James Stefanski
- Listed as
- architect, designer, engineer
- Firm
- Huntsman Arch. Group
- Based in
- San Francisco
- On San Francisco permits
- Oct 2004 to Dec 2016
91 permits since 2000 (architect on 87 permits, designer on 2 permits, engineer on 2 permits): 79 completed, 6 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 21, 2016 | Completed final sign-off Jun 2017 | 50 California St | R.M.R. Construction Company | suite 450 tenant improvement of non-structural walls, modify lighting & patch finishes includes mech + electrical. sprinkler + life safety are deferred.Details
suite 450 tenant improvement of non-structural walls, modify lighting & patch finishes includes mech + electrical. sprinkler + life safety are deferred. | $210,000 |
| Oct 12, 2016 | Completed final sign-off Apr 2017 | 220 Montgomery St | San Francisco Commercial Builders Inc | arch full floor 20th: non-structural demo of extg tenant space. construct non-structural partitions, doors, lighting, electrical, ceiling and finishes. restroom upgrades. 90 min doors in direction of egress for exit stairs and 20 min doors for elevator lobby. mep and fire under separate permit.Details
arch full floor 20th: non-structural demo of extg tenant space. construct non-structural partitions, doors, lighting, electrical, ceiling and finishes. restroom upgrades. 90 min doors in direction of egress for exit stairs and 20 min doors for elevator lobby. mep and fire under separate permit. | $570,000 |
| Sep 14, 2016 | Completed final sign-off Sep 2017 | 400 02nd St | Peacock Construction | lobby: demo of non structural partitions, ceiling patch and repair gyp/ new lights, additional power & finishes. mep/fire/life saftey under sep permitDetails
lobby: demo of non structural partitions, ceiling patch and repair gyp/ new lights, additional power & finishes. mep/fire/life saftey under sep permit | $96,000 |
| Aug 24, 2016 | Completed final sign-off Sep 2016 | 220 Montgomery St | San Francisco Commercial Builders Inc | #301 3/f- demo of non-structural partitions, millwork and finishes. constructioin of non-structural partitions, door assembles, millwork and finishes. n/a ordinance #155-13Details
#301 3/f- demo of non-structural partitions, millwork and finishes. constructioin of non-structural partitions, door assembles, millwork and finishes. n/a ordinance #155-13 | $85,000 |
| Jul 26, 2016 | Completed final sign-off Oct 2016 | 1045 Sansome St | Thomas Kessenich | 2nd floor - restrooms to meet ada/t-24 accessibility requirements under barrier removal only criteria. sprinkler, lie safety, mech ,electricla & plumbing design build under separate permit.Details
2nd floor - restrooms to meet ada/t-24 accessibility requirements under barrier removal only criteria. sprinkler, lie safety, mech ,electricla & plumbing design build under separate permit. | $48,000 |
| May 27, 2016 | Completed final sign-off Aug 2016 | 101 California St | Skyline Construction | 37th floor: new non load bearing partition & doors. no structural work. mep included. fire/life safety under sep permitDetails
37th floor: new non load bearing partition & doors. no structural work. mep included. fire/life safety under sep permit | $275,000 |
| Jan 14, 2016 | Completed final sign-off Mar 2017 | 400 02nd St | Peacock Construction | #425: demolition of non structural partitions, new non structural partitions, existing ceiling with minor light fixture adjustment, design-build electrical & mechanical rebalance defered submital, life safety & fire sprinkler under seperate permit. n/a ordinance #155-13Details
#425: demolition of non structural partitions, new non structural partitions, existing ceiling with minor light fixture adjustment, design-build electrical & mechanical rebalance defered submital, life safety & fire sprinkler under seperate permit. n/a ordinance #155-13 | $11,520 |
| Aug 21, 2015 | Completed final sign-off Oct 2015 | 260 Townsend St | Swinerton Builders | 5th flr: partial remodel of approx 584 sq ft of (e) ofc space. including non-structural partitions, electrical outlets and relocate of (e) light fixtures. maher naDetails
5th flr: partial remodel of approx 584 sq ft of (e) ofc space. including non-structural partitions, electrical outlets and relocate of (e) light fixtures. maher na | $63,972 |
| Aug 6, 2015 | Completed final sign-off Nov 2017 | 2105 O'farrell St | M W Logic Inc | to erect 1 story, no basement, storage building. ** maher: compliance with ordinance no# 155-13 not required **Details
to erect 1 story, no basement, storage building. ** maher: compliance with ordinance no# 155-13 not required ** | $20,000 |
| Nov 14, 2014 | Completed final sign-off Aug 2015 | 400 02nd St | Peacock Construction | 2nd floor: demolition of non-structural partitions.new non structural partition in fill, relocation of door and new power. extg cieling lights to remain. design build electrical under seperate permit with mech as required. as required life safety and sprinkler under seperate permit. n/a for maher.Details
2nd floor: demolition of non-structural partitions.new non structural partition in fill, relocation of door and new power. extg cieling lights to remain. design build electrical under seperate permit with mech as required. as required life safety and sprinkler under seperate permit. n/a for maher. | $20,300 |
| Oct 30, 2014 | Completed final sign-off Apr 2015 | 755 Sansome St | Gci, Inc | 4th floor ste 450 - interior t.i. : minor demo & construction of non-structural partition, electrical & plumbing. mep, life safety, sprinklers are separate design, build submitteds. n/a maher ordinanceDetails
4th floor ste 450 - interior t.i. : minor demo & construction of non-structural partition, electrical & plumbing. mep, life safety, sprinklers are separate design, build submitteds. n/a maher ordinance | $22,750 |
| Oct 30, 2014 | Completed final sign-off Jun 2015 | 123 Mission St | Rossi Builders Inc. | 18th floor ste 1800 - interior t.i.: minor demo & construction of non-structural partition, electrical & plumbing. mep, life safety, sprinklers are separate design build a separate submitteds. n/a maher ordinanceDetails
18th floor ste 1800 - interior t.i.: minor demo & construction of non-structural partition, electrical & plumbing. mep, life safety, sprinklers are separate design build a separate submitteds. n/a maher ordinance | $66,500 |
| Jun 24, 2014 | Completed final sign-off Jul 2015 | 260 Townsend St | Swinerton Builders | the project involves selective demolition, limited framing & finishes on 2nd & 3rd floors. the work stations will be reconfigurated. the meps will be design build. n/a ordinance #155-13.Details
the project involves selective demolition, limited framing & finishes on 2nd & 3rd floors. the work stations will be reconfigurated. the meps will be design build. n/a ordinance #155-13. | $225,000 |
| Jan 30, 2014 | Completed final sign-off May 2014 | 345 California St | Hathaway Dinwiddie Co. | 28th floor - selective demo & build new non-structural partitions, finishes, ceiling, lighting, doors & glazing & millwork re-workexisting switching & lighting as req'd. mep, sprinkler & life safety under separate permit. compliance with ordinance 155-13 not requiredDetails
28th floor - selective demo & build new non-structural partitions, finishes, ceiling, lighting, doors & glazing & millwork re-workexisting switching & lighting as req'd. mep, sprinkler & life safety under separate permit. compliance with ordinance 155-13 not required | $185,000 |
| Jan 27, 2014 | Completed final sign-off Jul 2014 | 27 Maiden Ln | minor tenant improvement of non structural pariton and minor electrical work. mech/elec/ls under separate permitDetails
minor tenant improvement of non structural pariton and minor electrical work. mech/elec/ls under separate permit | $8,750 | |
| Jan 22, 2014 | Completed final sign-off Mar 2014 | 345 California St | Gci, Inc | this project includes selective demolition of glazing and construction of new non-structural partitions, doors, glazing & millwork, no change in area. life safety, sprinklers, mechanical & electrical under seperate permit. compliance with ordinance #155-13 no excavation.Details
this project includes selective demolition of glazing and construction of new non-structural partitions, doors, glazing & millwork, no change in area. life safety, sprinklers, mechanical & electrical under seperate permit. compliance with ordinance #155-13 no excavation. | $20,000 |
| Nov 12, 2013 | Completed final sign-off Jul 2014 | 130 Sutter St | 7th floor full floor tenant improvement to include new non-structural partitions, restrooms, millwork, electrical & hvac. fsd included. no elevator lobby locks under this permit.sprinkler & life safety are under separate permit.Details
7th floor full floor tenant improvement to include new non-structural partitions, restrooms, millwork, electrical & hvac. fsd included. no elevator lobby locks under this permit.sprinkler & life safety are under separate permit. | $770,000 | |
| Aug 12, 2013 | Completed final sign-off Jan 2014 | 260 Townsend St | Swinerton Builders | 4th floor interior commerccial tenant improvement to include construction of two new rooms within an existing multi-purpose room. mechancial & electrical included.Details
4th floor interior commerccial tenant improvement to include construction of two new rooms within an existing multi-purpose room. mechancial & electrical included. | $72,296 |
| Aug 7, 2013 | Completed final sign-off Apr 2014 | 275 Battery St | Hathaway Dinwiddie Co. | 18,19,20 floors-demo (e) non-struct partitoins,(e) acoustical clg tile/grid & (e) finishes. retain (e) lt fixtures. const new non-struct part, new acoustic tile/grid & inst (e)lt fix. field verify compliance with sffd ab 2.10 (elev lobby) inst new upgrades elec/tel/data sys, new finishe.Details
18,19,20 floors-demo (e) non-struct partitoins,(e) acoustical clg tile/grid & (e) finishes. retain (e) lt fixtures. const new non-struct part, new acoustic tile/grid & inst (e)lt fix. field verify compliance with sffd ab 2.10 (elev lobby) inst new upgrades elec/tel/data sys, new finishe. | $3,024,780 |
| Jul 18, 2013 | Expired or cancelled expired Jul 2018 | 400 California St | Field Construction Inc. | floors 8,9,10 renovation of existing restrooms - new plumbing fixtures, new mechnaical & electrical serving area of work. barrier removal in adjacent accessible restrooms to provide fully compliant equivalant facilitation. compliance with ordinance #155-13 not required.Details
floors 8,9,10 renovation of existing restrooms - new plumbing fixtures, new mechnaical & electrical serving area of work. barrier removal in adjacent accessible restrooms to provide fully compliant equivalant facilitation. compliance with ordinance #155-13 not required. | $221,829 |
| May 29, 2013 | Completed final sign-off Aug 2013 | 27 Maiden Ln | mezzanine level - demolitoin of existing mezz level & partitoins, the bldg structure is not compromised by this work. no change in occupancy or floor area per ab-017, accessible documentation will be provided with separate permit for t.i.Details
mezzanine level - demolitoin of existing mezz level & partitoins, the bldg structure is not compromised by this work. no change in occupancy or floor area per ab-017, accessible documentation will be provided with separate permit for t.i. | $18,000 | |
| May 21, 2013 | Expired or cancelled cancelled Jan 2026 | 633 Battery St | 3rd floor t.i. to the exterior of (e) occupied bldg. demolitoin work includes removal of structurla masonry for new window openings. new work consists of new exterior windows, not visible from street, no change in floor area or bldg height,sprinklers are design build sumitted under separate permitDetails
3rd floor t.i. to the exterior of (e) occupied bldg. demolitoin work includes removal of structurla masonry for new window openings. new work consists of new exterior windows, not visible from street, no change in floor area or bldg height,sprinklers are design build sumitted under separate permit | $95,000 | |
| May 8, 2013 | Completed final sign-off Oct 2013 | 555 California St | Gci, Inc | 19th floor - demise existing vacant suite into suite a & b, includes demolition & construction of non-structural partitoins, doors, frames & hardward, ceiling, light fixtures, millwork & finishes. mep, sprinkler & life safety under separate permit, no change in area, occup use.Details
19th floor - demise existing vacant suite into suite a & b, includes demolition & construction of non-structural partitoins, doors, frames & hardward, ceiling, light fixtures, millwork & finishes. mep, sprinkler & life safety under separate permit, no change in area, occup use. | $430,000 |
| May 6, 2013 | Completed final sign-off Jul 2013 | 555 California St | Bcci Construction Company | floor b3 - fire repairs including demo, drywall, doors, ceiling wash, millwork & finishes. mech, elec, sprinklers & life safety under separate permit. all work in the area less than 500 sf in level b3; see sheet b3a-4.0Details
floor b3 - fire repairs including demo, drywall, doors, ceiling wash, millwork & finishes. mech, elec, sprinklers & life safety under separate permit. all work in the area less than 500 sf in level b3; see sheet b3a-4.0 | $31,000 |
| Apr 26, 2013 | Completed final sign-off Aug 2013 | 555 California St | Source Planning And Construction Inc | demolition of existing non-structural partitions door / frames, finishes, no new construction and space shall remain vacant under ab017Details
demolition of existing non-structural partitions door / frames, finishes, no new construction and space shall remain vacant under ab017 | $157,000 |
| Apr 9, 2013 | Completed final sign-off May 2013 | 3638 Sacramento St | Kevin Moylan General Contractor | rear bldg - change of use form office to skincare, no massages, no change to occupancy, t.i. to include installation of non-structural partitions. air supply & electrical under separate permit.Details
rear bldg - change of use form office to skincare, no massages, no change to occupancy, t.i. to include installation of non-structural partitions. air supply & electrical under separate permit. | $3,500 |
| Mar 15, 2013 | Expired or cancelled cancelled Jan 2026 | 350 California St | Swinerton Builders | revision to appl #2012.10.30.3068 - removal of four (4) access control pedestals (devices) & removal two (2) roll down doors & assoc elec from scope of work. install new demising wall adjacent to convenience store.Details
revision to appl #2012.10.30.3068 - removal of four (4) access control pedestals (devices) & removal two (2) roll down doors & assoc elec from scope of work. install new demising wall adjacent to convenience store. | |
| Mar 6, 2013 | Completed final sign-off Jun 2013 | 85 02nd St | suite 700: new t.i. to include doors, partitions, ceiling and millwork. m.e.p. is included in this permit.Details
suite 700: new t.i. to include doors, partitions, ceiling and millwork. m.e.p. is included in this permit. | $275,000 | |
| Oct 5, 2012 | Completed final sign-off Feb 2013 | 575 Market St | Rudolph Commercial Interiors Inc, Rci | 24th floor - renovation for suite 2400, elevator lobby, & men;s & women's restrooms. demolition & construction of non-structural partitions, ceiling, light fixtures, door & side lights, plumbing fixtures & finishes. no change in area, occupancy or use.fire alarm sprinkler,structural dwgs on separateDetails
24th floor - renovation for suite 2400, elevator lobby, & men;s & women's restrooms. demolition & construction of non-structural partitions, ceiling, light fixtures, door & side lights, plumbing fixtures & finishes. no change in area, occupancy or use.fire alarm sprinkler,structural dwgs on separate | $240,000 |
| Aug 20, 2012 | Completed final sign-off Mar 2013 | 201 Spear St | Peacock Construction Inc | 15th floor -demolition/construction of non-structural partitions, relocation of (e) light fixtures, new power/tele/data, new finishes. minor disabled access upgrades, mep engineering, sprinkler & life safety design-build under separate permit.Details
15th floor -demolition/construction of non-structural partitions, relocation of (e) light fixtures, new power/tele/data, new finishes. minor disabled access upgrades, mep engineering, sprinkler & life safety design-build under separate permit. | $125,750 |
| Jul 11, 2012 | Never finaled issued Jul 2012, no final | 180 Geary St | 4th floor - demolition of non-struct items only, demo existing interior aprtitions, doors & frames, plbg fixtures, existing ceiling & light fixtures, remvoal of all finishes include carpet, vct, base, tile, paint & wallcoverings throughout,Details
4th floor - demolition of non-struct items only, demo existing interior aprtitions, doors & frames, plbg fixtures, existing ceiling & light fixtures, remvoal of all finishes include carpet, vct, base, tile, paint & wallcoverings throughout, | $15,000 | |
| Jun 28, 2012 | Completed final sign-off Sep 2012 | 101 02nd St | Source Planning And Construction Inc | 8th floor - partial floor t.i. to demo & construct non-rated partitions doors, & finishes.Details
8th floor - partial floor t.i. to demo & construct non-rated partitions doors, & finishes. | $56,859 |
| Jun 18, 2012 | Completed final sign-off Oct 2012 | 3 Embarcadero Center | Bcci Construction Company | 15th floor revision to appl #2012.02.28.4970 - revise exiting path - delete 1 exit sign & revise 2 others. no change in occupancy or use, no increase in square footage.Details
15th floor revision to appl #2012.02.28.4970 - revise exiting path - delete 1 exit sign & revise 2 others. no change in occupancy or use, no increase in square footage. | |
| May 24, 2012 | Expired or cancelled cancelled Jan 2026 | 575 Market St | 14th floor - scope of work is a full demo & remodel including plumbing fixtures, ceiling grid, lighting & finishes at the men's & women's restrooms. no change in area, occupancy or use. fire alarm, sprinklers will be submitted under separate permit.Details
14th floor - scope of work is a full demo & remodel including plumbing fixtures, ceiling grid, lighting & finishes at the men's & women's restrooms. no change in area, occupancy or use. fire alarm, sprinklers will be submitted under separate permit. | $140,000 | |
| May 24, 2012 | Completed final sign-off Aug 2012 | 575 Market St | Rudolph Commercial Interiors Inc, Rci | 35th floor ste 3500 - renovation including demolition & construction of non-structural partitoins, doors & finishes. mep, sprinklers and fire alarm separate permitsDetails
35th floor ste 3500 - renovation including demolition & construction of non-structural partitoins, doors & finishes. mep, sprinklers and fire alarm separate permits | $29,000 |
| May 1, 2012 | Completed final sign-off Oct 2012 | 555 California St | Swinerton Builders | demolition of extg non structural partitions, doors/frames millwork, ceiling grid and tile. restroom upgrade.Details
demolition of extg non structural partitions, doors/frames millwork, ceiling grid and tile. restroom upgrade. | $375,000 |
| Apr 10, 2012 | Completed final sign-off Jun 2012 | 575 Market St | Rudolph Commercial Interiors Inc, Rci | 20th floor suite 2080 - demolition & construction of non-structural partitoins, ceiling, light fixtures, doors, finishes, & plumbing. no change in area, occupancy of use. mep, fire alarm, sprinklers, title 24 calculations will be submitted under separate permit.Details
20th floor suite 2080 - demolition & construction of non-structural partitoins, ceiling, light fixtures, doors, finishes, & plumbing. no change in area, occupancy of use. mep, fire alarm, sprinklers, title 24 calculations will be submitted under separate permit. | $20,900 |
| Apr 10, 2012 | Completed final sign-off May 2012 | 333 Bush St | Swinerton Builders | 6th floor tenant improvement to include minor demolition & construction of non-structural partitions, minor comestic touch up of ceiling & finishes. life safety/sprinkler, mep under separate permit.Details
6th floor tenant improvement to include minor demolition & construction of non-structural partitions, minor comestic touch up of ceiling & finishes. life safety/sprinkler, mep under separate permit. | $5,000 |
| Mar 29, 2012 | Completed final sign-off Nov 2012 | 575 Market St | Field Construction Inc. | 16th floor suite 1650 - demo & construction of non-structural partitions, ceiling, light fixtures, door & sidelights, & finishes. no change in area, occupancy or use. mechanical and elctrical includeds. fire alarm, sprinklers will be submitted under separate permit.Details
16th floor suite 1650 - demo & construction of non-structural partitions, ceiling, light fixtures, door & sidelights, & finishes. no change in area, occupancy or use. mechanical and elctrical includeds. fire alarm, sprinklers will be submitted under separate permit. | $282,345 |
| Mar 19, 2012 | Never finaled issued Oct 2012, no final | 200 California St | Principal Builders Inc. | roof level & basement mechanical system replacement & screen expansion. remove (e) water-cover chiller & related plumbing in basement.Details
roof level & basement mechanical system replacement & screen expansion. remove (e) water-cover chiller & related plumbing in basement. | $300,000 |
| Mar 9, 2012 | Completed final sign-off Jan 2013 | 555 Market St | Field Construction Inc. | ground floor lobby remodel - work includes replacement of wood panel wall cladding, new ceiling soffitts, new ceiling ligting & new guard desk. work also includes reconfiguration of hvac system to separate lobby from adjacent leased space. no work to exterior is proposed.Details
ground floor lobby remodel - work includes replacement of wood panel wall cladding, new ceiling soffitts, new ceiling ligting & new guard desk. work also includes reconfiguration of hvac system to separate lobby from adjacent leased space. no work to exterior is proposed. | $450,000 |
| Jan 24, 2012 | Completed final sign-off Jun 2012 | 555 California St | Bcci Construction Company | demo of extg non structural partitions, doors/frames, millwork, clg, lighting, power and finishes. there is no new construction under this demo permit. demo on floors 8 and 9. per ab-017 sf admin. bulletin accessibilty documentation will be provided with the permit app.Details
demo of extg non structural partitions, doors/frames, millwork, clg, lighting, power and finishes. there is no new construction under this demo permit. demo on floors 8 and 9. per ab-017 sf admin. bulletin accessibilty documentation will be provided with the permit app. | $109,500 |
| Dec 22, 2011 | Completed final sign-off Jan 2012 | 575 Market St | Rudolph Commercial Interiors Inc, Rci | 19th floor:permit revision to application#201107261092 in women's accessible stall, extg toilet is to remain. new toilet partition is reversed so that the partition door opens diagonal to the toilet.Details
19th floor:permit revision to application#201107261092 in women's accessible stall, extg toilet is to remain. new toilet partition is reversed so that the partition door opens diagonal to the toilet. | |
| Nov 21, 2011 | Completed final sign-off Sep 2012 | 100 Spear St | San Francisco Commercial Builders Inc | floor 15th t.i. - demo & construct new non-structural prtitions, door & sidelights, millwork, power & finishes, new & relocated light fixtures. restrooms upgrade per t-24. mep & t-24 & life safety under separate permit. evacuation signage included.Details
floor 15th t.i. - demo & construct new non-structural prtitions, door & sidelights, millwork, power & finishes, new & relocated light fixtures. restrooms upgrade per t-24. mep & t-24 & life safety under separate permit. evacuation signage included. | $150,000 |
| Nov 21, 2011 | Completed final sign-off Jan 2012 | 525 Market St | Skyline Construction | floor 2nd, ste 200 - selective demolition of non-rated & non -structural partitions & millwork.Details
floor 2nd, ste 200 - selective demolition of non-rated & non -structural partitions & millwork. | $26,500 |
| Nov 14, 2011 | Completed final sign-off Dec 2011 | 301 Howard St | 18th floor demo of (e) walls, ceiling, plumbing fixtures & finishes, construction of (n) break room, power & signal rework, minor ceiling & lighting rework, new finishes. mep , fire sprinklers, life safety under separate permit.Details
18th floor demo of (e) walls, ceiling, plumbing fixtures & finishes, construction of (n) break room, power & signal rework, minor ceiling & lighting rework, new finishes. mep , fire sprinklers, life safety under separate permit. | $142,000 | |
| Nov 14, 2011 | Completed final sign-off Feb 2012 | 201 Spear St | Turner Construction Co | floors 5,6,7,8 - voluntary barrier removal of non-compliant/accessible sink & countertop,installation of new compliant/accessible sink & countertop. reusing existing plumbing. sprinkler/fa under separate permits.Details
floors 5,6,7,8 - voluntary barrier removal of non-compliant/accessible sink & countertop,installation of new compliant/accessible sink & countertop. reusing existing plumbing. sprinkler/fa under separate permits. | $80,000 |
| Nov 4, 2011 | Completed final sign-off Dec 2012 | 400 02nd St | Peacock Construction Inc | 2nd floor demo of existing non-structural partitions, new non-structural partitions, doors & side lights. relcoate existing lighting, add new power outlets & finishes.Details
2nd floor demo of existing non-structural partitions, new non-structural partitions, doors & side lights. relcoate existing lighting, add new power outlets & finishes. | $25,000 |
| Nov 4, 2011 | Completed final sign-off Jan 2013 | 555 California St | Bcci Construction Company | revision to appl #201012237300: additional details & clarification ofr barrier removal as required by nov 201036576. confirm fdc hookup is unobstructed.Details
revision to appl #201012237300: additional details & clarification ofr barrier removal as required by nov 201036576. confirm fdc hookup is unobstructed. | |
| Oct 24, 2011 | Never finaled issued Nov 2011, no final | 615 Battery St | Hathaway Dinwiddie Co. | 4th floor tenant improvement communicating opening between 615 & 633 battery st. ab-010 local equivalency for communicating openings between bldgs, existing communicating opening on 4th floor. ref pa #201110241794.Details
4th floor tenant improvement communicating opening between 615 & 633 battery st. ab-010 local equivalency for communicating openings between bldgs, existing communicating opening on 4th floor. ref pa #201110241794. | |
| Oct 24, 2011 | Completed final sign-off Aug 2013 | 633 Battery St | Hathaway Dinwiddie Co. | 4th floor tenant improvement - demolition work , communicating opening between 615 & 633 battery st. construction of accessible ramp, ab-010 local equivalency for communicating openings between bldgs, existing communicating opening on 4th floor. ref pa #201110247498.Details
4th floor tenant improvement - demolition work , communicating opening between 615 & 633 battery st. construction of accessible ramp, ab-010 local equivalency for communicating openings between bldgs, existing communicating opening on 4th floor. ref pa #201110247498. | $25,000 |
| Oct 12, 2011 | Never finaled issued Oct 2011, no final | 353 Sacramento St | Peacock Construction Inc | 20th floor- demolition & consruction of non-structural, non-rated partitions, relocation of existing light fixtures, new power/tele/data, new finishes, mechanical, electrical, life-safety, sprinklers under separate permit.Details
20th floor- demolition & consruction of non-structural, non-rated partitions, relocation of existing light fixtures, new power/tele/data, new finishes, mechanical, electrical, life-safety, sprinklers under separate permit. | $37,170 |
| Aug 25, 2011 | Never finaled issued Jul 2012, no final | 35 Stanford St | Principal Builders Inc. | new 2 hour rated shaft and duct from ground floor through roof. new mechanical unit on roof.mep to be design build on seperate permit.structural calculations included. exterior work has approved certificate of appropriateness(sheet a-0.1). reference pa #2011.05.04.5331.Details
new 2 hour rated shaft and duct from ground floor through roof. new mechanical unit on roof.mep to be design build on seperate permit.structural calculations included. exterior work has approved certificate of appropriateness(sheet a-0.1). reference pa #2011.05.04.5331. | $75,000 |
| Aug 24, 2011 | Completed final sign-off Aug 2011 | 333 Bush St | Dome Construction Corp | revision to appl #201106137943 - revise locations of non-structural wall partitions on floors 31 & 27 from original permitted location to new location. revision per field inspector request. existing 8 story communicating stair. floors are unoccupied.Details
revision to appl #201106137943 - revise locations of non-structural wall partitions on floors 31 & 27 from original permitted location to new location. revision per field inspector request. existing 8 story communicating stair. floors are unoccupied. | |
| Aug 16, 2011 | Completed final sign-off Dec 2011 | 215 Leidesdorff St | basement tenant improvement 1700 sq ft: new restrooms & minor non-structural tenant improvements for partitions, lighting & plumbing., mep & sprinkler under separate permit.Details
basement tenant improvement 1700 sq ft: new restrooms & minor non-structural tenant improvements for partitions, lighting & plumbing., mep & sprinkler under separate permit. | $68,000 | |
| Aug 9, 2011 | Completed final sign-off Oct 2011 | 1 Montgomery St | Principal Builders Inc. | 35th floor t.i. work including demo of some non-structural walls, doors panels, glazing & ceiling. add new non-structural walls, doors, frames, glazing & ceiling. mep, fire sprinklers and fire alarm on separate permits.Details
35th floor t.i. work including demo of some non-structural walls, doors panels, glazing & ceiling. add new non-structural walls, doors, frames, glazing & ceiling. mep, fire sprinklers and fire alarm on separate permits. | $250,000 |
| Jul 19, 2011 | Completed final sign-off Jul 2011 | 2 Embarcadero Center | Ward Alan Emery Construction Inc. | 4th floor - new non structural partitions for new conference room only, power and data outlets and finishes. no change in occupancy, use or area. mep, sprinkler & fire alarm under seperate permit.Details
4th floor - new non structural partitions for new conference room only, power and data outlets and finishes. no change in occupancy, use or area. mep, sprinkler & fire alarm under seperate permit. | $40,000 |
| Jun 27, 2011 | Completed final sign-off Aug 2011 | 251 Rhode Island St | Field Construction Inc. | 2nd floor reconfiguration of existing office psac eto add four new offices & work area. hvac/electrical & fire sprinkler under separate permit, no increase in office space.Details
2nd floor reconfiguration of existing office psac eto add four new offices & work area. hvac/electrical & fire sprinkler under separate permit, no increase in office space. | $80,000 |
| May 4, 2011 | Completed final sign-off Nov 2013 | 35 Stanford St | Novo Construction Inc | ground floor - change of use from vacant commercial (retail) to restaurant. new rated demising walls, load bearing equipment platform, restaurant built-out. mep on separate permit.Details
ground floor - change of use from vacant commercial (retail) to restaurant. new rated demising walls, load bearing equipment platform, restaurant built-out. mep on separate permit. | $376,000 |
| Apr 29, 2011 | Completed final sign-off Nov 2011 | 550 Kearny St | R.M.R. Construction Company | 5th floor - demolition backc to core & shell - south side of floor, ref to ab-017.Details
5th floor - demolition backc to core & shell - south side of floor, ref to ab-017. | $50,000 |
| Apr 29, 2011 | Completed final sign-off Nov 2011 | 550 Kearny St | R.M.R. Construction Company | 5th floor - demolition backc to core & shell - south side of floor, ref to ab-017.Details
5th floor - demolition backc to core & shell - south side of floor, ref to ab-017. | $50,000 |
| Apr 29, 2011 | Completed final sign-off Nov 2011 | 550 Kearny St | R.M.R. Construction Company | 10th floor - demolition back to core & shell - full floor, ref to ab-017.Details
10th floor - demolition back to core & shell - full floor, ref to ab-017. | $50,000 |
| Apr 26, 2011 | Completed final sign-off Nov 2011 | 345 California St | Gci, Inc | 17th floor-t.i. work to construct a demising partition in (e) tenant space. el/mech/ls/sp to follow under seperate permitDetails
17th floor-t.i. work to construct a demising partition in (e) tenant space. el/mech/ls/sp to follow under seperate permit | $10,000 |
| Mar 29, 2011 | Completed final sign-off Nov 2011 | 345 California St | Gci, Inc | ti work for extg tenant floors 32 and 34 to demo and replace non-structural partition and add new doors and finishes.Details
ti work for extg tenant floors 32 and 34 to demo and replace non-structural partition and add new doors and finishes. | $60,000 |
| Mar 24, 2011 | Completed final sign-off Mar 2012 | 333 Bush St | Swinerton Builders | 4th to 7th flrs t.i.include: demo non-stru partitns, doors, frames, hardware, constr non-struct partitions, ceiling, light fixtures,doors,frames & hardware,struct strengtening for high density file system & new shower (4th flr only),new finishes. life safety/sprinkler retrofit under separate permit.Details
4th to 7th flrs t.i.include: demo non-stru partitns, doors, frames, hardware, constr non-struct partitions, ceiling, light fixtures,doors,frames & hardware,struct strengtening for high density file system & new shower (4th flr only),new finishes. life safety/sprinkler retrofit under separate permit. | $2,245,000 |
| Mar 23, 2011 | Completed final sign-off May 2011 | 575 Market St | Rudolph Commercial Interiors Inc, Rci | 37th floor - minor renovation for men's & women's restrooms.Details
37th floor - minor renovation for men's & women's restrooms. | $7,651 |
| Mar 23, 2011 | Completed final sign-off Mar 2012 | 333 Bush St | Swinerton Builders | 7th floor; demolition & construction of non-structural partitions, doors, & frames at multi-tenant corridor & elevator lobby.mep, life safety & sprinkler system under separate permit.Details
7th floor; demolition & construction of non-structural partitions, doors, & frames at multi-tenant corridor & elevator lobby.mep, life safety & sprinkler system under separate permit. | $80,000 |
| Mar 17, 2011 | Completed final sign-off Nov 2012 | 333 Bush St | Swinerton Builders | accessibility upgrades to exterior stairs, handrails, ground floor entry & basement levels 1 & 2.Details
accessibility upgrades to exterior stairs, handrails, ground floor entry & basement levels 1 & 2. | $100,000 |
| Dec 7, 2010 | Completed final sign-off Apr 2011 | 50 California St | Hathaway Dinwiddie Co. | floor 11, 12 & 13: demolition of non structural partitions, construction of non structural partitions,power data ceiling and finishes. restroom work. mep under separate permit. life safety and sprinkler under seperate permit.Details
floor 11, 12 & 13: demolition of non structural partitions, construction of non structural partitions,power data ceiling and finishes. restroom work. mep under separate permit. life safety and sprinkler under seperate permit. | $800,000 |
| Dec 2, 2010 | Completed final sign-off Jan 2011 | 1 Montgomery St | Hathaway Dinwiddie Co. | 36th floor: build 6 new walls and add 2 new doors and frames, elec & fire sprinkler under separate permit.Details
36th floor: build 6 new walls and add 2 new doors and frames, elec & fire sprinkler under separate permit. | $40,000 |
| Dec 1, 2010 | Completed final sign-off Apr 2011 | 475 Brannan St | Gci, Inc | 3rd floor suite 320 - addition of two private offices in previously improved space.Details
3rd floor suite 320 - addition of two private offices in previously improved space. | $25,000 |
| Nov 30, 2010 | Completed final sign-off Feb 2011 | 100 Spear St | San Francisco Commercial Builders Inc | 20th floor new partitions, doors, sidelights, millwork, lighting, power, finishes & evacuation signs. demo & restroom upgrade under separate permit. fire sprinkler, fire alrm, mep & t-24 under separate permit.Details
20th floor new partitions, doors, sidelights, millwork, lighting, power, finishes & evacuation signs. demo & restroom upgrade under separate permit. fire sprinkler, fire alrm, mep & t-24 under separate permit. | $260,820 |
| Nov 9, 2010 | Completed final sign-off Apr 2011 | 100 Spear St | San Francisco Commercial Builders Inc | 10th floor - demo & construciton of non-structural partitions, doors, sidelights, millwork, lighting, power finishes, evac signs, elevator lobby & multi-tenant corridor. upgrade restrooms. mep & t-24 under separate permit.Details
10th floor - demo & construciton of non-structural partitions, doors, sidelights, millwork, lighting, power finishes, evac signs, elevator lobby & multi-tenant corridor. upgrade restrooms. mep & t-24 under separate permit. | $310,000 |
| Oct 21, 2010 | Completed final sign-off Jun 2011 | 501 02nd St | R.M.R. Construction Company | 2nd floor, suite 212 -office tenant improvement in (e) demised office suite - restroom upgrade, mep, life safety & sprinklers under separate permit.Details
2nd floor, suite 212 -office tenant improvement in (e) demised office suite - restroom upgrade, mep, life safety & sprinklers under separate permit. | $189,000 |
| Oct 14, 2010 | Completed final sign-off Nov 2010 | 1 Front St | Bcci Construction Company | tenant improvement on the 5th floor including minor demolition new partitions, new lighting and associated mechanical and electrical workDetails
tenant improvement on the 5th floor including minor demolition new partitions, new lighting and associated mechanical and electrical work | $85,000 |
| Oct 12, 2010 | Completed final sign-off Apr 2011 | 100 Spear St | San Francisco Commercial Builders Inc | 19th floor - demo under separate permit. construction of (n) non-structural partitions, door & side lights, millwork, clg grid & tile, power & finishes & evacuation plans.restrooms under permit appl #201005263280. mep, t-24 light calcs, life safety, fire alarm & fire sprinkler under separate permit.Details
19th floor - demo under separate permit. construction of (n) non-structural partitions, door & side lights, millwork, clg grid & tile, power & finishes & evacuation plans.restrooms under permit appl #201005263280. mep, t-24 light calcs, life safety, fire alarm & fire sprinkler under separate permit. | $270,066 |
| Oct 12, 2010 | Completed final sign-off Sep 2011 | 555 California St | Turner Construction Co | 45th floor - restroom upgrade only, demo & construction of non-structural partitions, toilet partitions, plumbing fixtures, countertops, accessories, doors & frames, finishes & light fixtures. mechanical electrical, sprinklers life safety & plumbing under separate permit.Details
45th floor - restroom upgrade only, demo & construction of non-structural partitions, toilet partitions, plumbing fixtures, countertops, accessories, doors & frames, finishes & light fixtures. mechanical electrical, sprinklers life safety & plumbing under separate permit. | $200,000 |
| Sep 30, 2010 | Completed final sign-off Jan 2011 | 220 Montgomery St | R.M.R. Construction Company | 8th floor suite 860 - soft demolition, no disabled access per ab-017. construction separte permit.Details
8th floor suite 860 - soft demolition, no disabled access per ab-017. construction separte permit. | $19,000 |
| Sep 30, 2010 | Expired or cancelled cancelled Jul 2012 | 475 Brannan St | Rubecon General Contracting Inc | 4th floor #430 - demolish & remove approx 250 lf of non-structural, non-rated sheetrock partitions. safe off electrical, patch & paint. relocation of sprinklers under separate permit if required.Details
4th floor #430 - demolish & remove approx 250 lf of non-structural, non-rated sheetrock partitions. safe off electrical, patch & paint. relocation of sprinklers under separate permit if required. | $15,000 |
| Sep 30, 2010 | Completed final sign-off Jun 2012 | 475 Brannan St | Rubecon General Contracting Inc | 4th floor #420 -demolish & remove approx 80ft of non-structural, non-rated sheetrock partitions, safe off electrical patch & paint. reclocation of sprinklers if required under separate permit.Details
4th floor #420 -demolish & remove approx 80ft of non-structural, non-rated sheetrock partitions, safe off electrical patch & paint. reclocation of sprinklers if required under separate permit. | $10,000 |
| Aug 16, 2010 | Completed final sign-off Oct 2010 | 4 Embarcadero Center | Gci, Inc | 14th floor - demolition of non-strtuctural partitions, millwork, ceiling, lighting, finishes. all rated construction left in tact ( ab-017).Details
14th floor - demolition of non-strtuctural partitions, millwork, ceiling, lighting, finishes. all rated construction left in tact ( ab-017). | $60,000 |
| Jul 20, 2010 | Completed final sign-off Sep 2010 | 555 California St | Turner Construction Co | 16th floor construction new non-structural partitions, doors/frames/hardware, ceiling, light fixtures, millwork, mechanical, electrical & finishes. restroom & demolition under separate permit. sprinklere & life safety udner separate permit.Details
16th floor construction new non-structural partitions, doors/frames/hardware, ceiling, light fixtures, millwork, mechanical, electrical & finishes. restroom & demolition under separate permit. sprinklere & life safety udner separate permit. | $1,121,787 |
| Jul 15, 2010 | Expired or cancelled cancelled Jan 2026 | 275 Battery St | Hathaway Dinwiddie Co. | 17th floor demolition of (e) non-structural partitions, vct, & millwork. new millwork, vct, paint & carpet.Details
17th floor demolition of (e) non-structural partitions, vct, & millwork. new millwork, vct, paint & carpet. | $15,000 |
| Jul 8, 2010 | Completed final sign-off Oct 2010 | 333 Bush St | Swinerton Builders | office ti on the 14th floor. construction of non structural partitions, reconfigure existing lights in existing ceiling, new finishes, mep and life safety under separate permitDetails
office ti on the 14th floor. construction of non structural partitions, reconfigure existing lights in existing ceiling, new finishes, mep and life safety under separate permit | $50,000 |
| May 25, 2010 | Completed final sign-off Sep 2010 | 433 California St | Commercial Interior Builders Inc | ste 300 minor tenant improvement: expand tel/comroom, new millwork in break room, enclose area for conf. room. change men's restroom stall swing, relocate light fixture. mep under separate permit, sprinkler & life safety as req'd.Details
ste 300 minor tenant improvement: expand tel/comroom, new millwork in break room, enclose area for conf. room. change men's restroom stall swing, relocate light fixture. mep under separate permit, sprinkler & life safety as req'd. | $38,500 |
| May 21, 2010 | Completed final sign-off Jan 2011 | 50 California St | Skyline Construction | 8th floor demolition of non-structural partitions, new non-structural paritions & additoin of new power. mechanical, electrical & sprinkler to be design build under separate permit.Details
8th floor demolition of non-structural partitions, new non-structural paritions & additoin of new power. mechanical, electrical & sprinkler to be design build under separate permit. | $72,000 |
| Apr 2, 2010 | Completed final sign-off Aug 2010 | 312 Sutter St | Field Construction Inc. | 5th floor - demolition of non-structural interior partitions, construction of new private offices and reading and library rooms including new suspended ceiling, cabinets and finishes. mechanical, sprinklers, electrical and life safety are design build under separate permit.Details
5th floor - demolition of non-structural interior partitions, construction of new private offices and reading and library rooms including new suspended ceiling, cabinets and finishes. mechanical, sprinklers, electrical and life safety are design build under separate permit. | $250,000 |
| Mar 17, 2010 | Completed final sign-off May 2010 | 333 Bush St | Swinerton Builders | 14th floor - demolition of non-structural partitions, construction of non-structural partitions, reconfigure existing lighting in existing ceiling, new finishes, m.e.p., life safety under separate permit.Details
14th floor - demolition of non-structural partitions, construction of non-structural partitions, reconfigure existing lighting in existing ceiling, new finishes, m.e.p., life safety under separate permit. | $26,800 |
| Jan 5, 2010 | Never finaled issued Jan 2010, no final | 576 Beale St | Cannon Constructors North Inc | ground floor-tenant improvement: construct offices, demo partitions, ceilings, flooring & millwork. sub-divide commerical space (restaurant) into 2 spaces (restaurant & offices). m.e.p under seperate permitsDetails
ground floor-tenant improvement: construct offices, demo partitions, ceilings, flooring & millwork. sub-divide commerical space (restaurant) into 2 spaces (restaurant & offices). m.e.p under seperate permits | $128,405 |
| Dec 30, 2009 | Completed final sign-off Feb 2010 | 353 Sacramento St | Peacock Construction Inc | office to on 7th floor. new non rated partitions, relocate min. lights in (e) ceiling, new elec, new finishes. new millwork, mep underseparate permit. new plumbing/sink. 7th floor, suite 700 per plan.Details
office to on 7th floor. new non rated partitions, relocate min. lights in (e) ceiling, new elec, new finishes. new millwork, mep underseparate permit. new plumbing/sink. 7th floor, suite 700 per plan. | $119,000 |
| Oct 25, 2004 | Completed final sign-off Jan 2005 | 575 Market St | oti-3 34th fl-spDetails
oti-3 34th fl-sp | $1,000 |