John Pappas
- License
- M22366
- Mechanical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up M22366 at the Board for Professional Engineers
- Listed as
- architect, engineer
- Firm
- Mazzetti
- On San Francisco permits
- Oct 2008 to Sep 2017
3 permits since 2000 (engineer on 2 permits, architect on 1 permit): 2 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Bcci Construction Company, Cahill Contractors Inc, Herrero Builders Incorporated
- Architects
- Donald Harrier, Hugh Cotter, Rene Bihan
- Engineers
- Jesse Avery, Maryann Phipps
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 3
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 1, 2017 | Expired or cancelled cancelled Apr 2018 | 1603 Pine St | Cahill Contractors Inc | installation of new max ht 20" planters @ ground level; they do not extend past the building; irrigation lines to planters; installation of new awning above entry; no signage on it; does not extend past the buildingDetails
installation of new max ht 20" planters @ ground level; they do not extend past the building; irrigation lines to planters; installation of new awning above entry; no signage on it; does not extend past the building | $2,000 |
| Dec 15, 2016 | Completed final sign-off Aug 2018 | 475 Brannan St | Herrero Builders Incorporated | suite 120 & 130; replace casework in breakroom, (n) power & data outlets in mail room. conference room & aisle (n) wall mounted screen & equipoment. replace finishes per schedule. suite 130 - reconfigure office & lab spaces. selective demo (n) partitions, floor finishes, painting, ceiling, lightingDetails
suite 120 & 130; replace casework in breakroom, (n) power & data outlets in mail room. conference room & aisle (n) wall mounted screen & equipoment. replace finishes per schedule. suite 130 - reconfigure office & lab spaces. selective demo (n) partitions, floor finishes, painting, ceiling, lighting | $800,000 |
| Oct 20, 2008 | Completed final sign-off Dec 2008 | 1 Market St | Bcci Construction Company | mechanical & electrical work associated with appl. 200809303031, including new outlets, lighting, exhaust fan & thermostat.Details
mechanical & electrical work associated with appl. 200809303031, including new outlets, lighting, exhaust fan & thermostat. | $57,500 |