Block 3506, lot 001
1525 Market St
- City’s use
- Commercial Office
- Built
- 1959
- Stories
- 8
- Rooms
- 23 bathrooms
- Building
- 656,844 sq ft
- Lot
- 65,000 sq ft
- Zoning
- C3G
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 3, 2026 | In progress filed Sep 2026, not yet issued | 1525 Market St | Mastec Network Solutions Inc | t-mobile remove & replace 1 e) mirco wave dish, cable & equipment mw dish,Details
t-mobile remove & replace 1 e) mirco wave dish, cable & equipment mw dish, | $45,000 |
| Aug 14, 2026 | In progress issued Aug 2026 | 1 South Van Ness Av | Walschon Fire Protection Inc | revision to bpa: 202506068098 - for freight removal, removal of (e) sprinklers in the following elevators passenger p1&p2, hostway (north penthouse 2nd level) and elevator machine room (north penthouse and tank) freight elevator f1- 1 sprinkler in pit of hostway.Details
revision to bpa: 202506068098 - for freight removal, removal of (e) sprinklers in the following elevators passenger p1&p2, hostway (north penthouse 2nd level) and elevator machine room (north penthouse and tank) freight elevator f1- 1 sprinkler in pit of hostway. | $12,000 |
| Aug 11, 2026 | In progress issued Aug 2026 | 1 South Van Ness Av | W E Lyons Construction Co | rev to pa# 2022-0307-9381: replacement of superseded sffd pre application meeting notes & addition of sffd reference forms revised pre application meeting notes dated 7/9/2026. indicatrs approved alternate access door/panel at freight elevater hoistway.Details
rev to pa# 2022-0307-9381: replacement of superseded sffd pre application meeting notes & addition of sffd reference forms revised pre application meeting notes dated 7/9/2026. indicatrs approved alternate access door/panel at freight elevater hoistway. | |
| Jul 21, 2026 | In progress issued Jul 2026 | 1 South Van Ness Av | W E Lyons Construction Co | ref 202602092623- all work completed for drawings and cals for transformer rackDetails
ref 202602092623- all work completed for drawings and cals for transformer rack | |
| Jun 25, 2026 | In progress filed Jun 2026, not yet issued | 1 South Van Ness Av | modification of e verizon wireless unmanned telecommunication facility consisting of remove 9 antennas, 4 e radios. install 6 new antennas/relocate 6 e antennas. install 20 ft leave area w new frp screen.Details
modification of e verizon wireless unmanned telecommunication facility consisting of remove 9 antennas, 4 e radios. install 6 new antennas/relocate 6 e antennas. install 20 ft leave area w new frp screen. | $150,000 | |
| Jun 23, 2026 | In progress issued Jun 2026 | 1 South Van Ness Av | W E Lyons Construction Co | revision to pa #202203079381. at passenger elevators #1 and #2 machine room. addition of screen divider between disconnects for elevator #2Details
revision to pa #202203079381. at passenger elevators #1 and #2 machine room. addition of screen divider between disconnects for elevator #2 | $15,000 |
| Mar 26, 2026 | In progress issued Mar 2026 | 1 South Van Ness Av | W E Lyons Construction Co | revision to pa# 202203079381: addition to partial single line diagram for new scope and reference sheet for as-builts single line diagram. removal of intimescent paint reference over non-combustible partial height wall.Details
revision to pa# 202203079381: addition to partial single line diagram for new scope and reference sheet for as-builts single line diagram. removal of intimescent paint reference over non-combustible partial height wall. | |
| Mar 12, 2026 | In progress issued Mar 2026 | 1 South Van Ness Av | W E Lyons Construction Co | revision to pa #2022-0307-9381: addition to partial single line diagram for new scope and reference sheet for as builts single line diagram. removal of intumescent paint reference over non combustible partial height wall.Details
revision to pa #2022-0307-9381: addition to partial single line diagram for new scope and reference sheet for as builts single line diagram. removal of intumescent paint reference over non combustible partial height wall. | |
| Dec 8, 2025 | In progress filed Dec 2025, not yet issued | 1 South Van Ness Av | Ccsf Dpw-Bbr Steamfitters/Plumbers | 8th flr: to obtain final inspection for work approved under pa 201912129305. all work is complete.Details
8th flr: to obtain final inspection for work approved under pa 201912129305. all work is complete. | |
| Dec 8, 2025 | In progress filed Dec 2025, not yet issued | 1 South Van Ness Av | Ccsf Dpw-Bbr Steamfitters/Plumbers | 8th flr: to obtain final inspection for work approved under pa 201906193819,202002275561,202001303126. all work is complete.Details
8th flr: to obtain final inspection for work approved under pa 201906193819,202002275561,202001303126. all work is complete. | |
| Sep 3, 2025 | In progress issued Oct 2025 | 1 South Van Ness Av | W E Lyons Construction Co | revison to pa# 202203079381: create a temporary structural floor opening in existing deck floor. construction consists of structural support and new pan deck welded back with dowels in concrete after equipment is installedDetails
revison to pa# 202203079381: create a temporary structural floor opening in existing deck floor. construction consists of structural support and new pan deck welded back with dowels in concrete after equipment is installed | $10,000 |
| Jun 6, 2025 | In progress issued Jun 2025 | 1 South Van Ness Av | Walschon Fire Protection Inc | removal of exiting sprinkler in the following elevators: passenger elevator p1 & p2 - hoistway (north penthouse secondary level) and elevator machine room. (north penthouse tank).Details
removal of exiting sprinkler in the following elevators: passenger elevator p1 & p2 - hoistway (north penthouse secondary level) and elevator machine room. (north penthouse tank). | $12,000 |
| Mar 26, 2025 | In progress issued Mar 2025 | 1525 Market St | G Swanson Constr. Inc. | 8/fl-remove (e) exterior channel letters for bank of america facing street located on the north mech. house on the 8th floor. will stucco and waterproof (e) holes to match (e) siding.Details
8/fl-remove (e) exterior channel letters for bank of america facing street located on the north mech. house on the 8th floor. will stucco and waterproof (e) holes to match (e) siding. | $2,000 |
| Mar 13, 2025 | In progress issued Mar 2025 | 1525 Market St | G Swanson Constr. Inc. | paint over existing sign awning.Details
paint over existing sign awning. | $750 |
| Mar 13, 2025 | In progress issued Mar 2025 | 1525 Market St | G Swanson Constr. Inc. | paint over existing blade sign.Details
paint over existing blade sign. | $750 |
| Nov 5, 2024 | In progress issued Nov 2024 | 1 South Van Ness Av | Tristrux Llc Dba Tristrux Construction | remove & replace 4 (e) antenna mounting pipes w 4 (n) longer antenna mounting pipes. install 4 (n) antennas. wrapping in 3m film/painting (n) antennas exposed pipe mounts and exposed cables to match (e) frp screens. using (e) surge suppressors, hybrid cables & ixr e routers @ equipment & antennasDetails
remove & replace 4 (e) antenna mounting pipes w 4 (n) longer antenna mounting pipes. install 4 (n) antennas. wrapping in 3m film/painting (n) antennas exposed pipe mounts and exposed cables to match (e) frp screens. using (e) surge suppressors, hybrid cables & ixr e routers @ equipment & antennas | $18,000 |
| Jan 19, 2024 | In progress filed Jan 2024, not yet issued | 1 South Van Ness Av | Honeywell International, Inc | fire alarm - garage gate improvement/entrance override . add (2) smoke detectors, (1) emergency door release (1) pull stationDetails
fire alarm - garage gate improvement/entrance override . add (2) smoke detectors, (1) emergency door release (1) pull station | $18,000 |
| Aug 28, 2023 | Completed final sign-off Mar 2024 | 1 South Van Ness Av | Arch Plumbing Inc | 2/f: relocation and addition of fire sprinkler heads per ti per nfpa 13. ref ti permit 201911278390Details
2/f: relocation and addition of fire sprinkler heads per ti per nfpa 13. ref ti permit 201911278390 | $10,000 |
| Jul 28, 2023 | Completed final sign-off Apr 2024 | 1 South Van Ness Av | Honeywell International, Inc | 2/f: fire alarm. demo work, replacement of 2nd fl adding notification to baths. 11 speker strbs, 1 power supply, 1 moduleDetails
2/f: fire alarm. demo work, replacement of 2nd fl adding notification to baths. 11 speker strbs, 1 power supply, 1 module | $6,800 |
| Jul 27, 2023 | Never finaled issued Jul 2023, no final | 1 South Van Ness Av | Honeywell International, Inc | retrofit (28) damper actuators from pneumatic to ddc on roof only.Details
retrofit (28) damper actuators from pneumatic to ddc on roof only. | $58,954 |
| Jun 22, 2023 | Completed final sign-off Apr 2024 | 1 South Van Ness Av | Honeywell International, Inc | 2/f: fire alarm - adding bathroom strobes .Details
2/f: fire alarm - adding bathroom strobes . | $5,000 |
| Oct 3, 2022 | Completed final sign-off Nov 2023 | 11 South Van Ness Av | Mik Construction Inc | revision to bpa#201912139555, add covenience transaction pass-through @ lost & found room, installation of bullet resistant barriers @ hearing room desks, add new storage. no change to (e) occupancy & egress pass.Details
revision to bpa#201912139555, add covenience transaction pass-through @ lost & found room, installation of bullet resistant barriers @ hearing room desks, add new storage. no change to (e) occupancy & egress pass. | $295,584 |
| Jul 14, 2022 | Completed final sign-off Oct 2023 | 1 South Van Ness Av | Mik Construction Inc | replace (e) lobby front doors and incidental works along south van ness side in acccordance with spec no. joc-j44-15Details
replace (e) lobby front doors and incidental works along south van ness side in acccordance with spec no. joc-j44-15 | $409,974 |
| Apr 12, 2022 | Completed final sign-off Mar 2024 | 1 South Van Ness Av | revision to 201911278390. reloate 3 ambulatory compartments and chase wall (to mantian requirement clearance) within the proposed restrooms footprint without any chanegs to plumbing and approved scope of workDetails
revision to 201911278390. reloate 3 ambulatory compartments and chase wall (to mantian requirement clearance) within the proposed restrooms footprint without any chanegs to plumbing and approved scope of work | ||
| Mar 7, 2022 | Never finaled issued Aug 2023, no final | 1 South Van Ness Av | W E Lyons Construction Co | priority prj-modernize 3 (e) elevators: replace/refurbish (e) equipment, car control panels& lobby fixtures.upgrade elevator call system of passenger elevators to destination dispatch system & provide emergency 2-way/ visual based, text based interactive communication system in cab control panels.Details
priority prj-modernize 3 (e) elevators: replace/refurbish (e) equipment, car control panels& lobby fixtures.upgrade elevator call system of passenger elevators to destination dispatch system & provide emergency 2-way/ visual based, text based interactive communication system in cab control panels. | $1,226,500 |
| Jan 20, 2022 | Completed final sign-off Sep 2022 | 1 South Van Ness Av | Nuwave International Industries Inc | remove (3)(e) antennas, 16 (e) rrus, (8) rrusii b13 (8) rrus12 b5, install (8) new antennas, (4) new rrus4449, (3) new combinersDetails
remove (3)(e) antennas, 16 (e) rrus, (8) rrusii b13 (8) rrus12 b5, install (8) new antennas, (4) new rrus4449, (3) new combiners | $40,000 |
| Oct 5, 2021 | Never finaled issued Oct 2021, no final | 1 South Van Ness Av | Paganini Electric Corp(See Signatories) | 2/f: add 2 recessed fixtures for interior wall sign. add dimmer switch, connect to existing lighting control time clock.Details
2/f: add 2 recessed fixtures for interior wall sign. add dimmer switch, connect to existing lighting control time clock. | $6,900 |
| Aug 26, 2021 | Never finaled issued Oct 2021, no final | 1 South Van Ness Av | Ccsf Dpw-Bbr Steamfitters/Plumbers | 2/f: new generator. provide emergency power to office spaces. install new 100a, 42 circuit, 208/120v panel, install new emergency circuits, convert some extg normal power circuits to emergency use.Details
2/f: new generator. provide emergency power to office spaces. install new 100a, 42 circuit, 208/120v panel, install new emergency circuits, convert some extg normal power circuits to emergency use. | $65,000 |
| Jun 11, 2021 | Never finaled issued Aug 2021, no final | 1 South Van Ness Av | administrative permit to document 3rd party smoke control report dated 09-26-20. f/a sequence of operations.Details
administrative permit to document 3rd party smoke control report dated 09-26-20. f/a sequence of operations. | ||
| Feb 4, 2021 | Expired or cancelled cancelled Jan 2026 | 1525 Market St | modification to an unmanned telecommunication facility. remove 3 antenna with 3 new air6449 antenna. install 3 new radios, 2 new 6x12 hybrid cables. 2 new bb enclosures.Details
modification to an unmanned telecommunication facility. remove 3 antenna with 3 new air6449 antenna. install 3 new radios, 2 new 6x12 hybrid cables. 2 new bb enclosures. | $25,000 | |
| Sep 17, 2020 | Never finaled issued Feb 2021, no final | 1525 Market St | Mastec Network Solutions Inc | t-mobile mod to an (e) telecom facility consisting of- mod of (e) frp- install (3)(n) air 6141 antennas-install (n) sleepers for (n) cabinets-install (n) enclosure 6160 cabinet & (n) b160 bat cabinet on (n) sleepers-install (n) bb6630 for l2100 & bb6630 for l1900-install (2)(n) hybrid cablesDetails
t-mobile mod to an (e) telecom facility consisting of- mod of (e) frp- install (3)(n) air 6141 antennas-install (n) sleepers for (n) cabinets-install (n) enclosure 6160 cabinet & (n) b160 bat cabinet on (n) sleepers-install (n) bb6630 for l2100 & bb6630 for l1900-install (2)(n) hybrid cables | $25,000 |
| Feb 27, 2020 | Never finaled issued Mar 2020, no final | 1 South Van Ness Av | 8th floor: add power and data receptacles to 3 offices. revision to app#202001303126Details
8th floor: add power and data receptacles to 3 offices. revision to app#202001303126 | ||
| Jan 30, 2020 | Never finaled issued Feb 2020, no final | 1 South Van Ness Av | revision to pa 2019-1212-9305 add electrical outlets & data outletsDetails
revision to pa 2019-1212-9305 add electrical outlets & data outlets | $10,000 | |
| Dec 13, 2019 | Completed final sign-off Nov 2023 | 11 South Van Ness Av | minor remodel of sfmta's customer service center, scope of work to include demolition of the vestibule, secondary pass-tru for the lost & found room add bullet resistant barring at 3 hearing rooms, lighting and floor finish replacement n/a maherDetails
minor remodel of sfmta's customer service center, scope of work to include demolition of the vestibule, secondary pass-tru for the lost & found room add bullet resistant barring at 3 hearing rooms, lighting and floor finish replacement n/a maher | $465,000 | |
| Dec 12, 2019 | Never finaled issued Jan 2020, no final | 1 South Van Ness Av | ref pa# 201906193819; install heat pump to cool data roomDetails
ref pa# 201906193819; install heat pump to cool data room | $150,000 | |
| Nov 27, 2019 | Completed final sign-off Mar 2024 | 1 South Van Ness Av | renovate 2nd fl restrooms in 8 story office bldg. scope includes convert m/w restrooms to multi user all gender restroom. all plumbing fixtures, accessories, finishes lighting shall be replaced. modifications to e elec, hvac, plumbing, fire protection are part of upgradeDetails
renovate 2nd fl restrooms in 8 story office bldg. scope includes convert m/w restrooms to multi user all gender restroom. all plumbing fixtures, accessories, finishes lighting shall be replaced. modifications to e elec, hvac, plumbing, fire protection are part of upgrade | $634,000 | |
| Aug 14, 2019 | Never finaled issued Aug 2019, no final | 1 South Van Ness Av | streetspaceDetails
streetspace | ||
| Jul 26, 2019 | Never finaled issued Aug 2019, no final | 1 South Van Ness Av | Mitchell Engineering | modification of external structural of building in order to mount new sign. ref approved sign pa #201903014175Details
modification of external structural of building in order to mount new sign. ref approved sign pa #201903014175 | $15,000 |
| Jun 19, 2019 | Never finaled issued Oct 2019, no final | 1 South Van Ness Av | 8/f: selective demo of partitions, doors, finishes. relocation of light fixtures. installation of new partitons, glazed opening, and diffusers. ada upgrades in restrooms.Details
8/f: selective demo of partitions, doors, finishes. relocation of light fixtures. installation of new partitons, glazed opening, and diffusers. ada upgrades in restrooms. | $150,000 | |
| Mar 1, 2019 | Completed final sign-off Mar 2020 | 1 South Van Ness Av | Arrow Sign Company | replace (e) sign: install new non-electrical single faced wall sign "customer service center, sfmta"Details
replace (e) sign: install new non-electrical single faced wall sign "customer service center, sfmta" | $15,000 |
| Mar 1, 2019 | Completed final sign-off Mar 2020 | 1 South Van Ness Av | Arrow Sign Company | replace (e) sign: install new non-electrical single faced wall sign "customer service center, sfmta"Details
replace (e) sign: install new non-electrical single faced wall sign "customer service center, sfmta" | $20,000 |
| Mar 2, 2018 | Completed final sign-off May 2019 | 1 South Van Ness Av | Charles Pankow Builders Ltd | removal of existing formwork affixed to the southern facade of the city owned property located at 1 south van ness ave. maher naDetails
removal of existing formwork affixed to the southern facade of the city owned property located at 1 south van ness ave. maher na | $62,000 |
| Jan 4, 2018 | Never finaled issued Jan 2018, no final | 1 South Van Ness Av | Honeywell International, Inc | basement & 4th flr: fa modification - install 7 speaker/strobes, 2 smoke detecots and 1 emergency door release maher naDetails
basement & 4th flr: fa modification - install 7 speaker/strobes, 2 smoke detecots and 1 emergency door release maher na | $6,000 |
| Nov 3, 2017 | Completed final sign-off Mar 2018 | 1 South Van Ness Av | Honeywell International, Inc | 6/f: ref ti 2017-0420-4474 - fire alarm modification on 6th fl. add 1 speaker and relocate 1 speaker/strobeDetails
6/f: ref ti 2017-0420-4474 - fire alarm modification on 6th fl. add 1 speaker and relocate 1 speaker/strobe | $610 |
| Jun 19, 2017 | Completed final sign-off Sep 2018 | 1 South Van Ness Av | Charles Pankow Builders Ltd | tiebacks installed under boa building during excavation shoreing of adjacent property - 1500 mission street for new construction under pa#2016/06/20/0387-s. ** maher: exempted - see approval from dph attached with the plan **Details
tiebacks installed under boa building during excavation shoreing of adjacent property - 1500 mission street for new construction under pa#2016/06/20/0387-s. ** maher: exempted - see approval from dph attached with the plan ** | $478,430 |
| Apr 20, 2017 | Never finaled issued May 2017, no final | 1 South Van Ness Av | 6th floor: a minor remodel to add four new offices for sfmta. n/a for maherDetails
6th floor: a minor remodel to add four new offices for sfmta. n/a for maher | $97,000 | |
| Jul 14, 2016 | Never finaled issued Jul 2016, no final | 1 South Van Ness Av | Honeywell International, Inc | to obtain a final inspectoin for work approved under pa#201001134688 & pa#201403211383. all work is complete.Details
to obtain a final inspectoin for work approved under pa#201001134688 & pa#201403211383. all work is complete. | |
| Jul 14, 2016 | Never finaled issued Jul 2016, no final | 1 South Van Ness Av | Honeywell International, Inc | to obtain a final inspectoin for work approved under pa#201011175113. all work is complete.Details
to obtain a final inspectoin for work approved under pa#201011175113. all work is complete. | |
| Jul 14, 2016 | Never finaled issued Jul 2016, no final | 1 South Van Ness Av | Honeywell International, Inc | to obtain a final inspection for work approved under pa#201210051391 & pa#201403211378. all work is complete.Details
to obtain a final inspection for work approved under pa#201210051391 & pa#201403211378. all work is complete. | |
| Jul 14, 2016 | Never finaled issued Jul 2016, no final | 1 South Van Ness Av | Honeywell International, Inc | to obtain a final inspectoin for work approved under pa#201112291434. all work is complete.Details
to obtain a final inspectoin for work approved under pa#201112291434. all work is complete. | |
| Jul 14, 2016 | Never finaled issued Jul 2016, no final | 1 South Van Ness Av | Honeywell International, Inc | to obtain a final inspectoin for work approved under pa#201011034240. all work is complete.Details
to obtain a final inspectoin for work approved under pa#201011034240. all work is complete. | |
| May 11, 2016 | Completed final sign-off Aug 2019 | 1 South Van Ness Av | Jfc Construction Inc. | verizon wireless telecommunications facility with 15 panel antennas behind an frp screen and related radio equipment on rooftop; maher n/aDetails
verizon wireless telecommunications facility with 15 panel antennas behind an frp screen and related radio equipment on rooftop; maher n/a | $425,000 |
| Jan 22, 2016 | Expired or cancelled cancelled Aug 2023 | 1 South Van Ness Av | Honeywell International, Inc | garage: modification in garage - add 2 smoke detectors, 1 door release, 1 contril module, 1 pull cover. maher naDetails
garage: modification in garage - add 2 smoke detectors, 1 door release, 1 contril module, 1 pull cover. maher na | $2,600 |
| Aug 13, 2015 | Completed final sign-off Oct 2018 | 1 South Van Ness Av | Metropolitan Electrical Construction | install (n)t-mobile cell site on roof. install 9 antennas facade mounted to(e)penthouses. install screenwall in front of antennas. install(2)equip racks,(1)cabinet, power &(2)teclo boxes in(e)rooftop mechl room. install(1)microwave w/in screenwalls next to(n)antennasDetails
install (n)t-mobile cell site on roof. install 9 antennas facade mounted to(e)penthouses. install screenwall in front of antennas. install(2)equip racks,(1)cabinet, power &(2)teclo boxes in(e)rooftop mechl room. install(1)microwave w/in screenwalls next to(n)antennas | $25,000 |
| Mar 23, 2015 | Completed final sign-off Jul 2015 | 1 South Van Ness Av | Amone Corp | removal of 30 l.f. 5'-0" high (e) non load bearing partition and patch walls/floors in (e) office. no structural work. maher n/a.Details
removal of 30 l.f. 5'-0" high (e) non load bearing partition and patch walls/floors in (e) office. no structural work. maher n/a. | $8,500 |
| Feb 25, 2015 | Completed final sign-off Jul 2016 | 1 South Van Ness Av | Honeywell International, Inc | floors 4th, 6th & 8th - add (4) control modules. n/a maher ordinanceDetails
floors 4th, 6th & 8th - add (4) control modules. n/a maher ordinance | $2,100 |
| Feb 23, 2015 | Completed final sign-off Jul 2015 | 1 South Van Ness Av | Honeywell International, Inc | t.i. on l8: add one speaker/strobe. ref app#201411060895 n/a for the maher.Details
t.i. on l8: add one speaker/strobe. ref app#201411060895 n/a for the maher. | $524 |
| Jan 21, 2015 | Completed final sign-off Feb 2015 | 1 South Van Ness Av | International Fire Equip | ste 8243: add one and relocate 2 fire sprinklers. t.i. #201411060895. n/a for the maher.Details
ste 8243: add one and relocate 2 fire sprinklers. t.i. #201411060895. n/a for the maher. | $1,500 |
| Nov 6, 2014 | Completed final sign-off Apr 2015 | 1 South Van Ness Av | tenant improvement. storage approx 822 st. demolition of partitions less than 5', add new full heght walls, partial ht walls, 2 doors, frames, hdw. no ceiling work, no lighting, sprinklers is under seperate permit. interium control & maher n/a.Details
tenant improvement. storage approx 822 st. demolition of partitions less than 5', add new full heght walls, partial ht walls, 2 doors, frames, hdw. no ceiling work, no lighting, sprinklers is under seperate permit. interium control & maher n/a. | $114,795 | |
| Jun 27, 2014 | Never finaled issued Jun 2014, no final | 1 South Van Ness Av | Paganini Electric Corp(See Signatories) | 2nd floor - occupant load verification for change of use assembly from 'b' to 'b & a-3". no work to be performed.maher n/aDetails
2nd floor - occupant load verification for change of use assembly from 'b' to 'b & a-3". no work to be performed.maher n/a | |
| Mar 21, 2014 | Never finaled issued Mar 2014, no final | 1 South Van Ness Av | Honeywell International, Inc | to obtain final inspection for work approved under pa #2010.0113.4688. all work is complete.Details
to obtain final inspection for work approved under pa #2010.0113.4688. all work is complete. | |
| Mar 21, 2014 | Never finaled issued Mar 2014, no final | 1 South Van Ness Av | Honeywell International, Inc | to obtain final inspection for work approved under pa #2012.1005.1391. all work is complete.Details
to obtain final inspection for work approved under pa #2012.1005.1391. all work is complete. | |
| Oct 5, 2012 | Never finaled issued Oct 2012, no final | 1 South Van Ness Av | Honeywell International, Inc | 1st floor lobby - to supply & install an xls 3000 fire alrm panel on the guards desk.Details
1st floor lobby - to supply & install an xls 3000 fire alrm panel on the guards desk. | $15,000 |
| Jun 20, 2012 | Expired or cancelled cancelled Sep 2023 | 1 South Van Ness Av | Details
| $10,025 | |
| Jun 20, 2012 | Never finaled issued Jun 2012, no final | 1 South Van Ness Av | Signs America Inc Dba Sign A Rama | basement to 8th floor-fabrication & installation of eval maps-basement to 8th floorDetails
basement to 8th floor-fabrication & installation of eval maps-basement to 8th floor | $10,025 |
| Dec 29, 2011 | Never finaled issued Jan 2012, no final | 1 South Van Ness Av | Honeywell International, Inc | add speakers & strobes to flrs (basemnt, flr 1 & 8) to bring to current standards. mezzanine, roof will have all new devices to bring them up to current standard. all (e) non-addresssable duct smoke detectors to be replaced with new addressable duct smoke detectors to be replacedDetails
add speakers & strobes to flrs (basemnt, flr 1 & 8) to bring to current standards. mezzanine, roof will have all new devices to bring them up to current standard. all (e) non-addresssable duct smoke detectors to be replaced with new addressable duct smoke detectors to be replaced | $200,000 |
| Sep 14, 2011 | Completed final sign-off Nov 2011 | 1 South Van Ness Av | Western Roofing Service | to obtain final inspection for work approved under app#201004160448. all work is complete.Details
to obtain final inspection for work approved under app#201004160448. all work is complete. | |
| Aug 19, 2011 | Completed final sign-off Sep 2011 | 1 South Van Ness Av | Honeywell International, Inc | 4th floor fire alarm system - addition of one control module to shut down the crac unit on general alarm.Details
4th floor fire alarm system - addition of one control module to shut down the crac unit on general alarm. | $8,000 |
| May 24, 2011 | Never finaled issued Jun 2011, no final | 1 South Van Ness Av | convert existing 117 sf office into new finger printing room. add a door and provide acoustical treatment.Details
convert existing 117 sf office into new finger printing room. add a door and provide acoustical treatment. | $25,800 | |
| Nov 17, 2010 | Never finaled issued Nov 2010, no final | 1 South Van Ness Av | Honeywell International, Inc | addition of 1 duct smoke detector on the 8th floor. new heat pump installed shall be under separate permit.Details
addition of 1 duct smoke detector on the 8th floor. new heat pump installed shall be under separate permit. | $5,000 |
| Nov 3, 2010 | Never finaled issued Nov 2010, no final | 1 South Van Ness Av | Honeywell International, Inc | 4th floor:to furnish a honeywell inc. xls1000 fire detection system per nfpa 70,72,&101 adaag, local codes,and as discribed.1) provide shop drawings and submiittals 2) provide new fire alarm devices & panels as shown on shop drawings.3) provide necessary software for a complete operational system.Details
4th floor:to furnish a honeywell inc. xls1000 fire detection system per nfpa 70,72,&101 adaag, local codes,and as discribed.1) provide shop drawings and submiittals 2) provide new fire alarm devices & panels as shown on shop drawings.3) provide necessary software for a complete operational system. | $5,000 |
| Oct 26, 2010 | Completed final sign-off Nov 2010 | 1 South Van Ness Av | F D C Construction Inc | 8th floor - add two sprinkelr head in conference room, ( refer to pa #201008209228)Details
8th floor - add two sprinkelr head in conference room, ( refer to pa #201008209228) | $600 |
| Sep 24, 2010 | Never finaled issued Sep 2010, no final | 1 South Van Ness Av | Aquamatic Fire Protection | relocate 2 sprinklers due to installation of new projection screen ceiling recessed mountedDetails
relocate 2 sprinklers due to installation of new projection screen ceiling recessed mounted | $600 |
| Aug 20, 2010 | Completed final sign-off Apr 2012 | 1 South Van Ness Av | F D C Construction Inc | tenant improvmement at 8th fl of ex office building. work includes new conference room with interior glazing and doors. 2 new light fixtures and air register at conf room. no structural work. fire sprinkler under sep permitDetails
tenant improvmement at 8th fl of ex office building. work includes new conference room with interior glazing and doors. 2 new light fixtures and air register at conf room. no structural work. fire sprinkler under sep permit | $10,000 |
| Aug 12, 2010 | Never finaled issued Aug 2010, no final | 1 South Van Ness Av | Honeywell International, Inc | 2nd fl. the addition of one duct smoke detector and one relay to one fire alarm system on the 2nd floorDetails
2nd fl. the addition of one duct smoke detector and one relay to one fire alarm system on the 2nd floor | $300 |
| Jul 20, 2010 | Completed final sign-off Sep 2010 | 1 South Van Ness Av | City Mechanical Inc | install water source heat pump for supplemental cooling for after hours cooling in an existing bldg.Details
install water source heat pump for supplemental cooling for after hours cooling in an existing bldg. | $19,000 |
| May 24, 2010 | Never finaled issued May 2010, no final | 1 South Van Ness Av | Honeywell International, Inc | add 1 pull station (manual) at the new exit door. (address shall be assigned during mapping process)Details
add 1 pull station (manual) at the new exit door. (address shall be assigned during mapping process) | $2,400 |
| Apr 27, 2010 | Never finaled issued Oct 2010, no final | 1525 Market St | Coast Sign Incorporated | install 1-set of channel letters on wall for "bank of america" on roof penthouse.Details
install 1-set of channel letters on wall for "bank of america" on roof penthouse. | $8,000 |
| Apr 21, 2010 | Never finaled issued Apr 2010, no final | 1 South Van Ness Av | street space permitDetails
street space permit | ||
| Apr 16, 2010 | Never finaled issued Apr 2010, no final | 1 South Van Ness Av | revision to pa# 2009.05.14.8448. revision to tank foundation shown on a504. addition or securitu fence/gate ( interior) to at two locations on the 8th floor.Details
revision to pa# 2009.05.14.8448. revision to tank foundation shown on a504. addition or securitu fence/gate ( interior) to at two locations on the 8th floor. | ||
| Feb 25, 2010 | Completed final sign-off Dec 2010 | 1 South Van Ness Av | Aquamatic Fire Protection | 8th floor - relocate 3 existing sprinklers & add 2 due to interior remodel.Details
8th floor - relocate 3 existing sprinklers & add 2 due to interior remodel. | $1,000 |
| Feb 8, 2010 | Completed final sign-off Dec 2010 | 1 South Van Ness Av | Honeywell International, Inc | 8th floor-upgrade (e) 8th floor fire alarm system devices per the honeywell shop drawings, this includes new speakers & speakers/strobes, smoke detectors & sd controlsDetails
8th floor-upgrade (e) 8th floor fire alarm system devices per the honeywell shop drawings, this includes new speakers & speakers/strobes, smoke detectors & sd controls | $80,000 |
| Jan 13, 2010 | Never finaled issued Mar 2010, no final | 1 South Van Ness Av | Honeywell International, Inc | replacement of existing honeywell rs 90 and xls 1000 fire alarm panels with new honeywell xls 3000 fire alarm panels. work to be done in basement and 1st floorDetails
replacement of existing honeywell rs 90 and xls 1000 fire alarm panels with new honeywell xls 3000 fire alarm panels. work to be done in basement and 1st floor | $80,000 |
| Dec 21, 2009 | Completed final sign-off Jul 2010 | 1 South Van Ness Av | Torres Construction Corp. | revision wall @ vertibule to appl #200804099270, barrior removal- provide accessible path of travel to street level.Details
revision wall @ vertibule to appl #200804099270, barrior removal- provide accessible path of travel to street level. | $12,000 |
| Nov 13, 2009 | Completed final sign-off Dec 2010 | 1 South Van Ness Av | tenant improvements-provide/install as directed on plans & specs, glazing av equipment, training & conference rooms, painting, flooring & base. drywall metal & stud work, door frames, hardware, millwork, electrical, plumbing, mechanical, hvac. misc ada signs, drinking fountains, hDetails
tenant improvements-provide/install as directed on plans & specs, glazing av equipment, training & conference rooms, painting, flooring & base. drywall metal & stud work, door frames, hardware, millwork, electrical, plumbing, mechanical, hvac. misc ada signs, drinking fountains, h | $1,500,000 | |
| Oct 27, 2009 | Completed final sign-off Aug 2010 | 1 South Van Ness Av | Aquamatic Fire Protection | add 1 sprinkler to new exit vesibuleDetails
add 1 sprinkler to new exit vesibule | $500 |
| Sep 2, 2009 | Completed final sign-off Feb 2010 | 1 South Van Ness Av | Honeywell International, Inc | as built for 200812168588 fire alarm full floor 6th fl and partial basementDetails
as built for 200812168588 fire alarm full floor 6th fl and partial basement | $45,000 |
| Aug 31, 2009 | Never finaled issued Oct 2009, no final | 1 South Van Ness Av | interior office demolation per ab-17.Details
interior office demolation per ab-17. | $8,000 | |
| Aug 11, 2009 | Completed final sign-off Oct 2009 | 1 South Van Ness Av | Alternative Techs Cooperative Inc | 6th fl - seismic bracing of exiting raised access anchorage and overhead seismic racing of data center equipment and cabinets. installation of overhead cable ladder rack.Details
6th fl - seismic bracing of exiting raised access anchorage and overhead seismic racing of data center equipment and cabinets. installation of overhead cable ladder rack. | $46,500 |
| May 14, 2009 | Completed final sign-off Nov 2011 | 1 South Van Ness Av | roof replacement with single-ply tpo ove r20 rigid insulation. specified single-ply tpo products (cool roof): 1. crrc #0844-0002/commercial innovations/white tpo, 2. crrc #0608-0015/firestone bldg prod/reflexon tpo, 3. crrc #0628-0002/carlisle syntec corp/tpo whiteDetails
roof replacement with single-ply tpo ove r20 rigid insulation. specified single-ply tpo products (cool roof): 1. crrc #0844-0002/commercial innovations/white tpo, 2. crrc #0608-0015/firestone bldg prod/reflexon tpo, 3. crrc #0628-0002/carlisle syntec corp/tpo white | $1,000,000 | |
| May 14, 2009 | Completed final sign-off Nov 2011 | 1 South Van Ness Av | relocation of emergency generator exhaust flue, relocation of guel tank vents, installation of a living roof, refubishing of existing window washing equipment system and painting of roof penthouse exterior walls.Details
relocation of emergency generator exhaust flue, relocation of guel tank vents, installation of a living roof, refubishing of existing window washing equipment system and painting of roof penthouse exterior walls. | $500,000 | |
| Apr 16, 2009 | Completed final sign-off Feb 2010 | 1 South Van Ness Av | Steven Yeung Inc Dba Chung Wah Plbg&Fire | install preaction system for data room on 6th floor only.Details
install preaction system for data room on 6th floor only. | $30,000 |
| Dec 16, 2008 | Completed final sign-off Feb 2010 | 1 South Van Ness Av | Honeywell International, Inc | at basement & 6th fl: 85 speaker strobes, 1 strobe, 24 smoke detectors, 3 duct smoke detecters, 4 strobe power supplys, 8 montor modules, 3 control modules.Details
at basement & 6th fl: 85 speaker strobes, 1 strobe, 24 smoke detectors, 3 duct smoke detecters, 4 strobe power supplys, 8 montor modules, 3 control modules. | $70,000 |
| Dec 10, 2008 | Completed final sign-off Mar 2009 | 1 South Van Ness Av | Chiang C M Construction Inc. | interior demolition of partition walls, finishes, fixtures, and equipment on 6th fl, and partial basement enant space, to comply w/ ab-017. ref pa #200807146652.Details
interior demolition of partition walls, finishes, fixtures, and equipment on 6th fl, and partial basement enant space, to comply w/ ab-017. ref pa #200807146652. | $22,989 |
| Nov 25, 2008 | Completed final sign-off Jun 2010 | 1 South Van Ness Av | Honeywell International, Inc | add:110 speaker/strobes, 24 smoke detectors,1 duct smoke detector,4 strobes boostersDetails
add:110 speaker/strobes, 24 smoke detectors,1 duct smoke detector,4 strobes boosters | $70,000 |
| Sep 30, 2008 | Never finaled issued Oct 2008, no final | 1 South Van Ness Av | 4th floor tenant improvements for approx 5,000 sf, doors, frames, hdw, finishes, partitions, hvac, fire alarm, electricaln & sprinklers.Details
4th floor tenant improvements for approx 5,000 sf, doors, frames, hdw, finishes, partitions, hvac, fire alarm, electricaln & sprinklers. | $475,000 | |
| Aug 13, 2008 | Completed final sign-off Jun 2010 | 1 South Van Ness Av | at 4th fl: interior office demolition only per ab-017.Details
at 4th fl: interior office demolition only per ab-017. | $8,349 | |
| Jul 14, 2008 | Completed final sign-off Feb 2010 | 1 South Van Ness Av | basment (partial) & 6th floor tenant improvements to 6th floor offices-new ceilings, filing systems, structural support, work stations, casework, electrical, mechanical, plumbing. demo of storage room and construction of storeroom, small office in basement.Details
basment (partial) & 6th floor tenant improvements to 6th floor offices-new ceilings, filing systems, structural support, work stations, casework, electrical, mechanical, plumbing. demo of storage room and construction of storeroom, small office in basement. | ||
| May 23, 2008 | Never finaled issued May 2008, no final | 1 South Van Ness Av | Honeywell International, Inc | fire alarm system change sequence of operation from relocation to evacuation. add door magnets and smoke detectors on 2nd floor conference center. relocate exit sign and add exit door release.Details
fire alarm system change sequence of operation from relocation to evacuation. add door magnets and smoke detectors on 2nd floor conference center. relocate exit sign and add exit door release. | $44,644 |
| Apr 9, 2008 | Completed final sign-off Jul 2010 | 1 South Van Ness Av | provide new bike parking area & new exit vestibule at first floor parking.Details
provide new bike parking area & new exit vestibule at first floor parking. | $70,000 | |
| Nov 14, 2007 | Never finaled issued Nov 2007, no final | 1 South Van Ness Av | Sign Productions Inc.(Grant Sign Co) | install illuminated wall signDetails
install illuminated wall sign | |
| Nov 14, 2007 | Never finaled issued Nov 2007, no final | 1 South Van Ness Av | Sign Productions Inc.(Grant Sign Co) | install illuminated flag sign to replace existingDetails
install illuminated flag sign to replace existing | $3,600 |
| Nov 8, 2007 | Never finaled issued Nov 2007, no final | 1 South Van Ness Av | Sign Productions Inc.(Grant Sign Co) | erect an electric single faced wall sign. (reface)Details
erect an electric single faced wall sign. (reface) | |
| Nov 8, 2007 | Never finaled issued Nov 2007, no final | 1 South Van Ness Av | Sign Productions Inc.(Grant Sign Co) | install non-electric single faced wall sign. height above grade 9'-3"Details
install non-electric single faced wall sign. height above grade 9'-3" | $1,200 |
| Nov 8, 2007 | Never finaled issued Nov 2007, no final | 1 South Van Ness Av | Sign Productions Inc.(Grant Sign Co) | erect an electric single faced wall sign. (reface)Details
erect an electric single faced wall sign. (reface) | |
| Jul 6, 2007 | Completed final sign-off Aug 2007 | 1 South Van Ness Av | Arrow Sign Company | erect sign a electric wall new signDetails
erect sign a electric wall new sign | |
| Jul 6, 2007 | Completed final sign-off Mar 2008 | 1 South Van Ness Av | Arrow Sign Company | erect sign a electric wall projecting new signDetails
erect sign a electric wall projecting new sign | |
| Jun 28, 2007 | Never finaled issued Jun 2007, no final | 1 South Van Ness Av | street space permit.Details
street space permit. | ||
| Jun 28, 2007 | Never finaled issued Jun 2007, no final | 1 South Van Ness Av | street space permit.Details
street space permit. | ||
| May 21, 2007 | Completed final sign-off Mar 2008 | 1 South Van Ness Av | Plant Construction Company Lp | oti-2 tmg partners, 2nd fl, el, me, ls.Details
oti-2 tmg partners, 2nd fl, el, me, ls. | $277,000 |
| May 17, 2007 | Expired or cancelled expired May 2009 | 1 South Van Ness Av | R L H Fire Protection Inc | t/i upgrade on fire sprinkler system; for dtis facility 2nd floor, 3 add, 4 deletesDetails
t/i upgrade on fire sprinkler system; for dtis facility 2nd floor, 3 add, 4 deletes | $36,200 |
| May 7, 2007 | Completed final sign-off Mar 2008 | 1 South Van Ness Av | Plant Construction Company Lp | oti-1, tmg partners, 2nd floor, li, me,ls,sp.Details
oti-1, tmg partners, 2nd floor, li, me,ls,sp. | $555,000 |
| Feb 15, 2007 | Completed final sign-off Aug 2007 | 1 South Van Ness Av | Allied Fire Protection | fire sprinkler work for office tenant imporvement at southwest corner of first floor total = 54Details
fire sprinkler work for office tenant imporvement at southwest corner of first floor total = 54 | $17,120 |
| Jan 29, 2007 | Never finaled issued Jan 2007, no final | 1 South Van Ness Av | street spaceDetails
street space | ||
| Oct 4, 2006 | Completed final sign-off Jun 2007 | 1 South Van Ness Av | Plant Construction Company Lp | construct fire rated enclosure & install new 750 kw generator system. work includes: cmv enclosure, modifications & upgrades to (e) fuel storage room fue piping, exhaust piping, fire sprinkler & hvac system modifications. mechanical work only-exempt from title 24 disable access.Details
construct fire rated enclosure & install new 750 kw generator system. work includes: cmv enclosure, modifications & upgrades to (e) fuel storage room fue piping, exhaust piping, fire sprinkler & hvac system modifications. mechanical work only-exempt from title 24 disable access. | $756,000 |
| Jul 28, 2006 | Expired or cancelled expired Oct 2007 | 1 South Van Ness Av | proceed with demolition of non fired rated/non-load bearing interior finishes in advance of new tenant work under seperate permit. note: (e) tenant area is vacant. no exterior modifications. per application for ada upgrades. as per ab-0017Details
proceed with demolition of non fired rated/non-load bearing interior finishes in advance of new tenant work under seperate permit. note: (e) tenant area is vacant. no exterior modifications. per application for ada upgrades. as per ab-0017 | $22,500 | |
| Jul 28, 2006 | Completed final sign-off Mar 2008 | 1 South Van Ness Av | Plant Construction Company Lp | t/i to a portion of 1st fl level. work incl hard demolition, structural modifications, raised flooring, ada upgrades, new bullet resist glass in (e) frames, dry wall ptns, doors & hardware, acoustic ceilings, paint&millwork.modify (e)hvac,elec&life safety. soft demo&fire sprinklers under sep permit.Details
t/i to a portion of 1st fl level. work incl hard demolition, structural modifications, raised flooring, ada upgrades, new bullet resist glass in (e) frames, dry wall ptns, doors & hardware, acoustic ceilings, paint&millwork.modify (e)hvac,elec&life safety. soft demo&fire sprinklers under sep permit. | $1,167,000 |
| May 16, 2006 | Completed final sign-off May 2007 | 1 South Van Ness Av | Plant Construction Company Lp | oti-1, basement level, el, me, ls, sp. alterations to existing interior tenant areaDetails
oti-1, basement level, el, me, ls, sp. alterations to existing interior tenant area | $988,000 |
| May 16, 2006 | Completed final sign-off Jan 2007 | 1 South Van Ness Av | Plant Construction Company Lp | oti-2, basement level, el, me, ls, sp. upgrade existing hvac system for 24 hour operation. upgrade lighting & add new lighting, modify existing fire sprinkler system for new layout, life safety system upgrade.Details
oti-2, basement level, el, me, ls, sp. upgrade existing hvac system for 24 hour operation. upgrade lighting & add new lighting, modify existing fire sprinkler system for new layout, life safety system upgrade. | $538,000 |
| May 2, 2006 | Completed final sign-off Dec 2006 | 1 South Van Ness Av | Plant Construction Company Lp | oti-2 2/f el: relocate existing lighting, fire sprinkler under seperate permit. oti-1 approved appl#200604249649Details
oti-2 2/f el: relocate existing lighting, fire sprinkler under seperate permit. oti-1 approved appl#200604249649 | $11,550 |
| May 2, 2006 | Completed final sign-off Dec 2006 | 1 South Van Ness Av | Plant Construction Company Lp | install new redundant cooling toner on extg roof platform /mechanical work only. exempt from title 24 disable access.Details
install new redundant cooling toner on extg roof platform /mechanical work only. exempt from title 24 disable access. | $206,500 |
| Apr 24, 2006 | Completed final sign-off Dec 2006 | 1 South Van Ness Av | Plant Construction Company Lp | oti-1, at 2nd fl, el, me, ls.Details
oti-1, at 2nd fl, el, me, ls. | $26,500 |
| Apr 17, 2006 | Completed final sign-off Dec 2006 | 1 South Van Ness Av | Plant Construction Company Lp | oti-2 2nd floor el me ls sp.Details
oti-2 2nd floor el me ls sp. | $550,000 |
| Apr 12, 2006 | Completed final sign-off Aug 2006 | 1 South Van Ness Av | Plant Construction Company Lp | proceed with demolition of interior non fire rated/non load bearing interior finishes and acustic tile ceiling in advance of new tenant work tenant work and finishes under permit app oti #200603015682/note: 1 tenant area 2nd floor vacant. 2. no exterior modifications, 3. no increase in office spacDetails
proceed with demolition of interior non fire rated/non load bearing interior finishes and acustic tile ceiling in advance of new tenant work tenant work and finishes under permit app oti #200603015682/note: 1 tenant area 2nd floor vacant. 2. no exterior modifications, 3. no increase in office spac | $18,500 |
| Apr 3, 2006 | Completed final sign-off Dec 2006 | 1 South Van Ness Av | Plant Construction Company Lp | extend existing cooling tower support structure for future redundant cooling tower.Details
extend existing cooling tower support structure for future redundant cooling tower. | $56,000 |
| Mar 28, 2006 | Completed final sign-off Sep 2008 | 1 South Van Ness Av | Intelligent Technologies & Services Inc | install pre-action detection system for 2/f data center room 2109.Details
install pre-action detection system for 2/f data center room 2109. | $10,000 |
| Mar 20, 2006 | Completed final sign-off Aug 2006 | 1 South Van Ness Av | Plant Construction Company Lp | proceed with demolition of interior non-fire rated / non-load bearing interior finishes in advance of new tenant work under seperate permit. note: existing tenant area is vacant, no exterior modifications. see oti application for title 24 and ada upgrades.Details
proceed with demolition of interior non-fire rated / non-load bearing interior finishes in advance of new tenant work under seperate permit. note: existing tenant area is vacant, no exterior modifications. see oti application for title 24 and ada upgrades. | $35,000 |
| Mar 1, 2006 | Completed final sign-off Dec 2006 | 1 South Van Ness Av | Plant Construction Company Lp | oti-1 2nd floor, el, me, ls, sp alter (e) tenant space incl. new drywall partitions, reset existing doors,new glazing,new acoustic ceiling tile in existing grid,new carpet & paint.demolition under seperate permit,fire sprinkler,elect, ls & hvac under oti-2.no exterior modificationsDetails
oti-1 2nd floor, el, me, ls, sp alter (e) tenant space incl. new drywall partitions, reset existing doors,new glazing,new acoustic ceiling tile in existing grid,new carpet & paint.demolition under seperate permit,fire sprinkler,elect, ls & hvac under oti-2.no exterior modifications | $550,000 |
| Feb 16, 2006 | Expired or cancelled expired Mar 2007 | 1 South Van Ness Av | Allied Fire Protection | add 6 sprinkler heads.Details
add 6 sprinkler heads. | $1,500 |
| Dec 1, 2005 | Completed final sign-off Feb 2006 | 1 South Van Ness Av | Allied Fire Protection | add 22 sprinklers,relocate 118 sprinklers,upgrade existing bracing attachments.Details
add 22 sprinklers,relocate 118 sprinklers,upgrade existing bracing attachments. | $37,000 |
| Nov 18, 2005 | Completed final sign-off Feb 2006 | 1 South Van Ness Av | Plant Construction Company Lp | oti-2, 5th floor, el, me, lsDetails
oti-2, 5th floor, el, me, ls | $455,000 |
| Nov 16, 2005 | Completed final sign-off Dec 2005 | 1 South Van Ness Av | Mc Millan Electric | 6th floor (2)strobes wall mounted relocatingDetails
6th floor (2)strobes wall mounted relocating | $2,500 |
| Oct 28, 2005 | Completed final sign-off Dec 2005 | 1 South Van Ness Av | Plant Construction Company Lp | proceed with demoliation of interior non fire rated/non load bearing interior finishes in advance of new tenant work-tenant work & finishes under seperate permit application (oti-1:200510135450) note: tenant area (5th flor ) vacant. no exterior modifications. for title 24 information see oti-1 app#Details
proceed with demoliation of interior non fire rated/non load bearing interior finishes in advance of new tenant work-tenant work & finishes under seperate permit application (oti-1:200510135450) note: tenant area (5th flor ) vacant. no exterior modifications. for title 24 information see oti-1 app# | $25,000 |
| Oct 13, 2005 | Completed final sign-off Feb 2006 | 1 South Van Ness Av | Plant Construction Company Lp | oti-1, 5th floor, el, me, ls, sp.Details
oti-1, 5th floor, el, me, ls, sp. | $1,450,000 |
| Sep 21, 2005 | Expired or cancelled expired Mar 2006 | 1 South Van Ness Av | add 4 work stations to (e) office area & t.i. no change to lighting or mechanical. no change to (e)Details
add 4 work stations to (e) office area & t.i. no change to lighting or mechanical. no change to (e) | $4,500 | |
| Sep 1, 2005 | Completed final sign-off Dec 2005 | 1 South Van Ness Av | Plant Construction Company Lp | oti-2, 7th floor, el, me, ls, sp.Details
oti-2, 7th floor, el, me, ls, sp. | $535,000 |
| Aug 31, 2005 | Completed final sign-off Dec 2005 | 1 South Van Ness Av | Potter Fire Protection | relocate 6 fire sprinklers. in office space on 6th floor only.Details
relocate 6 fire sprinklers. in office space on 6th floor only. | $1,800 |
| Aug 24, 2005 | Completed final sign-off Oct 2005 | 1 South Van Ness Av | Plant Construction Company Lp | demolition of interior non-fire rated/non load bearing interior finishes in advance of new t.i.Details
demolition of interior non-fire rated/non load bearing interior finishes in advance of new t.i. | $35,000 |
| Aug 17, 2005 | Completed final sign-off Nov 2005 | 1 South Van Ness Av | Plant Construction Company Lp | oti-1, 7th floor, el, me, ls, sp.Details
oti-1, 7th floor, el, me, ls, sp. | $1,500,000 |
| Jul 14, 2005 | Completed final sign-off Dec 2005 | 1 South Van Ness Av | Field Construction Inc. | electrical & mechanical rev. to accomodate new furniture layout.4 phase project.construct new officeDetails
electrical & mechanical rev. to accomodate new furniture layout.4 phase project.construct new office | $100,000 |
| May 5, 2005 | Completed final sign-off Jun 2005 | 1 South Van Ness Av | Honeywell International, Inc | renew appl#200412101132,200412020508 for final inspectionDetails
renew appl#200412101132,200412020508 for final inspection | |
| Apr 12, 2005 | Completed final sign-off May 2005 | 1 South Van Ness Av | Intelligent Technologies & Services Inc | install pre-action system on 3rd floor - server room 3108Details
install pre-action system on 3rd floor - server room 3108 | $3,000 |
| Feb 22, 2005 | Completed final sign-off Apr 2005 | 1 South Van Ness Av | Plant Construction Company Lp | demo interior non fire rated/non load bearing interior finishes in advance new tenant wk.Details
demo interior non fire rated/non load bearing interior finishes in advance new tenant wk. | $25,000 |
| Feb 22, 2005 | Completed final sign-off May 2005 | 1 South Van Ness Av | Plant Construction Company Lp | oti-2, 3rd floor, el, me, ls, sp.Details
oti-2, 3rd floor, el, me, ls, sp. | $75,000 |
| Feb 8, 2005 | Completed final sign-off May 2005 | 1 South Van Ness Av | Plant Construction Company Lp | oti-1 3rd fl,oor, el, me, ls, sp.Details
oti-1 3rd fl,oor, el, me, ls, sp. | $1,750 |
| Dec 10, 2004 | Expired or cancelled expired Jun 2005 | 1 South Van Ness Av | Honeywell International, Inc | 3 smoke detectors rev. to app #200412020508Details
3 smoke detectors rev. to app #200412020508 | $500 |
| Dec 2, 2004 | Expired or cancelled expired Jun 2005 | 1 South Van Ness Av | Honeywell International, Inc | 3 control mdules to stop heat pumps on the 8th floorDetails
3 control mdules to stop heat pumps on the 8th floor | $5,000 |
| Nov 9, 2004 | Expired or cancelled expired Mar 2006 | 1 South Van Ness Av | Honeywell International, Inc | revised as built drawing submittac showing added devices for central station dialer supervision.Details
revised as built drawing submittac showing added devices for central station dialer supervision. | $2,300 |
| Jul 28, 2004 | Expired or cancelled expired Mar 2006 | 1 South Van Ness Av | Honeywell International, Inc | adding one chime/strobe device to (e) honeywell fs-90 fire/life safety alarmDetails
adding one chime/strobe device to (e) honeywell fs-90 fire/life safety alarm | $9,889 |
| Jun 16, 2004 | Completed final sign-off Dec 2004 | 1 South Van Ness Av | minor office t.i. on 8th floor: work includes (n) partitionsDetails
minor office t.i. on 8th floor: work includes (n) partitions | $25,000 | |
| Jun 10, 2004 | Completed final sign-off Jun 2005 | 1 South Van Ness Av | minor office t.i on 8th fl. work includes removal of low partitions, change of doors. (n) fire retarDetails
minor office t.i on 8th fl. work includes removal of low partitions, change of doors. (n) fire retar | $120,000 | |
| Apr 26, 2004 | Expired or cancelled expired Jan 2006 | 1 South Van Ness Av | City Building Inc. | renew appl#200101260677,200101260672,200104025748Details
renew appl#200101260677,200101260672,200104025748 | |
| Apr 26, 2004 | Expired or cancelled expired Jan 2006 | 1 South Van Ness Av | City Building Inc. | renew appl#9718150, 9718395 & 200112064670 for final inspectionDetails
renew appl#9718150, 9718395 & 200112064670 for final inspection | |
| Apr 26, 2004 | Expired or cancelled expired Jan 2006 | 1 South Van Ness Av | City Building Inc. | renew appl#200006122346, 200006122344 & 200204164113 for final inspectionDetails
renew appl#200006122346, 200006122344 & 200204164113 for final inspection | |
| Apr 26, 2004 | Expired or cancelled expired Jan 2006 | 1 South Van Ness Av | City Building Inc. | renew appl#200204234754,200310177790,8311099 for final inspectionDetails
renew appl#200204234754,200310177790,8311099 for final inspection | |
| Apr 26, 2004 | Expired or cancelled expired Apr 2005 | 1 South Van Ness Av | City Building Inc. | renew appl#9811903, 200112064669 work has been supercededDetails
renew appl#9811903, 200112064669 work has been superceded | |
| Apr 23, 2004 | Never finaled issued Apr 2004, no final | 1 South Van Ness Av | City Building Inc. | renew permits 200310177752-200310177740Details
renew permits 200310177752-200310177740 | |
| Apr 23, 2004 | Never finaled issued Apr 2004, no final | 1 South Van Ness Av | City Building Inc. | renew permits 200310177758-200310177757-200310177756Details
renew permits 200310177758-200310177757-200310177756 | |
| Apr 8, 2004 | Expired or cancelled expired Apr 2005 | 1 South Van Ness Av | Honeywell International, Inc | scope: add 1 smoke detector in fcc room and 1 smoke detector in battery roomDetails
scope: add 1 smoke detector in fcc room and 1 smoke detector in battery room | $4,000 |
| Nov 3, 2003 | Expired or cancelled expired Apr 2005 | 1 South Van Ness Av | Honeywell International, Inc | add (1) speaker & (1) strobe to the alarm system, rev. to pa#2002/04/23/4754Details
add (1) speaker & (1) strobe to the alarm system, rev. to pa#2002/04/23/4754 | $12,200 |
| Oct 17, 2003 | Completed final sign-off Dec 2003 | 1 South Van Ness Av | City Building Inc. | renew appln #9824007, 9903668, 9824006 0ti 7/f work has been superceded by other ti's since thenDetails
renew appln #9824007, 9903668, 9824006 0ti 7/f work has been superceded by other ti's since then | |
| Oct 17, 2003 | Never finaled issued Oct 2003, no final | 1 South Van Ness Av | City Building Inc. | renew appln #2000/06/12/2346 2000/06/12/2344 2002/04/16/4113 for final sign off oti 1, 2 2/fDetails
renew appln #2000/06/12/2346 2000/06/12/2344 2002/04/16/4113 for final sign off oti 1, 2 2/f | |
| Oct 17, 2003 | Never finaled issued Oct 2003, no final | 1 South Van Ness Av | City Building Inc. | renew appln #9408715, 9214225, 9320821 work has been superceded by other ti's since thenDetails
renew appln #9408715, 9214225, 9320821 work has been superceded by other ti's since then | |
| Oct 17, 2003 | Completed final sign-off Dec 2003 | 1 South Van Ness Av | City Building Inc. | renew appln #8908262, 9210083, 9014377 work has been super eded with other ti's since thenDetails
renew appln #8908262, 9210083, 9014377 work has been super eded with other ti's since then | |
| Oct 17, 2003 | Never finaled issued Oct 2003, no final | 1 South Van Ness Av | City Building Inc. | renew appln #2002/04/23/4754, 8311099 for final sign offDetails
renew appln #2002/04/23/4754, 8311099 for final sign off | |
| Oct 17, 2003 | Completed final sign-off Dec 2003 | 1 South Van Ness Av | City Building Inc. | renew appln #2001/01/26/0677 2001/01/26/0672 2001/04/02/5748 for final sign off oti 1, 2, 3 5/fDetails
renew appln #2001/01/26/0677 2001/01/26/0672 2001/04/02/5748 for final sign off oti 1, 2, 3 5/f | |
| Oct 17, 2003 | Completed final sign-off Dec 2003 | 1 South Van Ness Av | City Building Inc. | renew appln #9114240, 8407001, 9514628 work has been superceded with other ti's since then admDetails
renew appln #9114240, 8407001, 9514628 work has been superceded with other ti's since then adm | |
| Oct 17, 2003 | Completed final sign-off Dec 2003 | 1 South Van Ness Av | City Building Inc. | renew appln #2001/06/08/1098, 2001/06/29/2633 2001/04/11/6533 for final sign off oti-2,2, 2 2/fDetails
renew appln #2001/06/08/1098, 2001/06/29/2633 2001/04/11/6533 for final sign off oti-2,2, 2 2/f | |
| Oct 17, 2003 | Completed final sign-off Dec 2003 | 1 South Van Ness Av | City Building Inc. | renew appln #2000/04/25/8217, 9818953 for final sign offDetails
renew appln #2000/04/25/8217, 9818953 for final sign off | |
| Oct 17, 2003 | Completed final sign-off Dec 2003 | 1 South Van Ness Av | City Building Inc. | renew appln #9012846, 9012419, 9508254 work has been superceded with other ti's since then (adm procDetails
renew appln #9012846, 9012419, 9508254 work has been superceded with other ti's since then (adm proc | |
| Oct 17, 2003 | Completed final sign-off Dec 2003 | 1 South Van Ness Av | City Building Inc. | renew appln #9118431 9824542 work has been superceded with other ti's since then administrativeDetails
renew appln #9118431 9824542 work has been superceded with other ti's since then administrative | |
| Oct 17, 2003 | Completed final sign-off Dec 2003 | 1 South Van Ness Av | City Building Inc. | renew appln #9809099, 9806686, 9713376 work has been superceded by other ti's since then adm. procedDetails
renew appln #9809099, 9806686, 9713376 work has been superceded by other ti's since then adm. proced | |
| Oct 17, 2003 | Never finaled issued Oct 2003, no final | 1 South Van Ness Av | City Building Inc. | renew appln #9811903, 2001/12/06/4669, 9002761 work has been superceded by other ti's since thenDetails
renew appln #9811903, 2001/12/06/4669, 9002761 work has been superceded by other ti's since then | |
| Oct 17, 2003 | Completed final sign-off Dec 2003 | 1 South Van Ness Av | City Building Inc. | renew appln #9725928,9725927,9718150 2nd floor , grd fl. work has been superceded by other ti's sincDetails
renew appln #9725928,9725927,9718150 2nd floor , grd fl. work has been superceded by other ti's sinc | |
| Oct 17, 2003 | Completed final sign-off Dec 2003 | 1 South Van Ness Av | City Building Inc. | renew appln #8309108, 8313076, 9013428 work has been superceded with other ti's since then adm. procDetails
renew appln #8309108, 8313076, 9013428 work has been superceded with other ti's since then adm. proc | |
| Oct 17, 2003 | Completed final sign-off Dec 2003 | 1 South Van Ness Av | City Building Inc. | renew appln #2001/02/09/1718, 2001/04/02/5743, 2001/04/11/6534 for final sign off (adm. procedureDetails
renew appln #2001/02/09/1718, 2001/04/02/5743, 2001/04/11/6534 for final sign off (adm. procedure | |
| Oct 17, 2003 | Completed final sign-off Dec 2003 | 1 South Van Ness Av | City Building Inc. | renew appln #8400572, 92101075 for final sign off work has been supercededDetails
renew appln #8400572, 92101075 for final sign off work has been superceded | |
| Oct 17, 2003 | Completed final sign-off Dec 2003 | 1 South Van Ness Av | City Building Inc. | renew appln #9613624, 9614072, 9704755 work has been superced by other ti's since thenDetails
renew appln #9613624, 9614072, 9704755 work has been superced by other ti's since then | |
| Oct 17, 2003 | Completed final sign-off Dec 2003 | 1 South Van Ness Av | City Building Inc. | renew appln #9210088, 9210085, 9210087 work has been superceded by other ti's since then adm. procedDetails
renew appln #9210088, 9210085, 9210087 work has been superceded by other ti's since then adm. proced | |
| Oct 17, 2003 | Completed final sign-off Dec 2003 | 1 South Van Ness Av | City Building Inc. | renew appln #2002/01/24/7608, 2002/02/15/9307, 2002/02/15/9306 and 200202270145 for final sign offDetails
renew appln #2002/01/24/7608, 2002/02/15/9307, 2002/02/15/9306 and 200202270145 for final sign off | |
| Oct 17, 2003 | Never finaled issued Oct 2003, no final | 1 South Van Ness Av | City Building Inc. | renew appln #9718150, 9718395, 200112064670 for final sign off conference center remains for finalDetails
renew appln #9718150, 9718395, 200112064670 for final sign off conference center remains for final | |
| Oct 17, 2003 | Completed final sign-off Dec 2003 | 1 South Van Ness Av | City Building Inc. | renew appln #9807282 9807281 9809607 for final sign off marketing dept admin. procedure oti 1,2, 3Details
renew appln #9807282 9807281 9809607 for final sign off marketing dept admin. procedure oti 1,2, 3 | |
| Sep 5, 2003 | Never finaled issued Sep 2003, no final | 1 South Van Ness Av | Honeywell International, Inc | renew permit application #2002/04/23/4754 - for final inspectionDetails
renew permit application #2002/04/23/4754 - for final inspection | $9,500 |
| Aug 22, 2003 | Never finaled issued Aug 2003, no final | 1 South Van Ness Av | sidewalkDetails
sidewalk | ||
| Aug 11, 2003 | Expired or cancelled expired Apr 2005 | 1 South Van Ness Av | Honeywell International, Inc | renew appl#200112064669 for final inspectionDetails
renew appl#200112064669 for final inspection | |
| May 28, 2003 | Completed final sign-off Jun 2003 | 1 South Van Ness Av | Dpw Inc. | sprinkler correction per field inspection work only where clouds on drawing occurs (7) additionalDetails
sprinkler correction per field inspection work only where clouds on drawing occurs (7) additional | $8,000 |
| Jul 17, 2002 | Completed final sign-off Aug 2002 | 1 South Van Ness Av | Field Construction Inc. | oti-2 revised - me.Details
oti-2 revised - me. | $25,000 |
| Jul 15, 2002 | Completed final sign-off Aug 2002 | 1 South Van Ness Av | Field Construction Inc. | oti-4 6th floor lsDetails
oti-4 6th floor ls | $75,000 |
| May 28, 2002 | Completed final sign-off Aug 2002 | 1 South Van Ness Av | Field Construction Inc. | oti-3, 6th floor -spDetails
oti-3, 6th floor -sp | $15,000 |
| May 17, 2002 | Completed final sign-off Aug 2002 | 1 South Van Ness Av | Field Construction Inc. | oti-2 6th loor, ltg. mechDetails
oti-2 6th loor, ltg. mech | $175,000 |
| Apr 23, 2002 | Expired or cancelled expired Oct 2002 | 1 South Van Ness Av | Honeywell | addition of smoke detectors and life safety stobes (e) network and computer rooms @ 4th levelDetails
addition of smoke detectors and life safety stobes (e) network and computer rooms @ 4th level | $9,500 |
| Apr 16, 2002 | Expired or cancelled expired Oct 2002 | 1 South Van Ness Av | City Building Inc. | install life safety controllDetails
install life safety controll | $8,100 |
| Apr 9, 2002 | Completed final sign-off Jun 2002 | 1 South Van Ness Av | City Building Inc. | revision to pa 200202270144Details
revision to pa 200202270144 | |
| Mar 11, 2002 | Completed final sign-off Aug 2002 | 1 South Van Ness Av | Field Construction Inc. | oti-1 6th floor, el, me, ls, spDetails
oti-1 6th floor, el, me, ls, sp | $950,000 |
| Mar 5, 2002 | Expired or cancelled cancelled Feb 2003 | 1 South Van Ness Av | City Building Inc. | oti-4:(8th fl)l/sDetails
oti-4:(8th fl)l/s | $20,000 |
| Feb 27, 2002 | Expired or cancelled expired Aug 2002 | 1 South Van Ness Av | City Building Inc. | relocate partry. build wall add millwork. (revision to per#200201247608)Details
relocate partry. build wall add millwork. (revision to per#200201247608) | $10,000 |
| Feb 27, 2002 | Completed final sign-off Jul 2002 | 1 South Van Ness Av | City Building Inc. | oti-1, 6th floor, el, me, ls, spDetails
oti-1, 6th floor, el, me, ls, sp | $40,000 |
| Feb 15, 2002 | Expired or cancelled expired Sep 2002 | 1 South Van Ness Av | City Building Inc. | oti-3:(8thfl) sprinkler onlyDetails
oti-3:(8thfl) sprinkler only | $15,000 |
| Feb 15, 2002 | Expired or cancelled expired Jul 2003 | 1 South Van Ness Av | City Building Inc. | oti-2 8th floor, ltg, mechDetails
oti-2 8th floor, ltg, mech | $100,000 |
| Jan 24, 2002 | Expired or cancelled expired May 2003 | 1 South Van Ness Av | City Building Inc. | oti-1: (8th fl) ltg, mech, l/s & sprDetails
oti-1: (8th fl) ltg, mech, l/s & spr | $100,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.