| Sep 23, 2026 | In progress filed Sep 2026, not yet issued | 150 Spear St | suite 1400: modification of existing t.i. to include demo of non-load bearing partitions, ceiling grid and tile, light fixtures & switching, millwork , powder/data, finishes doors, frames & hardware. all work shall comply with federal, state & local codes. | $258,992 | |
| Sep 15, 2026 | In progress issued Sep 2026 | 150 Spear St | Thomas Swan Sign Co Inc | 12/f - suite 1200: install evacuation maps on 12th floor. | $2,500 |
| Aug 5, 2026 | In progress issued Aug 2026 | 150 Spear St | Peacock Construction | 12th floor: electrical under 202606032405. provide new lighting, power, signal and branch circuitng to existing panel. | $350,000 |
| Jul 24, 2026 | In progress issued Aug 2026 | 150 Spear St | Peacock Construction | 12th floor: hvac modifications under reference # 202606032405 | $300,000 |
| Jul 15, 2026 | In progress filed Jul 2026, not yet issued | 150 Spear St | ste: 1500: installation of 3 phone booths, including anchoring details. | $50,000 | |
| Jun 3, 2026 | In progress issued Jun 2026 | 150 Spear St | Peacock Construction | ste: 1200 - modification to (e) ti. to include selective demo+ construction of non load bearing partitions, new ceiling grid+ tile, new light fixtures+ switching, new break area + coffee bar millwork, new finishes new door frames. deferred mep. | $1,500,000 |
| Dec 19, 2025 | Completed final sign-off Jan 2026 | 150 Spear St | Phase One Fire Life Safety Systems Inc | suite 1800. arch permit: 202510217829. add 4 speaker strobes to 4 phone booth. 4 speaker strobes are being add to existing fire alarm system. | $13,760 |
| Oct 21, 2025 | Completed final sign-off Jan 2026 | 150 Spear St | Peacock Construction | 18th fl - installation of 2 new phone booths and associated anchoring of 2 existing phone booths. life safety and sprinkler work are submitted separately. previously permitted and completed ti | $6,000 |
| Oct 16, 2025 | Completed final sign-off Jun 2026 | 150 Spear St | Peacock Construction | non load bearing partitions, new ceiling, new lighting, and mechanical, electrical, and plumbing are deferred submittal. this project involves modification of existing t.i. to include selective demolition & construction of non-bearin partitions, lights, finishes, doors,&ceiling. ref pa #202504285343 | $5,500 |
| Sep 16, 2025 | In progress issued Sep 2025 | 150 Spear St | Johnson Controls Fire | 5th fl: as builts for pa # 2025-0512-6226. fire alarm devices installed as shown as drawings. | $10,000 |
| Aug 25, 2025 | In progress issued Aug 2025 | 150 Spear St | Phase One Fire Life Safety Systems Inc | ste# 1800/18th f: modification to e) fire alarm system, relocate e) fire alarm device per new architectural layout. add 1 new ceiling speaker strobe, add 2 ductor & shut down of 2 heat pumps. ref to t.i. 202504285343 | $36,526 |
| Aug 13, 2025 | Completed final sign-off Jun 2026 | 150 Spear St | Peacock Construction | 18th flr. deferred mechanical work for pa#: 202504285343. | $154,000 |
| Jul 3, 2025 | Completed final sign-off Jan 2026 | 150 Spear St | Golden Gate Fire Protection Inc | 18th fl - relocate 11 pendent sprinkler heads to upright due to removed ceiling to exposed deck at suite 31800 ref 202504285343 + 2025.1021.7829 | $2,500 |
| Jul 1, 2025 | Completed final sign-off Jun 2026 | 150 Spear St | Peacock Construction | 18th floor: suite 1800 electrical for 202504285343. | $186,000 |
| May 16, 2025 | Completed final sign-off Jul 2025 | 150 Spear St | Johnson Controls Fire | 16th floor: as built to approved pa #202503142236. 4 new speaker strobes. 1 relay and 2 door holders. ref #202411225591 | $3,000 |
| May 12, 2025 | In progress issued May 2025 | 150 Spear St | Johnson Controls Fire | 5/f: provide and install (2) duct detectors, (1) relay, and (4) speaker strobes. devices to scope if work embryology lab 557, cryo storage, room 582, and storage room 581, relocate and demo (e) devices shown on drawings. | $10,000 |
| May 8, 2025 | In progress issued May 2025 | 150 Spear St | R L H Fire Protection Inc | 5th floor: fire sprinkler permit. relocate 14, add 12, and delete 11 sprinklers. t.i. ref #202401314950 | $12,000 |
| Apr 28, 2025 | Completed final sign-off Jun 2026 | 150 Spear St | Peacock Construction | 18/f (ste 1800): ti - selective demo, new non load bearing partitions, lighting/switching finishes, door and frames. mech/electrical under seperate permit. | $260,000 |
| Mar 14, 2025 | Completed final sign-off Jul 2025 | 150 Spear St | Johnson Controls Fire | 16th/f: modify e) fire alarm system. prodide 4 new speakers to phone booths, remove 2 e) strobes, replace w/ 2 speaker strobes, 1 relay, 2 door holders. ref to t.i. 202411225591 | $7,500 |
| Jan 31, 2025 | Completed final sign-off Apr 2025 | 150 Spear St | Peacock Construction | 17/f suite 1700 - hvac modifications to support interior ti. ref permit 202412136794 | $10,000 |
| Jan 30, 2025 | Completed final sign-off Feb 2025 | 150 Spear St | Johnson Controls Fire | 17/f: modify (e) fire alarm system, add (1) relay, (12) speaker strobes and (2) door holders. ref pa# 202412136794. | $6,500 |
| Jan 14, 2025 | Completed final sign-off Apr 2025 | 150 Spear St | Peacock Construction | electrical ref 202412136794 | $50,000 |
| Jan 7, 2025 | Completed final sign-off Jan 2025 | 150 Spear St | Ayoob & Peery Plumbing Co Inc | suite 1700: add (6) relocate (37) change out (10) fire sprinkler per ti job #24-701. ref #202412136794 | $29,109 |
| Dec 13, 2024 | Completed final sign-off Apr 2025 | 150 Spear St | Peacock Construction | 17th floor. interior t.i. new millwork in break area, new huddle rooms, new conference roo, new grid ceiling + lighting. demo ceilings in open office. mep deferred | $475,000 |
| Nov 25, 2024 | Completed final sign-off Jan 2025 | 150 Spear St | R L H Fire Protection Inc | demo all sprinklers and piping in the work area (62 heads) install new piping and sprinklers and connect to the (e) piping 62 new pendents sprinklers t.i. #2024-0131-4950 | $40,000 |
| Nov 22, 2024 | Completed final sign-off Jul 2025 | 150 Spear St | Peacock Construction | 16th floor: phone booths with structural support.four (4)new phone booths. life safety &sprinkler work submitted separately. prefabricated phone booths | $98,576 |
| Nov 1, 2024 | Completed final sign-off Feb 2025 | 150 Spear St | Johnson Controls Fire | 5th/f, ste 500: provide and install new 3 duct detecotors, 23 speaker strobes, 1 speaker as shown on drawings. ref to 202401184175 | $12,000 |
| Oct 7, 2024 | In progress issued Jan 2025 | 150 Spear St | Gci, Inc | revision to 202401314950 no longer in scope nurse office 527, consult 526, exam 528, staff lounge 574, staff lockers, 576 staff lockers 576, staff toilet 577, dressing room 561, patient tt 575, clean/soiled 520, storage 516, med waste 530, blood lab 512, reception 513 | |
| Aug 6, 2024 | In progress issued Nov 2024 | 150 Spear St | Gci, Inc | 5/f suite 500: revision to permit 202401184175 to add consult room, office and storage, electrical, added wireless access points, security cameras and adjustments of ceilings with new offices and storage. 10/3/24: change of scope due to (e) conditions the staff restroom, lockers, and lacation room | |
| May 7, 2024 | In progress issued Jul 2024 | 150 Spear St | Gci, Inc | revision to 202401184175. mechanical units and electrical, relocation of outside air louver and associated partitions and ceiling adjustments in staff restroom 551b or ceiling of ln storage, 558 revised to rated gypsum ceiling | $10,000 |
| Feb 29, 2024 | Completed final sign-off Mar 2024 | 150 Spear St | Johnson Controls Fire | replace (1) strobe to speaker due to office being converted into conf. room | $700 |
| Jan 31, 2024 | In progress issued Mar 2024 | 150 Spear St | Gci, Inc | 5th fl, suite #500 (phase 2)- demo exsisting suite. new expansion of embryology lab, new medical gas lines, added pacu, new exam room, enlarged waiting room & radiation protection of exam room. new hvac electrical & plumbing | $800,000 |
| Jan 18, 2024 | In progress issued Mar 2024 | 150 Spear St | Gci, Inc | interior ti demo existing suite, light fixtures, doors and other elements being reused. new hvac design, new gas lines, to new med gas and cryo. addition of 1 new restroom, 3 collection rooms, adrology lab, breakroom. new lighting and power. 5th floor framing and anchorage | $800,000 |
| Jan 18, 2024 | Completed final sign-off Jan 2024 | 150 Spear St | Johnson Controls Fire | 13/f: fa modification, add 1 door holder, add 1 control relay, ref pa# 202311201087. | $1,900 |
| Nov 20, 2023 | Completed final sign-off Aug 2024 | 150 Spear St | Peacock Construction | 13th fl, ste 1350 - glass partition & security door | $60,000 |
| Oct 25, 2022 | Completed final sign-off May 2023 | 150 Spear St | Peacock Construction | #1800: electrical only-title 24. reference 202204182384. | $25,000 |
| Sep 26, 2022 | Completed final sign-off May 2023 | 150 Spear St | Peacock Construction | mech-demo (e) duct & hvac equipment. install new duct & hvac equipment. electric power lighting & signal. ref t.i. 202204182384 | $10,000 |
| Sep 15, 2022 | Never finaled issued Mar 2023, no final | 150 Spear St | Johnson Controls Fire | suite 1800: modify (e) fire alarm system. provide and install 1 addressable relay module and 10 speaker strobes as shown on drawnings. ref t.i. pa 202204182384. | |
| Jun 28, 2022 | Never finaled issued Jul 2022, no final | 150 Spear St | Johnson Controls Fire | 6th fl: modify existing fire alarm system. ref pa# 202202228428. | $6,500 |
| Jun 15, 2022 | Completed final sign-off Oct 2022 | 150 Spear St | Ayoob & Peery Plumbing Co Inc | 18th flr: add (2), relocate (34), changeout (13) sprinkler heads per t.i. ref# 2022-0418-2384. | $11,625 |
| May 19, 2022 | Completed final sign-off Nov 2022 | 150 Spear St | Peacock Construction | 6/f: mechanical demo of ductwork & diffusers, new duct work & diffusers, insulation of supply air duct work air balance within the scope. ref pa202202228428. | $19,000 |
| May 12, 2022 | Completed final sign-off Nov 2022 | 150 Spear St | Peacock Construction | 6/f: title 24 electrical compliance - power,lighting & signal. ref t.i. pa202202228428. | |
| May 6, 2022 | Completed final sign-off Jun 2022 | 150 Spear St | Ayoob & Peery Plumbing Co Inc | 6th fl: relocate 19 sprinkler heads per t.i.. ref pa# 202202228428. | $4,275 |
| Apr 18, 2022 | Completed final sign-off May 2023 | 150 Spear St | Peacock Construction | ste 1800: tenant improvement to consist of selective demolition & construction of non-load bearing partitions. (n) ceiling grid & tiles. (n) light fixtures & switching. (n) finishes, doors & frames. mep under separate permit. | $60,000 |
| Feb 22, 2022 | Completed final sign-off Nov 2022 | 150 Spear St | Peacock Construction | interior ti 6 th fl restroom modernization and elevator lobby finish upgrade | $225,000 |
| Sep 3, 2021 | Completed final sign-off Oct 2022 | 150 Spear St | Ayoob & Peery Plumbing Co Inc | replace (e) fire pump & motor with like kind. | $267,860 |
| Oct 24, 2020 | Completed final sign-off Dec 2021 | 150 Spear St | Thermal Mechanical | mechanical penthouse: cooling tower replacment. new sand filter, ew piping to serve cooling tower. 1 new heat exhanger. power for mechanical. maher n/a | $750,000 |
| Aug 24, 2020 | Completed final sign-off Oct 2020 | 150 Spear St | Peacock Construction | t-24 mechanical and electrical for work under pa #2020-0225-5314. | $150,000 |
| Aug 21, 2020 | Never finaled issued Sep 2020, no final | 150 Spear St | Golden Gate Fire Protection Inc | fire sprinklery only - ref #202002255314. relocate 17 pendents & 33 uprights on the 7/f. add 1 pendent, relocae 6 concelaed in restroom. | $28,500 |
| Jun 25, 2020 | Never finaled issued Jul 2020, no final | 150 Spear St | Johnson Controls Fire | suite #750: modify extg fire alarm system on 7th floor. maher n/a | $1,500 |
| Feb 25, 2020 | Completed final sign-off Oct 2020 | 150 Spear St | Peacock Construction | 7/f: selective demo and construction of non load bearing partitions, new ceiling grid and tile. light fixtures, doors, frames, millwork, new finishes. includes bathroom upgrades and lobby finishes. mep, sprinkler and life-safety under sep permit. maher n/a. | $425,000 |
| Nov 12, 2019 | Never finaled issued Jan 2020, no final | 150 Spear St | Mc Millan Electric | provide and install new light fixtures and power recepticles per tenant improvement project ref pa #2019-0823-9655. | $80,000 |
| Nov 8, 2019 | Never finaled issued Nov 2019, no final | 150 Spear St | Peacock Construction | 11/f: title 24 electrical compliance for t.i. pa201906193917. | |
| Nov 7, 2019 | Completed final sign-off Mar 2020 | 150 Spear St | Ayoob & Peery Plumbing Co Inc | add 2, relocate 35, plug 0 sprinkler to conform to new wall ceiling layout per ti ref 201908239655 | $8,925 |
| Oct 17, 2019 | Completed final sign-off Jun 2020 | 150 Spear St | Mc Millan Electric | 10/f: title 24 electrical installation under ew201907162189. ref t.i. pa201906254320. maher n/a. | $80,000 |
| Oct 16, 2019 | Never finaled issued Oct 2019, no final | 150 Spear St | Peacock Construction | 16/f: rev to pa# 201907307363; assembly door hardware from break room | |
| Oct 15, 2019 | Never finaled issued Oct 2019, no final | 150 Spear St | Johnson Controls Fire | add 1 relay module, 4 strobes, 12 speaker strobes on 11th fl fire alarm system. ref #201908239655 | $10,244 |
| Oct 3, 2019 | Completed final sign-off Jun 2020 | 150 Spear St | T C B Builders Inc | mechanical work only 10th fl office ti ref 201906254320 | |
| Oct 3, 2019 | Completed final sign-off May 2021 | 150 Spear St | T C B Builders Inc | mechanical work for 11th fl office ti ref 201908239655 | |
| Sep 20, 2019 | Never finaled issued Sep 2019, no final | 150 Spear St | Johnson Controls Fire | 11/f: installing 3 smk det and 11 speaker strob on 11th flr ref 201908017574 | $8,872 |
| Sep 20, 2019 | Completed final sign-off Oct 2019 | 150 Spear St | Johnson Controls Fire | 10/f: installing 3 smk det, 1 duct det and 10 speaker strobes on 10th ref 201906193914 | $9,822 |
| Sep 20, 2019 | Never finaled issued Sep 2019, no final | 150 Spear St | Johnson Controls Fire | 16/f: installing 1 nac panel, 7 smk det, 1 control module, 8 strobes and 32 speaker strobes ref 201907307363 | $7,076 |
| Sep 10, 2019 | Completed final sign-off Oct 2019 | 150 Spear St | Johnson Controls Fire | installing 1 nac p[anel, 1 smk det, 8 strobes and 18 speaker strobes on 10th flr in fa system ref 201906254320 | $17,848 |
| Sep 10, 2019 | Completed final sign-off Nov 2019 | 150 Spear St | Peacock Construction | 16th floor: t-24 mechanical and electrical for work under app#201907307363. n/a for maher | |
| Aug 23, 2019 | Completed final sign-off Mar 2020 | 150 Spear St | T C B Builders Inc | 11th flr. tenant improvement at 11th fl. new interior partitions, doors, elec, finishes, lighting mep def | $867,000 |
| Aug 15, 2019 | Completed final sign-off Sep 2019 | 150 Spear St | Golden Gate Fire Protection Inc | 16th floor: fire sprinklers, relocate 25 pendents, 95 uprights, and 54 window(upright heads)raise 5 pendents in the restrooms. ref app#201907307363. n/a for maher | $86,000 |
| Aug 1, 2019 | Completed final sign-off Dec 2019 | 150 Spear St | Golden Gate Fire Protection Inc | 11th flr - fire sprinklers relocate 14 pendents commom areas ref 201906193917 | $7,000 |
| Aug 1, 2019 | Completed final sign-off Aug 2019 | 150 Spear St | Golden Gate Fire Protection Inc | 10th flr - fire sprinklers relocate 16 pendents commom areas ref 201906193914 | $8,000 |
| Jul 30, 2019 | Never finaled issued Aug 2019, no final | 150 Spear St | Peacock Construction | 16th fl - selective demo and construction of non-structural partitions; new ceiling grid and tile, new light fixtures, doors and frames, millwork and finishes. mep, sprinkler, life safety under separate permit | $898,650 |
| Jul 29, 2019 | Completed final sign-off Nov 2019 | 150 Spear St | Peacock Construction | 10th flr. title 24 electrical compliance for pa 201906193914. maher n/a. | |
| Jul 16, 2019 | Completed final sign-off Oct 2019 | 150 Spear St | Ayoob & Peery Plumbing Co Inc | 10th flr, fire sprinklers. add 8, relocate 108 and plug 14 sprinklers to conform w/ (n) wall / ceiling layout of tenant improvement. job # 19-664 | $28,500 |
| Jun 25, 2019 | Completed final sign-off Jun 2020 | 150 Spear St | 10th flr. new tenant improvement incl (n) interior portions, doors, plumbing, electrical, finishes and lighting. demo throughout. mep and fire life safety under separate permit | $867,000 | |
| Jun 19, 2019 | Completed final sign-off Nov 2019 | 150 Spear St | Peacock Construction | modification to existing restrooms, elevator lobby, and extension of multi tenant corridor. to include selective demo and construction of ceiling grid and tile, light fixtures and finishes. | $225,000 |
| Jun 19, 2019 | Completed final sign-off Mar 2020 | 150 Spear St | Peacock Construction | 11/f:modification to existing restrooms, elevator lobby, and extension of multi tenant corridor. to include selective demo and construction of ceiling grid and tile, light fixtures and finishes. | $225,000 |
| Jun 18, 2019 | Never finaled issued Jun 2019, no final | 150 Spear St | street space | ||
| Jun 11, 2019 | Completed final sign-off Jul 2019 | 150 Spear St | Peacock Construction | t-24 electrical for work under pa# 201904178189 | |
| May 17, 2019 | Completed final sign-off Jul 2019 | 150 Spear St | Johnson Controls Fire | 13th fl: installing 3 smoke detectors, 4 stobes, 11 speaker strobes and 2 speakers in suite 1300 monitored and controlled by fire alarm system in the building. | $12,250 |
| Apr 29, 2019 | Completed final sign-off May 2019 | 150 Spear St | Golden Gate Fire Protection Inc | fire sprinkler only. relocate 32 pendents, 88 uprights, plug off 18 pendents, add 3 pendants for suite 1300 13th fl | $60,000 |
| Apr 24, 2019 | Completed final sign-off Jul 2019 | 150 Spear St | Peacock Construction | 13th fl - t-24 mechanical for work under pa 2019-0417-8189 | $31,000 |
| Apr 17, 2019 | Completed final sign-off Jul 2019 | 150 Spear St | Peacock Construction | 13/f: demo & construction of non-structural partitions, new partitions, new ceiling grid & tile, new light fixtures, office doors & frames, new millwork and finishes. mep, sprinklers, fire alarm under separate permit | $813,000 |
| Mar 15, 2019 | Never finaled issued Mar 2019, no final | 150 Spear St | Johnson Controls Fire | fire alarm system expansion for associated elevator modernization: install 20 new smoke sensors & 3 new relays | $14,500 |
| Feb 12, 2019 | Completed final sign-off Mar 2019 | 150 Spear St | Peacock Construction | revision in room identification 327 from mother's room to wellness room. ref pa #201901029492. | |
| Feb 7, 2019 | Completed final sign-off Mar 2019 | 150 Spear St | Johnson Controls Fire | 3rd flr - modifying the fire alarm system. remove 2 strobes and install 7 new strobes and 1 new speaker. ref pa 2019-0102-9492 | $4,224 |
| Jan 25, 2019 | Completed final sign-off Feb 2019 | 150 Spear St | Golden Gate Fire Protection Inc | 3rd fl: fire sprinkler only; relocate 1 sprinkler pendent, add 2 pendents for suite #300 | $1,500 |
| Jan 24, 2019 | Completed final sign-off Mar 2019 | 150 Spear St | Peacock Construction | t-24 electrical for work pa 201901029492. n/a for maher. | $13,000 |
| Jan 2, 2019 | Completed final sign-off Mar 2019 | 150 Spear St | Peacock Construction | 3rd fl: selective demo and construction of non structural partitions- new finishes | $81,000 |
| Dec 13, 2018 | Completed final sign-off Dec 2018 | 150 Spear St | Peacock Construction | revision to pa #201803133561 to show new finishes, no construction , new paint and carpet only. 15th fl | $10,000 |
| Dec 6, 2018 | Completed final sign-off Jun 2019 | 150 Spear St | Truebeck Construction | revision to pa #201803294961. added 02/c02 sensor with strobe per sffd comments during final medigas inspection. location is medical gas storage room 573. | $3,000 |
| Dec 4, 2018 | Never finaled issued Dec 2018, no final | 150 Spear St | Johnson Controls Fire | 5th fl: as-built record drawing for pa #201811075254 fire alarm tenant improvement. ref pa #201803294961. | $634 |
| Nov 28, 2018 | Never finaled issued Nov 2018, no final | 150 Spear St | Dome Construction Corp | street space | |
| Nov 7, 2018 | Completed final sign-off Dec 2018 | 150 Spear St | Johnson Controls Fire | as built record dwgs for 201807124384 fire alarm system (ref #201803294961) | |
| Oct 22, 2018 | Completed final sign-off Dec 2018 | 150 Spear St | Peacock Construction | 18th fl: t-24 electrical for work under pa #201802232158 | $83,000 |
| Oct 17, 2018 | Completed final sign-off Oct 2018 | 150 Spear St | R L H Fire Protection Inc | 1st flr. fire sprinkler tenant improvement. relocate 5 pendent heads. ref pa 201806081429. maher n/a | $2,500 |
| Oct 12, 2018 | Never finaled issued Oct 2018, no final | 150 Spear St | Dome Construction Corp | deferred electrical design build electrical drawing set. ref to permit app#210806081429. maher n/a exterior on first floor. | $146,000 |
| Sep 18, 2018 | Never finaled issued Sep 2018, no final | 150 Spear St | street space | ||
| Sep 12, 2018 | Never finaled issued Sep 2018, no final | 150 Spear St | Dome Construction Corp | revision to pa 2018-0608-1429, install new slab on grade within building lobby. n/a for maher | $10,000 |
| Sep 11, 2018 | Completed final sign-off Mar 2019 | 150 Spear St | Peacock Construction | t-24 electrical for work under pa 201805108739 | $57,500 |
| Sep 7, 2018 | Completed final sign-off Dec 2018 | 150 Spear St | Johnson Controls Fire | suite 550. fire alarm tenant improvement. install 15 new strobe appliances and 15 new speaker appliances. maher n/a | $15,800 |
| Aug 23, 2018 | Never finaled issued Aug 2018, no final | 150 Spear St | Acco Engineered Systems Inc. Dba Acco En | procurement/installation of qty. 1 linear slot diffuser. procurement/installation of qty 8 ceiling diffusers, rebalance of qty. 2 cooling only zone and associated grills. n/a for maher. arch 201806081429 | $21,000 |
| Aug 17, 2018 | Never finaled filed Aug 2018, never issued | 150 Spear St | t-24 mechanical for work under 201805108742 includes t24 elec | ||
| Aug 17, 2018 | Completed final sign-off Dec 2018 | 150 Spear St | Peacock Construction | t24 mechanical and electrical for 201808096915, no new fsd's | $63,000 |
| Aug 17, 2018 | Completed final sign-off Nov 2018 | 150 Spear St | Peacock Construction | t-24 mechanical and elec for work under 201806262904 | $41,000 |
| Aug 15, 2018 | Completed final sign-off Sep 2018 | 150 Spear St | Golden Gate Fire Protection Inc | fire sprinkler only. ref# 2018-0809-6915 relocate 15 pendents; relocate 27uprights for ginger lap suite #550. all work on the 5th floor. | $22,260 |
| Aug 9, 2018 | Completed final sign-off Dec 2018 | 150 Spear St | Peacock Construction | 5th flr - demo and construction of non structural partitions, new ceiling grid and tiles. light fixtures office doors and frames, millwork and finishes. mep/fire deferred. mahe rna | $395,000 |
| Aug 2, 2018 | Completed final sign-off Mar 2019 | 150 Spear St | Truebeck Construction | revision to mep components of approved bpa 201803294961 5th fl only | |
| Jul 26, 2018 | Completed final sign-off Feb 2019 | 150 Spear St | Johnson Controls Fire | fire alarm retrofit - install 4 new speaker/strobe modification appliances | $2,100 |
| Jul 25, 2018 | Completed final sign-off Jul 2018 | 150 Spear St | Golden Gate Fire Protection Inc | fire sprinklers: relocate 11 upright sprinklers and relocate 4 pendent sprinklers on 7th floor. t.i. 22018-06-26-2904. maher n/a | $7,875 |
| Jul 19, 2018 | Completed final sign-off Oct 2018 | 150 Spear St | R L H Fire Protection Inc | fire sprinkler permit. relocate 74, add 32, delete 09 pendent sprinklers on the 5th fl ti 201803294961 | $28,000 |
| Jul 12, 2018 | Never finaled issued Jul 2018, no final | 150 Spear St | Johnson Controls Fire | 5th flr - fa ti - install 11 new addressable out det, 1 new smk det, 1 new relay, 46 new strobe appliances, 4 new speaker appliances. ref 201803294961 maher na | $34,600 |
| Jul 12, 2018 | Completed final sign-off Sep 2018 | 150 Spear St | Johnson Controls Fire | 7th flr, suite 725 - fa ti, install 2 new strobes, 4 bew speaker/strobes ref 201506262904. n/a for maher. | $3,200 |
| Jun 26, 2018 | Never finaled issued Jun 2018, no final | 150 Spear St | street space | ||
| Jun 26, 2018 | Completed final sign-off Nov 2018 | 150 Spear St | Peacock Construction | 7th flr - construction of non structural partitions, new ceiling grid, tile light fixtures, doors and frames, new millwork and finishes maher na | $205,000 |
| Jun 22, 2018 | Completed final sign-off Mar 2019 | 150 Spear St | Johnson Controls Fire | fire alarm ti suite 950. 1 new strobe appliance and 1 new speaker appliances relocate 4 e appliances maher not req | $1,056 |
| Jun 22, 2018 | Completed final sign-off Aug 2018 | 150 Spear St | Johnson Controls Fire | fire alarm t.i in ste 900. install 6 notification appliances. relocate 2 existing notification appliances. | $3,160 |
| Jun 13, 2018 | Completed final sign-off Jun 2018 | 150 Spear St | Golden Gate Fire Protection Inc | 9th fl - relocate 12 pendents; plug-off 2 pendents for parallel advisor's expansion. ref pa 201805108739 for suite 970-975 | $3,000 |
| Jun 11, 2018 | Expired or cancelled withdrawn Sep 2019 | 150 Spear St | Dome Construction Corp | install address sign "150 spear" maher na | $6,000 |
| Jun 11, 2018 | Expired or cancelled withdrawn Sep 2019 | 150 Spear St | Dome Construction Corp | install 2 address sign "150" maher na | $8,000 |
| Jun 8, 2018 | Never finaled issued Jun 2018, no final | 150 Spear St | Dome Construction Corp | lobby - facade remodel at ground level lobby entry and bldg. lobby remodel (installation of (2) bldg. address, signs under separte permits) n/a maher | $1,200,000 |
| May 24, 2018 | Completed final sign-off Jun 2018 | 150 Spear St | Golden Gate Fire Protection Inc | fire sprinkler only on 9th fl: relocate 4 pendents; add 1 relocate 18 uprights - for tieron suite #900. | $5,750 |
| May 24, 2018 | Completed final sign-off Jan 2019 | 150 Spear St | Peacock Construction | 18th fl - t-24 mechanical for work under pa 2018-0223-2158 | $86,000 |
| May 24, 2018 | Completed final sign-off Dec 2018 | 150 Spear St | Peacock Construction | 9th fl - t-24 mechanical for work under pa 2018-0510-8742 | $31,000 |
| May 24, 2018 | Completed final sign-off Dec 2018 | 150 Spear St | Peacock Construction | 17th fl - t-24 mechanical for work under pa 2018-0207-0662 | $72,000 |
| May 10, 2018 | Completed final sign-off Dec 2018 | 150 Spear St | Peacock Construction | 9th fl, ste 900 - selective demo of ceiling grid and tile, construct new non-structural partitions, doors, frames, new ceiling grid and tile, light fixtures and finishes | $345,000 |
| May 10, 2018 | Completed final sign-off Mar 2019 | 150 Spear St | Peacock Construction | 9th fl, ste 950 - selective demo and construction of non-structural partitions, relocation of (e) office doors, new millwork and finishes | $189,000 |
| May 3, 2018 | Completed final sign-off Jul 2018 | 150 Spear St | Johnson Controls Fire | fa ti on 18th fl: suite 1850 - adding (3) strobes, (12) speaker strobes, demo existing fa devices as shown on drawings. ref ti #201802232158. maher na | $6,500 |
| Apr 9, 2018 | Completed final sign-off Apr 2018 | 150 Spear St | R L H Fire Protection Inc | fire sprinkler elevator modernization - remove 10 sprinklers in machine room, remove 6 sprinklers at top shafts. ref sffd approval letter dated 6/23/17 | $7,255 |
| Apr 3, 2018 | Completed final sign-off May 2018 | 150 Spear St | Ayoob & Peery Plumbing Co Inc | 18th flr ti- add 3 relocate 53 amd plug 13 sprinklers to conform with wall/ceiling layout of ti ref 201802232158 maher na | $13,500 |
| Mar 29, 2018 | Completed final sign-off Jun 2019 | 150 Spear St | Truebeck Construction | tenant improvement. rma of northern california. mep included. proposed use - health service | $3,000,000 |
| Mar 16, 2018 | Never finaled issued Mar 2018, no final | 150 Spear St | Johnson Controls Fire | 17th fl - ti consist of adding new 9 speaker/strobes. demo (e) fire alarm devices as shown on drawings. ref pa 2018-0207-0662 | $7,000 |
| Mar 16, 2018 | Never finaled issued Mar 2018, no final | 150 Spear St | Golden Gate Fire Protection Inc | 17/f: fire sprinkler only - relocate 18 heads (pendants) for suite #1750, 17th fl. ref #201802070662. maher na | $4,500 |
| Mar 13, 2018 | Completed final sign-off Dec 2018 | 150 Spear St | Peacock Construction | demo of non bearing partitions, millwork, electrical and office doors, frames and side lights. demo only ab-017 | $13,000 |
| Mar 12, 2018 | Completed final sign-off Apr 2018 | 150 Spear St | Golden Gate Fire Protection Inc | 15th flr - fire sprinkler only ref 201803133561, relocate 3 pendents; add 1 pendent for suite 1500 maher na | $1,250 |
| Feb 28, 2018 | Never finaled issued Feb 2018, no final | 150 Spear St | Peacock Construction | t-24 electrical lighting for work under app#201802070662. n/a for maher | $84,000 |
| Feb 23, 2018 | Completed final sign-off Dec 2018 | 150 Spear St | Peacock Construction | 18th fl ste 1850 - demo of non-structural partitions, ceiling grid and tile. construct new non-structural partitions, new grid & tile, doors and frames, new millwork and light fixtures, mep/fire under separate permits. | $585,000 |
| Feb 7, 2018 | Completed final sign-off Jun 2018 | 150 Spear St | Peacock Construction | 7th fl: demo of selected non-structural partitions, demise space into 3 smaller suites, revise (e) ceiling grid & tiles, light fixtures, millwork and finishes in suite 775 & 780, suite 725 to remain vacant. maher na | $89,000 |
| Feb 7, 2018 | Completed final sign-off Dec 2018 | 150 Spear St | Peacock Construction | suite 1750 - 17th fl: modification to (e) tenant space to include new non-structural partitions, ceiling, light fixtures, doors and frames, millwork, sink & finishes. mep deferred. maher na | $375,000 |
| Feb 7, 2018 | Completed final sign-off Feb 2018 | 150 Spear St | Peacock Construction | 5th fl - demo only, remove non-structural partition, doors, frames, ceilingm and finishesh, millworks and plumbing. ab-017. suite 575/580. maher na | $22,000 |
| Jan 17, 2018 | Completed final sign-off Mar 2018 | 150 Spear St | Golden Gate Fire Protection Inc | 7th floor #750 fire sprinkler only - relocate 18 uprights to spec suite #750. n/a maher ordinance | $4,500 |
| Nov 6, 2017 | Expired or cancelled cancelled Jan 2026 | 150 Spear St | Principal Builders Inc. | 5th floor: t.i. to demo partitions and doors and build new partitions, glazing, doors and upgrade restrooms. n/a for maher. | $525,000 |
| Nov 3, 2017 | Never finaled issued Nov 2017, no final | 150 Spear St | Johnson Controls Fire | 1st fl - f/a: remove existing (2) integral smoke detectors with (2) new duct detectors. maher na | $1,200 |
| Sep 26, 2017 | Completed final sign-off Nov 2017 | 150 Spear St | Principal Builders Inc. | 4/f, 14/f- ti, title 24 mechanical to install new mechanical systems on 4th and 14th floors. ref pa 2016-1230-6308, 2017-0612-9709 and 2017-0616-9628 for ti work. na for maher. | $60,000 |
| Aug 15, 2017 | Completed final sign-off Aug 2017 | 150 Spear St | Golden Gate Fire Protection Inc | fire sprinkler only. relocate 80 pendents on the 5th fl, ref ti #201707182242. & relocate 27 upright & 4 pendents on the 17th fl, ref ti #201707182244. maher na | $27,750 |
| Jul 27, 2017 | Completed final sign-off Aug 2017 | 150 Spear St | Johnson Controls Fire | 14/f: fire alarm. tenant improvement - provide and isntall 6 strobes and 1 speaker. ref. t.i. pa201612306308. | |
| Jul 18, 2017 | Completed final sign-off Sep 2017 | 150 Spear St | Peacock Construction | demo only non structural partitions, elec,plumbing, doors, frames demo only ab17 | $38,000 |
| Jul 18, 2017 | Completed final sign-off Sep 2017 | 150 Spear St | Peacock Construction | 17th floor demo only non structural partitions, elec, plumb, doors and frames. demo only ab17 | $21,000 |
| Jun 16, 2017 | Completed final sign-off Nov 2017 | 150 Spear St | Principal Builders Inc. | revision to 201612306308 to change occupancy load and purpose at proposed rooms maher not req | |
| Jun 15, 2017 | Completed final sign-off Jul 2017 | 150 Spear St | Anderson, Rowe & Buckley, Inc. | 4th & 14th floors: 4th-relocated 3. 14th - relocate 1, ad 1 maher na | $1,000 |
| Jun 12, 2017 | Completed final sign-off Nov 2017 | 150 Spear St | Principal Builders Inc. | 4th floor: t.i. - to remove glazed partition and construct new non-rated partitions, glazing and finishers. mep, sprinklers and life safety to be pulled under separate permit. | $59,000 |
| May 1, 2017 | Completed final sign-off May 2017 | 150 Spear St | Rossi Builders Inc. | modification of an existing tenant space to include selective construction of non-load bearing partition, light fixture relocation, new power & data, new door & frame and new finishes | $35,000 |
| Feb 10, 2017 | Never finaled issued Feb 2017, no final | 150 Spear St | Principal Builders Inc. | 2nd flr: ti to demo and construct new partitions, millwork, doors and finishes mep/fire/life safety under sep permit maher na | $145,000 |
| Jan 11, 2017 | Completed final sign-off Jan 2017 | 150 Spear St | Peacock Construction | to obtain final inspection for work approved under pa# 201211093884. all work is complete. | |
| Dec 30, 2016 | Completed final sign-off Nov 2017 | 150 Spear St | Principal Builders Inc. | 14th: ti- to demo and construct new partitions, millwork, doors and finishing mep/fire/life safety will be submitted sep. maher na | $250,000 |
| Dec 7, 2016 | Completed final sign-off Feb 2017 | 150 Spear St | Rossi Builders Inc. | #700- hvac for 2 new offices in (e) space, reference to pa#201611042003, install new and rebalance vav box to serve interior rooms. n/a ordinance #155-13. | |
| Dec 7, 2016 | Completed final sign-off Feb 2017 | 150 Spear St | Rossi Builders Inc. | #700- electrical for 2 new offices in (e) space, reference to pa#201611042003, lighting, power and signal, wiring, lighting and receptacle controls. n/a ordinance #155-13. | |
| Dec 2, 2016 | Never finaled issued Dec 2016, no final | 150 Spear St | Johnson Controls Fire | 7th fl: fire alarm improvement to ti ref. #2016-1104-2003. adding (2) strobes. relocate (1) speaker and strobe to new location. | $2,400 |
| Nov 7, 2016 | Completed final sign-off Nov 2016 | 150 Spear St | R L H Fire Protection Inc | fire sprinkler permit add 3 pendent sprinklers; relocated 1 pendent sprinkler on the 7th floor. ti 2016-1104-2003 | $4,275 |
| Nov 4, 2016 | Completed final sign-off Feb 2017 | 150 Spear St | Rossi Builders Inc. | 7th flr: 2 new offices in suite as well as new mothers room. paint & carpet new throughout space. new countertops in breakroom. maher na | $216,782 |
| Sep 21, 2016 | Completed final sign-off Sep 2016 | 150 Spear St | Golden Gate Fire Protection Inc | fire sprinkler only - 10th floor, 2016-0819-5555 relocate 20 pendents, 18th floor - 2016-0819-5557 relocate 23 pendents | $22,575 |
| Aug 19, 2016 | Completed final sign-off Dec 2016 | 150 Spear St | Peacock Construction | 10th flr: modification of (e)elevator lobby & extension of multi-tenant corridor.selective demo of (e)finishes,ceiling grid & tile and lights.new partial ceiling grid,tile &light fixtures,finishes;maher n/a | $53,000 |
| Aug 19, 2016 | Completed final sign-off Dec 2016 | 150 Spear St | Peacock Construction | 18th flr: modification of (e)elevator lobby & extension of multi-tenant corridor.selective demo of (e)finishes,ceiling grid & tile and lights.new partial ceiling grid,tile &light fixtures,finishes;maher n/a | $53,000 |
| Jun 15, 2016 | Completed final sign-off Jul 2016 | 150 Spear St | Commercial Interior Builders Inc | 8th floor - ductwork for modification of 3 offices. ref pa #201604215324 for architectural work. no new fire smoke dampers. n/a maher ordinance | $5,250 |
| May 27, 2016 | Completed final sign-off Jun 2016 | 150 Spear St | Golden Gate Fire Protection Inc | 8th floor, suite 850: ref pa 2016-0421-5324 relocate 3 pendents maher na | $1,500 |
| May 20, 2016 | Never finaled issued May 2016, no final | 150 Spear St | Johnson Controls Fire | 8th floor tenant improvement for fire alarm - relocate (1) existing strobe to new location. ref ti 2016-0421-5324. | $1,000 |
| May 4, 2016 | Completed final sign-off May 2016 | 150 Spear St | Johnson Controls Fire | grnd flr: application to final 201603162177 and 201602169694; maher n/a | |
| Apr 29, 2016 | Completed final sign-off May 2016 | 150 Spear St | Eric F Anderson Incorporated | fsd in exhaust duct ref 201406097840; maher n/a | $3,000 |
| Apr 21, 2016 | Completed final sign-off Jul 2016 | 150 Spear St | Commercial Interior Builders Inc | 8th fl modification of existing tenant improvmennts to include selective demo and construction of non load bearing partitions, new and relocated doors, mech, elec, fire sp ls sep permit | $45,000 |
| Mar 16, 2016 | Completed final sign-off Apr 2016 | 150 Spear St | Johnson Controls Fire | as built record drawing for pa 2016-0216-9694 per field inspection comments | |
| Feb 16, 2016 | Completed final sign-off Apr 2016 | 150 Spear St | Johnson Controls Fire | grnd flr: fire alarm tenant improvement on ground floor (4) speaker strobes, (1) manual pull box, (3) monitor fodules, (1) relay moduel; t.i. 201406097840; maher n/a | $4,800 |
| Feb 10, 2016 | Expired or cancelled cancelled Oct 2016 | 150 Spear St | Johnson United Inc Dba United Sign Syste | install new projecting electrical wall sign. n/a for maher | $2,400 |
| Feb 2, 2016 | Completed final sign-off Feb 2016 | 150 Spear St | Golden Gate Fire Protection Inc | relocate 20 pendents, add 1 plug off 2 pendents 21 total for specialty cafe on ground floor, fire sprinkler only ref pa 2014-0609-7840. n/a for maher. | $10,500 |
| Dec 16, 2015 | Never finaled issued Dec 2015, no final | 150 Spear St | street space | ||
| Oct 5, 2015 | Completed final sign-off Mar 2016 | 150 Spear St | Principal Builders Inc. | 20 min rated door is required and will be installed per revision to permit 201506307997 | |
| Jul 17, 2015 | Completed final sign-off Jul 2015 | 150 Spear St | R L H Fire Protection Inc | 4th floor fire sprinkler permit - relcoate 9 & add 2 pendent sprinklers. ref #201506037997. n/a maher ordinance | $5,654 |
| Jul 17, 2015 | Completed final sign-off Aug 2015 | 150 Spear St | Johnson Controls Fire | 4th floor: fire alarm t.i. 5 new speakers and 2 new strobes. n/a for maher. ref app#201506037997 | $4,500 |
| Jun 30, 2015 | Completed final sign-off Mar 2016 | 150 Spear St | Principal Builders Inc. | 4th flr: title 24 electrical & mechanical to install 3 new vav boxes & lighting/power on 4th flr t.i. 201506037997 for reference; maher n/a | $18,348 |
| Jun 24, 2015 | Completed final sign-off Oct 2015 | 150 Spear St | Johnson Controls Fire | fire alarm t.i. to 15/f. 14 strobes, 17 speakers, 2 duct smoke detectors with relay. t.i. pa#201505075646. n/a ordinance #155-13. | $16,700 |
| Jun 3, 2015 | Completed final sign-off Mar 2016 | 150 Spear St | Principal Builders Inc. | t.i. to demo and construction doors, millwork, non-structural partitions and finishes. mep life safety and sprinkler on seperate permit. n/a for the maher. | $57,564 |
| May 27, 2015 | Completed final sign-off Jun 2015 | 150 Spear St | Golden Gate Fire Protection Inc | 15th fl: fire sprinkler only. relocate 32 pendents, add 6 pendents, relocate 13 uprights, add uprights, plug 13 outlets. total 54 sprinkler heads | $27,000 |
| May 7, 2015 | Completed final sign-off Dec 2015 | 150 Spear St | Peacock Construction | 15th flr: demo (e) and construct new non structural partitions, ceilings, new lighting, doors & frames, millwork and sink. modifications to (e) elevator lobby, include mechanical. fire/life/safety under sep permit. maher na | $380,000 |
| Dec 17, 2014 | Completed final sign-off Jan 2015 | 150 Spear St | Golden Gate Fire Protection Inc | 9th flr: relocate 5 pendant sprinkler heads on the 9th flr, t.i. 201411121273; maher n/a | $3,090 |
| Nov 12, 2014 | Never finaled issued Nov 2014, no final | 150 Spear St | Peacock Construction | 9th floor: modification and expansion of (e) tenant space to include selective demo and constructio of non-structural partitions, ceiling grid and tile, light fixture relocation and re-switching, new doors and frames. life safety and sprinkler under separate permit. maher n/a. | $83,000 |
| Aug 22, 2014 | Never finaled issued Aug 2014, no final | 150 Spear St | street space | ||
| Aug 1, 2014 | Completed final sign-off Sep 2014 | 150 Spear St | Johnson Controls Fire | 8th floor: t.i. improvement. install new 2 smoke detectors and 2 door holders. ref app#201307121719. n/a for the maher ordinance #155-13 | $3,000 |
| Jun 9, 2014 | Completed final sign-off Apr 2016 | 150 Spear St | Eric F Anderson Incorporated | t.i. to an extg cafe, work includes soft demo of interior walls, new ceilings and walls, mechanical included, sprinkler & fire alarm seperate permit. n/a for the maher ordinance #155-13 | $300,000 |
| Jan 10, 2014 | Completed final sign-off Oct 2015 | 150 Spear St | Thermal Mechanical | replace 1 cooling tower at roof of building | $1,000,000 |
| Jan 9, 2014 | Completed final sign-off Jan 2014 | 150 Spear St | Johnson Controls Fire | 9th floor:addition of one speaker/strobe, 2 speakers, one duct detector and 2 door holders. remove and replace 8 extg speaker with new . relocate 3 extg strobes and 2 door holders as shown. t.i. app#201311051140 | $6,000 |
| Dec 20, 2013 | Completed final sign-off Sep 2014 | 150 Spear St | Johnson Controls Fire | relocate (6) existing strobes & (4) existing speakers to new locations, remove & cover (2) existing strobes, (3) speakers t.i. pa# 201312043343 | $5,000 |
| Dec 4, 2013 | Never finaled issued Dec 2013, no final | 150 Spear St | Peacock Construction Inc | 16th floor: demo and construction of selected non load bearing partitions, minor ceiling grid repair,new light fixtures. mech, elec, sprinkler, life safety under seperate permit. | $285,000 |
| Nov 27, 2013 | Completed final sign-off Jan 2014 | 150 Spear St | Ayoob & Peery Plumbing Co Inc | fire sprinkler t.i., 9th floor: add 3, relocate 67, remove 6 ref. app# 2013-1105-1140 | $35,980 |
| Nov 27, 2013 | Completed final sign-off Jan 2014 | 150 Spear St | Ayoob & Peery Plumbing Co Inc | 16th floor sprinkler t.i.: add and relocate fire sprinkler heads per tenant improvement. add 3 heads, relocate 50 heads, remove 3. ref. app# 2013 1001 8205 | $27,242 |
| Nov 25, 2013 | Never finaled issued Dec 2013, no final | 150 Spear St | Dome Construction Corp | 9th floor:demo and replace heating supply diffusers, disconnect fan coil duct work, relocating air outlets, demo and relocate pneumatic thermostats, replace all extg t bar grilles with new. reference app#201311051140 | $20,000 |
| Nov 5, 2013 | Completed final sign-off Mar 2014 | 150 Spear St | Dome Construction Corp | work for lobby & corridor, minor wall demo, no carpet in office space except corridor, ada upgrades to restroom, paint and patch work. mep under seperate permits. lifesafety ans sprinklers under seperate permit. | $250,000 |
| Oct 29, 2013 | Completed final sign-off Nov 2013 | 150 Spear St | Johnson Controls Fire | suite 350. fire alrm tenant improvement. relocate existing 3 strobes to new location. relocate existing speaker to new location, remove and cover 3 strobes and 2 speakers | $5,000 |
| Oct 22, 2013 | Completed final sign-off Nov 2013 | 150 Spear St | Ayoob & Peery Plumbing Co Inc | 3rd floor-add & relocate fire sprinklers per t.i-add 3 & relocate 32 | $18,000 |
| Oct 11, 2013 | Completed final sign-off Oct 2013 | 150 Spear St | Golden Gate Fire Protection Inc | 15th floor - relocate 7 pendent sprinkler heads. ref pa #2013.09.11.6482 | $6,682 |
| Oct 1, 2013 | Completed final sign-off Nov 2013 | 150 Spear St | Peacock Construction Inc | demolition and construction of selected non structural partitons. demo of existing accoustical ceilings, replace with new ceilings. mep, sprinkler, life safety sep permit | $200,000 |
| Sep 30, 2013 | Completed final sign-off Oct 2013 | 150 Spear St | Johnson Controls Fire | 15th floor - provide & install new (5) strobes, (2) speakers & (2) duct detectors. relocate (2) existing strobes to new location. remove & cover (6) existing strobes. ref t.i. #2013.09.11.6482 | $8,000 |
| Sep 18, 2013 | Never finaled issued Sep 2013, no final | 150 Spear St | Johnson Controls Fire | fire alarm ti to 5th fl lobby. add 1 new speaker, relocate 3 existing strobes, 2 existing speakers to new location/ t.i. # 201307182177 | $5,000 |
| Sep 11, 2013 | Completed final sign-off Nov 2013 | 150 Spear St | Dome Construction Corp | suite 1500 -office space, flooring, walls, ceiling, relocate existing light fixtures & sprinkler heads. revise existing doors and frames. relocate existing thermostates, return grills and diffusers. new finishes, paint, casework, carpet. mep, sprinklers and fire alarm separate permit | $140,000 |
| Aug 20, 2013 | Completed final sign-off Sep 2013 | 150 Spear St | Simplexgrinnell Lp. | 8/f- fire alarm t.i., relocate 4 existing strobes and removal of 4 strobes and 1 speaker. t.i. # 201307121719 | $8,000 |