Block 3722, lot 257

125 03rd St

34 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Aug 11, 2026In progress
filed Aug 2026, not yet issued
125 03rd Stconstruct permanent tnent on 4/f to be fire sprinkled and alarmed. new lighting and receptacles for temp event lighting. no change to (e) roof drainage.$4,217,680
Jun 23, 2026In progress
issued Jun 2026
125 03rd StPrima Acquire Inc Dba Lahue And Associat5th and 6th fl evacuation signs (4)
Oct 16, 2025Completed
final sign-off May 2026
125 03rd StRichlen Constructionrevision 202503273212 for (n) storage room$5,000
Oct 2, 2025Completed
final sign-off Oct 2025
125 03rd StPioneer Fire Inc.6th fl - fire sprinkler add 1 pendent; ref pa 202503273212$500
Mar 27, 2025Completed
final sign-off May 2026
125 03rd StRichlen Constructioninterior renovation of (e) spa @ 5th & 6th floors.$652,844
Sep 12, 2024In progress
filed Sep 2024, not yet issued
125 03rd Sttemporary portal and archway for event at st. regis san francisco on september 17-19 2024$12,000
Apr 10, 2023Completed
final sign-off Apr 2023
125 03rd StR L H Fire Protection Increlocate 8, add 1 and delete 3 pendent sprinklers on the 6th fl. t.i. pa# 2022-1101-5632$2,500
Mar 8, 2023Never finaled
issued Mar 2023, no final
125 03rd StSabah International Incorporatedpool area: demo existing notification devices, provide and install new devices as shown on plans.$13,640
Nov 1, 2022Completed
final sign-off Jan 2024
125 03rd StHathaway Dinwiddie Co.6/f: renovation of a natatorium and required accessibility upgrades to the adjacent restroom. installation of a pre-fab pool in (e) vault, plumbing and electrical work as shown.$944,425
Jan 13, 2022Completed
final sign-off Feb 2022
125 03rd StSabah International Incorporatedrevision to pa# 202112154470: revised drawings showing devices not being deleted from the program.
Dec 15, 2021Completed
final sign-off Feb 2022
125 03rd StSabah International Incorporated1st fl ti # 202106031577 & 202110180649. modify existing fire alarm system. demo (4) dectectors w/ carbon monoxide sensor. add (1) ceiling speaker/strobe.$23,510
Nov 8, 2021Completed
final sign-off Mar 2022
125 03rd StHathaway Dinwiddie Co.new evacuation signage at lobby lvel of e hotel. interior renovation approved under 202106031577$2,200
Oct 18, 2021Completed
final sign-off Mar 2022
125 03rd StHathaway Dinwiddie Construct Coadministrative permit to update/change/correct property address. job card states "ave" instead of "street" ref pa# 202106031577.
Sep 30, 2021Completed
final sign-off Oct 2021
125 03rd StR L H Fire Protection Increlocate four 4 pendents through area of tenant improvement. no other work to system. area of work limited to lobby bar. ti 202106031577$5,000
Jun 29, 2021Never finaled
issued Aug 2021, no final
689 Mission Stapplying for level 9 roof terrace assembly permit. all spaces over 49 occupants require a place of assembly permit. per a recent correction notice from sffd, a place of assembly permit has never been filed even though the space is not new. provided plans include ref.200008309233 to show occupantload
Dec 24, 2020Completed
final sign-off Mar 2022
125 03rd StHathaway Dinwiddie Co.barrier removel: accessible passenger drop-off/loading zone & access aisle, accessible entries, modification to accessible parking signage & elevator door jamp signs. widen women's accessible restroom stall. removal of urinal in men's restroom to probide adequate door clearance.$150,000
Dec 10, 2019Never finaled
issued Dec 2019, no final
125 03rd Ststreetspace
Oct 29, 2019Completed
final sign-off Feb 2020
125 03rd StContinental Contractors Incunit 1102. barrier removal at guestroom including new finishes, plumbing fixtures, and flooring$20,776
Jun 13, 2019Completed
final sign-off Feb 2024
125 03rd StWaterworks Industries Incorporateddemo and removal of pool lining, tile at lower wall coursing and ledge tile finish$18,235
Feb 19, 2019Never finaled
issued Feb 2019, no final
125 03rd Ststreet space
Jun 18, 2018Never finaled
issued Jun 2018, no final
125 03rd Sttemporary tent structure/ tent size 60w x 60d. 22'-9.5 h// this has been approved in the past, the historical building next door has prompted this approval with dbi prior to getting the temp membrane and occupancy(seperate permit) with 698 2nd street at sffd hq.$10,000
Jan 12, 2017Completed
final sign-off May 2017
125 03rd StMarchetti Groupto obtain final inspection for work approved under pa#2014-10-09-8487. all work is complete.
Jan 14, 2016Expired or cancelled
cancelled Jan 2026
125 03rd StSabah International Incorporatedupgrade existing fire alarm system for the st regis museum tower. install 86 manual pull stations on floor 2-38, install 6 door holders on 3rd and 4th fls$25,040
Dec 17, 2015Expired or cancelled
cancelled Mar 2019
125 03rd St(n) entrance door & awning @ 3rd street. (n) wall scences on (e) facade.$35,000
Dec 17, 2015Expired or cancelled
cancelled Jan 2026
125 03rd Sttenant improvement to existing restaurant on gr fl. set includes architectural and mep.$350,000
Oct 16, 2015Expired or cancelled
withdrawn Jun 2018
125 03rd Sttemporary tent structure dates of use 4/16-5/24 2016. tent size 60wx 60 dx 22'9.5 h$10,000
Jul 21, 2015Completed
final sign-off Feb 2017
125 03rd StSabah International Incorporatedupgrade existing fire alarm system on 1/f, 2/f & 4/f. remove/replace (6) smoke detectors with (6) combination smoke/carbon monoxide detectors. remove/replace (4) heat detectors with (4) combination heat/carbon monoxide detectors.they are being installed because of fire places,and kitchen gas cooking$12,467
Jun 29, 2015Expired or cancelled
cancelled Jan 2026
125 03rd Stinstallation of head end radio equipment within extg bldg to connect to extg idas system. no new antenna will be installed under this permit.$30,000
Dec 15, 2014Completed
final sign-off Jan 2015
685 Mission StPrincipal Builders Inc.3rd flr: reduction of original scope of work to remove 3rd flr from project and delete pages & details on 201406279886, 3/a00.60; page a02.03, 3/a06.00; 1,2,3,4,5,6 &9/12.02; 3/g02.01; and 7/ref-1 on 201407221894; 3/a00.60d & 3/a06.00.
Oct 9, 2014Completed
final sign-off May 2017
125 03rd StMarchetti Groupmiscellaneous accessibility improvement in public spaces and accessible guestrooms - voluntary removal of barriers to meet 2013 cbc accessible standards$75,000
Jul 22, 2014Completed
final sign-off Nov 2014
685 Mission StPrincipal Builders Inc.floors 1-3: demolish of nonload bearing partition doors, cieling, millwork and finishes. no occupancy per abo-17 and all ada issued to be addressed under seperate t.i. permit.$20,000
Apr 1, 2014Completed
final sign-off Nov 2014
125 03rd StMarchetti Construction Inc.21/f- add 2 gates for security in stairwells. (interior only)$20,000
May 14, 2009Completed
final sign-off Dec 2009
125 03rd StDiversified Fire Productsto complete work and obtain final inspection for work approved under pa 200804180040
Apr 18, 2008Expired or cancelled
expired Dec 2009
125 03rd StDiversified Fire Productsfire alarm t.i. for penthouse, floors 39 & 40. 28 addr relays, 14 monitor modules, 2 smoke detectors, 2 duct detectors, 54 sprinklers, 9 wp spkrs, 1 spkr/strobe, 21 door holders, 3 fsds, 8 vesda units.$252,000