Gordon Hoy
- Listed as
- architect, engineer
- Firm
- Bureau Of Architecture
- Based in
- San Francisco
- On San Francisco permits
- May 2005 to Jun 2011
38 permits since 2000 (architect on 37 permits, engineer on 1 permit): 21 completed, 14 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 21, 2011 | Never finaled issued Jul 2011, no final | 1680 Mission St | lobby renovation including new flooring, paint, new dropped ceiling, new transaction window & countertop & reception desk. all interior work only.Details
lobby renovation including new flooring, paint, new dropped ceiling, new transaction window & countertop & reception desk. all interior work only. | $76,800 | |
| May 12, 2011 | Completed final sign-off Jun 2012 | 25 Van Ness Av | comply comp 201045296(pid). accessibility improvement to existing restrooms on 1st, 3rd, 5th & 6th floors. work includes new flooring, relocation of plumbing fixtures, and reconfiguration of bathroom status.Details
comply comp 201045296(pid). accessibility improvement to existing restrooms on 1st, 3rd, 5th & 6th floors. work includes new flooring, relocation of plumbing fixtures, and reconfiguration of bathroom status. | $88,000 | |
| May 12, 2011 | Completed final sign-off May 2013 | 25 Van Ness Av | Turner Construction Co | t.i of the 1st, 3rd, 5th & 6th flrs of 25 van ness ave.interior alternation/renovation including architecture, structural, mechanical, plumbings and electrical work.Details
t.i of the 1st, 3rd, 5th & 6th flrs of 25 van ness ave.interior alternation/renovation including architecture, structural, mechanical, plumbings and electrical work. | $4,488,000 |
| Mar 22, 2011 | Completed final sign-off Dec 2011 | 930 Bryant St | provide (1) unisex toilets & others ada barrior removal (remodel bathroom)Details
provide (1) unisex toilets & others ada barrior removal (remodel bathroom) | $30,000 | |
| Mar 22, 2011 | Never finaled issued Oct 2011, no final | 333 Post St | provide ada remediation i various places in union square.Details
provide ada remediation i various places in union square. | $100,000 | |
| Feb 28, 2011 | Completed final sign-off Jan 2012 | 333 Turk St | 2nd floor renovate existing men's restroom to accomodate additional accessible urinal, water closet & lavatory. provide new finishes & related work.Details
2nd floor renovate existing men's restroom to accomodate additional accessible urinal, water closet & lavatory. provide new finishes & related work. | $72,000 | |
| Jan 4, 2011 | Never finaled issued Feb 2011, no final | 1650 Mission St | office ti on 2nd floor incl. demolition, new doors, frames, signs, restroom ada, ada upgrades, ceiling grids. no new light fixture.Details
office ti on 2nd floor incl. demolition, new doors, frames, signs, restroom ada, ada upgrades, ceiling grids. no new light fixture. | $140,918 | |
| Dec 21, 2010 | Completed final sign-off May 2014 | 301 Naglee Av | C D X Builders | to erect 1 story, recreational clubhouse.Details
to erect 1 story, recreational clubhouse. | $2,290,000 |
| Dec 20, 2010 | Completed final sign-off Sep 2014 | 855 27th Av | foundation repair, seismic & ada upgrade to building. repair site perimeter wall / fence, re-design playground / courts & re-pave surface. repair sidewalk. (historic resource evaluation report cast# 2009-0603e)Details
foundation repair, seismic & ada upgrade to building. repair site perimeter wall / fence, re-design playground / courts & re-pave surface. repair sidewalk. (historic resource evaluation report cast# 2009-0603e) | $1,100,000 | |
| Aug 6, 2010 | Completed final sign-off Apr 2012 | 811 Stanyan St | geneal renovation to bldg. including structural upgrade, ada compliances, toilet rooms & offices remodel parking resurface, sidewalk recontruction/repair, exterior siding & roof overhang repair. (building classified as historic landmark no. 201).Details
geneal renovation to bldg. including structural upgrade, ada compliances, toilet rooms & offices remodel parking resurface, sidewalk recontruction/repair, exterior siding & roof overhang repair. (building classified as historic landmark no. 201). | $965,000 | |
| Jul 23, 2010 | Never finaled issued Jul 2010, no final | 1001 Potrero Av | Yerba Buena Engineering & Construction | revision to pa# 2010-0607-3999 : construct retaining wall at ramp, more than 4 ft height, design built by contractor as required per previous permit.Details
revision to pa# 2010-0607-3999 : construct retaining wall at ramp, more than 4 ft height, design built by contractor as required per previous permit. | $1,500 |
| Jul 1, 2010 | Completed final sign-off Oct 2013 | 2225 Lawton St | site permit-repair & renovate exist clubhouse& gym bldg,children's play area,athletic fields & courts. repair exist irrigation.modify to remove barriers & improve access & recondition of the park landscape.Details
site permit-repair & renovate exist clubhouse& gym bldg,children's play area,athletic fields & courts. repair exist irrigation.modify to remove barriers & improve access & recondition of the park landscape. | $6,000,000 | |
| Jun 29, 2010 | Never finaled issued May 2011, no final | 3555 19th St | renovate&voluntary seismic retrofit(e)pool bldg,clubhse bldg& playgrd.scope of work will incl layout reconfiguration, mechanical, plumbing & electrical upgrades, seismic diaphragm strengthing, soil chemical grouting, court & pedestrain path resurfacing, site drainage improvement.Details
renovate&voluntary seismic retrofit(e)pool bldg,clubhse bldg& playgrd.scope of work will incl layout reconfiguration, mechanical, plumbing & electrical upgrades, seismic diaphragm strengthing, soil chemical grouting, court & pedestrain path resurfacing, site drainage improvement. | $3,500,000 | |
| Apr 21, 2010 | Completed final sign-off Jan 2011 | 25 Van Ness Av | 1st fl - tenant improvement work to house. offices for sfmta and hsa.Details
1st fl - tenant improvement work to house. offices for sfmta and hsa. | $100,000 | |
| Mar 16, 2010 | Completed final sign-off May 2011 | 155 Winston Dr | Clw Builders Inc | revision to current open permit #200904136157 to add simpson strongwall shearwall system in lieu of original plywd. on wd. stud shear wall at line "c" between column lines 4.1 & 5.Details
revision to current open permit #200904136157 to add simpson strongwall shearwall system in lieu of original plywd. on wd. stud shear wall at line "c" between column lines 4.1 & 5. | $10,000 |
| Feb 5, 2010 | Never finaled issued Mar 2011, no final | 4750 Martin Luther King Dr | Roebuck Construction | seismic improvements, ada code upgrades, electrical & hvac upgrades, window replacement & re-roofingDetails
seismic improvements, ada code upgrades, electrical & hvac upgrades, window replacement & re-roofing | $500,000 |
| Nov 20, 2009 | Completed final sign-off Feb 2011 | 1199 Mason St | to demolish 2 stories recreation center with basement.Details
to demolish 2 stories recreation center with basement. | $140,150 | |
| Oct 22, 2009 | Never finaled issued Dec 2009, no final | 25 Van Ness Av | installation of mechancial ducts @ basement per ab-019.Details
installation of mechancial ducts @ basement per ab-019. | $60,000 | |
| Oct 22, 2009 | Never finaled issued Nov 2009, no final | 25 Van Ness Av | installation of a trash compactor & secured bicycle area by fence.Details
installation of a trash compactor & secured bicycle area by fence. | $60,000 | |
| May 8, 2009 | Completed final sign-off Sep 2009 | 1680 Mission St | tenant improvment on 1st floor: 20l.f. of partition & 2 electrical outlets, 2 double electrical switches, no new lighting, 1 ocmbination supply return, 2 doors frames & hardware. painting, no new carpet, new base.Details
tenant improvment on 1st floor: 20l.f. of partition & 2 electrical outlets, 2 double electrical switches, no new lighting, 1 ocmbination supply return, 2 doors frames & hardware. painting, no new carpet, new base. | $15,000 | |
| Apr 13, 2009 | Completed final sign-off Jan 2013 | 155 Winston Dr | renovate/addition to (e) library include site demolition, selective bldg demolition, new sitework improvements including sidewalks, bldg strl upgrades, windows, doors, roofing, exiting doors & devices, caseworks finishes, mech, elec&plumb wk in accordance w/drawings specs addition 1100 sq ft.Details
renovate/addition to (e) library include site demolition, selective bldg demolition, new sitework improvements including sidewalks, bldg strl upgrades, windows, doors, roofing, exiting doors & devices, caseworks finishes, mech, elec&plumb wk in accordance w/drawings specs addition 1100 sq ft. | ||
| Jan 13, 2009 | Completed final sign-off Jun 2010 | 1490 Mason St | barrier removal - accessibility improvement, widen doors, remodel 3 toilet rooms, remodel counters, door hardware replacement, new ada drinking fountains, lower elevator control and new signage.Details
barrier removal - accessibility improvement, widen doors, remodel 3 toilet rooms, remodel counters, door hardware replacement, new ada drinking fountains, lower elevator control and new signage. | $300,000 | |
| Dec 23, 2008 | Completed final sign-off Jun 2012 | 201 Leland Av | erect one story type 5 public library.Details
erect one story type 5 public library. | ||
| Nov 20, 2008 | Completed final sign-off Aug 2011 | 550 37th Av | add an elevator & a staircase at rear of bldg; provide new ada bldg entrance, new accessible restrooms, drinking fountains, furnishings, & new mech & elec equipment, replace (e) windows. provide one on-site accessible parking space & seismic upgrade while preserving the historic character.Details
add an elevator & a staircase at rear of bldg; provide new ada bldg entrance, new accessible restrooms, drinking fountains, furnishings, & new mech & elec equipment, replace (e) windows. provide one on-site accessible parking space & seismic upgrade while preserving the historic character. | $3,019,736 | |
| Nov 12, 2008 | Never finaled issued Dec 2008, no final | 170 Otis St | install new fencing around play area at 1st fl, const of new opening in exterior wall & bldg glass storefront drs, upgrade access to existing men's & women's restrms in remodel area, replace (e) drinking fountains, modify (e) child's restrms.Details
install new fencing around play area at 1st fl, const of new opening in exterior wall & bldg glass storefront drs, upgrade access to existing men's & women's restrms in remodel area, replace (e) drinking fountains, modify (e) child's restrms. | $150,000 | |
| Oct 2, 2008 | Completed final sign-off Oct 2009 | 233 Melrose Av | city job: voluntary barrier removal consisting of restroom remodel, kitchen remodel. life safety under seperate permit.Details
city job: voluntary barrier removal consisting of restroom remodel, kitchen remodel. life safety under seperate permit. | ||
| Sep 18, 2008 | Completed final sign-off Jul 2009 | 555 Polk St | demolition work for t.i. improvement for community justice center, demo office partitions & doors, including removal of ceiling tiles & grids, toilets, sinks & stall partitions in (e) mens restrooms & (e) stove flooring & sst. wheel chair guard in 1st floor lobby. as per code ab-17.Details
demolition work for t.i. improvement for community justice center, demo office partitions & doors, including removal of ceiling tiles & grids, toilets, sinks & stall partitions in (e) mens restrooms & (e) stove flooring & sst. wheel chair guard in 1st floor lobby. as per code ab-17. | $45,000 | |
| May 1, 2008 | Never finaled issued Jul 2008, no final | 850 Bryant St | city job: revision to 200710044525: reduce scope of work from 34 restrooms to 6 restrooms for barrier removal. all signage to remain as stated in original application.Details
city job: revision to 200710044525: reduce scope of work from 34 restrooms to 6 restrooms for barrier removal. all signage to remain as stated in original application. | ||
| Sep 26, 2007 | Completed final sign-off Apr 2011 | 1050 Wisconsin St | the scope of services include barrier removal ada work, such as alteration of the main entrance door,public reception counter, 2 public restrooms, drinking fountain.work also includes construction of a new horizontal additional of approx 1050 s.f. for exam.room. consultation offices and conference.Details
the scope of services include barrier removal ada work, such as alteration of the main entrance door,public reception counter, 2 public restrooms, drinking fountain.work also includes construction of a new horizontal additional of approx 1050 s.f. for exam.room. consultation offices and conference. | ||
| May 8, 2007 | Completed final sign-off Feb 2010 | 1900 Geary Bl | seismic, access upgrades & renovation. renovate the (e) pool building & gymnasium . the (e) recreation center bldg. & pool locker rooms will be removed & replaced with a new one story bldg. site improvements include a new playground, play structures and new accessible ramps and entrances.Details
seismic, access upgrades & renovation. renovate the (e) pool building & gymnasium . the (e) recreation center bldg. & pool locker rooms will be removed & replaced with a new one story bldg. site improvements include a new playground, play structures and new accessible ramps and entrances. | ||
| Apr 30, 2007 | Expired or cancelled expired Aug 2008 | 1200 15th St | remodeling of (e) office/surgery into seperate surgery & prep.room. remove (e) furniture & accessories in (e) office, in surgery remove (e) counter sink & ceiling difuser, divide (e) office/stor & surgery into 2 rooms by a full hg. glass wall with sliding doors.relcoate cages, cabs,equip.& devices.Details
remodeling of (e) office/surgery into seperate surgery & prep.room. remove (e) furniture & accessories in (e) office, in surgery remove (e) counter sink & ceiling difuser, divide (e) office/stor & surgery into 2 rooms by a full hg. glass wall with sliding doors.relcoate cages, cabs,equip.& devices. | ||
| Feb 28, 2007 | Never finaled issued May 2007, no final | 25 Van Ness Av | oti-1 7th floor el, l/s (suite #700)Details
oti-1 7th floor el, l/s (suite #700) | ||
| Nov 30, 2006 | Completed final sign-off Aug 2007 | 1155 Market St | Angotti & Reilly Inc. | at the 6th floor, construction of 6 new offices, remodel of extg storate room and extg copy room. sprnklr to be submitted on separate permitDetails
at the 6th floor, construction of 6 new offices, remodel of extg storate room and extg copy room. sprnklr to be submitted on separate permit | $107,000 |
| Aug 2, 2006 | Never finaled issued Nov 2006, no final | 25 Van Ness Av | replace drinking fountains with new accessible hi-low drinking fountains - widen alcoves on 6th floor only. 1 per level. new accessible signage at various locations along common area paths. alteration / accessibility improvements of (e) restrooms. pair per level. includes 1 new power assist to (e)Details
replace drinking fountains with new accessible hi-low drinking fountains - widen alcoves on 6th floor only. 1 per level. new accessible signage at various locations along common area paths. alteration / accessibility improvements of (e) restrooms. pair per level. includes 1 new power assist to (e) | ||
| Aug 2, 2006 | Never finaled issued Nov 2006, no final | 25 Van Ness Av | replace drinking fountains w/new accessible hi-low drinking fountains-widen alcoves-1 per level.new accessible signage at var loc along common area paths.alter/access improv of (e) restrooms.pair per level.replace wall sconces at var loc along common area paths.adj door timing at (e)elevator landingDetails
replace drinking fountains w/new accessible hi-low drinking fountains-widen alcoves-1 per level.new accessible signage at var loc along common area paths.alter/access improv of (e) restrooms.pair per level.replace wall sconces at var loc along common area paths.adj door timing at (e)elevator landing | ||
| Jul 24, 2006 | Expired or cancelled expired Mar 2008 | 375 Laguna Honda Bl | to erect a smoking shelter.Details
to erect a smoking shelter. | ||
| Jul 24, 2006 | Expired or cancelled expired Mar 2008 | 375 Laguna Honda Bl | to erect a smoking shelter.Details
to erect a smoking shelter. | ||
| May 13, 2005 | Never finaled issued Jul 2005, no final | 3265 22nd St | shoring & underpinning along west property line & south property line for construction of ccsf newDetails
shoring & underpinning along west property line & south property line for construction of ccsf new | $20,000 |