Block 3787, lot 031
475 Brannan St
- City’s use
- Commercial Office
- Built
- 1908
- Stories
- 4
- Rooms
- 7 bathrooms
- Building
- 255,000 sq ft
- Lot
- 81,082 sq ft
- Zoning
- SSO
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
199 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 20, 2026 | Completed final sign-off Mar 2026 | 475 Brannan St | Gci, Inc | demo existing duct and air distribution as shown on m.i.i.d. install new duct and air distribution as shown (m2.1) ddc controls. air balance. ref pa#2025-1212-1655Details
demo existing duct and air distribution as shown on m.i.i.d. install new duct and air distribution as shown (m2.1) ddc controls. air balance. ref pa#2025-1212-1655 | $50,000 |
| Dec 12, 2025 | Completed final sign-off Mar 2026 | 475 Brannan St | Gci, Inc | 1st fl interior ti: non structural interior walls & ceiling in office area. mep deferredDetails
1st fl interior ti: non structural interior walls & ceiling in office area. mep deferred | |
| Nov 26, 2025 | In progress issued Dec 2025 | 475 Brannan St | Golden Gate Fire Protection Inc | 1/f suite 110: 202403077275-fire sprinkler t.i. relocate 6 uprights.Details
1/f suite 110: 202403077275-fire sprinkler t.i. relocate 6 uprights. | $1,500 |
| Mar 7, 2024 | Completed final sign-off May 2024 | 475 Brannan St | Anderson, Rowe & Buckley, Inc. | ti exsiting fire sprinkler system new ev charging locations. 75 new sprinkler & 24 change out sprinklersDetails
ti exsiting fire sprinkler system new ev charging locations. 75 new sprinkler & 24 change out sprinklers | |
| Dec 7, 2023 | In progress issued Jan 2024 | 475 Brannan St | Capitol Electric Const | new feeder, 75kva transformer,panel board and branch circuits for (8) new electr veh chargers.Details
new feeder, 75kva transformer,panel board and branch circuits for (8) new electr veh chargers. | $12,638 |
| May 2, 2023 | Completed final sign-off May 2023 | 475 Brannan St | Vantis Dba One Workplace Construction | 1/f unit# 110: revision to bpa#202211186828, furniture plan provided for evaluation/approval. revision to phone rooms for accessibility.Details
1/f unit# 110: revision to bpa#202211186828, furniture plan provided for evaluation/approval. revision to phone rooms for accessibility. | |
| Feb 16, 2023 | Never finaled issued Feb 2023, no final | 475 Brannan St | Capitol Electric Const | provide lighting & power for t.i. ref bpa#202211186828Details
provide lighting & power for t.i. ref bpa#202211186828 | $14,533 |
| Jan 18, 2023 | Completed final sign-off Feb 2023 | 475 Brannan St | Anderson, Rowe & Buckley, Inc. | relocate 2 head pendents suite 110 and plug off 2 sprinkler heads (1 upright and 1 pendent) at steelcase on 1st fl. ref #202211186828.Details
relocate 2 head pendents suite 110 and plug off 2 sprinkler heads (1 upright and 1 pendent) at steelcase on 1st fl. ref #202211186828. | $1,000 |
| Dec 21, 2022 | Completed final sign-off Jan 2023 | 475 Brannan St | Pyro-Comm Systems, Inc. | 2/f: (1) ceiling strobe added to mother's room to provide proper coverage. ref bpa #202212098034Details
2/f: (1) ceiling strobe added to mother's room to provide proper coverage. ref bpa #202212098034 | $500 |
| Dec 9, 2022 | Completed final sign-off Jan 2023 | 475 Brannan St | Principal Builders Inc. | t.i. 2nd floor: interior renovation. add new non load bearing walls, door, and casework at mother room.Details
t.i. 2nd floor: interior renovation. add new non load bearing walls, door, and casework at mother room. | $13,800 |
| Nov 18, 2022 | Completed final sign-off May 2023 | 475 Brannan St | Vantis Dba One Workplace Construction | relocation of pantry sink, minor non-structural demolition, minimal changes to finishes, no change of use, no change of egress, no added floor area.Details
relocation of pantry sink, minor non-structural demolition, minimal changes to finishes, no change of use, no change of egress, no added floor area. | $182,506 |
| Mar 29, 2022 | Completed final sign-off Jun 2022 | 475 Brannan St | revision to 2021-1130-3362 & 2021-1130-3368 to revise pot basement drawings for the updated accessible parking stall quantity and unauthorized vehicle signage @ garage entryDetails
revision to 2021-1130-3362 & 2021-1130-3368 to revise pot basement drawings for the updated accessible parking stall quantity and unauthorized vehicle signage @ garage entry | $2,000 | |
| Feb 17, 2022 | Completed final sign-off Aug 2022 | 475 Brannan St | Pyro-Comm Systems, Inc. | fire alarm. 14 ceiling strobes, 6 ceiling horn strobes, 1 remote power supply, 2 duct detectors, 2 relay modules, 1 control module & 1 smoke detector to be provided for proper coverage. ref 2nd fl pa# 202111303362. ref 3rd fl pa# 202111303368.Details
fire alarm. 14 ceiling strobes, 6 ceiling horn strobes, 1 remote power supply, 2 duct detectors, 2 relay modules, 1 control module & 1 smoke detector to be provided for proper coverage. ref 2nd fl pa# 202111303362. ref 3rd fl pa# 202111303368. | $8,500 |
| Dec 28, 2021 | Completed final sign-off Mar 2022 | 475 Brannan St | 3/f suite 300: relocate 16 existing sprinklers, add 14 new sprinklers. delete 5 existing sprinklers to suit t.i. ref permit 202111303368.Details
3/f suite 300: relocate 16 existing sprinklers, add 14 new sprinklers. delete 5 existing sprinklers to suit t.i. ref permit 202111303368. | $5,000 | |
| Dec 28, 2021 | Completed final sign-off Mar 2022 | 475 Brannan St | 2/f: relocate 1 existing pendent in restroom to suite 300. ref ti permit 202111303362.Details
2/f: relocate 1 existing pendent in restroom to suite 300. ref ti permit 202111303362. | $100 | |
| Nov 30, 2021 | Completed final sign-off Aug 2022 | 475 Brannan St | Principal Builders Inc. | 3/f: interior renovation of level 3 office: new finiehs, furnishings, millwork, updated light. targeted mech scop: plumbing additionsDetails
3/f: interior renovation of level 3 office: new finiehs, furnishings, millwork, updated light. targeted mech scop: plumbing additions | $800,000 |
| Nov 30, 2021 | Completed final sign-off Aug 2022 | 475 Brannan St | Principal Builders Inc. | 2/f: interior renovation of level 2 office: new finiehs, furnishings, millwork, updated light. target mech scop: lighting upgrades.Details
2/f: interior renovation of level 2 office: new finiehs, furnishings, millwork, updated light. target mech scop: lighting upgrades. | $734,100 |
| Oct 19, 2018 | Completed final sign-off Oct 2018 | 475 Brannan St | Gci, Inc | to obtain final inspection for work approved under pa# 201405307148. all work is complete.Details
to obtain final inspection for work approved under pa# 201405307148. all work is complete. | |
| Mar 19, 2018 | Completed final sign-off Mar 2018 | 475 Brannan St | Pyro-Comm Systems, Inc. | 4th floor: pryo comm will provide 2 smoke det and 3 wall mounted strobes. connect to (e) fa system ref 201801239294 maher naDetails
4th floor: pryo comm will provide 2 smoke det and 3 wall mounted strobes. connect to (e) fa system ref 201801239294 maher na | $5,000 |
| Mar 12, 2018 | Completed final sign-off May 2018 | 475 Brannan St | Skyline Construction | electrical work for ti at suite 400. ref pa 2018-0123-9294 and 2018-0301-2598Details
electrical work for ti at suite 400. ref pa 2018-0123-9294 and 2018-0301-2598 | $50,000 |
| Mar 1, 2018 | Completed final sign-off Aug 2018 | 475 Brannan St | Golden Gate Fire Protection Inc | 4/f: fire sprinkler only - rleocate 2 pendent for & 1 add for new phone rooms for upwork exp ste #430. ref #201705237348. maher naDetails
4/f: fire sprinkler only - rleocate 2 pendent for & 1 add for new phone rooms for upwork exp ste #430. ref #201705237348. maher na | $750 |
| Mar 1, 2018 | Completed final sign-off May 2018 | 475 Brannan St | Skyline Construction | suite #400: demo of (e) reception wall for new glazing. adding hardware to existing door previously burried in wall construction. (ref approved pa #201801239294). maher naDetails
suite #400: demo of (e) reception wall for new glazing. adding hardware to existing door previously burried in wall construction. (ref approved pa #201801239294). maher na | $10,000 |
| Jan 30, 2018 | Completed final sign-off Mar 2018 | 475 Brannan St | Pyro-Comm Systems, Inc. | ti to 2nd fl - add fire alarm devices in tenant suite and connect to (e) fire alarm system. ref #201711284908. maher naDetails
ti to 2nd fl - add fire alarm devices in tenant suite and connect to (e) fire alarm system. ref #201711284908. maher na | $13,000 |
| Jan 23, 2018 | Completed final sign-off May 2018 | 475 Brannan St | Skyline Construction | suite #400: demo portion of extg demising wall for new fire rated door. new interior partitions and doors for 3 new phone rooms. n/a for maherDetails
suite #400: demo portion of extg demising wall for new fire rated door. new interior partitions and doors for 3 new phone rooms. n/a for maher | $300,000 |
| Jan 10, 2018 | Completed final sign-off Mar 2018 | 475 Brannan St | 2nd flr: fire sprinklers - one relocated and 8 added pendent heads, 28 relocated and 35 added upright heads. ref pa 201711284908 maher naDetails
2nd flr: fire sprinklers - one relocated and 8 added pendent heads, 28 relocated and 35 added upright heads. ref pa 201711284908 maher na | $12,377 | |
| Dec 20, 2017 | Completed final sign-off May 2018 | 475 Brannan St | M C S Construction Services | mep upgrades utilizing bse building services. lighting, power, plumbing, mech, t24 met no exterior work or structural ref 201711284908 maher not reqDetails
mep upgrades utilizing bse building services. lighting, power, plumbing, mech, t24 met no exterior work or structural ref 201711284908 maher not req | $750,000 |
| Nov 28, 2017 | Completed final sign-off May 2018 | 475 Brannan St | M C S Construction Services | 2nd flr, suite 230 - additional demo (ref 201708316557), refer to mech & ele plans. space is currently unoccupied. no exterior building site, landscape, use or parking changes are proposed maher naDetails
2nd flr, suite 230 - additional demo (ref 201708316557), refer to mech & ele plans. space is currently unoccupied. no exterior building site, landscape, use or parking changes are proposed maher na | $1,200,000 |
| Nov 7, 2017 | Completed final sign-off Nov 2017 | 475 Brannan St | Anderson, Rowe & Buckley, Inc. | 2/f- fire sprinklers: plug (7). t.i. pa#201708316557. n/a ordinance #155-13Details
2/f- fire sprinklers: plug (7). t.i. pa#201708316557. n/a ordinance #155-13 | $1,500 |
| Oct 6, 2017 | Expired or cancelled withdrawn Jun 2018 | 475 Brannan St | 3/f- t.i. to replace lights only with new. wall, carpet, hvac, plumbing to remain as is. no fire life safety work. lights only. n/a ordinance #155-13Details
3/f- t.i. to replace lights only with new. wall, carpet, hvac, plumbing to remain as is. no fire life safety work. lights only. n/a ordinance #155-13 | $100,000 | |
| Sep 14, 2017 | Completed final sign-off May 2018 | 475 Brannan St | M C S Construction Services | suite 220, 2nd fl: selective demo only of non-structural partitions, doors, ceilings, carpets. ref f/s permit #201708255997. maher na whole floor is vacant. ab-017 applies.Details
suite 220, 2nd fl: selective demo only of non-structural partitions, doors, ceilings, carpets. ref f/s permit #201708255997. maher na whole floor is vacant. ab-017 applies. | $30,000 |
| Aug 31, 2017 | Completed final sign-off May 2018 | 475 Brannan St | M C S Construction Services | 2/f-ste 230 selective demolition only of non structural partitions, doors, ceilings, light fixtures, ductwork, plumbing and millwork per ab-17. n/a ordinance #155-13Details
2/f-ste 230 selective demolition only of non structural partitions, doors, ceilings, light fixtures, ductwork, plumbing and millwork per ab-17. n/a ordinance #155-13 | $75,000 |
| Aug 25, 2017 | Completed final sign-off May 2018 | 475 Brannan St | Anderson, Rowe & Buckley, Inc. | remove 142 sprinklers, add 142 sprinklers to existing line outletsDetails
remove 142 sprinklers, add 142 sprinklers to existing line outlets | $28,000 |
| Aug 10, 2017 | Completed final sign-off Oct 2017 | 475 Brannan St | Accurate Contracting Inc.Dba Unispace Co | 4/f #420- office tenant improvement interior renovation, no changes in occupancy, use or egress, no renovation to exterior envelope. n/a ordinance #155-13Details
4/f #420- office tenant improvement interior renovation, no changes in occupancy, use or egress, no renovation to exterior envelope. n/a ordinance #155-13 | $300,000 |
| Jul 6, 2017 | Completed final sign-off Aug 2018 | 475 Brannan St | Pyro-Comm Systems, Inc. | unit 430: fa ti to suite #430: add (3) nac devices. connect to (e) fa system. pa #201705237348. maher naDetails
unit 430: fa ti to suite #430: add (3) nac devices. connect to (e) fa system. pa #201705237348. maher na | $1,000 |
| Jun 15, 2017 | Completed final sign-off Jul 2017 | 475 Brannan St | Golden Gate Fire Protection Inc | 4th floor: fire sprinklers ony. ref 201705237348. relocate 2 pendents for room 4301 maher naDetails
4th floor: fire sprinklers ony. ref 201705237348. relocate 2 pendents for room 4301 maher na | $500 |
| Jun 13, 2017 | Completed final sign-off Jul 2018 | 475 Brannan St | Skyline Construction | mechanical, electrical work for tenant improvement at suite 430 ref pa 2017-0523-7348. n/a maher ordinanceDetails
mechanical, electrical work for tenant improvement at suite 430 ref pa 2017-0523-7348. n/a maher ordinance | $35,000 |
| May 23, 2017 | Completed final sign-off Aug 2017 | 475 Brannan St | Skyline Construction | suite 430: new interior glazing, misc. electrical. no plumbing improvements. no structural work. no improvements to extg compliant restrooms. n/a for maherDetails
suite 430: new interior glazing, misc. electrical. no plumbing improvements. no structural work. no improvements to extg compliant restrooms. n/a for maher | $168,989 |
| May 11, 2017 | Completed final sign-off May 2017 | 475 Brannan St | Pyro-Comm Systems, Inc. | 1st flr: fa as builts to pa 201703030581 relocation of nae iv5-10 from column facing north to column facing west maher naDetails
1st flr: fa as builts to pa 201703030581 relocation of nae iv5-10 from column facing north to column facing west maher na | |
| Mar 29, 2017 | Completed final sign-off Aug 2018 | 475 Brannan St | Herrero Builders Incorporated | revision to pa# 201612155062, slight architectural changes. changes to hvac & plumbing systems; maher ord 155-13 naDetails
revision to pa# 201612155062, slight architectural changes. changes to hvac & plumbing systems; maher ord 155-13 na | |
| Mar 3, 2017 | Completed final sign-off Jul 2017 | 475 Brannan St | Pyro-Comm Systems, Inc. | 1st flr: fire alarm ti to suite 120 & 130. add new fire alarm devices to suites connect to (e) fire alarm system ref 201612155062. maher naDetails
1st flr: fire alarm ti to suite 120 & 130. add new fire alarm devices to suites connect to (e) fire alarm system ref 201612155062. maher na | $15,000 |
| Feb 22, 2017 | Completed final sign-off Aug 2018 | 475 Brannan St | Potter Fire Protection | add (14) fire sprinklers at new drop ceilings. ref pa 2016-1215-5062. maher naDetails
add (14) fire sprinklers at new drop ceilings. ref pa 2016-1215-5062. maher na | $7,000 |
| Dec 15, 2016 | Completed final sign-off Aug 2018 | 475 Brannan St | Herrero Builders Incorporated | suite 120 & 130; replace casework in breakroom, (n) power & data outlets in mail room. conference room & aisle (n) wall mounted screen & equipoment. replace finishes per schedule. suite 130 - reconfigure office & lab spaces. selective demo (n) partitions, floor finishes, painting, ceiling, lightingDetails
suite 120 & 130; replace casework in breakroom, (n) power & data outlets in mail room. conference room & aisle (n) wall mounted screen & equipoment. replace finishes per schedule. suite 130 - reconfigure office & lab spaces. selective demo (n) partitions, floor finishes, painting, ceiling, lighting | $800,000 |
| Dec 13, 2016 | Completed final sign-off Jan 2017 | 475 Brannan St | Peacock Construction | 3rd flr - electrical only: change out (e) incandescent and flourscent lighting fixtures to led. power and data for av devices and furniture. maher naDetails
3rd flr - electrical only: change out (e) incandescent and flourscent lighting fixtures to led. power and data for av devices and furniture. maher na | $180,000 |
| Jul 8, 2016 | Expired or cancelled cancelled Jun 2018 | 475 Brannan St | Pioneer Fire Inc. | 2ndflr: relocate 1 head, relocate 2 uprights remove 3 uprights maher naDetails
2ndflr: relocate 1 head, relocate 2 uprights remove 3 uprights maher na | $4,755 |
| May 19, 2016 | Completed final sign-off Nov 2016 | 475 Brannan St | Field Construction Inc. | unit #210: partial retrofit: lighting, power & signal, wiring, lighting, & redepticle controls. ref app#201605137442.Details
unit #210: partial retrofit: lighting, power & signal, wiring, lighting, & redepticle controls. ref app#201605137442. | |
| May 13, 2016 | Completed final sign-off Nov 2016 | 475 Brannan St | Field Construction Inc. | #210: commercial t.i. which includes demolition on non-structural partitions, light fixtures, electrical devices, millwork, and finishes. construction of millwork, finishes, plumbing fixtures, light fixtures, and electrical. n/a for maher.Details
#210: commercial t.i. which includes demolition on non-structural partitions, light fixtures, electrical devices, millwork, and finishes. construction of millwork, finishes, plumbing fixtures, light fixtures, and electrical. n/a for maher. | $75,000 |
| Apr 27, 2016 | Completed final sign-off Jun 2016 | 475 Brannan St | Pyro-Comm Systems, Inc. | 2nd floor, suite 210: new fire alarm devices added in an (e) bld to include: 1 horn/strobe, 2 strobes. maher anDetails
2nd floor, suite 210: new fire alarm devices added in an (e) bld to include: 1 horn/strobe, 2 strobes. maher an | $1,500 |
| Apr 26, 2016 | Completed final sign-off Apr 2016 | 475 Brannan St | Bcci Construction Company | new furniture hookup, no lighting. mech title 24 201603212563; mech plan check review.Details
new furniture hookup, no lighting. mech title 24 201603212563; mech plan check review. | $35,000 |
| Mar 21, 2016 | Completed final sign-off Apr 2016 | 475 Brannan St | Bcci Construction Company | ste 330, selective demolition of existing multi-tenant floor. demolition of existing walls & finishes. maher naDetails
ste 330, selective demolition of existing multi-tenant floor. demolition of existing walls & finishes. maher na | $100,000 |
| Jan 20, 2016 | Completed final sign-off Feb 2016 | 475 Brannan St | Sprig Electric (Archkey Solutions) | suite #200 and #300: title 24 -electrical new furniture feeds, new receptacles. ref. app #20105206759.Details
suite #200 and #300: title 24 -electrical new furniture feeds, new receptacles. ref. app #20105206759. | $65,000 |
| Dec 14, 2015 | Completed final sign-off Feb 2016 | 475 Brannan St | Skyline Construction | revision to 201506169077 per field insp. change door from 20 rated to 25 min rated. change wall to chain link fence. compliance with maher ordinance no 155-13Details
revision to 201506169077 per field insp. change door from 20 rated to 25 min rated. change wall to chain link fence. compliance with maher ordinance no 155-13 | |
| Aug 21, 2015 | Completed final sign-off Sep 2015 | 475 Brannan St | Pyro-Comm Systems, Inc. | 4th flr/ suite 430: new fire alarm for a ti to an (e) bld to include: 1 power supply, 21 horn/strobes, 6 strobes. maher na ref pa #201506169077Details
4th flr/ suite 430: new fire alarm for a ti to an (e) bld to include: 1 power supply, 21 horn/strobes, 6 strobes. maher na ref pa #201506169077 | $6,430 |
| Aug 20, 2015 | Completed final sign-off Jul 2018 | 475 Brannan St | Skyline Construction | 4th floor, suite 430: revision to pa 2015 0714 1405. mechanical scope of work. arch - 2015 0618 9077, mech - 2015 0714 1405. maher naDetails
4th floor, suite 430: revision to pa 2015 0714 1405. mechanical scope of work. arch - 2015 0618 9077, mech - 2015 0714 1405. maher na | |
| Aug 11, 2015 | Completed final sign-off Sep 2015 | 475 Brannan St | Intelligent Technologies & Services Inc | demo 3 of 4 zones of clean agent & pre-action. complete removal of clean agent. n/a ordinance #155-13Details
demo 3 of 4 zones of clean agent & pre-action. complete removal of clean agent. n/a ordinance #155-13 | $2,500 |
| Jul 14, 2015 | Completed final sign-off Jul 2018 | 475 Brannan St | Skyline Construction | suite 430: mechanical and electrical work for tenant improvement on the 4th fl. ref bpa#201506169077.Details
suite 430: mechanical and electrical work for tenant improvement on the 4th fl. ref bpa#201506169077. | $120,000 |
| Jul 13, 2015 | Completed final sign-off Aug 2015 | 475 Brannan St | Golden Gate Fire Protection Inc | 4th fl: fire sprinkler only, add 19 sprinkler pendents for upwork, t.i. pa#2015-0616-9077. n/a ordinance #155-13Details
4th fl: fire sprinkler only, add 19 sprinkler pendents for upwork, t.i. pa#2015-0616-9077. n/a ordinance #155-13 | $9,500 |
| Jun 16, 2015 | Completed final sign-off Jul 2018 | 475 Brannan St | Skyline Construction | 4th floor suite 430 - new interior partitions & doors, misc electrical, hvac & plumbing improvements. no structural work (folding partition submitted separately), no improvements to existing compliant restrooms. n/a maher ordinanceDetails
4th floor suite 430 - new interior partitions & doors, misc electrical, hvac & plumbing improvements. no structural work (folding partition submitted separately), no improvements to existing compliant restrooms. n/a maher ordinance | $925,462 |
| Jun 11, 2015 | Completed final sign-off Jul 2018 | 475 Brannan St | Skyline Construction | demo non load bearing walls, doors, finishes ab017 maher not reqDetails
demo non load bearing walls, doors, finishes ab017 maher not req | $5,000 |
| May 28, 2015 | Completed final sign-off Jan 2016 | 475 Brannan St | Acco Engineered Systems Inc. Dba Acco En | 2nd/3rd flr: rebalance (e) vav boxes to serve (n) zones as shown. upsize boxes and redistribute ductwork as needed for new zones. provide and install 2 water source heat pumps. ref app#201505206759. maher naDetails
2nd/3rd flr: rebalance (e) vav boxes to serve (n) zones as shown. upsize boxes and redistribute ductwork as needed for new zones. provide and install 2 water source heat pumps. ref app#201505206759. maher na | $150,000 |
| May 20, 2015 | Completed final sign-off Feb 2016 | 475 Brannan St | Bcci Construction Company | #200 & #300 commercial t.i. which includes new non-structural partitoins, millwork, electrical, teledata, demolition under pa #2015055144. n/a maher ordinanceDetails
#200 & #300 commercial t.i. which includes new non-structural partitoins, millwork, electrical, teledata, demolition under pa #2015055144. n/a maher ordinance | $790,000 |
| May 20, 2015 | Completed final sign-off Jun 2015 | 475 Brannan St | Pribuss Engineering Inc | suite #300: fire sprinkler t.i. under appl. 2015.0501.5144. relocate and changing 2 heads. maher n/a.Details
suite #300: fire sprinkler t.i. under appl. 2015.0501.5144. relocate and changing 2 heads. maher n/a. | $1,030 |
| May 1, 2015 | Completed final sign-off Jul 2015 | 475 Brannan St | Bcci Construction Company | suite # 200 & 300: pre construction demolition under ab-017 includes demolition of non-structural partitions, doors, millwork and finishes. fire & ls to remain operational. n/a for the maher ordinanceti under sep permtDetails
suite # 200 & 300: pre construction demolition under ab-017 includes demolition of non-structural partitions, doors, millwork and finishes. fire & ls to remain operational. n/a for the maher ordinanceti under sep permt | $110,000 |
| Dec 9, 2014 | Expired or cancelled cancelled Feb 2015 | 475 Brannan St | Skyline Construction | 4th floor: demolition of extg non-structural partitions and millwork. mep and life safety under seperate permit. n/a for the maher.Details
4th floor: demolition of extg non-structural partitions and millwork. mep and life safety under seperate permit. n/a for the maher. | $10,000 |
| Oct 3, 2014 | Completed final sign-off Jul 2015 | 475 Brannan St | ste #110:revision to pa#201403251636. add structural details for steelcase system.Details
ste #110:revision to pa#201403251636. add structural details for steelcase system. | $100,000 | |
| Aug 21, 2014 | Completed final sign-off Oct 2014 | 475 Brannan St | Golden Gate Fire Protection Inc | 1st floor - relocate 8 pendent sprinkler heads. ref ti #2014.0325.1636. n/a maher ordinanceDetails
1st floor - relocate 8 pendent sprinkler heads. ref ti #2014.0325.1636. n/a maher ordinance | $4,120 |
| Jun 30, 2014 | Never finaled issued Sep 2014, no final | 475 Brannan St | Bevilacqua & Sons | ground floor - work includes new partial height walls & galss partitions & doors. no exterior work. (building is equipped with full automatic sprinkler system). compliance with maher ordinance no 155-13 not required.Details
ground floor - work includes new partial height walls & galss partitions & doors. no exterior work. (building is equipped with full automatic sprinkler system). compliance with maher ordinance no 155-13 not required. | $20,374 |
| May 30, 2014 | Completed final sign-off Oct 2018 | 475 Brannan St | Gci, Inc | non-structural demo on 4th floor to include: partitions, doors, glazing, millwork, etc. space to remain vacant per ab-017 until the time of t.i.Details
non-structural demo on 4th floor to include: partitions, doors, glazing, millwork, etc. space to remain vacant per ab-017 until the time of t.i. | $50,000 |
| May 7, 2014 | Completed final sign-off May 2014 | 475 Brannan St | Pacific Auxiliary Fire Alarm | add one horn/strobe & one strobe and relocate two existing smoke detectors, , ref. approved bldng permit # 201404042430Details
add one horn/strobe & one strobe and relocate two existing smoke detectors, , ref. approved bldng permit # 201404042430 | $2,000 |
| Apr 4, 2014 | Completed final sign-off May 2014 | 475 Brannan St | South Bay Construction | ste #230, 2nd flr: tenant improvement of exisitng office/lab spaceDetails
ste #230, 2nd flr: tenant improvement of exisitng office/lab space | $31,656 |
| Mar 25, 2014 | Completed final sign-off Jul 2015 | 475 Brannan St | Gci, Inc | 1st floor - minor non-structural demolition. new demountable partitions and furniture, finishes, acoustic ceiling. relocate exist. hvac ducting, lighting. office system showroom for retail prupose, renovtion of existing showroom.Details
1st floor - minor non-structural demolition. new demountable partitions and furniture, finishes, acoustic ceiling. relocate exist. hvac ducting, lighting. office system showroom for retail prupose, renovtion of existing showroom. | $114,000 |
| Oct 19, 2012 | Completed final sign-off Jan 2013 | 475 Brannan St | Principal Builders Inc. | 3rd & 4th floors-minor wall demolition on 2 floors, minor floor demolition & installation of new millwork & furnitureDetails
3rd & 4th floors-minor wall demolition on 2 floors, minor floor demolition & installation of new millwork & furniture | $100,000 |
| Oct 17, 2012 | Completed final sign-off Nov 2012 | 475 Brannan St | Pacific Auxiliary Fire Alarm | 3rd floor. add 1 power supply, 1 control module, 1 manual alarm, 19 horn/strobes 6 strobes & replace two (e) horn/strobes. const. permit #2012-10-04-1304Details
3rd floor. add 1 power supply, 1 control module, 1 manual alarm, 19 horn/strobes 6 strobes & replace two (e) horn/strobes. const. permit #2012-10-04-1304 | $26,500 |
| Oct 16, 2012 | Completed final sign-off May 2018 | 475 Brannan St | Anderson, Rowe & Buckley, Inc. | 3rd floor:extg fire sprinkler system.t.i.:2 added sprinklers,3 relocated sprinklers,2 removed sprinklers. app#201210041304.Details
3rd floor:extg fire sprinkler system.t.i.:2 added sprinklers,3 relocated sprinklers,2 removed sprinklers. app#201210041304. | $3,500 |
| Oct 4, 2012 | Completed final sign-off Nov 2012 | 475 Brannan St | Dpr Construction | partial floor ti on 3rd floor to demo & construct new partitions doors & finishes electrical, mechanical for sprinklers, life safety on separate permitDetails
partial floor ti on 3rd floor to demo & construct new partitions doors & finishes electrical, mechanical for sprinklers, life safety on separate permit | $206,000 |
| Aug 28, 2012 | Never finaled issued Aug 2012, no final | 475 Brannan St | obtain final inspection for work approved under pa# 2008-0403-8718. all work is completeDetails
obtain final inspection for work approved under pa# 2008-0403-8718. all work is complete | ||
| Mar 12, 2012 | Completed final sign-off Oct 2013 | 475 Brannan St | Rubecon General Contracting Inc | voluntary seismic mitigation at entry canopy.Details
voluntary seismic mitigation at entry canopy. | $14,000 |
| Sep 21, 2011 | Never finaled issued Sep 2011, no final | 475 Brannan St | Legacy Mechanical & Energy Services, Inc | heat pump on ceiling for lab to serve labDetails
heat pump on ceiling for lab to serve lab | $21,000 |
| Aug 5, 2011 | Completed final sign-off Jun 2012 | 475 Brannan St | Gci, Inc | hvac work for new office in extg tenant space to add one new vav box and thermostat, new supply and return diffusers, demo partial duct work and relocate one supply grille. please refer to app#201104144066.Details
hvac work for new office in extg tenant space to add one new vav box and thermostat, new supply and return diffusers, demo partial duct work and relocate one supply grille. please refer to app#201104144066. | $16,847 |
| Jul 19, 2011 | Completed final sign-off Aug 2011 | 475 Brannan St | Ayoob & Peery Plumbing Co Inc | add and relocate fire sprinkler heads per tenant imp. (3 add,3 relocate)Details
add and relocate fire sprinkler heads per tenant imp. (3 add,3 relocate) | $3,000 |
| Jul 19, 2011 | Completed final sign-off Oct 2011 | 475 Brannan St | Fisher Development Inc | floor 4, ste 430 t.t. office-new reception desk,finishes, replace (e) sconces w/like kind, (1) new wall sconces @ lobby, (1) new 5 ton hvac unit to supply rooms #4102 & 4104, replace (5) (e) doors w/glass lite doors, new sliding doors @ rooms #4072 &4070. mech, elec, fire protection under separateDetails
floor 4, ste 430 t.t. office-new reception desk,finishes, replace (e) sconces w/like kind, (1) new wall sconces @ lobby, (1) new 5 ton hvac unit to supply rooms #4102 & 4104, replace (5) (e) doors w/glass lite doors, new sliding doors @ rooms #4072 &4070. mech, elec, fire protection under separate | $100,000 |
| Apr 18, 2011 | Completed final sign-off May 2012 | 475 Brannan St | Pacific Auxiliary Fire Alarm | add 4 horn/strobe & replace 1 extg horn/strobe due to a tenant impr. of the 4th floor.Details
add 4 horn/strobe & replace 1 extg horn/strobe due to a tenant impr. of the 4th floor. | $3,100 |
| Apr 15, 2011 | Completed final sign-off Jun 2012 | 475 Brannan St | Gci, Inc | revision to hvac permit app#201103293043 to reflect addition of one heat pump and minor demo work to be moved to different location from previously approved permitDetails
revision to hvac permit app#201103293043 to reflect addition of one heat pump and minor demo work to be moved to different location from previously approved permit | $180 |
| Apr 14, 2011 | Completed final sign-off Nov 2011 | 475 Brannan St | Gci, Inc | add 2 private offices within extg suite. extg lighting, hvac and sprinklers/life safety to be reworked for new layout.Details
add 2 private offices within extg suite. extg lighting, hvac and sprinklers/life safety to be reworked for new layout. | $31,750 |
| Apr 1, 2011 | Completed final sign-off Jun 2012 | 475 Brannan St | Gci, Inc | 4th floor-relocating & installing new light fixtures, switches, outlets & equipment for new t.i. space. please refer to pa# 2011-0314-1990 for t.i. permitDetails
4th floor-relocating & installing new light fixtures, switches, outlets & equipment for new t.i. space. please refer to pa# 2011-0314-1990 for t.i. permit | $35,617 |
| Mar 30, 2011 | Completed final sign-off Apr 2011 | 475 Brannan St | Ayoob & Peery Plumbing Co Inc | relocate and add fire sprinkler. heads per tenant improvements. 16 relocate,5 addDetails
relocate and add fire sprinkler. heads per tenant improvements. 16 relocate,5 add | $10,000 |
| Mar 29, 2011 | Completed final sign-off Feb 2013 | 475 Brannan St | Gci, Inc | mechanical work for ti on 4th floor to install new vav boxes, grills, diffusers and thermostat.1 new fire damper, 1 new exhaust fan and relocate extg equipment. phase refer to app#201103141990 for ti work.Details
mechanical work for ti on 4th floor to install new vav boxes, grills, diffusers and thermostat.1 new fire damper, 1 new exhaust fan and relocate extg equipment. phase refer to app#201103141990 for ti work. | $33,970 |
| Mar 14, 2011 | Completed final sign-off May 2012 | 475 Brannan St | Gci, Inc | new ti to include demo and construction of non load bearing partitions, doors,frames,mill work and finishes. no increase in office space. mep, ls, sp separate permitDetails
new ti to include demo and construction of non load bearing partitions, doors,frames,mill work and finishes. no increase in office space. mep, ls, sp separate permit | $286,905 |
| Jan 13, 2011 | Completed final sign-off Apr 2011 | 475 Brannan St | 1st floor-sprinkler system upgrade, add 6 sidewall sprinkler heads.Details
1st floor-sprinkler system upgrade, add 6 sidewall sprinkler heads. | $3,000 | |
| Jan 6, 2011 | Completed final sign-off May 2011 | 475 Brannan St | Gci, Inc | 3rd floor addiiton of new fixtures to accommodate new work space of existing tenant space electrical/lighting only. refer to pa #201012015905 for t.i. work.Details
3rd floor addiiton of new fixtures to accommodate new work space of existing tenant space electrical/lighting only. refer to pa #201012015905 for t.i. work. | $9,000 |
| Dec 29, 2010 | Completed final sign-off Feb 2011 | 475 Brannan St | Ayoob & Peery Plumbing Co Inc | relocate & add fire sprinkler heads per tenant improvement. (1add & 3 relocate)Details
relocate & add fire sprinkler heads per tenant improvement. (1add & 3 relocate) | $2,000 |
| Dec 27, 2010 | Completed final sign-off Feb 2011 | 475 Brannan St | Gci, Inc | mechanical work only.relocate existing supply and return grills and thermostats. add one new vav box. ti approved under pa# 201012.01.5905.Details
mechanical work only.relocate existing supply and return grills and thermostats. add one new vav box. ti approved under pa# 201012.01.5905. | $18,000 |
| Dec 1, 2010 | Completed final sign-off Apr 2011 | 475 Brannan St | Gci, Inc | 3rd floor suite 320 - addition of two private offices in previously improved space.Details
3rd floor suite 320 - addition of two private offices in previously improved space. | $25,000 |
| Sep 30, 2010 | Expired or cancelled cancelled Jul 2012 | 475 Brannan St | Rubecon General Contracting Inc | 4th floor #430 - demolish & remove approx 250 lf of non-structural, non-rated sheetrock partitions. safe off electrical, patch & paint. relocation of sprinklers under separate permit if required.Details
4th floor #430 - demolish & remove approx 250 lf of non-structural, non-rated sheetrock partitions. safe off electrical, patch & paint. relocation of sprinklers under separate permit if required. | $15,000 |
| Sep 30, 2010 | Completed final sign-off Jun 2012 | 475 Brannan St | Rubecon General Contracting Inc | 4th floor #420 -demolish & remove approx 80ft of non-structural, non-rated sheetrock partitions, safe off electrical patch & paint. reclocation of sprinklers if required under separate permit.Details
4th floor #420 -demolish & remove approx 80ft of non-structural, non-rated sheetrock partitions, safe off electrical patch & paint. reclocation of sprinklers if required under separate permit. | $10,000 |
| Aug 12, 2010 | Expired or cancelled expired Mar 2013 | 475 Brannan St | to obtain final inspection for work approved under pa#200804038718. all work is complete.Details
to obtain final inspection for work approved under pa#200804038718. all work is complete. | ||
| Jun 22, 2009 | Completed final sign-off Jun 2009 | 475 Brannan St | Howard S. Wright Constructors Lp | 3rd floor install 2 fire smoke dampers.Details
3rd floor install 2 fire smoke dampers. | $1,500 |
| Jun 12, 2009 | Completed final sign-off Jun 2009 | 475 Brannan St | Howard S. Wright Constructors Lp | upgrade existing computer room walls to 1-hr. at 3rd. flr. repair/replace bathroom door closers. mep under separate permitDetails
upgrade existing computer room walls to 1-hr. at 3rd. flr. repair/replace bathroom door closers. mep under separate permit | $3,300 |
| May 27, 2009 | Completed final sign-off Oct 2012 | 475 Brannan St | Pacific Auxiliary Fire Alarm | adding 1 smoke detector and 3 relays to existing fire alarm system for server room on 3rd fl.Details
adding 1 smoke detector and 3 relays to existing fire alarm system for server room on 3rd fl. | $5,000 |
| May 1, 2009 | Completed final sign-off Aug 2009 | 475 Brannan St | Gci, Inc | ref pa #200904146271 for t.i. new lighting plan for 3rd fl to remove/relocate and add new fixtures and outlets.Details
ref pa #200904146271 for t.i. new lighting plan for 3rd fl to remove/relocate and add new fixtures and outlets. | $200,719 |
| Apr 28, 2009 | Completed final sign-off Aug 2009 | 475 Brannan St | Gci, Inc | hvac- to reconfigure hvac system on third (3rd) floor ti, please refer to pa#2009/0414/6271.Details
hvac- to reconfigure hvac system on third (3rd) floor ti, please refer to pa#2009/0414/6271. | $163,780 |
| Apr 24, 2009 | Completed final sign-off Aug 2009 | 475 Brannan St | Pacific Auxiliary Fire Alarm | add 1 smoke detector, 10 horn/strobes, 5 strobes, 1 sync mdule for tenant improvement on the 3rd floor and 1 s.l.c. loop expander at facp.Details
add 1 smoke detector, 10 horn/strobes, 5 strobes, 1 sync mdule for tenant improvement on the 3rd floor and 1 s.l.c. loop expander at facp. | $14,000 |
| Apr 22, 2009 | Completed final sign-off Jun 2009 | 475 Brannan St | Ayoob & Peery Plumbing Co Inc | add and relocate fire srpinker heads per tenant improvment. 0 adds, 43 relocatesDetails
add and relocate fire srpinker heads per tenant improvment. 0 adds, 43 relocates | $9,500 |
| Apr 14, 2009 | Completed final sign-off Aug 2009 | 475 Brannan St | Gci, Inc | #320- interior non structural tenant improvement of suite 320 . all mep, sprinkler and fire alarm will be under seperate permitDetails
#320- interior non structural tenant improvement of suite 320 . all mep, sprinkler and fire alarm will be under seperate permit | $1,067,750 |
| Nov 18, 2008 | Completed final sign-off Feb 2009 | 475 Brannan St | install sprinkler head in four fume hoodsDetails
install sprinkler head in four fume hoods | $800 | |
| Sep 24, 2008 | Completed final sign-off Feb 2009 | 475 Brannan St | Pacific Auxiliary Fire Alarm | addition of 2 duct detectors, 1 module, 2 srelays, relocating 2 strobes due to tenant improvment on the 1st floor. work being don on 1st and 2nd floorsDetails
addition of 2 duct detectors, 1 module, 2 srelays, relocating 2 strobes due to tenant improvment on the 1st floor. work being don on 1st and 2nd floors | $6,000 |
| Sep 24, 2008 | Completed final sign-off Dec 2008 | 475 Brannan St | Mc Millan Electric | access control system installation within 2nd floor tenant areaDetails
access control system installation within 2nd floor tenant area | $100,000 |
| Sep 12, 2008 | Completed final sign-off Dec 2008 | 475 Brannan St | documentation purpose only. no construction under this permit provide clarification for final inspection for pa# 2008/05/09/1746. correct the description for the proposed use to be surgical training center. not medical office.Details
documentation purpose only. no construction under this permit provide clarification for final inspection for pa# 2008/05/09/1746. correct the description for the proposed use to be surgical training center. not medical office. | ||
| Sep 8, 2008 | Completed final sign-off Sep 2008 | 475 Brannan St | retrofit work on sprinkler system; add 33 new head throughout four floors.Details
retrofit work on sprinkler system; add 33 new head throughout four floors. | $15,600 | |
| Aug 12, 2008 | Completed final sign-off Feb 2009 | 475 Brannan St | convert existing open office to b-occupancy lab. convert existing storage to clinical lab (b- occupancy) to match adjacent lab. on 1st floor. no exterior work. sprinkler & fire alarm under separate permit.Details
convert existing open office to b-occupancy lab. convert existing storage to clinical lab (b- occupancy) to match adjacent lab. on 1st floor. no exterior work. sprinkler & fire alarm under separate permit. | $100,000 | |
| Jul 9, 2008 | Completed final sign-off Dec 2008 | 475 Brannan St | Pacific Auxiliary Fire Alarm | additions to extg fire alarm system due to tenant improvement on part of 2nd floorDetails
additions to extg fire alarm system due to tenant improvement on part of 2nd floor | $30,000 |
| Jun 2, 2008 | Completed final sign-off Dec 2008 | 475 Brannan St | fire sprinkler tenant improvements on 1st lab & 2nd floor office, relocate 47 pend. add 80 pend. reloc uprights, added uprights- total 127 heads.Details
fire sprinkler tenant improvements on 1st lab & 2nd floor office, relocate 47 pend. add 80 pend. reloc uprights, added uprights- total 127 heads. | $26,500 | |
| May 9, 2008 | Completed final sign-off Dec 2008 | 475 Brannan St | remodel ex. cpmc tenant space on the 2/f expand existing clinical lab and new surgical training center. new mechanical duct on exterior of bldg. no structural work, fire alarm and sprinkler under a separate permit. "umbrella" permit to verify "fully sprinklered" bldg. required by fire dept.Details
remodel ex. cpmc tenant space on the 2/f expand existing clinical lab and new surgical training center. new mechanical duct on exterior of bldg. no structural work, fire alarm and sprinkler under a separate permit. "umbrella" permit to verify "fully sprinklered" bldg. required by fire dept. | $2,800,000 | |
| Apr 3, 2008 | Expired or cancelled expired Mar 2013 | 475 Brannan St | structural work only-new openings in tenant space and structural supports for new mechanical equipment. mep, sprinkler and fire alarm will be under seperate permitDetails
structural work only-new openings in tenant space and structural supports for new mechanical equipment. mep, sprinkler and fire alarm will be under seperate permit | $50,000 | |
| Mar 17, 2008 | Completed final sign-off Dec 2008 | 475 Brannan St | 1st & 2nd floors only - interior non-structural demolition of zone 1.Details
1st & 2nd floors only - interior non-structural demolition of zone 1. | $20,000 | |
| Sep 11, 2007 | Never finaled issued Sep 2007, no final | 475 Brannan St | street space and sidewalk repair | ||
| Dec 6, 2006 | Completed final sign-off Mar 2007 | 475 Brannan St | Rubecon General Contracting Inc | create new 1 hr. rate partition in an existing suite to make 2 suites. work on 3/f. sprinkler, hvac, electrical and life safety on seperate permit.Details
create new 1 hr. rate partition in an existing suite to make 2 suites. work on 3/f. sprinkler, hvac, electrical and life safety on seperate permit. | $35,000 |
| Aug 24, 2006 | Completed final sign-off Nov 2006 | 475 Brannan St | Swinerton Builders | revision to appl#200505122244 for sffd review. exit door with special egress control device located on 4th floor.Details
revision to appl#200505122244 for sffd review. exit door with special egress control device located on 4th floor. | $1,000 |
| May 30, 2006 | Completed final sign-off Nov 2006 | 475 Brannan St | Pacific Auxiliary Fire Alarm | installation of 3 smoke detectores on the 4th floor and a new annundator module at the facp. also includes relocation of 2 stobesDetails
installation of 3 smoke detectores on the 4th floor and a new annundator module at the facp. also includes relocation of 2 stobes | $3,000 |
| May 2, 2006 | Completed final sign-off Nov 2006 | 475 Brannan St | Anderson, Rowe & Buckley, Inc. | t.i (e) spkr. system, 13 new spkrs below.Details
t.i (e) spkr. system, 13 new spkrs below. | $2,600 |
| Aug 9, 2005 | Expired or cancelled expired Nov 2006 | 475 Brannan St | Acco Engineered Systems Inc. Dba Acco En | (1) exhaust fan, (1) vav box mechanical onlyDetails
(1) exhaust fan, (1) vav box mechanical only | $17,000 |
| May 12, 2005 | Completed final sign-off Nov 2006 | 475 Brannan St | Swinerton Builders | oti-1, 4th fl. el, me ls, sp.Details
oti-1, 4th fl. el, me ls, sp. | $400,000 |
| Mar 14, 2005 | Expired or cancelled expired Nov 2006 | 475 Brannan St | Novo Construction Inc | oti 1- 4th fl | $104,000 |
| Feb 25, 2005 | Completed final sign-off Apr 2005 | 475 Brannan St | Dpw Inc. | modify exist sprinkler system on 1st floor only per plan.Details
modify exist sprinkler system on 1st floor only per plan. | $13,000 |
| Feb 11, 2005 | Completed final sign-off Apr 2005 | 475 Brannan St | Young Electric Co | install new power supply , add additional speaker & fsd's.Details
install new power supply , add additional speaker & fsd's. | $10,000 |
| Dec 28, 2004 | Completed final sign-off Jul 2005 | 475 Brannan St | Rubecon General Contracting Inc | wood beam repairs inject epoxy grout in 2 crack beams/install 1 pair 8' bolted stich plates onDetails
wood beam repairs inject epoxy grout in 2 crack beams/install 1 pair 8' bolted stich plates on | $3,000 |
| Dec 23, 2004 | Completed final sign-off Jun 2005 | 475 Brannan St | rev. to appl#200411108901 new retractable wall in conference room,new paritions in electrical room &Details
rev. to appl#200411108901 new retractable wall in conference room,new paritions in electrical room & | $82,000 | |
| Dec 20, 2004 | Completed final sign-off Apr 2005 | 475 Brannan St | mechanical & electrical work for 1st floor tenant.Details
mechanical & electrical work for 1st floor tenant. | $100,000 | |
| Nov 12, 2004 | Completed final sign-off Jan 2005 | 475 Brannan St | Cupertino Electric Inc. | modify fire alarm system on 1st floor. remove 14, horen, strobes during demo, remodel and reinstallDetails
modify fire alarm system on 1st floor. remove 14, horen, strobes during demo, remodel and reinstall | $2,300 |
| Nov 10, 2004 | Completed final sign-off Apr 2005 | 475 Brannan St | remodel of 1st floor tenant space, mep under seperate permit.Details
remodel of 1st floor tenant space, mep under seperate permit. | $523,390 | |
| Oct 14, 2004 | Completed final sign-off Nov 2004 | 475 Brannan St | Ayoob & Peery Plumbing Co Inc | relocate fire sprinkler per tenant improvements.Details
relocate fire sprinkler per tenant improvements. | $4,250 |
| Sep 23, 2004 | Completed final sign-off Jan 2005 | 475 Brannan St | repair dryrot on 1st floor 2 columns and select floor area. disabled access floorunder 200405073378.Details
repair dryrot on 1st floor 2 columns and select floor area. disabled access floorunder 200405073378. | $35,000 | |
| Aug 27, 2004 | Completed final sign-off Nov 2004 | 475 Brannan St | Swinerton Builders | oti-2 4th floor elDetails
oti-2 4th floor el | $7,500 |
| Aug 27, 2004 | Completed final sign-off Nov 2004 | 475 Brannan St | Swinerton Builders | oti-2 3rd floor elDetails
oti-2 3rd floor el | $10,000 |
| Aug 11, 2004 | Completed final sign-off Jan 2005 | 475 Brannan St | fire sprinkler t/i to 1st floor research offices/ lab/relocate 62/add 4/delete 9 sprinklerDetails
fire sprinkler t/i to 1st floor research offices/ lab/relocate 62/add 4/delete 9 sprinkler | $14,100 | |
| Aug 11, 2004 | Completed final sign-off Jan 2005 | 475 Brannan St | oti-3 2nd floor sp onlyDetails
oti-3 2nd floor sp only | $9,800 | |
| Jul 30, 2004 | Completed final sign-off Jan 2005 | 475 Brannan St | new mechanical electrical and plumbing for 1st floor tenant improvement architectural approved underDetails
new mechanical electrical and plumbing for 1st floor tenant improvement architectural approved under | $850,000 | |
| Jun 1, 2004 | Completed final sign-off Aug 2004 | 475 Brannan St | interior non-structurl demo for 1stDetails
interior non-structurl demo for 1st | $5,000 | |
| May 12, 2004 | Completed final sign-off Jan 2005 | 475 Brannan St | oti-2 2nd floor me, elDetails
oti-2 2nd floor me, el | $85,000 | |
| May 7, 2004 | Completed final sign-off Jan 2005 | 475 Brannan St | tenant improvement 1st floor architectural onlyDetails
tenant improvement 1st floor architectural only | $1,428,466 | |
| May 7, 2004 | Expired or cancelled withdrawn Jun 2004 | 475 Brannan St | mmi-2 1st floor el,me | $1,000,000 | |
| May 7, 2004 | Completed final sign-off Jan 2005 | 475 Brannan St | oti-1 2nd floor el,me,ls,spDetails
oti-1 2nd floor el,me,ls,sp | $465,800 | |
| May 5, 2004 | Completed final sign-off Aug 2004 | 475 Brannan St | 2/f- non-structural interior soft demo of partial 2/fDetails
2/f- non-structural interior soft demo of partial 2/f | $10,000 | |
| Apr 7, 2004 | Completed final sign-off Nov 2004 | 475 Brannan St | Swinerton Builders | oti-1 3rd floor, el, me, l/s, spDetails
oti-1 3rd floor, el, me, l/s, sp | $80,000 |
| Apr 7, 2004 | Completed final sign-off Nov 2004 | 475 Brannan St | Swinerton Builders | oti-1 4th floor, el, me, l/s, spDetails
oti-1 4th floor, el, me, l/s, sp | $80,000 |
| Dec 1, 2003 | Completed final sign-off Apr 2004 | 475 Brannan St | Skyline Construction | revision to app#2003/05/07/3972.Details
revision to app#2003/05/07/3972. | $100 |
| Sep 25, 2003 | Completed final sign-off Apr 2004 | 475 Brannan St | Skyline Construction | fire sprinkler work on ground floor, no increase in spaceDetails
fire sprinkler work on ground floor, no increase in space | $4,000 |
| May 7, 2003 | Completed final sign-off Apr 2004 | 475 Brannan St | oti-1, 1st fl, el,me, ls, spDetails
oti-1, 1st fl, el,me, ls, sp | $100,000 | |
| Jun 19, 2002 | Expired or cancelled cancelled Mar 2003 | 475 Brannan St | change of doors at entry to lobby area fr solid rat to regulr glass doors rev to ap #200111072614Details
change of doors at entry to lobby area fr solid rat to regulr glass doors rev to ap #200111072614 | $5,000 | |
| May 13, 2002 | Completed final sign-off Jul 2002 | 475 Brannan St | Sasco | fire alarm system- tenant improvement for signature boiscience phase 2Details
fire alarm system- tenant improvement for signature boiscience phase 2 | $17,000 |
| May 2, 2002 | Completed final sign-off May 2002 | 475 Brannan St | Swinerton Builders | renew 200011024769,200103285416, 9924752,200006273780,200010264147Details
renew 200011024769,200103285416, 9924752,200006273780,200010264147 | |
| May 2, 2002 | Completed final sign-off Jun 2002 | 475 Brannan St | Swinerton Builders | to renew 200108317309,200004046295,200004046294 first floor ti improvementDetails
to renew 200108317309,200004046295,200004046294 first floor ti improvement | |
| May 2, 2002 | Completed final sign-off Jun 2002 | 475 Brannan St | Swinerton Builders | renew 200003083742,200003083743,200007276339, 200003204784 2nd floor tenant improvementDetails
renew 200003083742,200003083743,200007276339, 200003204784 2nd floor tenant improvement | |
| Apr 12, 2002 | Completed final sign-off Jul 2002 | 475 Brannan St | Walschon Fire Protection Inc | add and relocate automatic fire sprinkler systems as required per codeDetails
add and relocate automatic fire sprinkler systems as required per code | $23,885 |
| Mar 15, 2002 | Completed final sign-off Jul 2002 | 475 Brannan St | 1st fl new int. partition for office & lab room, new mech & elect.cDetails
1st fl new int. partition for office & lab room, new mech & elect.c | $1,350,000 | |
| Feb 15, 2002 | Completed final sign-off Jul 2002 | 475 Brannan St | 1/fl. - interior non structural demolistionDetails
1/fl. - interior non structural demolistion | $15,000 | |
| Feb 14, 2002 | Completed final sign-off Jul 2002 | 475 Brannan St | Sasco | fire alarm improvement-1st, 2nd, 3rd floors, install 4 smoke detectors, 57 horn strobes, 22 strobesDetails
fire alarm improvement-1st, 2nd, 3rd floors, install 4 smoke detectors, 57 horn strobes, 22 strobes | $28,000 |
| Feb 6, 2002 | Completed final sign-off Jul 2002 | 475 Brannan St | Ayoob & Peery Plumbing Co Inc | 1-3/fl: add & relocate fire sprinkler heads (37 new hds/18 relocate/11 removed)Details
1-3/fl: add & relocate fire sprinkler heads (37 new hds/18 relocate/11 removed) | $15,500 |
| Jan 3, 2002 | Completed final sign-off Mar 2002 | 475 Brannan St | Sasco | fire alarm system - t/i (4th floor)Details
fire alarm system - t/i (4th floor) | $15,000 |
| Dec 14, 2001 | Completed final sign-off Mar 2002 | 475 Brannan St | Skyline Construction | life saftey work to be performed on the 4th floorDetails
life saftey work to be performed on the 4th floor | $35,000 |
| Dec 13, 2001 | Completed final sign-off Jul 2002 | 475 Brannan St | tenant improvement, second and thired floors, sprinkler under separate permitDetails
tenant improvement, second and thired floors, sprinkler under separate permit | $200,000 | |
| Dec 13, 2001 | Completed final sign-off Jul 2002 | 475 Brannan St | 1st fl remodel, new bioscience lab, new mech on roof, new plmbg, new elec. sprinkler under separateDetails
1st fl remodel, new bioscience lab, new mech on roof, new plmbg, new elec. sprinkler under separate | $1,390,000 | |
| Dec 13, 2001 | Completed final sign-off Jul 2002 | 475 Brannan St | first, second and third (partial floors only), interior non-structural demoDetails
first, second and third (partial floors only), interior non-structural demo | $40,000 | |
| Nov 7, 2001 | Completed final sign-off Mar 2002 | 475 Brannan St | 4th floor, remodel existing office space, new partition, electrical and mechanicalDetails
4th floor, remodel existing office space, new partition, electrical and mechanical | $195,000 | |
| Nov 6, 2001 | Completed final sign-off Apr 2002 | 475 Brannan St | Skyline Construction | fire sprinkler work to be performed on 4th flr only.Details
fire sprinkler work to be performed on 4th flr only. | $100,000 |
| Oct 23, 2001 | Expired or cancelled expired Oct 2003 | 475 Brannan St | Intelligent Technologies & Services Inc | 1st floor- install fm200/pre-action fire alarm systemDetails
1st floor- install fm200/pre-action fire alarm system | $15,000 |
| Oct 4, 2001 | Expired or cancelled expired Oct 2003 | 475 Brannan St | Sasco | 1/fl.- fire alarm, t.i. improvement, relocate 4 horn strobes and add 2 strobesDetails
1/fl.- fire alarm, t.i. improvement, relocate 4 horn strobes and add 2 strobes | $2,000 |
| Sep 24, 2001 | Expired or cancelled expired Oct 2003 | 475 Brannan St | electrical distribution for lighting 1/f & 2/f and fire alarm @ 1/fDetails
electrical distribution for lighting 1/f & 2/f and fire alarm @ 1/f | $10,000 | |
| Sep 20, 2001 | Completed final sign-off Feb 2002 | 475 Brannan St | Ayoob & Peery Plumbing Co Inc | t.i., add, relocate & remove fire sprinkler heads at 1st & 2nd floorDetails
t.i., add, relocate & remove fire sprinkler heads at 1st & 2nd floor | $4,800 |
| Aug 31, 2001 | Expired or cancelled expired Jun 2002 | 475 Brannan St | Swinerton Builders | 1st/2nd floor, oti-2 1st/2nd floor: el, me on 2000/03/08/3743 & 2000/04/04/6295.Details
1st/2nd floor, oti-2 1st/2nd floor: el, me on 2000/03/08/3743 & 2000/04/04/6295. | |
| Aug 27, 2001 | Expired or cancelled expired Oct 2003 | 475 Brannan St | tenant improvement for first and second floor, mechanical includedDetails
tenant improvement for first and second floor, mechanical included | $247,040 | |
| Jun 29, 2001 | Completed final sign-off Dec 2001 | 475 Brannan St | tenant build out of third floorDetails
tenant build out of third floor | $300,000 | |
| May 11, 2001 | Completed final sign-off Dec 2001 | 475 Brannan St | Ayoob & Peery Plumbing Co Inc | fire sprinkler add & relocate per tenant improvements 3rd & 4th floor.Details
fire sprinkler add & relocate per tenant improvements 3rd & 4th floor. | $28,500 |
| May 8, 2001 | Completed final sign-off Dec 2001 | 475 Brannan St | Sasco | adjustment to permit appn. 2001-04-13-6813Details
adjustment to permit appn. 2001-04-13-6813 | $100 |
| Apr 13, 2001 | Completed final sign-off Dec 2001 | 475 Brannan St | Sasco | fire alarm - tenant improvement 3rd floor.Details
fire alarm - tenant improvement 3rd floor. | $30,000 |
| Mar 28, 2001 | Expired or cancelled expired May 2002 | 475 Brannan St | Ayoob & Peery Plumbing Co Inc | rev. to appl#200010264147 removal of fm200 tank per request of fire inspector tony hamptonDetails
rev. to appl#200010264147 removal of fm200 tank per request of fire inspector tony hampton | $100 |
| Feb 27, 2001 | Expired or cancelled expired Jun 2001 | 475 Brannan St | Swinerton Builders | renew app #99232226 for final inspection/fuel tankDetails
renew app #99232226 for final inspection/fuel tank | |
| Feb 27, 2001 | Completed final sign-off Jun 2001 | 475 Brannan St | Swinerton Builders | renew #9922699,9922700,9922698,9922701Details
renew #9922699,9922700,9922698,9922701 | |
| Feb 27, 2001 | Expired or cancelled expired Jun 2001 | 475 Brannan St | renewal of pa#20000113952 | ||
| Feb 27, 2001 | Expired or cancelled expired Jun 2001 | 475 Brannan St | Swinerton Builders | renew app #9923225 for final inspection for interior stairsDetails
renew app #9923225 for final inspection for interior stairs | |
| Feb 1, 2001 | Completed final sign-off Dec 2001 | 475 Brannan St | new structural stair between 3rd & 4th floors to support mech equipmentDetails
new structural stair between 3rd & 4th floors to support mech equipment | $100,000 | |
| Jan 23, 2001 | Completed final sign-off Dec 2001 | 475 Brannan St | one-stop:mtjoe:elect. & mech & plmbg, to all floorsDetails
one-stop:mtjoe:elect. & mech & plmbg, to all floors | $60,000 | |
| Dec 18, 2000 | Expired or cancelled expired Aug 2003 | 475 Brannan St | Thomas Swan Sign Co Inc | to erect electrical sign | $3,000 |
| Nov 20, 2000 | Completed final sign-off Feb 2001 | 475 Brannan St | erect a single faced, non-electric wall signDetails
erect a single faced, non-electric wall sign | ||
| Nov 2, 2000 | Expired or cancelled expired May 2002 | 475 Brannan St | Swinerton Builders | oti-3: (1st & 2nd fl.) l/s | $20,000 |
| Nov 1, 2000 | Expired or cancelled cancelled Jul 2001 | 475 Brannan St | oti-1 3rd flr,el,me, l/s. sp | $300,000 | |
| Nov 1, 2000 | Completed final sign-off Dec 2001 | 475 Brannan St | oti-1 4th flr,el,me, l/s spDetails
oti-1 4th flr,el,me, l/s sp | $850,000 | |
| Oct 30, 2000 | Expired or cancelled cancelled Aug 2001 | 475 Brannan St | Swinerton Builders | finish and install 1 underground fule tank, 4000 gallons. and one roof-top tank 60 gallonsDetails
finish and install 1 underground fule tank, 4000 gallons. and one roof-top tank 60 gallons | $50,000 |
| Oct 26, 2000 | Expired or cancelled expired May 2002 | 475 Brannan St | Intelligent Technologies & Services Inc | install new (fike) fire suppression system at 2nd floor only.Details
install new (fike) fire suppression system at 2nd floor only. | $36,500 |
| Jul 27, 2000 | Expired or cancelled cancelled Feb 2003 | 475 Brannan St | Swinerton Builders | install of emergency generator on roof 2 location of 2 cooling towers on roof.Details
install of emergency generator on roof 2 location of 2 cooling towers on roof. | $350,000 |
| Jul 27, 2000 | Expired or cancelled expired Jun 2002 | 475 Brannan St | Swinerton Builders | revision to oti-1 2000/03/08/3442. bracing & connection for the ceiling grind anchorage.Details
revision to oti-1 2000/03/08/3442. bracing & connection for the ceiling grind anchorage. | $3,000 |
| Jun 27, 2000 | Expired or cancelled expired May 2002 | 475 Brannan St | Ayoob & Peery Plumbing Co Inc | fire sprinklers, add & relocate,install new pre-action systemDetails
fire sprinklers, add & relocate,install new pre-action system | $116,000 |
| Apr 4, 2000 | Expired or cancelled expired Jun 2002 | 475 Brannan St | Swinerton Builders | oti-2 1st floor el me | $1,000,000 |
| Apr 4, 2000 | Expired or cancelled expired Jun 2002 | 475 Brannan St | Swinerton Builders | oti-2 el me 2nd floor | $1,000,000 |
| Mar 20, 2000 | Expired or cancelled expired Jun 2002 | 475 Brannan St | Swinerton Builders | structural work/new stairs/wall openings/new tube steel column/200003083743/200003083742Details
structural work/new stairs/wall openings/new tube steel column/200003083743/200003083742 | $200,000 |
| Mar 15, 2000 | Expired or cancelled expired May 2002 | 475 Brannan St | Swinerton Builders | fuel oil tank permit set | $100,000 |
| Mar 8, 2000 | Expired or cancelled expired Jun 2002 | 475 Brannan St | Swinerton Builders | oti-1, 1st floor, el, me, l/s, spDetails
oti-1, 1st floor, el, me, l/s, sp | $300,000 |
| Mar 8, 2000 | Expired or cancelled expired Jun 2002 | 475 Brannan St | Swinerton Builders | oti-1, 2nd floor, el, me, l/s, spDetails
oti-1, 2nd floor, el, me, l/s, sp | $300,000 |
| Jan 13, 2000 | Expired or cancelled expired Aug 2000 | 475 Brannan St | Sasco | add devices to existing fire alarm system as req for tenant improvementDetails
add devices to existing fire alarm system as req for tenant improvement | $15,250 |
| Jan 12, 2000 | Expired or cancelled expired May 2000 | 475 Brannan St | as built drawings-rev to appvd appl-9922109-fire alarm plan onlyDetails
as built drawings-rev to appvd appl-9922109-fire alarm plan only |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Swinerton Builders (23), Gci, Inc (17), Skyline Construction (15), Ayoob & Peery Plumbing Co Inc (10), Pyro-Comm Systems, Inc. (9), Pacific Auxiliary Fire Alarm (8), Sasco (7), Anderson, Rowe & Buckley, Inc. (6), Golden Gate Fire Protection Inc (5), Rubecon General Contracting Inc (5), Bcci Construction Company (4), M C S Construction Services (4), Principal Builders Inc. (4), Intelligent Technologies & Services Inc (3), Acco Engineered Systems Inc. Dba Acco En (2), Capitol Electric Const (2), Field Construction Inc. (2), Herrero Builders Incorporated (2), Howard S. Wright Constructors Lp (2), Vantis Dba One Workplace Construction (2), Accurate Contracting Inc.Dba Unispace Co, Bevilacqua & Sons, Cupertino Electric Inc., Dpr Construction, Dpw Inc., Fisher Development Inc, Legacy Mechanical & Energy Services, Inc, Mc Millan Electric, Novo Construction Inc, Peacock Construction, Pioneer Fire Inc., Potter Fire Protection, Pribuss Engineering Inc, South Bay Construction, Sprig Electric (Archkey Solutions), Thomas Swan Sign Co Inc, Walschon Fire Protection Inc, Young Electric Co
- Architects
- Denis A Henmi (3), James Stefanski (3), Hugh Cotter (2), Jane Cee (2), Joey Shimoda (2), Nicolas S. Detorres (2), Alfred Quezada, Anthony Cataldo, Dan Huntsman, Eric Ibsen, George S Soskin, Guion Chilldress, Jack Munson, Justin Martinkovic, Kelda Gragg, Peter Macrae, Scott Douglas Wurl
- Engineers
- John Pappas (3), Jesus Cabellon Jr. (2), Mark T Cornett (2), Alexander Joseph Pacheco, Donald Dammen, Jesse Avery, John Pappas, Jon Bell, Maryann Phipps, Ralph Lacaze, Rodolfo Bustos
- Authorized agents
- Amir Shahmirza, Hang Xue, Smith Group
- Designers
- Golden Gate Fire Protection, Nicholas Detorres
- Pmt consultant/expediters
- Prasad More (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.