Paul Cooper
- Listed as
- architect, engineer
- Firm
- Tef Design
- Based in
- San Francisco
- On San Francisco permits
- Oct 2019 to Aug 2026
54 permits since 2000 (architect on 52 permits, engineer on 2 permits): 10 completed, 14 in progress, 29 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 11, 2026 | In progress issued Aug 2026 | 1 South Van Ness Av | W E Lyons Construction Co | rev to pa# 2022-0307-9381: replacement of superseded sffd pre application meeting notes & addition of sffd reference forms revised pre application meeting notes dated 7/9/2026. indicatrs approved alternate access door/panel at freight elevater hoistway.Details
rev to pa# 2022-0307-9381: replacement of superseded sffd pre application meeting notes & addition of sffd reference forms revised pre application meeting notes dated 7/9/2026. indicatrs approved alternate access door/panel at freight elevater hoistway. | |
| Jun 23, 2026 | In progress issued Jun 2026 | 1 South Van Ness Av | W E Lyons Construction Co | revision to pa #202203079381. at passenger elevators #1 and #2 machine room. addition of screen divider between disconnects for elevator #2Details
revision to pa #202203079381. at passenger elevators #1 and #2 machine room. addition of screen divider between disconnects for elevator #2 | $15,000 |
| Mar 26, 2026 | In progress issued Mar 2026 | 1 South Van Ness Av | W E Lyons Construction Co | revision to pa# 202203079381: addition to partial single line diagram for new scope and reference sheet for as-builts single line diagram. removal of intimescent paint reference over non-combustible partial height wall.Details
revision to pa# 202203079381: addition to partial single line diagram for new scope and reference sheet for as-builts single line diagram. removal of intimescent paint reference over non-combustible partial height wall. | |
| Mar 12, 2026 | In progress issued Mar 2026 | 1 South Van Ness Av | W E Lyons Construction Co | revision to pa #2022-0307-9381: addition to partial single line diagram for new scope and reference sheet for as builts single line diagram. removal of intumescent paint reference over non combustible partial height wall.Details
revision to pa #2022-0307-9381: addition to partial single line diagram for new scope and reference sheet for as builts single line diagram. removal of intumescent paint reference over non combustible partial height wall. | |
| Dec 19, 2025 | In progress filed Dec 2025, not yet issued | 833 Mission St | elevator modernization of 6 tration elevators &1-6. upgrade new machines, new microprocessor based controllers, digital landing equipment, new guide rolles, new equipment in elevator machine room, and new 2-way emergency vidio and text based communication system.Details
elevator modernization of 6 tration elevators &1-6. upgrade new machines, new microprocessor based controllers, digital landing equipment, new guide rolles, new equipment in elevator machine room, and new 2-way emergency vidio and text based communication system. | $1,985,000 | |
| Dec 17, 2025 | In progress filed Dec 2025, not yet issued | 2500 24th St | elevator modernization of (2) hydraucic elevators #1 and #2. upgrade (n) machines, (n) microprocessor based controls. digital landing equipment. (n) rollers, 2 way emergency radio and based commincation system and (n) equipment roomDetails
elevator modernization of (2) hydraucic elevators #1 and #2. upgrade (n) machines, (n) microprocessor based controls. digital landing equipment. (n) rollers, 2 way emergency radio and based commincation system and (n) equipment room | $1,143,000 | |
| Dec 17, 2025 | In progress filed Dec 2025, not yet issued | 735 Vallejo St | elevator modernization of (2) hydraulic elevator #1 . upgrade new machines, new miroprocess based controllers, digital landing equipments, new guilded rollers, new equipment in elevator machine room, new two ways emergency video & text based communication systemDetails
elevator modernization of (2) hydraulic elevator #1 . upgrade new machines, new miroprocess based controllers, digital landing equipments, new guilded rollers, new equipment in elevator machine room, new two ways emergency video & text based communication system | $1,143,000 | |
| Dec 17, 2025 | In progress filed Dec 2025, not yet issued | 360 Grove St | elevator modernization of (2) traction elevators #1 and #2. upgrade (n) machines, (n) microprocessor based controls. digital landing equipment. (n) rollers, 2 way emergency radio and based commincation system and (n) equipment roomDetails
elevator modernization of (2) traction elevators #1 and #2. upgrade (n) machines, (n) microprocessor based controls. digital landing equipment. (n) rollers, 2 way emergency radio and based commincation system and (n) equipment room | $1,143,000 | |
| Nov 24, 2025 | In progress filed Nov 2025, not yet issued | 123 Ofarrell St | elevator modernization of 3 traction elevtors 1,2&3.upgrademew machines, new microprocessor based controllers, digital landing equipment, new guide rollers, new wiring at machine room. 2 way emergency interactive video/text based communication system.Details
elevator modernization of 3 traction elevtors 1,2&3.upgrademew machines, new microprocessor based controllers, digital landing equipment, new guide rollers, new wiring at machine room. 2 way emergency interactive video/text based communication system. | $1,065,000 | |
| Oct 22, 2025 | In progress filed Oct 2025, not yet issued | 433 Kearny St | elevator modernization of two traction elevator 1 & 2. refurbish hoistway machines, new door operator, new spring roller guides, new normal and terminal switches. new travel cables etc.Details
elevator modernization of two traction elevator 1 & 2. refurbish hoistway machines, new door operator, new spring roller guides, new normal and terminal switches. new travel cables etc. | $2,300,000 | |
| Oct 16, 2025 | Completed final sign-off May 2026 | 125 03rd St | Richlen Construction | revision 202503273212 for (n) storage roomDetails
revision 202503273212 for (n) storage room | $5,000 |
| Sep 22, 2025 | In progress filed Sep 2025, not yet issued | 1011 Turk St | ups replacements including batteries with structural anchrage & removed of existing equipement. installation of nw transformer & removal of existing tranformer, removed of existing mechanical unit & intallation of new ac unit, cutting & patching of finshes, fire partitions & fire rate doorsDetails
ups replacements including batteries with structural anchrage & removed of existing equipement. installation of nw transformer & removal of existing tranformer, removed of existing mechanical unit & intallation of new ac unit, cutting & patching of finshes, fire partitions & fire rate doors | $1,195,498 | |
| Aug 14, 2025 | In progress filed Aug 2025, not yet issued | 1 Dr Carlton B Goodlett Pl | revision to 202108236905: construction of a steel screen dividez in elevator machine room 4,5,6 in order to separate machine room from skylight wellDetails
revision to 202108236905: construction of a steel screen dividez in elevator machine room 4,5,6 in order to separate machine room from skylight well | $5,000 | |
| Mar 27, 2025 | Completed final sign-off May 2026 | 125 03rd St | Richlen Construction | interior renovation of (e) spa @ 5th & 6th floors.Details
interior renovation of (e) spa @ 5th & 6th floors. | $652,844 |
| Sep 19, 2024 | In progress issued Sep 2025 | 25 Van Ness Av | project consists exclusively of elevator modernization of two traction elevators (elevators #1 and #2) and one hydraulic elevator (#3) at 25 van ness aveDetails
project consists exclusively of elevator modernization of two traction elevators (elevators #1 and #2) and one hydraulic elevator (#3) at 25 van ness ave | ||
| Aug 7, 2024 | Completed final sign-off Jan 2026 | 375 Laguna Honda Bl | Rodan Builders Inc | revision to pa #2021-0923-9018 replacement of the water tank no.2 at laguna honda hospital in order to clarify and resolve current jurisdiction ovelap between hcai & sfdbi. includes minor revisions for construction coordinationDetails
revision to pa #2021-0923-9018 replacement of the water tank no.2 at laguna honda hospital in order to clarify and resolve current jurisdiction ovelap between hcai & sfdbi. includes minor revisions for construction coordination | |
| Jul 24, 2023 | Completed final sign-off Feb 2024 | 1011 Turk St | Buhler Commercial | work scope under revision (#3) of permit #2022.0106.5473 is the addition of idf room #242. to project renovation currently under construction. minor revisions that occured during construction included for reference.Details
work scope under revision (#3) of permit #2022.0106.5473 is the addition of idf room #242. to project renovation currently under construction. minor revisions that occured during construction included for reference. | $12,000 |
| Nov 1, 2022 | Completed final sign-off Jan 2024 | 125 03rd St | Hathaway Dinwiddie Co. | 6/f: renovation of a natatorium and required accessibility upgrades to the adjacent restroom. installation of a pre-fab pool in (e) vault, plumbing and electrical work as shown.Details
6/f: renovation of a natatorium and required accessibility upgrades to the adjacent restroom. installation of a pre-fab pool in (e) vault, plumbing and electrical work as shown. | $944,425 |
| Jul 28, 2022 | Never finaled filed Jul 2022, never issued | 1946 Van Ness Av | Hathaway Dinwiddie Co. | priority process - change of use from retail & light manufacturing (m,b) )into post-secondary education (b) for academy of art university. work includes: bike parking, accessibility upgrades (entry, elevator, restrooms), core & shell improvements. ref 2019-005609enf.Details
priority process - change of use from retail & light manufacturing (m,b) )into post-secondary education (b) for academy of art university. work includes: bike parking, accessibility upgrades (entry, elevator, restrooms), core & shell improvements. ref 2019-005609enf. | $950,000 |
| Mar 7, 2022 | Never finaled issued Aug 2023, no final | 1 South Van Ness Av | W E Lyons Construction Co | priority prj-modernize 3 (e) elevators: replace/refurbish (e) equipment, car control panels& lobby fixtures.upgrade elevator call system of passenger elevators to destination dispatch system & provide emergency 2-way/ visual based, text based interactive communication system in cab control panels.Details
priority prj-modernize 3 (e) elevators: replace/refurbish (e) equipment, car control panels& lobby fixtures.upgrade elevator call system of passenger elevators to destination dispatch system & provide emergency 2-way/ visual based, text based interactive communication system in cab control panels. | $1,226,500 |
| Jan 6, 2022 | Completed final sign-off Feb 2024 | 1011 Turk St | Buhler Commercial | t.i. to remodel of second fl including breakroom, dispatch, raised supervisor area, wall relocations and expansion into corridor.Details
t.i. to remodel of second fl including breakroom, dispatch, raised supervisor area, wall relocations and expansion into corridor. | $4,000,000 |
| Dec 15, 2021 | In progress issued Nov 2025 | 850 Bryant St | Angotti & Reilly Inc. | modernization/upgrade of elevator #2, # new machine and microprocessor baded controllers as well as new suspensions and door operating euipment. decommissioning of elevator #4 and #% removal of hoise, compensation ropes mechanical fastening hoistway.Details
modernization/upgrade of elevator #2, # new machine and microprocessor baded controllers as well as new suspensions and door operating euipment. decommissioning of elevator #4 and #% removal of hoise, compensation ropes mechanical fastening hoistway. | $3,000,000 |
| Nov 30, 2021 | Completed final sign-off May 2022 | 2801 Leavenworth St | Hathaway Dinwiddie Co. | this project is restrooms accessible upgrades and barrier removal.Details
this project is restrooms accessible upgrades and barrier removal. | $75,000 |
| Oct 27, 2021 | Never finaled filed Oct 2021, never issued | 2225 Jerrold Av | priority process - pursuant to case# 2008.0586 & enf#10639. change of use of a portion of 2225 jerrold from commercial storage with accessory office to private garage & lot with accessory office & community facility. full seismic retrofit w/ risk category change. conditional use requested.Details
priority process - pursuant to case# 2008.0586 & enf#10639. change of use of a portion of 2225 jerrold from commercial storage with accessory office to private garage & lot with accessory office & community facility. full seismic retrofit w/ risk category change. conditional use requested. | $1,500,000 | |
| Aug 23, 2021 | Never finaled issued Dec 2022, no final | 1 Dr Carlton B Goodlett Pl | Clw Builders Inc | city hall: to modernize (8) (e) elevators, including replacement / refurbishment of (e) equipment, car control panels & lobby fixtures. additional scope include removal of fire sprinklers & installation of (n) rooftop.Details
city hall: to modernize (8) (e) elevators, including replacement / refurbishment of (e) equipment, car control panels & lobby fixtures. additional scope include removal of fire sprinklers & installation of (n) rooftop. | $4,000,000 |
| Aug 6, 2021 | Never finaled filed Aug 2021, never issued | 1180 Evans Av | Clark Construction Group Ca Lp | erect a new 3 stories with no basement electrical switchgear/storage. type 2-aDetails
erect a new 3 stories with no basement electrical switchgear/storage. type 2-a | $16,000,000 |
| Jul 6, 2021 | Completed final sign-off Aug 2023 | 560 Powell St | Hathaway Dinwiddie Co. | replacement of existing elevator due to elevator failure. scope includes modernized elevator in existing shaft and new machine room per code requirements. this is a barrier removal project. mep and life safety deferred permitsDetails
replacement of existing elevator due to elevator failure. scope includes modernized elevator in existing shaft and new machine room per code requirements. this is a barrier removal project. mep and life safety deferred permits | $100,000 |
| Oct 31, 2020 | Never finaled filed Oct 2020, never issued | 1835 Van Ness Av | priority process - per case number 2008.0586, change the use of 1849 washington street (also known as 1849 van ness avenue) from a retail sales and service use to a post-secondary educational institution use. close enforcement cases 8608 , 10630, and 2015-012704Details
priority process - per case number 2008.0586, change the use of 1849 washington street (also known as 1849 van ness avenue) from a retail sales and service use to a post-secondary educational institution use. close enforcement cases 8608 , 10630, and 2015-012704 | $12,000 | |
| Sep 1, 2020 | Never finaled filed Sep 2020, never issued | 466 Townsend St | priority process - change the use of 466 townsend from internet service exchange (utility & infrastructure use) to post-secondary educational institution instruction related to pdr & arts activities uses. abate/close enforcement case 7622 (change of use to educational services w/o building permit).Details
priority process - change the use of 466 townsend from internet service exchange (utility & infrastructure use) to post-secondary educational institution instruction related to pdr & arts activities uses. abate/close enforcement case 7622 (change of use to educational services w/o building permit). | $10,000 | |
| Aug 28, 2020 | Never finaled filed Aug 2020, never issued | 491 Post St | priority process - change the use of 491 post from the last legal use of religioius institution to post secondary educational institutional.- abate and close enforcement case 8623 (post-secondary educational institution without a permmit. install of statues on a landmark building).Details
priority process - change the use of 491 post from the last legal use of religioius institution to post secondary educational institutional.- abate and close enforcement case 8623 (post-secondary educational institution without a permmit. install of statues on a landmark building). | $30,000 | |
| Aug 28, 2020 | Never finaled filed Aug 2020, never issued | 620 Sutter St | priority process - change the use from tourist hotel use to group housing (up to 61 bedrooms and 136 beds) with a student housing use characteristic.- retain 20,578 sf. of post-secondary educational institutional occupied fl area.- abate/close enforcement cases 8730, 2015-012594, and 2015-012702Details
priority process - change the use from tourist hotel use to group housing (up to 61 bedrooms and 136 beds) with a student housing use characteristic.- retain 20,578 sf. of post-secondary educational institutional occupied fl area.- abate/close enforcement cases 8730, 2015-012594, and 2015-012702 | $65,000 | |
| May 12, 2020 | Completed final sign-off Apr 2022 | 1011 Turk St | modernization of an existing elevator. (n) car controller, car guides, power unit, elevator door operator & hardware, car operating panel, position indicators, signal fixtures, landing system, and wiring, (n) disconnect switch, power-feeders, gfci receptacles & machine room lightingDetails
modernization of an existing elevator. (n) car controller, car guides, power unit, elevator door operator & hardware, car operating panel, position indicators, signal fixtures, landing system, and wiring, (n) disconnect switch, power-feeders, gfci receptacles & machine room lighting | $520,646 | |
| Mar 13, 2020 | Never finaled filed Mar 2020, never issued | 825 Sutter St | priority process - pursuant to case# 20080586. change of use of 825 sutter from tourist hotel to group housing(up to 1 bedrooms and 246 beds) w/ a student housing use characteristic. close enforcement case 8613 & bick parking on lev 1.Details
priority process - pursuant to case# 20080586. change of use of 825 sutter from tourist hotel to group housing(up to 1 bedrooms and 246 beds) w/ a student housing use characteristic. close enforcement case 8613 & bick parking on lev 1. | $55,000 | |
| Mar 11, 2020 | Never finaled filed Mar 2020, never issued | 930 Van Ness Av | priority process - pursuant to case #2008.0586: change use from retail automotive to private parking garage for classic car collection w/ ground flr classic car museum operation pursuant to 7/5/2019 institutinal plan. conditional use authorization for private parking garage use in the rc-4 &Details
priority process - pursuant to case #2008.0586: change use from retail automotive to private parking garage for classic car collection w/ ground flr classic car museum operation pursuant to 7/5/2019 institutinal plan. conditional use authorization for private parking garage use in the rc-4 & | $20,000 | |
| Mar 9, 2020 | Never finaled filed Mar 2020, never issued | 680 Sutter St | priority process-case# 20080586, legalize the removal of 1 dwelling unit at 680 sutter, resulting in 27 dwelling unit with a student housing use charact.retain 898 sq ft of occupied floor on the first leve.abate and/or close enforcement cases 8730; 2015-012594: and 2015-012702. ext window replacemeDetails
priority process-case# 20080586, legalize the removal of 1 dwelling unit at 680 sutter, resulting in 27 dwelling unit with a student housing use charact.retain 898 sq ft of occupied floor on the first leve.abate and/or close enforcement cases 8730; 2015-012594: and 2015-012702. ext window replaceme | $60,000 | |
| Mar 6, 2020 | Never finaled filed Mar 2020, never issued | 79 New Montgomery St | priority process - close and abate enforcement case #2015-013579. the project proposes to change the use of 77-79 new montgomery from the last legal use of general office to post-secondary educational institutional. work includes security cameras, new bike parking, exterior clean up.Details
priority process - close and abate enforcement case #2015-013579. the project proposes to change the use of 77-79 new montgomery from the last legal use of general office to post-secondary educational institutional. work includes security cameras, new bike parking, exterior clean up. | $65,000 | |
| Mar 2, 2020 | Never finaled filed Mar 2020, never issued | 601 Brannan St | priority process - pursuant to case #2008.0586, change use of 601 brannan to last legal use of general office to post-secondary educational institutinal. abate/close enforcement cases 9114 & 2015-012595. conditional use authorization requested to institute post-secondary educational services use inDetails
priority process - pursuant to case #2008.0586, change use of 601 brannan to last legal use of general office to post-secondary educational institutinal. abate/close enforcement cases 9114 & 2015-012595. conditional use authorization requested to institute post-secondary educational services use in | $75,000 | |
| Mar 2, 2020 | Never finaled filed Mar 2020, never issued | 860 Sutter St | priority process - abate/close enforcement case #10926 & 8617. pursuant to case #2008.0586 change the use of 39 tourist hotel units & 50 residential hotel units to group housing (89 bedrooms & 184 beds) w/ a student housing characteristics. retain 2,969 sf of post-secondary educDetails
priority process - abate/close enforcement case #10926 & 8617. pursuant to case #2008.0586 change the use of 39 tourist hotel units & 50 residential hotel units to group housing (89 bedrooms & 184 beds) w/ a student housing characteristics. retain 2,969 sf of post-secondary educ | $155,000 | |
| Feb 28, 2020 | Never finaled filed Feb 2020, never issued | 2151 Van Ness Av | priority process - abate/close enforcement case# 8607. pursuant to case# 20080586, change of use from a religious institution (vacant 13 year prior to aau aquired property in 2005) to a post-secondary institution use. cua requested for post secondary educational institutional use inDetails
priority process - abate/close enforcement case# 8607. pursuant to case# 20080586, change of use from a religious institution (vacant 13 year prior to aau aquired property in 2005) to a post-secondary institution use. cua requested for post secondary educational institutional use in | $5,000 | |
| Feb 28, 2020 | Never finaled filed Feb 2020, never issued | 180 New Montgomery St | priority process - abate / close enforcement case# 2015-013540. pursuant to case# 20080586, change of use from last legas use of general office to a post-secondary institution use. permit includes exterior work such as legalization of windows & panel replacement. bike parking added in bldg.Details
priority process - abate / close enforcement case# 2015-013540. pursuant to case# 20080586, change of use from last legas use of general office to a post-secondary institution use. permit includes exterior work such as legalization of windows & panel replacement. bike parking added in bldg. | $85,000 | |
| Feb 21, 2020 | Never finaled filed Feb 2020, never issued | 2211 Van Ness Av | priority process - pursuant to case# 20080586. change of use 2 unit & restaurant to 3 dwelling units & group housing (3 dwelling units & 4 group housing rooms in total of 24 beds) with student housing characteristim for all residential uses. abate/close enforcement case 8604. cua requested forDetails
priority process - pursuant to case# 20080586. change of use 2 unit & restaurant to 3 dwelling units & group housing (3 dwelling units & 4 group housing rooms in total of 24 beds) with student housing characteristim for all residential uses. abate/close enforcement case 8604. cua requested for | $66,000 | |
| Feb 19, 2020 | Never finaled filed Feb 2020, never issued | 410 Bush St | priority process - pursuant to case #20080586, change the use from the last legal use of office to post secondary educational institution. project also proposes to reflect the legally instituted use of basement parking for aau faculty & staff.Details
priority process - pursuant to case #20080586, change the use from the last legal use of office to post secondary educational institution. project also proposes to reflect the legally instituted use of basement parking for aau faculty & staff. | $40,000 | |
| Feb 14, 2020 | Never finaled filed Feb 2020, never issued | 1080 Bush St | priority process - close enforcement case 8547. pursuant to case# 20080586. retain 42 dwelling unit, reflecting student housing characteristic under current plan code that was legally instituted in dwellin gunits in 1999. convert 15 admin ch 41 designated residential hotel units to 15 groupDetails
priority process - close enforcement case 8547. pursuant to case# 20080586. retain 42 dwelling unit, reflecting student housing characteristic under current plan code that was legally instituted in dwellin gunits in 1999. convert 15 admin ch 41 designated residential hotel units to 15 group | $30,000 | |
| Feb 14, 2020 | Never finaled filed Feb 2020, never issued | 1153 Bush St | priority process - close out enforcement case 8549. pursuant to case# 20080586. project proposes to convert one dwelling unit & 14 residential hotel units to 16 group housing bedroomw with max of 42 beds. work include bicycle parking & exterior facade repairs (windows) ** maher: n/a **Details
priority process - close out enforcement case 8549. pursuant to case# 20080586. project proposes to convert one dwelling unit & 14 residential hotel units to 16 group housing bedroomw with max of 42 beds. work include bicycle parking & exterior facade repairs (windows) ** maher: n/a ** | $55,000 | |
| Feb 12, 2020 | Never finaled filed Feb 2020, never issued | 601 Polk St | priority process - permit to legalize: pursuant to case# 20080586. the project proposes to retain the (e) post-secondary educational institution use at 601-625 polk. no change of use proposed. project to abate & close planning dept complaint# 11492. work also includes security camera repairs.Details
priority process - permit to legalize: pursuant to case# 20080586. the project proposes to retain the (e) post-secondary educational institution use at 601-625 polk. no change of use proposed. project to abate & close planning dept complaint# 11492. work also includes security camera repairs. | $79,500 | |
| Feb 6, 2020 | Never finaled filed Feb 2020, never issued | 1727 Lombard St | priority process - permit is to abate & enforcement case #9112, pursant to plan case 20080586, change use of 1727 lombard from tourist hotel to 52 group housing w/ s student housing use chartic, retain parking space not being removed for common open space, aau proposes conditional use parking,Details
priority process - permit is to abate & enforcement case #9112, pursant to plan case 20080586, change use of 1727 lombard from tourist hotel to 52 group housing w/ s student housing use chartic, retain parking space not being removed for common open space, aau proposes conditional use parking, | $35,000 | |
| Feb 5, 2020 | Never finaled filed Feb 2020, never issued | 575 Harrison St | priority process - legalize pursuant to case 2008.0586 to retain 33 live work units reflecting what is now defined as student housing use characteristic under the current planning code legally instituted at 575 harrison in 1996. no change to live work is proposed. the legally instituted use ofDetails
priority process - legalize pursuant to case 2008.0586 to retain 33 live work units reflecting what is now defined as student housing use characteristic under the current planning code legally instituted at 575 harrison in 1996. no change to live work is proposed. the legally instituted use of | $10,000 | |
| Jan 28, 2020 | Never finaled filed Jan 2020, never issued | 655 Sutter St | priority process - pursuant to case #20080586, permit to legalize. establish (e) previously instituted student housing uses @ 655 sutter in the form of (1) dwelling unit & (55) group housing bedrm w/ 177 beds, all reflcting student housing use characterstic. retain 5,362 sf of postDetails
priority process - pursuant to case #20080586, permit to legalize. establish (e) previously instituted student housing uses @ 655 sutter in the form of (1) dwelling unit & (55) group housing bedrm w/ 177 beds, all reflcting student housing use characterstic. retain 5,362 sf of post | $40,000 | |
| Jan 28, 2020 | Never finaled filed Jan 2020, never issued | 560 Powell St | prority process - pursuant to case #20080586, to retain 27 dwelling units currently (e), reflecting what is now defined student housing use characteristics under the current planning code was legally instituted @ 560 powell in 1996. no change of use is proposed. increase bed count on flrs 2,3,5Details
prority process - pursuant to case #20080586, to retain 27 dwelling units currently (e), reflecting what is now defined student housing use characteristics under the current planning code was legally instituted @ 560 powell in 1996. no change of use is proposed. increase bed count on flrs 2,3,5 | ||
| Jan 28, 2020 | Never finaled filed Jan 2020, never issued | 736 Jones St | priority process - legalized pursuant to case #20080586, proj proposes to retain 35 dwelling units currently (e) @ 736 jones, reflecting that what is now defined as a student housing use characteristic under the current planning code was institued at 736 jones in 1994. no change of use proposedDetails
priority process - legalized pursuant to case #20080586, proj proposes to retain 35 dwelling units currently (e) @ 736 jones, reflecting that what is now defined as a student housing use characteristic under the current planning code was institued at 736 jones in 1994. no change of use proposed | ||
| Jan 27, 2020 | Never finaled filed Jan 2020, never issued | 740 Taylor St | priority process - permits to legalize pursuant to case number 2008.0586, the project propose to retain the existing post-secondary educational institution use at 740 taylor. no change of use is proposed.Details
priority process - permits to legalize pursuant to case number 2008.0586, the project propose to retain the existing post-secondary educational institution use at 740 taylor. no change of use is proposed. | ||
| Jan 27, 2020 | Never finaled filed Jan 2020, never issued | 1900 Jackson St | priority process - legal purst to case#2008.0586,retain 9 dwelling units reflect is now defined as study housing use charize under curr planning code legally insted in 1997.no chg of res'l use is proposed.prj prop cond'l use auth for private pk in bsmt & level 1.install new bike racks&stg in bsmt.Details
priority process - legal purst to case#2008.0586,retain 9 dwelling units reflect is now defined as study housing use charize under curr planning code legally insted in 1997.no chg of res'l use is proposed.prj prop cond'l use auth for private pk in bsmt & level 1.install new bike racks&stg in bsmt. | $35,000 | |
| Jan 21, 2020 | Expired or cancelled withdrawn Jul 2020 | 2550 Van Ness Av | work includes restriping for van accessible parking, contrasting stripe in (e) stairs, (n) tactile, "exit" & "exit route" signs, door landing resurfacing, (n) power door operator, removal of artificial turb & floor repair. replacement of (e) lavatory & remounting of (e) toilet accessories.maher n/a*Details
work includes restriping for van accessible parking, contrasting stripe in (e) stairs, (n) tactile, "exit" & "exit route" signs, door landing resurfacing, (n) power door operator, removal of artificial turb & floor repair. replacement of (e) lavatory & remounting of (e) toilet accessories.maher n/a* | $25,000 | |
| Oct 28, 2019 | Completed final sign-off Apr 2025 | 4908 California St | legalization of ground flr studio unit per ord# 43-14. sprinkler and fire alarm system as required to be pulled under separate permit.Details
legalization of ground flr studio unit per ord# 43-14. sprinkler and fire alarm system as required to be pulled under separate permit. | $20,000 |