136 permits since 2000: 90 completed, 30 never finaled, 16 expired or cancelled.
Of the 30 never-finaled permits, 30 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 136.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 8, 2016 | Completed final sign-off Feb 2016 | 417 31st Av | to obtain a final inspeciton for work approved under pa# 201206041739, all work is completeDetails
to obtain a final inspeciton for work approved under pa# 201206041739, all work is complete | |
| Jul 15, 2015 | Completed final sign-off Feb 2016 | 429 Castro St | sprint wts revision appl. #2012.0705.4168. revise scope of work to install 3 2.5 ghz antennas on a single pole screened by a faux chimney radone on the south corner of the roof for sect. b location. 800/1900 antennas model has been updated. location remain. no other change to antennas or equip.Details
sprint wts revision appl. #2012.0705.4168. revise scope of work to install 3 2.5 ghz antennas on a single pole screened by a faux chimney radone on the south corner of the roof for sect. b location. 800/1900 antennas model has been updated. location remain. no other change to antennas or equip. | $30,000 |
| May 12, 2015 | Completed final sign-off Sep 2015 | 121 Spear St | to obtain final inspection for work approved under pa #201211295152. all work is complete.Details
to obtain final inspection for work approved under pa #201211295152. all work is complete. | |
| Apr 7, 2015 | Completed final sign-off Nov 2015 | 5700 03rd St | to obtain final inspection for work approved under pa#201112160813 all work is complete. n/a ordinance #155-13Details
to obtain final inspection for work approved under pa#201112160813 all work is complete. n/a ordinance #155-13 | |
| Apr 7, 2015 | Never finaled issued Apr 2015, no final | 679 24th Av | to obtain final inspection for work approved under pa#200110191260 all work is complete.Details
to obtain final inspection for work approved under pa#200110191260 all work is complete. | |
| Mar 20, 2015 | Completed final sign-off Jun 2015 | 706 Polk St | rev to 2012 0830 8604: addtl structural framing to meet antenna & rru loading needs. (e) parapet & bracing, ac unit on roof added. revised location of apprvd antenna tripod mounts, rru h frames, cabinet location...Details
rev to 2012 0830 8604: addtl structural framing to meet antenna & rru loading needs. (e) parapet & bracing, ac unit on roof added. revised location of apprvd antenna tripod mounts, rru h frames, cabinet location... | $10,000 |
| Mar 19, 2015 | Never finaled issued Mar 2015, no final | 1515 19th Av | revision to pa# 2014 0610 7963 - add safety eme barrier/guardrail detailsDetails
revision to pa# 2014 0610 7963 - add safety eme barrier/guardrail details | |
| Mar 18, 2015 | Completed final sign-off Apr 2015 | 1520 Stockton St | to obtain final inspection for work approved under pa# 201110197155. all work is complete.Details
to obtain final inspection for work approved under pa# 201110197155. all work is complete. | |
| Mar 18, 2015 | Completed final sign-off Apr 2015 | 2350 Turk Bl | to obtain final inspection for work approved under pa# 201211305223. all work is complete.Details
to obtain final inspection for work approved under pa# 201211305223. all work is complete. | |
| Mar 18, 2015 | Completed final sign-off Apr 2015 | 990 Columbus Av | to obtain final inspection for work approved under pa# 201206273577. all work is complete.Details
to obtain final inspection for work approved under pa# 201206273577. all work is complete. | |
| Mar 9, 2015 | Completed final sign-off Mar 2015 | 5 The Embarcadero | to obtain a final inspection for work already approved under pa# 201210111825, all work is completeDetails
to obtain a final inspection for work already approved under pa# 201210111825, all work is complete | |
| Mar 9, 2015 | Expired or cancelled expired Oct 2021 | 420 Taylor St | to obtain a final inspection for work already approved under pa# 201109144575, all work is completeDetails
to obtain a final inspection for work already approved under pa# 201109144575, all work is complete | |
| Feb 27, 2015 | Expired or cancelled cancelled Jan 2026 | 1515 19th Av | revision to permit 2014 0610 7963 add safety cross over stairsDetails
revision to permit 2014 0610 7963 add safety cross over stairs | |
| Feb 17, 2015 | Completed final sign-off Apr 2015 | 1101 Fillmore St | to obtain final inspection for work approved under pa 201205210876; all work is complete.Details
to obtain final inspection for work approved under pa 201205210876; all work is complete. | |
| Jan 6, 2015 | Expired or cancelled expired Oct 2018 | 1465 25th St | to obtain final inspection for work approved under pa# 201210292974. all work is complete.Details
to obtain final inspection for work approved under pa# 201210292974. all work is complete. | |
| Nov 20, 2014 | Never finaled issued Nov 2014, no final | 990 Columbus Av | to obtain final inspection for work approved under pa #201206273577. all work is complete.Details
to obtain final inspection for work approved under pa #201206273577. all work is complete. | |
| Nov 4, 2014 | Completed final sign-off Feb 2015 | 2000 Van Ness Av | to obtain final inspection for work approved under pa#2012-0910-9316. all work is complete.Details
to obtain final inspection for work approved under pa#2012-0910-9316. all work is complete. | |
| Nov 4, 2014 | Completed final sign-off Mar 2015 | 667 Portola Dr | to obtain final inspection for work approved under pa#2012-0628-3665. all work is complete.Details
to obtain final inspection for work approved under pa#2012-0628-3665. all work is complete. | |
| Jun 10, 2014 | Completed final sign-off Jul 2015 | 1515 19th Av | modification sprint cell site: remove 12 (e) nextel antennas, 3 (e) sprint antennas install 3 new panel antennas, 6 remote radio units (rrus). replace 1 gps antenna, replace 2 equipment cabinets.Details
modification sprint cell site: remove 12 (e) nextel antennas, 3 (e) sprint antennas install 3 new panel antennas, 6 remote radio units (rrus). replace 1 gps antenna, replace 2 equipment cabinets. | $35,000 |
| Apr 22, 2014 | Completed final sign-off Jun 2015 | 3251 20th Av | redesign antenna mount (page 9). revision to 201309106403 & 201210292989.Details
redesign antenna mount (page 9). revision to 201309106403 & 201210292989. | $5,000 |
| Apr 17, 2014 | Completed final sign-off Dec 2015 | 310 Townsend St | proposed modifications to an (e) unmanned wts-install 2 new equipment cabinets, 3 new antennas on new masts & 6 new rrus & 3 new filters, new cabling from (e) new equipment to new antennas. removing 4 (e) equipment cabinets, 3 (e) antennas & 1 (e) gps antenna. sprintDetails
proposed modifications to an (e) unmanned wts-install 2 new equipment cabinets, 3 new antennas on new masts & 6 new rrus & 3 new filters, new cabling from (e) new equipment to new antennas. removing 4 (e) equipment cabinets, 3 (e) antennas & 1 (e) gps antenna. sprint | $40,000 |
| Mar 20, 2014 | Completed final sign-off May 2015 | 601 California St | (3) (e) panel antennas to be hotswapped with (3) new panel antennas (1 per sector) (e) frp shrouds to be removed & replaced w/new frp shrouds to accomodate new antennas & 6 rrus (2 per sector) to be installed. (2)(e) equipment cabinets to be hots wapped w/(2) new cabs.Details
(3) (e) panel antennas to be hotswapped with (3) new panel antennas (1 per sector) (e) frp shrouds to be removed & replaced w/new frp shrouds to accomodate new antennas & 6 rrus (2 per sector) to be installed. (2)(e) equipment cabinets to be hots wapped w/(2) new cabs. | $40,000 |
| Feb 7, 2014 | Expired or cancelled expired Mar 2023 | 2525 16th St | to obtain final inspection for work approved under pa#2011.1011.6507. all work is complete.Details
to obtain final inspection for work approved under pa#2011.1011.6507. all work is complete. | |
| Feb 7, 2014 | Completed final sign-off Mar 2015 | 1431 San Bruno Av | to obtain final inspection for work approved under pa#2012.1129.5141. all work is comlpleted.Details
to obtain final inspection for work approved under pa#2012.1129.5141. all work is comlpleted. | |
| Jan 28, 2014 | Completed final sign-off Sep 2015 | 1455 Market St | to obtain final inspection for work approved under pa# 201109215157. all work is complete. compliance with ordiance no. 155-13 not required.Details
to obtain final inspection for work approved under pa# 201109215157. all work is complete. compliance with ordiance no. 155-13 not required. | |
| Jan 28, 2014 | Completed final sign-off Oct 2014 | 470 West Portal Av | to obtain final inspection for work approved under pa# 201211305221. all work is complete.Details
to obtain final inspection for work approved under pa# 201211305221. all work is complete. | |
| Jan 28, 2014 | Completed final sign-off Mar 2015 | 2 Henry Adams St | to obtain final inspection for work approved under pa# 201201273043. all work is complete.Details
to obtain final inspection for work approved under pa# 201201273043. all work is complete. | |
| Jan 28, 2014 | Completed final sign-off Aug 2015 | 209 Post St | to obtain final inspection for work approved under pa# 201111038203. all work is complete.Details
to obtain final inspection for work approved under pa# 201111038203. all work is complete. | |
| Jan 21, 2014 | Completed final sign-off Oct 2014 | 1031 Quesada Av | to obtain final inspection for work approved under pa #201111309792; all work is complete; compliance with ord 15-133 not requiredDetails
to obtain final inspection for work approved under pa #201111309792; all work is complete; compliance with ord 15-133 not required | |
| Jan 21, 2014 | Completed final sign-off Oct 2014 | 152 Helena St | to obtain final inspection for work approved under pa #201108263387; all work is completeDetails
to obtain final inspection for work approved under pa #201108263387; all work is complete | |
| Jan 21, 2014 | Completed final sign-off Apr 2015 | 545 Powell St | to obtain final inspection for work approved under pa #201110287884; all work is completed;Details
to obtain final inspection for work approved under pa #201110287884; all work is completed; | |
| Dec 20, 2013 | Completed final sign-off Jan 2014 | 160 Pine St | to obtain final inspection for work approved under pa # 201208308659. all work is complete. (description of work: modification of sprint wireless facility. remove & replace (2) antennas concealed as flagpoles. remove (3) equipment cabinets & installDetails
to obtain final inspection for work approved under pa # 201208308659. all work is complete. (description of work: modification of sprint wireless facility. remove & replace (2) antennas concealed as flagpoles. remove (3) equipment cabinets & install | |
| Dec 9, 2013 | Expired or cancelled cancelled Jan 2026 | 988 Howard St | revision to pa 201205150469 - cable attachement details were revised. no other changes to antennas or equipment.Details
revision to pa 201205150469 - cable attachement details were revised. no other changes to antennas or equipment. | $45,000 |
| Sep 12, 2013 | Never finaled issued Sep 2013, no final | 750 Phelps St | remove sprints (e) antennas & equipment cabinets. install 3 new panel antennas & 1 microwave antenna, 1 aps antenna, 6 rrus, install 2 new equipment cabinets.Details
remove sprints (e) antennas & equipment cabinets. install 3 new panel antennas & 1 microwave antenna, 1 aps antenna, 6 rrus, install 2 new equipment cabinets. | $55,000 |
| Sep 10, 2013 | Never finaled issued Oct 2013, no final | 3251 20th Av | revision to application #201210292989.update/revise antena base plate detail.Details
revision to application #201210292989.update/revise antena base plate detail. | $5,000 |
| Jul 12, 2013 | Expired or cancelled withdrawn Oct 2021 | 2301 03rd St | perform site modification to an (e) wireless communications facility. adding (3) panel antennas on rooftop penthouse. additing (2) equipment cabinets. adding (6) rru units.Details
perform site modification to an (e) wireless communications facility. adding (3) panel antennas on rooftop penthouse. additing (2) equipment cabinets. adding (6) rru units. | $45,000 |
| Jul 12, 2013 | Completed final sign-off Mar 2015 | 1740 Sloat Bl | modifications of interior bracing, repair work only to sprint tower. no work on sprint antennas.Details
modifications of interior bracing, repair work only to sprint tower. no work on sprint antennas. | $25,000 |
| Jun 19, 2013 | Completed final sign-off Apr 2015 | 890 Taraval St | (3) existing iden panel antennas to be replaced with (3) new panel ant. mounted to (e) antenna frame & (9) existing panel antennas to be removed. (1) existing equipment cabinet to be removed & (2) new indoor equipment to be installed.Details
(3) existing iden panel antennas to be replaced with (3) new panel ant. mounted to (e) antenna frame & (9) existing panel antennas to be removed. (1) existing equipment cabinet to be removed & (2) new indoor equipment to be installed. | $45,000 |
| Jun 13, 2013 | Completed final sign-off Sep 2015 | 501 Laguna St | sprint wireless modification: replace (3) (e) antennas w/ (3) (n) antennas on roof; add (6) (n) rru's mounted on roof; replace (2) (e) equipment cabinets w/ (2) (n) equipment cabinets in basement. add camouflage (faux penthouse).Details
sprint wireless modification: replace (3) (e) antennas w/ (3) (n) antennas on roof; add (6) (n) rru's mounted on roof; replace (2) (e) equipment cabinets w/ (2) (n) equipment cabinets in basement. add camouflage (faux penthouse). | $45,000 |
| Jun 7, 2013 | Completed final sign-off May 2015 | 2288 Broadway | remove 3 antennas & 1 equipment cabinet at roof top. install 3 new antennas, 6 rrus & 1 new equipment cabinet within sprint's (e) lease space.Details
remove 3 antennas & 1 equipment cabinet at roof top. install 3 new antennas, 6 rrus & 1 new equipment cabinet within sprint's (e) lease space. | $45,000 |
| May 29, 2013 | Completed final sign-off Mar 2015 | 1633 Taraval St | sprint proposes to modify an unmanned telecommunications facility. removal of 3 panel antennas. installation of 3 panel antennas. installation of 6 rru's. replacement of 2 equipment cabinets, removal of 1 equipment cabinet.Details
sprint proposes to modify an unmanned telecommunications facility. removal of 3 panel antennas. installation of 3 panel antennas. installation of 6 rru's. replacement of 2 equipment cabinets, removal of 1 equipment cabinet. | $45,000 |
| May 3, 2013 | Completed final sign-off Apr 2015 | 2543 Noriega St | remove 3 antennas and 2 cabinets. install 3 new antennas 6 rrus and 2 cabinets.Details
remove 3 antennas and 2 cabinets. install 3 new antennas 6 rrus and 2 cabinets. | $45,000 |
| Apr 30, 2013 | Completed final sign-off Apr 2015 | 988 Howard St | revised drawings for previously approved pa# 201205150469. cable tray route was revised. no other changes to antennas or equipment.Details
revised drawings for previously approved pa# 201205150469. cable tray route was revised. no other changes to antennas or equipment. | $6,000 |
| Apr 22, 2013 | Never finaled issued Apr 2013, no final | 3595 Taraval St | revision to appl #2012.08.30.8663 - work revised to replace a larger section of cylinder with frp material. no additoinal changes to previous permit, no change to rf report.Details
revision to appl #2012.08.30.8663 - work revised to replace a larger section of cylinder with frp material. no additoinal changes to previous permit, no change to rf report. | |
| Apr 8, 2013 | Completed final sign-off Apr 2015 | 679 24th Av | modifications to an (e) sprint cell siteDetails
modifications to an (e) sprint cell site | $20,000 |
| Mar 29, 2013 | Completed final sign-off Jun 2015 | 1111 Junipero Serra Bl | sprint proposes to notify an unmanned telecommunications facility. (3) (e) panel antenna to be hot swapped. 3 (n) panel antennas to be mounted on (e) steeple. (3) (e) equipment cabinets to be removed. (2) (n) equipment cabinets to be installed @ (e) outdoor equipment area. new shrouds over antennas.Details
sprint proposes to notify an unmanned telecommunications facility. (3) (e) panel antenna to be hot swapped. 3 (n) panel antennas to be mounted on (e) steeple. (3) (e) equipment cabinets to be removed. (2) (n) equipment cabinets to be installed @ (e) outdoor equipment area. new shrouds over antennas. | $45,000 |
| Feb 28, 2013 | Completed final sign-off Dec 2015 | 100 Powell St | remove (3)(e)sprint antennas, install (3) (n) antennas in new radomes add (6) rrus, swap (1)gps antenna. replace (3)(e) equipment cabinets with (2) cabinets in basement.Details
remove (3)(e)sprint antennas, install (3) (n) antennas in new radomes add (6) rrus, swap (1)gps antenna. replace (3)(e) equipment cabinets with (2) cabinets in basement. | $45,000 |
| Feb 11, 2013 | Completed final sign-off Apr 2015 | 4131 Geary Bl | sprint proposes to modify (e) unmanned telecommunications facility. 4 (e) panel antennas to be removed. 3 (e) new panel antennas mounted on (e) building. 3 (e) equipment cabinets to be remove & 2 (e) new equipment cabinets to be installed at (e) equipment room.Details
sprint proposes to modify (e) unmanned telecommunications facility. 4 (e) panel antennas to be removed. 3 (e) new panel antennas mounted on (e) building. 3 (e) equipment cabinets to be remove & 2 (e) new equipment cabinets to be installed at (e) equipment room. | $45,000 |
| Dec 4, 2012 | Completed final sign-off Jan 2015 | 1060 Hyde St | sprint wireless modification: replace 3 (e) panel antennas with 3 new panel antennas within 3 new radomes on roof. add 6 new rru's on roof. replace 3 (e) equipment cabinets with 2 new equipment cabinets in (e) sprint lease area.Details
sprint wireless modification: replace 3 (e) panel antennas with 3 new panel antennas within 3 new radomes on roof. add 6 new rru's on roof. replace 3 (e) equipment cabinets with 2 new equipment cabinets in (e) sprint lease area. | $45,000 |
| Nov 30, 2012 | Expired or cancelled cancelled Jul 2018 | 2350 Turk Bl | sprint wireless modification: replace 2 (e) panel antennas with 2 new panel antennas on facade of building. add 4 rrus on roof (behind parapet wall); replace 2 (e) equipment cabinets with 2 new equipment cabinets on roof. replace 1 (e) gps antenna with new gps antenna. install 2 new filters on rrus.Details
sprint wireless modification: replace 2 (e) panel antennas with 2 new panel antennas on facade of building. add 4 rrus on roof (behind parapet wall); replace 2 (e) equipment cabinets with 2 new equipment cabinets on roof. replace 1 (e) gps antenna with new gps antenna. install 2 new filters on rrus. | $45,000 |
| Nov 30, 2012 | Never finaled issued Feb 2013, no final | 470 West Portal Av | remove 3 sprint antennas. install 3 new antennas on roof top in a radome. remove & replace 2 cabinets in (e) lease area on roof top.Details
remove 3 sprint antennas. install 3 new antennas on roof top in a radome. remove & replace 2 cabinets in (e) lease area on roof top. | $45,000 |
| Nov 30, 2012 | Completed final sign-off Mar 2015 | 570 Beale St | sprint modification: replace 3 existing antennas w/ 3 new anntennas inside frp screens on roof; add 6 new rrus on roof; replace 4 existing equipment cabinets w/ 2 new equipment cabinets in basement.Details
sprint modification: replace 3 existing antennas w/ 3 new anntennas inside frp screens on roof; add 6 new rrus on roof; replace 4 existing equipment cabinets w/ 2 new equipment cabinets in basement. | $45,000 |
| Nov 29, 2012 | Never finaled issued Mar 2013, no final | 121 Spear St | sprint proposed to modify an (e) unmanned telecommunications facility. 2 (e) panel antennas to be removed & replaced with 2 new panel antennas mounted behind steal thing 2 (e) cabinets to be removed & replaced with 2 new equipment cabinets.Details
sprint proposed to modify an (e) unmanned telecommunications facility. 2 (e) panel antennas to be removed & replaced with 2 new panel antennas mounted behind steal thing 2 (e) cabinets to be removed & replaced with 2 new equipment cabinets. | $45,000 |
| Nov 29, 2012 | Expired or cancelled expired Mar 2015 | 1431 San Bruno Av | tower-remove 2 antennas, install 1 new antenna & 2 rru's. billboard sign-remove 4 antennas, install 2 new antennas & 4 rru's. equipment area-replace 2 equipment cabinets,remove 1 equip cabinet, replace gps antenna, addition of fiber service & all associated cabinets,conduits, etc.Details
tower-remove 2 antennas, install 1 new antenna & 2 rru's. billboard sign-remove 4 antennas, install 2 new antennas & 4 rru's. equipment area-replace 2 equipment cabinets,remove 1 equip cabinet, replace gps antenna, addition of fiber service & all associated cabinets,conduits, etc. | $35,000 |
| Oct 29, 2012 | Never finaled issued Jan 2013, no final | 3251 20th Av | modify wireless facility. replace 3 panel antennas. replace 3 equipment cabinets. install 6 remote radio units (rru's). install hybrid cables along (e) cable path.Details
modify wireless facility. replace 3 panel antennas. replace 3 equipment cabinets. install 6 remote radio units (rru's). install hybrid cables along (e) cable path. | $35,000 |
| Oct 29, 2012 | Completed final sign-off Apr 2015 | 275 Olympia Wy | modify (e) wireless facility. remove 3 equipment cabinets & install 2 new cabinets. replace gps antenna, remove & replace 3 pantlantennas. install new radome, install 6 new remote radio units (rru's). install hybrid cables in new conduit along (e) path.Details
modify (e) wireless facility. remove 3 equipment cabinets & install 2 new cabinets. replace gps antenna, remove & replace 3 pantlantennas. install new radome, install 6 new remote radio units (rru's). install hybrid cables in new conduit along (e) path. | $35,000 |
| Oct 29, 2012 | Expired or cancelled expired Nov 2018 | 1465 25th St | sprint pcs proposes to remove (e) panel antennas (3) & install new panel antennas mounted within new frp simulated vent to (e) bldg. (e) equip cabinets to be removed (2) & (2) new equip cabinets to be installed at ground level.Details
sprint pcs proposes to remove (e) panel antennas (3) & install new panel antennas mounted within new frp simulated vent to (e) bldg. (e) equip cabinets to be removed (2) & (2) new equip cabinets to be installed at ground level. | $45,000 |
| Oct 26, 2012 | Completed final sign-off Jul 2015 | 1111 California St | sprint wireless modification: replace (1) existing panel antenna on facade with (1) new panel antenna on penthouse, replace (3) equipment cabinets with (2) new equipment cabinets inside roof penthouse.Details
sprint wireless modification: replace (1) existing panel antenna on facade with (1) new panel antenna on penthouse, replace (3) equipment cabinets with (2) new equipment cabinets inside roof penthouse. | $45,000 |
| Oct 22, 2012 | Never finaled issued Nov 2012, no final | 3234 Pierce St | sprint wireless modification on parking garage roof: replace 3 (e) panel antenna on (e) light standard with 3 new panel antennas on a new light standard on roof. replace 3 (e) equipment cabinets with 2 new equipment cabinets on 3rd level of parking garage.Details
sprint wireless modification on parking garage roof: replace 3 (e) panel antenna on (e) light standard with 3 new panel antennas on a new light standard on roof. replace 3 (e) equipment cabinets with 2 new equipment cabinets on 3rd level of parking garage. | $45,000 |
| Oct 18, 2012 | Completed final sign-off Apr 2015 | 1135 Evans Av | modification to an (e) sprint cell site. consisting of adding a new mmbs cabinet, a new battery cabinet, a new ciena cabinet, a new uam cabinet, 3 new sprint antennas, 6 new rrus. 3 new tower mounts. a new gps antenna & 3 new hybrid cables.Details
modification to an (e) sprint cell site. consisting of adding a new mmbs cabinet, a new battery cabinet, a new ciena cabinet, a new uam cabinet, 3 new sprint antennas, 6 new rrus. 3 new tower mounts. a new gps antenna & 3 new hybrid cables. | $40,000 |
| Oct 12, 2012 | Completed final sign-off Jul 2014 | 30 Onondaga Av | remove & replace 2 antennas. add 4 new rru's. replace gps antenna. replace 2 equipment cabinets run new fiber cables from equipment to antennas.Details
remove & replace 2 antennas. add 4 new rru's. replace gps antenna. replace 2 equipment cabinets run new fiber cables from equipment to antennas. | $35,000 |
| Oct 11, 2012 | Never finaled issued Nov 2012, no final | 5 Embarcadero Center | sprint wireless modification: replace (6) existing panel antennas with (3) new antennas on roof; replace (2) existing equipment cabinets with (2) equipment cabinets within (e) lease area on roof.Details
sprint wireless modification: replace (6) existing panel antennas with (3) new antennas on roof; replace (2) existing equipment cabinets with (2) equipment cabinets within (e) lease area on roof. | $45,000 |
| Oct 1, 2012 | Completed final sign-off Jan 2015 | 455 Irwin St | (e) sprint / nextel site mod: install 6 new antennas & 6 rrus at roof top. frp shroud to be expanded. install 2 new cabinets at (e) equipment compound.Details
(e) sprint / nextel site mod: install 6 new antennas & 6 rrus at roof top. frp shroud to be expanded. install 2 new cabinets at (e) equipment compound. | $45,000 |
| Sep 24, 2012 | Completed final sign-off Dec 2017 | 310 Townsend St | three (e) panel antennas to be removed and replaced with three new antennas. four (e) equipment cabinets to be replaced with two new cabinets. rru and fiber install.(e) 100 amp ppc to be upgraded to 200 amp.Details
three (e) panel antennas to be removed and replaced with three new antennas. four (e) equipment cabinets to be replaced with two new cabinets. rru and fiber install.(e) 100 amp ppc to be upgraded to 200 amp. | $45,000 |
| Sep 20, 2012 | Completed final sign-off Mar 2015 | 1212 Geary Bl | remove 3 (e) sprint panel antennas. installed 3 new panel antennas inside church steeple. install 6 rrus at antennas. replace 2 equipment cabinets with 2 new equipment cabinets inside equipment room in basement.Details
remove 3 (e) sprint panel antennas. installed 3 new panel antennas inside church steeple. install 6 rrus at antennas. replace 2 equipment cabinets with 2 new equipment cabinets inside equipment room in basement. | $45,000 |
| Sep 10, 2012 | Expired or cancelled expired Jun 2014 | 2000 Van Ness Av | remove 3 existing sprint antennas, install 3 new antennas on penthouse and 6 rru's. remove 4 existing cabinets from equipment platform on roof top and install 2 new cabinets.Details
remove 3 existing sprint antennas, install 3 new antennas on penthouse and 6 rru's. remove 4 existing cabinets from equipment platform on roof top and install 2 new cabinets. | $45,000 |
| Sep 10, 2012 | Completed final sign-off Dec 2014 | 3999 Mission St | sprint wireless modification. remove & replace (3) (e) panel antennas w/ (3) (n) panel antennas on roof; replace (3) (e) equipment cabinets w/ (2) (n) equipment cabinets within (e) equipment shelter on ground level.Details
sprint wireless modification. remove & replace (3) (e) panel antennas w/ (3) (n) panel antennas on roof; replace (3) (e) equipment cabinets w/ (2) (n) equipment cabinets within (e) equipment shelter on ground level. | $45,000 |
| Sep 10, 2012 | Completed final sign-off Apr 2015 | 555 De Haro St | sprint wireless modification. replace (4) (e) panel antennas w/ (3) (n) antennas within (e) radome on roof; replace (3) (e) equipment cabinets with (2) (n) equipment cabinets in (e) equipment shelter on ground level.Details
sprint wireless modification. replace (4) (e) panel antennas w/ (3) (n) antennas within (e) radome on roof; replace (3) (e) equipment cabinets with (2) (n) equipment cabinets in (e) equipment shelter on ground level. | $45,000 |
| Sep 7, 2012 | Completed final sign-off Jul 2015 | 512 Van Ness Av | remove (3) antennas, install (6) (n) antennas at roof top section of (e) parapet in front of (3) antennas to be reconstructed in rf-transparent material (color & texture to match). (3) equipment cabinets to be removed & replaced w/ (2) (n) cabinets. install telco backboard in equipment room.Details
remove (3) antennas, install (6) (n) antennas at roof top section of (e) parapet in front of (3) antennas to be reconstructed in rf-transparent material (color & texture to match). (3) equipment cabinets to be removed & replaced w/ (2) (n) cabinets. install telco backboard in equipment room. | $45,000 |
| Aug 31, 2012 | Completed final sign-off Feb 2015 | 191 02nd St | remove 3 existing antennas & install 3 new. 6 rrus on roof top. remove 4 existing equipment cabinets in the basement install 2 cabinets in same lease space.Details
remove 3 existing antennas & install 3 new. 6 rrus on roof top. remove 4 existing equipment cabinets in the basement install 2 cabinets in same lease space. | $45,000 |
| Aug 31, 2012 | Completed final sign-off Mar 2015 | 260 Sagamore St | modification to an existing wireless facility consisting of replacing 3 existing panel antennas w/ 3 new, replacing 3 existing equipment cabinets w/ 2 new cabinets within sprints existing lease space.Details
modification to an existing wireless facility consisting of replacing 3 existing panel antennas w/ 3 new, replacing 3 existing equipment cabinets w/ 2 new cabinets within sprints existing lease space. | $45,000 |
| Aug 30, 2012 | Never finaled issued Sep 2012, no final | 160 Pine St | modification of (e) sprint wireless facility. remove & replace (2) antennas concealed as flagpoles. remove (3) equipment cabinets & install (2) (n) cabinets at same lease area on roof top. install 4 rrus on h-frames.Details
modification of (e) sprint wireless facility. remove & replace (2) antennas concealed as flagpoles. remove (3) equipment cabinets & install (2) (n) cabinets at same lease area on roof top. install 4 rrus on h-frames. | $45,000 |
| Aug 30, 2012 | Completed final sign-off Apr 2015 | 3595 Taraval St | (3) (e) panel antennas to be removed & replaced w/ 3 (n) panel antennas. (3) (e) equipment cabinets to be removed & replaced w/ (2) equipment cabinets. (6) remote radio units & fiber to be installed.Details
(3) (e) panel antennas to be removed & replaced w/ 3 (n) panel antennas. (3) (e) equipment cabinets to be removed & replaced w/ (2) equipment cabinets. (6) remote radio units & fiber to be installed. | $45,000 |
| Aug 30, 2012 | Never finaled issued Oct 2012, no final | 444 Presidio Av | remove & replace 4 antennas at roof top, install 8 rrus, replace equipment cabinets inside (e) lease space.Details
remove & replace 4 antennas at roof top, install 8 rrus, replace equipment cabinets inside (e) lease space. | $45,000 |
| Aug 30, 2012 | Completed final sign-off Jun 2015 | 706 Polk St | modification of (e) sprint wireless facility. remove 2 antennas from facade, install 2 new antennas on roof top in simulation chimmey vents. install 4 rrus near antennas. remove 3 equipment cabinets from basement, install 2 new cabinets.Details
modification of (e) sprint wireless facility. remove 2 antennas from facade, install 2 new antennas on roof top in simulation chimmey vents. install 4 rrus near antennas. remove 3 equipment cabinets from basement, install 2 new cabinets. | $45,000 |
| Aug 23, 2012 | Completed final sign-off Mar 2015 | 291 Duboce Av | three (e) panel antennas to be removed and replaced with 3 new panel antennas. 3 (e) equipment cabinets to be removed and replaced with 2 new equipment cabinets. rru and fiber install.Details
three (e) panel antennas to be removed and replaced with 3 new panel antennas. 3 (e) equipment cabinets to be removed and replaced with 2 new equipment cabinets. rru and fiber install. | $45,000 |
| Aug 22, 2012 | Completed final sign-off Feb 2015 | 5000 Geary Bl | remove 3 (e) sprint panel antennas & install 3 new panel antennas on roof top. mount 6 rrus behind antennas (2 per antenna). remove 3 equipment cabinets & install 2 new equipment cabinets inside (e) equipment enclosure behind building.Details
remove 3 (e) sprint panel antennas & install 3 new panel antennas on roof top. mount 6 rrus behind antennas (2 per antenna). remove 3 equipment cabinets & install 2 new equipment cabinets inside (e) equipment enclosure behind building. | $45,000 |
| Aug 14, 2012 | Completed final sign-off Aug 2015 | 8 Montgomery St | wireless modification: replace (2) panel antennas w/ (4) (n) panel antennas mounted to (e) bldg; replace (3) (e) equipment cabinets w/ (2) (n) equipment cabinets, run coaxial lines from equipment & antennas. power will stay the same (no change)Details
wireless modification: replace (2) panel antennas w/ (4) (n) panel antennas mounted to (e) bldg; replace (3) (e) equipment cabinets w/ (2) (n) equipment cabinets, run coaxial lines from equipment & antennas. power will stay the same (no change) | $45,000 |
| Aug 14, 2012 | Completed final sign-off Feb 2015 | 2130 Ofarrell St | sprint wireless modification. replace (3) (e) panel antennas w/ (3) (n) panel antennas on (e) penthouse roof; replace (2) (e) equipment cabinets w/ (2) (n) equipment cabinets on (e) steel beam on roof.Details
sprint wireless modification. replace (3) (e) panel antennas w/ (3) (n) panel antennas on (e) penthouse roof; replace (2) (e) equipment cabinets w/ (2) (n) equipment cabinets on (e) steel beam on roof. | $45,000 |
| Aug 13, 2012 | Never finaled issued Sep 2012, no final | 370 Grove St | sprint wireless modification: replace 3 existing panel antennas with 3 new panel antennas on roof of existing parking garage. replace 4 existing equipment cabinets with 2 new equipment cabinets on roof.Details
sprint wireless modification: replace 3 existing panel antennas with 3 new panel antennas on roof of existing parking garage. replace 4 existing equipment cabinets with 2 new equipment cabinets on roof. | $45,000 |
| Jul 25, 2012 | Completed final sign-off Mar 2016 | 3004 16th St | wireless facility modification & replace 6 panel antennas with 3 new panel antennas, add 2 new equipment cabinets . no power upgrade.Details
wireless facility modification & replace 6 panel antennas with 3 new panel antennas, add 2 new equipment cabinets . no power upgrade. | $45,000 |
| Jul 25, 2012 | Completed final sign-off Apr 2015 | 353 Bay Shore Bl | replace 3 (e) antennas with 3 new antennas on roof; replace 3 (e) equipment cabinets with 2 new equipment cabinets within (e) lease area on ground level.Details
replace 3 (e) antennas with 3 new antennas on roof; replace 3 (e) equipment cabinets with 2 new equipment cabinets within (e) lease area on ground level. | $45,000 |
| Jul 20, 2012 | Completed final sign-off Jun 2015 | 950 Market St | sprint. 3 (e) antennas to be removed and replaced with 3 new panel antennas in a new frp chimney. 6 remote radio units (rrus) to be attached to the parapet wall. 3 (e) equipment cabinets to be removed and replaced with 2 new cabinets fiber install.Details
sprint. 3 (e) antennas to be removed and replaced with 3 new panel antennas in a new frp chimney. 6 remote radio units (rrus) to be attached to the parapet wall. 3 (e) equipment cabinets to be removed and replaced with 2 new cabinets fiber install. | $45,000 |
| Jul 19, 2012 | Completed final sign-off Feb 2015 | 450 Harrison St | 6 existing panel antennas will be removed and replaced by 3 new panel antennas. 3 equipment cabinets will be removed and replaced by 2 new equipment cabinets. rru and fiber install.Details
6 existing panel antennas will be removed and replaced by 3 new panel antennas. 3 equipment cabinets will be removed and replaced by 2 new equipment cabinets. rru and fiber install. | $45,000 |
| Jul 16, 2012 | Completed final sign-off Apr 2015 | 246 Judah St | remove 3 antennas & 3 equip cabinets.install 3 new antenas & 6 rrus screened within a faux frp penthouse on toof top. install 2 new equip cabinets inside (e) shelter on roof top of adjacent garage.Details
remove 3 antennas & 3 equip cabinets.install 3 new antenas & 6 rrus screened within a faux frp penthouse on toof top. install 2 new equip cabinets inside (e) shelter on roof top of adjacent garage. | $45,000 |
| Jul 11, 2012 | Completed final sign-off Apr 2015 | 1100 Oak St | wireless facility modification. replace 3 panel antennas with 3 new panel antennas. replace 3 (e) equipment cabinets with 2 new equipment cabinets. no power upgrade.Details
wireless facility modification. replace 3 panel antennas with 3 new panel antennas. replace 3 (e) equipment cabinets with 2 new equipment cabinets. no power upgrade. | $45,000 |
| Jul 5, 2012 | Completed final sign-off Feb 2016 | 429 Castro St | modif. to(e)sprint unmanned telecom fac. 3 (e)panel antennas to be removed (3 ea of antennas). 6(n) panel antennas mounted inside. 3 (n)frp radomes to replace 1 (e)radome/n rru's per antenna. 2 new gps. 4 equipment cabinets to be removed & 4(n)eqpt cabinets to be installed on roof (n) antennasDetails
modif. to(e)sprint unmanned telecom fac. 3 (e)panel antennas to be removed (3 ea of antennas). 6(n) panel antennas mounted inside. 3 (n)frp radomes to replace 1 (e)radome/n rru's per antenna. 2 new gps. 4 equipment cabinets to be removed & 4(n)eqpt cabinets to be installed on roof (n) antennas | $45,000 |
| Jun 29, 2012 | Never finaled issued May 2013, no final | 1334 Van Ness Av | 4 (e) panel antennas to be removed and 3 new panel antennas to be installed with blinders. 3 equipment cabinets to be removed and 2 cabinets to be installed.Details
4 (e) panel antennas to be removed and 3 new panel antennas to be installed with blinders. 3 equipment cabinets to be removed and 2 cabinets to be installed. | $45,000 |
| Jun 28, 2012 | Completed final sign-off Jun 2015 | 5226 Mission St | sprint wireless modification: replace (3) existing antennas with (3) new antennas on existing roof, replace (3) existing equipment cabinets with (2) new equipment cabinets in existing equipment room on 2nd level of building.Details
sprint wireless modification: replace (3) existing antennas with (3) new antennas on existing roof, replace (3) existing equipment cabinets with (2) new equipment cabinets in existing equipment room on 2nd level of building. | $45,000 |
| Jun 28, 2012 | Never finaled issued Sep 2012, no final | 667 Portola Dr | sprint wireless modification: replace (6) existing antennas with (3) new antennas on roof, replace (3) existing equipment cabinets with (2) new equipment cabinets on roof.Details
sprint wireless modification: replace (6) existing antennas with (3) new antennas on roof, replace (3) existing equipment cabinets with (2) new equipment cabinets on roof. | $45,000 |
| Jun 28, 2012 | Completed final sign-off Jan 2015 | 2300 California St | (3) (e) sprint panel antennas to be removed, (3) (n) panel antennas to be installed at roof top. (6) rrus to be installed (3) (e) equipment cabinets to be removed & (2) (n) cabinets to be installed inside same lease space on roof top. antennas & cables painted to match.Details
(3) (e) sprint panel antennas to be removed, (3) (n) panel antennas to be installed at roof top. (6) rrus to be installed (3) (e) equipment cabinets to be removed & (2) (n) cabinets to be installed inside same lease space on roof top. antennas & cables painted to match. | $45,000 |
| Jun 27, 2012 | Completed final sign-off Mar 2015 | 2001 Union St | sprint wireless modification:replace (5) existing panel antennas with (3) new panel antennas on existing penthouse roof, replace (2) existing equipment cabinets with (2) new equipment cabinets within existing lease area on roof.Details
sprint wireless modification:replace (5) existing panel antennas with (3) new panel antennas on existing penthouse roof, replace (2) existing equipment cabinets with (2) new equipment cabinets within existing lease area on roof. | $45,000 |
| Jun 27, 2012 | Completed final sign-off Dec 2015 | 700 Jones St | sprint wireless modification:replace (2) existing panel antennas with (2) new panel antennas on roof, replace (2) existing equipment cabinets with (2) new equipment cabinets in basement. remove screenwall on roof.Details
sprint wireless modification:replace (2) existing panel antennas with (2) new panel antennas on roof, replace (2) existing equipment cabinets with (2) new equipment cabinets in basement. remove screenwall on roof. | $45,000 |
| Jun 27, 2012 | Expired or cancelled expired Oct 2014 | 990 Columbus Av | remove (3) sprint panel antennas, install (3) (n) panel antennas on roof top. remove (2) equipment cabinets & install (2) (n) equipment cabinets inside (e) lease space inside basement.Details
remove (3) sprint panel antennas, install (3) (n) panel antennas on roof top. remove (2) equipment cabinets & install (2) (n) equipment cabinets inside (e) lease space inside basement. | $45,000 |
| Jun 26, 2012 | Never finaled issued Sep 2012, no final | 720 Moscow St | sprint wireless modification: replace (3) existing antennas with (3) new antennas on roof, replace (3) existing equipment cabinets with (2) new equipment cabinets within existing lease area on roof.Details
sprint wireless modification: replace (3) existing antennas with (3) new antennas on roof, replace (3) existing equipment cabinets with (2) new equipment cabinets within existing lease area on roof. | $45,000 |
| Jun 25, 2012 | Never finaled issued Dec 2014, no final | 955 Potrero Av | 3 (e) panel antennas to be hotswapped w/ 3 (n) antennas. 3 (e) equipment cabinets to be removed & replaced w/ 2 (n) equipment cabinets. fiber & rru install.Details
3 (e) panel antennas to be hotswapped w/ 3 (n) antennas. 3 (e) equipment cabinets to be removed & replaced w/ 2 (n) equipment cabinets. fiber & rru install. | $45,000 |
| Jun 21, 2012 | Never finaled issued Mar 2014, no final | 930 Gough St | remove 2 sprint panel antennas, install 2 new antennas, 4 rrus on roof top. remove 3 equipment cabinets and install 2 new equipment cabinets.Details
remove 2 sprint panel antennas, install 2 new antennas, 4 rrus on roof top. remove 3 equipment cabinets and install 2 new equipment cabinets. | $45,000 |
| Jun 15, 2012 | Completed final sign-off Mar 2015 | 2199 Fulton St | sprint wireless modification. replace 6 (e) antennas with 3 new antennas on (e) roof. replace 3 (e) equipment cabinets with 2 new equipment cabinets on (e) steel beam on roof.Details
sprint wireless modification. replace 6 (e) antennas with 3 new antennas on (e) roof. replace 3 (e) equipment cabinets with 2 new equipment cabinets on (e) steel beam on roof. | $45,000 |
| Jun 4, 2012 | Completed final sign-off Feb 2016 | 417 31st Av | (3) sprint panel antennas to be removed from facade, (3) new antennas to be installed in the same location concealed with frp cover. equipment cabinets to be replaced in same interior lease space (2 cabinets removed, 2 installed).Details
(3) sprint panel antennas to be removed from facade, (3) new antennas to be installed in the same location concealed with frp cover. equipment cabinets to be replaced in same interior lease space (2 cabinets removed, 2 installed). | $45,000 |
| May 31, 2012 | Completed final sign-off May 2015 | 510 Frederick St | remove 3 sprint antennas, install 3 new panel antennas on roof top. remove 2 equipment cabinets & install 2 new cabinets in (e) lease area in the basement.Details
remove 3 sprint antennas, install 3 new panel antennas on roof top. remove 2 equipment cabinets & install 2 new cabinets in (e) lease area in the basement. | $45,000 |