glazing millwork and finishes (n) mep and (n) horizontal exitDetails
7&8/fl-mb3- ti demo non structrual paritions. (n) non structural partitions doors glazing millwork and finishes (n) mep and (n) horizontal exit | $2,328,962 |
| Oct 9, 2024 | In progress issued Jan 2025 | 1725 03rd St | Dpr Construction A | 6&7/fl- partial floor ti including non structural partition demo with new non structural paritions, doors, glazing millwork and finishes throughout project includes new fully engineered mep systems serving the tenant areas. scope of remodel includes the addition of a horizontal exit. includesDetails
6&7/fl- partial floor ti including non structural partition demo with new non structural paritions, doors, glazing millwork and finishes throughout project includes new fully engineered mep systems serving the tenant areas. scope of remodel includes the addition of a horizontal exit. includes | $2,113,464 |
| Oct 9, 2024 | In progress issued Feb 2025 | 1725 03rd St | Dpr Construction A | 11/fl-mb4- partial floor ti including non structural partition demo with new non structural paritions, doors, glazing millwork and finishes throughout project includes new fully engineered mep systems serving the tenant areas. no change in occupancy, use or areaDetails
11/fl-mb4- partial floor ti including non structural partition demo with new non structural paritions, doors, glazing millwork and finishes throughout project includes new fully engineered mep systems serving the tenant areas. no change in occupancy, use or area | $1,570,332 |
| Sep 24, 2024 | In progress issued Sep 2024 | 1655 03rd St | Dpr Construction A | mb3/bldg new phone booths floors 3, 4,5, 6, 9, 10, 11. parking area modifications and power door actuators.Details
mb3/bldg new phone booths floors 3, 4,5, 6, 9, 10, 11. parking area modifications and power door actuators. | $53,000 |
| Sep 24, 2024 | In progress issued Oct 2024 | 1725 03rd St | Dpr Construction A | mb4(tower 4) new furniture phone booths floors: 3, 4, 5, 8, 9, and 10.Details
mb4(tower 4) new furniture phone booths floors: 3, 4, 5, 8, 9, and 10. | $53,000 |
| Sep 20, 2024 | Completed final sign-off Apr 2025 | 1275 Market St | Bcci Construction Company | replacement of swinging storefront doors with sliding storefront doors. no change in occupancy, use or area. doors located at the backside of the building not street visibleDetails
replacement of swinging storefront doors with sliding storefront doors. no change in occupancy, use or area. doors located at the backside of the building not street visible | $2,840 |
| Sep 4, 2024 | In progress issued Sep 2024 | 50 California St | Bcci Construction Company | 24th fl - dmo of non-structural partitions, millwork, finishes, ceiling, lighting and plumbing. construction of non-structural partitions, millwork, finishes, ceiling, lights and new partitions. no change in occupancy use or areaDetails
24th fl - dmo of non-structural partitions, millwork, finishes, ceiling, lighting and plumbing. construction of non-structural partitions, millwork, finishes, ceiling, lights and new partitions. no change in occupancy use or area | $1,721,466 |
| Aug 15, 2024 | Completed final sign-off Apr 2025 | 600 Montgomery St | Hathaway Dinwiddie Co. | revise 202203039170 to doucment change of occupancy of transfer lobby from b to a-3.Details
revise 202203039170 to doucment change of occupancy of transfer lobby from b to a-3. | |
| Aug 13, 2024 | Expired or cancelled withdrawn Jul 2026 | 600 Montgomery St | Hathaway Dinwiddie Co. | 9/flr- interior demo of (e) non structural partitions, doors, millwork, ceilings, flooring, and other finsihes, mep equipmentDetails
9/flr- interior demo of (e) non structural partitions, doors, millwork, ceilings, flooring, and other finsihes, mep equipment | $158,490 |
| Aug 2, 2024 | Completed final sign-off May 2025 | 600 Montgomery St | Hathaway Dinwiddie Co. | 48/f: revise pa #202203089486 to document a-2 occupancy load on the 48th floor for sffd operational permit and provide furniture layout for the same.Details
48/f: revise pa #202203089486 to document a-2 occupancy load on the 48th floor for sffd operational permit and provide furniture layout for the same. | |
| Jul 30, 2024 | Completed final sign-off Nov 2024 | 505 Sansome St | Hathaway Dinwiddie Co. | ground fl revision to pa # 2022-0207-7476 scope of work includes planter and non structural demolition of storefront door to comply with notice of complaint # 202426441. remove demising wall to combine 2 tenant spaces into one. tenant space remains vacantDetails
ground fl revision to pa # 2022-0207-7476 scope of work includes planter and non structural demolition of storefront door to comply with notice of complaint # 202426441. remove demising wall to combine 2 tenant spaces into one. tenant space remains vacant | |
| Jul 24, 2024 | Completed final sign-off Nov 2024 | 600 Montgomery St | Hathaway Dinwiddie Co. | 12th fl - interior demo of (e) non structural partitions, doors, millwork, ceilings, flooring & other finishes. hvac, electrical (including lighting) plumbing & equipment. subject to ab-017Details
12th fl - interior demo of (e) non structural partitions, doors, millwork, ceilings, flooring & other finishes. hvac, electrical (including lighting) plumbing & equipment. subject to ab-017 | $486,000 |
| Jul 23, 2024 | Expired or cancelled cancelled Apr 2025 | 600 Montgomery St | Hathaway Dinwiddie Co. | revise pa# 202205164296: to amend scope to repair (e) precase concrete veneer on cooling tower vents. no change in use of occupancy.Details
revise pa# 202205164296: to amend scope to repair (e) precase concrete veneer on cooling tower vents. no change in use of occupancy. | $150,000 |
| Jul 19, 2024 | In progress issued Aug 2024 | 1725 03rd St | Dpr Construction A | mission bay 4 bldg level 11 interior non structural demo no fixture increaseDetails
mission bay 4 bldg level 11 interior non structural demo no fixture increase | $20,000 |