Clement T. Soga
- License
- C17022
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C17022 at the Board for Professional Engineers
- Listed as
- architect, engineer
- Firm
- O+A
- Based in
- San Francisco
- On San Francisco permits
- Mar 2016 to Sep 2016
2 permits since 2000 (architect on 1 permit, engineer on 1 permit): 2 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Novo Construction Inc, Truebeck Construction
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 2, 2016 | Completed final sign-off Aug 2017 | 555 Market St | Truebeck Construction | 14th floor: t.i. for new partitions doors, millwork ceilings, finishes, mep, fire protection under seperate permit. no exterior work.Details
14th floor: t.i. for new partitions doors, millwork ceilings, finishes, mep, fire protection under seperate permit. no exterior work. | $160,000 |
| Mar 25, 2016 | Completed final sign-off Sep 2016 | 55 Hawthorne St | Novo Construction Inc | roof deck- revision t0 2015-05-21-6880. to include subsequent changes to archt'l flooring finish layout, modification of flooring finish details & omitting details per new layout. mep,struct'l,waterproofing and drainage drawings were altered to reflect the new changes. life safety/sprinkler deferredDetails
roof deck- revision t0 2015-05-21-6880. to include subsequent changes to archt'l flooring finish layout, modification of flooring finish details & omitting details per new layout. mep,struct'l,waterproofing and drainage drawings were altered to reflect the new changes. life safety/sprinkler deferred |