Permit GraphSan Francisco building permits since 2000

Block 3717, lot 021

150 Spear St

The 200 most recent permits filed for this property.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 23, 2026In progress
filed Sep 2026, not yet issued
150 Spear Stsuite 1400: modification of existing t.i. to include demo of non-load bearing partitions, ceiling grid and tile, light fixtures & switching, millwork , powder/data, finishes doors, frames & hardware. all work shall comply with federal, state & local codes.$258,992
Sep 15, 2026In progress
issued Sep 2026
150 Spear StThomas Swan Sign Co Inc12/f - suite 1200: install evacuation maps on 12th floor.$2,500
Aug 5, 2026In progress
issued Aug 2026
150 Spear StPeacock Construction12th floor: electrical under 202606032405. provide new lighting, power, signal and branch circuitng to existing panel.$350,000
Jul 24, 2026In progress
issued Aug 2026
150 Spear StPeacock Construction12th floor: hvac modifications under reference # 202606032405$300,000
Jul 15, 2026In progress
filed Jul 2026, not yet issued
150 Spear Stste: 1500: installation of 3 phone booths, including anchoring details.$50,000
Jun 3, 2026In progress
issued Jun 2026
150 Spear StPeacock Constructionste: 1200 - modification to (e) ti. to include selective demo+ construction of non load bearing partitions, new ceiling grid+ tile, new light fixtures+ switching, new break area + coffee bar millwork, new finishes new door frames. deferred mep.$1,500,000
Dec 19, 2025Completed
final sign-off Jan 2026
150 Spear StPhase One Fire Life Safety Systems Incsuite 1800. arch permit: 202510217829. add 4 speaker strobes to 4 phone booth. 4 speaker strobes are being add to existing fire alarm system.$13,760
Oct 21, 2025Completed
final sign-off Jan 2026
150 Spear StPeacock Construction18th fl - installation of 2 new phone booths and associated anchoring of 2 existing phone booths. life safety and sprinkler work are submitted separately. previously permitted and completed ti$6,000
Oct 16, 2025Completed
final sign-off Jun 2026
150 Spear StPeacock Constructionnon load bearing partitions, new ceiling, new lighting, and mechanical, electrical, and plumbing are deferred submittal. this project involves modification of existing t.i. to include selective demolition & construction of non-bearin partitions, lights, finishes, doors,&ceiling. ref pa #202504285343$5,500
Sep 16, 2025In progress
issued Sep 2025
150 Spear StJohnson Controls Fire5th fl: as builts for pa # 2025-0512-6226. fire alarm devices installed as shown as drawings.$10,000
Aug 25, 2025In progress
issued Aug 2025
150 Spear StPhase One Fire Life Safety Systems Incste# 1800/18th f: modification to e) fire alarm system, relocate e) fire alarm device per new architectural layout. add 1 new ceiling speaker strobe, add 2 ductor & shut down of 2 heat pumps. ref to t.i. 202504285343$36,526
Aug 13, 2025Completed
final sign-off Jun 2026
150 Spear StPeacock Construction18th flr. deferred mechanical work for pa#: 202504285343.$154,000
Jul 3, 2025Completed
final sign-off Jan 2026
150 Spear StGolden Gate Fire Protection Inc18th fl - relocate 11 pendent sprinkler heads to upright due to removed ceiling to exposed deck at suite 31800 ref 202504285343 + 2025.1021.7829$2,500
Jul 1, 2025Completed
final sign-off Jun 2026
150 Spear StPeacock Construction18th floor: suite 1800 electrical for 202504285343.$186,000
May 16, 2025Completed
final sign-off Jul 2025
150 Spear StJohnson Controls Fire16th floor: as built to approved pa #202503142236. 4 new speaker strobes. 1 relay and 2 door holders. ref #202411225591$3,000
May 12, 2025In progress
issued May 2025
150 Spear StJohnson Controls Fire5/f: provide and install (2) duct detectors, (1) relay, and (4) speaker strobes. devices to scope if work embryology lab 557, cryo storage, room 582, and storage room 581, relocate and demo (e) devices shown on drawings.$10,000
May 8, 2025In progress
issued May 2025
150 Spear StR L H Fire Protection Inc5th floor: fire sprinkler permit. relocate 14, add 12, and delete 11 sprinklers. t.i. ref #202401314950$12,000
Apr 28, 2025Completed
final sign-off Jun 2026
150 Spear StPeacock Construction18/f (ste 1800): ti - selective demo, new non load bearing partitions, lighting/switching finishes, door and frames. mech/electrical under seperate permit.$260,000
Mar 14, 2025Completed
final sign-off Jul 2025
150 Spear StJohnson Controls Fire16th/f: modify e) fire alarm system. prodide 4 new speakers to phone booths, remove 2 e) strobes, replace w/ 2 speaker strobes, 1 relay, 2 door holders. ref to t.i. 202411225591$7,500
Jan 31, 2025Completed
final sign-off Apr 2025
150 Spear StPeacock Construction17/f suite 1700 - hvac modifications to support interior ti. ref permit 202412136794$10,000
Jan 30, 2025Completed
final sign-off Feb 2025
150 Spear StJohnson Controls Fire17/f: modify (e) fire alarm system, add (1) relay, (12) speaker strobes and (2) door holders. ref pa# 202412136794.$6,500
Jan 14, 2025Completed
final sign-off Apr 2025
150 Spear StPeacock Constructionelectrical ref 202412136794$50,000
Jan 7, 2025Completed
final sign-off Jan 2025
150 Spear StAyoob & Peery Plumbing Co Incsuite 1700: add (6) relocate (37) change out (10) fire sprinkler per ti job #24-701. ref #202412136794$29,109
Dec 13, 2024Completed
final sign-off Apr 2025
150 Spear StPeacock Construction17th floor. interior t.i. new millwork in break area, new huddle rooms, new conference roo, new grid ceiling + lighting. demo ceilings in open office. mep deferred$475,000
Nov 25, 2024Completed
final sign-off Jan 2025
150 Spear StR L H Fire Protection Incdemo all sprinklers and piping in the work area (62 heads) install new piping and sprinklers and connect to the (e) piping 62 new pendents sprinklers t.i. #2024-0131-4950$40,000
Nov 22, 2024Completed
final sign-off Jul 2025
150 Spear StPeacock Construction16th floor: phone booths with structural support.four (4)new phone booths. life safety &sprinkler work submitted separately. prefabricated phone booths$98,576
Nov 1, 2024Completed
final sign-off Feb 2025
150 Spear StJohnson Controls Fire5th/f, ste 500: provide and install new 3 duct detecotors, 23 speaker strobes, 1 speaker as shown on drawings. ref to 202401184175$12,000
Oct 7, 2024In progress
issued Jan 2025
150 Spear StGci, Increvision to 202401314950 no longer in scope nurse office 527, consult 526, exam 528, staff lounge 574, staff lockers, 576 staff lockers 576, staff toilet 577, dressing room 561, patient tt 575, clean/soiled 520, storage 516, med waste 530, blood lab 512, reception 513
Aug 6, 2024In progress
issued Nov 2024
150 Spear StGci, Inc5/f suite 500: revision to permit 202401184175 to add consult room, office and storage, electrical, added wireless access points, security cameras and adjustments of ceilings with new offices and storage. 10/3/24: change of scope due to (e) conditions the staff restroom, lockers, and lacation room
May 7, 2024In progress
issued Jul 2024
150 Spear StGci, Increvision to 202401184175. mechanical units and electrical, relocation of outside air louver and associated partitions and ceiling adjustments in staff restroom 551b or ceiling of ln storage, 558 revised to rated gypsum ceiling$10,000
Feb 29, 2024Completed
final sign-off Mar 2024
150 Spear StJohnson Controls Firereplace (1) strobe to speaker due to office being converted into conf. room$700
Jan 31, 2024In progress
issued Mar 2024
150 Spear StGci, Inc5th fl, suite #500 (phase 2)- demo exsisting suite. new expansion of embryology lab, new medical gas lines, added pacu, new exam room, enlarged waiting room & radiation protection of exam room. new hvac electrical & plumbing$800,000
Jan 18, 2024In progress
issued Mar 2024
150 Spear StGci, Incinterior ti demo existing suite, light fixtures, doors and other elements being reused. new hvac design, new gas lines, to new med gas and cryo. addition of 1 new restroom, 3 collection rooms, adrology lab, breakroom. new lighting and power. 5th floor framing and anchorage$800,000
Jan 18, 2024Completed
final sign-off Jan 2024
150 Spear StJohnson Controls Fire13/f: fa modification, add 1 door holder, add 1 control relay, ref pa# 202311201087.$1,900
Nov 20, 2023Completed
final sign-off Aug 2024
150 Spear StPeacock Construction13th fl, ste 1350 - glass partition & security door$60,000
Oct 25, 2022Completed
final sign-off May 2023
150 Spear StPeacock Construction#1800: electrical only-title 24. reference 202204182384.$25,000
Sep 26, 2022Completed
final sign-off May 2023
150 Spear StPeacock Constructionmech-demo (e) duct & hvac equipment. install new duct & hvac equipment. electric power lighting & signal. ref t.i. 202204182384$10,000
Sep 15, 2022Never finaled
issued Mar 2023, no final
150 Spear StJohnson Controls Firesuite 1800: modify (e) fire alarm system. provide and install 1 addressable relay module and 10 speaker strobes as shown on drawnings. ref t.i. pa 202204182384.
Jun 28, 2022Never finaled
issued Jul 2022, no final
150 Spear StJohnson Controls Fire6th fl: modify existing fire alarm system. ref pa# 202202228428.$6,500
Jun 15, 2022Completed
final sign-off Oct 2022
150 Spear StAyoob & Peery Plumbing Co Inc18th flr: add (2), relocate (34), changeout (13) sprinkler heads per t.i. ref# 2022-0418-2384.$11,625
May 19, 2022Completed
final sign-off Nov 2022
150 Spear StPeacock Construction6/f: mechanical demo of ductwork & diffusers, new duct work & diffusers, insulation of supply air duct work air balance within the scope. ref pa202202228428.$19,000
May 12, 2022Completed
final sign-off Nov 2022
150 Spear StPeacock Construction6/f: title 24 electrical compliance - power,lighting & signal. ref t.i. pa202202228428.
May 6, 2022Completed
final sign-off Jun 2022
150 Spear StAyoob & Peery Plumbing Co Inc6th fl: relocate 19 sprinkler heads per t.i.. ref pa# 202202228428.$4,275
Apr 18, 2022Completed
final sign-off May 2023
150 Spear StPeacock Constructionste 1800: tenant improvement to consist of selective demolition & construction of non-load bearing partitions. (n) ceiling grid & tiles. (n) light fixtures & switching. (n) finishes, doors & frames. mep under separate permit.$60,000
Feb 22, 2022Completed
final sign-off Nov 2022
150 Spear StPeacock Constructioninterior ti 6 th fl restroom modernization and elevator lobby finish upgrade$225,000
Sep 3, 2021Completed
final sign-off Oct 2022
150 Spear StAyoob & Peery Plumbing Co Increplace (e) fire pump & motor with like kind.$267,860
Oct 24, 2020Completed
final sign-off Dec 2021
150 Spear StThermal Mechanicalmechanical penthouse: cooling tower replacment. new sand filter, ew piping to serve cooling tower. 1 new heat exhanger. power for mechanical. maher n/a$750,000
Aug 24, 2020Completed
final sign-off Oct 2020
150 Spear StPeacock Constructiont-24 mechanical and electrical for work under pa #2020-0225-5314.$150,000
Aug 21, 2020Never finaled
issued Sep 2020, no final
150 Spear StGolden Gate Fire Protection Incfire sprinklery only - ref #202002255314. relocate 17 pendents & 33 uprights on the 7/f. add 1 pendent, relocae 6 concelaed in restroom.$28,500
Jun 25, 2020Never finaled
issued Jul 2020, no final
150 Spear StJohnson Controls Firesuite #750: modify extg fire alarm system on 7th floor. maher n/a$1,500
Feb 25, 2020Completed
final sign-off Oct 2020
150 Spear StPeacock Construction7/f: selective demo and construction of non load bearing partitions, new ceiling grid and tile. light fixtures, doors, frames, millwork, new finishes. includes bathroom upgrades and lobby finishes. mep, sprinkler and life-safety under sep permit. maher n/a.$425,000
Nov 12, 2019Never finaled
issued Jan 2020, no final
150 Spear StMc Millan Electricprovide and install new light fixtures and power recepticles per tenant improvement project ref pa #2019-0823-9655.$80,000
Nov 8, 2019Never finaled
issued Nov 2019, no final
150 Spear StPeacock Construction11/f: title 24 electrical compliance for t.i. pa201906193917.
Nov 7, 2019Completed
final sign-off Mar 2020
150 Spear StAyoob & Peery Plumbing Co Incadd 2, relocate 35, plug 0 sprinkler to conform to new wall ceiling layout per ti ref 201908239655$8,925
Oct 17, 2019Completed
final sign-off Jun 2020
150 Spear StMc Millan Electric10/f: title 24 electrical installation under ew201907162189. ref t.i. pa201906254320. maher n/a.$80,000
Oct 16, 2019Never finaled
issued Oct 2019, no final
150 Spear StPeacock Construction16/f: rev to pa# 201907307363; assembly door hardware from break room
Oct 15, 2019Never finaled
issued Oct 2019, no final
150 Spear StJohnson Controls Fireadd 1 relay module, 4 strobes, 12 speaker strobes on 11th fl fire alarm system. ref #201908239655$10,244
Oct 3, 2019Completed
final sign-off Jun 2020
150 Spear StT C B Builders Incmechanical work only 10th fl office ti ref 201906254320
Oct 3, 2019Completed
final sign-off May 2021
150 Spear StT C B Builders Incmechanical work for 11th fl office ti ref 201908239655
Sep 20, 2019Never finaled
issued Sep 2019, no final
150 Spear StJohnson Controls Fire11/f: installing 3 smk det and 11 speaker strob on 11th flr ref 201908017574$8,872
Sep 20, 2019Completed
final sign-off Oct 2019
150 Spear StJohnson Controls Fire10/f: installing 3 smk det, 1 duct det and 10 speaker strobes on 10th ref 201906193914$9,822
Sep 20, 2019Never finaled
issued Sep 2019, no final
150 Spear StJohnson Controls Fire16/f: installing 1 nac panel, 7 smk det, 1 control module, 8 strobes and 32 speaker strobes ref 201907307363$7,076
Sep 10, 2019Completed
final sign-off Oct 2019
150 Spear StJohnson Controls Fireinstalling 1 nac p[anel, 1 smk det, 8 strobes and 18 speaker strobes on 10th flr in fa system ref 201906254320$17,848
Sep 10, 2019Completed
final sign-off Nov 2019
150 Spear StPeacock Construction16th floor: t-24 mechanical and electrical for work under app#201907307363. n/a for maher
Aug 23, 2019Completed
final sign-off Mar 2020
150 Spear StT C B Builders Inc11th flr. tenant improvement at 11th fl. new interior partitions, doors, elec, finishes, lighting mep def$867,000
Aug 15, 2019Completed
final sign-off Sep 2019
150 Spear StGolden Gate Fire Protection Inc16th floor: fire sprinklers, relocate 25 pendents, 95 uprights, and 54 window(upright heads)raise 5 pendents in the restrooms. ref app#201907307363. n/a for maher$86,000
Aug 1, 2019Completed
final sign-off Dec 2019
150 Spear StGolden Gate Fire Protection Inc11th flr - fire sprinklers relocate 14 pendents commom areas ref 201906193917$7,000
Aug 1, 2019Completed
final sign-off Aug 2019
150 Spear StGolden Gate Fire Protection Inc10th flr - fire sprinklers relocate 16 pendents commom areas ref 201906193914$8,000
Jul 30, 2019Never finaled
issued Aug 2019, no final
150 Spear StPeacock Construction16th fl - selective demo and construction of non-structural partitions; new ceiling grid and tile, new light fixtures, doors and frames, millwork and finishes. mep, sprinkler, life safety under separate permit$898,650
Jul 29, 2019Completed
final sign-off Nov 2019
150 Spear StPeacock Construction10th flr. title 24 electrical compliance for pa 201906193914. maher n/a.
Jul 16, 2019Completed
final sign-off Oct 2019
150 Spear StAyoob & Peery Plumbing Co Inc10th flr, fire sprinklers. add 8, relocate 108 and plug 14 sprinklers to conform w/ (n) wall / ceiling layout of tenant improvement. job # 19-664$28,500
Jun 25, 2019Completed
final sign-off Jun 2020
150 Spear St10th flr. new tenant improvement incl (n) interior portions, doors, plumbing, electrical, finishes and lighting. demo throughout. mep and fire life safety under separate permit$867,000
Jun 19, 2019Completed
final sign-off Nov 2019
150 Spear StPeacock Constructionmodification to existing restrooms, elevator lobby, and extension of multi tenant corridor. to include selective demo and construction of ceiling grid and tile, light fixtures and finishes.$225,000
Jun 19, 2019Completed
final sign-off Mar 2020
150 Spear StPeacock Construction11/f:modification to existing restrooms, elevator lobby, and extension of multi tenant corridor. to include selective demo and construction of ceiling grid and tile, light fixtures and finishes.$225,000
Jun 18, 2019Never finaled
issued Jun 2019, no final
150 Spear Ststreet space
Jun 11, 2019Completed
final sign-off Jul 2019
150 Spear StPeacock Constructiont-24 electrical for work under pa# 201904178189
May 17, 2019Completed
final sign-off Jul 2019
150 Spear StJohnson Controls Fire13th fl: installing 3 smoke detectors, 4 stobes, 11 speaker strobes and 2 speakers in suite 1300 monitored and controlled by fire alarm system in the building.$12,250
Apr 29, 2019Completed
final sign-off May 2019
150 Spear StGolden Gate Fire Protection Incfire sprinkler only. relocate 32 pendents, 88 uprights, plug off 18 pendents, add 3 pendants for suite 1300 13th fl$60,000
Apr 24, 2019Completed
final sign-off Jul 2019
150 Spear StPeacock Construction13th fl - t-24 mechanical for work under pa 2019-0417-8189$31,000
Apr 17, 2019Completed
final sign-off Jul 2019
150 Spear StPeacock Construction13/f: demo & construction of non-structural partitions, new partitions, new ceiling grid & tile, new light fixtures, office doors & frames, new millwork and finishes. mep, sprinklers, fire alarm under separate permit$813,000
Mar 15, 2019Never finaled
issued Mar 2019, no final
150 Spear StJohnson Controls Firefire alarm system expansion for associated elevator modernization: install 20 new smoke sensors & 3 new relays$14,500
Feb 12, 2019Completed
final sign-off Mar 2019
150 Spear StPeacock Constructionrevision in room identification 327 from mother's room to wellness room. ref pa #201901029492.
Feb 7, 2019Completed
final sign-off Mar 2019
150 Spear StJohnson Controls Fire3rd flr - modifying the fire alarm system. remove 2 strobes and install 7 new strobes and 1 new speaker. ref pa 2019-0102-9492$4,224
Jan 25, 2019Completed
final sign-off Feb 2019
150 Spear StGolden Gate Fire Protection Inc3rd fl: fire sprinkler only; relocate 1 sprinkler pendent, add 2 pendents for suite #300$1,500
Jan 24, 2019Completed
final sign-off Mar 2019
150 Spear StPeacock Constructiont-24 electrical for work pa 201901029492. n/a for maher.$13,000
Jan 2, 2019Completed
final sign-off Mar 2019
150 Spear StPeacock Construction3rd fl: selective demo and construction of non structural partitions- new finishes$81,000
Dec 13, 2018Completed
final sign-off Dec 2018
150 Spear StPeacock Constructionrevision to pa #201803133561 to show new finishes, no construction , new paint and carpet only. 15th fl$10,000
Dec 6, 2018Completed
final sign-off Jun 2019
150 Spear StTruebeck Constructionrevision to pa #201803294961. added 02/c02 sensor with strobe per sffd comments during final medigas inspection. location is medical gas storage room 573.$3,000
Dec 4, 2018Never finaled
issued Dec 2018, no final
150 Spear StJohnson Controls Fire5th fl: as-built record drawing for pa #201811075254 fire alarm tenant improvement. ref pa #201803294961.$634
Nov 28, 2018Never finaled
issued Nov 2018, no final
150 Spear StDome Construction Corpstreet space
Nov 7, 2018Completed
final sign-off Dec 2018
150 Spear StJohnson Controls Fireas built record dwgs for 201807124384 fire alarm system (ref #201803294961)
Oct 22, 2018Completed
final sign-off Dec 2018
150 Spear StPeacock Construction18th fl: t-24 electrical for work under pa #201802232158$83,000
Oct 17, 2018Completed
final sign-off Oct 2018
150 Spear StR L H Fire Protection Inc1st flr. fire sprinkler tenant improvement. relocate 5 pendent heads. ref pa 201806081429. maher n/a$2,500
Oct 12, 2018Never finaled
issued Oct 2018, no final
150 Spear StDome Construction Corpdeferred electrical design build electrical drawing set. ref to permit app#210806081429. maher n/a exterior on first floor.$146,000
Sep 18, 2018Never finaled
issued Sep 2018, no final
150 Spear Ststreet space
Sep 12, 2018Never finaled
issued Sep 2018, no final
150 Spear StDome Construction Corprevision to pa 2018-0608-1429, install new slab on grade within building lobby. n/a for maher$10,000
Sep 11, 2018Completed
final sign-off Mar 2019
150 Spear StPeacock Constructiont-24 electrical for work under pa 201805108739$57,500
Sep 7, 2018Completed
final sign-off Dec 2018
150 Spear StJohnson Controls Firesuite 550. fire alarm tenant improvement. install 15 new strobe appliances and 15 new speaker appliances. maher n/a$15,800
Aug 23, 2018Never finaled
issued Aug 2018, no final
150 Spear StAcco Engineered Systems Inc. Dba Acco Enprocurement/installation of qty. 1 linear slot diffuser. procurement/installation of qty 8 ceiling diffusers, rebalance of qty. 2 cooling only zone and associated grills. n/a for maher. arch 201806081429$21,000
Aug 17, 2018Never finaled
filed Aug 2018, never issued
150 Spear Stt-24 mechanical for work under 201805108742 includes t24 elec
Aug 17, 2018Completed
final sign-off Dec 2018
150 Spear StPeacock Constructiont24 mechanical and electrical for 201808096915, no new fsd's$63,000
Aug 17, 2018Completed
final sign-off Nov 2018
150 Spear StPeacock Constructiont-24 mechanical and elec for work under 201806262904$41,000
Aug 15, 2018Completed
final sign-off Sep 2018
150 Spear StGolden Gate Fire Protection Incfire sprinkler only. ref# 2018-0809-6915 relocate 15 pendents; relocate 27uprights for ginger lap suite #550. all work on the 5th floor.$22,260
Aug 9, 2018Completed
final sign-off Dec 2018
150 Spear StPeacock Construction5th flr - demo and construction of non structural partitions, new ceiling grid and tiles. light fixtures office doors and frames, millwork and finishes. mep/fire deferred. mahe rna$395,000
Aug 2, 2018Completed
final sign-off Mar 2019
150 Spear StTruebeck Constructionrevision to mep components of approved bpa 201803294961 5th fl only
Jul 26, 2018Completed
final sign-off Feb 2019
150 Spear StJohnson Controls Firefire alarm retrofit - install 4 new speaker/strobe modification appliances$2,100
Jul 25, 2018Completed
final sign-off Jul 2018
150 Spear StGolden Gate Fire Protection Incfire sprinklers: relocate 11 upright sprinklers and relocate 4 pendent sprinklers on 7th floor. t.i. 22018-06-26-2904. maher n/a$7,875
Jul 19, 2018Completed
final sign-off Oct 2018
150 Spear StR L H Fire Protection Incfire sprinkler permit. relocate 74, add 32, delete 09 pendent sprinklers on the 5th fl ti 201803294961$28,000
Jul 12, 2018Never finaled
issued Jul 2018, no final
150 Spear StJohnson Controls Fire5th flr - fa ti - install 11 new addressable out det, 1 new smk det, 1 new relay, 46 new strobe appliances, 4 new speaker appliances. ref 201803294961 maher na$34,600
Jul 12, 2018Completed
final sign-off Sep 2018
150 Spear StJohnson Controls Fire7th flr, suite 725 - fa ti, install 2 new strobes, 4 bew speaker/strobes ref 201506262904. n/a for maher.$3,200
Jun 26, 2018Never finaled
issued Jun 2018, no final
150 Spear Ststreet space
Jun 26, 2018Completed
final sign-off Nov 2018
150 Spear StPeacock Construction7th flr - construction of non structural partitions, new ceiling grid, tile light fixtures, doors and frames, new millwork and finishes maher na$205,000
Jun 22, 2018Completed
final sign-off Mar 2019
150 Spear StJohnson Controls Firefire alarm ti suite 950. 1 new strobe appliance and 1 new speaker appliances relocate 4 e appliances maher not req$1,056
Jun 22, 2018Completed
final sign-off Aug 2018
150 Spear StJohnson Controls Firefire alarm t.i in ste 900. install 6 notification appliances. relocate 2 existing notification appliances.$3,160
Jun 13, 2018Completed
final sign-off Jun 2018
150 Spear StGolden Gate Fire Protection Inc9th fl - relocate 12 pendents; plug-off 2 pendents for parallel advisor's expansion. ref pa 201805108739 for suite 970-975$3,000
Jun 11, 2018Expired or cancelled
withdrawn Sep 2019
150 Spear StDome Construction Corpinstall address sign "150 spear" maher na$6,000
Jun 11, 2018Expired or cancelled
withdrawn Sep 2019
150 Spear StDome Construction Corpinstall 2 address sign "150" maher na$8,000
Jun 8, 2018Never finaled
issued Jun 2018, no final
150 Spear StDome Construction Corplobby - facade remodel at ground level lobby entry and bldg. lobby remodel (installation of (2) bldg. address, signs under separte permits) n/a maher$1,200,000
May 24, 2018Completed
final sign-off Jun 2018
150 Spear StGolden Gate Fire Protection Incfire sprinkler only on 9th fl: relocate 4 pendents; add 1 relocate 18 uprights - for tieron suite #900.$5,750
May 24, 2018Completed
final sign-off Jan 2019
150 Spear StPeacock Construction18th fl - t-24 mechanical for work under pa 2018-0223-2158$86,000
May 24, 2018Completed
final sign-off Dec 2018
150 Spear StPeacock Construction9th fl - t-24 mechanical for work under pa 2018-0510-8742$31,000
May 24, 2018Completed
final sign-off Dec 2018
150 Spear StPeacock Construction17th fl - t-24 mechanical for work under pa 2018-0207-0662$72,000
May 10, 2018Completed
final sign-off Dec 2018
150 Spear StPeacock Construction9th fl, ste 900 - selective demo of ceiling grid and tile, construct new non-structural partitions, doors, frames, new ceiling grid and tile, light fixtures and finishes$345,000
May 10, 2018Completed
final sign-off Mar 2019
150 Spear StPeacock Construction9th fl, ste 950 - selective demo and construction of non-structural partitions, relocation of (e) office doors, new millwork and finishes$189,000
May 3, 2018Completed
final sign-off Jul 2018
150 Spear StJohnson Controls Firefa ti on 18th fl: suite 1850 - adding (3) strobes, (12) speaker strobes, demo existing fa devices as shown on drawings. ref ti #201802232158. maher na$6,500
Apr 9, 2018Completed
final sign-off Apr 2018
150 Spear StR L H Fire Protection Incfire sprinkler elevator modernization - remove 10 sprinklers in machine room, remove 6 sprinklers at top shafts. ref sffd approval letter dated 6/23/17$7,255
Apr 3, 2018Completed
final sign-off May 2018
150 Spear StAyoob & Peery Plumbing Co Inc18th flr ti- add 3 relocate 53 amd plug 13 sprinklers to conform with wall/ceiling layout of ti ref 201802232158 maher na$13,500
Mar 29, 2018Completed
final sign-off Jun 2019
150 Spear StTruebeck Constructiontenant improvement. rma of northern california. mep included. proposed use - health service$3,000,000
Mar 16, 2018Never finaled
issued Mar 2018, no final
150 Spear StJohnson Controls Fire17th fl - ti consist of adding new 9 speaker/strobes. demo (e) fire alarm devices as shown on drawings. ref pa 2018-0207-0662$7,000
Mar 16, 2018Never finaled
issued Mar 2018, no final
150 Spear StGolden Gate Fire Protection Inc17/f: fire sprinkler only - relocate 18 heads (pendants) for suite #1750, 17th fl. ref #201802070662. maher na$4,500
Mar 13, 2018Completed
final sign-off Dec 2018
150 Spear StPeacock Constructiondemo of non bearing partitions, millwork, electrical and office doors, frames and side lights. demo only ab-017$13,000
Mar 12, 2018Completed
final sign-off Apr 2018
150 Spear StGolden Gate Fire Protection Inc15th flr - fire sprinkler only ref 201803133561, relocate 3 pendents; add 1 pendent for suite 1500 maher na$1,250
Feb 28, 2018Never finaled
issued Feb 2018, no final
150 Spear StPeacock Constructiont-24 electrical lighting for work under app#201802070662. n/a for maher$84,000
Feb 23, 2018Completed
final sign-off Dec 2018
150 Spear StPeacock Construction18th fl ste 1850 - demo of non-structural partitions, ceiling grid and tile. construct new non-structural partitions, new grid & tile, doors and frames, new millwork and light fixtures, mep/fire under separate permits.$585,000
Feb 7, 2018Completed
final sign-off Jun 2018
150 Spear StPeacock Construction7th fl: demo of selected non-structural partitions, demise space into 3 smaller suites, revise (e) ceiling grid & tiles, light fixtures, millwork and finishes in suite 775 & 780, suite 725 to remain vacant. maher na$89,000
Feb 7, 2018Completed
final sign-off Dec 2018
150 Spear StPeacock Constructionsuite 1750 - 17th fl: modification to (e) tenant space to include new non-structural partitions, ceiling, light fixtures, doors and frames, millwork, sink & finishes. mep deferred. maher na$375,000
Feb 7, 2018Completed
final sign-off Feb 2018
150 Spear StPeacock Construction5th fl - demo only, remove non-structural partition, doors, frames, ceilingm and finishesh, millworks and plumbing. ab-017. suite 575/580. maher na$22,000
Jan 17, 2018Completed
final sign-off Mar 2018
150 Spear StGolden Gate Fire Protection Inc7th floor #750 fire sprinkler only - relocate 18 uprights to spec suite #750. n/a maher ordinance$4,500
Nov 6, 2017Expired or cancelled
cancelled Jan 2026
150 Spear StPrincipal Builders Inc.5th floor: t.i. to demo partitions and doors and build new partitions, glazing, doors and upgrade restrooms. n/a for maher.$525,000
Nov 3, 2017Never finaled
issued Nov 2017, no final
150 Spear StJohnson Controls Fire1st fl - f/a: remove existing (2) integral smoke detectors with (2) new duct detectors. maher na$1,200
Sep 26, 2017Completed
final sign-off Nov 2017
150 Spear StPrincipal Builders Inc.4/f, 14/f- ti, title 24 mechanical to install new mechanical systems on 4th and 14th floors. ref pa 2016-1230-6308, 2017-0612-9709 and 2017-0616-9628 for ti work. na for maher.$60,000
Aug 15, 2017Completed
final sign-off Aug 2017
150 Spear StGolden Gate Fire Protection Incfire sprinkler only. relocate 80 pendents on the 5th fl, ref ti #201707182242. & relocate 27 upright & 4 pendents on the 17th fl, ref ti #201707182244. maher na$27,750
Jul 27, 2017Completed
final sign-off Aug 2017
150 Spear StJohnson Controls Fire14/f: fire alarm. tenant improvement - provide and isntall 6 strobes and 1 speaker. ref. t.i. pa201612306308.
Jul 18, 2017Completed
final sign-off Sep 2017
150 Spear StPeacock Constructiondemo only non structural partitions, elec,plumbing, doors, frames demo only ab17$38,000
Jul 18, 2017Completed
final sign-off Sep 2017
150 Spear StPeacock Construction17th floor demo only non structural partitions, elec, plumb, doors and frames. demo only ab17$21,000
Jun 16, 2017Completed
final sign-off Nov 2017
150 Spear StPrincipal Builders Inc.revision to 201612306308 to change occupancy load and purpose at proposed rooms maher not req
Jun 15, 2017Completed
final sign-off Jul 2017
150 Spear StAnderson, Rowe & Buckley, Inc.4th & 14th floors: 4th-relocated 3. 14th - relocate 1, ad 1 maher na$1,000
Jun 12, 2017Completed
final sign-off Nov 2017
150 Spear StPrincipal Builders Inc.4th floor: t.i. - to remove glazed partition and construct new non-rated partitions, glazing and finishers. mep, sprinklers and life safety to be pulled under separate permit.$59,000
May 1, 2017Completed
final sign-off May 2017
150 Spear StRossi Builders Inc.modification of an existing tenant space to include selective construction of non-load bearing partition, light fixture relocation, new power & data, new door & frame and new finishes$35,000
Feb 10, 2017Never finaled
issued Feb 2017, no final
150 Spear StPrincipal Builders Inc.2nd flr: ti to demo and construct new partitions, millwork, doors and finishes mep/fire/life safety under sep permit maher na$145,000
Jan 11, 2017Completed
final sign-off Jan 2017
150 Spear StPeacock Constructionto obtain final inspection for work approved under pa# 201211093884. all work is complete.
Dec 30, 2016Completed
final sign-off Nov 2017
150 Spear StPrincipal Builders Inc.14th: ti- to demo and construct new partitions, millwork, doors and finishing mep/fire/life safety will be submitted sep. maher na$250,000
Dec 7, 2016Completed
final sign-off Feb 2017
150 Spear StRossi Builders Inc.#700- hvac for 2 new offices in (e) space, reference to pa#201611042003, install new and rebalance vav box to serve interior rooms. n/a ordinance #155-13.
Dec 7, 2016Completed
final sign-off Feb 2017
150 Spear StRossi Builders Inc.#700- electrical for 2 new offices in (e) space, reference to pa#201611042003, lighting, power and signal, wiring, lighting and receptacle controls. n/a ordinance #155-13.
Dec 2, 2016Never finaled
issued Dec 2016, no final
150 Spear StJohnson Controls Fire7th fl: fire alarm improvement to ti ref. #2016-1104-2003. adding (2) strobes. relocate (1) speaker and strobe to new location.$2,400
Nov 7, 2016Completed
final sign-off Nov 2016
150 Spear StR L H Fire Protection Incfire sprinkler permit add 3 pendent sprinklers; relocated 1 pendent sprinkler on the 7th floor. ti 2016-1104-2003$4,275
Nov 4, 2016Completed
final sign-off Feb 2017
150 Spear StRossi Builders Inc.7th flr: 2 new offices in suite as well as new mothers room. paint & carpet new throughout space. new countertops in breakroom. maher na$216,782
Sep 21, 2016Completed
final sign-off Sep 2016
150 Spear StGolden Gate Fire Protection Incfire sprinkler only - 10th floor, 2016-0819-5555 relocate 20 pendents, 18th floor - 2016-0819-5557 relocate 23 pendents$22,575
Aug 19, 2016Completed
final sign-off Dec 2016
150 Spear StPeacock Construction10th flr: modification of (e)elevator lobby & extension of multi-tenant corridor.selective demo of (e)finishes,ceiling grid & tile and lights.new partial ceiling grid,tile &light fixtures,finishes;maher n/a$53,000
Aug 19, 2016Completed
final sign-off Dec 2016
150 Spear StPeacock Construction18th flr: modification of (e)elevator lobby & extension of multi-tenant corridor.selective demo of (e)finishes,ceiling grid & tile and lights.new partial ceiling grid,tile &light fixtures,finishes;maher n/a$53,000
Jun 15, 2016Completed
final sign-off Jul 2016
150 Spear StCommercial Interior Builders Inc8th floor - ductwork for modification of 3 offices. ref pa #201604215324 for architectural work. no new fire smoke dampers. n/a maher ordinance$5,250
May 27, 2016Completed
final sign-off Jun 2016
150 Spear StGolden Gate Fire Protection Inc8th floor, suite 850: ref pa 2016-0421-5324 relocate 3 pendents maher na$1,500
May 20, 2016Never finaled
issued May 2016, no final
150 Spear StJohnson Controls Fire8th floor tenant improvement for fire alarm - relocate (1) existing strobe to new location. ref ti 2016-0421-5324.$1,000
May 4, 2016Completed
final sign-off May 2016
150 Spear StJohnson Controls Firegrnd flr: application to final 201603162177 and 201602169694; maher n/a
Apr 29, 2016Completed
final sign-off May 2016
150 Spear StEric F Anderson Incorporatedfsd in exhaust duct ref 201406097840; maher n/a$3,000
Apr 21, 2016Completed
final sign-off Jul 2016
150 Spear StCommercial Interior Builders Inc8th fl modification of existing tenant improvmennts to include selective demo and construction of non load bearing partitions, new and relocated doors, mech, elec, fire sp ls sep permit$45,000
Mar 16, 2016Completed
final sign-off Apr 2016
150 Spear StJohnson Controls Fireas built record drawing for pa 2016-0216-9694 per field inspection comments
Feb 16, 2016Completed
final sign-off Apr 2016
150 Spear StJohnson Controls Firegrnd flr: fire alarm tenant improvement on ground floor (4) speaker strobes, (1) manual pull box, (3) monitor fodules, (1) relay moduel; t.i. 201406097840; maher n/a$4,800
Feb 10, 2016Expired or cancelled
cancelled Oct 2016
150 Spear StJohnson United Inc Dba United Sign Systeinstall new projecting electrical wall sign. n/a for maher$2,400
Feb 2, 2016Completed
final sign-off Feb 2016
150 Spear StGolden Gate Fire Protection Increlocate 20 pendents, add 1 plug off 2 pendents 21 total for specialty cafe on ground floor, fire sprinkler only ref pa 2014-0609-7840. n/a for maher.$10,500
Dec 16, 2015Never finaled
issued Dec 2015, no final
150 Spear Ststreet space
Oct 5, 2015Completed
final sign-off Mar 2016
150 Spear StPrincipal Builders Inc.20 min rated door is required and will be installed per revision to permit 201506307997
Jul 17, 2015Completed
final sign-off Jul 2015
150 Spear StR L H Fire Protection Inc4th floor fire sprinkler permit - relcoate 9 & add 2 pendent sprinklers. ref #201506037997. n/a maher ordinance$5,654
Jul 17, 2015Completed
final sign-off Aug 2015
150 Spear StJohnson Controls Fire4th floor: fire alarm t.i. 5 new speakers and 2 new strobes. n/a for maher. ref app#201506037997$4,500
Jun 30, 2015Completed
final sign-off Mar 2016
150 Spear StPrincipal Builders Inc.4th flr: title 24 electrical & mechanical to install 3 new vav boxes & lighting/power on 4th flr t.i. 201506037997 for reference; maher n/a$18,348
Jun 24, 2015Completed
final sign-off Oct 2015
150 Spear StJohnson Controls Firefire alarm t.i. to 15/f. 14 strobes, 17 speakers, 2 duct smoke detectors with relay. t.i. pa#201505075646. n/a ordinance #155-13.$16,700
Jun 3, 2015Completed
final sign-off Mar 2016
150 Spear StPrincipal Builders Inc.t.i. to demo and construction doors, millwork, non-structural partitions and finishes. mep life safety and sprinkler on seperate permit. n/a for the maher.$57,564
May 27, 2015Completed
final sign-off Jun 2015
150 Spear StGolden Gate Fire Protection Inc15th fl: fire sprinkler only. relocate 32 pendents, add 6 pendents, relocate 13 uprights, add uprights, plug 13 outlets. total 54 sprinkler heads$27,000
May 7, 2015Completed
final sign-off Dec 2015
150 Spear StPeacock Construction15th flr: demo (e) and construct new non structural partitions, ceilings, new lighting, doors & frames, millwork and sink. modifications to (e) elevator lobby, include mechanical. fire/life/safety under sep permit. maher na$380,000
Dec 17, 2014Completed
final sign-off Jan 2015
150 Spear StGolden Gate Fire Protection Inc9th flr: relocate 5 pendant sprinkler heads on the 9th flr, t.i. 201411121273; maher n/a$3,090
Nov 12, 2014Never finaled
issued Nov 2014, no final
150 Spear StPeacock Construction9th floor: modification and expansion of (e) tenant space to include selective demo and constructio of non-structural partitions, ceiling grid and tile, light fixture relocation and re-switching, new doors and frames. life safety and sprinkler under separate permit. maher n/a.$83,000
Aug 22, 2014Never finaled
issued Aug 2014, no final
150 Spear Ststreet space
Aug 1, 2014Completed
final sign-off Sep 2014
150 Spear StJohnson Controls Fire8th floor: t.i. improvement. install new 2 smoke detectors and 2 door holders. ref app#201307121719. n/a for the maher ordinance #155-13$3,000
Jun 9, 2014Completed
final sign-off Apr 2016
150 Spear StEric F Anderson Incorporatedt.i. to an extg cafe, work includes soft demo of interior walls, new ceilings and walls, mechanical included, sprinkler & fire alarm seperate permit. n/a for the maher ordinance #155-13$300,000
Jan 10, 2014Completed
final sign-off Oct 2015
150 Spear StThermal Mechanicalreplace 1 cooling tower at roof of building$1,000,000
Jan 9, 2014Completed
final sign-off Jan 2014
150 Spear StJohnson Controls Fire9th floor:addition of one speaker/strobe, 2 speakers, one duct detector and 2 door holders. remove and replace 8 extg speaker with new . relocate 3 extg strobes and 2 door holders as shown. t.i. app#201311051140$6,000
Dec 20, 2013Completed
final sign-off Sep 2014
150 Spear StJohnson Controls Firerelocate (6) existing strobes & (4) existing speakers to new locations, remove & cover (2) existing strobes, (3) speakers t.i. pa# 201312043343$5,000
Dec 4, 2013Never finaled
issued Dec 2013, no final
150 Spear StPeacock Construction Inc16th floor: demo and construction of selected non load bearing partitions, minor ceiling grid repair,new light fixtures. mech, elec, sprinkler, life safety under seperate permit.$285,000
Nov 27, 2013Completed
final sign-off Jan 2014
150 Spear StAyoob & Peery Plumbing Co Incfire sprinkler t.i., 9th floor: add 3, relocate 67, remove 6 ref. app# 2013-1105-1140$35,980
Nov 27, 2013Completed
final sign-off Jan 2014
150 Spear StAyoob & Peery Plumbing Co Inc16th floor sprinkler t.i.: add and relocate fire sprinkler heads per tenant improvement. add 3 heads, relocate 50 heads, remove 3. ref. app# 2013 1001 8205$27,242
Nov 25, 2013Never finaled
issued Dec 2013, no final
150 Spear StDome Construction Corp9th floor:demo and replace heating supply diffusers, disconnect fan coil duct work, relocating air outlets, demo and relocate pneumatic thermostats, replace all extg t bar grilles with new. reference app#201311051140$20,000
Nov 5, 2013Completed
final sign-off Mar 2014
150 Spear StDome Construction Corpwork for lobby & corridor, minor wall demo, no carpet in office space except corridor, ada upgrades to restroom, paint and patch work. mep under seperate permits. lifesafety ans sprinklers under seperate permit.$250,000
Oct 29, 2013Completed
final sign-off Nov 2013
150 Spear StJohnson Controls Firesuite 350. fire alrm tenant improvement. relocate existing 3 strobes to new location. relocate existing speaker to new location, remove and cover 3 strobes and 2 speakers$5,000
Oct 22, 2013Completed
final sign-off Nov 2013
150 Spear StAyoob & Peery Plumbing Co Inc3rd floor-add & relocate fire sprinklers per t.i-add 3 & relocate 32$18,000
Oct 11, 2013Completed
final sign-off Oct 2013
150 Spear StGolden Gate Fire Protection Inc15th floor - relocate 7 pendent sprinkler heads. ref pa #2013.09.11.6482$6,682
Oct 1, 2013Completed
final sign-off Nov 2013
150 Spear StPeacock Construction Incdemolition and construction of selected non structural partitons. demo of existing accoustical ceilings, replace with new ceilings. mep, sprinkler, life safety sep permit$200,000
Sep 30, 2013Completed
final sign-off Oct 2013
150 Spear StJohnson Controls Fire15th floor - provide & install new (5) strobes, (2) speakers & (2) duct detectors. relocate (2) existing strobes to new location. remove & cover (6) existing strobes. ref t.i. #2013.09.11.6482$8,000
Sep 18, 2013Never finaled
issued Sep 2013, no final
150 Spear StJohnson Controls Firefire alarm ti to 5th fl lobby. add 1 new speaker, relocate 3 existing strobes, 2 existing speakers to new location/ t.i. # 201307182177$5,000
Sep 11, 2013Completed
final sign-off Nov 2013
150 Spear StDome Construction Corpsuite 1500 -office space, flooring, walls, ceiling, relocate existing light fixtures & sprinkler heads. revise existing doors and frames. relocate existing thermostates, return grills and diffusers. new finishes, paint, casework, carpet. mep, sprinklers and fire alarm separate permit$140,000
Aug 20, 2013Completed
final sign-off Sep 2013
150 Spear StSimplexgrinnell Lp.8/f- fire alarm t.i., relocate 4 existing strobes and removal of 4 strobes and 1 speaker. t.i. # 201307121719$8,000