Block 3787, lot 031
475 Brannan St
199 permits filed for this property since 2000.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 20, 2026 | Completed | 475 Brannan St | Gci, Inc | demo existing duct and air distribution as shown on m.i.i.d. install new duct and air distribution as shown (m2.1) ddc controls. air balance. ref pa#2025-1212-1655 | $50,000 |
| Dec 12, 2025 | Completed | 475 Brannan St | Gci, Inc | 1st fl interior ti: non structural interior walls & ceiling in office area. mep deferred | |
| Nov 26, 2025 | In progress | 475 Brannan St | Golden Gate Fire Protection Inc | 1/f suite 110: 202403077275-fire sprinkler t.i. relocate 6 uprights. | $1,500 |
| Mar 7, 2024 | Completed | 475 Brannan St | Anderson, Rowe & Buckley, Inc. | ti exsiting fire sprinkler system new ev charging locations. 75 new sprinkler & 24 change out sprinklers | |
| Dec 7, 2023 | In progress | 475 Brannan St | Capitol Electric Const | new feeder, 75kva transformer,panel board and branch circuits for (8) new electr veh chargers. | $12,638 |
| May 2, 2023 | Completed | 475 Brannan St | Vantis Dba One Workplace Construction | 1/f unit# 110: revision to bpa#202211186828, furniture plan provided for evaluation/approval. revision to phone rooms for accessibility. | |
| Feb 16, 2023 | Never finaled | 475 Brannan St | Capitol Electric Const | provide lighting & power for t.i. ref bpa#202211186828 | $14,533 |
| Jan 18, 2023 | Completed | 475 Brannan St | Anderson, Rowe & Buckley, Inc. | relocate 2 head pendents suite 110 and plug off 2 sprinkler heads (1 upright and 1 pendent) at steelcase on 1st fl. ref #202211186828. | $1,000 |
| Dec 21, 2022 | Completed | 475 Brannan St | Pyro-Comm Systems, Inc. | 2/f: (1) ceiling strobe added to mother's room to provide proper coverage. ref bpa #202212098034 | $500 |
| Dec 9, 2022 | Completed | 475 Brannan St | Principal Builders Inc. | t.i. 2nd floor: interior renovation. add new non load bearing walls, door, and casework at mother room. | $13,800 |
| Nov 18, 2022 | Completed | 475 Brannan St | Vantis Dba One Workplace Construction | relocation of pantry sink, minor non-structural demolition, minimal changes to finishes, no change of use, no change of egress, no added floor area. | $182,506 |
| Mar 29, 2022 | Completed | 475 Brannan St | revision to 2021-1130-3362 & 2021-1130-3368 to revise pot basement drawings for the updated accessible parking stall quantity and unauthorized vehicle signage @ garage entry | $2,000 | |
| Feb 17, 2022 | Completed | 475 Brannan St | Pyro-Comm Systems, Inc. | fire alarm. 14 ceiling strobes, 6 ceiling horn strobes, 1 remote power supply, 2 duct detectors, 2 relay modules, 1 control module & 1 smoke detector to be provided for proper coverage. ref 2nd fl pa# 202111303362. ref 3rd fl pa# 202111303368. | $8,500 |
| Dec 28, 2021 | Completed | 475 Brannan St | R L H Fire Protection Inc | 2/f: relocate 1 existing pendent in restroom to suite 300. ref ti permit 202111303362. | $100 |
| Dec 28, 2021 | Completed | 475 Brannan St | R L H Fire Protection Inc | 3/f suite 300: relocate 16 existing sprinklers, add 14 new sprinklers. delete 5 existing sprinklers to suit t.i. ref permit 202111303368. | $5,000 |
| Nov 30, 2021 | Completed | 475 Brannan St | Principal Builders Inc. | 2/f: interior renovation of level 2 office: new finiehs, furnishings, millwork, updated light. target mech scop: lighting upgrades. | $734,100 |
| Nov 30, 2021 | Completed | 475 Brannan St | Principal Builders Inc. | 3/f: interior renovation of level 3 office: new finiehs, furnishings, millwork, updated light. targeted mech scop: plumbing additions | $800,000 |
| Oct 19, 2018 | Completed | 475 Brannan St | Gci, Inc | to obtain final inspection for work approved under pa# 201405307148. all work is complete. | |
| Mar 19, 2018 | Completed | 475 Brannan St | Pyro-Comm Systems, Inc. | 4th floor: pryo comm will provide 2 smoke det and 3 wall mounted strobes. connect to (e) fa system ref 201801239294 maher na | $5,000 |
| Mar 12, 2018 | Completed | 475 Brannan St | Skyline Construction | electrical work for ti at suite 400. ref pa 2018-0123-9294 and 2018-0301-2598 | $50,000 |
| Mar 1, 2018 | Completed | 475 Brannan St | Golden Gate Fire Protection Inc | 4/f: fire sprinkler only - rleocate 2 pendent for & 1 add for new phone rooms for upwork exp ste #430. ref #201705237348. maher na | $750 |
| Mar 1, 2018 | Completed | 475 Brannan St | Skyline Construction | suite #400: demo of (e) reception wall for new glazing. adding hardware to existing door previously burried in wall construction. (ref approved pa #201801239294). maher na | $10,000 |
| Jan 30, 2018 | Completed | 475 Brannan St | Pyro-Comm Systems, Inc. | ti to 2nd fl - add fire alarm devices in tenant suite and connect to (e) fire alarm system. ref #201711284908. maher na | $13,000 |
| Jan 23, 2018 | Completed | 475 Brannan St | Skyline Construction | suite #400: demo portion of extg demising wall for new fire rated door. new interior partitions and doors for 3 new phone rooms. n/a for maher | $300,000 |
| Jan 10, 2018 | Completed | 475 Brannan St | R L H Fire Protection Inc | 2nd flr: fire sprinklers - one relocated and 8 added pendent heads, 28 relocated and 35 added upright heads. ref pa 201711284908 maher na | $12,377 |
| Dec 20, 2017 | Completed | 475 Brannan St | M C S Construction Services | mep upgrades utilizing bse building services. lighting, power, plumbing, mech, t24 met no exterior work or structural ref 201711284908 maher not req | $750,000 |
| Nov 28, 2017 | Completed | 475 Brannan St | M C S Construction Services | 2nd flr, suite 230 - additional demo (ref 201708316557), refer to mech & ele plans. space is currently unoccupied. no exterior building site, landscape, use or parking changes are proposed maher na | $1,200,000 |
| Nov 7, 2017 | Completed | 475 Brannan St | Anderson, Rowe & Buckley, Inc. | 2/f- fire sprinklers: plug (7). t.i. pa#201708316557. n/a ordinance #155-13 | $1,500 |
| Oct 6, 2017 | Expired or cancelled | 475 Brannan St | 3/f- t.i. to replace lights only with new. wall, carpet, hvac, plumbing to remain as is. no fire life safety work. lights only. n/a ordinance #155-13 | $100,000 | |
| Sep 14, 2017 | Completed | 475 Brannan St | M C S Construction Services | suite 220, 2nd fl: selective demo only of non-structural partitions, doors, ceilings, carpets. ref f/s permit #201708255997. maher na whole floor is vacant. ab-017 applies. | $30,000 |
| Aug 31, 2017 | Completed | 475 Brannan St | M C S Construction Services | 2/f-ste 230 selective demolition only of non structural partitions, doors, ceilings, light fixtures, ductwork, plumbing and millwork per ab-17. n/a ordinance #155-13 | $75,000 |
| Aug 25, 2017 | Completed | 475 Brannan St | Anderson, Rowe & Buckley, Inc. | remove 142 sprinklers, add 142 sprinklers to existing line outlets | $28,000 |
| Aug 10, 2017 | Completed | 475 Brannan St | Accurate Contracting Inc.Dba Unispace Co | 4/f #420- office tenant improvement interior renovation, no changes in occupancy, use or egress, no renovation to exterior envelope. n/a ordinance #155-13 | $300,000 |
| Jul 6, 2017 | Completed | 475 Brannan St | Pyro-Comm Systems, Inc. | unit 430: fa ti to suite #430: add (3) nac devices. connect to (e) fa system. pa #201705237348. maher na | $1,000 |
| Jun 15, 2017 | Completed | 475 Brannan St | Golden Gate Fire Protection Inc | 4th floor: fire sprinklers ony. ref 201705237348. relocate 2 pendents for room 4301 maher na | $500 |
| Jun 13, 2017 | Completed | 475 Brannan St | Skyline Construction | mechanical, electrical work for tenant improvement at suite 430 ref pa 2017-0523-7348. n/a maher ordinance | $35,000 |
| May 23, 2017 | Completed | 475 Brannan St | Skyline Construction | suite 430: new interior glazing, misc. electrical. no plumbing improvements. no structural work. no improvements to extg compliant restrooms. n/a for maher | $168,989 |
| May 11, 2017 | Completed | 475 Brannan St | Pyro-Comm Systems, Inc. | 1st flr: fa as builts to pa 201703030581 relocation of nae iv5-10 from column facing north to column facing west maher na | |
| Mar 29, 2017 | Completed | 475 Brannan St | Herrero Builders Incorporated | revision to pa# 201612155062, slight architectural changes. changes to hvac & plumbing systems; maher ord 155-13 na | |
| Mar 3, 2017 | Completed | 475 Brannan St | Pyro-Comm Systems, Inc. | 1st flr: fire alarm ti to suite 120 & 130. add new fire alarm devices to suites connect to (e) fire alarm system ref 201612155062. maher na | $15,000 |
| Feb 22, 2017 | Completed | 475 Brannan St | Potter Fire Protection | add (14) fire sprinklers at new drop ceilings. ref pa 2016-1215-5062. maher na | $7,000 |
| Dec 15, 2016 | Completed | 475 Brannan St | Herrero Builders Incorporated | suite 120 & 130; replace casework in breakroom, (n) power & data outlets in mail room. conference room & aisle (n) wall mounted screen & equipoment. replace finishes per schedule. suite 130 - reconfigure office & lab spaces. selective demo (n) partitions, floor finishes, painting, ceiling, lighting | $800,000 |
| Dec 13, 2016 | Completed | 475 Brannan St | Peacock Construction | 3rd flr - electrical only: change out (e) incandescent and flourscent lighting fixtures to led. power and data for av devices and furniture. maher na | $180,000 |
| Jul 8, 2016 | Expired or cancelled | 475 Brannan St | Pioneer Fire Inc. | 2ndflr: relocate 1 head, relocate 2 uprights remove 3 uprights maher na | $4,755 |
| May 19, 2016 | Completed | 475 Brannan St | Field Construction Inc. | unit #210: partial retrofit: lighting, power & signal, wiring, lighting, & redepticle controls. ref app#201605137442. | |
| May 13, 2016 | Completed | 475 Brannan St | Field Construction Inc. | #210: commercial t.i. which includes demolition on non-structural partitions, light fixtures, electrical devices, millwork, and finishes. construction of millwork, finishes, plumbing fixtures, light fixtures, and electrical. n/a for maher. | $75,000 |
| Apr 27, 2016 | Completed | 475 Brannan St | Pyro-Comm Systems, Inc. | 2nd floor, suite 210: new fire alarm devices added in an (e) bld to include: 1 horn/strobe, 2 strobes. maher an | $1,500 |
| Apr 26, 2016 | Completed | 475 Brannan St | Bcci Construction Company | new furniture hookup, no lighting. mech title 24 201603212563; mech plan check review. | $35,000 |
| Mar 21, 2016 | Completed | 475 Brannan St | Bcci Construction Company | ste 330, selective demolition of existing multi-tenant floor. demolition of existing walls & finishes. maher na | $100,000 |
| Jan 20, 2016 | Completed | 475 Brannan St | Sprig Electric (Archkey Solutions) | suite #200 and #300: title 24 -electrical new furniture feeds, new receptacles. ref. app #20105206759. | $65,000 |
| Dec 14, 2015 | Completed | 475 Brannan St | Skyline Construction | revision to 201506169077 per field insp. change door from 20 rated to 25 min rated. change wall to chain link fence. compliance with maher ordinance no 155-13 | |
| Aug 21, 2015 | Completed | 475 Brannan St | Pyro-Comm Systems, Inc. | 4th flr/ suite 430: new fire alarm for a ti to an (e) bld to include: 1 power supply, 21 horn/strobes, 6 strobes. maher na ref pa #201506169077 | $6,430 |
| Aug 20, 2015 | Completed | 475 Brannan St | Skyline Construction | 4th floor, suite 430: revision to pa 2015 0714 1405. mechanical scope of work. arch - 2015 0618 9077, mech - 2015 0714 1405. maher na | |
| Aug 11, 2015 | Completed | 475 Brannan St | Intelligent Technologies & Services Inc | demo 3 of 4 zones of clean agent & pre-action. complete removal of clean agent. n/a ordinance #155-13 | $2,500 |
| Jul 14, 2015 | Completed | 475 Brannan St | Skyline Construction | suite 430: mechanical and electrical work for tenant improvement on the 4th fl. ref bpa#201506169077. | $120,000 |
| Jul 13, 2015 | Completed | 475 Brannan St | Golden Gate Fire Protection Inc | 4th fl: fire sprinkler only, add 19 sprinkler pendents for upwork, t.i. pa#2015-0616-9077. n/a ordinance #155-13 | $9,500 |
| Jun 16, 2015 | Completed | 475 Brannan St | Skyline Construction | 4th floor suite 430 - new interior partitions & doors, misc electrical, hvac & plumbing improvements. no structural work (folding partition submitted separately), no improvements to existing compliant restrooms. n/a maher ordinance | $925,462 |
| Jun 11, 2015 | Completed | 475 Brannan St | Skyline Construction | demo non load bearing walls, doors, finishes ab017 maher not req | $5,000 |
| May 28, 2015 | Completed | 475 Brannan St | Acco Engineered Systems Inc. Dba Acco En | 2nd/3rd flr: rebalance (e) vav boxes to serve (n) zones as shown. upsize boxes and redistribute ductwork as needed for new zones. provide and install 2 water source heat pumps. ref app#201505206759. maher na | $150,000 |
| May 20, 2015 | Completed | 475 Brannan St | Pribuss Engineering Inc | suite #300: fire sprinkler t.i. under appl. 2015.0501.5144. relocate and changing 2 heads. maher n/a. | $1,030 |
| May 20, 2015 | Completed | 475 Brannan St | Bcci Construction Company | #200 & #300 commercial t.i. which includes new non-structural partitoins, millwork, electrical, teledata, demolition under pa #2015055144. n/a maher ordinance | $790,000 |
| May 1, 2015 | Completed | 475 Brannan St | Bcci Construction Company | suite # 200 & 300: pre construction demolition under ab-017 includes demolition of non-structural partitions, doors, millwork and finishes. fire & ls to remain operational. n/a for the maher ordinanceti under sep permt | $110,000 |
| Dec 9, 2014 | Expired or cancelled | 475 Brannan St | Skyline Construction | 4th floor: demolition of extg non-structural partitions and millwork. mep and life safety under seperate permit. n/a for the maher. | $10,000 |
| Oct 3, 2014 | Completed | 475 Brannan St | ste #110:revision to pa#201403251636. add structural details for steelcase system. | $100,000 | |
| Aug 21, 2014 | Completed | 475 Brannan St | Golden Gate Fire Protection Inc | 1st floor - relocate 8 pendent sprinkler heads. ref ti #2014.0325.1636. n/a maher ordinance | $4,120 |
| Jun 30, 2014 | Never finaled | 475 Brannan St | Bevilacqua & Sons | ground floor - work includes new partial height walls & galss partitions & doors. no exterior work. (building is equipped with full automatic sprinkler system). compliance with maher ordinance no 155-13 not required. | $20,374 |
| May 30, 2014 | Completed | 475 Brannan St | Gci, Inc | non-structural demo on 4th floor to include: partitions, doors, glazing, millwork, etc. space to remain vacant per ab-017 until the time of t.i. | $50,000 |
| May 7, 2014 | Completed | 475 Brannan St | Pacific Auxiliary Fire Alarm | add one horn/strobe & one strobe and relocate two existing smoke detectors, , ref. approved bldng permit # 201404042430 | $2,000 |
| Apr 4, 2014 | Completed | 475 Brannan St | South Bay Construction | ste #230, 2nd flr: tenant improvement of exisitng office/lab space | $31,656 |
| Mar 25, 2014 | Completed | 475 Brannan St | Gci, Inc | 1st floor - minor non-structural demolition. new demountable partitions and furniture, finishes, acoustic ceiling. relocate exist. hvac ducting, lighting. office system showroom for retail prupose, renovtion of existing showroom. | $114,000 |
| Oct 19, 2012 | Completed | 475 Brannan St | Principal Builders Inc. | 3rd & 4th floors-minor wall demolition on 2 floors, minor floor demolition & installation of new millwork & furniture | $100,000 |
| Oct 17, 2012 | Completed | 475 Brannan St | Pacific Auxiliary Fire Alarm | 3rd floor. add 1 power supply, 1 control module, 1 manual alarm, 19 horn/strobes 6 strobes & replace two (e) horn/strobes. const. permit #2012-10-04-1304 | $26,500 |
| Oct 16, 2012 | Completed | 475 Brannan St | Anderson, Rowe & Buckley, Inc. | 3rd floor:extg fire sprinkler system.t.i.:2 added sprinklers,3 relocated sprinklers,2 removed sprinklers. app#201210041304. | $3,500 |
| Oct 4, 2012 | Completed | 475 Brannan St | Dpr Construction | partial floor ti on 3rd floor to demo & construct new partitions doors & finishes electrical, mechanical for sprinklers, life safety on separate permit | $206,000 |
| Aug 28, 2012 | Never finaled | 475 Brannan St | obtain final inspection for work approved under pa# 2008-0403-8718. all work is complete | ||
| Mar 12, 2012 | Completed | 475 Brannan St | Rubecon General Contracting Inc | voluntary seismic mitigation at entry canopy. | $14,000 |
| Sep 21, 2011 | Never finaled | 475 Brannan St | Legacy Mechanical & Energy Services, Inc | heat pump on ceiling for lab to serve lab | $21,000 |
| Aug 5, 2011 | Completed | 475 Brannan St | Gci, Inc | hvac work for new office in extg tenant space to add one new vav box and thermostat, new supply and return diffusers, demo partial duct work and relocate one supply grille. please refer to app#201104144066. | $16,847 |
| Jul 19, 2011 | Completed | 475 Brannan St | Ayoob & Peery Plumbing Co Inc | add and relocate fire sprinkler heads per tenant imp. (3 add,3 relocate) | $3,000 |
| Jul 19, 2011 | Completed | 475 Brannan St | Fisher Development Inc | floor 4, ste 430 t.t. office-new reception desk,finishes, replace (e) sconces w/like kind, (1) new wall sconces @ lobby, (1) new 5 ton hvac unit to supply rooms #4102 & 4104, replace (5) (e) doors w/glass lite doors, new sliding doors @ rooms #4072 &4070. mech, elec, fire protection under separate | $100,000 |
| Apr 18, 2011 | Completed | 475 Brannan St | Pacific Auxiliary Fire Alarm | add 4 horn/strobe & replace 1 extg horn/strobe due to a tenant impr. of the 4th floor. | $3,100 |
| Apr 15, 2011 | Completed | 475 Brannan St | Gci, Inc | revision to hvac permit app#201103293043 to reflect addition of one heat pump and minor demo work to be moved to different location from previously approved permit | $180 |
| Apr 14, 2011 | Completed | 475 Brannan St | Gci, Inc | add 2 private offices within extg suite. extg lighting, hvac and sprinklers/life safety to be reworked for new layout. | $31,750 |
| Apr 1, 2011 | Completed | 475 Brannan St | Gci, Inc | 4th floor-relocating & installing new light fixtures, switches, outlets & equipment for new t.i. space. please refer to pa# 2011-0314-1990 for t.i. permit | $35,617 |
| Mar 30, 2011 | Completed | 475 Brannan St | Ayoob & Peery Plumbing Co Inc | relocate and add fire sprinkler. heads per tenant improvements. 16 relocate,5 add | $10,000 |
| Mar 29, 2011 | Completed | 475 Brannan St | Gci, Inc | mechanical work for ti on 4th floor to install new vav boxes, grills, diffusers and thermostat.1 new fire damper, 1 new exhaust fan and relocate extg equipment. phase refer to app#201103141990 for ti work. | $33,970 |
| Mar 14, 2011 | Completed | 475 Brannan St | Gci, Inc | new ti to include demo and construction of non load bearing partitions, doors,frames,mill work and finishes. no increase in office space. mep, ls, sp separate permit | $286,905 |
| Jan 13, 2011 | Completed | 475 Brannan St | R L H Fire Protection Inc | 1st floor-sprinkler system upgrade, add 6 sidewall sprinkler heads. | $3,000 |
| Jan 6, 2011 | Completed | 475 Brannan St | Gci, Inc | 3rd floor addiiton of new fixtures to accommodate new work space of existing tenant space electrical/lighting only. refer to pa #201012015905 for t.i. work. | $9,000 |
| Dec 29, 2010 | Completed | 475 Brannan St | Ayoob & Peery Plumbing Co Inc | relocate & add fire sprinkler heads per tenant improvement. (1add & 3 relocate) | $2,000 |
| Dec 27, 2010 | Completed | 475 Brannan St | Gci, Inc | mechanical work only.relocate existing supply and return grills and thermostats. add one new vav box. ti approved under pa# 201012.01.5905. | $18,000 |
| Dec 1, 2010 | Completed | 475 Brannan St | Gci, Inc | 3rd floor suite 320 - addition of two private offices in previously improved space. | $25,000 |
| Sep 30, 2010 | Expired or cancelled | 475 Brannan St | Rubecon General Contracting Inc | 4th floor #430 - demolish & remove approx 250 lf of non-structural, non-rated sheetrock partitions. safe off electrical, patch & paint. relocation of sprinklers under separate permit if required. | $15,000 |
| Sep 30, 2010 | Completed | 475 Brannan St | Rubecon General Contracting Inc | 4th floor #420 -demolish & remove approx 80ft of non-structural, non-rated sheetrock partitions, safe off electrical patch & paint. reclocation of sprinklers if required under separate permit. | $10,000 |
| Aug 12, 2010 | Expired or cancelled | 475 Brannan St | to obtain final inspection for work approved under pa#200804038718. all work is complete. | ||
| Jun 22, 2009 | Completed | 475 Brannan St | Howard S. Wright Constructors Lp | 3rd floor install 2 fire smoke dampers. | $1,500 |
| Jun 12, 2009 | Completed | 475 Brannan St | Howard S. Wright Constructors Lp | upgrade existing computer room walls to 1-hr. at 3rd. flr. repair/replace bathroom door closers. mep under separate permit | $3,300 |
| May 27, 2009 | Completed | 475 Brannan St | Pacific Auxiliary Fire Alarm | adding 1 smoke detector and 3 relays to existing fire alarm system for server room on 3rd fl. | $5,000 |
| May 1, 2009 | Completed | 475 Brannan St | Gci, Inc | ref pa #200904146271 for t.i. new lighting plan for 3rd fl to remove/relocate and add new fixtures and outlets. | $200,719 |
| Apr 28, 2009 | Completed | 475 Brannan St | Gci, Inc | hvac- to reconfigure hvac system on third (3rd) floor ti, please refer to pa#2009/0414/6271. | $163,780 |
| Apr 24, 2009 | Completed | 475 Brannan St | Pacific Auxiliary Fire Alarm | add 1 smoke detector, 10 horn/strobes, 5 strobes, 1 sync mdule for tenant improvement on the 3rd floor and 1 s.l.c. loop expander at facp. | $14,000 |
| Apr 22, 2009 | Completed | 475 Brannan St | Ayoob & Peery Plumbing Co Inc | add and relocate fire srpinker heads per tenant improvment. 0 adds, 43 relocates | $9,500 |
| Apr 14, 2009 | Completed | 475 Brannan St | Gci, Inc | #320- interior non structural tenant improvement of suite 320 . all mep, sprinkler and fire alarm will be under seperate permit | $1,067,750 |
| Nov 18, 2008 | Completed | 475 Brannan St | R L H Fire Protection Inc | install sprinkler head in four fume hoods | $800 |
| Sep 24, 2008 | Completed | 475 Brannan St | Mc Millan Electric | access control system installation within 2nd floor tenant area | $100,000 |
| Sep 24, 2008 | Completed | 475 Brannan St | Pacific Auxiliary Fire Alarm | addition of 2 duct detectors, 1 module, 2 srelays, relocating 2 strobes due to tenant improvment on the 1st floor. work being don on 1st and 2nd floors | $6,000 |
| Sep 12, 2008 | Completed | 475 Brannan St | documentation purpose only. no construction under this permit provide clarification for final inspection for pa# 2008/05/09/1746. correct the description for the proposed use to be surgical training center. not medical office. | ||
| Sep 8, 2008 | Completed | 475 Brannan St | R L H Fire Protection Inc | retrofit work on sprinkler system; add 33 new head throughout four floors. | $15,600 |
| Aug 12, 2008 | Completed | 475 Brannan St | convert existing open office to b-occupancy lab. convert existing storage to clinical lab (b- occupancy) to match adjacent lab. on 1st floor. no exterior work. sprinkler & fire alarm under separate permit. | $100,000 | |
| Jul 9, 2008 | Completed | 475 Brannan St | Pacific Auxiliary Fire Alarm | additions to extg fire alarm system due to tenant improvement on part of 2nd floor | $30,000 |
| Jun 2, 2008 | Completed | 475 Brannan St | R L H Fire Protection Inc | fire sprinkler tenant improvements on 1st lab & 2nd floor office, relocate 47 pend. add 80 pend. reloc uprights, added uprights- total 127 heads. | $26,500 |
| May 9, 2008 | Completed | 475 Brannan St | remodel ex. cpmc tenant space on the 2/f expand existing clinical lab and new surgical training center. new mechanical duct on exterior of bldg. no structural work, fire alarm and sprinkler under a separate permit. "umbrella" permit to verify "fully sprinklered" bldg. required by fire dept. | $2,800,000 | |
| Apr 3, 2008 | Expired or cancelled | 475 Brannan St | structural work only-new openings in tenant space and structural supports for new mechanical equipment. mep, sprinkler and fire alarm will be under seperate permit | $50,000 | |
| Mar 17, 2008 | Completed | 475 Brannan St | 1st & 2nd floors only - interior non-structural demolition of zone 1. | $20,000 | |
| Sep 11, 2007 | Never finaled | 475 Brannan St | street space and sidewalk repair | ||
| Dec 6, 2006 | Completed | 475 Brannan St | Rubecon General Contracting Inc | create new 1 hr. rate partition in an existing suite to make 2 suites. work on 3/f. sprinkler, hvac, electrical and life safety on seperate permit. | $35,000 |
| Aug 24, 2006 | Completed | 475 Brannan St | Swinerton Builders | revision to appl#200505122244 for sffd review. exit door with special egress control device located on 4th floor. | $1,000 |
| May 30, 2006 | Completed | 475 Brannan St | Pacific Auxiliary Fire Alarm | installation of 3 smoke detectores on the 4th floor and a new annundator module at the facp. also includes relocation of 2 stobes | $3,000 |
| May 2, 2006 | Completed | 475 Brannan St | Anderson, Rowe & Buckley, Inc. | t.i (e) spkr. system, 13 new spkrs below. | $2,600 |
| Aug 9, 2005 | Expired or cancelled | 475 Brannan St | Acco Engineered Systems Inc. Dba Acco En | (1) exhaust fan, (1) vav box mechanical only | $17,000 |
| May 12, 2005 | Completed | 475 Brannan St | Swinerton Builders | oti-1, 4th fl. el, me ls, sp. | $400,000 |
| Mar 14, 2005 | Expired or cancelled | 475 Brannan St | Novo Construction Inc | oti 1- 4th fl | $104,000 |
| Feb 25, 2005 | Completed | 475 Brannan St | Dpw Inc. | modify exist sprinkler system on 1st floor only per plan. | $13,000 |
| Feb 11, 2005 | Completed | 475 Brannan St | Young Electric Co | install new power supply , add additional speaker & fsd's. | $10,000 |
| Dec 28, 2004 | Completed | 475 Brannan St | Rubecon General Contracting Inc | wood beam repairs inject epoxy grout in 2 crack beams/install 1 pair 8' bolted stich plates on | $3,000 |
| Dec 23, 2004 | Completed | 475 Brannan St | rev. to appl#200411108901 new retractable wall in conference room,new paritions in electrical room & | $82,000 | |
| Dec 20, 2004 | Completed | 475 Brannan St | mechanical & electrical work for 1st floor tenant. | $100,000 | |
| Nov 12, 2004 | Completed | 475 Brannan St | Cupertino Electric Inc. | modify fire alarm system on 1st floor. remove 14, horen, strobes during demo, remodel and reinstall | $2,300 |
| Nov 10, 2004 | Completed | 475 Brannan St | remodel of 1st floor tenant space, mep under seperate permit. | $523,390 | |
| Oct 14, 2004 | Completed | 475 Brannan St | Ayoob & Peery Plumbing Co Inc | relocate fire sprinkler per tenant improvements. | $4,250 |
| Sep 23, 2004 | Completed | 475 Brannan St | repair dryrot on 1st floor 2 columns and select floor area. disabled access floorunder 200405073378. | $35,000 | |
| Aug 27, 2004 | Completed | 475 Brannan St | Swinerton Builders | oti-2 4th floor el | $7,500 |
| Aug 27, 2004 | Completed | 475 Brannan St | Swinerton Builders | oti-2 3rd floor el | $10,000 |
| Aug 11, 2004 | Completed | 475 Brannan St | R L H Fire Protection Inc | fire sprinkler t/i to 1st floor research offices/ lab/relocate 62/add 4/delete 9 sprinkler | $14,100 |
| Aug 11, 2004 | Completed | 475 Brannan St | R L H Fire Protection Inc | oti-3 2nd floor sp only | $9,800 |
| Jul 30, 2004 | Completed | 475 Brannan St | new mechanical electrical and plumbing for 1st floor tenant improvement architectural approved under | $850,000 | |
| Jun 1, 2004 | Completed | 475 Brannan St | interior non-structurl demo for 1st | $5,000 | |
| May 12, 2004 | Completed | 475 Brannan St | oti-2 2nd floor me, el | $85,000 | |
| May 7, 2004 | Expired or cancelled | 475 Brannan St | mmi-2 1st floor el,me | $1,000,000 | |
| May 7, 2004 | Completed | 475 Brannan St | tenant improvement 1st floor architectural only | $1,428,466 | |
| May 7, 2004 | Completed | 475 Brannan St | oti-1 2nd floor el,me,ls,sp | $465,800 | |
| May 5, 2004 | Completed | 475 Brannan St | 2/f- non-structural interior soft demo of partial 2/f | $10,000 | |
| Apr 7, 2004 | Completed | 475 Brannan St | Swinerton Builders | oti-1 4th floor, el, me, l/s, sp | $80,000 |
| Apr 7, 2004 | Completed | 475 Brannan St | Swinerton Builders | oti-1 3rd floor, el, me, l/s, sp | $80,000 |
| Dec 1, 2003 | Completed | 475 Brannan St | Skyline Construction | revision to app#2003/05/07/3972. | $100 |
| Sep 25, 2003 | Completed | 475 Brannan St | Skyline Construction | fire sprinkler work on ground floor, no increase in space | $4,000 |
| May 7, 2003 | Completed | 475 Brannan St | oti-1, 1st fl, el,me, ls, sp | $100,000 | |
| Jun 19, 2002 | Expired or cancelled | 475 Brannan St | change of doors at entry to lobby area fr solid rat to regulr glass doors rev to ap #200111072614 | $5,000 | |
| May 13, 2002 | Completed | 475 Brannan St | Sasco | fire alarm system- tenant improvement for signature boiscience phase 2 | $17,000 |
| May 2, 2002 | Completed | 475 Brannan St | Swinerton Builders | renew 200011024769,200103285416, 9924752,200006273780,200010264147 | |
| May 2, 2002 | Completed | 475 Brannan St | Swinerton Builders | renew 200003083742,200003083743,200007276339, 200003204784 2nd floor tenant improvement | |
| May 2, 2002 | Completed | 475 Brannan St | Swinerton Builders | to renew 200108317309,200004046295,200004046294 first floor ti improvement | |
| Apr 12, 2002 | Completed | 475 Brannan St | Walschon Fire Protection Inc | add and relocate automatic fire sprinkler systems as required per code | $23,885 |
| Mar 15, 2002 | Completed | 475 Brannan St | 1st fl new int. partition for office & lab room, new mech & elect.c | $1,350,000 | |
| Feb 15, 2002 | Completed | 475 Brannan St | 1/fl. - interior non structural demolistion | $15,000 | |
| Feb 14, 2002 | Completed | 475 Brannan St | Sasco | fire alarm improvement-1st, 2nd, 3rd floors, install 4 smoke detectors, 57 horn strobes, 22 strobes | $28,000 |
| Feb 6, 2002 | Completed | 475 Brannan St | Ayoob & Peery Plumbing Co Inc | 1-3/fl: add & relocate fire sprinkler heads (37 new hds/18 relocate/11 removed) | $15,500 |
| Jan 3, 2002 | Completed | 475 Brannan St | Sasco | fire alarm system - t/i (4th floor) | $15,000 |
| Dec 14, 2001 | Completed | 475 Brannan St | Skyline Construction | life saftey work to be performed on the 4th floor | $35,000 |
| Dec 13, 2001 | Completed | 475 Brannan St | 1st fl remodel, new bioscience lab, new mech on roof, new plmbg, new elec. sprinkler under separate | $1,390,000 | |
| Dec 13, 2001 | Completed | 475 Brannan St | first, second and third (partial floors only), interior non-structural demo | $40,000 | |
| Dec 13, 2001 | Completed | 475 Brannan St | tenant improvement, second and thired floors, sprinkler under separate permit | $200,000 | |
| Nov 7, 2001 | Completed | 475 Brannan St | 4th floor, remodel existing office space, new partition, electrical and mechanical | $195,000 | |
| Nov 6, 2001 | Completed | 475 Brannan St | Skyline Construction | fire sprinkler work to be performed on 4th flr only. | $100,000 |
| Oct 23, 2001 | Expired or cancelled | 475 Brannan St | Intelligent Technologies & Services Inc | 1st floor- install fm200/pre-action fire alarm system | $15,000 |
| Oct 4, 2001 | Expired or cancelled | 475 Brannan St | Sasco | 1/fl.- fire alarm, t.i. improvement, relocate 4 horn strobes and add 2 strobes | $2,000 |
| Sep 24, 2001 | Expired or cancelled | 475 Brannan St | electrical distribution for lighting 1/f & 2/f and fire alarm @ 1/f | $10,000 | |
| Sep 20, 2001 | Completed | 475 Brannan St | Ayoob & Peery Plumbing Co Inc | t.i., add, relocate & remove fire sprinkler heads at 1st & 2nd floor | $4,800 |
| Aug 31, 2001 | Expired or cancelled | 475 Brannan St | Swinerton Builders | 1st/2nd floor, oti-2 1st/2nd floor: el, me on 2000/03/08/3743 & 2000/04/04/6295. | |
| Aug 27, 2001 | Expired or cancelled | 475 Brannan St | tenant improvement for first and second floor, mechanical included | $247,040 | |
| Jun 29, 2001 | Completed | 475 Brannan St | tenant build out of third floor | $300,000 | |
| May 11, 2001 | Completed | 475 Brannan St | Ayoob & Peery Plumbing Co Inc | fire sprinkler add & relocate per tenant improvements 3rd & 4th floor. | $28,500 |
| May 8, 2001 | Completed | 475 Brannan St | Sasco | adjustment to permit appn. 2001-04-13-6813 | $100 |
| Apr 13, 2001 | Completed | 475 Brannan St | Sasco | fire alarm - tenant improvement 3rd floor. | $30,000 |
| Mar 28, 2001 | Expired or cancelled | 475 Brannan St | Ayoob & Peery Plumbing Co Inc | rev. to appl#200010264147 removal of fm200 tank per request of fire inspector tony hampton | $100 |
| Feb 27, 2001 | Expired or cancelled | 475 Brannan St | renewal of pa#20000113952 | ||
| Feb 27, 2001 | Expired or cancelled | 475 Brannan St | Swinerton Builders | renew app #9923225 for final inspection for interior stairs | |
| Feb 27, 2001 | Expired or cancelled | 475 Brannan St | Swinerton Builders | renew app #99232226 for final inspection/fuel tank | |
| Feb 27, 2001 | Completed | 475 Brannan St | Swinerton Builders | renew #9922699,9922700,9922698,9922701 | |
| Feb 1, 2001 | Completed | 475 Brannan St | new structural stair between 3rd & 4th floors to support mech equipment | $100,000 | |
| Jan 23, 2001 | Completed | 475 Brannan St | one-stop:mtjoe:elect. & mech & plmbg, to all floors | $60,000 | |
| Dec 18, 2000 | Expired or cancelled | 475 Brannan St | Thomas Swan Sign Co Inc | to erect electrical sign | $3,000 |
| Nov 20, 2000 | Completed | 475 Brannan St | erect a single faced, non-electric wall sign | ||
| Nov 2, 2000 | Expired or cancelled | 475 Brannan St | Swinerton Builders | oti-3: (1st & 2nd fl.) l/s | $20,000 |
| Nov 1, 2000 | Expired or cancelled | 475 Brannan St | oti-1 3rd flr,el,me, l/s. sp | $300,000 | |
| Nov 1, 2000 | Completed | 475 Brannan St | oti-1 4th flr,el,me, l/s sp | $850,000 | |
| Oct 30, 2000 | Expired or cancelled | 475 Brannan St | Swinerton Builders | finish and install 1 underground fule tank, 4000 gallons. and one roof-top tank 60 gallons | $50,000 |
| Oct 26, 2000 | Expired or cancelled | 475 Brannan St | Intelligent Technologies & Services Inc | install new (fike) fire suppression system at 2nd floor only. | $36,500 |
| Jul 27, 2000 | Expired or cancelled | 475 Brannan St | Swinerton Builders | revision to oti-1 2000/03/08/3442. bracing & connection for the ceiling grind anchorage. | $3,000 |
| Jul 27, 2000 | Expired or cancelled | 475 Brannan St | Swinerton Builders | install of emergency generator on roof 2 location of 2 cooling towers on roof. | $350,000 |
| Jun 27, 2000 | Expired or cancelled | 475 Brannan St | Ayoob & Peery Plumbing Co Inc | fire sprinklers, add & relocate,install new pre-action system | $116,000 |
| Apr 4, 2000 | Expired or cancelled | 475 Brannan St | Swinerton Builders | oti-2 1st floor el me | $1,000,000 |
| Apr 4, 2000 | Expired or cancelled | 475 Brannan St | Swinerton Builders | oti-2 el me 2nd floor | $1,000,000 |
| Mar 20, 2000 | Expired or cancelled | 475 Brannan St | Swinerton Builders | structural work/new stairs/wall openings/new tube steel column/200003083743/200003083742 | $200,000 |
| Mar 15, 2000 | Expired or cancelled | 475 Brannan St | Swinerton Builders | fuel oil tank permit set | $100,000 |
| Mar 8, 2000 | Expired or cancelled | 475 Brannan St | Swinerton Builders | oti-1, 2nd floor, el, me, l/s, sp | $300,000 |
| Mar 8, 2000 | Expired or cancelled | 475 Brannan St | Swinerton Builders | oti-1, 1st floor, el, me, l/s, sp | $300,000 |
| Jan 13, 2000 | Expired or cancelled | 475 Brannan St | Sasco | add devices to existing fire alarm system as req for tenant improvement | $15,250 |
| Jan 12, 2000 | Expired or cancelled | 475 Brannan St | as built drawings-rev to appvd appl-9922109-fire alarm plan only |