Block 0316, lot 010
420 Taylor St
- City’s use
- Commercial Office
- Built
- 1942
- Stories
- 4
- Units
- 1
- Rooms
- 13 bathrooms
- Building
- 86,473 sq ft
- Lot
- 18,905 sq ft
- Zoning
- C3G
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
101 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 9, 2025 | Completed final sign-off Oct 2025 | 420 Taylor St | Pyro-Comm Systems, Inc. | adding (1) annuiciator expander module to the (e) panel to disable button for horn/strobes and elevator recall.Details
adding (1) annuiciator expander module to the (e) panel to disable button for horn/strobes and elevator recall. | $5,000 |
| Oct 24, 2023 | Completed final sign-off Nov 2023 | 420 Taylor St | Nibbi Bros Assoc Inc. | relocate existing wall + floor mounted bike racks so as to comply with 1a bulletin no.9 only. no other work is proposed.Details
relocate existing wall + floor mounted bike racks so as to comply with 1a bulletin no.9 only. no other work is proposed. | |
| Nov 10, 2022 | Completed final sign-off Dec 2023 | 420 Taylor St | Tristrux Llc Dba Tristrux Construction | removal of sprint decommissioned transmission equipment, utility meter to remain, no hazardous materials involved, no new equipment proposed. remove existing antenna hardware and support structures. site to be restored to pre-existing condition.Details
removal of sprint decommissioned transmission equipment, utility meter to remain, no hazardous materials involved, no new equipment proposed. remove existing antenna hardware and support structures. site to be restored to pre-existing condition. | $15,000 |
| Mar 3, 2022 | Expired or cancelled cancelled Jan 2026 | 400 Taylor St | addition of new exterior security doors. construction of storefront, finishes and lighting. modification of (e) hvac and electrical.Details
addition of new exterior security doors. construction of storefront, finishes and lighting. modification of (e) hvac and electrical. | $500,000 | |
| Jan 5, 2022 | Completed final sign-off Jan 2022 | 420 Taylor St | Rcm Fire Protection Inc. | add, relocate, and revise head locations and types due to new hard lid ceilings being added. revise pipe layout due to new walls, standpipes, and open ceilings. ref permit 202001141845.Details
add, relocate, and revise head locations and types due to new hard lid ceilings being added. revise pipe layout due to new walls, standpipes, and open ceilings. ref permit 202001141845. | $1,500 |
| Dec 15, 2021 | Completed final sign-off Dec 2021 | 420 Taylor St | Pyro-Comm Systems, Inc. | as builts to reflect the new quantity of devices from the aproved plans. ref pa 2021-0610-2063Details
as builts to reflect the new quantity of devices from the aproved plans. ref pa 2021-0610-2063 | $34,000 |
| Dec 14, 2021 | Completed final sign-off Dec 2021 | 420 Taylor St | Pyro-Comm Systems, Inc. | ste 2700: as-builts fire alarm for 202011108635 relfects new auantity of devies. allso adding 3 dialm inotor modules, 1 errcs led annunciator panel. ref 202011108635Details
ste 2700: as-builts fire alarm for 202011108635 relfects new auantity of devies. allso adding 3 dialm inotor modules, 1 errcs led annunciator panel. ref 202011108635 | $8,000 |
| Oct 20, 2021 | Completed final sign-off Dec 2021 | 420 Taylor St | Young Electric Co | install emergency responder radio coverage systemDetails
install emergency responder radio coverage system | $50,000 |
| Sep 22, 2021 | Completed final sign-off Oct 2021 | 420 Taylor St | Ayoob & Peery Plumbing Co Inc | trash room: add 1 sprinkler per ti ref pa 2020-1229-1867Details
trash room: add 1 sprinkler per ti ref pa 2020-1229-1867 | $525 |
| Jun 10, 2021 | Completed final sign-off Dec 2021 | 420 Taylor St | Pyro-Comm Systems, Inc. | an addition to the existing fire alarm system. new notification devices will be added and connected to the existing remote power supply. 10 smoke detectors, 5 relay modules, 3 horn strobe wall, 4 duct detectorsm 26 strobe, 22 horn strobe ceiling. bldg permit # 202012291858Details
an addition to the existing fire alarm system. new notification devices will be added and connected to the existing remote power supply. 10 smoke detectors, 5 relay modules, 3 horn strobe wall, 4 duct detectorsm 26 strobe, 22 horn strobe ceiling. bldg permit # 202012291858 | $34,000 |
| Mar 25, 2021 | Expired or cancelled withdrawn Apr 2021 | 420 Taylor St | Pyro-Comm Systems, Inc. | replace existing fire alarm system and 2-way communication system. replace old panel with new panel. ref ti# 2020 1229 1867Details
replace existing fire alarm system and 2-way communication system. replace old panel with new panel. ref ti# 2020 1229 1867 | $24,000 |
| Mar 1, 2021 | Completed final sign-off Dec 2021 | 420 Taylor St | Novo Construction Inc | administrative review of pa 202009265171. previous submission was approved without benefit of planning preservation review, and this submission is to allow planning preservative review.Details
administrative review of pa 202009265171. previous submission was approved without benefit of planning preservation review, and this submission is to allow planning preservative review. | |
| Feb 18, 2021 | Completed final sign-off Jun 2021 | 420 Taylor St | Ayoob & Peery Plumbing Co Inc | add (74) new sprinkler heads and replace (6) existing heads with new & relocate existing sprinkler pipes to accomodate hvac. ref pa: 2020 1229 1867Details
add (74) new sprinkler heads and replace (6) existing heads with new & relocate existing sprinkler pipes to accomodate hvac. ref pa: 2020 1229 1867 | $40,200 |
| Dec 29, 2020 | Completed final sign-off Jan 2022 | 420 Taylor St | Novo Construction Inc | 1st floor & mezzanine ti: scope includes construction of new partitions, finishes, and lighting. extension of existing hvac and electrical.Details
1st floor & mezzanine ti: scope includes construction of new partitions, finishes, and lighting. extension of existing hvac and electrical. | $1,180,000 |
| Dec 29, 2020 | Completed final sign-off Jan 2022 | 420 Taylor St | Novo Construction Inc | basement t.i. . scope includes construction of new partitions. finishes, and lighting, extension of extg hvac and electrical.Details
basement t.i. . scope includes construction of new partitions. finishes, and lighting, extension of extg hvac and electrical. | $1,140,000 |
| Nov 30, 2020 | Completed final sign-off Nov 2021 | 420 Taylor St | Nibbi Bros Assoc Inc. | revision to bpa# 201901160492. this application is for the review and approval of design/build interior steel stairs. the attached shop drawings and calculations have been reviewed and approved by the project architect and structural engineer.Details
revision to bpa# 201901160492. this application is for the review and approval of design/build interior steel stairs. the attached shop drawings and calculations have been reviewed and approved by the project architect and structural engineer. | $150,000 |
| Nov 10, 2020 | Completed final sign-off Dec 2021 | 420 Taylor St | Pyro-Comm Systems, Inc. | ti project to replace (e) fire panel with new. provide new smoke detectors, initiating devices to include notification devices to the core & shell areas of our scope of work.Details
ti project to replace (e) fire panel with new. provide new smoke detectors, initiating devices to include notification devices to the core & shell areas of our scope of work. | $40,000 |
| Sep 28, 2020 | Completed final sign-off Oct 2020 | 420 Taylor St | Ayoob & Peery Plumbing Co Inc | 1/f lobby: relcoate 1 sprinker head for t.i. 202005277869.Details
1/f lobby: relcoate 1 sprinker head for t.i. 202005277869. | $225 |
| Sep 27, 2020 | Completed final sign-off Nov 2020 | 420 Taylor St | Pyro-Comm Systems, Inc. | 2 relay modules to be added to (e) facu.Details
2 relay modules to be added to (e) facu. | $1,000 |
| Sep 26, 2020 | Completed final sign-off Nov 2020 | 420 Taylor St | Novo Construction Inc | rev to pa202005277869/bb434455232: new vestible with double doors and electrical connections for 2 turnsiles w/ emergency swing gate at main entry. (turnstle provided by vendor). maher n/aDetails
rev to pa202005277869/bb434455232: new vestible with double doors and electrical connections for 2 turnsiles w/ emergency swing gate at main entry. (turnstle provided by vendor). maher n/a | $73,500 |
| Sep 4, 2020 | Completed final sign-off Nov 2021 | 420 Taylor St | Nibbi Bros Assoc Inc. | revision to pa #2019-0116-0492: revise the extension of the (e) traction elevator serving the 1st through 4th floor to the newly converted basement level office space.Details
revision to pa #2019-0116-0492: revise the extension of the (e) traction elevator serving the 1st through 4th floor to the newly converted basement level office space. | $195,000 |
| Aug 24, 2020 | Never finaled issued Jan 2021, no final | 420 Taylor St | Specialized Graphics Inc | installation of (2) halo lit channel letter/logo signsDetails
installation of (2) halo lit channel letter/logo signs | $20,000 |
| Aug 6, 2020 | Never finaled issued Aug 2020, no final | 420 Taylor St | street spaceDetails
street space | ||
| Jul 8, 2020 | Never finaled issued Jul 2020, no final | 420 Taylor St | street spaceDetails
street space | ||
| May 27, 2020 | Completed final sign-off Nov 2020 | 420 Taylor St | 2nd floor - tenant improvement includes the building of new non-structural partitions. all new or revised mep, life safety, and sprinkler work will be design build and submitted under separate permit if needed. building is fully sprinklered.Details
2nd floor - tenant improvement includes the building of new non-structural partitions. all new or revised mep, life safety, and sprinkler work will be design build and submitted under separate permit if needed. building is fully sprinklered. | $42,000 | |
| Jan 14, 2020 | Completed final sign-off Jan 2022 | 420 Taylor St | Rcm Fire Protection Inc. | to modify (e) fire sprinkler system for new walls. general cont.# 2019-0116-0492. **maher n/a**Details
to modify (e) fire sprinkler system for new walls. general cont.# 2019-0116-0492. **maher n/a** | $112,000 |
| Jan 7, 2020 | Never finaled issued Jan 2020, no final | 420 Taylor St | street spaceDetails
street space | ||
| Sep 18, 2019 | Completed final sign-off Jan 2022 | 420 Taylor St | Nibbi Bros Assoc Inc. | electrical & lighting work. ref pa #201901160492. maher naDetails
electrical & lighting work. ref pa #201901160492. maher na | |
| Sep 9, 2019 | Completed final sign-off May 2021 | 420 Taylor St | Nibbi Bros Assoc Inc. | rooftop mech equipment platform framing. screen calls with attachment (n) guardrail. ref pa 2019-0116-0492Details
rooftop mech equipment platform framing. screen calls with attachment (n) guardrail. ref pa 2019-0116-0492 | $10,000 |
| Jun 18, 2019 | Never finaled issued Jun 2019, no final | 420 Taylor St | street spaceDetails
street space | ||
| Mar 14, 2019 | Never finaled issued Mar 2019, no final | 420 Taylor St | street spaceDetails
street space | ||
| Jan 22, 2019 | Completed final sign-off Nov 2021 | 420 Taylor St | Nibbi Bros Assoc Inc. | interior concrete demo of slab on grade and interior drive ramp as well as a portion of upper level concrete deck. n/a for maherDetails
interior concrete demo of slab on grade and interior drive ramp as well as a portion of upper level concrete deck. n/a for maher | $750,000 |
| Jan 16, 2019 | Completed final sign-off Jan 2022 | 420 Taylor St | Nibbi Bros Inc. | remodel existing basement and ground fl levels; addition of new mezzanine into office with small retail component. raise ground floor slab and infill existing openings onto the street with windows & doors & provision of stairs. maher naDetails
remodel existing basement and ground fl levels; addition of new mezzanine into office with small retail component. raise ground floor slab and infill existing openings onto the street with windows & doors & provision of stairs. maher na | $5,000,000 |
| Dec 14, 2017 | Expired or cancelled withdrawn Jan 2019 | 420 Taylor St | conversion of (e) ground floor & basement parking into office space with addition of partial mezzanine @ ground floor & addition of office space @ existing 4th floor roof deckDetails
conversion of (e) ground floor & basement parking into office space with addition of partial mezzanine @ ground floor & addition of office space @ existing 4th floor roof deck | $5,000,000 | |
| Jul 24, 2015 | Completed final sign-off Jul 2015 | 420 Taylor St | Transceive Communications Inc. | at&t: remove of omni antenna & microcell equipment. n/a ordinance #155-13Details
at&t: remove of omni antenna & microcell equipment. n/a ordinance #155-13 | $2,000 |
| Mar 9, 2015 | Expired or cancelled expired Oct 2021 | 420 Taylor St | Overland Contracting Inc | to obtain a final inspection for work already approved under pa# 201109144575, all work is completeDetails
to obtain a final inspection for work already approved under pa# 201109144575, all work is complete | |
| Sep 8, 2014 | Completed final sign-off Feb 2017 | 420 Taylor St | Advanced Wireless & Logistics Inc | sprint: remove(2)nv 800/1900 antennas(1)each at sectors a ^ b/add(2)triband panel antennas(1)each at sectors a & b/add(2)2.5 rrh(1)each at sectors a & b/add new 2.5 equipmt inside(e)mmbs cabinet/add(n)2.5 batteries inside(e)bbu cabinet/add(n jumper lines fr rrhs to(n) antennas/re-use(e) hybrid cableDetails
sprint: remove(2)nv 800/1900 antennas(1)each at sectors a ^ b/add(2)triband panel antennas(1)each at sectors a & b/add(2)2.5 rrh(1)each at sectors a & b/add new 2.5 equipmt inside(e)mmbs cabinet/add(n)2.5 batteries inside(e)bbu cabinet/add(n jumper lines fr rrhs to(n) antennas/re-use(e) hybrid cable | $20,000 |
| Jun 10, 2014 | Completed final sign-off Jun 2015 | 420 Taylor St | Ad Art Inc. | erect 2 electric, wall, single faced signs.Details
erect 2 electric, wall, single faced signs. | $10,000 |
| Feb 28, 2012 | Never finaled issued Feb 2012, no final | 420 Taylor St | Coulthard Identity Group Inc Dba Amcoe | erect electric sign practice fusionDetails
erect electric sign practice fusion | $8,000 |
| Dec 12, 2011 | Completed final sign-off Jan 2012 | 420 Taylor St | Cci Com'l Constr & Improv**See 985808*** | relocate duct work, grilles install, relocate three thermostats. 3rd. & 4th. flr.Details
relocate duct work, grilles install, relocate three thermostats. 3rd. & 4th. flr. | $30,000 |
| Dec 9, 2011 | Completed final sign-off Feb 2012 | 420 Taylor St | Cisco Fire Sprinklers, Inc. | add 4 upright sprinklers, demo out 29 exist sprinklers upgrade seismic bracingDetails
add 4 upright sprinklers, demo out 29 exist sprinklers upgrade seismic bracing | $3,000 |
| Nov 15, 2011 | Completed final sign-off Dec 2011 | 420 Taylor St | All Guard Alarm Sys. Inc. | additions and modification to ext fire alarm system on floors 2, 3, and 4.Details
additions and modification to ext fire alarm system on floors 2, 3, and 4. | $12,000 |
| Nov 14, 2011 | Completed final sign-off Jan 2012 | 420 Taylor St | Cci Com'l Constr & Improv**See 985808*** | interior improvement 1st, 3rd, and 4th. new interior non structural partitoiins, new mep distribution, new and relocate lighting, relocate doors and hardwareDetails
interior improvement 1st, 3rd, and 4th. new interior non structural partitoiins, new mep distribution, new and relocate lighting, relocate doors and hardware | $125,000 |
| Nov 9, 2011 | Expired or cancelled expired Oct 2021 | 420 Taylor St | Cci Com'l Constr & Improv**See 985808*** | mechanical t-24 per permit app#201110146831Details
mechanical t-24 per permit app#201110146831 | $30,000 |
| Nov 2, 2011 | Completed final sign-off Jan 2012 | 420 Taylor St | Cisco Fire Sprinklers, Inc. | demo 12 drops, install 12 uprights, upgrade bracing and restraintDetails
demo 12 drops, install 12 uprights, upgrade bracing and restraint | $2,500 |
| Oct 31, 2011 | Expired or cancelled cancelled Jan 2026 | 420 Taylor St | install 1' diameter microwave antenna on existing concret roof deck. antenna is for private use (for the transfer fo medical files).Details
install 1' diameter microwave antenna on existing concret roof deck. antenna is for private use (for the transfer fo medical files). | $10,000 | |
| Oct 14, 2011 | Completed final sign-off Jan 2012 | 420 Taylor St | Cci Com'l Constr & Improv**See 985808*** | tenant improvement on 2nd floor, new interior non structural partitions. mep under seperate permit.Details
tenant improvement on 2nd floor, new interior non structural partitions. mep under seperate permit. | $250,000 |
| Oct 5, 2011 | Expired or cancelled expired Oct 2021 | 420 Taylor St | Cci Com'l Constr & Improv**See 985808*** | remove e partitions millwork , doors, for work at floors 1,2,3,4 per ab-017. sprinkler/fa work (if applicable) shall be under separate permitsDetails
remove e partitions millwork , doors, for work at floors 1,2,3,4 per ab-017. sprinkler/fa work (if applicable) shall be under separate permits | $30,000 |
| Sep 14, 2011 | Completed final sign-off Apr 2015 | 420 Taylor St | Overland Contracting Inc | wireless facility modification: replace 4 panel antennas w/ 4 (n) panel antennas on (e) bldg; replace 3 (e) equipment cabinets w/ 2 (n) equipment cabinets w/in rm of (e) bldg; run coxial lines from equipment to antennas.replace 1 gps antennaDetails
wireless facility modification: replace 4 panel antennas w/ 4 (n) panel antennas on (e) bldg; replace 3 (e) equipment cabinets w/ 2 (n) equipment cabinets w/in rm of (e) bldg; run coxial lines from equipment to antennas.replace 1 gps antenna | $45,000 |
| Jul 22, 2011 | Expired or cancelled cancelled Jun 2013 | 420 Taylor St | installation of indoor equiptment inside an existing penthouse and (6) panel antennas in frp shrodus on rooftop.Details
installation of indoor equiptment inside an existing penthouse and (6) panel antennas in frp shrodus on rooftop. | $139,000 | |
| Jan 27, 2010 | Never finaled issued Jan 2010, no final | 400 Taylor St | street space & sidewalkDetails
street space & sidewalk | ||
| Aug 26, 2009 | Never finaled issued Aug 2009, no final | 420 Taylor St | street space permit only.Details
street space permit only. | ||
| Apr 13, 2009 | Completed final sign-off Oct 2009 | 420 Taylor St | N S A Wireless Inc | modification to an (e) unmanned telecommunication facility consisting of removing an (e) rbs 3303 radio cabinet & replacing it with an new rbs 3518 radio cabinet. adding 2 rru (remote radio units). adding 1 new pbc-02 battyer backup cabinet & removing (e) tdma equipment.Details
modification to an (e) unmanned telecommunication facility consisting of removing an (e) rbs 3303 radio cabinet & replacing it with an new rbs 3518 radio cabinet. adding 2 rru (remote radio units). adding 1 new pbc-02 battyer backup cabinet & removing (e) tdma equipment. | $5,000 |
| Apr 2, 2007 | Never finaled issued Apr 2007, no final | 420 Taylor St | sidewalk repair onlyDetails
sidewalk repair only | ||
| May 30, 2006 | Never finaled issued May 2006, no final | 420 Taylor St | street space & sidewalk permit only.Details
street space & sidewalk permit only. | ||
| May 12, 2006 | Completed final sign-off May 2006 | 420 Taylor St | Metropolitan Electrical Construction | renew permit appl# 9926195 for final inspection.Details
renew permit appl# 9926195 for final inspection. | |
| Apr 19, 2005 | Completed final sign-off May 2005 | 420 Taylor St | rev#200303260714. deletion of 4 car-lifts only under this permit@ 1st floor.Details
rev#200303260714. deletion of 4 car-lifts only under this permit@ 1st floor. | ||
| Apr 11, 2005 | Completed final sign-off May 2005 | 420 Taylor St | renew permit app 200407158873-200404282551-200404060584-200403188999Details
renew permit app 200407158873-200404282551-200404060584-200403188999 | ||
| Oct 20, 2004 | Expired or cancelled expired Oct 2021 | 420 Taylor St | Geo M Robinson & Co | office work under permit 200409275192-fire sprinkler t.i. relocate co ceil hds & 2 roof hds on 2nd fDetails
office work under permit 200409275192-fire sprinkler t.i. relocate co ceil hds & 2 roof hds on 2nd f | $2,700 |
| Sep 27, 2004 | Completed final sign-off Nov 2004 | 420 Taylor St | Ward Alan Emery Construction Inc. | interior alteration - drywall.Details
interior alteration - drywall. | $45,000 |
| Jul 15, 2004 | Completed final sign-off May 2005 | 420 Taylor St | renew pa#200306260714 for stated work. install rot lift & ground floor & basement.Details
renew pa#200306260714 for stated work. install rot lift & ground floor & basement. | $147,200 | |
| Jul 15, 2004 | Expired or cancelled expired May 2005 | 420 Taylor St | renew expired pa#200403188999: install the partition per fred stump fire dept requirement full heighDetails
renew expired pa#200403188999: install the partition per fred stump fire dept requirement full heigh | $22,000 | |
| Jul 14, 2004 | Never finaled issued Oct 2004, no final | 420 Taylor St | Pribuss Engineering Inc | garage fire sprinkler upgrade garage parking lifts jl 2083Details
garage fire sprinkler upgrade garage parking lifts jl 2083 | $28,000 |
| Apr 28, 2004 | Expired or cancelled expired May 2005 | 420 Taylor St | rev. to pa#2003/03/26/0714 - handicapped parking changeDetails
rev. to pa#2003/03/26/0714 - handicapped parking change | ||
| Apr 6, 2004 | Expired or cancelled expired May 2005 | 420 Taylor St | install 4 1 hour wall partitions per fred stump @ basement only uner this permitDetails
install 4 1 hour wall partitions per fred stump @ basement only uner this permit | $10,000 | |
| Mar 18, 2004 | Expired or cancelled expired May 2005 | 420 Taylor St | install 1 hr partition only under this permit.1-hr horiz. duct enclosure full height x15' long.Details
install 1 hr partition only under this permit.1-hr horiz. duct enclosure full height x15' long. | $22,000 | |
| Aug 4, 2003 | Never finaled issued Aug 2003, no final | 420 Taylor St | erect sign for non electric, wall, projecting, double facedDetails
erect sign for non electric, wall, projecting, double faced | ||
| Mar 26, 2003 | Expired or cancelled expired May 2005 | 420 Taylor St | install 32 auto lifts at ground floor and basement floor.Details
install 32 auto lifts at ground floor and basement floor. | $35,000 | |
| Jul 23, 2002 | Expired or cancelled cancelled Jan 2003 | 420 Taylor St | oti-1, 3rd flr, ltg, mech, ls, sprDetails
oti-1, 3rd flr, ltg, mech, ls, spr | $20,000 | |
| Oct 24, 2001 | Expired or cancelled expired Feb 2002 | 420 Taylor St | Commercial Neon Inc. | to install 2 single faced electrical signDetails
to install 2 single faced electrical sign | |
| Oct 23, 2001 | Expired or cancelled cancelled Oct 2024 | 420 Taylor St | Commercial Neon Inc. | sign permit- electric, wall, single faced.Details
sign permit- electric, wall, single faced. | |
| Jun 22, 2001 | Completed final sign-off Jul 2001 | 420 Taylor St | Cupertino Electric Inc. | relocate 1 horn strobe @ on 2, 3 & 4th floor rev. #200105159157, 200105159159, 200105159156 add 2 duDetails
relocate 1 horn strobe @ on 2, 3 & 4th floor rev. #200105159157, 200105159159, 200105159156 add 2 du | $4,000 |
| Jun 12, 2001 | Completed final sign-off Jul 2001 | 420 Taylor St | Dpr Construction Inc | oti-2 4th floor el, me, sp, hvacDetails
oti-2 4th floor el, me, sp, hvac | $100,000 |
| Jun 12, 2001 | Completed final sign-off Jul 2001 | 420 Taylor St | Dpr Construction Inc | oti-2 3rd floor el, me, spDetails
oti-2 3rd floor el, me, sp | $100,000 |
| Jun 12, 2001 | Completed final sign-off Jul 2001 | 420 Taylor St | Dpr Construction Inc | oti-2 2nd floor el, me, spDetails
oti-2 2nd floor el, me, sp | $175,000 |
| Jun 12, 2001 | Completed final sign-off Jul 2001 | 420 Taylor St | Dpr Construction Inc | oti-2 1st floor el, me,Details
oti-2 1st floor el, me, | $35,000 |
| May 15, 2001 | Completed final sign-off Jul 2001 | 420 Taylor St | Dpr Construction Inc | oti-1 2nd floor el me l/s spDetails
oti-1 2nd floor el me l/s sp | $80,000 |
| May 15, 2001 | Completed final sign-off Jul 2001 | 420 Taylor St | Dpr Construction Inc | oti-1 3rd flr,el,me, l/s, & spDetails
oti-1 3rd flr,el,me, l/s, & sp | $60,000 |
| May 15, 2001 | Completed final sign-off Jul 2001 | 420 Taylor St | Dpr Construction Inc | oti-1 4th flr,el,me, l/s & spDetails
oti-1 4th flr,el,me, l/s & sp | $40,000 |
| May 15, 2001 | Completed final sign-off Jul 2001 | 420 Taylor St | Dpr Construction Inc | oti-1 1st flr,el,me, l/s & spDetails
oti-1 1st flr,el,me, l/s & sp | $10,000 |
| Apr 9, 2001 | Completed final sign-off Nov 2002 | 420 Taylor St | Dpr Construction Inc | roof patio ada fully comply 200010052401 200010052404Details
roof patio ada fully comply 200010052401 200010052404 | $40,000 |
| Mar 16, 2001 | Completed final sign-off Apr 2001 | 420 Taylor St | one-stop:m.tjoe:facade, new windows of new facade on appl #20000203989, new ada doorDetails
one-stop:m.tjoe:facade, new windows of new facade on appl #20000203989, new ada door | $5,000 | |
| Mar 14, 2001 | Completed final sign-off Apr 2001 | 420 Taylor St | West And East Bay Cosntruction, Inc | revision 200004127017 structural revision work only to show how mech equip is supportmentDetails
revision 200004127017 structural revision work only to show how mech equip is supportment | |
| Feb 16, 2001 | Completed final sign-off Apr 2001 | 420 Taylor St | Dpr Construction Inc | oti-2 4th floor el, me, l/s, spDetails
oti-2 4th floor el, me, l/s, sp | $105,000 |
| Feb 16, 2001 | Completed final sign-off Apr 2001 | 420 Taylor St | Dpr Construction Inc | oti-2, 1st floor, el, me, ls, spDetails
oti-2, 1st floor, el, me, ls, sp | $25,270 |
| Feb 16, 2001 | Expired or cancelled expired Mar 2002 | 420 Taylor St | Dpr Construction Inc | oti-2 3/f el me ls spDetails
oti-2 3/f el me ls sp | $202,000 |
| Feb 16, 2001 | Expired or cancelled expired Apr 2001 | 420 Taylor St | Dpr Construction Inc | oti-2 2/f el me ls spDetails
oti-2 2/f el me ls sp | $202,000 |
| Oct 23, 2000 | Completed final sign-off Apr 2001 | 420 Taylor St | revision to 200004127017:Details
revision to 200004127017: | $500 | |
| Oct 5, 2000 | Completed final sign-off Apr 2001 | 420 Taylor St | oti-1, 3rd floor, el, me, ls, spDetails
oti-1, 3rd floor, el, me, ls, sp | $202,000 | |
| Oct 5, 2000 | Completed final sign-off Apr 2001 | 420 Taylor St | oti-1, 2nd floor, el, me, ls,& spDetails
oti-1, 2nd floor, el, me, ls,& sp | $202,000 | |
| Oct 5, 2000 | Completed final sign-off Apr 2001 | 420 Taylor St | oti-1 ground floor, el, me, ls & spDetails
oti-1 ground floor, el, me, ls & sp | $25,270 | |
| Oct 5, 2000 | Completed final sign-off Apr 2001 | 420 Taylor St | oti-1 4th floor el, me, ls, spDetails
oti-1 4th floor el, me, ls, sp | $105,000 | |
| Jul 27, 2000 | Completed final sign-off Apr 2001 | 420 Taylor St | electrical distribution all floors/title 24Details
electrical distribution all floors/title 24 | ||
| Jul 20, 2000 | Completed final sign-off Apr 2001 | 420 Taylor St | Pribuss Engineering Inc | fire spriklr and booster pumpDetails
fire spriklr and booster pump | $163,200 |
| Jun 8, 2000 | Expired or cancelled expired Mar 2001 | 420 Taylor St | Fovell Enterprises Dba Southwest Sign | double-faced non-electric projecting signDetails
double-faced non-electric projecting sign | $3,000 |
| Jun 2, 2000 | Completed final sign-off Apr 2001 | 420 Taylor St | new fire alarm control panel, smoke detector, audible/visuals in core, elevator recal & shunt tripDetails
new fire alarm control panel, smoke detector, audible/visuals in core, elevator recal & shunt trip | $20,000 | |
| Apr 12, 2000 | Completed final sign-off Apr 2001 | 420 Taylor St | seismic upgrade to all floorsDetails
seismic upgrade to all floors | $250,000 | |
| Apr 8, 2000 | Expired or cancelled expired Mar 2001 | 420 Taylor St | revision to bpa #9926195 move bts equipment fr the roof into (e) penthouseDetails
revision to bpa #9926195 move bts equipment fr the roof into (e) penthouse | ||
| Mar 30, 2000 | Expired or cancelled expired Mar 2001 | 420 Taylor St | install radio equipment & antennas at this siteDetails
install radio equipment & antennas at this site | $35,000 | |
| Feb 22, 2000 | Expired or cancelled expired Jun 2000 | 420 Taylor St | street spaceDetails
street space | ||
| Feb 3, 2000 | Completed final sign-off Apr 2001 | 420 Taylor St | replace windows, re-roofingDetails
replace windows, re-roofing | $200,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Dpr Construction Inc (13), Pyro-Comm Systems, Inc. (7), Nibbi Bros Assoc Inc. (6), Cci Com'l Constr & Improv**See 985808*** (5), Novo Construction Inc (4), Ayoob & Peery Plumbing Co Inc (3), Cisco Fire Sprinklers, Inc. (2), Commercial Neon Inc. (2), Overland Contracting Inc (2), Pribuss Engineering Inc (2), Rcm Fire Protection Inc. (2), Ad Art Inc., Advanced Wireless & Logistics Inc, All Guard Alarm Sys. Inc., Coulthard Identity Group Inc Dba Amcoe, Cupertino Electric Inc., Fovell Enterprises Dba Southwest Sign, Geo M Robinson & Co, Metropolitan Electrical Construction, N S A Wireless Inc, Nibbi Bros Inc., Specialized Graphics Inc, Transceive Communications Inc., Tristrux Llc Dba Tristrux Construction, Ward Alan Emery Construction Inc., West And East Bay Cosntruction, Inc, Young Electric Co
- Architects
- Gerald S. Tierney (7), Brian Braganza (3), Joseph A. Remling (3), Tim Murphy (2), Ben Sun, Ian Glidden, Richard Sambucetti, Trk Engineer
- Engineers
- Benjamin Noggle, Carl Milsum, Dana Reidenbach, Mathew Bittleston, Mojtaba Ardebili, Nathan Short, Steamline Engineer Steamline Engineering, Tim Murphy
- Authorized agent-otherss
- Drsa Architects Drsa Architects, Jodee August
- Designers
- Michael Joseph Donahue
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.