Block 0267, lot 016
180 Sansome St
- City’s use
- Commercial Office
- Built
- 1965
- Stories
- 17
- Units
- 2
- Rooms
- 20 bathrooms
- Building
- 151,326 sq ft
- Lot
- 10,001 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
143 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 18, 2024 | Completed final sign-off Aug 2025 | 180 Sansome St | Pyro-Comm Systems, Inc. | install 28 duct detectors will be added for the 28 fsd.Details
install 28 duct detectors will be added for the 28 fsd. | $10,000 |
| Oct 17, 2023 | Completed final sign-off Aug 2025 | 180 Sansome St | Bay City Mechanical Inc | replacing fusible link smoke dampers with new automated fire smoke dampers.Details
replacing fusible link smoke dampers with new automated fire smoke dampers. | $369,000 |
| Mar 10, 2020 | Completed final sign-off Apr 2020 | 180 Sansome St | Golden Gate Fire Protection Inc | fire sprinkler only for 1st - lobby upgrade (ceiling lower) relocate 3 pendents in new ceiling. ref pa #201903276364.Details
fire sprinkler only for 1st - lobby upgrade (ceiling lower) relocate 3 pendents in new ceiling. ref pa #201903276364. | $1,500 |
| Feb 19, 2020 | Completed final sign-off Jul 2020 | 180 Sansome St | Mcclure Electric Inc | 1st fl lobby: title 24 lighting only. ref pa #201903276364.Details
1st fl lobby: title 24 lighting only. ref pa #201903276364. | |
| Feb 7, 2020 | Never finaled issued Feb 2020, no final | 180 Sansome St | Pacific Auxiliary Fire Alarm | to obtain a final inspection for work approved under pa#201409045386.all work is complete. floors 3, 7 & 8. maher n/a.Details
to obtain a final inspection for work approved under pa#201409045386.all work is complete. floors 3, 7 & 8. maher n/a. | |
| Oct 11, 2019 | Never finaled issued Oct 2019, no final | 180 Sansome St | Red Hawk Fire & Security Ca Llc | fire alarm t.i. on 1st floor lobby to replace 3 extg speaker strobe with new at extg location. n/a for maherDetails
fire alarm t.i. on 1st floor lobby to replace 3 extg speaker strobe with new at extg location. n/a for maher | $1,700 |
| Oct 10, 2019 | Never finaled issued Oct 2019, no final | 180 Sansome St | Maguire Inc Dba Lahue And Associates | install (wework) non -electrical wall signDetails
install (wework) non -electrical wall sign | $5,000 |
| Sep 30, 2019 | Completed final sign-off Oct 2019 | 180 Sansome St | Pyro-Comm Systems, Inc. | 16th fl - as built drwgs with correct device address. ref pa 2019-0725-6902Details
16th fl - as built drwgs with correct device address. ref pa 2019-0725-6902 | |
| Sep 30, 2019 | Completed final sign-off Oct 2019 | 180 Sansome St | Pyro-Comm Systems, Inc. | 17th fl - as built drwgs with correct device address. ref pa 2019-0717-6107Details
17th fl - as built drwgs with correct device address. ref pa 2019-0717-6107 | |
| Sep 30, 2019 | Completed final sign-off Oct 2019 | 180 Sansome St | Pyro-Comm Systems, Inc. | 15th fl - as built drwgs with correct device locations. ref pa 2019-0725-6900Details
15th fl - as built drwgs with correct device locations. ref pa 2019-0725-6900 | |
| Sep 30, 2019 | Never finaled issued Sep 2019, no final | 180 Sansome St | Pioneer Fire Inc. | fire sprinklers on 2nd fl: relocate 5 pendents, 8 uprights, add 9 uprights. ref ti pa #201903054435.Details
fire sprinklers on 2nd fl: relocate 5 pendents, 8 uprights, add 9 uprights. ref ti pa #201903054435. | $9,500 |
| Sep 30, 2019 | Completed final sign-off Oct 2019 | 180 Sansome St | Pyro-Comm Systems, Inc. | 18th fl - as built drwgs with correct device address. ref pa 2019-0717-6111Details
18th fl - as built drwgs with correct device address. ref pa 2019-0717-6111 | |
| Aug 30, 2019 | Never finaled issued Aug 2019, no final | 180 Sansome St | street spaceDetails
street space | ||
| Aug 15, 2019 | Expired or cancelled cancelled Mar 2021 | 180 Sansome St | Pyro-Comm Systems, Inc. | fire alram 2nd fl: 1 smoke detector, 10 speaker ceiling strobes to be added to (e) facu. ref pa# 201902132888.Details
fire alram 2nd fl: 1 smoke detector, 10 speaker ceiling strobes to be added to (e) facu. ref pa# 201902132888. | $7,500 |
| Aug 7, 2019 | Never finaled issued Oct 2019, no final | 180 Sansome St | Wework Construction Llc Dba Wework Const | roof equipment support @ roof. no change to other floors in building or existing egress path to street. mep, fire alarm, sprinkler, shall be under separate permit.Details
roof equipment support @ roof. no change to other floors in building or existing egress path to street. mep, fire alarm, sprinkler, shall be under separate permit. | $20,000 |
| Aug 1, 2019 | Expired or cancelled cancelled Mar 2021 | 180 Sansome St | Pyro-Comm Systems, Inc. | 4th flr - 2 smk det 6 ceiling strobes, 10 speaker strobes, 2 magnetic door holders to be added to (e) facu ref 201902132888Details
4th flr - 2 smk det 6 ceiling strobes, 10 speaker strobes, 2 magnetic door holders to be added to (e) facu ref 201902132888 | $10,000 |
| Aug 1, 2019 | Expired or cancelled cancelled May 2022 | 180 Sansome St | Pyro-Comm Systems, Inc. | 3rd flr - 2 smk det 7 ceiling strobes, 9 speaker strobes to be added to (e) facu ref 201902132888Details
3rd flr - 2 smk det 7 ceiling strobes, 9 speaker strobes to be added to (e) facu ref 201902132888 | $9,000 |
| Jul 26, 2019 | Expired or cancelled cancelled Mar 2021 | 180 Sansome St | Pyro-Comm Systems, Inc. | f/a on 9th fl: 11 speaker strobes, 4 magnetic door holders, 2 smoke detectors, 5 ceiling strobes to be added to existing facu. ref pa #201902132888Details
f/a on 9th fl: 11 speaker strobes, 4 magnetic door holders, 2 smoke detectors, 5 ceiling strobes to be added to existing facu. ref pa #201902132888 | $10,500 |
| Jul 26, 2019 | Expired or cancelled cancelled Mar 2021 | 180 Sansome St | Pyro-Comm Systems, Inc. | f/a on 7th fl: 1 smoke detector, 6 ceiling strobes, 9 speaker strobes to be added to existing facu. ref pa #201902132888Details
f/a on 7th fl: 1 smoke detector, 6 ceiling strobes, 9 speaker strobes to be added to existing facu. ref pa #201902132888 | $8,000 |
| Jul 26, 2019 | Expired or cancelled cancelled Mar 2021 | 180 Sansome St | Pyro-Comm Systems, Inc. | f/a on 6th fl: 10 speaker strobes, 2 magnetic door holders, 6 ceiling strobes, 2 smoke detectors to be added to existing facu. ref pa #201902132888Details
f/a on 6th fl: 10 speaker strobes, 2 magnetic door holders, 6 ceiling strobes, 2 smoke detectors to be added to existing facu. ref pa #201902132888 | $10,000 |
| Jul 25, 2019 | Completed final sign-off Oct 2019 | 180 Sansome St | Pyro-Comm Systems, Inc. | 16th flr. 2 smoke detectors, 7 ceiling strobes, 10 speaker strobes, 1 magnetic door holder to be added to (e) facu. ref pa# 201902132888;Details
16th flr. 2 smoke detectors, 7 ceiling strobes, 10 speaker strobes, 1 magnetic door holder to be added to (e) facu. ref pa# 201902132888; | $9,000 |
| Jul 25, 2019 | Completed final sign-off Oct 2019 | 180 Sansome St | Pyro-Comm Systems, Inc. | ref pa# 201902132888; 10 speaker strobes, 2 smoke detectors, 6 ceiling strobes, 3 magnetic door holders to be added to (e) facuDetails
ref pa# 201902132888; 10 speaker strobes, 2 smoke detectors, 6 ceiling strobes, 3 magnetic door holders to be added to (e) facu | $9,500 |
| Jul 25, 2019 | Expired or cancelled cancelled Mar 2021 | 180 Sansome St | Pyro-Comm Systems, Inc. | 11th flr, fire alarm. 2 smoke detectors, 5 ceiling strobes, 10 speaker strobes to be added to (e) facu. ref pa 201902132888Details
11th flr, fire alarm. 2 smoke detectors, 5 ceiling strobes, 10 speaker strobes to be added to (e) facu. ref pa 201902132888 | $8,500 |
| Jul 25, 2019 | Expired or cancelled cancelled May 2022 | 180 Sansome St | Pyro-Comm Systems, Inc. | 14th flr, fire alarm. 1 smoke detectors, 7 ceiling strobes, 9 speaker strobes, 4 magnetic holders to be added to (e) facu. ref pa 201902132888Details
14th flr, fire alarm. 1 smoke detectors, 7 ceiling strobes, 9 speaker strobes, 4 magnetic holders to be added to (e) facu. ref pa 201902132888 | $10,000 |
| Jul 25, 2019 | Expired or cancelled cancelled Mar 2021 | 180 Sansome St | Pyro-Comm Systems, Inc. | 12th flr, fire alarm. 2 smoke detectors, 7 ceiling strobes, 10 speaker strobes, 2 magnetic holders to be added to (e) facu. ref pa 201902132888Details
12th flr, fire alarm. 2 smoke detectors, 7 ceiling strobes, 10 speaker strobes, 2 magnetic holders to be added to (e) facu. ref pa 201902132888 | $10,000 |
| Jul 17, 2019 | Completed final sign-off Oct 2019 | 180 Sansome St | Pyro-Comm Systems, Inc. | f/a on 17th fl: 2 smoke detectors, 7 ceiling strobes, 8 speaker strobes, 2 magnetic door holders to be added to facu. ref pa #201903205753Details
f/a on 17th fl: 2 smoke detectors, 7 ceiling strobes, 8 speaker strobes, 2 magnetic door holders to be added to facu. ref pa #201903205753 | $8,500 |
| Jul 17, 2019 | Completed final sign-off Oct 2019 | 180 Sansome St | Pyro-Comm Systems, Inc. | f/a on 18th fl: 1 smoke detectors, 7 ceiling strobes, 10 speaker strobes, 2 magnetic door holders to be added to (e) facu. ref pa #201903205753Details
f/a on 18th fl: 1 smoke detectors, 7 ceiling strobes, 10 speaker strobes, 2 magnetic door holders to be added to (e) facu. ref pa #201903205753 | $6,000 |
| Jul 2, 2019 | Never finaled issued Jul 2019, no final | 180 Sansome St | Pioneer Fire Inc. | f/s: relocate 57 concealers, 3 added concealers, 26 relocated uprights, 45 added uprights, & 7 removed pendents. ref pa #201903054399 (fl 17,18) 201903054417 (fl 15,16), 201903054423 (fl 12,14), 201903054407 (fl 9,10), 201903054410 (fl 6,7) 201903054428 (fl 3,4) 201903054435 (fl 2)Details
f/s: relocate 57 concealers, 3 added concealers, 26 relocated uprights, 45 added uprights, & 7 removed pendents. ref pa #201903054399 (fl 17,18) 201903054417 (fl 15,16), 201903054423 (fl 12,14), 201903054407 (fl 9,10), 201903054410 (fl 6,7) 201903054428 (fl 3,4) 201903054435 (fl 2) | $46,000 |
| Jul 2, 2019 | Never finaled issued Jul 2019, no final | 180 Sansome St | Pyro-Comm Systems, Inc. | ref pa# 201903205753; sequence of operation did not show 1 above, 2 below for evacDetails
ref pa# 201903205753; sequence of operation did not show 1 above, 2 below for evac | |
| Jun 24, 2019 | Never finaled issued Jun 2019, no final | 180 Sansome St | street spaceDetails
street space | ||
| May 13, 2019 | Never finaled issued May 2019, no final | 180 Sansome St | Wework Construction Llc Dba Wework Const | mep for 17th and 18th fl ti under 201903054399Details
mep for 17th and 18th fl ti under 201903054399 | $400,000 |
| Apr 23, 2019 | Completed final sign-off Sep 2019 | 180 Sansome St | Pioneer Fire Inc. | return to shell condition on floors: 2,3,4,6,7,9,11,12,14,15,16,17,18Details
return to shell condition on floors: 2,3,4,6,7,9,11,12,14,15,16,17,18 | $50,000 |
| Apr 11, 2019 | Never finaled issued Apr 2019, no final | 180 Sansome St | street space /mtaDetails
street space /mta | ||
| Mar 27, 2019 | Completed final sign-off Jul 2020 | 180 Sansome St | Peacock Construction | demo of finishes & millwork of (e) 1st flr lobby. new construction consists of providing new finishes, new millwork and new electDetails
demo of finishes & millwork of (e) 1st flr lobby. new construction consists of providing new finishes, new millwork and new elect | $200,000 |
| Mar 20, 2019 | Never finaled issued Jun 2019, no final | 180 Sansome St | Pyro-Comm Systems, Inc. | fire alarm panel replacement (1) facu & 21 nac panels. voluntary panel replacementDetails
fire alarm panel replacement (1) facu & 21 nac panels. voluntary panel replacement | $25,000 |
| Mar 14, 2019 | Completed final sign-off Sep 2019 | 180 Sansome St | Crane Construction Company Inc. | revision to pa 201803153746 & 201901099971. reflect second means of egress from 1st flr locker / reception area. determine occupant code.Details
revision to pa 201803153746 & 201901099971. reflect second means of egress from 1st flr locker / reception area. determine occupant code. | |
| Mar 5, 2019 | Never finaled issued Oct 2019, no final | 180 Sansome St | Wework Construction Llc Dba Wework Const | interior remodel of 2nd fl only. non-structural remodel to include partitions, flooring, ceilings, furnishing, finishes, etc. no change to other floors in bldg or (e) egress path to street. all fire alarm/sprinklers & structural under sep pemrit.Details
interior remodel of 2nd fl only. non-structural remodel to include partitions, flooring, ceilings, furnishing, finishes, etc. no change to other floors in bldg or (e) egress path to street. all fire alarm/sprinklers & structural under sep pemrit. | $150,000 |
| Mar 5, 2019 | Never finaled issued May 2019, no final | 180 Sansome St | Wework Construction Llc Dba Wework Const | interior remodel of 12th & 14th fl only. non-structural remodel to include partitions, flooring, ceilings, furnishing, finishes, etc. no change to other floors in bldg or (e) egress path to street. all fire alarm/sprinklers & structural under sep pemrit. maher n/a.Details
interior remodel of 12th & 14th fl only. non-structural remodel to include partitions, flooring, ceilings, furnishing, finishes, etc. no change to other floors in bldg or (e) egress path to street. all fire alarm/sprinklers & structural under sep pemrit. maher n/a. | $300,000 |
| Mar 5, 2019 | Never finaled issued Jun 2019, no final | 180 Sansome St | Wework Construction Llc Dba Wework Const | interior remodel of 6th & 7th fl only. non-structural remodel to include partitions, flooring, ceilings, furnishing, finishes, etc. no change to other floors in bldg or (e) egress path to street. all fire alarm/sprinklers & structural under sep permit.Details
interior remodel of 6th & 7th fl only. non-structural remodel to include partitions, flooring, ceilings, furnishing, finishes, etc. no change to other floors in bldg or (e) egress path to street. all fire alarm/sprinklers & structural under sep permit. | $295,000 |
| Mar 5, 2019 | Never finaled issued Jun 2019, no final | 180 Sansome St | Wework Construction Llc Dba Wework Const | interior remodel of 3rd & 4th fl only. non-structural remodel to include partitions, flooring, ceilings, furnishing, finishes, etc. no change to other floors in bldg or (e) egress path to street. all fire alarm/sprinklers & structural under sep pemrit.Details
interior remodel of 3rd & 4th fl only. non-structural remodel to include partitions, flooring, ceilings, furnishing, finishes, etc. no change to other floors in bldg or (e) egress path to street. all fire alarm/sprinklers & structural under sep pemrit. | $300,000 |
| Mar 5, 2019 | Never finaled issued May 2019, no final | 180 Sansome St | Wework Construction Llc Dba Wework Const | interior remodel of 15th & 16th fl only. non-structural remodel to include partitions, flooring, ceilings, furnishing, finishes, etc. no change to other floors in bldg or (e) egress path to street. all fire alarm/sprinklers & structural under sep pemrit.Details
interior remodel of 15th & 16th fl only. non-structural remodel to include partitions, flooring, ceilings, furnishing, finishes, etc. no change to other floors in bldg or (e) egress path to street. all fire alarm/sprinklers & structural under sep pemrit. | $300,000 |
| Mar 5, 2019 | Never finaled issued Jun 2019, no final | 180 Sansome St | Wework Construction Llc Dba Wework Const | interior remodel of 9th and 11th floor only. non stuctural remodel to include partitions,floorings, ceilings, furnishings finishes etc. no change to other floors in building or existing egress path to street. all fire alarm, fire sprinkler and structural work under seperate permit.Details
interior remodel of 9th and 11th floor only. non stuctural remodel to include partitions,floorings, ceilings, furnishings finishes etc. no change to other floors in building or existing egress path to street. all fire alarm, fire sprinkler and structural work under seperate permit. | $300,000 |
| Mar 5, 2019 | Never finaled issued May 2019, no final | 180 Sansome St | Wework Construction Llc Dba Wework Const | interior remodel of 17th & 18th fl only. non-structural remodel to include partitions, flooring, ceilings, furnishing, finishes, etc. no change to other floors in bldg or (e) egress path to street. all fire alarm/sprinklers & structural under sep pemrit.Details
interior remodel of 17th & 18th fl only. non-structural remodel to include partitions, flooring, ceilings, furnishing, finishes, etc. no change to other floors in bldg or (e) egress path to street. all fire alarm/sprinklers & structural under sep pemrit. | $300,000 |
| Feb 13, 2019 | Never finaled issued Mar 2019, no final | 180 Sansome St | Wework Construction Llc Dba Wework Const | interior non structural demo of 2nd, 3rd, 4th, 6th, 7th, 9th, 11, 12,14, 15, 16, 17, 18th flrs in cluding partitoins, flooring, ceiling, furnishing, finishes, etc. no change to other floors in building or existing egress path to street. all mep, fire alarm, fire sprinkler, structural work shall beDetails
interior non structural demo of 2nd, 3rd, 4th, 6th, 7th, 9th, 11, 12,14, 15, 16, 17, 18th flrs in cluding partitoins, flooring, ceiling, furnishing, finishes, etc. no change to other floors in building or existing egress path to street. all mep, fire alarm, fire sprinkler, structural work shall be | $225,000 |
| Jan 10, 2019 | Completed final sign-off Jan 2019 | 180 Sansome St | Red Hawk Fire & Security Ca Llc | ref pa# 201809271645; fire alarm as-built drawingDetails
ref pa# 201809271645; fire alarm as-built drawing | |
| Jan 9, 2019 | Completed final sign-off Jul 2019 | 180 Sansome St | Crane Construction Company Inc. | revision to 201803153746 for correction to show occupancy loading confirming change from b to a-3 occupancy only. no work under this permit.Details
revision to 201803153746 for correction to show occupancy loading confirming change from b to a-3 occupancy only. no work under this permit. | |
| Dec 18, 2018 | Completed final sign-off Sep 2019 | 180 Sansome St | Crane Construction Company Inc. | application to show occupancy and egress. fire only. n/a for maherDetails
application to show occupancy and egress. fire only. n/a for maher | |
| Nov 6, 2018 | Never finaled issued Nov 2018, no final | 180 Sansome St | street spaceDetails
street space | ||
| Oct 24, 2018 | Completed final sign-off Jul 2019 | 180 Sansome St | Signs Par Excellence Inc | sign #2: install one illuminated wall sign "rumble"Details
sign #2: install one illuminated wall sign "rumble" | $600 |
| Oct 24, 2018 | Completed final sign-off May 2019 | 180 Sansome St | Signs Par Excellence Inc | sign #1: install one illuminated wall sign "rumble"Details
sign #1: install one illuminated wall sign "rumble" | $600 |
| Sep 27, 2018 | Completed final sign-off Jan 2019 | 180 Sansome St | Red Hawk Fire & Security Ca Llc | fire alarm ti add 6 smoke detectors, 1 power supply, 1 control relay for power supply. 1 relay for av shutdown, 6 duct detectors for fan coil units, 4 duct detectors for fsd, 21 speake strobes, 1 speaker ref 201803153746 maher not reqDetails
fire alarm ti add 6 smoke detectors, 1 power supply, 1 control relay for power supply. 1 relay for av shutdown, 6 duct detectors for fan coil units, 4 duct detectors for fsd, 21 speake strobes, 1 speaker ref 201803153746 maher not req | $15,000 |
| Aug 29, 2018 | Completed final sign-off Dec 2018 | 180 Sansome St | Westates Mechanical Corporation Inc | 1st fl: add, relocate and change out 104 sprinklers on the area of work of a tenant improvement. n/a for maherDetails
1st fl: add, relocate and change out 104 sprinklers on the area of work of a tenant improvement. n/a for maher | $35,000 |
| Aug 24, 2018 | Completed final sign-off Sep 2019 | 180 Sansome St | Crane Construction Company Inc. | revision to app#201803153746 to include front door replacement, expanded equipment platform, storefront transoms clarified, mezzanine tenant demise wall added to scope.Details
revision to app#201803153746 to include front door replacement, expanded equipment platform, storefront transoms clarified, mezzanine tenant demise wall added to scope. | |
| Jul 12, 2018 | Never finaled issued Jul 2018, no final | 180 Sansome St | street spaceDetails
street space | ||
| Apr 4, 2018 | Never finaled issued Apr 2018, no final | 180 Sansome St | Team Commercial Construction Inc. | demo existing partitions at front of ground floor, remove kitchen and bathroom finishes. no exterior work. comply with ab-017.Details
demo existing partitions at front of ground floor, remove kitchen and bathroom finishes. no exterior work. comply with ab-017. | $11,720 |
| Mar 15, 2018 | Completed final sign-off Sep 2019 | 180 Sansome St | Crane Construction Company Inc. | grnd flr & mezzanine - new fitness club. new fixtures, finishes, equipment, bathrooms, kitchenette, mep. no exterior work. fire protections under sep permit maher naDetails
grnd flr & mezzanine - new fitness club. new fixtures, finishes, equipment, bathrooms, kitchenette, mep. no exterior work. fire protections under sep permit maher na | $900,000 |
| Dec 5, 2016 | Completed final sign-off Dec 2016 | 180 Sansome St | Red Hawk Fire & Security Ca Llc | fire alarm ti on 3rd fl. add 1 smoke detector for door holder. 7 speaker strobes maher not reqDetails
fire alarm ti on 3rd fl. add 1 smoke detector for door holder. 7 speaker strobes maher not req | $4,100 |
| Nov 29, 2016 | Completed final sign-off Dec 2016 | 180 Sansome St | R L H Fire Protection Inc | relocate 3 pendent sprinlkers, add 10 pendent sprinklers on the 3rd fl rf 201610190683 maher not reqDetails
relocate 3 pendent sprinlkers, add 10 pendent sprinklers on the 3rd fl rf 201610190683 maher not req | $8,360 |
| Nov 15, 2016 | Never finaled issued Nov 2016, no final | 180 Sansome St | Rudolph And Sletten Inc | (aka 160 sansome st.) 3rd fl mechanical and electrical for 201610170683 maher not req. n/a maherDetails
(aka 160 sansome st.) 3rd fl mechanical and electrical for 201610170683 maher not req. n/a maher | $20,000 |
| Oct 19, 2016 | Completed final sign-off Dec 2016 | 180 Sansome St | Rudolph And Sletten Inc | 3rd floor tenant improvement limited to non-structural interior walls & floor finishes. meps, life safety etc will be design build & submitted separately, n/a ordinance #155-13Details
3rd floor tenant improvement limited to non-structural interior walls & floor finishes. meps, life safety etc will be design build & submitted separately, n/a ordinance #155-13 | $342,244 |
| Jun 6, 2016 | Never finaled issued Jun 2016, no final | 180 Sansome St | Rudolph And Sletten Inc | suite 200 -electrical permit for pa #201604124595 - additoinal outlets & power distribution. n/a maher ordinanceDetails
suite 200 -electrical permit for pa #201604124595 - additoinal outlets & power distribution. n/a maher ordinance | $12,464 |
| Jun 6, 2016 | Completed final sign-off Jun 2016 | 180 Sansome St | Red Hawk Fire & Security Ca Llc | add 2 smoke detectors, add 8 speakers/strobes.Details
add 2 smoke detectors, add 8 speakers/strobes. | $7,500 |
| May 27, 2016 | Completed final sign-off Jun 2016 | 180 Sansome St | Rudolph And Sletten Inc | 2nd fl: revision to ref pa 2016-0412-4595: ti to include minor removal of non structural partitions, new millwork in pantry and restrooms, paint & carpet; maher n/aDetails
2nd fl: revision to ref pa 2016-0412-4595: ti to include minor removal of non structural partitions, new millwork in pantry and restrooms, paint & carpet; maher n/a | $250 |
| Apr 12, 2016 | Completed final sign-off Jun 2016 | 180 Sansome St | Rudolph And Sletten Inc | ste #200: scope of modifications for tenant improvements are minimal:removal of non-structural partitions,floor finishes,kitchen cabinetry. minor modifications to 9e) ada restroom to bring room into full compliance.new kitchen cabinets & sink, carpet and paint; maher n/a. life safety deferred.Details
ste #200: scope of modifications for tenant improvements are minimal:removal of non-structural partitions,floor finishes,kitchen cabinetry. minor modifications to 9e) ada restroom to bring room into full compliance.new kitchen cabinets & sink, carpet and paint; maher n/a. life safety deferred. | $100,000 |
| Dec 17, 2015 | Completed final sign-off Jan 2016 | 180 Sansome St | Red Hawk Fire & Security Ca Llc | fire alarm t.i. on 8th floor. add 2 speaker strobes in t.i. space. ref app#201507242444. n/a for maherDetails
fire alarm t.i. on 8th floor. add 2 speaker strobes in t.i. space. ref app#201507242444. n/a for maher | $1,000 |
| Oct 9, 2015 | Completed final sign-off Oct 2015 | 180 Sansome St | Pioneer Fire Inc. | 8th flr: remodel of all outlined areas consisting of one relocated pendant and 20 added pendants; ref.201507242444; maher n/aDetails
8th flr: remodel of all outlined areas consisting of one relocated pendant and 20 added pendants; ref.201507242444; maher n/a | $6,931 |
| Jul 24, 2015 | Completed final sign-off Aug 2016 | 180 Sansome St | Team Commercial Construction Inc. | 8th floor t.i. include new construction of non structural partition walls, replacement of light fixtures, add a break area with sink. maher n/a. mep included - sprinkler & fire alarm sep permitDetails
8th floor t.i. include new construction of non structural partition walls, replacement of light fixtures, add a break area with sink. maher n/a. mep included - sprinkler & fire alarm sep permit | $854,280 |
| Jan 28, 2015 | Never finaled issued Jan 2015, no final | 180 Sansome St | street spaceDetails
street space | ||
| Oct 6, 2014 | Completed final sign-off Mar 2015 | 180 Sansome St | Rainbow Waterproofing & Restor | 2nd flr demo of existing concrete topping slab and existing waterproofing membrane. installation of new hot rubber waterproofing membrane. pour new concrete topping slab work at 2nd flr courtyard; maher n/aDetails
2nd flr demo of existing concrete topping slab and existing waterproofing membrane. installation of new hot rubber waterproofing membrane. pour new concrete topping slab work at 2nd flr courtyard; maher n/a | $395,000 |
| Sep 4, 2014 | Never finaled issued Sep 2014, no final | 180 Sansome St | Pacific Auxiliary Fire Alarm | floors 3,7,& 8: revision (as-builts) to app#201309247558 to decrease in scope of work. 3 smoke detectors and 3 relays not needed revise/correct extg operational matrix. n/a for the maher ordinance #155-13Details
floors 3,7,& 8: revision (as-builts) to app#201309247558 to decrease in scope of work. 3 smoke detectors and 3 relays not needed revise/correct extg operational matrix. n/a for the maher ordinance #155-13 | |
| Aug 20, 2014 | Completed final sign-off Oct 2014 | 180 Sansome St | Pacific Auxiliary Fire Alarm | 11th flr: add one new power supply, 3 speaker/strobes & 2 strobes to (e) system as part of a tenant improvement on the 11th flr (ref. bldg permit 201405226537) maher n/aDetails
11th flr: add one new power supply, 3 speaker/strobes & 2 strobes to (e) system as part of a tenant improvement on the 11th flr (ref. bldg permit 201405226537) maher n/a | $4,700 |
| Aug 8, 2014 | Completed final sign-off Aug 2014 | 180 Sansome St | Ayoob & Peery Plumbing Co Inc | 11th floor bathroom: add and relocate fire sprinkle heads. add 1, 3 relocate. ref. appl. #2014.0522.6537. maher n/a.Details
11th floor bathroom: add and relocate fire sprinkle heads. add 1, 3 relocate. ref. appl. #2014.0522.6537. maher n/a. | $2,056 |
| Jul 3, 2014 | Completed final sign-off Jul 2014 | 180 Sansome St | Pacific Auxiliary Fire Alarm | add 1 smoke detector on 3/f per requrest of field inspector. no bldg permit associated with this work. n/a ordinance #155-13Details
add 1 smoke detector on 3/f per requrest of field inspector. no bldg permit associated with this work. n/a ordinance #155-13 | $800 |
| May 22, 2014 | Completed final sign-off Sep 2014 | 180 Sansome St | Dettaglio Construction Inc Dba Dci Const | disabled access barrier removal on the 11th floor of 180 sansome. demolition of current non-compliant restroom and construction of 2 new single-occupancy restrooms one mens and one womens. n/a for the maher ordinance #155-133Details
disabled access barrier removal on the 11th floor of 180 sansome. demolition of current non-compliant restroom and construction of 2 new single-occupancy restrooms one mens and one womens. n/a for the maher ordinance #155-133 | $90,000 |
| Jan 22, 2014 | Completed final sign-off Apr 2014 | 180 Sansome St | Pacific Auxiliary Fire Alarm | 11 new speaker strobes added, 5 existing speaker strobes relocated on the 4th and 15th floors. comply with ordiance #155-13, not required.Details
11 new speaker strobes added, 5 existing speaker strobes relocated on the 4th and 15th floors. comply with ordiance #155-13, not required. | $11,500 |
| Jan 8, 2014 | Completed final sign-off Jul 2014 | 180 Sansome St | Pioneer Fire Inc. | 4th and 15th floors: relocate 9 pendents and add 5 pendants. t.i app#201311051201; compliance with ordinance no 15-133 not requiredDetails
4th and 15th floors: relocate 9 pendents and add 5 pendants. t.i app#201311051201; compliance with ordinance no 15-133 not required | $5,900 |
| Nov 5, 2013 | Completed final sign-off Apr 2014 | 180 Sansome St | Richlen Construction | 4th & 15th floor - demo int partition & finishes, new walls, doors & finishes, rewire space to new layout, relocate power outlets, modification of (e) hvac system. modification of existing toilets. f/a sprinkler under separateDetails
4th & 15th floor - demo int partition & finishes, new walls, doors & finishes, rewire space to new layout, relocate power outlets, modification of (e) hvac system. modification of existing toilets. f/a sprinkler under separate | $280,000 |
| Nov 1, 2013 | Never finaled issued May 2014, no final | 180 Sansome St | Team Commercial Construction Inc. | install mechanical hvac for spec spaces on floors 3,7, & 8. ref app#201209280845/r1Details
install mechanical hvac for spec spaces on floors 3,7, & 8. ref app#201209280845/r1 | $150,000 |
| Sep 24, 2013 | Never finaled issued Sep 2013, no final | 180 Sansome St | Pacific Auxiliary Fire Alarm | add 3 smoke detectors, 6 duct detectors, 3 relay, 9 strobes & 21 speaker strobes, replace 4 existing smoke detectors, 3 existing strobes & 3 speaker/strobes. ref. to approved bldg. pa#201209280845Details
add 3 smoke detectors, 6 duct detectors, 3 relay, 9 strobes & 21 speaker strobes, replace 4 existing smoke detectors, 3 existing strobes & 3 speaker/strobes. ref. to approved bldg. pa#201209280845 | $30,000 |
| Sep 24, 2013 | Never finaled issued Sep 2013, no final | 180 Sansome St | Pacific Auxiliary Fire Alarm | add 1 duct detector, 1 relay, 2 strobes & 5 s[ealer/strobes, relocate 1 existing smoke detector due to t.i. on floors 6 & 9. ref to pa# 201306129284Details
add 1 duct detector, 1 relay, 2 strobes & 5 s[ealer/strobes, relocate 1 existing smoke detector due to t.i. on floors 6 & 9. ref to pa# 201306129284 | $7,000 |
| Sep 19, 2013 | Completed final sign-off Nov 2013 | 180 Sansome St | Pioneer Fire Inc. | 6th & 9th floors-relocate 8 fire sprinklersDetails
6th & 9th floors-relocate 8 fire sprinklers | $4,000 |
| Sep 12, 2013 | Never finaled issued Sep 2013, no final | 180 Sansome St | Team Commercial Construction Inc. | 6th & 9th floor - engineered electrical, mechanical & plumbing work for architectural permit #2013.06.12.9281.Details
6th & 9th floor - engineered electrical, mechanical & plumbing work for architectural permit #2013.06.12.9281. | $81,000 |
| Jul 23, 2013 | Never finaled issued Jul 2013, no final | 180 Sansome St | Pacific Auxiliary Fire Alarm | 6th floor-adding 1 speaker/strobe & removing 1 (e) smoke detector as part of a restroom addition.Details
6th floor-adding 1 speaker/strobe & removing 1 (e) smoke detector as part of a restroom addition. | $1,000 |
| Jul 18, 2013 | Completed final sign-off Oct 2013 | 180 Sansome St | Pioneer Fire Inc. | 3rd,6th,7th,8th floors-remodel of all outline area consisting of 101 relocated pendents, 15 added pendents and 3 removed pendents.Details
3rd,6th,7th,8th floors-remodel of all outline area consisting of 101 relocated pendents, 15 added pendents and 3 removed pendents. | $24,750 |
| Jun 12, 2013 | Completed final sign-off Nov 2013 | 180 Sansome St | Team Commercial Construction Inc. | 6th & 9th floors-tenant improvement-removal & construction of non structural partitions, new finishes throughout. m.e.p, fire life safety & sprinkler under seperate permitsDetails
6th & 9th floors-tenant improvement-removal & construction of non structural partitions, new finishes throughout. m.e.p, fire life safety & sprinkler under seperate permits | $281,000 |
| May 1, 2013 | Completed final sign-off Jul 2014 | 180 Sansome St | Team Commercial Construction Inc. | adding one ada restroom on 6th floor. barrier removal work & creating new h.c. women's single accommodation toilet facility.Details
adding one ada restroom on 6th floor. barrier removal work & creating new h.c. women's single accommodation toilet facility. | $90,000 |
| Sep 28, 2012 | Completed final sign-off Sep 2014 | 180 Sansome St | tenant improvement of 3rd, 7th and 8th floors to include rated elevator lobby with rated door, non bearing partitions and millwork and ada accessible restrooms.Details
tenant improvement of 3rd, 7th and 8th floors to include rated elevator lobby with rated door, non bearing partitions and millwork and ada accessible restrooms. | $375,000 | |
| Sep 12, 2012 | Never finaled issued Sep 2012, no final | 180 Sansome St | Pacific Auxiliary Fire Alarm | lobby tenant improvement to existing fire alarm system - adding power supply, speaker strobe, replacing 2 speaker strobe, relocating pull station.Details
lobby tenant improvement to existing fire alarm system - adding power supply, speaker strobe, replacing 2 speaker strobe, relocating pull station. | $5,000 |
| Jun 13, 2012 | Completed final sign-off Nov 2012 | 180 Sansome St | Pioneer Fire Inc. | ground floor - relocate 19 fire sprinklersDetails
ground floor - relocate 19 fire sprinklers | $3,000 |
| May 1, 2012 | Completed final sign-off Nov 2012 | 180 Sansome St | revision to apllication 2010-07-21-7078 r-1-replace t-bar ceiling with metal strip ceiling and hanging lights. ground level lobby - changing ceiling to ceiling with open slats - 4 inches apart- sprinklers required above and below ceiling- bldg also known as 160 sansome- sprinklers separte permitDetails
revision to apllication 2010-07-21-7078 r-1-replace t-bar ceiling with metal strip ceiling and hanging lights. ground level lobby - changing ceiling to ceiling with open slats - 4 inches apart- sprinklers required above and below ceiling- bldg also known as 160 sansome- sprinklers separte permit | $20,000 | |
| Mar 3, 2011 | Never finaled issued Mar 2011, no final | 180 Sansome St | Thomas Swan Sign Co Inc | installation of emergency evacuation signs(3) on 4th floorDetails
installation of emergency evacuation signs(3) on 4th floor | $935 |
| Oct 14, 2010 | Expired or cancelled withdrawn Nov 2013 | 180 Sansome St | Skyline Construction | 4th floor-plumbing work, ref arch pa# 2010-0611-4296Details
4th floor-plumbing work, ref arch pa# 2010-0611-4296 | $8,000 |
| Oct 12, 2010 | Completed final sign-off Mar 2011 | 180 Sansome St | Pacific Coast Fire | 4th floor #400 -add 34 fire sprinklers for new ceiling.Details
4th floor #400 -add 34 fire sprinklers for new ceiling. | $6,000 |
| Oct 8, 2010 | Completed final sign-off Mar 2011 | 180 Sansome St | Skyline Construction | 4th floor ste 400 - tenant improvement for mechanical work. ref pa #201006114296.Details
4th floor ste 400 - tenant improvement for mechanical work. ref pa #201006114296. | $60,000 |
| Sep 2, 2010 | Completed final sign-off Mar 2011 | 180 Sansome St | Pacific Auxiliary Fire Alarm | addition of 1 power supply, 2 smoke detector, 12 speaker strobes, 1 strobe, 1 relay, 2 duct detectors, due to tenant improvement for suite 400Details
addition of 1 power supply, 2 smoke detector, 12 speaker strobes, 1 strobe, 1 relay, 2 duct detectors, due to tenant improvement for suite 400 | $8,000 |
| Jul 21, 2010 | Completed final sign-off Nov 2012 | 180 Sansome St | storefront replacement & expansion of lobby (t.i.work).Details
storefront replacement & expansion of lobby (t.i.work). | $250,000 | |
| Jun 11, 2010 | Completed final sign-off Mar 2011 | 180 Sansome St | Skyline Construction | ti 4th fl - incl rated elevator lobby with fire rated won door, non bearing partitions & millwork. ada accessible restrooms.Details
ti 4th fl - incl rated elevator lobby with fire rated won door, non bearing partitions & millwork. ada accessible restrooms. | $250,000 |
| Mar 12, 2010 | Completed final sign-off Mar 2011 | 160 Sansome St | Schindler Elevator Corp | to complete work and obtain final inspection for work approved under pa #200808078684Details
to complete work and obtain final inspection for work approved under pa #200808078684 | $500 |
| Sep 17, 2009 | Completed final sign-off Sep 2009 | 160 Sansome St | Pacific Auxiliary Fire Alarm | to obtain final inspection for work approved under pa#200705151252. all work complete. fl#5,#12,#15 & #18.Details
to obtain final inspection for work approved under pa#200705151252. all work complete. fl#5,#12,#15 & #18. | |
| May 13, 2009 | Never finaled issued May 2009, no final | 180 Sansome St | Pacific Auxiliary Fire Alarm | addition of 6 smoke detectors and three relay modules as part of elevator modernization project. devices being added on the 1st floor and upper penthouse. new elevator controller under separate permitDetails
addition of 6 smoke detectors and three relay modules as part of elevator modernization project. devices being added on the 1st floor and upper penthouse. new elevator controller under separate permit | $6,900 |
| Mar 17, 2009 | Completed final sign-off Mar 2009 | 160 Sansome St | Pacific Auxiliary Fire Alarm | to obtain final inspection for work approved under pa#2006/02/01/3560. all work has been completed.Details
to obtain final inspection for work approved under pa#2006/02/01/3560. all work has been completed. | |
| Feb 5, 2009 | Completed final sign-off Feb 2009 | 160 Sansome St | Dpw Inc. | renewal of existing fire appl#200601051503. all work has been completed.Details
renewal of existing fire appl#200601051503. all work has been completed. | |
| Nov 4, 2008 | Completed final sign-off Jun 2009 | 160 Sansome St | Pioneer Fire Protection | relocate 32 and add 13 fire sprinklersDetails
relocate 32 and add 13 fire sprinklers | $5,800 |
| Oct 30, 2008 | Completed final sign-off Jun 2009 | 160 Sansome St | Pacific Auxiliary Fire Alarm | adding 11 speaker/strobes, 4 smoke detectors, 1 power supply and 2 relay module as part of remodel on the tenth floorDetails
adding 11 speaker/strobes, 4 smoke detectors, 1 power supply and 2 relay module as part of remodel on the tenth floor | $18,000 |
| Oct 16, 2008 | Completed final sign-off Jun 2009 | 160 Sansome St | Team Commercial Construction Inc. | new hvac including duet and vau. new power and lighting through out. re-route plmg for restrooms and kitchen. reference app #200809232444- new door hardware with releaseDetails
new hvac including duet and vau. new power and lighting through out. re-route plmg for restrooms and kitchen. reference app #200809232444- new door hardware with release | $85,000 |
| Sep 23, 2008 | Completed final sign-off Jun 2009 | 160 Sansome St | Team Commercial Construction Inc. | tenant improvement of 10th floor to incude rated elevator lobby with automatic fire rated door, non bearing partitions millwork and ada accessable restrooms. mep and life safety to be filed separatelyDetails
tenant improvement of 10th floor to incude rated elevator lobby with automatic fire rated door, non bearing partitions millwork and ada accessable restrooms. mep and life safety to be filed separately | $472,043 |
| Aug 7, 2008 | Expired or cancelled expired Mar 2011 | 160 Sansome St | Schindler Elevator Corp | installation of destination based elevator controls (3 cabs)Details
installation of destination based elevator controls (3 cabs) | $65,000 |
| Jul 24, 2008 | Completed final sign-off Jul 2008 | 160 Sansome St | umbrella permit: compliance with high-rise sprinkler ordinance #377-93. pa# 2008-05-16-2243 no work.Details
umbrella permit: compliance with high-rise sprinkler ordinance #377-93. pa# 2008-05-16-2243 no work. | ||
| Jul 9, 2008 | Completed final sign-off Jun 2009 | 160 Sansome St | Pacific Auxiliary Fire Alarm | addition of 8 speaker/strobes, 2 duct detectors & 3 relays and relocation of 2 extg smoke detectors for tenant improvement on the 14 floorDetails
addition of 8 speaker/strobes, 2 duct detectors & 3 relays and relocation of 2 extg smoke detectors for tenant improvement on the 14 floor | $12,000 |
| May 27, 2008 | Completed final sign-off Jun 2009 | 160 Sansome St | Pioneer Fire Protection | 14th floor-relocate 39 fire sprinklers, add 9 fire sprinklersDetails
14th floor-relocate 39 fire sprinklers, add 9 fire sprinklers | $7,500 |
| May 16, 2008 | Expired or cancelled cancelled Mar 2010 | 160 Sansome St | change of use occupancy on 3rd floor existing office to 2 residential apartment units. interior works only, each unit includes 2 bedrooms and 2 bathrooms.Details
change of use occupancy on 3rd floor existing office to 2 residential apartment units. interior works only, each unit includes 2 bedrooms and 2 bathrooms. | $300,000 | |
| May 16, 2008 | Completed final sign-off Jul 2008 | 160 Sansome St | Dpw Inc. | revise sprinklers to comply with high rise sprinkler ordinance. (umbrella permit) total 14 heads.Details
revise sprinklers to comply with high rise sprinkler ordinance. (umbrella permit) total 14 heads. | $20,000 |
| May 15, 2008 | Completed final sign-off Jun 2009 | 160 Sansome St | Team Commercial Construction Inc. | 14th floor-ti including rated elevator lobby with rated won door, non-bearing partitions, millwork and ada accessible restrooms. sprinklers and fire alarm separate permit. sprinkler system is completed throughout building- umbrella permit to be signed off before occupancy can be granted.Details
14th floor-ti including rated elevator lobby with rated won door, non-bearing partitions, millwork and ada accessible restrooms. sprinklers and fire alarm separate permit. sprinkler system is completed throughout building- umbrella permit to be signed off before occupancy can be granted. | $500,000 |
| Mar 25, 2008 | Never finaled issued Mar 2008, no final | 160 Sansome St | Pacific Auxiliary Fire Alarm | 6th & 17th floor: addition of 2 smoke detectors and 2 relays in order to unlock stairwell doors.( 1 smoke detector installed on 6th floor and 1 smoke detector on the 17th floor.)Details
6th & 17th floor: addition of 2 smoke detectors and 2 relays in order to unlock stairwell doors.( 1 smoke detector installed on 6th floor and 1 smoke detector on the 17th floor.) | $2,100 |
| Oct 26, 2007 | Completed final sign-off Jan 2008 | 160 Sansome St | Dpw Inc. | fully sprinkle per nfpa 13 floors 7 and 14, on exisiting srinkler system. floors have now been abated. tie into existing 6" riser and install new sectional control valves for both floors.Details
fully sprinkle per nfpa 13 floors 7 and 14, on exisiting srinkler system. floors have now been abated. tie into existing 6" riser and install new sectional control valves for both floors. | $40,000 |
| Jul 5, 2007 | Completed final sign-off Jan 2008 | 160 Sansome St | Pacific Auxiliary Fire Alarm | addition of 2 monitoring modules to provide monitoring of the sprinkler system on the 7th & 14th floors.Details
addition of 2 monitoring modules to provide monitoring of the sprinkler system on the 7th & 14th floors. | $3,200 |
| Jun 18, 2007 | Completed final sign-off Jan 2008 | 160 Sansome St | Pacific Auxiliary Fire Alarm | 19th floor: addition of one dual monitoring module to supervise the new waterflow and tamper switches.Details
19th floor: addition of one dual monitoring module to supervise the new waterflow and tamper switches. | $2,500 |
| May 15, 2007 | Expired or cancelled expired Apr 2009 | 160 Sansome St | Pacific Auxiliary Fire Alarm | installation of 4 addtional smoke detectors in the telecom/server rooms on floors 5,12,15,18. additions to extg fire alarm systemDetails
installation of 4 addtional smoke detectors in the telecom/server rooms on floors 5,12,15,18. additions to extg fire alarm system | $11,000 |
| Mar 15, 2007 | Completed final sign-off Jan 2008 | 160 Sansome St | Dpw Inc. | install a new wet type sprinkler system in the roof mech. room. 53 new sprinkler heads.Details
install a new wet type sprinkler system in the roof mech. room. 53 new sprinkler heads. | $40,000 |
| Feb 1, 2006 | Expired or cancelled expired May 2008 | 160 Sansome St | Pacific Auxiliary Fire Alarm | addition of 4 monitoring modules to provide monitoring of the sprinkler system being installed on 3rd, 4th, 8th & 10th floors.Details
addition of 4 monitoring modules to provide monitoring of the sprinkler system being installed on 3rd, 4th, 8th & 10th floors. | $5,000 |
| Jan 5, 2006 | Expired or cancelled expired Feb 2009 | 160 Sansome St | Dpw Inc. | install a new wet type sprinkler systems on floors 4th,8th,& 10th. we will tie in to (e) 6" riser, floor systems will be left in core condition, all floors are typical.Details
install a new wet type sprinkler systems on floors 4th,8th,& 10th. we will tie in to (e) 6" riser, floor systems will be left in core condition, all floors are typical. | $50,000 |
| Sep 15, 2005 | Expired or cancelled expired Jan 2008 | 160 Sansome St | Dpw Inc. | install a new sprinkler system on mezzanine & 3rd floor. tie in to exist risen.Details
install a new sprinkler system on mezzanine & 3rd floor. tie in to exist risen. | $35,000 |
| Aug 26, 2005 | Never finaled issued Aug 2005, no final | 160 Sansome St | Novo Construction Inc | electrical & mechanical work for 15th fl t.i.Details
electrical & mechanical work for 15th fl t.i. | $25,000 |
| Aug 22, 2005 | Never finaled issued Aug 2005, no final | 160 Sansome St | Pacific Auxiliary Fire Alarm | expend the fire alarm system due to a remodel of the 14th fl. 7 smokeDetails
expend the fire alarm system due to a remodel of the 14th fl. 7 smoke | $10,000 |
| Aug 22, 2005 | Never finaled issued Aug 2005, no final | 160 Sansome St | Pacific Auxiliary Fire Alarm | additional fire alarm system, includes 5 smoke detectors, 6 speaker/strobe and 1 power supply.Details
additional fire alarm system, includes 5 smoke detectors, 6 speaker/strobe and 1 power supply. | $10,000 |
| Aug 8, 2005 | Completed final sign-off Sep 2005 | 160 Sansome St | Dpw Inc. | relocate 5 (e)sprinkler heads & plugoff 1 for new tenant work.Details
relocate 5 (e)sprinkler heads & plugoff 1 for new tenant work. | $4,000 |
| Aug 3, 2005 | Expired or cancelled expired Jan 2008 | 160 Sansome St | Pacific Auxiliary Fire Alarm | oti-2 15/f lsDetails
oti-2 15/f ls | $12,000 |
| Jun 16, 2005 | Completed final sign-off Sep 2005 | 160 Sansome St | Novo Construction Inc | oti-1, 15th floor, el, me, ls, sp.Details
oti-1, 15th floor, el, me, ls, sp. | $92,000 |
| Dec 8, 2004 | Expired or cancelled expired May 2008 | 160 Sansome St | Novo Construction Inc | oti-2 6/f ls onlyDetails
oti-2 6/f ls only | $5,000 |
| Dec 3, 2004 | Never finaled issued Dec 2004, no final | 160 Sansome St | Dpw Inc. | modify existing sprinkler system on 6th floor onlyDetails
modify existing sprinkler system on 6th floor only | $6,000 |
| Oct 7, 2004 | Expired or cancelled expired May 2008 | 160 Sansome St | oti-1, 6th floor- el, me, ls, spDetails
oti-1, 6th floor- el, me, ls, sp | $68,000 | |
| Jul 23, 2004 | Never finaled issued Jul 2004, no final | 160 Sansome St | Dpw Inc. | install additional upright coverage for temporary sales office first floor (2)relocate (1) dropDetails
install additional upright coverage for temporary sales office first floor (2)relocate (1) drop | $1,800 |
| Jul 22, 2004 | Expired or cancelled expired Jan 2008 | 160 Sansome St | Pacific Auxiliary Fire Alarm | addition of two speaker/strobes and one manual alarm pull station to the fire alarm system as partDetails
addition of two speaker/strobes and one manual alarm pull station to the fire alarm system as part | $3,500 |
| Jul 20, 2004 | Expired or cancelled expired Oct 2007 | 160 Sansome St | Big D Pacific Builders | oti-4 9th floor, lsDetails
oti-4 9th floor, ls | $8,000 |
| Jul 14, 2004 | Expired or cancelled expired Jan 2008 | 160 Sansome St | tenant improvement at g/f for office use: work includes (n) sheetrock,flooringDetails
tenant improvement at g/f for office use: work includes (n) sheetrock,flooring | $50,000 | |
| Jul 2, 2004 | Never finaled issued Jul 2004, no final | 160 Sansome St | Ayoob & Peery Plumbing Co Inc | add 9. sprk heads per tenant improvement grd fl)Details
add 9. sprk heads per tenant improvement grd fl) | $4,200 |
| Jun 24, 2004 | Expired or cancelled expired Oct 2007 | 160 Sansome St | Big D Pacific Builders | oti-3, 9th floor, meDetails
oti-3, 9th floor, me | $1,250 |
| Jun 16, 2004 | Expired or cancelled expired Oct 2007 | 160 Sansome St | Big D Pacific Builders | oti-2, 9th floor-elDetails
oti-2, 9th floor-el | $21,000 |
| May 28, 2004 | Expired or cancelled expired Oct 2007 | 160 Sansome St | Big D Pacific Builders | oti-1, 9th floor, el, me, ls, sp.Details
oti-1, 9th floor, el, me, ls, sp. | $27,000 |
| Jan 22, 2004 | Completed final sign-off Sep 2004 | 180 Sansome St | National Systems Integration | addition to existing fire alarm system. addition includes 2/smoke detectors, one/duct detector, 2/puDetails
addition to existing fire alarm system. addition includes 2/smoke detectors, one/duct detector, 2/pu | $7,073 |
| Jan 15, 2004 | Completed final sign-off Apr 2004 | 160 Sansome St | Skyline Construction | install new sprinkler heads on g/fDetails
install new sprinkler heads on g/f | $25,000 |
| Dec 2, 2003 | Completed final sign-off Apr 2004 | 180 Sansome St | Golden Gate Sign Company Inc. | to erect non-electrical signDetails
to erect non-electrical sign | |
| Nov 12, 2003 | Completed final sign-off Sep 2004 | 160 Sansome St | new const. in shell space previously occupied by a bank includes partitions doors frames caseworkDetails
new const. in shell space previously occupied by a bank includes partitions doors frames casework | $265,000 |
Find contractors for work like this