Vincent Waters
- Listed as
- authorized agent-others, engineer
- Firm
- Sceg
- Based in
- Calabasas
- On San Francisco permits
- Mar 2018 to Jun 2023
14 permits since 2000 (engineer on 13 permits, authorized agent-others on 1 permit): 8 completed, 5 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 6, 2023 | Completed final sign-off Apr 2024 | 333 Battery St | Centric Construction Inc | basement: conversion of (e) back of house space to new offices/changing rooms, new partitions, finishes & lightingDetails
basement: conversion of (e) back of house space to new offices/changing rooms, new partitions, finishes & lighting | $20,000 |
| Dec 16, 2022 | Never finaled issued Apr 2023, no final | 333 Battery St | Continental Contractors Inc | 5-14/flrs: renovation of guestrooms including n finishes, plumbing fixtures and lightingDetails
5-14/flrs: renovation of guestrooms including n finishes, plumbing fixtures and lighting | $900,000 |
| Dec 16, 2022 | Never finaled issued Apr 2023, no final | 333 Battery St | Continental Contractors Inc | 15-24/flrs: renovations of guestrooms including new finishes, plumbing fixtures and lighting.Details
15-24/flrs: renovations of guestrooms including new finishes, plumbing fixtures and lighting. | $900,000 |
| Dec 13, 2022 | Completed final sign-off Dec 2023 | 333 Battery St | Centric Construction Inc | the project scope include: level 3. renovation of (e) public restrooms, renovation of (e) restaurant and bar, (n) reception louge and coffee bar. renovation of (e) outdoor patio with (n) outdoor bar, concrete planter, trellis.Details
the project scope include: level 3. renovation of (e) public restrooms, renovation of (e) restaurant and bar, (n) reception louge and coffee bar. renovation of (e) outdoor patio with (n) outdoor bar, concrete planter, trellis. | $1,775,000 |
| Aug 17, 2022 | Completed final sign-off Dec 2023 | 333 Battery St | Centric Construction Inc | level 1: new paving, drains, finishes, exterior screen, entry door at porte-cochere; new lighting, mech, finishes, ff&e @new pre-arrival lobby; new handrail extensions (level 1 only) & floor finishes @ grand stair (levels 1-3).Details
level 1: new paving, drains, finishes, exterior screen, entry door at porte-cochere; new lighting, mech, finishes, ff&e @new pre-arrival lobby; new handrail extensions (level 1 only) & floor finishes @ grand stair (levels 1-3). | $600,000 |
| May 27, 2022 | Never finaled filed May 2022, never issued | 5 Embarcadero Center | addition of 30 guestrooms to the existing hotel by establishing 2 new guestrooms per floor on floor 2-17 via the conversion of 2 areas on either side of the elevator. total guestroom count after construction will be 851. scope includes (n) entry door, walls, lighting and finishes. replace (e)windowsDetails
addition of 30 guestrooms to the existing hotel by establishing 2 new guestrooms per floor on floor 2-17 via the conversion of 2 areas on either side of the elevator. total guestroom count after construction will be 851. scope includes (n) entry door, walls, lighting and finishes. replace (e)windows | $1,100,000 | |
| Dec 2, 2021 | Completed final sign-off Jun 2022 | 333 Battery St | Continental Contractors Inc | 5/f: renovation of two guestrooms and partial corridor, including new finishes, plumbing fixtures, light fixtures, and flooring. new tactile exist signs at hotel entry.Details
5/f: renovation of two guestrooms and partial corridor, including new finishes, plumbing fixtures, light fixtures, and flooring. new tactile exist signs at hotel entry. | $10,000 |
| Sep 15, 2021 | Completed final sign-off Oct 2022 | 5 Embarcadero Center | Hathaway Dinwiddie Co. | floors 2-11: renovate (e) guestrooms to provide clear floor space at plmbing fixtures scope.inlcludes outlet relocation and new ff&e,finishes, lhgting and plumbing fixtures.renoation of corridors on flrs 2-11,including new finishes and pf%e. (e) hvac system to remain.Details
floors 2-11: renovate (e) guestrooms to provide clear floor space at plmbing fixtures scope.inlcludes outlet relocation and new ff&e,finishes, lhgting and plumbing fixtures.renoation of corridors on flrs 2-11,including new finishes and pf%e. (e) hvac system to remain. | $5,000,000 |
| Jul 23, 2021 | Completed final sign-off Oct 2022 | 5 Embarcadero Center | Hathaway Dinwiddie Co. | renovation of e guestrooms ( flrs 12,14,15) to provide clear floor space at plumbing fixtures. scope also includes outlet relocation and new ffe, finishes, lighting, plumbing fixtures. renovation of corridors on floors 12-17, including new finishes ffe and lighting. (e) hvac systems to remain.Details
renovation of e guestrooms ( flrs 12,14,15) to provide clear floor space at plumbing fixtures. scope also includes outlet relocation and new ffe, finishes, lighting, plumbing fixtures. renovation of corridors on floors 12-17, including new finishes ffe and lighting. (e) hvac systems to remain. | $26,554 |
| Dec 24, 2020 | Completed final sign-off Mar 2022 | 125 03rd St | Hathaway Dinwiddie Co. | barrier removel: accessible passenger drop-off/loading zone & access aisle, accessible entries, modification to accessible parking signage & elevator door jamp signs. widen women's accessible restroom stall. removal of urinal in men's restroom to probide adequate door clearance.Details
barrier removel: accessible passenger drop-off/loading zone & access aisle, accessible entries, modification to accessible parking signage & elevator door jamp signs. widen women's accessible restroom stall. removal of urinal in men's restroom to probide adequate door clearance. | $150,000 |
| Aug 5, 2020 | Never finaled issued Oct 2020, no final | 5 The Embarcadero | Hathaway Dinwiddie Co. | 5th fl: renovation of 2 existing guestrooms and partial corridor/door drop, including new finishes, plumbing fixtures, lighting fixtures and flooring. maher naDetails
5th fl: renovation of 2 existing guestrooms and partial corridor/door drop, including new finishes, plumbing fixtures, lighting fixtures and flooring. maher na | $153,482 |
| May 17, 2018 | Expired or cancelled withdrawn Feb 2019 | 2620 Jones St | lobby: demo staff offices/restrms, kitch, market, dining area, confer rm. construt staff offi/restrms, kitch & sales office/gallery. renov/upgrade public restrms. garage a&b: demo storage, boh, mech rm, restrm. const boh office, storage, break rm, laundry, restrm, add 2 exit to e stairwells. replaceDetails
lobby: demo staff offices/restrms, kitch, market, dining area, confer rm. construt staff offi/restrms, kitch & sales office/gallery. renov/upgrade public restrms. garage a&b: demo storage, boh, mech rm, restrm. const boh office, storage, break rm, laundry, restrm, add 2 exit to e stairwells. replace | $800,000 | |
| May 17, 2018 | Never finaled issued Dec 2018, no final | 2620 Jones St | Smc Constracting Inc | corridors: remove & replace e wall sconces & recessed light fixtures in (e) soffits. guestrms: demo e entry door & hardware. install secondary acoustical window at bay st side rms. convert 1 typical guestroom to acces. suite. elec/linen closets: patch & repair e opening in 1hr & 2hr fire rated wallsDetails
corridors: remove & replace e wall sconces & recessed light fixtures in (e) soffits. guestrms: demo e entry door & hardware. install secondary acoustical window at bay st side rms. convert 1 typical guestroom to acces. suite. elec/linen closets: patch & repair e opening in 1hr & 2hr fire rated walls | $650,000 |
| Mar 15, 2018 | Completed final sign-off Sep 2019 | 180 Sansome St | Crane Construction Company Inc. | grnd flr & mezzanine - new fitness club. new fixtures, finishes, equipment, bathrooms, kitchenette, mep. no exterior work. fire protections under sep permit maher naDetails
grnd flr & mezzanine - new fitness club. new fixtures, finishes, equipment, bathrooms, kitchenette, mep. no exterior work. fire protections under sep permit maher na | $900,000 |