Dan Caswell
- Listed as
- engineer
- On San Francisco permits
- Aug 2026 to Aug 2026
1 permit since 2000 (engineer on 1 permit): 1 in progress.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 21, 2026 | In progress issued Sep 2026 | 425 07th St | replace (e) digital controls of each ahu, controller of vav box, install electrical feed to new temperature control panel, install new temperature control panel. install new thermostat & replace building automation system.Details
replace (e) digital controls of each ahu, controller of vav box, install electrical feed to new temperature control panel, install new temperature control panel. install new thermostat & replace building automation system. | $209,208 |