Gordon Garet Hoy
- Listed as
- architect
- Firm
- Bureau Of Arch
- Based in
- Sf
- On San Francisco permits
- Oct 2006 to Jun 2009
5 permits since 2000 (architect on 5 permits): 3 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 22, 2009 | Expired or cancelled expired Oct 2017 | 70 Oak Grove St | modify ramp and landing at rear entry. provide handrails. sawcut e concrete sidewalk and infill new concreteDetails
modify ramp and landing at rear entry. provide handrails. sawcut e concrete sidewalk and infill new concrete | $4,000 | |
| May 14, 2009 | Completed final sign-off Nov 2011 | 1 South Van Ness Av | relocation of emergency generator exhaust flue, relocation of guel tank vents, installation of a living roof, refubishing of existing window washing equipment system and painting of roof penthouse exterior walls.Details
relocation of emergency generator exhaust flue, relocation of guel tank vents, installation of a living roof, refubishing of existing window washing equipment system and painting of roof penthouse exterior walls. | $500,000 | |
| Dec 23, 2008 | Completed final sign-off Mar 2010 | 1 Dr. Carlton B. Goodlett Pl | provide new way finding accessibility signage along the perimeter of the building. provide door actuators to assist wheel chair persons to operate the doors for buildings entranceDetails
provide new way finding accessibility signage along the perimeter of the building. provide door actuators to assist wheel chair persons to operate the doors for buildings entrance | ||
| Sep 26, 2007 | Completed final sign-off Apr 2011 | 1050 Wisconsin St | the scope of services include barrier removal ada work, such as alteration of the main entrance door,public reception counter, 2 public restrooms, drinking fountain.work also includes construction of a new horizontal additional of approx 1050 s.f. for exam.room. consultation offices and conference.Details
the scope of services include barrier removal ada work, such as alteration of the main entrance door,public reception counter, 2 public restrooms, drinking fountain.work also includes construction of a new horizontal additional of approx 1050 s.f. for exam.room. consultation offices and conference. | ||
| Oct 27, 2006 | Expired or cancelled expired Feb 2010 | 3850 17th St | remodeling of restrooms, exam rooms, other public spaces for ada compliance. installation of new ada elevator. general construction work, selective demo, new walls, ceilings, doors, room finishes, signage, cabinetry, painting etc haz mat abatement.nov 200342070.Details
remodeling of restrooms, exam rooms, other public spaces for ada compliance. installation of new ada elevator. general construction work, selective demo, new walls, ceilings, doors, room finishes, signage, cabinetry, painting etc haz mat abatement.nov 200342070. |