Tim Murphy
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Tmda
- Based in
- San Francisco
- On San Francisco permits
- Nov 2002 to Sep 2026
159 permits since 2000 (architect on 153 permits, engineer on 4 permits, authorized agent-others on 3 permits): 109 completed, 15 in progress, 16 never finaled, 19 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 159.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 24, 2026 | In progress issued Sep 2026 | 145 New Montgomery St | Principal Builders Inc. | ground floor: revise pa #202607175229 to show addition of sink and removal of millwork at reception desk. deferred mep for pa 202607175229 is included on this permit.Details
ground floor: revise pa #202607175229 to show addition of sink and removal of millwork at reception desk. deferred mep for pa 202607175229 is included on this permit. | $842,811 |
| Jul 17, 2026 | In progress issued Aug 2026 | 145 New Montgomery St | Principal Builders Inc. | minor tenant improvements on ground floor, new non-structural partitions, finishes, and millwork.Details
minor tenant improvements on ground floor, new non-structural partitions, finishes, and millwork. | $750,000 |
| Jul 13, 2026 | In progress issued Aug 2026 | 298 Alabama St | Brennan Strong Hold Construction Inc | non-structural improvements @ 2nd fl including new partitions and glazing, new finishes, doors and hardware. no exterior work. no change in use, occupancy or exiting.Details
non-structural improvements @ 2nd fl including new partitions and glazing, new finishes, doors and hardware. no exterior work. no change in use, occupancy or exiting. | $180,000 |
| Dec 15, 2025 | Completed final sign-off Mar 2026 | 600 Montgomery St | Truebeck Construction | structural revision to pa# 202504245130 and pa# 202504144304, to reassign engineer of record for the coil unit anchorage.Details
structural revision to pa# 202504245130 and pa# 202504144304, to reassign engineer of record for the coil unit anchorage. | |
| Jul 31, 2025 | In progress issued Sep 2025 | 4 Embarcadero Center | Bcci Construction Company | 13t/14th. interconnecting stair between floors 13&14 as part of office t.i. mep deferred.Details
13t/14th. interconnecting stair between floors 13&14 as part of office t.i. mep deferred. | $300,000 |
| Jun 27, 2025 | Completed final sign-off Aug 2026 | 345 California St | Gci, Inc | 30/f: tenant improvement.Details
30/f: tenant improvement. | $400,000 |
| Jun 24, 2025 | Completed final sign-off Nov 2025 | 35 South Park | Novo Construction Inc | 1st fl tenant improvement, new non structural partition, ceilings, door and hardware, glazing and frames. modifcation to existing floor, wall ceiling finishes for new layout.Details
1st fl tenant improvement, new non structural partition, ceilings, door and hardware, glazing and frames. modifcation to existing floor, wall ceiling finishes for new layout. | $136,968 |
| Jun 23, 2025 | Completed final sign-off Nov 2025 | 3 Embarcadero Center | Principal Builders Inc. | 26/f: installation of new non-structural partitions & glazing for new multipurpose room, conference room, & catering counter space.Details
26/f: installation of new non-structural partitions & glazing for new multipurpose room, conference room, & catering counter space. | $957,720 |
| May 14, 2025 | In progress issued May 2025 | 405 Howard St | Skyline Construction | 8th/f: revision to 202412126728 (no work to be done). update restroom plans per existing conditions. no fixture count changes, measurement correction onlyDetails
8th/f: revision to 202412126728 (no work to be done). update restroom plans per existing conditions. no fixture count changes, measurement correction only | |
| May 7, 2025 | In progress issued May 2025 | 405 Howard St | Skyline Construction | 1st fl: ti for 1,777 sq ft installation of non structural partitions, millwork, doors & hardware. partial replacement of mep distribution: new supply fan, distribution duct, power + signal, lighting & controlsDetails
1st fl: ti for 1,777 sq ft installation of non structural partitions, millwork, doors & hardware. partial replacement of mep distribution: new supply fan, distribution duct, power + signal, lighting & controls | $251,766 |
| May 6, 2025 | Completed final sign-off Dec 2025 | 600 Montgomery St | Truebeck Construction | priority ab004 deferred review of structural scope associated with pa# 202504114225Details
priority ab004 deferred review of structural scope associated with pa# 202504114225 | |
| Apr 24, 2025 | In progress issued May 2025 | 405 Howard St | Skyline Construction | 7/f: interior tenant improvement. infill stair opening with pan decking/structural support/concrete. patch back raised access flooring.Details
7/f: interior tenant improvement. infill stair opening with pan decking/structural support/concrete. patch back raised access flooring. | $172,000 |
| Apr 14, 2025 | Completed final sign-off Jun 2026 | 600 Montgomery St | Truebeck Construction | interior alterations of new tenant fit out of levels 10,12, and 13 levels. to include conference rooms, and storage areas.Details
interior alterations of new tenant fit out of levels 10,12, and 13 levels. to include conference rooms, and storage areas. | $9,800,000 |
| Apr 14, 2025 | Completed final sign-off Jun 2026 | 600 Montgomery St | Truebeck Construction | 9th & 11th fl t.i. interior alteration of new tenant fit out included conference rooms, storag aeras, enclosed offices, lan rooms w/ associated mep & structural workDetails
9th & 11th fl t.i. interior alteration of new tenant fit out included conference rooms, storag aeras, enclosed offices, lan rooms w/ associated mep & structural work | $6,500,000 |
| Apr 11, 2025 | Completed final sign-off Mar 2026 | 600 Montgomery St | Truebeck Construction | 23rd & 24th fl: interior alteration of conference rooms, storage areas, enclosed offices, pantries and lan rooms with associated mep, (structural for communicating opening for convenience stairs under separate permit. pa#2025-0424-5130)Details
23rd & 24th fl: interior alteration of conference rooms, storage areas, enclosed offices, pantries and lan rooms with associated mep, (structural for communicating opening for convenience stairs under separate permit. pa#2025-0424-5130) | $5,500,000 |
| Mar 10, 2025 | In progress issued Mar 2025 | 345 California St | Gci, Inc | 31st fl - revision to pa 202312132454 updated floor plans door schedule added conference room, reconfigured team rooms/ofces in lieu of open office work stations, updated restroom sheets (34) vav boxes, (2) heat pumps added electrical workDetails
31st fl - revision to pa 202312132454 updated floor plans door schedule added conference room, reconfigured team rooms/ofces in lieu of open office work stations, updated restroom sheets (34) vav boxes, (2) heat pumps added electrical work | |
| Jan 24, 2025 | Completed final sign-off Jul 2025 | 35 South Park | Novo Construction Inc | new interior partition, door hardware; glazing and frames. modification of existing floor,wall and ceiling finishes for new layoutDetails
new interior partition, door hardware; glazing and frames. modification of existing floor,wall and ceiling finishes for new layout | $116,545 |
| Jan 3, 2025 | Completed final sign-off Aug 2025 | 405 Howard St | Skyline Construction | 10/fl-ref 202410223482- partial ti to install non structural partitions and ceilings no change of use mep fire alarm system and sprinkler under separte permitDetails
10/fl-ref 202410223482- partial ti to install non structural partitions and ceilings no change of use mep fire alarm system and sprinkler under separte permit | $852,000 |
| Dec 12, 2024 | In progress issued Jan 2025 | 405 Howard St | Skyline Construction | 8/f: partial interior tenant improvement. installation of non structural partitions and ceilings. addition of patio millwork. no change of use. fire alarm system, sprinkler, mep under separate permit.Details
8/f: partial interior tenant improvement. installation of non structural partitions and ceilings. addition of patio millwork. no change of use. fire alarm system, sprinkler, mep under separate permit. | $1,704,000 |
| Dec 12, 2024 | In progress issued Jan 2025 | 405 Howard St | Skyline Construction | partial interior t.i. on 9th fl. installation of non structural partitions and ceilings (improvement area 7,900 sq) no change of use mep deferredDetails
partial interior t.i. on 9th fl. installation of non structural partitions and ceilings (improvement area 7,900 sq) no change of use mep deferred | $1,212,800 |
| Oct 22, 2024 | In progress issued Dec 2024 | 405 Howard St | Skyline Construction | 8-10/fl- partial interior demo of non structural partitions (e) lightings, ceilings, millwork. removal of (e) furniture systems. fire sprinkler plans will be under separate permit by fire protection contractor.Details
8-10/fl- partial interior demo of non structural partitions (e) lightings, ceilings, millwork. removal of (e) furniture systems. fire sprinkler plans will be under separate permit by fire protection contractor. | $170,000 |
| Oct 10, 2024 | In progress issued Nov 2024 | 140 New Montgomery St | Principal Builders Inc. | 21/fl- demo (e) non structural partitions ceilings finsihes (n) non structural partitions (n) millwork furniture glazing repair (e) finishesDetails
21/fl- demo (e) non structural partitions ceilings finsihes (n) non structural partitions (n) millwork furniture glazing repair (e) finishes | $300,000 |
| Aug 7, 2024 | Completed final sign-off Jan 2025 | 1088 Sansome St | Brennan Strong Hold Construction Inc | minor ti on the basement level only. new interior non structural partition, new door, and hardware. new glazing and frame. minor alteration to floor finish and ceiling finish. no change to mechanical or plumbing.Details
minor ti on the basement level only. new interior non structural partition, new door, and hardware. new glazing and frame. minor alteration to floor finish and ceiling finish. no change to mechanical or plumbing. | $30,000 |
| Dec 13, 2023 | In progress issued Jan 2024 | 345 California St | Gci, Inc | 31/f: demo of no structural partitions, ceilings, finhses & hardware. new interior non structural partitions & glazing, new doors, lighting & ceilings. new 36 vav boxes 1-new heat pump, 2-new fsds in lobby, new power lighting, new plumbing.Details
31/f: demo of no structural partitions, ceilings, finhses & hardware. new interior non structural partitions & glazing, new doors, lighting & ceilings. new 36 vav boxes 1-new heat pump, 2-new fsds in lobby, new power lighting, new plumbing. | $3,000,000 |
| Sep 5, 2023 | Completed final sign-off May 2024 | 345 California St | Gci, Inc | structural support and details for skyfold partition ceiling panel. ref 202305228283 and 202212218840.Details
structural support and details for skyfold partition ceiling panel. ref 202305228283 and 202212218840. | $15,000 |
| Aug 1, 2023 | Completed final sign-off Feb 2024 | 1 Embarcadero Center | Gci, Inc | 35th fl - ti to include new non structural partitions, doors, hardware glazing and frmaes. new flooring finishes. mep & fire like safety under separate permitDetails
35th fl - ti to include new non structural partitions, doors, hardware glazing and frmaes. new flooring finishes. mep & fire like safety under separate permit | $100,000 |
| Jul 17, 2023 | Never finaled issued Jul 2023, no final | 600 Montgomery St | Principal Builders Inc. | revision to 202304246334 to provide exacct product specification for concealed automatic rolled down smoke curtain at elevator doorsDetails
revision to 202304246334 to provide exacct product specification for concealed automatic rolled down smoke curtain at elevator doors | |
| May 22, 2023 | Completed final sign-off May 2024 | 345 California St | Gci, Inc | rev pa202109077835.resized the conference room 3004 and removed the banquet.removel a phone room and changed another phone room to a print room.changed the furntiure layout. added floor are to all offices. changed finish specs in misc design. maher n/a.Details
rev pa202109077835.resized the conference room 3004 and removed the banquet.removel a phone room and changed another phone room to a print room.changed the furntiure layout. added floor are to all offices. changed finish specs in misc design. maher n/a. | |
| May 22, 2023 | In progress issued Jan 2024 | 345 California St | Gci, Inc | rev pa202103086103: rev to design/details of stairs and removal of fire door at 31/32 flrs; interior improvements on the 30/31/32 flrs. 30/31/32 demo of (e) stairs from floors 31-32. new communicating stairs through floors 30-32. maher n/a.Details
rev pa202103086103: rev to design/details of stairs and removal of fire door at 31/32 flrs; interior improvements on the 30/31/32 flrs. 30/31/32 demo of (e) stairs from floors 31-32. new communicating stairs through floors 30-32. maher n/a. | |
| May 3, 2023 | Completed final sign-off Mar 2025 | 298 Alabama St | Brennan Strong Hold Construction Inc | minor interior improvement on 2nd fl, new non-structural partitions & glazings, add 4 new doors and hardware, add new finishes to rooms, casings , basebaord & paint. replace (e) countertop @ island. mo exteropr work, mep/life safety deferred.Details
minor interior improvement on 2nd fl, new non-structural partitions & glazings, add 4 new doors and hardware, add new finishes to rooms, casings , basebaord & paint. replace (e) countertop @ island. mo exteropr work, mep/life safety deferred. | $75,000 |
| Apr 14, 2023 | Never finaled issued Apr 2023, no final | 35 South Park | Novo Construction Inc | roof trellis and associated structural and penthouse deck. deferred submittal associated with prev approved permit 202008222419Details
roof trellis and associated structural and penthouse deck. deferred submittal associated with prev approved permit 202008222419 | |
| Jan 24, 2023 | Completed final sign-off Jul 2023 | 35 South Park | Novo Construction Inc | administrative permit to remove rooftop trellis scope of work from pa#202008222419. trellis owrk to be under seperate permit w/ structural design.Details
administrative permit to remove rooftop trellis scope of work from pa#202008222419. trellis owrk to be under seperate permit w/ structural design. | |
| Dec 21, 2022 | Completed final sign-off Jun 2024 | 345 California St | Gci, Inc | revision to pa# 202109077835 to reconfigure office space and add one new all gender restroom. new millwork added, remove conference room 3022 from scope, remove millwork in breakroom.Details
revision to pa# 202109077835 to reconfigure office space and add one new all gender restroom. new millwork added, remove conference room 3022 from scope, remove millwork in breakroom. | |
| Nov 18, 2022 | In progress issued May 2024 | 720 Montgomery St | new drink preparation and servery counter.Details
new drink preparation and servery counter. | $18,000 | |
| Jan 12, 2022 | Completed final sign-off Apr 2022 | 150 California St | M C S Construction Services | demo of non-structural partition & misc built in millwork. construct new partition to patch opening. patch & replace adjacent finishes/ceilings as needed. no impact to mep system or life/fire safety/sprinkler systems.Details
demo of non-structural partition & misc built in millwork. construct new partition to patch opening. patch & replace adjacent finishes/ceilings as needed. no impact to mep system or life/fire safety/sprinkler systems. | $24,000 |
| Jan 10, 2022 | Expired or cancelled cancelled May 2024 | 2229 Webster St | Hutan Construction | new foundation and voluntary seismic retrofit. new interior renovations second and third floors. new partitions, new millwork, new fixtures.Details
new foundation and voluntary seismic retrofit. new interior renovations second and third floors. new partitions, new millwork, new fixtures. | $360,000 |
| Nov 5, 2021 | Completed final sign-off Mar 2022 | 2860 Sacramento St | D3 Construction | interior improvements on the 3rd fl includes a new non-structural partitions, new door, hardware, new lighting and ceiling, new finishes, new flooring, new plumbing, fixture & refinemant of a structural workDetails
interior improvements on the 3rd fl includes a new non-structural partitions, new door, hardware, new lighting and ceiling, new finishes, new flooring, new plumbing, fixture & refinemant of a structural work | $80,000 |
| Nov 5, 2021 | Completed final sign-off Feb 2022 | 2856 Sacramento St | D3 Construction | revision to pa# 2021-0609-2024; refinement of structural wall on the 1st floorDetails
revision to pa# 2021-0609-2024; refinement of structural wall on the 1st floor | $2,000 |
| Sep 10, 2021 | Completed final sign-off Dec 2021 | 535 Mission St | Skyline Construction | 24th fl: ti add two (2) new conference rooms and reception area. demolition of non-structural partitions. new non-structural partitions /glazing new lighting and ceiling.Details
24th fl: ti add two (2) new conference rooms and reception area. demolition of non-structural partitions. new non-structural partitions /glazing new lighting and ceiling. | $165,000 |
| Sep 7, 2021 | Completed final sign-off Jun 2024 | 345 California St | 30th fl: demo of non-structural partitions, ceilings, finishes & hardwarre. new interior non-structural partitions & glazing, new doors & hardware, new lighting & ceiling, walls finishes & floor, new mep.Details
30th fl: demo of non-structural partitions, ceilings, finishes & hardwarre. new interior non-structural partitions & glazing, new doors & hardware, new lighting & ceiling, walls finishes & floor, new mep. | $2,750,000 | |
| Jun 10, 2021 | Completed final sign-off Mar 2022 | 21 South Park | Novo Construction Inc | 1st fl t.i.- new non structural partitions. revision to (e) mep distribution new finishies, flooring and furnitures. mep under sep permitDetails
1st fl t.i.- new non structural partitions. revision to (e) mep distribution new finishies, flooring and furnitures. mep under sep permit | $15,000 |
| May 24, 2021 | Completed final sign-off Oct 2021 | 2858 Sacramento St | D3 Construction | interior improvements on the basement and 1st fl includes new structural footings and posts. 2nd fl new structural posts, non structural partitions, new door and hardware, new lighting, ceilings, new finishes, new flooring, new plumbing fixtures, new furniture.Details
interior improvements on the basement and 1st fl includes new structural footings and posts. 2nd fl new structural posts, non structural partitions, new door and hardware, new lighting, ceilings, new finishes, new flooring, new plumbing fixtures, new furniture. | $50,000 |
| Apr 21, 2021 | Completed final sign-off Nov 2021 | 1 Embarcadero Center | M C S Construction Services | new non-structural partitions, new door and hardware, new lighting and ceilings, new wall and floor finishes, new millwork and furniture, new upgraded restrooms for ada complianceDetails
new non-structural partitions, new door and hardware, new lighting and ceilings, new wall and floor finishes, new millwork and furniture, new upgraded restrooms for ada compliance | $285,000 |
| Mar 8, 2021 | Never finaled issued May 2021, no final | 345 California St | Gci, Inc | revision to pa# 202009234825. to increase scope to add communicating stair. 31st to 32nd floor structural support.Details
revision to pa# 202009234825. to increase scope to add communicating stair. 31st to 32nd floor structural support. | $50,000 |
| Jan 6, 2021 | Completed final sign-off Oct 2023 | 27 Maiden Ln | Novo Construction Inc | roof deck improvements: additional prefabricated pergola.Details
roof deck improvements: additional prefabricated pergola. | $15,000 |
| Dec 24, 2020 | Completed final sign-off Jul 2023 | 35 South Park | Novo Construction Inc | voluntary structural upgrade for seismic strengthening. work is limited to new shotcrete walls and supporting foundations.Details
voluntary structural upgrade for seismic strengthening. work is limited to new shotcrete walls and supporting foundations. | $250,000 |
| Sep 23, 2020 | Never finaled issued Dec 2020, no final | 345 California St | Gci, Inc | 30-31/f: new communicating stair on 30-31st floor: new non-structurual partitions m, new doors & hardware. new structural support.Details
30-31/f: new communicating stair on 30-31st floor: new non-structurual partitions m, new doors & hardware. new structural support. | $350,000 |
| Sep 2, 2020 | Completed final sign-off Sep 2021 | 27 Maiden Ln | Novo Construction Inc | interior improvements to incl new structural stair, new flooring and finishes. new flooring and furniture at roof deck.Details
interior improvements to incl new structural stair, new flooring and finishes. new flooring and furniture at roof deck. | $200,000 |
| Sep 2, 2020 | Completed final sign-off Feb 2021 | 27 Maiden Ln | Novo Construction Inc | tenant improvement on 7th fl to include new non-structural patitions. new mep distribution, new lighting & ceiling. new millwork, finishes, flooring & furniture.Details
tenant improvement on 7th fl to include new non-structural patitions. new mep distribution, new lighting & ceiling. new millwork, finishes, flooring & furniture. | $1,750,000 |
| Sep 2, 2020 | Completed final sign-off Apr 2021 | 747 Front St | Novo Construction Inc | interior improvement on 1st fl to include demolition of non-structural patitions. revision to mep distribution. new electrical & plumbing. new lighting, ceilings, finishes, flooring & furniture.Details
interior improvement on 1st fl to include demolition of non-structural patitions. revision to mep distribution. new electrical & plumbing. new lighting, ceilings, finishes, flooring & furniture. | $1,013,000 |
| Aug 31, 2020 | Completed final sign-off Nov 2020 | 3 Embarcadero Center | M C S Construction Services | suite #1420: new interior improvements. new inteiror non-structural partitions, new door & hardware, new glazing & frames, new wall & floor finishes.Details
suite #1420: new interior improvements. new inteiror non-structural partitions, new door & hardware, new glazing & frames, new wall & floor finishes. | $8,000 |
| Aug 22, 2020 | Never finaled issued Mar 2022, no final | 35 South Park | Novo Construction Inc | tenant improvement; new penthouse level, new non-structural partitions, new lighting and ceilings, new finishes, new flooring, and new furniture systems, maher n/a. deferred submittal for mep scope of work.Details
tenant improvement; new penthouse level, new non-structural partitions, new lighting and ceilings, new finishes, new flooring, and new furniture systems, maher n/a. deferred submittal for mep scope of work. | $1,500,000 |
| Mar 16, 2020 | Completed final sign-off Jan 2021 | 1 Embarcadero Center | Gci, Inc | 35/f: demo of (e) non structural partitions. new interior improvements (partitions non-structural, dfh, lighting, finishes, new furniture systems power & data) meps deferredDetails
35/f: demo of (e) non structural partitions. new interior improvements (partitions non-structural, dfh, lighting, finishes, new furniture systems power & data) meps deferred | $25,000 |
| Mar 5, 2020 | Completed final sign-off Jul 2020 | 345 California St | Gci, Inc | ti on 25th & 26th fl: new interior non-structural partition to enclose (e) communicating stair, new non-structural partial height wall at reception.Details
ti on 25th & 26th fl: new interior non-structural partition to enclose (e) communicating stair, new non-structural partial height wall at reception. | $12,000 |
| Feb 6, 2020 | Completed final sign-off Aug 2020 | 345 California St | Gci, Inc | interior improvements on the 11th floor. n/aDetails
interior improvements on the 11th floor. n/a | $95,000 |
| Nov 12, 2019 | Completed final sign-off Aug 2020 | 4 Embarcadero Center | Gci, Inc | new interior improvements noin structural partitions, new wall and flooring finishes, new millwork, plumbing fixtures, dfh, glazing and frames, meps fire alarm deferred maher not reqDetails
new interior improvements noin structural partitions, new wall and flooring finishes, new millwork, plumbing fixtures, dfh, glazing and frames, meps fire alarm deferred maher not req | $2,500,000 |
| Oct 7, 2019 | Completed final sign-off Dec 2019 | 1088 Sansome St | Brennan Strong Hold Construction Inc | to show exact layout of office conversion.Details
to show exact layout of office conversion. | |
| Jul 23, 2019 | Completed final sign-off Dec 2019 | 4 Embarcadero Center | Source Planning And Construction Inc | revision to pa 2018-1203-7203 and 2019-0312-4971. reconfigure office spaceDetails
revision to pa 2018-1203-7203 and 2019-0312-4971. reconfigure office space | |
| Mar 12, 2019 | Completed final sign-off Dec 2019 | 4 Embarcadero Center | Source Planning And Construction Inc | 25th flr- revision to 201812037203 maher naDetails
25th flr- revision to 201812037203 maher na | |
| Jan 23, 2019 | Completed final sign-off May 2019 | 1 Embarcadero Center | Skyline Construction | 38th floor: t.i. to include new partitions, doors and hardware, glazing and frames, millwork, ceiling. mep, life safety and fire sprinkler under seperate permit. n/a for maherDetails
38th floor: t.i. to include new partitions, doors and hardware, glazing and frames, millwork, ceiling. mep, life safety and fire sprinkler under seperate permit. n/a for maher | $600,000 |
| Dec 3, 2018 | Completed final sign-off Dec 2019 | 4 Embarcadero Center | Source Planning And Construction Inc | 25th fl - demo of (e) non structural partitions. (n) non-structural paritions, meps, life safety & sprinkler under separate permitDetails
25th fl - demo of (e) non structural partitions. (n) non-structural paritions, meps, life safety & sprinkler under separate permit | $272,000 |
| Aug 23, 2018 | Completed final sign-off Jan 2019 | 1 Embarcadero Center | Skyline Construction | 36th flr. interior tenant improvement, demo of non-structural partitions, new partitions, new doors and hardware, millwork & finishesDetails
36th flr. interior tenant improvement, demo of non-structural partitions, new partitions, new doors and hardware, millwork & finishes | $1,003,145 |
| Jul 10, 2018 | Completed final sign-off Nov 2019 | 160 Spear St | Novo Construction Inc | 14th fl - demo of non-structural partitions doors & millwork. new non-structural partitions, new doors, flooring, finishes, new break area. mep & fire life safety under separate permitDetails
14th fl - demo of non-structural partitions doors & millwork. new non-structural partitions, new doors, flooring, finishes, new break area. mep & fire life safety under separate permit | $86,250 |
| Apr 20, 2018 | Completed final sign-off Oct 2018 | 2060 Divisadero St | Larkspur Builders Inc. | demo of non structural walls, doors in response to planning enforcement 201800279 enf to re-establish 2 dwelling units and 1 business space; new walls, doors, plumbingm, ceiling, stairs.Details
demo of non structural walls, doors in response to planning enforcement 201800279 enf to re-establish 2 dwelling units and 1 business space; new walls, doors, plumbingm, ceiling, stairs. | $25,000 |
| Dec 8, 2017 | Completed final sign-off Aug 2020 | 2602 Pacific Av | revision to 2016-0513-7389. replace (e) skylights with (n) skylights. extent terrace deck to align with flat roof below.Details
revision to 2016-0513-7389. replace (e) skylights with (n) skylights. extent terrace deck to align with flat roof below. | $15,000 | |
| Aug 7, 2017 | Never finaled issued Aug 2017, no final | 140 New Montgomery St | Skyline Construction | 20th fl - interior non-structural partitions, ceilings, doors & hardware. mep under separate permit. n/a ordinance #155-13Details
20th fl - interior non-structural partitions, ceilings, doors & hardware. mep under separate permit. n/a ordinance #155-13 | $340,000 |
| Jun 30, 2017 | Completed final sign-off May 2018 | 65 Alpine Tr | Pinkowski Construction | deck extension and new stair to grade, reconfiguration of 1st floor, install new french doors, replace extg door with window, new lighting, plumbing fixtures and finishes.Details
deck extension and new stair to grade, reconfiguration of 1st floor, install new french doors, replace extg door with window, new lighting, plumbing fixtures and finishes. | $65,000 |
| May 1, 2017 | Completed final sign-off Dec 2017 | 2060 Divisadero St | D3 Construction | unit 2: renovation of (e) apts on 2nd and 3rd fl. work includes new partitions, fixtures, ceilings, doors, finishes, 1 new bathroom. no work gr fl. no exterior workDetails
unit 2: renovation of (e) apts on 2nd and 3rd fl. work includes new partitions, fixtures, ceilings, doors, finishes, 1 new bathroom. no work gr fl. no exterior work | $40,000 |
| Apr 12, 2017 | Completed final sign-off Jan 2018 | 2060 Divisadero St | D3 Construction | demo of (e) slab & post for new voluntary structural foundation upgrade. new stair & ramps for level change, new ceiling, light fixtures & floor finishes maher naDetails
demo of (e) slab & post for new voluntary structural foundation upgrade. new stair & ramps for level change, new ceiling, light fixtures & floor finishes maher na | $30,000 |
| Apr 4, 2017 | Completed final sign-off Dec 2017 | 2060 Divisadero St | D3 Construction | change of use of ground floor bar to office. no construction under this permit, no change upper units.Details
change of use of ground floor bar to office. no construction under this permit, no change upper units. | |
| Dec 30, 2016 | Completed final sign-off Nov 2017 | 150 Spear St | Principal Builders Inc. | 14th: ti- to demo and construct new partitions, millwork, doors and finishing mep/fire/life safety will be submitted sep. maher naDetails
14th: ti- to demo and construct new partitions, millwork, doors and finishing mep/fire/life safety will be submitted sep. maher na | $250,000 |
| May 13, 2016 | Completed final sign-off Nov 2018 | 2602 Pacific Av | revison to approved site permit & addendum under 2014-11-24-2346. changes include horizontal expansion on 3rd floor, exterior walls & siding (in rear), (n) terrace, interior changes.Details
revison to approved site permit & addendum under 2014-11-24-2346. changes include horizontal expansion on 3rd floor, exterior walls & siding (in rear), (n) terrace, interior changes. | $65,000 | |
| May 10, 2016 | Completed final sign-off Aug 2017 | 1 Sansome St | Novo Construction Inc | 42nd floor: ti new interior partitions, new and relocated mep distribution, new finishes.Details
42nd floor: ti new interior partitions, new and relocated mep distribution, new finishes. | $200,000 |
| May 2, 2016 | Never finaled issued May 2016, no final | 1 Embarcadero Center | Skyline Construction | interior t.i. on the 40/f, removal of all existing partitions, new interior non-structural partitions, new doors, hardware, new ceiling and lighting, new finishes, mep. under seperate permit. n/a ordinance #155-13Details
interior t.i. on the 40/f, removal of all existing partitions, new interior non-structural partitions, new doors, hardware, new ceiling and lighting, new finishes, mep. under seperate permit. n/a ordinance #155-13 | $75,000 |
| Dec 30, 2015 | Completed final sign-off Dec 2016 | 1 Sansome St | Novo Construction Inc | 41st flr: new interior non-structural partitions, new & relocated mep distribution, new lighting & ceilings, new doors & hardware,new casework, new finishes; maher n/aDetails
41st flr: new interior non-structural partitions, new & relocated mep distribution, new lighting & ceilings, new doors & hardware,new casework, new finishes; maher n/a | $1,850,000 |
| Oct 14, 2015 | Completed final sign-off Apr 2016 | 3511 Clay St | Aaron Gordon Construction Inc | demolition of existing balcony metal railing to be replaced with new metal railing. addition of ne entry decorative metal, new exterior paintDetails
demolition of existing balcony metal railing to be replaced with new metal railing. addition of ne entry decorative metal, new exterior paint | $10,000 |
| Sep 1, 2015 | Completed final sign-off Oct 2016 | 1 Sansome St | Novo Construction Inc | 38th floor tenant improvement - new non-structural partitions, new & relocated mep distribution, new lighting ceilings, new doors, casework & finishes.Details
38th floor tenant improvement - new non-structural partitions, new & relocated mep distribution, new lighting ceilings, new doors, casework & finishes. | $1,000,000 |
| Aug 24, 2015 | Completed final sign-off Jan 2016 | 3037 California St | D3 Construction | interior & minor exterior improvements on attic level: new dormer window, skylights; new interior furred partitions & roof deck for thermal improvements; new lighting, new fixtures.Details
interior & minor exterior improvements on attic level: new dormer window, skylights; new interior furred partitions & roof deck for thermal improvements; new lighting, new fixtures. | $35,000 |
| Aug 5, 2015 | Completed final sign-off Apr 2017 | 28 Fremont St | Novo Construction Inc | ground floor: revision to pa 2015 0126 6675: mechanical, electrical & plumbing, & elevation changes. no exterior work or change of use. maher naDetails
ground floor: revision to pa 2015 0126 6675: mechanical, electrical & plumbing, & elevation changes. no exterior work or change of use. maher na | |
| Jul 13, 2015 | Completed final sign-off Jan 2016 | 55 02nd St | Skyline Construction | 4th fl: interior non-structural demolition to include removal of full height partition & associate glazing per ab-017. n/a ordinance #155-13Details
4th fl: interior non-structural demolition to include removal of full height partition & associate glazing per ab-017. n/a ordinance #155-13 | $30,000 |
| Apr 17, 2015 | Expired or cancelled cancelled Mar 2019 | 456 Montgomery St | partial exterior improvements to include new canopy above (e) doors, new exterior lighting, new structural awning supports. new finishes to match (e) facade. ** maher: compliance with oridnance no# 155-13 not required **Details
partial exterior improvements to include new canopy above (e) doors, new exterior lighting, new structural awning supports. new finishes to match (e) facade. ** maher: compliance with oridnance no# 155-13 not required ** | $20,000 | |
| Mar 23, 2015 | Completed final sign-off Nov 2015 | 340 Pine St | Rossi Builders Inc. | revision to appl #2015.0206.7665 - delete (n) conference room from scope of work & back to storage room. (e) solid concrete shaft walls & rated doors to remain. n/a marher ordinanceDetails
revision to appl #2015.0206.7665 - delete (n) conference room from scope of work & back to storage room. (e) solid concrete shaft walls & rated doors to remain. n/a marher ordinance | |
| Feb 6, 2015 | Never finaled issued Feb 2015, no final | 1 Sansome St | Novo Construction Inc | suite# 4000. t.i. on 40th floor to include removal of existing partial & full height partitions @ stairs. new interior non-structural partitions.Details
suite# 4000. t.i. on 40th floor to include removal of existing partial & full height partitions @ stairs. new interior non-structural partitions. | $600,000 |
| Feb 6, 2015 | Completed final sign-off May 2015 | 530 Washington St | Nuco Dba Premier Construction Services | improvement to 2/f offices: remove & replace partitions, new doors, hardware & finishes, paint & carpet. n/a ordinance #155-13Details
improvement to 2/f offices: remove & replace partitions, new doors, hardware & finishes, paint & carpet. n/a ordinance #155-13 | $120,250 |
| Feb 6, 2015 | Completed final sign-off Nov 2015 | 340 Pine St | Rossi Builders Inc. | t.i. includes int. improvements to ground floor and mezz. level. doors. hardware, casework, toilet room, and associated ceilings where occurs. n/a for the maher. no exterior work. compliance with maher ordinance no 155-13 not required.Details
t.i. includes int. improvements to ground floor and mezz. level. doors. hardware, casework, toilet room, and associated ceilings where occurs. n/a for the maher. no exterior work. compliance with maher ordinance no 155-13 not required. | $850,000 |
| Jan 27, 2015 | Completed final sign-off Nov 2015 | 340 Pine St | Rossi Builders Inc. | t.i. in basement level, removal of (e) full, ceiling height partitions, doors, hardware, casework, toilets. n/a ordinance #155-13Details
t.i. in basement level, removal of (e) full, ceiling height partitions, doors, hardware, casework, toilets. n/a ordinance #155-13 | $65,000 |
| Jan 8, 2015 | Completed final sign-off Nov 2015 | 340 Pine St | Rossi Builders Inc. | basement demo only - ermoval of (e) full & ceiling height interior partitions per ab-017. n/a maher ordinanceDetails
basement demo only - ermoval of (e) full & ceiling height interior partitions per ab-017. n/a maher ordinance | $30,000 |
| Nov 24, 2014 | Completed final sign-off Nov 2018 | 2602 Pacific Av | interior t.i. on all 4 floors. minor horizontal expansion in rear on floors 1,3,& 4. (n) seismic reinforcement, (n) window, doors, hardware, finishes, lighting, plumbing.Details
interior t.i. on all 4 floors. minor horizontal expansion in rear on floors 1,3,& 4. (n) seismic reinforcement, (n) window, doors, hardware, finishes, lighting, plumbing. | $200,000 | |
| Nov 19, 2014 | Completed final sign-off Dec 2015 | 151 10th St | Novo Construction Inc | demolition of existing non structural partitions, interior glazing, doors & frames. demo per ab-017. n/a ordinance #155-13Details
demolition of existing non structural partitions, interior glazing, doors & frames. demo per ab-017. n/a ordinance #155-13 | $6,000 |
| Oct 30, 2014 | Completed final sign-off Dec 2014 | 2810 Clay St | D3 Construction | revision changes a.00 to reflect non sprinklered status to pa #2013.0918.7184-s1 - correction of error on documents: building is non sprinklered, drawings state bldg is partially sprinklered. n/a marher ordinanceDetails
revision changes a.00 to reflect non sprinklered status to pa #2013.0918.7184-s1 - correction of error on documents: building is non sprinklered, drawings state bldg is partially sprinklered. n/a marher ordinance | |
| Oct 23, 2014 | Never finaled issued Nov 2014, no final | 2602 Pacific Av | voluntary seismic upgrade of 4 story single family home.Details
voluntary seismic upgrade of 4 story single family home. | $100,000 | |
| Oct 10, 2014 | Completed final sign-off Dec 2014 | 3079 16th St | Speedy Construction ****See Note | title 24 submittal 201406138318 & 201409032487Details
title 24 submittal 201406138318 & 201409032487 | |
| Jun 13, 2014 | Completed final sign-off Dec 2014 | 3079 16th St | Speedy Construction ****See Note | construction of entry/egress doors, path, toilet room to full compliance, bar and lower back bar, built in seating, lighting, demo under separate permit.Details
construction of entry/egress doors, path, toilet room to full compliance, bar and lower back bar, built in seating, lighting, demo under separate permit. | $45,000 |
| Jun 6, 2014 | Completed final sign-off Dec 2014 | 3079 16th St | Speedy Construction ****See Note | demo non complaint toilet baths, front lower back bar, mezzanine storage area, landing at non functional stair. demo work only for future t.i. ab-017 appliesDetails
demo non complaint toilet baths, front lower back bar, mezzanine storage area, landing at non functional stair. demo work only for future t.i. ab-017 applies | $4,000 |
| Apr 2, 2014 | Never finaled issued Apr 2014, no final | 465 California St | Rossi Builders Inc., Roebuck Construction | revision to appl #2013.0816.4527 with sheet #'s a3.0,a6.0 & a9.0 amended to illustrate a waterproof membrane as requested by the bldg inspector. compliance with ordinance #155-13 not requiredDetails
revision to appl #2013.0816.4527 with sheet #'s a3.0,a6.0 & a9.0 amended to illustrate a waterproof membrane as requested by the bldg inspector. compliance with ordinance #155-13 not required | |
| Apr 2, 2014 | Never finaled issued Apr 2014, no final | 140 New Montgomery St | Skyline Construction | 20th floor: interior improvements on the 20th floor to include, new non structural partitions, mep distribution,new lighting and ceilings, new doors hardware and finishes.n/a for the maher ordinance #155-13 and interim ordinance #428-13Details
20th floor: interior improvements on the 20th floor to include, new non structural partitions, mep distribution,new lighting and ceilings, new doors hardware and finishes.n/a for the maher ordinance #155-13 and interim ordinance #428-13 | $900,000 |
| Jan 30, 2014 | Never finaled issued Feb 2014, no final | 360 Pine St | Roebuck Construction | tenant improvement of 3rd floor suite. compliance with ordinance #155-13 not required.Details
tenant improvement of 3rd floor suite. compliance with ordinance #155-13 not required. | $135,000 |
| Dec 12, 2013 | Never finaled issued Dec 2013, no final | 3198 16th St | Northern Sun Associates | non-structural interior demolition only, removal of interior finishes & non structural partition walls. ti under separate permit.Details
non-structural interior demolition only, removal of interior finishes & non structural partition walls. ti under separate permit. | $4,500 |
| Nov 26, 2013 | Completed final sign-off Mar 2014 | 607 Front St | Novo Construction Inc | new interior non-structural partitions, new restrooms, relocate doors and hardware and finishes. mep, fire sprinkler& life safety under separate permit.Details
new interior non-structural partitions, new restrooms, relocate doors and hardware and finishes. mep, fire sprinkler& life safety under separate permit. | $263,000 |
| Sep 18, 2013 | Completed final sign-off Dec 2014 | 2810 Clay St | D3 Construction | unit reduction via merger: 3 into 2 units. unit #1 no work. unit 2 & 3 merge units. remove non bearing partiition. remove range + refrigerator from unit 3 covert top level kitchen to laundry. ** maher: compliance with ordinance no# 155-13 not required **Details
unit reduction via merger: 3 into 2 units. unit #1 no work. unit 2 & 3 merge units. remove non bearing partiition. remove range + refrigerator from unit 3 covert top level kitchen to laundry. ** maher: compliance with ordinance no# 155-13 not required ** | $1,000 |