Jesse Avery
- Listed as
- engineer
- Firm
- Mazzetti
- On San Francisco permits
- Dec 2016 to Aug 2024
6 permits since 2000 (engineer on 6 permits): 3 completed, 3 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 6, 2024 | In progress issued Nov 2024 | 150 Spear St | Gci, Inc | 5/f suite 500: revision to permit 202401184175 to add consult room, office and storage, electrical, added wireless access points, security cameras and adjustments of ceilings with new offices and storage. 10/3/24: change of scope due to (e) conditions the staff restroom, lockers, and lacation roomDetails
5/f suite 500: revision to permit 202401184175 to add consult room, office and storage, electrical, added wireless access points, security cameras and adjustments of ceilings with new offices and storage. 10/3/24: change of scope due to (e) conditions the staff restroom, lockers, and lacation room | |
| Mar 19, 2024 | In progress filed Mar 2024, not yet issued | 278 Post St | Rudolph Commercial Interiors Inc, Rci | replacement of (e) fluid cooler, condenser water pumps, heating hot water boiler, heating hot water pumps and associated piping and appertenances. replace of existing rooftop existing rooftop emergency generatorDetails
replacement of (e) fluid cooler, condenser water pumps, heating hot water boiler, heating hot water pumps and associated piping and appertenances. replace of existing rooftop existing rooftop emergency generator | $190,000 |
| Jan 31, 2024 | In progress issued Mar 2024 | 150 Spear St | Gci, Inc | 5th fl, suite #500 (phase 2)- demo exsisting suite. new expansion of embryology lab, new medical gas lines, added pacu, new exam room, enlarged waiting room & radiation protection of exam room. new hvac electrical & plumbingDetails
5th fl, suite #500 (phase 2)- demo exsisting suite. new expansion of embryology lab, new medical gas lines, added pacu, new exam room, enlarged waiting room & radiation protection of exam room. new hvac electrical & plumbing | $800,000 |
| Mar 3, 2020 | Completed final sign-off Aug 2020 | 1100 Van Ness Av | Rudolph And Sletten Inc | modify electrical outlets, electrical panels, curtains, casework, and equipment in 1415 sq ft on level 4 & 5 of the existing medical office building and add a transformer to the existing mechanical room on level 2.Details
modify electrical outlets, electrical panels, curtains, casework, and equipment in 1415 sq ft on level 4 & 5 of the existing medical office building and add a transformer to the existing mechanical room on level 2. | $620,000 |
| May 17, 2018 | Completed final sign-off Apr 2019 | 1100 Van Ness Av | Rudolph And Sletten Inc | 5th fl - revision to pa 2017-0927-9716 and 2018-0416-6404 adding gamma rey machine to scope and additional correction to building & engineering pagesDetails
5th fl - revision to pa 2017-0927-9716 and 2018-0416-6404 adding gamma rey machine to scope and additional correction to building & engineering pages | |
| Dec 15, 2016 | Completed final sign-off Aug 2018 | 475 Brannan St | Herrero Builders Incorporated | suite 120 & 130; replace casework in breakroom, (n) power & data outlets in mail room. conference room & aisle (n) wall mounted screen & equipoment. replace finishes per schedule. suite 130 - reconfigure office & lab spaces. selective demo (n) partitions, floor finishes, painting, ceiling, lightingDetails
suite 120 & 130; replace casework in breakroom, (n) power & data outlets in mail room. conference room & aisle (n) wall mounted screen & equipoment. replace finishes per schedule. suite 130 - reconfigure office & lab spaces. selective demo (n) partitions, floor finishes, painting, ceiling, lighting | $800,000 |