Block 3708, lot 057
555 Market St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 2, 2016 | Completed final sign-off Aug 2017 | 555 Market St | Truebeck Construction | 11th floor: t.i. for new partitions doors, hardware, millwork ceilings, finishes, mep, fire protection under seperate permit. no exterior work.Details
11th floor: t.i. for new partitions doors, hardware, millwork ceilings, finishes, mep, fire protection under seperate permit. no exterior work. | $160,000 |
| Sep 2, 2016 | Completed final sign-off Aug 2017 | 555 Market St | Truebeck Construction | 14th floor: t.i. for new partitions doors, millwork ceilings, finishes, mep, fire protection under seperate permit. no exterior work.Details
14th floor: t.i. for new partitions doors, millwork ceilings, finishes, mep, fire protection under seperate permit. no exterior work. | $160,000 |
| Sep 2, 2016 | Completed final sign-off Aug 2017 | 555 Market St | Truebeck Construction | 12th floor: t.i. for new partitions doors, millwork ceilings, finishes, mep, fire protection under seperate permit. no exterior work.Details
12th floor: t.i. for new partitions doors, millwork ceilings, finishes, mep, fire protection under seperate permit. no exterior work. | $160,000 |
| Jul 26, 2016 | Expired or cancelled cancelled Jan 2026 | 555 Market St | Truebeck Construction | 14/f- limited demolition of non structural interior partitions, doors/frames/hardware, millwork, ceiling, finishes, mechanical, electrical and plumbing as noted per sfab-017.no core/elevator lobby demo under this permit - to be filed separately along with ti work.Details
14/f- limited demolition of non structural interior partitions, doors/frames/hardware, millwork, ceiling, finishes, mechanical, electrical and plumbing as noted per sfab-017.no core/elevator lobby demo under this permit - to be filed separately along with ti work. | $70,000 |
| Jul 26, 2016 | Expired or cancelled cancelled Jan 2026 | 555 Market St | Truebeck Construction | 11/f- limited demolition of non structural interior partitions, doors/frames/hardware, millwork, ceiling, finishes, mechanical, electrical and plumbing as noted per sfab-017. no core/elevator lobby demo under this permit - to be filed separately along with ti work.Details
11/f- limited demolition of non structural interior partitions, doors/frames/hardware, millwork, ceiling, finishes, mechanical, electrical and plumbing as noted per sfab-017. no core/elevator lobby demo under this permit - to be filed separately along with ti work. | $70,000 |
| Jul 26, 2016 | Expired or cancelled cancelled Jan 2026 | 555 Market St | Truebeck Construction | 12/f- limited demolition of non structural interior partitions, doors/frames/hardware, millwork, ceiling, finishes, mechanical, electrical and plumbing as noted per sfab-017.no core/elevator lobby demo under this permit - to be filed separately along with ti work.Details
12/f- limited demolition of non structural interior partitions, doors/frames/hardware, millwork, ceiling, finishes, mechanical, electrical and plumbing as noted per sfab-017.no core/elevator lobby demo under this permit - to be filed separately along with ti work. | $70,000 |
| May 10, 2016 | Completed final sign-off Aug 2017 | 555 Market St | Truebeck Construction | ti for 15th floor scope includes new partitions, doors, ceilings, fixtures, finishes, mep. fire protection under sep permitDetails
ti for 15th floor scope includes new partitions, doors, ceilings, fixtures, finishes, mep. fire protection under sep permit | $65,000 |
| May 3, 2016 | Completed final sign-off May 2016 | 555 Market St | Siemens Industry, Inc. | fire alarm work for the "uber" remodel on floor 13; additions are 5 smoke detectors, 2 duct detectors, 2 modules, 19 speaker/strobes, 4 strobes; and the relocation of 6 smoke detectors. ref pa 2016-0107-6554Details
fire alarm work for the "uber" remodel on floor 13; additions are 5 smoke detectors, 2 duct detectors, 2 modules, 19 speaker/strobes, 4 strobes; and the relocation of 6 smoke detectors. ref pa 2016-0107-6554 | $16,700 |
| Apr 29, 2016 | Expired or cancelled cancelled May 2016 | 555 Market St | Siemens Industry, Inc. | fire alarm work for the "fan s-6 upgrade" on floor 13; addition is 1 duct detector. ref pa 2015-1102-1378 (building hvac upgrade)Details
fire alarm work for the "fan s-6 upgrade" on floor 13; addition is 1 duct detector. ref pa 2015-1102-1378 (building hvac upgrade) | $610 |
| Apr 13, 2016 | Completed final sign-off Jul 2017 | 555 Market St | Truebeck Construction | int. soft demo on 15th floor per ab-017. no exterior work.Details
int. soft demo on 15th floor per ab-017. no exterior work. | $15,000 |
| Apr 12, 2016 | Completed final sign-off Apr 2016 | 555 Market St | Siemens Industry, Inc. | 5th flr: fire alarm for uber ti 2016 0107 6558: add 1 speaker, 30 speakers/strobes and 6 strobes.Details
5th flr: fire alarm for uber ti 2016 0107 6558: add 1 speaker, 30 speakers/strobes and 6 strobes. | $18,870 |
| Mar 7, 2016 | Completed final sign-off Mar 2016 | 555 Market St | Siemens Industry, Inc. | fire alarm work for the "uber" ti remodels on floor 16 and 17; additions are 2 smoke detectors, 1 module, 17 speaker/strobes and 6 strobes. ref pa 2015-1124-3562 (floor 16) and 2015-1228-5980 (floor 17)Details
fire alarm work for the "uber" ti remodels on floor 16 and 17; additions are 2 smoke detectors, 1 module, 17 speaker/strobes and 6 strobes. ref pa 2015-1124-3562 (floor 16) and 2015-1228-5980 (floor 17) | $13,200 |
| Mar 7, 2016 | Completed final sign-off May 2016 | 555 Market St | Garnett Signs Llc | install 10 evacuation signs - 6 on 5th floor and 4 on 13th floorDetails
install 10 evacuation signs - 6 on 5th floor and 4 on 13th floor | $3,000 |
| Feb 25, 2016 | Completed final sign-off Mar 2017 | 555 Market St | W M Wireless Inc | a modification to an (e) unmanned telecommunication facility consisting of : reanchoring (e) pbc 6500 on (n) wf sleepers. adding batteries ot (e) pbc 6500 for a total of (20) batteries.Details
a modification to an (e) unmanned telecommunication facility consisting of : reanchoring (e) pbc 6500 on (n) wf sleepers. adding batteries ot (e) pbc 6500 for a total of (20) batteries. | $8,000 |
| Feb 19, 2016 | Completed final sign-off Feb 2016 | 555 Market St | Siemens Industry, Inc. | fire alarm work for the "uber" remodel on floor 19; additions are 19 speaker/strobes 4 strobes, as well as the relocation of 1 smoke detector. ref pa 2015-1124-3564.Details
fire alarm work for the "uber" remodel on floor 19; additions are 19 speaker/strobes 4 strobes, as well as the relocation of 1 smoke detector. ref pa 2015-1124-3564. | $11,800 |
| Feb 17, 2016 | Never finaled issued Mar 2016, no final | 555 Market St | Truebeck Construction | 13th flr: revision to ref pa 2016 0107 6554, minor changes to mech & lightingDetails
13th flr: revision to ref pa 2016 0107 6554, minor changes to mech & lighting | |
| Feb 9, 2016 | Never finaled issued Feb 2016, no final | 555 Market St | Anderson, Rowe & Buckley, Inc. | 5th floor: extg fire sprinkler system t.i. : 6 sprinklers, ref app#201601076558. 5 relocated, 1 newDetails
5th floor: extg fire sprinkler system t.i. : 6 sprinklers, ref app#201601076558. 5 relocated, 1 new | $3,000 |
| Feb 9, 2016 | Never finaled issued Feb 2016, no final | 555 Market St | Anderson, Rowe & Buckley, Inc. | 13th floor: extg fire sprinkler system t.i. : 138 sprinklers, ref app#201601076554Details
13th floor: extg fire sprinkler system t.i. : 138 sprinklers, ref app#201601076554 | $69,000 |
| Feb 2, 2016 | Never finaled issued Feb 2016, no final | 555 Market St | Truebeck Construction | 13th floor: revision to app#201601076554. scope is minor addition of lighting in exit passageway. no other work. fire protection under separate permit.Details
13th floor: revision to app#201601076554. scope is minor addition of lighting in exit passageway. no other work. fire protection under separate permit. | $1,000 |
| Jan 28, 2016 | Completed final sign-off Feb 2016 | 555 Market St | Siemens Industry, Inc. | 20th & 21st floors: fire alarm - add 1 relay modul, 18 speakers/strobes, 11 strobes, and the relocation of 1 smoke detector. referenced ti 201511102235 (20th floor), 2015.1110.2237(21 fl)Details
20th & 21st floors: fire alarm - add 1 relay modul, 18 speakers/strobes, 11 strobes, and the relocation of 1 smoke detector. referenced ti 201511102235 (20th floor), 2015.1110.2237(21 fl) | $15,600 |
| Jan 27, 2016 | Never finaled issued Jan 2016, no final | 555 Market St | Garnett Signs Llc | 20 evac maps floors 16,17,.19,20,21Details
20 evac maps floors 16,17,.19,20,21 | $7,000 |
| Jan 21, 2016 | Completed final sign-off Jan 2016 | 555 Market St | Anderson, Rowe & Buckley, Inc. | fire sprinkler system t.i., 16/f- 10 sprinklers, 17/f- 11 sprinklers, 19/f- 5 sprinklers, 20/f- 6 sprinklers, 21/f- 4 sprinklers.Details
fire sprinkler system t.i., 16/f- 10 sprinklers, 17/f- 11 sprinklers, 19/f- 5 sprinklers, 20/f- 6 sprinklers, 21/f- 4 sprinklers. | $20,000 |
| Jan 14, 2016 | Never finaled issued Jan 2016, no final | 555 Market St | Truebeck Construction | 16th floor: revision to app#201511243562. change in light fixture only (1).Details
16th floor: revision to app#201511243562. change in light fixture only (1). | |
| Jan 14, 2016 | Never finaled issued Jan 2016, no final | 555 Market St | Truebeck Construction | 19th floor: revision to app#201511243564. change in light fixture only, one light fixture to a brighter settingDetails
19th floor: revision to app#201511243564. change in light fixture only, one light fixture to a brighter setting | |
| Jan 13, 2016 | Completed final sign-off Feb 2016 | 555 Market St | Truebeck Construction | revision to pa 2015-1110-2235. change in lighting fixtures onlyDetails
revision to pa 2015-1110-2235. change in lighting fixtures only | |
| Jan 13, 2016 | Never finaled issued Jan 2016, no final | 555 Market St | Truebeck Construction | revision to pa 2015-1228-5980. change in lighting fixtures onlyDetails
revision to pa 2015-1228-5980. change in lighting fixtures only | |
| Jan 13, 2016 | Completed final sign-off Feb 2016 | 555 Market St | Truebeck Construction | 21/f: revision to pa 2015-1110-2237. change in lighting fixtures onlyDetails
21/f: revision to pa 2015-1110-2237. change in lighting fixtures only | |
| Jan 11, 2016 | Never finaled issued Jan 2016, no final | 555 Market St | street space permit | ||
| Jan 7, 2016 | Completed final sign-off Jun 2016 | 555 Market St | Truebeck Construction | 5th floor: office t.i. work includes new partitions, millwork, doors, ceilings, finishes, mep. fire protection under seperate permit.Details
5th floor: office t.i. work includes new partitions, millwork, doors, ceilings, finishes, mep. fire protection under seperate permit. | $110,000 |
| Jan 7, 2016 | Completed final sign-off Jun 2016 | 555 Market St | Truebeck Construction | 13th floor: office t.i. work includes new partitions, millwork, doors, ceilings, finishes, mep. fire protection under seperate permits.Details
13th floor: office t.i. work includes new partitions, millwork, doors, ceilings, finishes, mep. fire protection under seperate permits. | $110,000 |
| Dec 28, 2015 | Completed final sign-off Apr 2016 | 555 Market St | Truebeck Construction | non structural tenant improvement to include interior partions, doors frames, hardware, millwork, ceiling. mep as notedDetails
non structural tenant improvement to include interior partions, doors frames, hardware, millwork, ceiling. mep as noted | $110,000 |
| Nov 24, 2015 | Never finaled issued Dec 2015, no final | 555 Market St | Truebeck Construction | 19th floor: t.i. work includes new bathrooms, partitions, doors, millwork, finishes, & mep.Details
19th floor: t.i. work includes new bathrooms, partitions, doors, millwork, finishes, & mep. | $75,000 |
| Nov 24, 2015 | Completed final sign-off Mar 2016 | 555 Market St | Truebeck Construction | 16th floor: t.i. work includes new bathrooms, partitions doors, millwork, ceilings finishes, mep. fire protection under seperate permit.Details
16th floor: t.i. work includes new bathrooms, partitions doors, millwork, ceilings finishes, mep. fire protection under seperate permit. | $75,000 |
| Nov 17, 2015 | Expired or cancelled cancelled Jan 2026 | 555 Market St | modify (e) cell site on rooftop to install (3) (n) antennas; (3) rrh's behind antennas; install (1) new cabinet inside (e) shelter; (3) stealth radomes to cover new antennas; paint radomes, (e) antennas; brackets. cabling; sherwin williams "ponder" colorDetails
modify (e) cell site on rooftop to install (3) (n) antennas; (3) rrh's behind antennas; install (1) new cabinet inside (e) shelter; (3) stealth radomes to cover new antennas; paint radomes, (e) antennas; brackets. cabling; sherwin williams "ponder" color | $10,000 | |
| Nov 16, 2015 | Completed final sign-off Nov 2015 | 555 Market St | Siemens Industry, Inc. | fire alarm work for the "uber" ti remodel on floor 2; additions are 1 duct detector, 1 module, 16 speakers/strobes and 5 strobes. ref pa 2015-0730-2882Details
fire alarm work for the "uber" ti remodel on floor 2; additions are 1 duct detector, 1 module, 16 speakers/strobes and 5 strobes. ref pa 2015-0730-2882 | $11,600 |
| Nov 13, 2015 | Completed final sign-off Nov 2015 | 555 Market St | Siemens Industry, Inc. | fire alarm work for the "uber". ti remodel on floor 6; additions are 1 duct detector, 1 module, and 14 speaker/strobes. ref pa 2015-0601-7616Details
fire alarm work for the "uber". ti remodel on floor 6; additions are 1 duct detector, 1 module, and 14 speaker/strobes. ref pa 2015-0601-7616 | $8,100 |
| Nov 10, 2015 | Completed final sign-off Feb 2016 | 555 Market St | Truebeck Construction | 20th floor: office t.i. work includes partitions, doors, finishes, millwork, ceilings, and mep. fire protection under seperate permit.Details
20th floor: office t.i. work includes partitions, doors, finishes, millwork, ceilings, and mep. fire protection under seperate permit. | $75,000 |
| Nov 10, 2015 | Never finaled issued Nov 2015, no final | 555 Market St | Garnett Signs Llc | 17 evac floors (2,6,7 and 8) | $3,210 |
| Nov 10, 2015 | Completed final sign-off Feb 2016 | 555 Market St | Truebeck Construction | 21st floor: office t.i. work includes partitions, doors, finishes, millwork, ceilings, and mep. fire protection under seperate permit.Details
21st floor: office t.i. work includes partitions, doors, finishes, millwork, ceilings, and mep. fire protection under seperate permit. | $65,000 |
| Nov 6, 2015 | Completed final sign-off Nov 2015 | 555 Market St | Anderson, Rowe & Buckley, Inc. | fire sprinkler ti plugged hds 29, relocated hds 104, added hds 3,Details
fire sprinkler ti plugged hds 29, relocated hds 104, added hds 3, | $55,000 |
| Nov 4, 2015 | Completed final sign-off Nov 2015 | 555 Market St | Anderson, Rowe & Buckley, Inc. | 6th floor: fire sprinkler t.i. one heads, relocate 23, added heads 102. ref app# 201507302876Details
6th floor: fire sprinkler t.i. one heads, relocate 23, added heads 102. ref app# 201507302876 | $64,750 |
| Nov 2, 2015 | Completed final sign-off Mar 2018 | 555 Market St | Field Construction Inc. | the project involves (e) hvac system and duct work upgrade. base building scope of work as part of "warm shell & core". existing ems systems upgrade as part of siemens. fast forward panel mirgration scope of work.Details
the project involves (e) hvac system and duct work upgrade. base building scope of work as part of "warm shell & core". existing ems systems upgrade as part of siemens. fast forward panel mirgration scope of work. | $150,000 |
| Oct 22, 2015 | Never finaled issued Oct 2015, no final | 555 Market St | street space w/mta | ||
| Oct 22, 2015 | Never finaled filed Oct 2015, never issued | 555 Market St | street space permit | ||
| Oct 20, 2015 | Never finaled issued Oct 2015, no final | 555 Market St | Truebeck Construction | 19th floor:limited demolition of extg non-structural interior partitions, doors/frames/hardware, millwork, ceilings, finishes, mechanical, electrical and plmg as noted. sf ab-017Details
19th floor:limited demolition of extg non-structural interior partitions, doors/frames/hardware, millwork, ceilings, finishes, mechanical, electrical and plmg as noted. sf ab-017 | $15,000 |
| Oct 20, 2015 | Never finaled issued Oct 2015, no final | 555 Market St | Truebeck Construction | 16th floor:limited demolition of extg non-structural interior partitions, doors/frames/hardware, millwork, ceilings, finishes, mechanical, electrical and plmg as noted. sf ab-017Details
16th floor:limited demolition of extg non-structural interior partitions, doors/frames/hardware, millwork, ceilings, finishes, mechanical, electrical and plmg as noted. sf ab-017 | $15,000 |
| Oct 20, 2015 | Completed final sign-off Apr 2016 | 555 Market St | Truebeck Construction | 17th floor:limited demolition of extg non-structural interior partitions, doors/frames/hardware, millwork, ceilings, finishes, mechanical, electrical and plmg as noted. sf ab-017Details
17th floor:limited demolition of extg non-structural interior partitions, doors/frames/hardware, millwork, ceilings, finishes, mechanical, electrical and plmg as noted. sf ab-017 | $10,000 |
| Oct 20, 2015 | Completed final sign-off Feb 2016 | 555 Market St | Truebeck Construction | 20th floor:limited demolition of extg non-structural interior partitions, doors/frames/hardware, millwork, ceilings, finishes, mechanical, electrical and plmg as noted. sf ab-017Details
20th floor:limited demolition of extg non-structural interior partitions, doors/frames/hardware, millwork, ceilings, finishes, mechanical, electrical and plmg as noted. sf ab-017 | $15,000 |
| Oct 20, 2015 | Never finaled issued Oct 2015, no final | 555 Market St | Truebeck Construction | 5th floor:limited demolition of extg non-structural interior partitions, doors/frames/hardware, millwork, ceilings, finishes, mechanical, electrical and plmg as noted. sf ab-017Details
5th floor:limited demolition of extg non-structural interior partitions, doors/frames/hardware, millwork, ceilings, finishes, mechanical, electrical and plmg as noted. sf ab-017 | $15,000 |
| Oct 20, 2015 | Completed final sign-off Feb 2016 | 555 Market St | Truebeck Construction | 21st floor:limited demolition of extg non-structural interior partitions, doors/frames/hardware, millwork, ceilings, finishes, mechanical, electrical and plmg as noted. sf ab-017Details
21st floor:limited demolition of extg non-structural interior partitions, doors/frames/hardware, millwork, ceilings, finishes, mechanical, electrical and plmg as noted. sf ab-017 | $15,000 |
| Oct 8, 2015 | Completed final sign-off Oct 2015 | 555 Market St | Siemens Industry, Inc. | 6th floor: fire alarm work for the uber t.i. projects on floor 7 and 8. additions are one module, 7 speaker/strobes, and 5 strobes. ref t.i. #201509015808 for 8th floor and 201509015804 for 7th floor.Details
6th floor: fire alarm work for the uber t.i. projects on floor 7 and 8. additions are one module, 7 speaker/strobes, and 5 strobes. ref t.i. #201509015808 for 8th floor and 201509015804 for 7th floor. | $6,500 |
| Sep 24, 2015 | Completed final sign-off Nov 2015 | 555 Market St | Truebeck Construction | 8th floor: revision to pa 2015 0901 5808 - remove horizontal exit & extend exit seperation w/1hour rated corridorDetails
8th floor: revision to pa 2015 0901 5808 - remove horizontal exit & extend exit seperation w/1hour rated corridor | |
| Sep 21, 2015 | Completed final sign-off Nov 2015 | 555 Market St | Truebeck Construction | 8th floor - revision to approved pa 2015-09-01-5808. changes to mep onlyDetails
8th floor - revision to approved pa 2015-09-01-5808. changes to mep only | |
| Sep 21, 2015 | Completed final sign-off Nov 2015 | 555 Market St | Truebeck Construction | 7th floor - revision to approved pa 2015-09-01-5804. changes to mep onlyDetails
7th floor - revision to approved pa 2015-09-01-5804. changes to mep only | |
| Sep 21, 2015 | Completed final sign-off Sep 2015 | 555 Market St | Anderson, Rowe & Buckley, Inc. | 7th & 8th floor: fire sprinklers - 7th: relocate 2 head, added 2 heads.reference arch#2015.0901.5804 8th flr: relocate 2 heads, added 1 head. reference arch 2015.09015808Details
7th & 8th floor: fire sprinklers - 7th: relocate 2 head, added 2 heads.reference arch#2015.0901.5804 8th flr: relocate 2 heads, added 1 head. reference arch 2015.09015808 | $3,700 |
| Sep 18, 2015 | Never finaled issued Sep 2015, no final | 555 Market St | Truebeck Construction | 2/f: revision to approved pa 2015-0730-2882, scope is to relocate wall partition, door & hallway in related area. no change to mep fire protection under separate permitDetails
2/f: revision to approved pa 2015-0730-2882, scope is to relocate wall partition, door & hallway in related area. no change to mep fire protection under separate permit | $10,000 |
| Sep 1, 2015 | Completed final sign-off Nov 2015 | 555 Market St | Truebeck Construction | 7th floor: ti office work, includes (n) partitions, doors, ceiling, finishes, mepDetails
7th floor: ti office work, includes (n) partitions, doors, ceiling, finishes, mep | $125,000 |
| Sep 1, 2015 | Completed final sign-off Nov 2015 | 555 Market St | Truebeck Construction | 8th floor: ti office work, includes (n) partitions, doors, ceiling, finishes, mepDetails
8th floor: ti office work, includes (n) partitions, doors, ceiling, finishes, mep | $100,000 |
| Aug 24, 2015 | Completed final sign-off Nov 2015 | 555 Market St | Truebeck Construction | limited demolition of (e) non-structural interior partitions, doors/frames/hardware, millwork, ceiling, finishes. architectural, mechanical, electrical and plumbing under separate permit. sfab-017Details
limited demolition of (e) non-structural interior partitions, doors/frames/hardware, millwork, ceiling, finishes. architectural, mechanical, electrical and plumbing under separate permit. sfab-017 | $50,000 |
| Aug 24, 2015 | Completed final sign-off Nov 2015 | 555 Market St | Truebeck Construction | limited demolition of (e) non-structural interior partitions, doors/frames/hardware, millwork, ceiling, finishes. architectural, mechanical, electrical and plumbing under separate permit. sfab-017Details
limited demolition of (e) non-structural interior partitions, doors/frames/hardware, millwork, ceiling, finishes. architectural, mechanical, electrical and plumbing under separate permit. sfab-017 | $50,000 |
| Jul 30, 2015 | Completed final sign-off Jan 2016 | 555 Market St | Truebeck Construction | 6th floor - revision to appl #2015.0601.7616: remvoal of assembly training room, enlarge serving & employee area, relocate pantry. work to include mechanical, electrical, & plumbing. fire sprinkler under separate permit.Details
6th floor - revision to appl #2015.0601.7616: remvoal of assembly training room, enlarge serving & employee area, relocate pantry. work to include mechanical, electrical, & plumbing. fire sprinkler under separate permit. | |
| Jul 30, 2015 | Never finaled issued Sep 2015, no final | 555 Market St | Truebeck Construction | 2nd floor - domo of non-structural partitions, construction of new partitions doors, millwork, m.e.p. sprinklers under separate permit.Details
2nd floor - domo of non-structural partitions, construction of new partitions doors, millwork, m.e.p. sprinklers under separate permit. | $1,866,061 |
| Jun 25, 2015 | Completed final sign-off Nov 2015 | 555 Market St | Westower Communications | remove nextel antennas, coax, radio equipment & gps antennas, shelter to remain. fire rated assemblies to be maintained/patch roofing as necessaryDetails
remove nextel antennas, coax, radio equipment & gps antennas, shelter to remain. fire rated assemblies to be maintained/patch roofing as necessary | $10,000 |
| Jun 23, 2015 | Completed final sign-off Jun 2016 | 555 Market St | Walker Cellular Inc | "t-mobile" wireless proposes to modify an (e) wireless communicaiton site. scope will consist: install 3 new 8' l700 panel antennas adj to (e) panel antennas. replace (e) dul20 w/new dus 41 main unit within (e) equipment cabinet. re-use (e) hcs fiber/coax cables. install cmu, if available.Details
"t-mobile" wireless proposes to modify an (e) wireless communicaiton site. scope will consist: install 3 new 8' l700 panel antennas adj to (e) panel antennas. replace (e) dul20 w/new dus 41 main unit within (e) equipment cabinet. re-use (e) hcs fiber/coax cables. install cmu, if available. | $20,000 |
| Jun 1, 2015 | Never finaled issued Jun 2015, no final | 555 Market St | Truebeck Construction | 6th floor construction of (n) assembly spaces (a-3) for single tenant "uber" demo of partition & installation of new partitions, (n) doors, millwork, ceilings, finishes. new food service area (no range) & assembly roof deck. fire/life safety & mep under separate permit.Details
6th floor construction of (n) assembly spaces (a-3) for single tenant "uber" demo of partition & installation of new partitions, (n) doors, millwork, ceilings, finishes. new food service area (no range) & assembly roof deck. fire/life safety & mep under separate permit. | $1,600,000 |
| May 26, 2015 | Completed final sign-off Jul 2015 | 555 Market St | Siemens Industry, Inc. | 4th/9th/10th floors: (no new walls). fire alarm: add 25 speaker/strobes and 16 strobes.Details
4th/9th/10th floors: (no new walls). fire alarm: add 25 speaker/strobes and 16 strobes. | $20,500 |
| May 12, 2015 | Completed final sign-off Jul 2015 | 555 Market St | Acco Engineered Systems Inc. Dba Acco En | 11th fl: exhaust fan to serve breakroom. thermostat per new tenant requirements. air outlets where necessary; ref. 201503261921.Details
11th fl: exhaust fan to serve breakroom. thermostat per new tenant requirements. air outlets where necessary; ref. 201503261921. | $11,000 |
| May 7, 2015 | Completed final sign-off Jul 2015 | 555 Market St | Hathaway Dinwiddie Co. | 11th flr: design build electrical engineered drawing. addendum to 2015 0326 1921. connecting power to new or relocated light fixtures, power outlets and tenant equipmentDetails
11th flr: design build electrical engineered drawing. addendum to 2015 0326 1921. connecting power to new or relocated light fixtures, power outlets and tenant equipment | |
| Apr 23, 2015 | Completed final sign-off Jul 2015 | 555 Market St | Golden Gate Fire Protection Inc | 11th flr: fire sprinkler only- relocate 2 pendents, add 8 pendents ref 2015-0326-1921Details
11th flr: fire sprinkler only- relocate 2 pendents, add 8 pendents ref 2015-0326-1921 | $5,000 |
| Apr 17, 2015 | Completed final sign-off Jun 2015 | 555 Market St | Siemens Industry, Inc. | 11th flr: fire alarm ti for "morrison & foerster". aditions are 3 speaker/strobes ref # 2015 0326 1921Details
11th flr: fire alarm ti for "morrison & foerster". aditions are 3 speaker/strobes ref # 2015 0326 1921 | $1,500 |
| Apr 15, 2015 | Completed final sign-off May 2017 | 555 Market St | Field Construction Inc. | demolition of interconnecting stairs between 5th and 6th flrs and refill of slab as required to separate floors. not for egress. floors 5 and 6 currently unoccupied and will remain unoccupied. any tenant work will be submitted under separate permit. no change in occupancy . no change in floor areaDetails
demolition of interconnecting stairs between 5th and 6th flrs and refill of slab as required to separate floors. not for egress. floors 5 and 6 currently unoccupied and will remain unoccupied. any tenant work will be submitted under separate permit. no change in occupancy . no change in floor area | $150,000 |
| Apr 1, 2015 | Expired or cancelled cancelled Jan 2026 | 555 Market St | Field Construction Inc. | 5th & 6th: circulation stair to be removed. 6th flr opening at stair to be infilled.Details
5th & 6th: circulation stair to be removed. 6th flr opening at stair to be infilled. | $50,000 |
| Mar 26, 2015 | Completed final sign-off Jul 2015 | 555 Market St | Hathaway Dinwiddie Co. | 11th flr: modification of 2 (e) office zones into 1. sm open office dept walled off from adjacent open office zones. 2. convert conference rm & open plan into break room. 3. upgrade of previous 1-hr seperation for h.r.egress seperation to 2 h.r. ele/plumb/mech - under seperate permtDetails
11th flr: modification of 2 (e) office zones into 1. sm open office dept walled off from adjacent open office zones. 2. convert conference rm & open plan into break room. 3. upgrade of previous 1-hr seperation for h.r.egress seperation to 2 h.r. ele/plumb/mech - under seperate permt | $180,000 |
| Nov 12, 2014 | Completed final sign-off Jan 2015 | 555 Market St | Field Construction Inc. | demolition of non structural partitions, power & data outlets & removal of finishes on the 13/floor, re fire proofing as needed. this floor is unoccupied & ref. to ab-017Details
demolition of non structural partitions, power & data outlets & removal of finishes on the 13/floor, re fire proofing as needed. this floor is unoccupied & ref. to ab-017 | $45,000 |
| Oct 31, 2014 | Completed final sign-off May 2015 | 555 Market St | Service Station Systems Inc. | replace (e) tank monitoring system panel with new veeder root tls 350c "like for like"Details
replace (e) tank monitoring system panel with new veeder root tls 350c "like for like" | $4,800 |
| Oct 10, 2014 | Completed final sign-off Oct 2014 | 555 Market St | Pribuss Engineering Inc | 13th floor fire sprinkler - relcoate 73 (convert pendent to upright coverage w/new upright spklrs), add 4, total 77.Details
13th floor fire sprinkler - relcoate 73 (convert pendent to upright coverage w/new upright spklrs), add 4, total 77. | $39,626 |
| Dec 13, 2013 | Never finaled issued Dec 2013, no final | 555 Market St | Acco Engineered Systems Inc. Dba Acco En | replace existing auxilliary chillers and chilled water pumps, add (2) variable frequency drives, modify piping.Details
replace existing auxilliary chillers and chilled water pumps, add (2) variable frequency drives, modify piping. | $125,000 |
| Jul 26, 2013 | Completed final sign-off Aug 2013 | 555 Market St | Siemens Industry, Inc. | 18th floor:addition of 15 speaker/strobes and 7 strobes for the "protiviti" remodel on floor 18. all new devices connect onto the life safety system.Details
18th floor:addition of 15 speaker/strobes and 7 strobes for the "protiviti" remodel on floor 18. all new devices connect onto the life safety system. | $10,800 |
| Jul 25, 2013 | Completed final sign-off Aug 2013 | 555 Market St | Ayoob & Peery Plumbing Co Inc | 18th floor tenant improvement: add (7), relocate (37) sprinkler heads. ref pa #2013.06.11.9140Details
18th floor tenant improvement: add (7), relocate (37) sprinkler heads. ref pa #2013.06.11.9140 | $22,600 |
| Jun 11, 2013 | Completed final sign-off Oct 2013 | 555 Market St | Novo Construction Inc | non-structural alteration. (n) non-structural partitions, ceiling, lights, electrical, finishes, millwork. no change in area use, occupancy. mep, sprinkler & fire alarm under sep permit.Details
non-structural alteration. (n) non-structural partitions, ceiling, lights, electrical, finishes, millwork. no change in area use, occupancy. mep, sprinkler & fire alarm under sep permit. | $450,000 |
| Mar 5, 2013 | Never finaled issued Mar 2013, no final | 555 Market St | Gci, Inc | demolition of non-structural low-height partitions, power data outlets and removal of floor finishes. fire alarm, sprinkler drawings will be under separate permit, ada (minor) at restroom.Details
demolition of non-structural low-height partitions, power data outlets and removal of floor finishes. fire alarm, sprinkler drawings will be under separate permit, ada (minor) at restroom. | $3,000 |
| Dec 10, 2012 | Completed final sign-off Oct 2013 | 555 Market St | Gci, Inc | 5th floor:the scope of work is for the demolition of non structural low height partitions, power/dated outlet and removal of floor finishes. fire alarm, sprklr drawings will be under seperate permitDetails
5th floor:the scope of work is for the demolition of non structural low height partitions, power/dated outlet and removal of floor finishes. fire alarm, sprklr drawings will be under seperate permit | $3,000 |
| Sep 25, 2012 | Completed final sign-off Oct 2012 | 555 Market St | Siemens Industry, Inc. | addition of one speaker/strobe for the wellness room, remodel on floor 1, the new device connects onto the life safety systemDetails
addition of one speaker/strobe for the wellness room, remodel on floor 1, the new device connects onto the life safety system | $600 |
| Sep 17, 2012 | Never finaled issued Sep 2012, no final | 555 Market St | Pioneer Fire Inc. | ground floor-relocate 6 pendent fire sprinklers delete 2 pendentsDetails
ground floor-relocate 6 pendent fire sprinklers delete 2 pendents | $2,500 |
| Jun 28, 2012 | Completed final sign-off Jul 2012 | 555 Market St | Siemens Industry, Inc. | addition of 2 smoke detectors, 10 duct detectors, 3 relay modules, 3 speaker/strobes, and 4 strobes for the floor 1 "lobby areas" and floor 3 " s11 fan room" projects. all devices connect onto the life safety system.Details
addition of 2 smoke detectors, 10 duct detectors, 3 relay modules, 3 speaker/strobes, and 4 strobes for the floor 1 "lobby areas" and floor 3 " s11 fan room" projects. all devices connect onto the life safety system. | $10,500 |
| Jun 13, 2012 | Completed final sign-off Jan 2013 | 555 Market St | Field Construction Inc. | the scope of work is demolition and construcgtion of non structural partitions, ceiling, light fixtures, and finishes. no change in area, occupancy or use. fire alarm, sprinkler, will be submitted under separate permit.Details
the scope of work is demolition and construcgtion of non structural partitions, ceiling, light fixtures, and finishes. no change in area, occupancy or use. fire alarm, sprinkler, will be submitted under separate permit. | $40,000 |
| May 7, 2012 | Completed final sign-off Feb 2013 | 555 Market St | Viking Sign Installations | installation of one single face illuminated sign.Details
installation of one single face illuminated sign. | $10,000 |
| May 3, 2012 | Never finaled issued May 2012, no final | 555 Market St | Pioneer Fire Inc. | 2nd floor-remodel of all outlined areas, consisting of converting 2 upright sprinklers to the pendent positionDetails
2nd floor-remodel of all outlined areas, consisting of converting 2 upright sprinklers to the pendent position | $1,000 |
| May 2, 2012 | Completed final sign-off Jul 2012 | 555 Market St | Siemens Industry, Inc. | 1st floor:addition of 2 smoke detectors, 2 relay modules, 1 speaker, 15 speaker/strobes, and 5 strobes for the 'bank of the west' remodel on floor 1. all devices connect onto the life safety system.Details
1st floor:addition of 2 smoke detectors, 2 relay modules, 1 speaker, 15 speaker/strobes, and 5 strobes for the 'bank of the west' remodel on floor 1. all devices connect onto the life safety system. | $11,400 |
| May 1, 2012 | Completed final sign-off Jul 2012 | 555 Market St | Viking Sign Installations | to install one single face electrical sign.Details
to install one single face electrical sign. | $10,000 |
| Mar 9, 2012 | Completed final sign-off Jan 2013 | 555 Market St | Field Construction Inc. | ground floor lobby remodel - work includes replacement of wood panel wall cladding, new ceiling soffitts, new ceiling ligting & new guard desk. work also includes reconfiguration of hvac system to separate lobby from adjacent leased space. no work to exterior is proposed.Details
ground floor lobby remodel - work includes replacement of wood panel wall cladding, new ceiling soffitts, new ceiling ligting & new guard desk. work also includes reconfiguration of hvac system to separate lobby from adjacent leased space. no work to exterior is proposed. | $450,000 |
| Mar 1, 2012 | Never finaled issued Mar 2012, no final | 555 Market St | Pioneer Fire Inc. | 1st floor "bank of the west" relocate 59 fire sprinklers, add 3 fire sprinklers, remove 2 fire sprinklers.Details
1st floor "bank of the west" relocate 59 fire sprinklers, add 3 fire sprinklers, remove 2 fire sprinklers. | $18,000 |
| Mar 1, 2012 | Completed final sign-off Nov 2012 | 555 Market St | Pioneer Fire Inc. | 1st floor - relocate 22 fire sprinklers, add 5 fire sprinklers, remove 1 fire sprinkler. space remain core & shell.Details
1st floor - relocate 22 fire sprinklers, add 5 fire sprinklers, remove 1 fire sprinkler. space remain core & shell. | $10,000 |
| Feb 1, 2012 | Completed final sign-off Jan 2013 | 555 Market St | Field Construction Inc. | ground floor: demo drywall ceiling, wood paneling on walls, all ceilings and wall sconce lighting in main lobby.Details
ground floor: demo drywall ceiling, wood paneling on walls, all ceilings and wall sconce lighting in main lobby. | $16,000 |
| Jan 30, 2012 | Completed final sign-off Feb 2012 | 555 Market St | Howard S. Wright Constructors Lp | lobby- revision to app#201111028105. original permit was to install 5 new windows. revision adds the replacement of 4 extg windows, same size, same location.Details
lobby- revision to app#201111028105. original permit was to install 5 new windows. revision adds the replacement of 4 extg windows, same size, same location. | $10,000 |
| Jan 19, 2012 | Completed final sign-off Aug 2012 | 555 Market St | Field Construction Inc. | tenant improvement on ground floor including demo, partitions, electrical, mechanical, plumbing, structural, ceilings, finishes. life safety under separate permits.Details
tenant improvement on ground floor including demo, partitions, electrical, mechanical, plumbing, structural, ceilings, finishes. life safety under separate permits. | $916,375 |
| Jan 4, 2012 | Never finaled issued Jan 2012, no final | 555 Market St | street space permit | ||
| Dec 30, 2011 | Completed final sign-off Jan 2013 | 555 Market St | Field Construction Inc. | demolish interior wall for new door; construction of 4 individual shower rooms for building tenants on the first floor of 555 market street, one of these 4 rooms is fully accessible. mechanical, electrical and plumbing systems reconfiguration to provide adequate functions of these shower rooms.Details
demolish interior wall for new door; construction of 4 individual shower rooms for building tenants on the first floor of 555 market street, one of these 4 rooms is fully accessible. mechanical, electrical and plumbing systems reconfiguration to provide adequate functions of these shower rooms. | $200,000 |
| Dec 29, 2011 | Never finaled issued Feb 2012, no final | 555 Market St | Overland Contracting Inc, Slc Inc | wireless facility modification: replace 3 panel antennas w/ 6 (n) panel antennas; replace 2 (e) equipment cabinets w/ 2 equipment cabinets in (e) equipment shelter; run coaxial lines from equipment to antennas.Details
wireless facility modification: replace 3 panel antennas w/ 6 (n) panel antennas; replace 2 (e) equipment cabinets w/ 2 equipment cabinets in (e) equipment shelter; run coaxial lines from equipment to antennas. | $45,000 |
| Dec 12, 2011 | Never finaled issued Dec 2011, no final | 555 Market St | Field Construction Inc. | demolish existing interior partitions, construct new interior partitions (no structural work). demolish existing mechanical and reconfigure for future tenant improvement.Details
demolish existing interior partitions, construct new interior partitions (no structural work). demolish existing mechanical and reconfigure for future tenant improvement. | $450,000 |
| Dec 5, 2011 | Never finaled issued Dec 2011, no final | 555 Market St | streetspace | ||
| Nov 2, 2011 | Completed final sign-off Feb 2012 | 555 Market St | construction of new concrete shear wall along line "f". installation of five new fixed windows at ground floor level along line "f" to match (e) four windows in same space.Details
construction of new concrete shear wall along line "f". installation of five new fixed windows at ground floor level along line "f" to match (e) four windows in same space. | $80,000 | |
| Aug 6, 2010 | Completed final sign-off Aug 2011 | 555 Market St | Cccs, Inc | installation of an unmanned telecommunications facility, consisting of equipment cabinets installed within an (e) room on the 21st floor, and antennas mounted on the roof.Details
installation of an unmanned telecommunications facility, consisting of equipment cabinets installed within an (e) room on the 21st floor, and antennas mounted on the roof. | $65,000 |
| Jun 17, 2010 | Expired or cancelled expired Nov 2013 | 555 Market St | Gci, Inc | electrical and lighting for ti under pa# 2010.05.20.2840 in existing office aspace to connect new or relocated fixtures outlets and equipment.Details
electrical and lighting for ti under pa# 2010.05.20.2840 in existing office aspace to connect new or relocated fixtures outlets and equipment. | $18,132 |
| May 26, 2010 | Expired or cancelled expired Nov 2013 | 555 Market St | Gci, Inc | hvac work for 16th floor ti to demo 2 supply air diffusers, return transger grilles, duct work and thermostat. relocate existing thermostat. spiral duct and upgrade air flow. all work is in breakroom only. ti approved under pa# 2010.05.20.2840Details
hvac work for 16th floor ti to demo 2 supply air diffusers, return transger grilles, duct work and thermostat. relocate existing thermostat. spiral duct and upgrade air flow. all work is in breakroom only. ti approved under pa# 2010.05.20.2840 | $2,800 |
| May 20, 2010 | Expired or cancelled expired Nov 2013 | 555 Market St | Gci, Inc | 17th floor- demolition of office partitions, doors, power & tel./data receptacle & finishes on a (e) single tenant flr. construction of (n) tel./data receptacles & finishes. space is currently occupied. mep system modidification are to be provided under separate permit. fire alarm sep. permit.Details
17th floor- demolition of office partitions, doors, power & tel./data receptacle & finishes on a (e) single tenant flr. construction of (n) tel./data receptacles & finishes. space is currently occupied. mep system modidification are to be provided under separate permit. fire alarm sep. permit. | $48,503 |
| Jan 5, 2010 | Never finaled issued Jan 2010, no final | 555 Market St | Pioneer Fire Inc. | 1st floor. demo all pendent sprinklers to bring system back to shell conditions.Details
1st floor. demo all pendent sprinklers to bring system back to shell conditions. | $10,000 |
| Oct 5, 2009 | Never finaled filed Oct 2009, never issued | 555 Market St | remove advertising signs from windows at ground level including "for lease" and citibank signs.Details
remove advertising signs from windows at ground level including "for lease" and citibank signs. | $2,500 | |
| Aug 17, 2009 | Completed final sign-off Oct 2009 | 555 Market St | Siemens Industry, Inc. | 15th floor: addition of 4 smoke detectors, one duct detector, 17 speaker/strobes, 2 strobes for the "tetra tech" remodel on floor 15. all new devices connect onto the existing life safety system.Details
15th floor: addition of 4 smoke detectors, one duct detector, 17 speaker/strobes, 2 strobes for the "tetra tech" remodel on floor 15. all new devices connect onto the existing life safety system. | $9,800 |
| Jul 31, 2009 | Completed final sign-off Jun 2010 | 555 Market St | Metropolitan Electrical Construction | installation of two base transceiver cabinet on the roof top. three panel antennas ( 1 per sector) on the existing open mounts along helipad edge. oe internet services exchange antennas on a monopole along helipad edge (clearwire); 1 gps antenna.Details
installation of two base transceiver cabinet on the roof top. three panel antennas ( 1 per sector) on the existing open mounts along helipad edge. oe internet services exchange antennas on a monopole along helipad edge (clearwire); 1 gps antenna. | $45,000 |
| Jul 27, 2009 | Completed final sign-off Oct 2009 | 555 Market St | Ayoob & Peery Plumbing Co Inc | relocate, add & removed fire sprinkler heads per tenant improvements. (77 relocated, 28 add, 1 removed).Details
relocate, add & removed fire sprinkler heads per tenant improvements. (77 relocated, 28 add, 1 removed). | $15,000 |
| Jul 20, 2009 | Completed final sign-off Oct 2009 | 555 Market St | Gci, Inc | electrical work for full floor t.i. to connect power to new and relocated fixtures & outlets. refer to t.i. work on p.a.#2009/0604/9760.Details
electrical work for full floor t.i. to connect power to new and relocated fixtures & outlets. refer to t.i. work on p.a.#2009/0604/9760. | $120,043 |
| Jul 15, 2009 | Completed final sign-off Feb 2010 | 555 Market St | Acco Engineered Systems Inc. Dba Acco En | install 16 re-heat vav boxes, 1 cooling only vav box, 1 transfer fan and 1 fire smoke damper. work on 15th floor.Details
install 16 re-heat vav boxes, 1 cooling only vav box, 1 transfer fan and 1 fire smoke damper. work on 15th floor. | $142,000 |
| Jun 4, 2009 | Completed final sign-off Oct 2009 | 555 Market St | Gci, Inc | demolition of (e) items and construction of non-structural walls, doors, glazing,ceiling,light fixtures, millwork and finishes. (m.e.p. , fire alarm and sprinklers under separate permit.Details
demolition of (e) items and construction of non-structural walls, doors, glazing,ceiling,light fixtures, millwork and finishes. (m.e.p. , fire alarm and sprinklers under separate permit. | $450,000 |
| Mar 3, 2009 | Completed final sign-off Apr 2009 | 555 Market St | Gci, Inc | 7th floor-electrical t24 for partial floor t.i toshow changes in outlets & fixtures to accomodate t.i work. please refer to pa# 2009-0127-0869.Details
7th floor-electrical t24 for partial floor t.i toshow changes in outlets & fixtures to accomodate t.i work. please refer to pa# 2009-0127-0869. | $9,074 |
| Feb 26, 2009 | Completed final sign-off Apr 2009 | 555 Market St | Siemens Industry, Inc. | addition of 1 speaker/strobe, and the reloction of an speaker/strobe and strobe, for the omd expansion remodel on floor 7. all devices connect onto extg life safety system circuits.Details
addition of 1 speaker/strobe, and the reloction of an speaker/strobe and strobe, for the omd expansion remodel on floor 7. all devices connect onto extg life safety system circuits. | $900 |
| Jan 27, 2009 | Completed final sign-off Apr 2009 | 555 Market St | Gci, Inc | #700- demolition of partitions, doors, power/tel. data receptacles, ceiling grid + finisheson existing multi tenant flr. constr. of (n) partitions, doors, ceiling, power + tel./data receptacles + fin. mech., elec., + sprinkler system mod. under separate pemitDetails
#700- demolition of partitions, doors, power/tel. data receptacles, ceiling grid + finisheson existing multi tenant flr. constr. of (n) partitions, doors, ceiling, power + tel./data receptacles + fin. mech., elec., + sprinkler system mod. under separate pemit | $50,000 |
| Apr 11, 2008 | Completed final sign-off Apr 2008 | 555 Market St | Pioneer Fire Protection | umbrella permit to verify building is fully sprinklered and in full compliance with the requirements of san francisco high-rise retrofit sprinkler ordinance #377-93.Details
umbrella permit to verify building is fully sprinklered and in full compliance with the requirements of san francisco high-rise retrofit sprinkler ordinance #377-93. | |
| Apr 3, 2008 | Completed final sign-off Apr 2008 | 555 Market St | Pioneer Fire Protection | 6th floor: revision to appl #200804028586 to add 6 sprinkler systems to generator room.Details
6th floor: revision to appl #200804028586 to add 6 sprinkler systems to generator room. | |
| Apr 2, 2008 | Completed final sign-off Apr 2008 | 555 Market St | Pioneer Fire Protection | add and relocate sprinkler to comply with high rise complaince-total of 37 sprinklersDetails
add and relocate sprinkler to comply with high rise complaince-total of 37 sprinklers | $10,000 |
| Dec 28, 2007 | Completed final sign-off Dec 2007 | 555 Market St | Ayoob & Peery Plumbing Co Inc | renew pa#200602235227,#200602144577 for final inspeciton.Details
renew pa#200602235227,#200602144577 for final inspeciton. | |
| Dec 28, 2007 | Completed final sign-off Dec 2007 | 555 Market St | Ayoob & Peery Plumbing Co Inc | renew pa# 2006/02/14/4580, pa# 2006/02/14/4576 & pa# 2007/04/05/8172 for final inspection only.Details
renew pa# 2006/02/14/4580, pa# 2006/02/14/4576 & pa# 2007/04/05/8172 for final inspection only. | |
| Dec 21, 2007 | Completed final sign-off Jan 2008 | 555 Market St | renewal of pa 200409305615 for final inspection only.Details
renewal of pa 200409305615 for final inspection only. | ||
| Jul 13, 2007 | Completed final sign-off Oct 2007 | 555 Market St | Siemens Industry, Inc. | basement -addition of 3 speaker/strobes & 3 strobes for the men & women "locker rooms" remodel on the basement level. all new devices will connect onto existing circuits. no new alarm initiating devces are being added.Details
basement -addition of 3 speaker/strobes & 3 strobes for the men & women "locker rooms" remodel on the basement level. all new devices will connect onto existing circuits. no new alarm initiating devces are being added. | $2,100 |
| May 17, 2007 | Completed final sign-off Jun 2007 | 555 Market St | Gci, Inc | renew pa#200603096319,3200604270047,#200604269948 for final inspection.Details
renew pa#200603096319,3200604270047,#200604269948 for final inspection. | |
| May 16, 2007 | Completed final sign-off Aug 2007 | 555 Market St | Gci, Inc | oti-3, 10th floor, meDetails
oti-3, 10th floor, me | $130,777 |
| May 4, 2007 | Completed final sign-off May 2007 | 555 Market St | Gci, Inc | renewal of pa# 2006/05/08/0922, pa# 2004/08/20/2149 & pa# 2006/08/29/0847 for final inspection only.Details
renewal of pa# 2006/05/08/0922, pa# 2004/08/20/2149 & pa# 2006/08/29/0847 for final inspection only. | |
| May 4, 2007 | Completed final sign-off May 2007 | 555 Market St | Gci, Inc | renewal of pa# 2006/08/09/8995 for final inspection only.Details
renewal of pa# 2006/08/09/8995 for final inspection only. | |
| May 4, 2007 | Completed final sign-off Aug 2007 | 555 Market St | Gci, Inc | oti-3, 10th floor, el.Details
oti-3, 10th floor, el. | $98,557 |
| May 1, 2007 | Completed final sign-off Aug 2007 | 555 Market St | Siemens Industry, Inc. | 10th floor-additions to the (e) life safety system on floor 10 for the "phd" tenant as follows: 7 smoke detectors including one for a return air fsd; one duct detector for a tenant fsd; one relay module for electric door lock control; 14 speakers/strobes, 6 strobes.Details
10th floor-additions to the (e) life safety system on floor 10 for the "phd" tenant as follows: 7 smoke detectors including one for a return air fsd; one duct detector for a tenant fsd; one relay module for electric door lock control; 14 speakers/strobes, 6 strobes. | $12,500 |
| May 1, 2007 | Never finaled issued May 2007, no final | 555 Market St | Siemens Industry, Inc. | 10th floor-additions to the (e) life safety system on floor 10 for the "phd" tenant as follows: 7 smoke detectors including one for a return air fsd; one duct detector for a tenant fsd; one relay module for electric door lock control; 14 speaker/strobes, 6 strobes.Details
10th floor-additions to the (e) life safety system on floor 10 for the "phd" tenant as follows: 7 smoke detectors including one for a return air fsd; one duct detector for a tenant fsd; one relay module for electric door lock control; 14 speaker/strobes, 6 strobes. | $125,000 |
| Apr 25, 2007 | Completed final sign-off Oct 2007 | 555 Market St | rreef management: oti-1 basement, el, me, ls, spDetails
rreef management: oti-1 basement, el, me, ls, sp | $90,000 | |
| Apr 12, 2007 | Completed final sign-off Aug 2007 | 555 Market St | Gci, Inc | rreef: oti-2 10th floor spDetails
rreef: oti-2 10th floor sp | $13,350 |
| Apr 10, 2007 | Completed final sign-off Apr 2007 | 555 Market St | Gci, Inc | 9th floor-renewal of pa# 200508109891 & 200611077017 for final.Details
9th floor-renewal of pa# 200508109891 & 200611077017 for final. | |
| Apr 5, 2007 | Expired or cancelled expired Dec 2007 | 555 Market St | Ayoob & Peery Plumbing Co Inc | install fire speriinkler at penthouse overhang connect to existing system totatl = 24 headsDetails
install fire speriinkler at penthouse overhang connect to existing system totatl = 24 heads | $4,500 |
| Feb 1, 2007 | Completed final sign-off Aug 2007 | 555 Market St | Gci, Inc | oti-1, rreef mgmt, 10/fl, el, ls, sp.Details
oti-1, rreef mgmt, 10/fl, el, ls, sp. | $300,000 |
| Dec 5, 2006 | Completed final sign-off Aug 2007 | 555 Market St | Siemens Industry, Inc. | addition of 2 speaker/strobes (restrooms), one duct detector (new fire/smoke damper), & one smoke detector (existing telephone room) for the "restrooms/fsd" project on floor 10.Details
addition of 2 speaker/strobes (restrooms), one duct detector (new fire/smoke damper), & one smoke detector (existing telephone room) for the "restrooms/fsd" project on floor 10. | $1,900 |
| Nov 14, 2006 | Completed final sign-off Jan 2007 | 555 Market St | renew app #200601192562 and 200601192564 (missing job cards)Details
renew app #200601192562 and 200601192564 (missing job cards) | ||
| Nov 7, 2006 | Expired or cancelled expired Apr 2007 | 555 Market St | Gci, Inc | renew pa#200509304467,#200508109893 for final inspection.Details
renew pa#200509304467,#200508109893 for final inspection. | |
| Oct 17, 2006 | Expired or cancelled expired Jun 2008 | 555 Market St | Siemens Industry, Inc. | as-built device location drawing for 3 fl remodels.re-submit to get all as-built permit prior to sffd final test tonite on all 3 fls.request by sffd inspector,incl 2 additional duct detectors on floor 21.approv appl are 200607257469(19), 200607257465(20), 200607186802(21).Details
as-built device location drawing for 3 fl remodels.re-submit to get all as-built permit prior to sffd final test tonite on all 3 fls.request by sffd inspector,incl 2 additional duct detectors on floor 21.approv appl are 200607257469(19), 200607257465(20), 200607186802(21). | $1,800 |
| Oct 5, 2006 | Completed final sign-off Aug 2007 | 555 Market St | oti-1 10th floor, el, me, ls, spDetails
oti-1 10th floor, el, me, ls, sp | $30,000 | |
| Oct 5, 2006 | Completed final sign-off Dec 2006 | 555 Market St | Gci, Inc | renewal of pa# 2005/09/22/3541 & pa# 2005/12/06/9570.Details
renewal of pa# 2005/09/22/3541 & pa# 2005/12/06/9570. | |
| Sep 28, 2006 | Completed final sign-off Apr 2007 | 555 Market St | Pribuss Engineering Inc | fire sprinkler, 86 sprinklers.Details
fire sprinkler, 86 sprinklers. | $25,000 |
| Sep 28, 2006 | Completed final sign-off Apr 2007 | 555 Market St | Pribuss Engineering Inc | fire sprinkler, 88 sprinklers.Details
fire sprinkler, 88 sprinklers. | $27,000 |
| Sep 21, 2006 | Completed final sign-off Apr 2007 | 555 Market St | Pribuss Engineering Inc | fires prinklers for tenant improvement on the 14th floor, 89 sprinklersDetails
fires prinklers for tenant improvement on the 14th floor, 89 sprinklers | $31,000 |
| Sep 21, 2006 | Completed final sign-off Apr 2007 | 555 Market St | Pribuss Engineering Inc | fire sprinklers only, 2nd floor 98 sprinklersDetails
fire sprinklers only, 2nd floor 98 sprinklers | $18,500 |
| Sep 6, 2006 | Completed final sign-off Apr 2007 | 555 Market St | Gci, Inc | oti-2 19th floor, el,me.Details
oti-2 19th floor, el,me. | $30,000 |
| Aug 29, 2006 | Expired or cancelled expired May 2007 | 555 Market St | Gci, Inc | to renew appl#200608098995 to show appl#200407148774Details
to renew appl#200608098995 to show appl#200407148774 | |
| Aug 22, 2006 | Completed final sign-off Apr 2007 | 555 Market St | Siemens Industry, Inc. | addition of following life safety devices onto existing system for the floor 2 "morrison and foerster" remodel: 5 smoke detectors, 15 speaker/strobes, 2 strobes. project does not include existing core area, does include restroomsDetails
addition of following life safety devices onto existing system for the floor 2 "morrison and foerster" remodel: 5 smoke detectors, 15 speaker/strobes, 2 strobes. project does not include existing core area, does include restrooms | $10,200 |
| Aug 22, 2006 | Completed final sign-off Apr 2007 | 555 Market St | Siemens Industry, Inc. | addition of life safety devices, onto existing system, for the floor 12 "morrison and foerster" tenant remodel. 9 smoke detectors (4 at fsds)1 fsd duct detector, 2 monitor modules for pre-action system signals, 14 speaker/strobes. preaction system is being provided by others under a sep permit. doesDetails
addition of life safety devices, onto existing system, for the floor 12 "morrison and foerster" tenant remodel. 9 smoke detectors (4 at fsds)1 fsd duct detector, 2 monitor modules for pre-action system signals, 14 speaker/strobes. preaction system is being provided by others under a sep permit. does | $14,000 |
| Aug 15, 2006 | Completed final sign-off Apr 2007 | 555 Market St | Siemens Industry, Inc. | add life safety devices onto existing system for 11/f, morrison & foerster" tenant remodel: 11 smoke detectors (4 at fsds), 1 fsd duct detector, 14 speaker/strobes & 2 strobes. the project does not include existing core area, but does include the restrooms.Details
add life safety devices onto existing system for 11/f, morrison & foerster" tenant remodel: 11 smoke detectors (4 at fsds), 1 fsd duct detector, 14 speaker/strobes & 2 strobes. the project does not include existing core area, but does include the restrooms. | $13,600 |
| Aug 15, 2006 | Completed final sign-off Apr 2007 | 555 Market St | Siemens Industry, Inc. | add life safety devices onto existing system for floor 14 "morrison & foerster" tenant remodel: 9 smoke detectors (2 at fsds), 1 fsd duct detector, 13 speaker/strobes & 6 strobes. the project does not include the existing core area, but does include the restrooms.Details
add life safety devices onto existing system for floor 14 "morrison & foerster" tenant remodel: 9 smoke detectors (2 at fsds), 1 fsd duct detector, 13 speaker/strobes & 6 strobes. the project does not include the existing core area, but does include the restrooms. | $13,600 |
| Aug 11, 2006 | Completed final sign-off Dec 2006 | 555 Market St | Gci, Inc | oti-4, 19th floor, el, me.Details
oti-4, 19th floor, el, me. | $75,000 |
| Aug 11, 2006 | Completed final sign-off Dec 2006 | 555 Market St | Gci, Inc | oti-4, 21st floor, el.Details
oti-4, 21st floor, el. | $75,000 |
| Aug 11, 2006 | Completed final sign-off Dec 2006 | 555 Market St | Gci, Inc | 0t1-4, 20th floor, el.Details
0t1-4, 20th floor, el. | $75,000 |
| Aug 10, 2006 | Completed final sign-off Dec 2006 | 555 Market St | Gci, Inc | oti-2 20gh fl, spDetails
oti-2 20gh fl, sp | $10,200 |
| Aug 9, 2006 | Expired or cancelled expired May 2007 | 555 Market St | Gci, Inc | revision to pa 200408202155, 200407148744 and 200407279853Details
revision to pa 200408202155, 200407148744 and 200407279853 | |
| Aug 7, 2006 | Completed final sign-off Dec 2006 | 555 Market St | Gci, Inc | oti-3, 19th floor, me.Details
oti-3, 19th floor, me. | $98,000 |
| Aug 7, 2006 | Completed final sign-off Dec 2006 | 555 Market St | Gci, Inc | oti-3, 21st floor, meDetails
oti-3, 21st floor, me | $200,000 |
| Aug 7, 2006 | Completed final sign-off Dec 2006 | 555 Market St | Gci, Inc | oti-3, 20th floor, meDetails
oti-3, 20th floor, me | $200,000 |
| Aug 3, 2006 | Completed final sign-off Dec 2006 | 555 Market St | Gci, Inc | oti-2, 21st floor, sp.Details
oti-2, 21st floor, sp. | $24,000 |
| Aug 3, 2006 | Completed final sign-off Dec 2006 | 555 Market St | Gci, Inc | oti-1, 19th floor, spDetails
oti-1, 19th floor, sp | $24,000 |
| Jul 25, 2006 | Completed final sign-off Dec 2006 | 555 Market St | Siemens Industry, Inc. | additions of life safety devices for the floor 20 "fleishman hillard" remodal as follows: 2 smoke detectors, 2 duct detectors for fsds, 10 speaker/strobes, & 3 strobes. all core devices are existingDetails
additions of life safety devices for the floor 20 "fleishman hillard" remodal as follows: 2 smoke detectors, 2 duct detectors for fsds, 10 speaker/strobes, & 3 strobes. all core devices are existing | $6,100 |
| Jul 25, 2006 | Completed final sign-off Dec 2006 | 555 Market St | Siemens Industry, Inc. | additions of life safety devices for the floor 19 "fleishman hillard" remodel as follows: 2 smoke detectors, 13 speaker/strobes, & 1 strobe. no new fire/smoke dampers on this project and all core devices are existingDetails
additions of life safety devices for the floor 19 "fleishman hillard" remodel as follows: 2 smoke detectors, 13 speaker/strobes, & 1 strobe. no new fire/smoke dampers on this project and all core devices are existing | $5,200 |
| Jul 18, 2006 | Completed final sign-off Dec 2006 | 555 Market St | Siemens Industry, Inc. | life safety device additions for the "fleishman hillard" remodel on floor 21 as follows: 6 smoke detectors, 12 speaker/satrobes, 3 strobes, 1 door lock release moduile. no work is being done at the (e) core area or the mechanical room.Details
life safety device additions for the "fleishman hillard" remodel on floor 21 as follows: 6 smoke detectors, 12 speaker/satrobes, 3 strobes, 1 door lock release moduile. no work is being done at the (e) core area or the mechanical room. | $7,000 |
| Jul 11, 2006 | Completed final sign-off Apr 2007 | 555 Market St | Intelligent Technologies & Services Inc | 12th floor - install hfc-227 ea clean agent system for the 12th floor server room. no office increase.Details
12th floor - install hfc-227 ea clean agent system for the 12th floor server room. no office increase. | $17,000 |
| Jul 10, 2006 | Completed final sign-off Dec 2006 | 555 Market St | Gci, Inc | oti-1 20th/fl, el, me, ls, sp.full floor tenant upgrade, office wall construction only. mep seperate permit.Details
oti-1 20th/fl, el, me, ls, sp.full floor tenant upgrade, office wall construction only. mep seperate permit. | $250,000 |
| Jul 10, 2006 | Completed final sign-off Dec 2006 | 555 Market St | Gci, Inc | oti-1 19th/fl el-me-ls-sp. full floor tenant upgrade, office wall construction wall-all compliesDetails
oti-1 19th/fl el-me-ls-sp. full floor tenant upgrade, office wall construction wall-all complies | $250,000 |
| Jul 10, 2006 | Completed final sign-off Dec 2006 | 555 Market St | Gci, Inc | oti-1 21st/fl, el, me, ls, sp. full floor tenant upgrade. office wall construction only. all complies. mep under seperate permit.Details
oti-1 21st/fl, el, me, ls, sp. full floor tenant upgrade. office wall construction only. all complies. mep under seperate permit. | $250,000 |
| May 10, 2006 | Completed final sign-off Apr 2007 | 555 Market St | Hathaway Dinwiddie Co. | tenant build-out of floors 2, 11, 12, 14 and associated structural work.Details
tenant build-out of floors 2, 11, 12, 14 and associated structural work. | $1,750,000 |
| May 9, 2006 | Completed final sign-off Aug 2006 | 555 Market St | Gci, Inc | base building air handler upgrade - repair to (e) equipment and rework of duct work on floors 20 & 21, reconfiguration of power and signal of floors 20, 21 & 22Details
base building air handler upgrade - repair to (e) equipment and rework of duct work on floors 20 & 21, reconfiguration of power and signal of floors 20, 21 & 22 | $12,487 |
| May 9, 2006 | Completed final sign-off Aug 2006 | 555 Market St | Gci, Inc | base building air handler upgrad repair to (e) equipment and rework of duct work on floors 10, 11, 14 & 15 power & signal plan will also be reconfiguredDetails
base building air handler upgrad repair to (e) equipment and rework of duct work on floors 10, 11, 14 & 15 power & signal plan will also be reconfigured | $21,000 |
| May 9, 2006 | Completed final sign-off Apr 2007 | 555 Market St | Hathaway Dinwiddie Co. | soft demo only. floors 2, 11, 12, 14. tenant buildout to follow under a seperate permit. comply with ab017, 05/09/06.Details
soft demo only. floors 2, 11, 12, 14. tenant buildout to follow under a seperate permit. comply with ab017, 05/09/06. | $32,000 |
| May 8, 2006 | Expired or cancelled expired May 2007 | 555 Market St | Gci, Inc | oti-1 rev. 5th floor | $100 |
| Apr 27, 2006 | Completed final sign-off Dec 2006 | 555 Market St | Gci, Inc | add new sprinklers & piping with upgrades to existing work on 20/f & 21/f restrooms.Details
add new sprinklers & piping with upgrades to existing work on 20/f & 21/f restrooms. | $2,579 |
| Apr 27, 2006 | Expired or cancelled expired Jun 2007 | 555 Market St | Gci, Inc | oti-3 sp 9th floor, fire sprinklers adding 2 new heads and relocating 8 heads. refer to appl#200603096319Details
oti-3 sp 9th floor, fire sprinklers adding 2 new heads and relocating 8 heads. refer to appl#200603096319 | $2,760 |
| Apr 26, 2006 | Expired or cancelled expired Jun 2007 | 555 Market St | Gci, Inc | oti-2 el me | $15,692 |
| Apr 25, 2006 | Expired or cancelled expired Jun 2007 | 555 Market St | Siemens Industry, Inc. | addition of 3 smoke detectors (telco rooms & mua fsds), 5 duct detectors (fsds) & 4 speaker / strobe (restrooms) for the 2- floor "hvac core upgrade" project on 20th, 21th. the detector layout matches a previously approved design for prior hvac upgrades in this building.Details
addition of 3 smoke detectors (telco rooms & mua fsds), 5 duct detectors (fsds) & 4 speaker / strobe (restrooms) for the 2- floor "hvac core upgrade" project on 20th, 21th. the detector layout matches a previously approved design for prior hvac upgrades in this building. | $5,000 |
| Apr 25, 2006 | Completed final sign-off Aug 2006 | 555 Market St | Siemens Industry, Inc. | addition of 2 smoke detectors (telco rooms) & 6 duct detectors (fsds) for the 4- floor "hvac core upgrade" project on 10th, 11th, 14th & 15th. the detector layout matches a previously approved design for prior hvac upgrades in this building. a portion of this core work will be done under futureDetails
addition of 2 smoke detectors (telco rooms) & 6 duct detectors (fsds) for the 4- floor "hvac core upgrade" project on 10th, 11th, 14th & 15th. the detector layout matches a previously approved design for prior hvac upgrades in this building. a portion of this core work will be done under future | $4,600 |
| Apr 19, 2006 | Completed final sign-off Dec 2006 | 555 Market St | Gci, Inc | renew app #200503288537Details
renew app #200503288537 | $60,000 |
| Apr 19, 2006 | Completed final sign-off Dec 2006 | 555 Market St | Gci, Inc | renew of app#200503288541 for final inspectionDetails
renew of app#200503288541 for final inspection | $60,000 |
| Mar 9, 2006 | Expired or cancelled expired Apr 2007 | 555 Market St | oti-1 9th flfoor el, me, l/s, spDetails
oti-1 9th flfoor el, me, l/s, sp | $100,000 | |
| Feb 23, 2006 | Expired or cancelled expired Jul 2007 | 555 Market St | Ayoob & Peery Plumbing Co Inc | ground floor - install fire sprinkler system at tenant space and connect to existing supply. 44 headsDetails
ground floor - install fire sprinkler system at tenant space and connect to existing supply. 44 heads | $11,500 |
| Feb 14, 2006 | Expired or cancelled expired Dec 2007 | 555 Market St | Ayoob & Peery Plumbing Co Inc | install fire sprinkler system, connect to existing riser & floor control valve assembly.Details
install fire sprinkler system, connect to existing riser & floor control valve assembly. | $19,500 |
| Feb 14, 2006 | Expired or cancelled cancelled Mar 2007 | 555 Market St | fixture demolition work in restrooms to prepare area for installations of (n) air handling unitDetails
fixture demolition work in restrooms to prepare area for installations of (n) air handling unit | $10,000 | |
| Feb 14, 2006 | Expired or cancelled expired May 2007 | 555 Market St | Ayoob & Peery Plumbing Co Inc | install fire sprinkler system, connect to existing riser & valve assembly.Details
install fire sprinkler system, connect to existing riser & valve assembly. | $15,000 |
| Feb 14, 2006 | Expired or cancelled expired Dec 2007 | 555 Market St | Ayoob & Peery Plumbing Co Inc | install fire sprinkler system connect to extg riser and floor control assemblyDetails
install fire sprinkler system connect to extg riser and floor control assembly | $15,000 |
| Feb 9, 2006 | Expired or cancelled expired Feb 2009 | 555 Market St | Gci, Inc | oti-3 8th floor, sp. fire sprinkler, 27 new heads (9 recalculated), 63 relocating, 1 removal. refer oti-1 200511147968 & oti-2 200601111985Details
oti-3 8th floor, sp. fire sprinkler, 27 new heads (9 recalculated), 63 relocating, 1 removal. refer oti-1 200511147968 & oti-2 200601111985 | $28,321 |
| Feb 8, 2006 | Completed final sign-off Feb 2006 | 555 Market St | Gci, Inc | renew pa# 2005/01/07/2737 for final inspection. oti, 16th floor.Details
renew pa# 2005/01/07/2737 for final inspection. oti, 16th floor. | |
| Feb 8, 2006 | Completed final sign-off Mar 2006 | 555 Market St | Gci, Inc | renew pa# 2004/05/21/4498 for final inspection. oti, 7th floor.Details
renew pa# 2004/05/21/4498 for final inspection. oti, 7th floor. | |
| Feb 8, 2006 | Completed final sign-off Feb 2006 | 555 Market St | Gci, Inc | renew 200504220721, 200405214499 for final inspectionDetails
renew 200504220721, 200405214499 for final inspection | |
| Feb 8, 2006 | Completed final sign-off Mar 2006 | 555 Market St | Gci, Inc | renew pa# 2004/11/01/8191 & pa# 2004/10/05/5994 for final inspection. oti, 4th floor.Details
renew pa# 2004/11/01/8191 & pa# 2004/10/05/5994 for final inspection. oti, 4th floor. | |
| Feb 7, 2006 | Never finaled issued Feb 2006, no final | 555 Market St | oti-1, 20th floor, el, me, ls, sp.Details
oti-1, 20th floor, el, me, ls, sp. | $60,000 | |
| Feb 7, 2006 | Completed final sign-off Feb 2006 | 555 Market St | Gci, Inc | renew appl#200501284217, 200502074921 for final inspectionDetails
renew appl#200501284217, 200502074921 for final inspection | |
| Feb 7, 2006 | Completed final sign-off Feb 2006 | 555 Market St | Gci, Inc | renew appl#200408161633, 200502105237, 200501112987 for final inspectionDetails
renew appl#200408161633, 200502105237, 200501112987 for final inspection | |
| Feb 7, 2006 | Never finaled issued Feb 2006, no final | 555 Market St | oti-1, 21st floor, el, me, ls, sp.Details
oti-1, 21st floor, el, me, ls, sp. | $60,000 | |
| Feb 1, 2006 | Expired or cancelled withdrawn Feb 2006 | 555 Market St | Gci, Inc | oti-4 8th floor ls. life safety-full floor installation for all new tenant space.relocate some existing strobes & alarms.Details
oti-4 8th floor ls. life safety-full floor installation for all new tenant space.relocate some existing strobes & alarms. | $13,697 |
| Jan 25, 2006 | Completed final sign-off Mar 2006 | 555 Market St | Siemens Industry, Inc. | addition of 8 smoke detectors, a fsd duct detector, 11 speaker/strobes, and 5 strobes to the (e) life safety system.Details
addition of 8 smoke detectors, a fsd duct detector, 11 speaker/strobes, and 5 strobes to the (e) life safety system. | $12,000 |
| Jan 25, 2006 | Expired or cancelled expired May 2007 | 555 Market St | oti-1 25th floor | $7,500 | |
| Jan 19, 2006 | Expired or cancelled expired Jan 2007 | 555 Market St | demo 11th fl, interior non-bearing partitions and mak chote.Details
demo 11th fl, interior non-bearing partitions and mak chote. | $20,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Gci, Inc (50), Truebeck Construction (39), Siemens Industry, Inc. (32), Field Construction Inc. (10), Ayoob & Peery Plumbing Co Inc (9), Anderson, Rowe & Buckley, Inc. (6), Pioneer Fire Inc. (5), Pribuss Engineering Inc (5), Hathaway Dinwiddie Co. (4), Acco Engineered Systems Inc. Dba Acco En (3), Garnett Signs Llc (3), Pioneer Fire Protection (3), Viking Sign Installations (2), Cccs, Inc, Golden Gate Fire Protection Inc, Howard S. Wright Constructors Lp, Intelligent Technologies & Services Inc, Metropolitan Electrical Construction, Novo Construction Inc, Overland Contracting Inc, Service Station Systems Inc., Slc Inc, W M Wireless Inc, Walker Cellular Inc, Westower Communications
- Architects
- Clement Soga (16), Daniel E Huntsman (16), Siemens Building Technologies (2), Ayoob & Peery, Douglas Zucker, George S Soskin, Ia Interior Architects, James Stefanski, Jonathan Gordon, Michael Wilk, Thomas Holland
- Engineers
- Peter Mchugh (2), Siemens Building Technologies (2), Clement Soga, Clement T. Soga, George Dimic, Gregory Gershkovich, Kevin Sorensen, Stephen Glatt, Wissam Zalzali
- Authorized agents
- Malee Ackerman