From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

199 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Feb 20, 2026Completed
final sign-off Mar 2026
475 Brannan StGci, Incdemo existing duct and air distribution as shown on m.i.i.d. install new duct and air distribution as shown (m2.1) ddc controls. air balance. ref pa#2025-1212-1655
Details
Permit
202602206264
Permit issued
Feb 24, 2026
Final sign-off
Mar 24, 2026

demo existing duct and air distribution as shown on m.i.i.d. install new duct and air distribution as shown (m2.1) ddc controls. air balance. ref pa#2025-1212-1655

Open the permit page

$50,000
Dec 12, 2025Completed
final sign-off Mar 2026
475 Brannan StGci, Inc1st fl interior ti: non structural interior walls & ceiling in office area. mep deferred
Details
Permit
202512121655
Permit issued
Jan 21, 2026
Final sign-off
Mar 24, 2026

1st fl interior ti: non structural interior walls & ceiling in office area. mep deferred

Open the permit page

Nov 26, 2025In progress
issued Dec 2025
475 Brannan StGolden Gate Fire Protection Inc1/f suite 110: 202403077275-fire sprinkler t.i. relocate 6 uprights.
Details
Permit
202511260525
Permit issued
Dec 5, 2025

1/f suite 110: 202403077275-fire sprinkler t.i. relocate 6 uprights.

Open the permit page

$1,500
Mar 7, 2024Completed
final sign-off May 2024
475 Brannan StAnderson, Rowe & Buckley, Inc.ti exsiting fire sprinkler system new ev charging locations. 75 new sprinkler & 24 change out sprinklers
Details
Permit
202403077275
Permit issued
Mar 7, 2024
Final sign-off
May 31, 2024

ti exsiting fire sprinkler system new ev charging locations. 75 new sprinkler & 24 change out sprinklers

Open the permit page

Dec 7, 2023In progress
issued Jan 2024
475 Brannan StCapitol Electric Constnew feeder, 75kva transformer,panel board and branch circuits for (8) new electr veh chargers.
Details
Permit
202312072124
Permit issued
Jan 11, 2024

new feeder, 75kva transformer,panel board and branch circuits for (8) new electr veh chargers.

Open the permit page

$12,638
May 2, 2023Completed
final sign-off May 2023
475 Brannan StVantis Dba One Workplace Construction1/f unit# 110: revision to bpa#202211186828, furniture plan provided for evaluation/approval. revision to phone rooms for accessibility.
Details
Permit
202305026908
Permit issued
May 11, 2023
Final sign-off
May 16, 2023

1/f unit# 110: revision to bpa#202211186828, furniture plan provided for evaluation/approval. revision to phone rooms for accessibility.

Open the permit page

Feb 16, 2023Never finaled
issued Feb 2023, no final
475 Brannan StCapitol Electric Constprovide lighting & power for t.i. ref bpa#202211186828
Details
Permit
202302162110
Permit issued
Feb 16, 2023

provide lighting & power for t.i. ref bpa#202211186828

Open the permit page

$14,533
Jan 18, 2023Completed
final sign-off Feb 2023
475 Brannan StAnderson, Rowe & Buckley, Inc.relocate 2 head pendents suite 110 and plug off 2 sprinkler heads (1 upright and 1 pendent) at steelcase on 1st fl. ref #202211186828.
Details
Permit
202301180288
Permit issued
Jan 18, 2023
Final sign-off
Feb 14, 2023

relocate 2 head pendents suite 110 and plug off 2 sprinkler heads (1 upright and 1 pendent) at steelcase on 1st fl. ref #202211186828.

Open the permit page

$1,000
Dec 21, 2022Completed
final sign-off Jan 2023
475 Brannan StPyro-Comm Systems, Inc.2/f: (1) ceiling strobe added to mother's room to provide proper coverage. ref bpa #202212098034
Details
Permit
202212218852
Permit issued
Dec 22, 2022
Final sign-off
Jan 6, 2023

2/f: (1) ceiling strobe added to mother's room to provide proper coverage. ref bpa #202212098034

Open the permit page

$500
Dec 9, 2022Completed
final sign-off Jan 2023
475 Brannan StPrincipal Builders Inc.t.i. 2nd floor: interior renovation. add new non load bearing walls, door, and casework at mother room.
Details
Permit
202212098034
Permit issued
Dec 21, 2022
Final sign-off
Jan 6, 2023

t.i. 2nd floor: interior renovation. add new non load bearing walls, door, and casework at mother room.

Open the permit page

$13,800
Nov 18, 2022Completed
final sign-off May 2023
475 Brannan StVantis Dba One Workplace Constructionrelocation of pantry sink, minor non-structural demolition, minimal changes to finishes, no change of use, no change of egress, no added floor area.
Details
Permit
202211186828
Permit issued
Dec 13, 2022
Final sign-off
May 16, 2023

relocation of pantry sink, minor non-structural demolition, minimal changes to finishes, no change of use, no change of egress, no added floor area.

Open the permit page

$182,506
Mar 29, 2022Completed
final sign-off Jun 2022
475 Brannan Strevision to 2021-1130-3362 & 2021-1130-3368 to revise pot basement drawings for the updated accessible parking stall quantity and unauthorized vehicle signage @ garage entry
Details
Permit
202203291104
Permit issued
Apr 6, 2022
Final sign-off
Jun 24, 2022

revision to 2021-1130-3362 & 2021-1130-3368 to revise pot basement drawings for the updated accessible parking stall quantity and unauthorized vehicle signage @ garage entry

Open the permit page

$2,000
Feb 17, 2022Completed
final sign-off Aug 2022
475 Brannan StPyro-Comm Systems, Inc.fire alarm. 14 ceiling strobes, 6 ceiling horn strobes, 1 remote power supply, 2 duct detectors, 2 relay modules, 1 control module & 1 smoke detector to be provided for proper coverage. ref 2nd fl pa# 202111303362. ref 3rd fl pa# 202111303368.
Details
Permit
202202178211
Permit issued
Feb 17, 2022
Final sign-off
Aug 1, 2022

fire alarm. 14 ceiling strobes, 6 ceiling horn strobes, 1 remote power supply, 2 duct detectors, 2 relay modules, 1 control module & 1 smoke detector to be provided for proper coverage. ref 2nd fl pa# 202111303362. ref 3rd fl pa# 202111303368.

Open the permit page

$8,500
Dec 28, 2021Completed
final sign-off Mar 2022
475 Brannan St3/f suite 300: relocate 16 existing sprinklers, add 14 new sprinklers. delete 5 existing sprinklers to suit t.i. ref permit 202111303368.
Details
Permit
202112285070
Permit issued
Dec 28, 2021
Final sign-off
Mar 17, 2022

3/f suite 300: relocate 16 existing sprinklers, add 14 new sprinklers. delete 5 existing sprinklers to suit t.i. ref permit 202111303368.

Open the permit page

$5,000
Dec 28, 2021Completed
final sign-off Mar 2022
475 Brannan St2/f: relocate 1 existing pendent in restroom to suite 300. ref ti permit 202111303362.
Details
Permit
202112285071
Permit issued
Dec 28, 2021
Final sign-off
Mar 17, 2022

2/f: relocate 1 existing pendent in restroom to suite 300. ref ti permit 202111303362.

Open the permit page

$100
Nov 30, 2021Completed
final sign-off Aug 2022
475 Brannan StPrincipal Builders Inc.3/f: interior renovation of level 3 office: new finiehs, furnishings, millwork, updated light. targeted mech scop: plumbing additions
Details
Permit
202111303368
Permit issued
Dec 22, 2021
Final sign-off
Aug 1, 2022

3/f: interior renovation of level 3 office: new finiehs, furnishings, millwork, updated light. targeted mech scop: plumbing additions

Open the permit page

$800,000
Nov 30, 2021Completed
final sign-off Aug 2022
475 Brannan StPrincipal Builders Inc.2/f: interior renovation of level 2 office: new finiehs, furnishings, millwork, updated light. target mech scop: lighting upgrades.
Details
Permit
202111303362
Permit issued
Dec 22, 2021
Final sign-off
Aug 1, 2022

2/f: interior renovation of level 2 office: new finiehs, furnishings, millwork, updated light. target mech scop: lighting upgrades.

Open the permit page

$734,100
Oct 19, 2018Completed
final sign-off Oct 2018
475 Brannan StGci, Incto obtain final inspection for work approved under pa# 201405307148. all work is complete.
Details
Permit
201810193699
Permit issued
Oct 19, 2018
Final sign-off
Oct 26, 2018

to obtain final inspection for work approved under pa# 201405307148. all work is complete.

Open the permit page

Mar 19, 2018Completed
final sign-off Mar 2018
475 Brannan StPyro-Comm Systems, Inc.4th floor: pryo comm will provide 2 smoke det and 3 wall mounted strobes. connect to (e) fa system ref 201801239294 maher na
Details
Permit
201803193949
Permit issued
Mar 19, 2018
Final sign-off
Mar 30, 2018

4th floor: pryo comm will provide 2 smoke det and 3 wall mounted strobes. connect to (e) fa system ref 201801239294 maher na

Open the permit page

$5,000
Mar 12, 2018Completed
final sign-off May 2018
475 Brannan StSkyline Constructionelectrical work for ti at suite 400. ref pa 2018-0123-9294 and 2018-0301-2598
Details
Permit
201803123386
Permit issued
Mar 12, 2018
Final sign-off
May 18, 2018

electrical work for ti at suite 400. ref pa 2018-0123-9294 and 2018-0301-2598

Open the permit page

$50,000
Mar 1, 2018Completed
final sign-off Aug 2018
475 Brannan StGolden Gate Fire Protection Inc4/f: fire sprinkler only - rleocate 2 pendent for & 1 add for new phone rooms for upwork exp ste #430. ref #201705237348. maher na
Details
Permit
201803012574
Permit issued
Mar 2, 2018
Final sign-off
Aug 22, 2018

4/f: fire sprinkler only - rleocate 2 pendent for & 1 add for new phone rooms for upwork exp ste #430. ref #201705237348. maher na

Open the permit page

$750
Mar 1, 2018Completed
final sign-off May 2018
475 Brannan StSkyline Constructionsuite #400: demo of (e) reception wall for new glazing. adding hardware to existing door previously burried in wall construction. (ref approved pa #201801239294). maher na
Details
Permit
201803012598
Permit issued
Mar 5, 2018
Final sign-off
May 18, 2018

suite #400: demo of (e) reception wall for new glazing. adding hardware to existing door previously burried in wall construction. (ref approved pa #201801239294). maher na

Open the permit page

$10,000
Jan 30, 2018Completed
final sign-off Mar 2018
475 Brannan StPyro-Comm Systems, Inc.ti to 2nd fl - add fire alarm devices in tenant suite and connect to (e) fire alarm system. ref #201711284908. maher na
Details
Permit
201801309843
Permit issued
Jan 30, 2018
Final sign-off
Mar 19, 2018

ti to 2nd fl - add fire alarm devices in tenant suite and connect to (e) fire alarm system. ref #201711284908. maher na

Open the permit page

$13,000
Jan 23, 2018Completed
final sign-off May 2018
475 Brannan StSkyline Constructionsuite #400: demo portion of extg demising wall for new fire rated door. new interior partitions and doors for 3 new phone rooms. n/a for maher
Details
Permit
201801239294
Permit issued
Feb 7, 2018
Final sign-off
May 18, 2018

suite #400: demo portion of extg demising wall for new fire rated door. new interior partitions and doors for 3 new phone rooms. n/a for maher

Open the permit page

$300,000
Jan 10, 2018Completed
final sign-off Mar 2018
475 Brannan St2nd flr: fire sprinklers - one relocated and 8 added pendent heads, 28 relocated and 35 added upright heads. ref pa 201711284908 maher na
Details
Permit
201801108291
Permit issued
Jan 24, 2018
Final sign-off
Mar 23, 2018

2nd flr: fire sprinklers - one relocated and 8 added pendent heads, 28 relocated and 35 added upright heads. ref pa 201711284908 maher na

Open the permit page

$12,377
Dec 20, 2017Completed
final sign-off May 2018
475 Brannan StM C S Construction Servicesmep upgrades utilizing bse building services. lighting, power, plumbing, mech, t24 met no exterior work or structural ref 201711284908 maher not req
Details
Permit
201712206948
Permit issued
Jan 30, 2018
Final sign-off
May 8, 2018

mep upgrades utilizing bse building services. lighting, power, plumbing, mech, t24 met no exterior work or structural ref 201711284908 maher not req

Open the permit page

$750,000
Nov 28, 2017Completed
final sign-off May 2018
475 Brannan StM C S Construction Services2nd flr, suite 230 - additional demo (ref 201708316557), refer to mech & ele plans. space is currently unoccupied. no exterior building site, landscape, use or parking changes are proposed maher na
Details
Permit
201711284908
Permit issued
Dec 1, 2017
Final sign-off
May 3, 2018

2nd flr, suite 230 - additional demo (ref 201708316557), refer to mech & ele plans. space is currently unoccupied. no exterior building site, landscape, use or parking changes are proposed maher na

Open the permit page

$1,200,000
Nov 7, 2017Completed
final sign-off Nov 2017
475 Brannan StAnderson, Rowe & Buckley, Inc.2/f- fire sprinklers: plug (7). t.i. pa#201708316557. n/a ordinance #155-13
Details
Permit
201711073337
Permit issued
Nov 7, 2017
Final sign-off
Nov 15, 2017

2/f- fire sprinklers: plug (7). t.i. pa#201708316557. n/a ordinance #155-13

Open the permit page

$1,500
Oct 6, 2017Expired or cancelled
withdrawn Jun 2018
475 Brannan St3/f- t.i. to replace lights only with new. wall, carpet, hvac, plumbing to remain as is. no fire life safety work. lights only. n/a ordinance #155-13
Details
Permit
201710060588

3/f- t.i. to replace lights only with new. wall, carpet, hvac, plumbing to remain as is. no fire life safety work. lights only. n/a ordinance #155-13

Open the permit page

$100,000
Sep 14, 2017Completed
final sign-off May 2018
475 Brannan StM C S Construction Servicessuite 220, 2nd fl: selective demo only of non-structural partitions, doors, ceilings, carpets. ref f/s permit #201708255997. maher na whole floor is vacant. ab-017 applies.
Details
Permit
201709148100
Permit issued
Sep 14, 2017
Final sign-off
May 3, 2018

suite 220, 2nd fl: selective demo only of non-structural partitions, doors, ceilings, carpets. ref f/s permit #201708255997. maher na whole floor is vacant. ab-017 applies.

Open the permit page

$30,000
Aug 31, 2017Completed
final sign-off May 2018
475 Brannan StM C S Construction Services2/f-ste 230 selective demolition only of non structural partitions, doors, ceilings, light fixtures, ductwork, plumbing and millwork per ab-17. n/a ordinance #155-13
Details
Permit
201708316557
Permit issued
Sep 14, 2017
Final sign-off
May 3, 2018

2/f-ste 230 selective demolition only of non structural partitions, doors, ceilings, light fixtures, ductwork, plumbing and millwork per ab-17. n/a ordinance #155-13

Open the permit page

$75,000
Aug 25, 2017Completed
final sign-off May 2018
475 Brannan StAnderson, Rowe & Buckley, Inc.remove 142 sprinklers, add 142 sprinklers to existing line outlets
Details
Permit
201708255997
Permit issued
Aug 25, 2017
Final sign-off
May 11, 2018

remove 142 sprinklers, add 142 sprinklers to existing line outlets

Open the permit page

$28,000
Aug 10, 2017Completed
final sign-off Oct 2017
475 Brannan StAccurate Contracting Inc.Dba Unispace Co4/f #420- office tenant improvement interior renovation, no changes in occupancy, use or egress, no renovation to exterior envelope. n/a ordinance #155-13
Details
Permit
201708104418
Permit issued
Aug 25, 2017
Final sign-off
Oct 20, 2017

4/f #420- office tenant improvement interior renovation, no changes in occupancy, use or egress, no renovation to exterior envelope. n/a ordinance #155-13

Open the permit page

$300,000
Jul 6, 2017Completed
final sign-off Aug 2018
475 Brannan StPyro-Comm Systems, Inc.unit 430: fa ti to suite #430: add (3) nac devices. connect to (e) fa system. pa #201705237348. maher na
Details
Permit
201707061104
Permit issued
Jul 6, 2017
Final sign-off
Aug 17, 2018

unit 430: fa ti to suite #430: add (3) nac devices. connect to (e) fa system. pa #201705237348. maher na

Open the permit page

$1,000
Jun 15, 2017Completed
final sign-off Jul 2017
475 Brannan StGolden Gate Fire Protection Inc4th floor: fire sprinklers ony. ref 201705237348. relocate 2 pendents for room 4301 maher na
Details
Permit
201706159434
Permit issued
Jun 15, 2017
Final sign-off
Jul 10, 2017

4th floor: fire sprinklers ony. ref 201705237348. relocate 2 pendents for room 4301 maher na

Open the permit page

$500
Jun 13, 2017Completed
final sign-off Jul 2018
475 Brannan StSkyline Constructionmechanical, electrical work for tenant improvement at suite 430 ref pa 2017-0523-7348. n/a maher ordinance
Details
Permit
201706139130
Permit issued
Jun 14, 2017
Final sign-off
Jul 2, 2018

mechanical, electrical work for tenant improvement at suite 430 ref pa 2017-0523-7348. n/a maher ordinance

Open the permit page

$35,000
May 23, 2017Completed
final sign-off Aug 2017
475 Brannan StSkyline Constructionsuite 430: new interior glazing, misc. electrical. no plumbing improvements. no structural work. no improvements to extg compliant restrooms. n/a for maher
Details
Permit
201705237348
Permit issued
Jun 6, 2017
Final sign-off
Aug 7, 2017

suite 430: new interior glazing, misc. electrical. no plumbing improvements. no structural work. no improvements to extg compliant restrooms. n/a for maher

Open the permit page

$168,989
May 11, 2017Completed
final sign-off May 2017
475 Brannan StPyro-Comm Systems, Inc.1st flr: fa as builts to pa 201703030581 relocation of nae iv5-10 from column facing north to column facing west maher na
Details
Permit
201705116328
Permit issued
May 11, 2017
Final sign-off
May 22, 2017

1st flr: fa as builts to pa 201703030581 relocation of nae iv5-10 from column facing north to column facing west maher na

Open the permit page

Mar 29, 2017Completed
final sign-off Aug 2018
475 Brannan StHerrero Builders Incorporatedrevision to pa# 201612155062, slight architectural changes. changes to hvac & plumbing systems; maher ord 155-13 na
Details
Permit
201703292695
Permit issued
Apr 17, 2017
Final sign-off
Aug 14, 2018

revision to pa# 201612155062, slight architectural changes. changes to hvac & plumbing systems; maher ord 155-13 na

Open the permit page

Mar 3, 2017Completed
final sign-off Jul 2017
475 Brannan StPyro-Comm Systems, Inc.1st flr: fire alarm ti to suite 120 & 130. add new fire alarm devices to suites connect to (e) fire alarm system ref 201612155062. maher na
Details
Permit
201703030581
Permit issued
Apr 11, 2017
Final sign-off
Jul 13, 2017

1st flr: fire alarm ti to suite 120 & 130. add new fire alarm devices to suites connect to (e) fire alarm system ref 201612155062. maher na

Open the permit page

$15,000
Feb 22, 2017Completed
final sign-off Aug 2018
475 Brannan StPotter Fire Protectionadd (14) fire sprinklers at new drop ceilings. ref pa 2016-1215-5062. maher na
Details
Permit
201702229887
Permit issued
Feb 24, 2017
Final sign-off
Aug 17, 2018

add (14) fire sprinklers at new drop ceilings. ref pa 2016-1215-5062. maher na

Open the permit page

$7,000
Dec 15, 2016Completed
final sign-off Aug 2018
475 Brannan StHerrero Builders Incorporatedsuite 120 & 130; replace casework in breakroom, (n) power & data outlets in mail room. conference room & aisle (n) wall mounted screen & equipoment. replace finishes per schedule. suite 130 - reconfigure office & lab spaces. selective demo (n) partitions, floor finishes, painting, ceiling, lighting
Details
Permit
201612155062
Permit issued
Jan 31, 2017
Final sign-off
Aug 14, 2018

suite 120 & 130; replace casework in breakroom, (n) power & data outlets in mail room. conference room & aisle (n) wall mounted screen & equipoment. replace finishes per schedule. suite 130 - reconfigure office & lab spaces. selective demo (n) partitions, floor finishes, painting, ceiling, lighting

Open the permit page

$800,000
Dec 13, 2016Completed
final sign-off Jan 2017
475 Brannan StPeacock Construction3rd flr - electrical only: change out (e) incandescent and flourscent lighting fixtures to led. power and data for av devices and furniture. maher na
Details
Permit
201612134773
Permit issued
Dec 13, 2016
Final sign-off
Jan 27, 2017

3rd flr - electrical only: change out (e) incandescent and flourscent lighting fixtures to led. power and data for av devices and furniture. maher na

Open the permit page

$180,000
Jul 8, 2016Expired or cancelled
cancelled Jun 2018
475 Brannan StPioneer Fire Inc.2ndflr: relocate 1 head, relocate 2 uprights remove 3 uprights maher na
Details
Permit
201607081882
Permit issued
Jul 8, 2016

2ndflr: relocate 1 head, relocate 2 uprights remove 3 uprights maher na

Open the permit page

$4,755
May 19, 2016Completed
final sign-off Nov 2016
475 Brannan StField Construction Inc.unit #210: partial retrofit: lighting, power & signal, wiring, lighting, & redepticle controls. ref app#201605137442.
Details
Permit
201605197855
Permit issued
May 19, 2016
Final sign-off
Nov 3, 2016

unit #210: partial retrofit: lighting, power & signal, wiring, lighting, & redepticle controls. ref app#201605137442.

Open the permit page

May 13, 2016Completed
final sign-off Nov 2016
475 Brannan StField Construction Inc.#210: commercial t.i. which includes demolition on non-structural partitions, light fixtures, electrical devices, millwork, and finishes. construction of millwork, finishes, plumbing fixtures, light fixtures, and electrical. n/a for maher.
Details
Permit
201605137442
Permit issued
May 19, 2016
Final sign-off
Nov 7, 2016

#210: commercial t.i. which includes demolition on non-structural partitions, light fixtures, electrical devices, millwork, and finishes. construction of millwork, finishes, plumbing fixtures, light fixtures, and electrical. n/a for maher.

Open the permit page

$75,000
Apr 27, 2016Completed
final sign-off Jun 2016
475 Brannan StPyro-Comm Systems, Inc.2nd floor, suite 210: new fire alarm devices added in an (e) bld to include: 1 horn/strobe, 2 strobes. maher an
Details
Permit
201604275819
Permit issued
Apr 27, 2016
Final sign-off
Jun 25, 2016

2nd floor, suite 210: new fire alarm devices added in an (e) bld to include: 1 horn/strobe, 2 strobes. maher an

Open the permit page

$1,500
Apr 26, 2016Completed
final sign-off Apr 2016
475 Brannan StBcci Construction Companynew furniture hookup, no lighting. mech title 24 201603212563; mech plan check review.
Details
Permit
201604265718
Permit issued
Apr 27, 2016
Final sign-off
Apr 29, 2016

new furniture hookup, no lighting. mech title 24 201603212563; mech plan check review.

Open the permit page

$35,000
Mar 21, 2016Completed
final sign-off Apr 2016
475 Brannan StBcci Construction Companyste 330, selective demolition of existing multi-tenant floor. demolition of existing walls & finishes. maher na
Details
Permit
201603212563
Permit issued
Mar 25, 2016
Final sign-off
Apr 29, 2016

ste 330, selective demolition of existing multi-tenant floor. demolition of existing walls & finishes. maher na

Open the permit page

$100,000
Jan 20, 2016Completed
final sign-off Feb 2016
475 Brannan StSprig Electric (Archkey Solutions)suite #200 and #300: title 24 -electrical new furniture feeds, new receptacles. ref. app #20105206759.
Details
Permit
201601207519
Permit issued
Jan 22, 2016
Final sign-off
Feb 2, 2016

suite #200 and #300: title 24 -electrical new furniture feeds, new receptacles. ref. app #20105206759.

Open the permit page

$65,000
Dec 14, 2015Completed
final sign-off Feb 2016
475 Brannan StSkyline Constructionrevision to 201506169077 per field insp. change door from 20 rated to 25 min rated. change wall to chain link fence. compliance with maher ordinance no 155-13
Details
Permit
201512145052
Permit issued
Dec 14, 2015
Final sign-off
Feb 1, 2016

revision to 201506169077 per field insp. change door from 20 rated to 25 min rated. change wall to chain link fence. compliance with maher ordinance no 155-13

Open the permit page

Aug 21, 2015Completed
final sign-off Sep 2015
475 Brannan StPyro-Comm Systems, Inc.4th flr/ suite 430: new fire alarm for a ti to an (e) bld to include: 1 power supply, 21 horn/strobes, 6 strobes. maher na ref pa #201506169077
Details
Permit
201508214969
Permit issued
Aug 21, 2015
Final sign-off
Sep 16, 2015

4th flr/ suite 430: new fire alarm for a ti to an (e) bld to include: 1 power supply, 21 horn/strobes, 6 strobes. maher na ref pa #201506169077

Open the permit page

$6,430
Aug 20, 2015Completed
final sign-off Jul 2018
475 Brannan StSkyline Construction4th floor, suite 430: revision to pa 2015 0714 1405. mechanical scope of work. arch - 2015 0618 9077, mech - 2015 0714 1405. maher na
Details
Permit
201508204802
Permit issued
Aug 20, 2015
Final sign-off
Jul 2, 2018

4th floor, suite 430: revision to pa 2015 0714 1405. mechanical scope of work. arch - 2015 0618 9077, mech - 2015 0714 1405. maher na

Open the permit page

Aug 11, 2015Completed
final sign-off Sep 2015
475 Brannan StIntelligent Technologies & Services Incdemo 3 of 4 zones of clean agent & pre-action. complete removal of clean agent. n/a ordinance #155-13
Details
Permit
201508113926
Permit issued
Aug 11, 2015
Final sign-off
Sep 16, 2015

demo 3 of 4 zones of clean agent & pre-action. complete removal of clean agent. n/a ordinance #155-13

Open the permit page

$2,500
Jul 14, 2015Completed
final sign-off Jul 2018
475 Brannan StSkyline Constructionsuite 430: mechanical and electrical work for tenant improvement on the 4th fl. ref bpa#201506169077.
Details
Permit
201507141405
Permit issued
Jul 20, 2015
Final sign-off
Jul 2, 2018

suite 430: mechanical and electrical work for tenant improvement on the 4th fl. ref bpa#201506169077.

Open the permit page

$120,000
Jul 13, 2015Completed
final sign-off Aug 2015
475 Brannan StGolden Gate Fire Protection Inc4th fl: fire sprinkler only, add 19 sprinkler pendents for upwork, t.i. pa#2015-0616-9077. n/a ordinance #155-13
Details
Permit
201507131256
Permit issued
Jul 13, 2015
Final sign-off
Aug 25, 2015

4th fl: fire sprinkler only, add 19 sprinkler pendents for upwork, t.i. pa#2015-0616-9077. n/a ordinance #155-13

Open the permit page

$9,500
Jun 16, 2015Completed
final sign-off Jul 2018
475 Brannan StSkyline Construction4th floor suite 430 - new interior partitions & doors, misc electrical, hvac & plumbing improvements. no structural work (folding partition submitted separately), no improvements to existing compliant restrooms. n/a maher ordinance
Details
Permit
201506169077
Permit issued
Jun 30, 2015
Final sign-off
Jul 2, 2018

4th floor suite 430 - new interior partitions & doors, misc electrical, hvac & plumbing improvements. no structural work (folding partition submitted separately), no improvements to existing compliant restrooms. n/a maher ordinance

Open the permit page

$925,462
Jun 11, 2015Completed
final sign-off Jul 2018
475 Brannan StSkyline Constructiondemo non load bearing walls, doors, finishes ab017 maher not req
Details
Permit
201506118697
Permit issued
Jun 11, 2015
Final sign-off
Jul 2, 2018

demo non load bearing walls, doors, finishes ab017 maher not req

Open the permit page

$5,000
May 28, 2015Completed
final sign-off Jan 2016
475 Brannan StAcco Engineered Systems Inc. Dba Acco En2nd/3rd flr: rebalance (e) vav boxes to serve (n) zones as shown. upsize boxes and redistribute ductwork as needed for new zones. provide and install 2 water source heat pumps. ref app#201505206759. maher na
Details
Permit
201505287447
Permit issued
Jun 2, 2015
Final sign-off
Jan 27, 2016

2nd/3rd flr: rebalance (e) vav boxes to serve (n) zones as shown. upsize boxes and redistribute ductwork as needed for new zones. provide and install 2 water source heat pumps. ref app#201505206759. maher na

Open the permit page

$150,000
May 20, 2015Completed
final sign-off Feb 2016
475 Brannan StBcci Construction Company#200 & #300 commercial t.i. which includes new non-structural partitoins, millwork, electrical, teledata, demolition under pa #2015055144. n/a maher ordinance
Details
Permit
201505206759
Permit issued
May 26, 2015
Final sign-off
Feb 2, 2016

#200 & #300 commercial t.i. which includes new non-structural partitoins, millwork, electrical, teledata, demolition under pa #2015055144. n/a maher ordinance

Open the permit page

$790,000
May 20, 2015Completed
final sign-off Jun 2015
475 Brannan StPribuss Engineering Incsuite #300: fire sprinkler t.i. under appl. 2015.0501.5144. relocate and changing 2 heads. maher n/a.
Details
Permit
201505206824
Permit issued
May 20, 2015
Final sign-off
Jun 9, 2015

suite #300: fire sprinkler t.i. under appl. 2015.0501.5144. relocate and changing 2 heads. maher n/a.

Open the permit page

$1,030
May 1, 2015Completed
final sign-off Jul 2015
475 Brannan StBcci Construction Companysuite # 200 & 300: pre construction demolition under ab-017 includes demolition of non-structural partitions, doors, millwork and finishes. fire & ls to remain operational. n/a for the maher ordinanceti under sep permt
Details
Permit
201505015144
Permit issued
May 1, 2015
Final sign-off
Jul 16, 2015

suite # 200 & 300: pre construction demolition under ab-017 includes demolition of non-structural partitions, doors, millwork and finishes. fire & ls to remain operational. n/a for the maher ordinanceti under sep permt

Open the permit page

$110,000
Dec 9, 2014Expired or cancelled
cancelled Feb 2015
475 Brannan StSkyline Construction4th floor: demolition of extg non-structural partitions and millwork. mep and life safety under seperate permit. n/a for the maher.
Details
Permit
201412093331
Permit issued
Jan 9, 2015

4th floor: demolition of extg non-structural partitions and millwork. mep and life safety under seperate permit. n/a for the maher.

Open the permit page

$10,000
Oct 3, 2014Completed
final sign-off Jul 2015
475 Brannan Stste #110:revision to pa#201403251636. add structural details for steelcase system.
Details
Permit
201410037993
Permit issued
Oct 10, 2014
Final sign-off
Jul 17, 2015

ste #110:revision to pa#201403251636. add structural details for steelcase system.

Open the permit page

$100,000
Aug 21, 2014Completed
final sign-off Oct 2014
475 Brannan StGolden Gate Fire Protection Inc1st floor - relocate 8 pendent sprinkler heads. ref ti #2014.0325.1636. n/a maher ordinance
Details
Permit
201408214381
Permit issued
Aug 21, 2014
Final sign-off
Oct 3, 2014

1st floor - relocate 8 pendent sprinkler heads. ref ti #2014.0325.1636. n/a maher ordinance

Open the permit page

$4,120
Jun 30, 2014Never finaled
issued Sep 2014, no final
475 Brannan StBevilacqua & Sonsground floor - work includes new partial height walls & galss partitions & doors. no exterior work. (building is equipped with full automatic sprinkler system). compliance with maher ordinance no 155-13 not required.
Details
Permit
201406309983
Permit issued
Sep 26, 2014

ground floor - work includes new partial height walls & galss partitions & doors. no exterior work. (building is equipped with full automatic sprinkler system). compliance with maher ordinance no 155-13 not required.

Open the permit page

$20,374
May 30, 2014Completed
final sign-off Oct 2018
475 Brannan StGci, Incnon-structural demo on 4th floor to include: partitions, doors, glazing, millwork, etc. space to remain vacant per ab-017 until the time of t.i.
Details
Permit
201405307148
Permit issued
May 30, 2014
Final sign-off
Oct 26, 2018

non-structural demo on 4th floor to include: partitions, doors, glazing, millwork, etc. space to remain vacant per ab-017 until the time of t.i.

Open the permit page

$50,000
May 7, 2014Completed
final sign-off May 2014
475 Brannan StPacific Auxiliary Fire Alarmadd one horn/strobe & one strobe and relocate two existing smoke detectors, , ref. approved bldng permit # 201404042430
Details
Permit
201405075140
Permit issued
May 9, 2014
Final sign-off
May 29, 2014

add one horn/strobe & one strobe and relocate two existing smoke detectors, , ref. approved bldng permit # 201404042430

Open the permit page

$2,000
Apr 4, 2014Completed
final sign-off May 2014
475 Brannan StSouth Bay Constructionste #230, 2nd flr: tenant improvement of exisitng office/lab space
Details
Permit
201404042430
Permit issued
Apr 9, 2014
Final sign-off
May 23, 2014

ste #230, 2nd flr: tenant improvement of exisitng office/lab space

Open the permit page

$31,656
Mar 25, 2014Completed
final sign-off Jul 2015
475 Brannan StGci, Inc1st floor - minor non-structural demolition. new demountable partitions and furniture, finishes, acoustic ceiling. relocate exist. hvac ducting, lighting. office system showroom for retail prupose, renovtion of existing showroom.
Details
Permit
201403251636
Permit issued
Apr 18, 2014
Final sign-off
Jul 17, 2015

1st floor - minor non-structural demolition. new demountable partitions and furniture, finishes, acoustic ceiling. relocate exist. hvac ducting, lighting. office system showroom for retail prupose, renovtion of existing showroom.

Open the permit page

$114,000
Oct 19, 2012Completed
final sign-off Jan 2013
475 Brannan StPrincipal Builders Inc.3rd & 4th floors-minor wall demolition on 2 floors, minor floor demolition & installation of new millwork & furniture
Details
Permit
201210192491
Permit issued
Nov 26, 2012
Final sign-off
Jan 11, 2013

3rd & 4th floors-minor wall demolition on 2 floors, minor floor demolition & installation of new millwork & furniture

Open the permit page

$100,000
Oct 17, 2012Completed
final sign-off Nov 2012
475 Brannan StPacific Auxiliary Fire Alarm3rd floor. add 1 power supply, 1 control module, 1 manual alarm, 19 horn/strobes 6 strobes & replace two (e) horn/strobes. const. permit #2012-10-04-1304
Details
Permit
201210172218
Permit issued
Oct 17, 2012
Final sign-off
Nov 16, 2012

3rd floor. add 1 power supply, 1 control module, 1 manual alarm, 19 horn/strobes 6 strobes & replace two (e) horn/strobes. const. permit #2012-10-04-1304

Open the permit page

$26,500
Oct 16, 2012Completed
final sign-off May 2018
475 Brannan StAnderson, Rowe & Buckley, Inc.3rd floor:extg fire sprinkler system.t.i.:2 added sprinklers,3 relocated sprinklers,2 removed sprinklers. app#201210041304.
Details
Permit
201210162087
Permit issued
Oct 16, 2012
Final sign-off
May 11, 2018

3rd floor:extg fire sprinkler system.t.i.:2 added sprinklers,3 relocated sprinklers,2 removed sprinklers. app#201210041304.

Open the permit page

$3,500
Oct 4, 2012Completed
final sign-off Nov 2012
475 Brannan StDpr Constructionpartial floor ti on 3rd floor to demo & construct new partitions doors & finishes electrical, mechanical for sprinklers, life safety on separate permit
Details
Permit
201210041304
Permit issued
Oct 9, 2012
Final sign-off
Nov 19, 2012

partial floor ti on 3rd floor to demo & construct new partitions doors & finishes electrical, mechanical for sprinklers, life safety on separate permit

Open the permit page

$206,000
Aug 28, 2012Never finaled
issued Aug 2012, no final
475 Brannan Stobtain final inspection for work approved under pa# 2008-0403-8718. all work is complete
Details
Permit
201208288406
Permit issued
Aug 28, 2012

obtain final inspection for work approved under pa# 2008-0403-8718. all work is complete

Open the permit page

Mar 12, 2012Completed
final sign-off Oct 2013
475 Brannan StRubecon General Contracting Incvoluntary seismic mitigation at entry canopy.
Details
Permit
201203125830
Permit issued
Mar 12, 2012
Final sign-off
Oct 1, 2013

voluntary seismic mitigation at entry canopy.

Open the permit page

$14,000
Sep 21, 2011Never finaled
issued Sep 2011, no final
475 Brannan StLegacy Mechanical & Energy Services, Incheat pump on ceiling for lab to serve lab
Details
Permit
201109215130
Permit issued
Sep 21, 2011

heat pump on ceiling for lab to serve lab

Open the permit page

$21,000
Aug 5, 2011Completed
final sign-off Jun 2012
475 Brannan StGci, Inchvac work for new office in extg tenant space to add one new vav box and thermostat, new supply and return diffusers, demo partial duct work and relocate one supply grille. please refer to app#201104144066.
Details
Permit
201108051850
Permit issued
Aug 5, 2011
Final sign-off
Jun 20, 2012

hvac work for new office in extg tenant space to add one new vav box and thermostat, new supply and return diffusers, demo partial duct work and relocate one supply grille. please refer to app#201104144066.

Open the permit page

$16,847
Jul 19, 2011Completed
final sign-off Aug 2011
475 Brannan StAyoob & Peery Plumbing Co Incadd and relocate fire sprinkler heads per tenant imp. (3 add,3 relocate)
Details
Permit
201107190556
Permit issued
Jul 19, 2011
Final sign-off
Aug 24, 2011

add and relocate fire sprinkler heads per tenant imp. (3 add,3 relocate)

Open the permit page

$3,000
Jul 19, 2011Completed
final sign-off Oct 2011
475 Brannan StFisher Development Incfloor 4, ste 430 t.t. office-new reception desk,finishes, replace (e) sconces w/like kind, (1) new wall sconces @ lobby, (1) new 5 ton hvac unit to supply rooms #4102 & 4104, replace (5) (e) doors w/glass lite doors, new sliding doors @ rooms #4072 &4070. mech, elec, fire protection under separate
Details
Permit
201107190517
Permit issued
Jul 26, 2011
Final sign-off
Oct 17, 2011

floor 4, ste 430 t.t. office-new reception desk,finishes, replace (e) sconces w/like kind, (1) new wall sconces @ lobby, (1) new 5 ton hvac unit to supply rooms #4102 & 4104, replace (5) (e) doors w/glass lite doors, new sliding doors @ rooms #4072 &4070. mech, elec, fire protection under separate

Open the permit page

$100,000
Apr 18, 2011Completed
final sign-off May 2012
475 Brannan StPacific Auxiliary Fire Alarmadd 4 horn/strobe & replace 1 extg horn/strobe due to a tenant impr. of the 4th floor.
Details
Permit
201104184268
Permit issued
Apr 18, 2011
Final sign-off
May 22, 2012

add 4 horn/strobe & replace 1 extg horn/strobe due to a tenant impr. of the 4th floor.

Open the permit page

$3,100
Apr 15, 2011Completed
final sign-off Jun 2012
475 Brannan StGci, Increvision to hvac permit app#201103293043 to reflect addition of one heat pump and minor demo work to be moved to different location from previously approved permit
Details
Permit
201104154168
Permit issued
Apr 21, 2011
Final sign-off
Jun 4, 2012

revision to hvac permit app#201103293043 to reflect addition of one heat pump and minor demo work to be moved to different location from previously approved permit

Open the permit page

$180
Apr 14, 2011Completed
final sign-off Nov 2011
475 Brannan StGci, Incadd 2 private offices within extg suite. extg lighting, hvac and sprinklers/life safety to be reworked for new layout.
Details
Permit
201104144066
Permit issued
Jun 24, 2011
Final sign-off
Nov 8, 2011

add 2 private offices within extg suite. extg lighting, hvac and sprinklers/life safety to be reworked for new layout.

Open the permit page

$31,750
Apr 1, 2011Completed
final sign-off Jun 2012
475 Brannan StGci, Inc4th floor-relocating & installing new light fixtures, switches, outlets & equipment for new t.i. space. please refer to pa# 2011-0314-1990 for t.i. permit
Details
Permit
201104013283
Permit issued
Apr 7, 2011
Final sign-off
Jun 7, 2012

4th floor-relocating & installing new light fixtures, switches, outlets & equipment for new t.i. space. please refer to pa# 2011-0314-1990 for t.i. permit

Open the permit page

$35,617
Mar 30, 2011Completed
final sign-off Apr 2011
475 Brannan StAyoob & Peery Plumbing Co Increlocate and add fire sprinkler. heads per tenant improvements. 16 relocate,5 add
Details
Permit
201103303151
Permit issued
Mar 30, 2011
Final sign-off
Apr 14, 2011

relocate and add fire sprinkler. heads per tenant improvements. 16 relocate,5 add

Open the permit page

$10,000
Mar 29, 2011Completed
final sign-off Feb 2013
475 Brannan StGci, Incmechanical work for ti on 4th floor to install new vav boxes, grills, diffusers and thermostat.1 new fire damper, 1 new exhaust fan and relocate extg equipment. phase refer to app#201103141990 for ti work.
Details
Permit
201103293043
Permit issued
Mar 29, 2011
Final sign-off
Feb 6, 2013

mechanical work for ti on 4th floor to install new vav boxes, grills, diffusers and thermostat.1 new fire damper, 1 new exhaust fan and relocate extg equipment. phase refer to app#201103141990 for ti work.

Open the permit page

$33,970
Mar 14, 2011Completed
final sign-off May 2012
475 Brannan StGci, Incnew ti to include demo and construction of non load bearing partitions, doors,frames,mill work and finishes. no increase in office space. mep, ls, sp separate permit
Details
Permit
201103141990
Permit issued
Mar 14, 2011
Final sign-off
May 24, 2012

new ti to include demo and construction of non load bearing partitions, doors,frames,mill work and finishes. no increase in office space. mep, ls, sp separate permit

Open the permit page

$286,905
Jan 13, 2011Completed
final sign-off Apr 2011
475 Brannan St1st floor-sprinkler system upgrade, add 6 sidewall sprinkler heads.
Details
Permit
201101138334
Permit issued
Jan 13, 2011
Final sign-off
Apr 1, 2011

1st floor-sprinkler system upgrade, add 6 sidewall sprinkler heads.

Open the permit page

$3,000
Jan 6, 2011Completed
final sign-off May 2011
475 Brannan StGci, Inc3rd floor addiiton of new fixtures to accommodate new work space of existing tenant space electrical/lighting only. refer to pa #201012015905 for t.i. work.
Details
Permit
201101067944
Permit issued
Jan 6, 2011
Final sign-off
May 4, 2011

3rd floor addiiton of new fixtures to accommodate new work space of existing tenant space electrical/lighting only. refer to pa #201012015905 for t.i. work.

Open the permit page

$9,000
Dec 29, 2010Completed
final sign-off Feb 2011
475 Brannan StAyoob & Peery Plumbing Co Increlocate & add fire sprinkler heads per tenant improvement. (1add & 3 relocate)
Details
Permit
201012297567
Permit issued
Dec 29, 2010
Final sign-off
Feb 8, 2011

relocate & add fire sprinkler heads per tenant improvement. (1add & 3 relocate)

Open the permit page

$2,000
Dec 27, 2010Completed
final sign-off Feb 2011
475 Brannan StGci, Incmechanical work only.relocate existing supply and return grills and thermostats. add one new vav box. ti approved under pa# 201012.01.5905.
Details
Permit
201012277443
Permit issued
Dec 27, 2010
Final sign-off
Feb 8, 2011

mechanical work only.relocate existing supply and return grills and thermostats. add one new vav box. ti approved under pa# 201012.01.5905.

Open the permit page

$18,000
Dec 1, 2010Completed
final sign-off Apr 2011
475 Brannan StGci, Inc3rd floor suite 320 - addition of two private offices in previously improved space.
Details
Permit
201012015905
Permit issued
Dec 1, 2010
Final sign-off
Apr 18, 2011

3rd floor suite 320 - addition of two private offices in previously improved space.

Open the permit page

$25,000
Sep 30, 2010Expired or cancelled
cancelled Jul 2012
475 Brannan StRubecon General Contracting Inc4th floor #430 - demolish & remove approx 250 lf of non-structural, non-rated sheetrock partitions. safe off electrical, patch & paint. relocation of sprinklers under separate permit if required.
Details
Permit
201009301978
Permit issued
Sep 30, 2010

4th floor #430 - demolish & remove approx 250 lf of non-structural, non-rated sheetrock partitions. safe off electrical, patch & paint. relocation of sprinklers under separate permit if required.

Open the permit page

$15,000
Sep 30, 2010Completed
final sign-off Jun 2012
475 Brannan StRubecon General Contracting Inc4th floor #420 -demolish & remove approx 80ft of non-structural, non-rated sheetrock partitions, safe off electrical patch & paint. reclocation of sprinklers if required under separate permit.
Details
Permit
201009301973
Permit issued
Sep 30, 2010
Final sign-off
Jun 20, 2012

4th floor #420 -demolish & remove approx 80ft of non-structural, non-rated sheetrock partitions, safe off electrical patch & paint. reclocation of sprinklers if required under separate permit.

Open the permit page

$10,000
Aug 12, 2010Expired or cancelled
expired Mar 2013
475 Brannan Stto obtain final inspection for work approved under pa#200804038718. all work is complete.
Details
Permit
201008128690
Permit issued
Aug 12, 2010

to obtain final inspection for work approved under pa#200804038718. all work is complete.

Open the permit page

Jun 22, 2009Completed
final sign-off Jun 2009
475 Brannan StHoward S. Wright Constructors Lp3rd floor install 2 fire smoke dampers.
Details
Permit
200906220928
Permit issued
Jun 22, 2009
Final sign-off
Jun 30, 2009

3rd floor install 2 fire smoke dampers.

Open the permit page

$1,500
Jun 12, 2009Completed
final sign-off Jun 2009
475 Brannan StHoward S. Wright Constructors Lpupgrade existing computer room walls to 1-hr. at 3rd. flr. repair/replace bathroom door closers. mep under separate permit
Details
Permit
200906120341
Permit issued
Jun 16, 2009
Final sign-off
Jun 30, 2009

upgrade existing computer room walls to 1-hr. at 3rd. flr. repair/replace bathroom door closers. mep under separate permit

Open the permit page

$3,300
May 27, 2009Completed
final sign-off Oct 2012
475 Brannan StPacific Auxiliary Fire Alarmadding 1 smoke detector and 3 relays to existing fire alarm system for server room on 3rd fl.
Details
Permit
200905279166
Permit issued
May 27, 2009
Final sign-off
Oct 2, 2012

adding 1 smoke detector and 3 relays to existing fire alarm system for server room on 3rd fl.

Open the permit page

$5,000
May 1, 2009Completed
final sign-off Aug 2009
475 Brannan StGci, Incref pa #200904146271 for t.i. new lighting plan for 3rd fl to remove/relocate and add new fixtures and outlets.
Details
Permit
200905017496
Permit issued
May 1, 2009
Final sign-off
Aug 25, 2009

ref pa #200904146271 for t.i. new lighting plan for 3rd fl to remove/relocate and add new fixtures and outlets.

Open the permit page

$200,719
Apr 28, 2009Completed
final sign-off Aug 2009
475 Brannan StGci, Inchvac- to reconfigure hvac system on third (3rd) floor ti, please refer to pa#2009/0414/6271.
Details
Permit
200904287231
Permit issued
Apr 28, 2009
Final sign-off
Aug 25, 2009

hvac- to reconfigure hvac system on third (3rd) floor ti, please refer to pa#2009/0414/6271.

Open the permit page

$163,780
Apr 24, 2009Completed
final sign-off Aug 2009
475 Brannan StPacific Auxiliary Fire Alarmadd 1 smoke detector, 10 horn/strobes, 5 strobes, 1 sync mdule for tenant improvement on the 3rd floor and 1 s.l.c. loop expander at facp.
Details
Permit
200904247013
Permit issued
Apr 24, 2009
Final sign-off
Aug 25, 2009

add 1 smoke detector, 10 horn/strobes, 5 strobes, 1 sync mdule for tenant improvement on the 3rd floor and 1 s.l.c. loop expander at facp.

Open the permit page

$14,000
Apr 22, 2009Completed
final sign-off Jun 2009
475 Brannan StAyoob & Peery Plumbing Co Incadd and relocate fire srpinker heads per tenant improvment. 0 adds, 43 relocates
Details
Permit
200904226827
Permit issued
Apr 22, 2009
Final sign-off
Jun 19, 2009

add and relocate fire srpinker heads per tenant improvment. 0 adds, 43 relocates

Open the permit page

$9,500
Apr 14, 2009Completed
final sign-off Aug 2009
475 Brannan StGci, Inc#320- interior non structural tenant improvement of suite 320 . all mep, sprinkler and fire alarm will be under seperate permit
Details
Permit
200904146271
Permit issued
Apr 16, 2009
Final sign-off
Aug 25, 2009

#320- interior non structural tenant improvement of suite 320 . all mep, sprinkler and fire alarm will be under seperate permit

Open the permit page

$1,067,750
Nov 18, 2008Completed
final sign-off Feb 2009
475 Brannan Stinstall sprinkler head in four fume hoods
Details
Permit
200811186802
Permit issued
Nov 18, 2008
Final sign-off
Feb 23, 2009

install sprinkler head in four fume hoods

Open the permit page

$800
Sep 24, 2008Completed
final sign-off Feb 2009
475 Brannan StPacific Auxiliary Fire Alarmaddition of 2 duct detectors, 1 module, 2 srelays, relocating 2 strobes due to tenant improvment on the 1st floor. work being don on 1st and 2nd floors
Details
Permit
200809242517
Permit issued
Sep 24, 2008
Final sign-off
Feb 23, 2009

addition of 2 duct detectors, 1 module, 2 srelays, relocating 2 strobes due to tenant improvment on the 1st floor. work being don on 1st and 2nd floors

Open the permit page

$6,000
Sep 24, 2008Completed
final sign-off Dec 2008
475 Brannan StMc Millan Electricaccess control system installation within 2nd floor tenant area
Details
Permit
200809242568
Permit issued
Sep 26, 2008
Final sign-off
Dec 10, 2008

access control system installation within 2nd floor tenant area

Open the permit page

$100,000
Sep 12, 2008Completed
final sign-off Dec 2008
475 Brannan Stdocumentation purpose only. no construction under this permit provide clarification for final inspection for pa# 2008/05/09/1746. correct the description for the proposed use to be surgical training center. not medical office.
Details
Permit
200809121499
Permit issued
Sep 12, 2008
Final sign-off
Dec 10, 2008

documentation purpose only. no construction under this permit provide clarification for final inspection for pa# 2008/05/09/1746. correct the description for the proposed use to be surgical training center. not medical office.

Open the permit page

Sep 8, 2008Completed
final sign-off Sep 2008
475 Brannan Stretrofit work on sprinkler system; add 33 new head throughout four floors.
Details
Permit
200809080987
Permit issued
Sep 8, 2008
Final sign-off
Sep 12, 2008

retrofit work on sprinkler system; add 33 new head throughout four floors.

Open the permit page

$15,600
Aug 12, 2008Completed
final sign-off Feb 2009
475 Brannan Stconvert existing open office to b-occupancy lab. convert existing storage to clinical lab (b- occupancy) to match adjacent lab. on 1st floor. no exterior work. sprinkler & fire alarm under separate permit.
Details
Permit
200808128971
Permit issued
Oct 30, 2008
Final sign-off
Feb 23, 2009

convert existing open office to b-occupancy lab. convert existing storage to clinical lab (b- occupancy) to match adjacent lab. on 1st floor. no exterior work. sprinkler & fire alarm under separate permit.

Open the permit page

$100,000
Jul 9, 2008Completed
final sign-off Dec 2008
475 Brannan StPacific Auxiliary Fire Alarmadditions to extg fire alarm system due to tenant improvement on part of 2nd floor
Details
Permit
200807096277
Permit issued
Jul 9, 2008
Final sign-off
Dec 10, 2008

additions to extg fire alarm system due to tenant improvement on part of 2nd floor

Open the permit page

$30,000
Jun 2, 2008Completed
final sign-off Dec 2008
475 Brannan Stfire sprinkler tenant improvements on 1st lab & 2nd floor office, relocate 47 pend. add 80 pend. reloc uprights, added uprights- total 127 heads.
Details
Permit
200806023386
Permit issued
Jun 2, 2008
Final sign-off
Dec 10, 2008

fire sprinkler tenant improvements on 1st lab & 2nd floor office, relocate 47 pend. add 80 pend. reloc uprights, added uprights- total 127 heads.

Open the permit page

$26,500
May 9, 2008Completed
final sign-off Dec 2008
475 Brannan Stremodel ex. cpmc tenant space on the 2/f expand existing clinical lab and new surgical training center. new mechanical duct on exterior of bldg. no structural work, fire alarm and sprinkler under a separate permit. "umbrella" permit to verify "fully sprinklered" bldg. required by fire dept.
Details
Permit
200805091746
Permit issued
Jul 10, 2008
Final sign-off
Dec 10, 2008

remodel ex. cpmc tenant space on the 2/f expand existing clinical lab and new surgical training center. new mechanical duct on exterior of bldg. no structural work, fire alarm and sprinkler under a separate permit. "umbrella" permit to verify "fully sprinklered" bldg. required by fire dept.

Open the permit page

$2,800,000
Apr 3, 2008Expired or cancelled
expired Mar 2013
475 Brannan Ststructural work only-new openings in tenant space and structural supports for new mechanical equipment. mep, sprinkler and fire alarm will be under seperate permit
Details
Permit
200804038718
Permit issued
May 15, 2008

structural work only-new openings in tenant space and structural supports for new mechanical equipment. mep, sprinkler and fire alarm will be under seperate permit

Open the permit page

$50,000
Mar 17, 2008Completed
final sign-off Dec 2008
475 Brannan St1st & 2nd floors only - interior non-structural demolition of zone 1.
Details
Permit
200803177299
Permit issued
Mar 26, 2008
Final sign-off
Dec 10, 2008

1st & 2nd floors only - interior non-structural demolition of zone 1.

Open the permit page

$20,000
Sep 11, 2007Never finaled
issued Sep 2007, no final
475 Brannan Ststreet space and sidewalk repair
Details
Permit
M85704
Permit issued
Sep 11, 2007

street space and sidewalk repair

Open the permit page

Dec 6, 2006Completed
final sign-off Mar 2007
475 Brannan StRubecon General Contracting Inccreate new 1 hr. rate partition in an existing suite to make 2 suites. work on 3/f. sprinkler, hvac, electrical and life safety on seperate permit.
Details
Permit
200612069249
Permit issued
Dec 6, 2006
Final sign-off
Mar 5, 2007

create new 1 hr. rate partition in an existing suite to make 2 suites. work on 3/f. sprinkler, hvac, electrical and life safety on seperate permit.

Open the permit page

$35,000
Aug 24, 2006Completed
final sign-off Nov 2006
475 Brannan StSwinerton Buildersrevision to appl#200505122244 for sffd review. exit door with special egress control device located on 4th floor.
Details
Permit
200608240469
Permit issued
Aug 24, 2006
Final sign-off
Nov 6, 2006

revision to appl#200505122244 for sffd review. exit door with special egress control device located on 4th floor.

Open the permit page

$1,000
May 30, 2006Completed
final sign-off Nov 2006
475 Brannan StPacific Auxiliary Fire Alarminstallation of 3 smoke detectores on the 4th floor and a new annundator module at the facp. also includes relocation of 2 stobes
Details
Permit
200605302772
Permit issued
May 30, 2006
Final sign-off
Nov 6, 2006

installation of 3 smoke detectores on the 4th floor and a new annundator module at the facp. also includes relocation of 2 stobes

Open the permit page

$3,000
May 2, 2006Completed
final sign-off Nov 2006
475 Brannan StAnderson, Rowe & Buckley, Inc.t.i (e) spkr. system, 13 new spkrs below.
Details
Permit
200605020478
Permit issued
May 2, 2006
Final sign-off
Nov 6, 2006

t.i (e) spkr. system, 13 new spkrs below.

Open the permit page

$2,600
Aug 9, 2005Expired or cancelled
expired Nov 2006
475 Brannan StAcco Engineered Systems Inc. Dba Acco En(1) exhaust fan, (1) vav box mechanical only
Details
Permit
200508099783
Permit issued
Aug 9, 2005

(1) exhaust fan, (1) vav box mechanical only

Open the permit page

$17,000
May 12, 2005Completed
final sign-off Nov 2006
475 Brannan StSwinerton Buildersoti-1, 4th fl. el, me ls, sp.
Details
Permit
200505122244
Permit issued
Jan 26, 2006
Final sign-off
Nov 6, 2006

oti-1, 4th fl. el, me ls, sp.

Open the permit page

$400,000
Mar 14, 2005Expired or cancelled
expired Nov 2006
475 Brannan StNovo Construction Incoti 1- 4th fl
Details
Permit
200503147464
Permit issued
Mar 14, 2005

oti 1- 4th fl

Open the permit page

$104,000
Feb 25, 2005Completed
final sign-off Apr 2005
475 Brannan StDpw Inc.modify exist sprinkler system on 1st floor only per plan.
Details
Permit
200502256289
Permit issued
Feb 25, 2005
Final sign-off
Apr 8, 2005

modify exist sprinkler system on 1st floor only per plan.

Open the permit page

$13,000
Feb 11, 2005Completed
final sign-off Apr 2005
475 Brannan StYoung Electric Coinstall new power supply , add additional speaker & fsd's.
Details
Permit
200502115318
Permit issued
Feb 11, 2005
Final sign-off
Apr 8, 2005

install new power supply , add additional speaker & fsd's.

Open the permit page

$10,000
Dec 28, 2004Completed
final sign-off Jul 2005
475 Brannan StRubecon General Contracting Incwood beam repairs inject epoxy grout in 2 crack beams/install 1 pair 8' bolted stich plates on
Details
Permit
200412282207
Permit issued
Mar 11, 2005
Final sign-off
Jul 14, 2005

wood beam repairs inject epoxy grout in 2 crack beams/install 1 pair 8' bolted stich plates on

Open the permit page

$3,000
Dec 23, 2004Completed
final sign-off Jun 2005
475 Brannan Strev. to appl#200411108901 new retractable wall in conference room,new paritions in electrical room &
Details
Permit
200412232114
Permit issued
Jan 28, 2005
Final sign-off
Jun 6, 2005

rev. to appl#200411108901 new retractable wall in conference room,new paritions in electrical room &

Open the permit page

$82,000
Dec 20, 2004Completed
final sign-off Apr 2005
475 Brannan Stmechanical & electrical work for 1st floor tenant.
Details
Permit
200412201787
Permit issued
Jan 4, 2005
Final sign-off
Apr 8, 2005

mechanical & electrical work for 1st floor tenant.

Open the permit page

$100,000
Nov 12, 2004Completed
final sign-off Jan 2005
475 Brannan StCupertino Electric Inc.modify fire alarm system on 1st floor. remove 14, horen, strobes during demo, remodel and reinstall
Details
Permit
200411129007
Permit issued
Dec 13, 2004
Final sign-off
Jan 5, 2005

modify fire alarm system on 1st floor. remove 14, horen, strobes during demo, remodel and reinstall

Open the permit page

$2,300
Nov 10, 2004Completed
final sign-off Apr 2005
475 Brannan Stremodel of 1st floor tenant space, mep under seperate permit.
Details
Permit
200411108901
Permit issued
Dec 10, 2004
Final sign-off
Apr 8, 2005

remodel of 1st floor tenant space, mep under seperate permit.

Open the permit page

$523,390
Oct 14, 2004Completed
final sign-off Nov 2004
475 Brannan StAyoob & Peery Plumbing Co Increlocate fire sprinkler per tenant improvements.
Details
Permit
200410146802
Permit issued
Oct 14, 2004
Final sign-off
Nov 1, 2004

relocate fire sprinkler per tenant improvements.

Open the permit page

$4,250
Sep 23, 2004Completed
final sign-off Jan 2005
475 Brannan Strepair dryrot on 1st floor 2 columns and select floor area. disabled access floorunder 200405073378.
Details
Permit
200409234961
Permit issued
Sep 23, 2004
Final sign-off
Jan 5, 2005

repair dryrot on 1st floor 2 columns and select floor area. disabled access floorunder 200405073378.

Open the permit page

$35,000
Aug 27, 2004Completed
final sign-off Nov 2004
475 Brannan StSwinerton Buildersoti-2 4th floor el
Details
Permit
200408272727
Permit issued
Sep 15, 2004
Final sign-off
Nov 1, 2004

oti-2 4th floor el

Open the permit page

$7,500
Aug 27, 2004Completed
final sign-off Nov 2004
475 Brannan StSwinerton Buildersoti-2 3rd floor el
Details
Permit
200408272722
Permit issued
Sep 15, 2004
Final sign-off
Nov 1, 2004

oti-2 3rd floor el

Open the permit page

$10,000
Aug 11, 2004Completed
final sign-off Jan 2005
475 Brannan Stfire sprinkler t/i to 1st floor research offices/ lab/relocate 62/add 4/delete 9 sprinkler
Details
Permit
200408111222
Permit issued
Aug 11, 2004
Final sign-off
Jan 5, 2005

fire sprinkler t/i to 1st floor research offices/ lab/relocate 62/add 4/delete 9 sprinkler

Open the permit page

$14,100
Aug 11, 2004Completed
final sign-off Jan 2005
475 Brannan Stoti-3 2nd floor sp only
Details
Permit
200408111228
Permit issued
Sep 8, 2004
Final sign-off
Jan 5, 2005

oti-3 2nd floor sp only

Open the permit page

$9,800
Jul 30, 2004Completed
final sign-off Jan 2005
475 Brannan Stnew mechanical electrical and plumbing for 1st floor tenant improvement architectural approved under
Details
Permit
200407300268
Permit issued
Sep 3, 2004
Final sign-off
Jan 5, 2005

new mechanical electrical and plumbing for 1st floor tenant improvement architectural approved under

Open the permit page

$850,000
Jun 1, 2004Completed
final sign-off Aug 2004
475 Brannan Stinterior non-structurl demo for 1st
Details
Permit
200406015204
Permit issued
Jun 1, 2004
Final sign-off
Aug 10, 2004

interior non-structurl demo for 1st

Open the permit page

$5,000
May 12, 2004Completed
final sign-off Jan 2005
475 Brannan Stoti-2 2nd floor me, el
Details
Permit
200405123717
Permit issued
Sep 13, 2004
Final sign-off
Jan 5, 2005

oti-2 2nd floor me, el

Open the permit page

$85,000
May 7, 2004Completed
final sign-off Jan 2005
475 Brannan Sttenant improvement 1st floor architectural only
Details
Permit
200405073378
Permit issued
Jul 29, 2004
Final sign-off
Jan 5, 2005

tenant improvement 1st floor architectural only

Open the permit page

$1,428,466
May 7, 2004Expired or cancelled
withdrawn Jun 2004
475 Brannan Stmmi-2 1st floor el,me
Details
Permit
200405073380

mmi-2 1st floor el,me

Open the permit page

$1,000,000
May 7, 2004Completed
final sign-off Jan 2005
475 Brannan Stoti-1 2nd floor el,me,ls,sp
Details
Permit
200405073381
Permit issued
Sep 13, 2004
Final sign-off
Jan 5, 2005

oti-1 2nd floor el,me,ls,sp

Open the permit page

$465,800
May 5, 2004Completed
final sign-off Aug 2004
475 Brannan St2/f- non-structural interior soft demo of partial 2/f
Details
Permit
200405053103
Permit issued
May 5, 2004
Final sign-off
Aug 10, 2004

2/f- non-structural interior soft demo of partial 2/f

Open the permit page

$10,000
Apr 7, 2004Completed
final sign-off Nov 2004
475 Brannan StSwinerton Buildersoti-1 3rd floor, el, me, l/s, sp
Details
Permit
200404070665
Permit issued
May 12, 2004
Final sign-off
Nov 1, 2004

oti-1 3rd floor, el, me, l/s, sp

Open the permit page

$80,000
Apr 7, 2004Completed
final sign-off Nov 2004
475 Brannan StSwinerton Buildersoti-1 4th floor, el, me, l/s, sp
Details
Permit
200404070668
Permit issued
Aug 30, 2004
Final sign-off
Nov 1, 2004

oti-1 4th floor, el, me, l/s, sp

Open the permit page

$80,000
Dec 1, 2003Completed
final sign-off Apr 2004
475 Brannan StSkyline Constructionrevision to app#2003/05/07/3972.
Details
Permit
200312011316
Permit issued
Dec 1, 2003
Final sign-off
Apr 26, 2004

revision to app#2003/05/07/3972.

Open the permit page

$100
Sep 25, 2003Completed
final sign-off Apr 2004
475 Brannan StSkyline Constructionfire sprinkler work on ground floor, no increase in space
Details
Permit
200309255710
Permit issued
Sep 25, 2003
Final sign-off
Apr 26, 2004

fire sprinkler work on ground floor, no increase in space

Open the permit page

$4,000
May 7, 2003Completed
final sign-off Apr 2004
475 Brannan Stoti-1, 1st fl, el,me, ls, sp
Details
Permit
200305073972
Permit issued
Jun 20, 2003
Final sign-off
Apr 26, 2004

oti-1, 1st fl, el,me, ls, sp

Open the permit page

$100,000
Jun 19, 2002Expired or cancelled
cancelled Mar 2003
475 Brannan Stchange of doors at entry to lobby area fr solid rat to regulr glass doors rev to ap #200111072614
Details
Permit
200206199419

change of doors at entry to lobby area fr solid rat to regulr glass doors rev to ap #200111072614

Open the permit page

$5,000
May 13, 2002Completed
final sign-off Jul 2002
475 Brannan StSascofire alarm system- tenant improvement for signature boiscience phase 2
Details
Permit
200205136441
Permit issued
Jun 12, 2002
Final sign-off
Jul 3, 2002

fire alarm system- tenant improvement for signature boiscience phase 2

Open the permit page

$17,000
May 2, 2002Completed
final sign-off May 2002
475 Brannan StSwinerton Buildersrenew 200011024769,200103285416, 9924752,200006273780,200010264147
Details
Permit
200205025610
Permit issued
May 2, 2002
Final sign-off
May 16, 2002

renew 200011024769,200103285416, 9924752,200006273780,200010264147

Open the permit page

May 2, 2002Completed
final sign-off Jun 2002
475 Brannan StSwinerton Buildersto renew 200108317309,200004046295,200004046294 first floor ti improvement
Details
Permit
200205025606
Permit issued
May 2, 2002
Final sign-off
Jun 18, 2002

to renew 200108317309,200004046295,200004046294 first floor ti improvement

Open the permit page

May 2, 2002Completed
final sign-off Jun 2002
475 Brannan StSwinerton Buildersrenew 200003083742,200003083743,200007276339, 200003204784 2nd floor tenant improvement
Details
Permit
200205025599
Permit issued
May 2, 2002
Final sign-off
Jun 18, 2002

renew 200003083742,200003083743,200007276339, 200003204784 2nd floor tenant improvement

Open the permit page

Apr 12, 2002Completed
final sign-off Jul 2002
475 Brannan StWalschon Fire Protection Incadd and relocate automatic fire sprinkler systems as required per code
Details
Permit
200204123883
Permit issued
May 15, 2002
Final sign-off
Jul 3, 2002

add and relocate automatic fire sprinkler systems as required per code

Open the permit page

$23,885
Mar 15, 2002Completed
final sign-off Jul 2002
475 Brannan St1st fl new int. partition for office & lab room, new mech & elect.c
Details
Permit
200203151575
Permit issued
Apr 17, 2002
Final sign-off
Jul 3, 2002

1st fl new int. partition for office & lab room, new mech & elect.c

Open the permit page

$1,350,000
Feb 15, 2002Completed
final sign-off Jul 2002
475 Brannan St1/fl. - interior non structural demolistion
Details
Permit
200202159310
Permit issued
Feb 15, 2002
Final sign-off
Jul 3, 2002

1/fl. - interior non structural demolistion

Open the permit page

$15,000
Feb 14, 2002Completed
final sign-off Jul 2002
475 Brannan StSascofire alarm improvement-1st, 2nd, 3rd floors, install 4 smoke detectors, 57 horn strobes, 22 strobes
Details
Permit
200202149291
Permit issued
Feb 22, 2002
Final sign-off
Jul 3, 2002

fire alarm improvement-1st, 2nd, 3rd floors, install 4 smoke detectors, 57 horn strobes, 22 strobes

Open the permit page

$28,000
Feb 6, 2002Completed
final sign-off Jul 2002
475 Brannan StAyoob & Peery Plumbing Co Inc1-3/fl: add & relocate fire sprinkler heads (37 new hds/18 relocate/11 removed)
Details
Permit
200202068644
Permit issued
Mar 28, 2002
Final sign-off
Jul 3, 2002

1-3/fl: add & relocate fire sprinkler heads (37 new hds/18 relocate/11 removed)

Open the permit page

$15,500
Jan 3, 2002Completed
final sign-off Mar 2002
475 Brannan StSascofire alarm system - t/i (4th floor)
Details
Permit
200201036221
Permit issued
Feb 19, 2002
Final sign-off
Mar 6, 2002

fire alarm system - t/i (4th floor)

Open the permit page

$15,000
Dec 14, 2001Completed
final sign-off Mar 2002
475 Brannan StSkyline Constructionlife saftey work to be performed on the 4th floor
Details
Permit
200112145309
Permit issued
Feb 11, 2002
Final sign-off
Mar 6, 2002

life saftey work to be performed on the 4th floor

Open the permit page

$35,000
Dec 13, 2001Completed
final sign-off Jul 2002
475 Brannan Sttenant improvement, second and thired floors, sprinkler under separate permit
Details
Permit
200112135211
Permit issued
Feb 20, 2002
Final sign-off
Jul 3, 2002

tenant improvement, second and thired floors, sprinkler under separate permit

Open the permit page

$200,000
Dec 13, 2001Completed
final sign-off Jul 2002
475 Brannan St1st fl remodel, new bioscience lab, new mech on roof, new plmbg, new elec. sprinkler under separate
Details
Permit
200112135215
Permit issued
Mar 8, 2002
Final sign-off
Jul 3, 2002

1st fl remodel, new bioscience lab, new mech on roof, new plmbg, new elec. sprinkler under separate

Open the permit page

$1,390,000
Dec 13, 2001Completed
final sign-off Jul 2002
475 Brannan Stfirst, second and third (partial floors only), interior non-structural demo
Details
Permit
200112135217
Permit issued
Dec 13, 2001
Final sign-off
Jul 3, 2002

first, second and third (partial floors only), interior non-structural demo

Open the permit page

$40,000
Nov 7, 2001Completed
final sign-off Mar 2002
475 Brannan St4th floor, remodel existing office space, new partition, electrical and mechanical
Details
Permit
200111072614
Permit issued
Nov 27, 2001
Final sign-off
Mar 6, 2002

4th floor, remodel existing office space, new partition, electrical and mechanical

Open the permit page

$195,000
Nov 6, 2001Completed
final sign-off Apr 2002
475 Brannan StSkyline Constructionfire sprinkler work to be performed on 4th flr only.
Details
Permit
200111062507
Permit issued
Jan 22, 2002
Final sign-off
Apr 17, 2002

fire sprinkler work to be performed on 4th flr only.

Open the permit page

$100,000
Oct 23, 2001Expired or cancelled
expired Oct 2003
475 Brannan StIntelligent Technologies & Services Inc1st floor- install fm200/pre-action fire alarm system
Details
Permit
200110231477
Permit issued
Dec 4, 2001
Final sign-off
Apr 17, 2002

1st floor- install fm200/pre-action fire alarm system

Open the permit page

$15,000
Oct 4, 2001Expired or cancelled
expired Oct 2003
475 Brannan StSasco1/fl.- fire alarm, t.i. improvement, relocate 4 horn strobes and add 2 strobes
Details
Permit
200110049940
Permit issued
Oct 4, 2001
Final sign-off
Feb 4, 2002

1/fl.- fire alarm, t.i. improvement, relocate 4 horn strobes and add 2 strobes

Open the permit page

$2,000
Sep 24, 2001Expired or cancelled
expired Oct 2003
475 Brannan Stelectrical distribution for lighting 1/f & 2/f and fire alarm @ 1/f
Details
Permit
200109249057
Permit issued
Sep 24, 2001
Final sign-off
Feb 4, 2002

electrical distribution for lighting 1/f & 2/f and fire alarm @ 1/f

Open the permit page

$10,000
Sep 20, 2001Completed
final sign-off Feb 2002
475 Brannan StAyoob & Peery Plumbing Co Inct.i., add, relocate & remove fire sprinkler heads at 1st & 2nd floor
Details
Permit
200109208780
Permit issued
Sep 20, 2001
Final sign-off
Feb 4, 2002

t.i., add, relocate & remove fire sprinkler heads at 1st & 2nd floor

Open the permit page

$4,800
Aug 31, 2001Expired or cancelled
expired Jun 2002
475 Brannan StSwinerton Builders1st/2nd floor, oti-2 1st/2nd floor: el, me on 2000/03/08/3743 & 2000/04/04/6295.
Details
Permit
200108317309
Permit issued
Oct 3, 2001

1st/2nd floor, oti-2 1st/2nd floor: el, me on 2000/03/08/3743 & 2000/04/04/6295.

Open the permit page

Aug 27, 2001Expired or cancelled
expired Oct 2003
475 Brannan Sttenant improvement for first and second floor, mechanical included
Details
Permit
200108276959
Permit issued
Aug 27, 2001

tenant improvement for first and second floor, mechanical included

Open the permit page

$247,040
Jun 29, 2001Completed
final sign-off Dec 2001
475 Brannan Sttenant build out of third floor
Details
Permit
200106292740
Permit issued
Jun 29, 2001
Final sign-off
Dec 18, 2001

tenant build out of third floor

Open the permit page

$300,000
May 11, 2001Completed
final sign-off Dec 2001
475 Brannan StAyoob & Peery Plumbing Co Incfire sprinkler add & relocate per tenant improvements 3rd & 4th floor.
Details
Permit
200105118951
Permit issued
May 22, 2001
Final sign-off
Dec 18, 2001

fire sprinkler add & relocate per tenant improvements 3rd & 4th floor.

Open the permit page

$28,500
May 8, 2001Completed
final sign-off Dec 2001
475 Brannan StSascoadjustment to permit appn. 2001-04-13-6813
Details
Permit
200105088673
Permit issued
May 8, 2001
Final sign-off
Dec 18, 2001

adjustment to permit appn. 2001-04-13-6813

Open the permit page

$100
Apr 13, 2001Completed
final sign-off Dec 2001
475 Brannan StSascofire alarm - tenant improvement 3rd floor.
Details
Permit
200104136813
Permit issued
Apr 24, 2001
Final sign-off
Dec 18, 2001

fire alarm - tenant improvement 3rd floor.

Open the permit page

$30,000
Mar 28, 2001Expired or cancelled
expired May 2002
475 Brannan StAyoob & Peery Plumbing Co Increv. to appl#200010264147 removal of fm200 tank per request of fire inspector tony hampton
Details
Permit
200103285416
Permit issued
Mar 28, 2001

rev. to appl#200010264147 removal of fm200 tank per request of fire inspector tony hampton

Open the permit page

$100
Feb 27, 2001Expired or cancelled
expired Jun 2001
475 Brannan StSwinerton Buildersrenew app #99232226 for final inspection/fuel tank
Details
Permit
200102273001
Permit issued
Feb 27, 2001

renew app #99232226 for final inspection/fuel tank

Open the permit page

Feb 27, 2001Completed
final sign-off Jun 2001
475 Brannan StSwinerton Buildersrenew #9922699,9922700,9922698,9922701
Details
Permit
200102272999
Permit issued
Feb 27, 2001
Final sign-off
Jun 25, 2001

renew #9922699,9922700,9922698,9922701

Open the permit page

Feb 27, 2001Expired or cancelled
expired Jun 2001
475 Brannan Strenewal of pa#20000113952
Details
Permit
200102273008
Permit issued
Feb 27, 2001

renewal of pa#20000113952

Open the permit page

Feb 27, 2001Expired or cancelled
expired Jun 2001
475 Brannan StSwinerton Buildersrenew app #9923225 for final inspection for interior stairs
Details
Permit
200102273006
Permit issued
Feb 27, 2001

renew app #9923225 for final inspection for interior stairs

Open the permit page

Feb 1, 2001Completed
final sign-off Dec 2001
475 Brannan Stnew structural stair between 3rd & 4th floors to support mech equipment
Details
Permit
200102011140
Permit issued
Feb 21, 2001
Final sign-off
Dec 18, 2001

new structural stair between 3rd & 4th floors to support mech equipment

Open the permit page

$100,000
Jan 23, 2001Completed
final sign-off Dec 2001
475 Brannan Stone-stop:mtjoe:elect. & mech & plmbg, to all floors
Details
Permit
200101230419
Permit issued
Feb 16, 2001
Final sign-off
Dec 18, 2001

one-stop:mtjoe:elect. & mech & plmbg, to all floors

Open the permit page

$60,000
Dec 18, 2000Expired or cancelled
expired Aug 2003
475 Brannan StThomas Swan Sign Co Incto erect electrical sign
Details
Permit
200012188201
Permit issued
Feb 1, 2001

to erect electrical sign

Open the permit page

$3,000
Nov 20, 2000Completed
final sign-off Feb 2001
475 Brannan Sterect a single faced, non-electric wall sign
Details
Permit
200011206209
Permit issued
Nov 20, 2000
Final sign-off
Feb 20, 2001

erect a single faced, non-electric wall sign

Open the permit page

Nov 2, 2000Expired or cancelled
expired May 2002
475 Brannan StSwinerton Buildersoti-3: (1st & 2nd fl.) l/s
Details
Permit
200011024769
Permit issued
Dec 12, 2000

oti-3: (1st & 2nd fl.) l/s

Open the permit page

$20,000
Nov 1, 2000Expired or cancelled
cancelled Jul 2001
475 Brannan Stoti-1 3rd flr,el,me, l/s. sp
Details
Permit
200011014645

oti-1 3rd flr,el,me, l/s. sp

Open the permit page

$300,000
Nov 1, 2000Completed
final sign-off Dec 2001
475 Brannan Stoti-1 4th flr,el,me, l/s sp
Details
Permit
200011014656
Permit issued
Feb 14, 2001
Final sign-off
Dec 18, 2001

oti-1 4th flr,el,me, l/s sp

Open the permit page

$850,000
Oct 30, 2000Expired or cancelled
cancelled Aug 2001
475 Brannan StSwinerton Buildersfinish and install 1 underground fule tank, 4000 gallons. and one roof-top tank 60 gallons
Details
Permit
200010304380

finish and install 1 underground fule tank, 4000 gallons. and one roof-top tank 60 gallons

Open the permit page

$50,000
Oct 26, 2000Expired or cancelled
expired May 2002
475 Brannan StIntelligent Technologies & Services Incinstall new (fike) fire suppression system at 2nd floor only.
Details
Permit
200010264147
Permit issued
Dec 12, 2000

install new (fike) fire suppression system at 2nd floor only.

Open the permit page

$36,500
Jul 27, 2000Expired or cancelled
cancelled Feb 2003
475 Brannan StSwinerton Buildersinstall of emergency generator on roof 2 location of 2 cooling towers on roof.
Details
Permit
200007276335

install of emergency generator on roof 2 location of 2 cooling towers on roof.

Open the permit page

$350,000
Jul 27, 2000Expired or cancelled
expired Jun 2002
475 Brannan StSwinerton Buildersrevision to oti-1 2000/03/08/3442. bracing & connection for the ceiling grind anchorage.
Details
Permit
200007276339
Permit issued
Jul 27, 2000

revision to oti-1 2000/03/08/3442. bracing & connection for the ceiling grind anchorage.

Open the permit page

$3,000
Jun 27, 2000Expired or cancelled
expired May 2002
475 Brannan StAyoob & Peery Plumbing Co Incfire sprinklers, add & relocate,install new pre-action system
Details
Permit
200006273780
Permit issued
Jul 25, 2000

fire sprinklers, add & relocate,install new pre-action system

Open the permit page

$116,000
Apr 4, 2000Expired or cancelled
expired Jun 2002
475 Brannan StSwinerton Buildersoti-2 1st floor el me
Details
Permit
200004046295
Permit issued
Apr 20, 2000

oti-2 1st floor el me

Open the permit page

$1,000,000
Apr 4, 2000Expired or cancelled
expired Jun 2002
475 Brannan StSwinerton Buildersoti-2 el me 2nd floor
Details
Permit
200004046294
Permit issued
Apr 14, 2000

oti-2 el me 2nd floor

Open the permit page

$1,000,000
Mar 20, 2000Expired or cancelled
expired Jun 2002
475 Brannan StSwinerton Buildersstructural work/new stairs/wall openings/new tube steel column/200003083743/200003083742
Details
Permit
200003204784
Permit issued
Apr 25, 2000

structural work/new stairs/wall openings/new tube steel column/200003083743/200003083742

Open the permit page

$200,000
Mar 15, 2000Expired or cancelled
expired May 2002
475 Brannan StSwinerton Buildersfuel oil tank permit set
Details
Permit
9924752
Permit issued
Mar 24, 2000

fuel oil tank permit set

Open the permit page

$100,000
Mar 8, 2000Expired or cancelled
expired Jun 2002
475 Brannan StSwinerton Buildersoti-1, 1st floor, el, me, l/s, sp
Details
Permit
200003083743
Permit issued
Mar 29, 2000

oti-1, 1st floor, el, me, l/s, sp

Open the permit page

$300,000
Mar 8, 2000Expired or cancelled
expired Jun 2002
475 Brannan StSwinerton Buildersoti-1, 2nd floor, el, me, l/s, sp
Details
Permit
200003083742
Permit issued
Mar 29, 2000

oti-1, 2nd floor, el, me, l/s, sp

Open the permit page

$300,000
Jan 13, 2000Expired or cancelled
expired Aug 2000
475 Brannan StSascoadd devices to existing fire alarm system as req for tenant improvement
Details
Permit
20000113952
Permit issued
Feb 10, 2000

add devices to existing fire alarm system as req for tenant improvement

Open the permit page

$15,250
Jan 12, 2000Expired or cancelled
expired May 2000
475 Brannan Stas built drawings-rev to appvd appl-9922109-fire alarm plan only
Details
Permit
20000112906
Permit issued
Jan 12, 2000

as built drawings-rev to appvd appl-9922109-fire alarm plan only

Open the permit page

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Swinerton Builders (23), Gci, Inc (17), Skyline Construction (15), Ayoob & Peery Plumbing Co Inc (10), Pyro-Comm Systems, Inc. (9), Pacific Auxiliary Fire Alarm (8), Sasco (7), Anderson, Rowe & Buckley, Inc. (6), Golden Gate Fire Protection Inc (5), Rubecon General Contracting Inc (5), Bcci Construction Company (4), M C S Construction Services (4), Principal Builders Inc. (4), Intelligent Technologies & Services Inc (3), Acco Engineered Systems Inc. Dba Acco En (2), Capitol Electric Const (2), Field Construction Inc. (2), Herrero Builders Incorporated (2), Howard S. Wright Constructors Lp (2), Vantis Dba One Workplace Construction (2), Accurate Contracting Inc.Dba Unispace Co, Bevilacqua & Sons, Cupertino Electric Inc., Dpr Construction, Dpw Inc., Fisher Development Inc, Legacy Mechanical & Energy Services, Inc, Mc Millan Electric, Novo Construction Inc, Peacock Construction, Pioneer Fire Inc., Potter Fire Protection, Pribuss Engineering Inc, South Bay Construction, Sprig Electric (Archkey Solutions), Thomas Swan Sign Co Inc, Walschon Fire Protection Inc, Young Electric Co
Architects
Denis A Henmi (3), James Stefanski (3), Hugh Cotter (2), Jane Cee (2), Joey Shimoda (2), Nicolas S. Detorres (2), Alfred Quezada, Anthony Cataldo, Dan Huntsman, Eric Ibsen, George S Soskin, Guion Chilldress, Jack Munson, Justin Martinkovic, Kelda Gragg, Peter Macrae, Scott Douglas Wurl
Engineers
John Pappas (3), Jesus Cabellon Jr. (2), Mark T Cornett (2), Alexander Joseph Pacheco, Donald Dammen, Jesse Avery, John Pappas, Jon Bell, Maryann Phipps, Ralph Lacaze, Rodolfo Bustos
Authorized agents
Amir Shahmirza, Hang Xue, Smith Group
Designers
Golden Gate Fire Protection, Nicholas Detorres
Pmt consultant/expediters
Prasad More (2)

Find contractors for work like this