Peter Kraut
- Listed as
- engineer
- Firm
- Sceg
- Based in
- Calabasas
- On San Francisco permits
- Mar 2018 to Jun 2026
11 permits since 2000 (engineer on 11 permits): 5 completed, 1 in progress, 3 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 17, 2026 | Completed final sign-off Sep 2026 | 181 03rd St | Centric Construction Inc | upgrade bar equipment at (e) lobby bar in "w" hotel. revise plumbing + electrical related to upgrade bar equip. please ref pa# 202603036811.Details
upgrade bar equipment at (e) lobby bar in "w" hotel. revise plumbing + electrical related to upgrade bar equip. please ref pa# 202603036811. | $145,000 |
| Nov 8, 2024 | Expired or cancelled withdrawn Sep 2025 | 2620 Jones St | renovate (e) non-accessible and (1) accessible guestrooms. conversion of(6)2-bay suites into (12) single bay guestrooms. (addition of 6 guestroom keys). replace lighting fixture at elevator lobbies (total 6 fixtures).Details
renovate (e) non-accessible and (1) accessible guestrooms. conversion of(6)2-bay suites into (12) single bay guestrooms. (addition of 6 guestroom keys). replace lighting fixture at elevator lobbies (total 6 fixtures). | $150,000 | |
| May 27, 2022 | Never finaled filed May 2022, never issued | 5 Embarcadero Center | addition of 30 guestrooms to the existing hotel by establishing 2 new guestrooms per floor on floor 2-17 via the conversion of 2 areas on either side of the elevator. total guestroom count after construction will be 851. scope includes (n) entry door, walls, lighting and finishes. replace (e)windowsDetails
addition of 30 guestrooms to the existing hotel by establishing 2 new guestrooms per floor on floor 2-17 via the conversion of 2 areas on either side of the elevator. total guestroom count after construction will be 851. scope includes (n) entry door, walls, lighting and finishes. replace (e)windows | $1,100,000 | |
| Mar 17, 2022 | In progress issued Feb 2024 | 1 Warriors Wy | Acco Engineered Systems Inc. Dba Acco En | installation of (14) storm water filters (7) duplex storm drain sump pump, basin, discharge pipe to correct and supplement (e) storm drain system design for water recycling on site.Details
installation of (14) storm water filters (7) duplex storm drain sump pump, basin, discharge pipe to correct and supplement (e) storm drain system design for water recycling on site. | |
| Dec 24, 2020 | Completed final sign-off Mar 2022 | 125 03rd St | Hathaway Dinwiddie Co. | barrier removel: accessible passenger drop-off/loading zone & access aisle, accessible entries, modification to accessible parking signage & elevator door jamp signs. widen women's accessible restroom stall. removal of urinal in men's restroom to probide adequate door clearance.Details
barrier removel: accessible passenger drop-off/loading zone & access aisle, accessible entries, modification to accessible parking signage & elevator door jamp signs. widen women's accessible restroom stall. removal of urinal in men's restroom to probide adequate door clearance. | $150,000 |
| Dec 16, 2020 | Completed final sign-off Nov 2022 | 50 03rd St | Plant Construction Co, Lp | lobby level renovation includes new finishes, replacement of lighting, modification to bar & buffet, revision to (e) restaurant layout & (e) giftshop layout. modify (e) elec, plumb, & hvac. 2nd & 3rd floor renovation: new finishes, replace light fixtures. no hvac.Details
lobby level renovation includes new finishes, replacement of lighting, modification to bar & buffet, revision to (e) restaurant layout & (e) giftshop layout. modify (e) elec, plumb, & hvac. 2nd & 3rd floor renovation: new finishes, replace light fixtures. no hvac. | $2,683,405 |
| Dec 15, 2020 | Completed final sign-off Dec 2024 | 340 Stockton St | Centric Construction Inc | renovation to (e) lobby & meeting room levels to include replacement of (e) finishes & millwork. ada upgrades to (e) restrooms. replace (e) lighting. no hvac or structural work.Details
renovation to (e) lobby & meeting room levels to include replacement of (e) finishes & millwork. ada upgrades to (e) restrooms. replace (e) lighting. no hvac or structural work. | $425,000 |
| Aug 5, 2020 | Never finaled issued Oct 2020, no final | 5 The Embarcadero | Hathaway Dinwiddie Co. | 5th fl: renovation of 2 existing guestrooms and partial corridor/door drop, including new finishes, plumbing fixtures, lighting fixtures and flooring. maher naDetails
5th fl: renovation of 2 existing guestrooms and partial corridor/door drop, including new finishes, plumbing fixtures, lighting fixtures and flooring. maher na | $153,482 |
| May 17, 2018 | Expired or cancelled withdrawn Feb 2019 | 2620 Jones St | lobby: demo staff offices/restrms, kitch, market, dining area, confer rm. construt staff offi/restrms, kitch & sales office/gallery. renov/upgrade public restrms. garage a&b: demo storage, boh, mech rm, restrm. const boh office, storage, break rm, laundry, restrm, add 2 exit to e stairwells. replaceDetails
lobby: demo staff offices/restrms, kitch, market, dining area, confer rm. construt staff offi/restrms, kitch & sales office/gallery. renov/upgrade public restrms. garage a&b: demo storage, boh, mech rm, restrm. const boh office, storage, break rm, laundry, restrm, add 2 exit to e stairwells. replace | $800,000 | |
| May 17, 2018 | Never finaled issued Dec 2018, no final | 2620 Jones St | Smc Constracting Inc | corridors: remove & replace e wall sconces & recessed light fixtures in (e) soffits. guestrms: demo e entry door & hardware. install secondary acoustical window at bay st side rms. convert 1 typical guestroom to acces. suite. elec/linen closets: patch & repair e opening in 1hr & 2hr fire rated wallsDetails
corridors: remove & replace e wall sconces & recessed light fixtures in (e) soffits. guestrms: demo e entry door & hardware. install secondary acoustical window at bay st side rms. convert 1 typical guestroom to acces. suite. elec/linen closets: patch & repair e opening in 1hr & 2hr fire rated walls | $650,000 |
| Mar 15, 2018 | Completed final sign-off Sep 2019 | 180 Sansome St | Crane Construction Company Inc. | grnd flr & mezzanine - new fitness club. new fixtures, finishes, equipment, bathrooms, kitchenette, mep. no exterior work. fire protections under sep permit maher naDetails
grnd flr & mezzanine - new fitness club. new fixtures, finishes, equipment, bathrooms, kitchenette, mep. no exterior work. fire protections under sep permit maher na | $900,000 |