Tristrux Llc Dba Tristrux Construction
- Based in
- Clifton
- On San Francisco permits
- Nov 2022 to Aug 2025
- Last 24 months
- 14 permits filed
34 permits since 2000: 14 completed, 8 in progress, 1 never finaled, 11 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 21, 2025 | In progress issued Oct 2025 | 1155 Bryant St | att modification of (e) faciilty . remove and replace (6) antenna, install (3) dc 9 raycaps, (3) 24 pair fiber trunks, (6) 6 awg dc power trunks, remove (1) power plant and (6) rectifiers; install (1) net sure conversion kit power plant. (1) 58v buss bar panel, (12) 18v rectifiers, (11) 58vDetails
att modification of (e) faciilty . remove and replace (6) antenna, install (3) dc 9 raycaps, (3) 24 pair fiber trunks, (6) 6 awg dc power trunks, remove (1) power plant and (6) rectifiers; install (1) net sure conversion kit power plant. (1) 58v buss bar panel, (12) 18v rectifiers, (11) 58v | $45,000 |
| May 21, 2025 | In progress issued Oct 2025 | 1900 Bryant St | modification of an (e) verizon wireless unmanned telecommunicaition facility: installl (4) (n) verizon wireless antennas/wrapping in 3m film/painting (n) antennas, exposed pipe mounts and exposed cables to match (e) screens/using (e) surge supressors, hybrid cables & i x r-e at equipment & antennasDetails
modification of an (e) verizon wireless unmanned telecommunicaition facility: installl (4) (n) verizon wireless antennas/wrapping in 3m film/painting (n) antennas, exposed pipe mounts and exposed cables to match (e) screens/using (e) surge supressors, hybrid cables & i x r-e at equipment & antennas | $25,000 |
| Mar 5, 2025 | Completed final sign-off Feb 2026 | 405 Valencia St | verizon - install 4(n) antennas; no propose batteriesDetails
verizon - install 4(n) antennas; no propose batteries | $45,000 |
| Jan 30, 2025 | Completed final sign-off May 2026 | 2191 Market St | verizon wireless project- install (4) new antennas and (2) surge protector on an (e) verizon facilityDetails
verizon wireless project- install (4) new antennas and (2) surge protector on an (e) verizon facility | $30,000 |
| Dec 12, 2024 | In progress issued Apr 2025 | 333 Baker St | verizon project: install (4) new antennas and (4) new wall mounts on an (e) verizon facilityDetails
verizon project: install (4) new antennas and (4) new wall mounts on an (e) verizon facility | $45,000 |
| Dec 12, 2024 | Completed final sign-off Feb 2026 | 832 Folsom St | verizon project- install 4 (n) antennas and wall mounts to an (e) verizon facilityDetails
verizon project- install 4 (n) antennas and wall mounts to an (e) verizon facility | $35,000 |
| Nov 21, 2024 | Expired or cancelled cancelled Aug 2026 | 2288 Broadway | verizon install 4 new antennas to wrap w 3m film, install 4 new breakers in e dc power plan, no proposed batteries.Details
verizon install 4 new antennas to wrap w 3m film, install 4 new breakers in e dc power plan, no proposed batteries. | $35,000 |
| Nov 21, 2024 | Completed final sign-off Apr 2026 | 1300 26th Av | verizon: install 4 new antennas, 2 new surge suppressors, install new grounding, no new batteries proposedDetails
verizon: install 4 new antennas, 2 new surge suppressors, install new grounding, no new batteries proposed | $45,000 |
| Nov 21, 2024 | In progress issued Mar 2025 | 1777 Yosemite Av | verizon: install 4 new antennas; remove 6 existing surge suppressors and install 6 new surge suppressors; no proposed batteries.Details
verizon: install 4 new antennas; remove 6 existing surge suppressors and install 6 new surge suppressors; no proposed batteries. | $45,000 |
| Nov 19, 2024 | Completed final sign-off Apr 2026 | 2601 Mission St | verizon: install 4(n) antennas w/3m film to match (e) building; no proposed batteries; install (n) elec groundingDetails
verizon: install 4(n) antennas w/3m film to match (e) building; no proposed batteries; install (n) elec grounding | $35,000 |
| Nov 7, 2024 | In progress issued Apr 2025 | 595 Buckingham Wy | verizon project: install 4 new antennas & 4 new wall mount on the e) verizon facilityDetails
verizon project: install 4 new antennas & 4 new wall mount on the e) verizon facility | $40,000 |
| Nov 5, 2024 | In progress issued Nov 2024 | 1 South Van Ness Av | remove & replace 4 (e) antenna mounting pipes w 4 (n) longer antenna mounting pipes. install 4 (n) antennas. wrapping in 3m film/painting (n) antennas exposed pipe mounts and exposed cables to match (e) frp screens. using (e) surge suppressors, hybrid cables & ixr e routers @ equipment & antennasDetails
remove & replace 4 (e) antenna mounting pipes w 4 (n) longer antenna mounting pipes. install 4 (n) antennas. wrapping in 3m film/painting (n) antennas exposed pipe mounts and exposed cables to match (e) frp screens. using (e) surge suppressors, hybrid cables & ixr e routers @ equipment & antennas | $18,000 |
| Nov 5, 2024 | In progress issued Nov 2024 | 1285 Sutter St | install 4 (n) antennas on (n) pipe extensions. covering (n) antennas w/3m film to match (e) fpr raydomes. use (e) surge suppressors, (e) hybrid cables & (e) ikr-e router @ equipment and @ antennas for dc power and fiber connectivityDetails
install 4 (n) antennas on (n) pipe extensions. covering (n) antennas w/3m film to match (e) fpr raydomes. use (e) surge suppressors, (e) hybrid cables & (e) ikr-e router @ equipment and @ antennas for dc power and fiber connectivity | $18,000 |
| Nov 4, 2024 | In progress issued Oct 2025 | 501 Laguna Honda Bl | verizon: swap 2 (e) antennas w/ 2 (n) antennas; swap 6 (e) rrvs w/ 6 (n) rrvs; no proposed (n) batteries; (n) electrical groundingDetails
verizon: swap 2 (e) antennas w/ 2 (n) antennas; swap 6 (e) rrvs w/ 6 (n) rrvs; no proposed (n) batteries; (n) electrical grounding | $25,000 |
| May 17, 2023 | Expired or cancelled cancelled Jan 2026 | 682 Schofield Rd | decommissioning (e) sprint/tmo faclity including shroud, antennas, meter & support equipement. west of park bl, btw schofield rd & kobbe av.Details
decommissioning (e) sprint/tmo faclity including shroud, antennas, meter & support equipement. west of park bl, btw schofield rd & kobbe av. | $15,000 |
| Dec 22, 2022 | Expired or cancelled cancelled May 2023 | 2288 Broadway | removal of sprint decommissioned transmission equipment. utility meter to be removed. no hazardous materials involved. no new equipment proposedDetails
removal of sprint decommissioned transmission equipment. utility meter to be removed. no hazardous materials involved. no new equipment proposed | $15,000 |
| Dec 22, 2022 | Expired or cancelled cancelled Jun 2023 | 2000 Van Ness Av | removal of sprint decomissioned transmission equipment. utility meter to remain, no hazardous materials, no new equipment proposedDetails
removal of sprint decomissioned transmission equipment. utility meter to remain, no hazardous materials, no new equipment proposed | $15,000 |
| Dec 21, 2022 | Completed final sign-off Jul 2023 | 370 Grove St | the removal of sprint decommissioned transmission equipment. utility meter to remain. no hazardous materials involved. no new equipment proposed.Details
the removal of sprint decommissioned transmission equipment. utility meter to remain. no hazardous materials involved. no new equipment proposed. | $15,000 |
| Dec 21, 2022 | Completed final sign-off Jun 2023 | 965 Mission St | the removal of sprint decommissioned transmission equipment. utility meter to remain. no hazardous materials involved. no new equipment proposed.Details
the removal of sprint decommissioned transmission equipment. utility meter to remain. no hazardous materials involved. no new equipment proposed. | $15,000 |
| Dec 20, 2022 | Completed final sign-off Aug 2023 | 512 Van Ness Av | removal of sprint decommissioned transmission equipment. utility meter to remain. no hazardous materials involved. no new equip proposed.Details
removal of sprint decommissioned transmission equipment. utility meter to remain. no hazardous materials involved. no new equip proposed. | $15,000 |
| Dec 20, 2022 | Completed final sign-off Aug 2023 | 706 Polk St | removal of sprint decommissioned transmission equipment. utility meter to remain. no hazardous matrials involved. no new equip proposedDetails
removal of sprint decommissioned transmission equipment. utility meter to remain. no hazardous matrials involved. no new equip proposed | $15,000 |
| Dec 19, 2022 | Completed final sign-off May 2023 | 1501 Lincoln Wy | roof - removal of sprint decommissioned cell site equipment. existing submeter to be removed. no hazardous materials involved. no new equipment proposed.Details
roof - removal of sprint decommissioned cell site equipment. existing submeter to be removed. no hazardous materials involved. no new equipment proposed. | $15,000 |
| Dec 19, 2022 | Expired or cancelled cancelled Feb 2023 | 2775 Van Ness Av | removal of sprint decommissioned equipment. existing submeter to be removed. no hazardous materials involved. no new equipment proposed.Details
removal of sprint decommissioned equipment. existing submeter to be removed. no hazardous materials involved. no new equipment proposed. | $15,000 |
| Dec 19, 2022 | Completed final sign-off May 2023 | 1201 Howard St | removal of sprint decommissioned equipment. utility meter to remain. . no hazardous materials involved. no new equipment proposed. maher not reqDetails
removal of sprint decommissioned equipment. utility meter to remain. . no hazardous materials involved. no new equipment proposed. maher not req | $15,000 |
| Dec 19, 2022 | Completed final sign-off Dec 2023 | 2238 Geary Bl | removal of sprint decommissioned equipment. existing submeter to be removed. no hazardous materials involved. no new equipment proposed.Details
removal of sprint decommissioned equipment. existing submeter to be removed. no hazardous materials involved. no new equipment proposed. | $15,000 |
| Nov 10, 2022 | Never finaled filed Nov 2022, never issued | 1201 Howard St | #1205: complete removal of sprint rooftop cell site, antennas, equip, hardware, & support sturctures installed by sprint will be removed/no replacement/no new equipment to be added. site will be restored to pre-existing conditionDetails
#1205: complete removal of sprint rooftop cell site, antennas, equip, hardware, & support sturctures installed by sprint will be removed/no replacement/no new equipment to be added. site will be restored to pre-existing condition | $15,000 |
| Nov 10, 2022 | Completed final sign-off Dec 2023 | 420 Taylor St | removal of sprint decommissioned transmission equipment, utility meter to remain, no hazardous materials involved, no new equipment proposed. remove existing antenna hardware and support structures. site to be restored to pre-existing condition.Details
removal of sprint decommissioned transmission equipment, utility meter to remain, no hazardous materials involved, no new equipment proposed. remove existing antenna hardware and support structures. site to be restored to pre-existing condition. | $15,000 |
| Nov 10, 2022 | Completed final sign-off Oct 2023 | 2350 Turk Bl | complete removal of sprint rooftop cell site antenna equipment, hardware, & support stuctors installed by sprint will be removed. will not replace, no new equiptment to be added. site to be restored to pre-existing condition.Details
complete removal of sprint rooftop cell site antenna equipment, hardware, & support stuctors installed by sprint will be removed. will not replace, no new equiptment to be added. site to be restored to pre-existing condition. | $15,000 |
| Nov 10, 2022 | Expired or cancelled cancelled Jan 2026 | 2000 Van Ness Av | removal of sprint equip on rooftop. antennas, equip, hardware, & support structures installed by sprint will be removed/no replacement/no new equipment to be added. site will be restored to pre-existing conditionDetails
removal of sprint equip on rooftop. antennas, equip, hardware, & support structures installed by sprint will be removed/no replacement/no new equipment to be added. site will be restored to pre-existing condition | $15,000 |
| Nov 3, 2022 | Expired or cancelled cancelled Jun 2023 | 310 Townsend St | t-mobile: 100% removal of sprint rooftop cell site. all antennas, equipment, hardware and support structures installed by sprint will be removed. will not replace - no new equipment to be added. site to be restored to pre-existing condition.Details
t-mobile: 100% removal of sprint rooftop cell site. all antennas, equipment, hardware and support structures installed by sprint will be removed. will not replace - no new equipment to be added. site to be restored to pre-existing condition. | $15,000 |
| Nov 3, 2022 | Expired or cancelled cancelled May 2023 | 100 Armory Dr | 100% removal of sprint euiqpment. will not replace- no new equp to be added. mono pole. with other carrier to remain. site to be restored to prexisting condition.Details
100% removal of sprint euiqpment. will not replace- no new equp to be added. mono pole. with other carrier to remain. site to be restored to prexisting condition. | $15,000 |
| Nov 3, 2022 | Expired or cancelled cancelled Jan 2026 | 512 Van Ness Av | 100% removal of sprint rooftop cell site. all antennas, equip, hardware and support structures by sprint will be removed. will not replace - no new equip to be added. site to be restored to pre-existing condition.Details
100% removal of sprint rooftop cell site. all antennas, equip, hardware and support structures by sprint will be removed. will not replace - no new equip to be added. site to be restored to pre-existing condition. | $15,000 |
| Nov 3, 2022 | Expired or cancelled cancelled Jan 2026 | 2775 Van Ness Av | t-mobile: 100% removal of sprint rooftop cell site. all antennas, equipment, hardware and support structures installed by sprint will be removed. will not replace - no new equipment to be added. site to be restored to pre-existing condition.Details
t-mobile: 100% removal of sprint rooftop cell site. all antennas, equipment, hardware and support structures installed by sprint will be removed. will not replace - no new equipment to be added. site to be restored to pre-existing condition. | $15,000 |
| Nov 1, 2022 | Expired or cancelled cancelled Jan 2026 | 706 Polk St | rooftop: 100% removal of sprint cell site. all antennas, equipment, hardware and support structures installed by sprint will be removed. will not replace - no new equipment to be added. site to be restored to pre-existing condition.Details
rooftop: 100% removal of sprint cell site. all antennas, equipment, hardware and support structures installed by sprint will be removed. will not replace - no new equipment to be added. site to be restored to pre-existing condition. | $15,000 |