- May 2009 to Jun 2022
11 permits since 2000 (engineer on 11 permits): 9 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 30, 2022 | Completed final sign-off Jan 2025 | 750 Florida St | Dome Construction Corp | alteration to (e) structure including change of use from warehouse to occupancy b-animal care. sow includes: arch, mep & structural modifications not included under phase 1 bpa# 2022-0406-1682. dferred: fire protection, life safety. ** ~encrypt&yes **Details
alteration to (e) structure including change of use from warehouse to occupancy b-animal care. sow includes: arch, mep & structural modifications not included under phase 1 bpa# 2022-0406-1682. dferred: fire protection, life safety. ** ~encrypt&yes ** | $4,800,000 |
| Nov 16, 2021 | Completed final sign-off Mar 2022 | 499 Illinois St | Silicon Valley Shelving & Equipment Comp | 4/f: adding mobile shelving (high density storage)Details
4/f: adding mobile shelving (high density storage) | $37,000 |
| Jan 26, 2021 | Completed final sign-off Jan 2022 | 1100 Van Ness Av | The Boldt Company | this project consists of adding (2) dc fast charging stations and electrical panel at garage level g2Details
this project consists of adding (2) dc fast charging stations and electrical panel at garage level g2 | $13,400 |
| Dec 18, 2019 | Completed final sign-off Sep 2022 | 401 Cherry St | Herrero Builders Incorporated | revision to mandatory soft story pa #201709067106. minor structural detailing adjustments to address existing conditions.Details
revision to mandatory soft story pa #201709067106. minor structural detailing adjustments to address existing conditions. | |
| Sep 6, 2017 | Completed final sign-off Sep 2022 | 2329 Sacramento St | Herrero Builders Incorporated | mandatory soft story retrofit using iebc a-4Details
mandatory soft story retrofit using iebc a-4 | $260,295 |
| Dec 15, 2016 | Completed final sign-off Aug 2018 | 475 Brannan St | Herrero Builders Incorporated | suite 120 & 130; replace casework in breakroom, (n) power & data outlets in mail room. conference room & aisle (n) wall mounted screen & equipoment. replace finishes per schedule. suite 130 - reconfigure office & lab spaces. selective demo (n) partitions, floor finishes, painting, ceiling, lightingDetails
suite 120 & 130; replace casework in breakroom, (n) power & data outlets in mail room. conference room & aisle (n) wall mounted screen & equipoment. replace finishes per schedule. suite 130 - reconfigure office & lab spaces. selective demo (n) partitions, floor finishes, painting, ceiling, lighting | $800,000 |
| Mar 8, 2016 | Completed final sign-off Jun 2017 | 2655 Bush St | Cameron Builders Inc. | tenant improvement for physical therapy clinic, 3,600 sq.ft. shell building permit pa#201211093966.Details
tenant improvement for physical therapy clinic, 3,600 sq.ft. shell building permit pa#201211093966. | $1,800,000 |
| Nov 6, 2015 | Never finaled issued Feb 2016, no final | 2340 Clay St | D Kelly Construction Inc. | rev. to pa#201505156458. n/a ordinance #133-15. new framing for elevator equipment at elevator machine room.Details
rev. to pa#201505156458. n/a ordinance #133-15. new framing for elevator equipment at elevator machine room. | $20,000 |
| Nov 26, 2014 | Completed final sign-off Jan 2015 | 50 Osgood Pl | Western Allied Mechanical Inc. | revision to pa# 201411070983 roof consisted metal deck with lighweight concrete fill instead of bare metal deck with insulation during field investigation. revise details and support of the cooling tower for concrete fill. n/a ordinance #155-13Details
revision to pa# 201411070983 roof consisted metal deck with lighweight concrete fill instead of bare metal deck with insulation during field investigation. revise details and support of the cooling tower for concrete fill. n/a ordinance #155-13 | |
| Sep 2, 2011 | Expired or cancelled cancelled Mar 2020 | 2501 Ocean Av | structral strengthening @ 1st floor, 2nd floor, attic, basement. arch items as related for the above. new fire alarm system & minor elec. items. ada as req. (20% const cost) new finishes.Details
structral strengthening @ 1st floor, 2nd floor, attic, basement. arch items as related for the above. new fire alarm system & minor elec. items. ada as req. (20% const cost) new finishes. | $240,000 | |
| May 20, 2009 | Completed final sign-off Jun 2009 | 1240 14th Av | Jab Construction Company Ltd | #301 - replace dryrotted cantilevered balcony joists (including deckboard) in kind. replace (2) sliding glass doors in kind (0.67) patch interior drywall in kind. patch exterior stucco in kind, rear prime & paint all repairs. re-install existing railings.Details
#301 - replace dryrotted cantilevered balcony joists (including deckboard) in kind. replace (2) sliding glass doors in kind (0.67) patch interior drywall in kind. patch exterior stucco in kind, rear prime & paint all repairs. re-install existing railings. | $12,500 |