Block 3759, lot 042
425 07th St
- City’s use
- Miscellaneous/Mixed-Use
- Lot
- 212,677 sq ft
- Zoning
- P
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
51 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 21, 2026 | In progress issued Sep 2026 | 425 07th St | replace (e) digital controls of each ahu, controller of vav box, install electrical feed to new temperature control panel, install new temperature control panel. install new thermostat & replace building automation system.Details
replace (e) digital controls of each ahu, controller of vav box, install electrical feed to new temperature control panel, install new temperature control panel. install new thermostat & replace building automation system. | $209,208 | |
| Jul 29, 2026 | In progress filed Jul 2026, not yet issued | 850 Bryant St | replace (e) chiller in (e) underground chiller-boiler room. work includes the removal of the (e) chiller, installation of the new chiller, associated piping and electrical work, testing and commissioning. no change in occupancy, floor area, building use, or mean of egress.Details
replace (e) chiller in (e) underground chiller-boiler room. work includes the removal of the (e) chiller, installation of the new chiller, associated piping and electrical work, testing and commissioning. no change in occupancy, floor area, building use, or mean of egress. | $1,648,088 | |
| Jan 28, 2026 | In progress issued Jan 2026 | 850 Bryant St | Siemens Industry, Inc. | roof level: fire only work for the elevator modernization of cars 2 and 3 at the roof level machine room under 202112154499. additions are 1 smoke detector and 2 modules.Details
roof level: fire only work for the elevator modernization of cars 2 and 3 at the roof level machine room under 202112154499. additions are 1 smoke detector and 2 modules. | $1,920 |
| Nov 17, 2022 | Completed final sign-off Dec 2022 | 425 07th St | Johnson Controls Fire | as built, modify existihg fire alarm system. e 3 smoke sensors, e 5 heat sensors, e 1 horn, e 1 strobe. new heat detector (1)Details
as built, modify existihg fire alarm system. e 3 smoke sensors, e 5 heat sensors, e 1 horn, e 1 strobe. new heat detector (1) | |
| Oct 26, 2022 | Completed final sign-off Feb 2023 | 425 07th St | Johnson Controls Fire | modify (e) f/a, (e)(2) new smoke sensors, (e)(7) new heat sensors, (e)(1) new horn, (e)(1) new strobe. protect/cover (e) device and appliances during renovation, reinstall back on new finished floor. as-built to permit 202207289498Details
modify (e) f/a, (e)(2) new smoke sensors, (e)(7) new heat sensors, (e)(1) new horn, (e)(1) new strobe. protect/cover (e) device and appliances during renovation, reinstall back on new finished floor. as-built to permit 202207289498 | $2,000 |
| Jul 28, 2022 | Completed final sign-off Dec 2022 | 425 07th St | Johnson Controls Fire | modify existing fire alarm. 2 new smoke sensor, 7 new heat sensors, 1 new horn, 1 new strobe protect and cover existing device and applicances during renovation.Details
modify existing fire alarm. 2 new smoke sensor, 7 new heat sensors, 1 new horn, 1 new strobe protect and cover existing device and applicances during renovation. | $2,000 |
| Mar 17, 2022 | Completed final sign-off Dec 2022 | 425 07th St | Buhler Commercial | amendment to approved permit #201908199221 and 202110049757.the added scope of work is to modify staff restroom 2548 to comply with california state title 24 2019Details
amendment to approved permit #201908199221 and 202110049757.the added scope of work is to modify staff restroom 2548 to comply with california state title 24 2019 | $30,000 |
| Dec 15, 2021 | In progress issued Nov 2025 | 850 Bryant St | Angotti & Reilly Inc. | modernization/upgrade of elevator #2, # new machine and microprocessor baded controllers as well as new suspensions and door operating euipment. decommissioning of elevator #4 and #% removal of hoise, compensation ropes mechanical fastening hoistway.Details
modernization/upgrade of elevator #2, # new machine and microprocessor baded controllers as well as new suspensions and door operating euipment. decommissioning of elevator #4 and #% removal of hoise, compensation ropes mechanical fastening hoistway. | $3,000,000 |
| Oct 4, 2021 | Completed final sign-off Jan 2023 | 425 07th St | Buhler Commercial | rev to pa201908199221: new equipment and finiehes to the officers dining room,new flooring i the service corride, new flooring for the 2/f central supplies & treatment room; new counter and cabinets, sink, faucet and eye wash in the treatment room and work to the (e) dark room on 2/f.Details
rev to pa201908199221: new equipment and finiehes to the officers dining room,new flooring i the service corride, new flooring for the 2/f central supplies & treatment room; new counter and cabinets, sink, faucet and eye wash in the treatment room and work to the (e) dark room on 2/f. | $400,000 |
| Feb 8, 2021 | Completed final sign-off Aug 2021 | 425 07th St | Custom Fire Protection Inc | relocate 30 heads to new locations in new t-bar ceiling replace 1 dry pendent head add one (1) new head 3rd floor kitchen remodelDetails
relocate 30 heads to new locations in new t-bar ceiling replace 1 dry pendent head add one (1) new head 3rd floor kitchen remodel | |
| Dec 21, 2020 | Completed final sign-off Dec 2022 | 425 07th St | Johnson Controls Fire | city jail: modify existing fire alarm system, 3rd floor south kitchen. (2)(n) smoke sensors, (7) (new) heat sensors, (1) (new) horn, (1) (new) strobe. ref to ti permit # 2019-0819-9221Details
city jail: modify existing fire alarm system, 3rd floor south kitchen. (2)(n) smoke sensors, (7) (new) heat sensors, (1) (new) horn, (1) (new) strobe. ref to ti permit # 2019-0819-9221 | $20,000 |
| Nov 23, 2020 | Completed final sign-off Oct 2022 | 425 07th St | Aaa Restaurant Fire Control/Dba Aaa Fire | rework and repair one (1) existing ansul r-102 fire suppression system in the main kitchen area. ref. permit # 2019-0819-9221.Details
rework and repair one (1) existing ansul r-102 fire suppression system in the main kitchen area. ref. permit # 2019-0819-9221. | $13,625 |
| Aug 19, 2019 | Completed final sign-off Dec 2022 | 425 07th St | renovation of extg commercial kitchen of county jail #2. work inlcudes architectural, structural mep work in support of food service improvement. n/a for maherDetails
renovation of extg commercial kitchen of county jail #2. work inlcudes architectural, structural mep work in support of food service improvement. n/a for maher | $1,900,000 | |
| Apr 20, 2018 | Never finaled issued May 2018, no final | 850 Bryant St | Siemens Industry, Inc. | basement,1,6,7,roof - fire alarm for the elevator machine room upgrade- additions are 2 smk det and 17 relay modules maher na. ref pa #2018-0306-2935.Details
basement,1,6,7,roof - fire alarm for the elevator machine room upgrade- additions are 2 smk det and 17 relay modules maher na. ref pa #2018-0306-2935. | $10,275 |
| Mar 6, 2018 | Never finaled issued Mar 2018, no final | 850 Bryant St | Famand Inc Dba Indoor Environmental Serv | install two 2 ton split cooling system in elevator mechanical rooms 9 and 10; n/a maherDetails
install two 2 ton split cooling system in elevator mechanical rooms 9 and 10; n/a maher | $27,105 |
| Mar 14, 2016 | Never finaled issued Apr 2016, no final | 850 Bryant St | 4th flr: addition of two private rooms on the 4th flr of the hall of justice for administrative activities of sheriff's facilities, including a 60 sqft custodian room & a 100 sq.ft. interview room.work involves the construction of interior acoustical walls & intermediate door with accessibleDetails
4th flr: addition of two private rooms on the 4th flr of the hall of justice for administrative activities of sheriff's facilities, including a 60 sqft custodian room & a 100 sq.ft. interview room.work involves the construction of interior acoustical walls & intermediate door with accessible | $15,000 | |
| Sep 10, 2015 | Expired or cancelled cancelled Jan 2026 | 850 Bryant St | Mark Scott Construction | 3rd floor jury assembly room - remove existing wall, construct new wall, remove & replace drop ceiling & light fixtures, remove janitors sink & cap plumbing, relocate electrical & fire life safety. n/a maher ordinanceDetails
3rd floor jury assembly room - remove existing wall, construct new wall, remove & replace drop ceiling & light fixtures, remove janitors sink & cap plumbing, relocate electrical & fire life safety. n/a maher ordinance | $175,000 |
| Aug 12, 2014 | Completed final sign-off Jan 2015 | 850 Bryant St | Siemens Industry, Inc. | 6th & 7th floor. installation of 2 remote fire alarm panels & the replacement of all (e) fire alarm devices for floor 6 & 7. ** maher: compliance with ordinance no# 155-13 not required **Details
6th & 7th floor. installation of 2 remote fire alarm panels & the replacement of all (e) fire alarm devices for floor 6 & 7. ** maher: compliance with ordinance no# 155-13 not required ** | $200,000 |
| Oct 9, 2013 | Never finaled issued Oct 2013, no final | 850 Bryant St | Security Engineers Inc | as built fire alarm. add 1 sheet to document deleted work. per app 201106153191, 201308224983Details
as built fire alarm. add 1 sheet to document deleted work. per app 201106153191, 201308224983 | |
| Aug 22, 2013 | Completed final sign-off Oct 2013 | 850 Bryant St | Security Engineers Inc | as built fire alarm system, additional 4 smoke detectors, 4 horn/strobes (ref. permit 201106158191) floors 3,4,5 phase ii changesDetails
as built fire alarm system, additional 4 smoke detectors, 4 horn/strobes (ref. permit 201106158191) floors 3,4,5 phase ii changes | $416,000 |
| Jul 15, 2013 | Never finaled issued Jul 2013, no final | 850 Bryant St | street spaceDetails
street space | ||
| Jun 3, 2013 | Never finaled issued Jun 2013, no final | 850 Bryant St | Emcor Services/Mesa Energy Systems Inc | basemt/ground level -replace (e) 535 "worthington" r-11 chilles. provide a refrigeration machine rom enclosure with correct exiting, rating & ventilation. provide refrigerant exhaust purge sys along w/monitoring & all code required alarms. upgrade all mechanical controls w/new ddc sys.Details
basemt/ground level -replace (e) 535 "worthington" r-11 chilles. provide a refrigeration machine rom enclosure with correct exiting, rating & ventilation. provide refrigerant exhaust purge sys along w/monitoring & all code required alarms. upgrade all mechanical controls w/new ddc sys. | $906,015 |
| Nov 14, 2012 | Expired or cancelled cancelled Jan 2026 | 850 Bryant St | replace existing 535" worthington r-11 chiller with a 425 "new york" r-134a chillerDetails
replace existing 535" worthington r-11 chiller with a 425 "new york" r-134a chiller | $400,000 | |
| Nov 13, 2012 | Never finaled issued Nov 2012, no final | 850 Bryant St | street spaceDetails
street space | ||
| Aug 14, 2012 | Completed final sign-off Nov 2012 | 850 Bryant St | All-Bright Electric Company Inc | relocate 2 horn strobes due to new courtrooms being constructed on 2nd floor, courtrooms a & bDetails
relocate 2 horn strobes due to new courtrooms being constructed on 2nd floor, courtrooms a & b | $750 |
| Nov 21, 2011 | Completed final sign-off Jul 2013 | 850 Bryant St | Howard S. Wright Constructors Lp | select demolition of internal walls and finishes. install of new interior walls, 2 new restrooms (non public) and associated utilities. new furred ceiling, new raised floor. new finishes. fa, sprinkler, & occupant load calc's separate permit.Details
select demolition of internal walls and finishes. install of new interior walls, 2 new restrooms (non public) and associated utilities. new furred ceiling, new raised floor. new finishes. fa, sprinkler, & occupant load calc's separate permit. | $505,808 |
| Jun 22, 2011 | Completed final sign-off Sep 2011 | 850 Bryant St | Aaa Restaurant Fire Control/Dba Aaa Fire | upgrade the ansul system ul 300Details
upgrade the ansul system ul 300 | $2,500 |
| Jun 15, 2011 | Never finaled issued Oct 2011, no final | 850 Bryant St | Security Engineers Inc | phase ii-upgrade of fire alarm system on the 3rd,4th,5th flr, of hall of justice, including the medical examiners bldg. work includes installation of new fire alarm initiating & notification devices, integration of new devices into the (e) system, testing of the new devices & remodel of(e)devices.Details
phase ii-upgrade of fire alarm system on the 3rd,4th,5th flr, of hall of justice, including the medical examiners bldg. work includes installation of new fire alarm initiating & notification devices, integration of new devices into the (e) system, testing of the new devices & remodel of(e)devices. | $95,000 |
| May 23, 2011 | Completed final sign-off Sep 2011 | 425 07th St | Emcor Services/Mesa Energy Systems Inc | san francisco jail. two chiller replacements in-kind on roof. approx same weight.Details
san francisco jail. two chiller replacements in-kind on roof. approx same weight. | $450,000 |
| Dec 1, 2010 | Never finaled issued May 2012, no final | 850 Bryant St | installation of two 1,000kw generators. work includes installation of fuel oil, suppy piping, and pumping system connecting to existing fuel tanks, electrical switch board, electrical raceways, conduit, wiring, and pull boxes.Details
installation of two 1,000kw generators. work includes installation of fuel oil, suppy piping, and pumping system connecting to existing fuel tanks, electrical switch board, electrical raceways, conduit, wiring, and pull boxes. | $750,000 | |
| Nov 19, 2009 | Completed final sign-off Mar 2010 | 850 Bryant St | Gregory Electric Inc | as built plans for appl. 200807025852. fire alarm additions per fire marshall. this permit will contain final changes.Details
as built plans for appl. 200807025852. fire alarm additions per fire marshall. this permit will contain final changes. | $15,000 |
| Oct 7, 2009 | Never finaled issued Oct 2009, no final | 850 Bryant St | city job - ti work to ccsf office of the chief medical examiner at the hall of justice. concert (e) confrerence room into 2 doctor's offices. new unisex toilet ada compliance. work on 1st/street level. interior work only.Details
city job - ti work to ccsf office of the chief medical examiner at the hall of justice. concert (e) confrerence room into 2 doctor's offices. new unisex toilet ada compliance. work on 1st/street level. interior work only. | $234,456 | |
| Apr 21, 2009 | Never finaled issued Apr 2009, no final | 850 Bryant St | construction of 2 concrete equipment pads only, for future emergency generators. review and approval by city planning required for pad location. generator and installation under sep permit 200901079750Details
construction of 2 concrete equipment pads only, for future emergency generators. review and approval by city planning required for pad location. generator and installation under sep permit 200901079750 | $35,000 | |
| Jan 7, 2009 | Expired or cancelled withdrawn Jan 2011 | 850 Bryant St | work entails installation of 2 1,000 kw generators for the hall of justice bldg @ 850 bryant street. work includes installation of equipment pads, fuel oil piping with double containment & leak detection. electrical raseways, conduit, wiring, pull boxes and a switch boardDetails
work entails installation of 2 1,000 kw generators for the hall of justice bldg @ 850 bryant street. work includes installation of equipment pads, fuel oil piping with double containment & leak detection. electrical raseways, conduit, wiring, pull boxes and a switch board | ||
| Jul 2, 2008 | Completed final sign-off Mar 2010 | 850 Bryant St | Gregory Electric Inc | installation of new fire alarm system in basement, 1st and 2nd floors. new xls500 will be interconected with ex. system for the cornor's bldg and the panell located on the 6th floor serving the jail. new grahic annuciator at the entrance and remot lcd at the boiler rmDetails
installation of new fire alarm system in basement, 1st and 2nd floors. new xls500 will be interconected with ex. system for the cornor's bldg and the panell located on the 6th floor serving the jail. new grahic annuciator at the entrance and remot lcd at the boiler rm | $250,000 |
| May 1, 2008 | Never finaled issued Jul 2008, no final | 850 Bryant St | city job: revision to 200710044525: reduce scope of work from 34 restrooms to 6 restrooms for barrier removal. all signage to remain as stated in original application.Details
city job: revision to 200710044525: reduce scope of work from 34 restrooms to 6 restrooms for barrier removal. all signage to remain as stated in original application. | ||
| Apr 22, 2008 | Never finaled issued May 2008, no final | 850 Bryant St | ventilation improvement work for 6th & 7th floors of hall of justice bldg. the work includes replacement of supply & exhause fans, filters, and recondition of exhaust fan for 4 fan rooms.Details
ventilation improvement work for 6th & 7th floors of hall of justice bldg. the work includes replacement of supply & exhause fans, filters, and recondition of exhaust fan for 4 fan rooms. | $1,900,000 | |
| Mar 4, 2008 | Never finaled issued Mar 2008, no final | 850 Bryant St | Acco Engineered Systems Inc. Dba Acco En | replace (e) cooling tower with new cooling tower & mechanical support at the roof.Details
replace (e) cooling tower with new cooling tower & mechanical support at the roof. | $200,000 |
| Oct 4, 2007 | Never finaled issued Oct 2007, no final | 850 Bryant St | remove architectural barriers. work includes barrier removal at various existing restrooms and drinking fountains in common, court & tenant areas. includes various signage for evacuation, exiting, directional and stairs.Details
remove architectural barriers. work includes barrier removal at various existing restrooms and drinking fountains in common, court & tenant areas. includes various signage for evacuation, exiting, directional and stairs. | ||
| Jan 22, 2007 | Never finaled issued Jan 2007, no final | 850 Bryant St | no:200609071686 to add project sign off form from mayor's office on disability. room 145Details
no:200609071686 to add project sign off form from mayor's office on disability. room 145 | ||
| Dec 22, 2006 | Completed final sign-off Apr 2010 | 850 Bryant St | 2nd fl, room #201 - tenant improvement - courtroom renovation and court holding facility.Details
2nd fl, room #201 - tenant improvement - courtroom renovation and court holding facility. | ||
| Sep 7, 2006 | Never finaled issued Sep 2006, no final | 850 Bryant St | room 145 - t.i. of (e) office space. no structural work.Details
room 145 - t.i. of (e) office space. no structural work. | $75,000 | |
| Oct 9, 2003 | Never finaled issued Oct 2003, no final | 850 Bryant St | Signal Fire Detection Inc. | addition of 40 smoke detector on 7th fl to (e) fire alarm systemDetails
addition of 40 smoke detector on 7th fl to (e) fire alarm system | $20,000 |
| Oct 8, 2003 | Never finaled issued Jul 2004, no final | 850 Bryant St | Fire Guard Fire Protection Service Inc | procide fire sprinklers for exercise area @7th fl. (courtsey checkfor sfm occupancy)Details
procide fire sprinklers for exercise area @7th fl. (courtsey checkfor sfm occupancy) | $8,000 |
| May 9, 2003 | Expired or cancelled expired Mar 2007 | 425 07th St | Sierra Electric Co | new addition to the 5th floor fire detection & notificationDetails
new addition to the 5th floor fire detection & notification | $19,000 |
| Jan 15, 2003 | Expired or cancelled expired Mar 2007 | 425 07th St | Cosco Fire Protection Inc. | adding 55 new sprinkler heads on 5th floorDetails
adding 55 new sprinkler heads on 5th floor | $9,500 |
| Oct 25, 2002 | Expired or cancelled expired Jun 2003 | 850 Bryant St | San Francisco Mechanical | new air conditioning unit fpor server conditioning unitDetails
new air conditioning unit fpor server conditioning unit | $10,116 |
| Jul 31, 2002 | Expired or cancelled expired Jun 2003 | 850 Bryant St | San Francisco Mechanical | air conditioning unit for room 26,3rd flr d.a. office use for supplimental cooling. rm#26 has existiDetails
air conditioning unit for room 26,3rd flr d.a. office use for supplimental cooling. rm#26 has existi | $10,116 |
| Dec 1, 2001 | Expired or cancelled cancelled Dec 2001 | 850 Bryant St | construct 2 shafts for hvac air intake & exhaustDetails
construct 2 shafts for hvac air intake & exhaust | $608,000 | |
| Jan 23, 2001 | Expired or cancelled expired May 2001 | 850 Bryant St | Kin Wo Construction Inc. | renew for final inspection only. app # 9822915 oti-2 permit.Details
renew for final inspection only. app # 9822915 oti-2 permit. | |
| Jan 8, 2001 | Completed final sign-off Jan 2001 | 850 Bryant St | Kin Wo Construction Inc. | renewed appl#9909448 for final inspectionDetails
renewed appl#9909448 for final inspection |