Centric Construction Inc
- Based in
- Brisbane
- On San Francisco permits
- Mar 2007 to Oct 2026
- Last 24 months
- 14 permits filed
313 permits since 2000: 237 completed, 6 in progress, 58 never finaled, 12 expired or cancelled.
Of the 58 never-finaled permits, 3 are 3 to 5 years old, 23 are 5 to 10 years old, 32 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 313.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 600 Stockton St | revision to bpa#202606183514, minor interior remodel of existing retail shop(562 sf) on 4th floor(entry level). includes new beam supporting nanowall assembly. no exterior work.Details
revision to bpa#202606183514, minor interior remodel of existing retail shop(562 sf) on 4th floor(entry level). includes new beam supporting nanowall assembly. no exterior work. | $5,000 |
| Aug 11, 2026 | Completed final sign-off Aug 2026 | 555 Post St | revision to 202305057166, 2023-09206pta: add replacement of 2 penthouse windows with new aluminum windows. removal of east coping under 202306099668. coping shall be installed under sep permit.Details
revision to 202305057166, 2023-09206pta: add replacement of 2 penthouse windows with new aluminum windows. removal of east coping under 202306099668. coping shall be installed under sep permit. | $7,000 |
| Jun 18, 2026 | In progress issued Jul 2026 | 600 Stockton St | minor interior remodel of existing retail shop. inlcudes plumbing, hvac, and electrical. no exterior work.Details
minor interior remodel of existing retail shop. inlcudes plumbing, hvac, and electrical. no exterior work. | $145,000 |
| Jun 17, 2026 | Completed final sign-off Sep 2026 | 181 03rd St | upgrade bar equipment at (e) lobby bar in "w" hotel. revise plumbing + electrical related to upgrade bar equip. please ref pa# 202603036811.Details
upgrade bar equipment at (e) lobby bar in "w" hotel. revise plumbing + electrical related to upgrade bar equip. please ref pa# 202603036811. | $145,000 |
| Jun 11, 2026 | In progress issued Jun 2026 | 3150 Pacific Av | 3rd floor: replace existing solarium style shower, in kind. waterproofing, repair to deck and roof areas and 2nd floor ceiling due to leaks.Details
3rd floor: replace existing solarium style shower, in kind. waterproofing, repair to deck and roof areas and 2nd floor ceiling due to leaks. | $30,000 |
| May 20, 2026 | In progress issued Jul 2026 | 500 Sansome St | 6/f suite 600 - t.i buildout of an (e) office space. scope include new open office space, enclosed office space, employeee kitchenette and storage. new office space will utilize (e) men's and women's restrooms on 6/f.Details
6/f suite 600 - t.i buildout of an (e) office space. scope include new open office space, enclosed office space, employeee kitchenette and storage. new office space will utilize (e) men's and women's restrooms on 6/f. | $1,300,000 |
| Apr 2, 2026 | Completed final sign-off Sep 2026 | 600 Stockton St | minor interior remodel of (e) lobby lounge/bar (1227 sf) on 4th floor (entry level). includes plumbing and electrical. no exterior work.Details
minor interior remodel of (e) lobby lounge/bar (1227 sf) on 4th floor (entry level). includes plumbing and electrical. no exterior work. | $470,000 |
| Mar 3, 2026 | Completed final sign-off Sep 2026 | 181 03rd St | lobby: upgrade e) finishes of lobby in "w" hotel. upgrade lighting and n) chandeliers. add interior door/panels in dining area. add tv in lounge. add 2 fire extinguishers cabinets. add misc. metal stud furring and blocking. upgrade mezzanine lighting and finishes. no work to food equipmentDetails
lobby: upgrade e) finishes of lobby in "w" hotel. upgrade lighting and n) chandeliers. add interior door/panels in dining area. add tv in lounge. add 2 fire extinguishers cabinets. add misc. metal stud furring and blocking. upgrade mezzanine lighting and finishes. no work to food equipment | $785,000 |
| Oct 6, 2025 | In progress issued Dec 2025 | 335 Powell St | revision 202301230600- revised electrical alterationsDetails
revision 202301230600- revised electrical alterations | |
| Sep 19, 2025 | Completed final sign-off Mar 2026 | 550 07th St | 2nd fl: tenant improvement of (e) level 2 and mezzanine as office space. mezzanine not visible from street.Details
2nd fl: tenant improvement of (e) level 2 and mezzanine as office space. mezzanine not visible from street. | $1,744,000 |
| Aug 27, 2025 | Completed final sign-off Nov 2025 | 550 07th St | tenant improvement of existing lvel 1 as prototyping space. new construction includes new drinking fountain and lighting and electrical distribution for occupancy as a prototyping space. no changes to the exterior, roof terrace or gr level proposed.Details
tenant improvement of existing lvel 1 as prototyping space. new construction includes new drinking fountain and lighting and electrical distribution for occupancy as a prototyping space. no changes to the exterior, roof terrace or gr level proposed. | $325,000 |
| May 30, 2025 | Completed final sign-off Dec 2025 | 500 Sansome St | 1st floor: deferred structural for pa #202503263112Details
1st floor: deferred structural for pa #202503263112 | |
| May 8, 2025 | In progress issued Aug 2025 | 335 Powell St | adminstrative review for assembly and occuapancy permit number 202306150178. restaurant pdr barDetails
adminstrative review for assembly and occuapancy permit number 202306150178. restaurant pdr bar | |
| Mar 26, 2025 | Completed final sign-off Dec 2025 | 500 Sansome St | 1/fl and mezzanine- ti including dmeo and construction of non structual partitions ceilings, finishes and ffe. (n) restrooms and breakroom. deferred mepDetails
1/fl and mezzanine- ti including dmeo and construction of non structual partitions ceilings, finishes and ffe. (n) restrooms and breakroom. deferred mep | $4,360,000 |
| Apr 29, 2024 | Completed final sign-off Jun 2024 | 1 Kearny St | revision to pa# 202209122232 and 202304055128: changes include - remove scope of work at 1902 building (710 market) and roof. remove chipped paint and repaint at select areas. add crack injection details. update cover sheet notes.Details
revision to pa# 202209122232 and 202304055128: changes include - remove scope of work at 1902 building (710 market) and roof. remove chipped paint and repaint at select areas. add crack injection details. update cover sheet notes. | |
| Mar 15, 2024 | Completed final sign-off Apr 2025 | 335 Powell St | addition of 2 trellisses on level 2 north and south balcones. work on balcones and adj space performed under bpa#202212299387Details
addition of 2 trellisses on level 2 north and south balcones. work on balcones and adj space performed under bpa#202212299387 | $20,000 |
| Mar 5, 2024 | Completed final sign-off May 2024 | 333 Battery St | ref pa# 202305026872 administrative permit to confirm occupancy counts for ground fl restaurantDetails
ref pa# 202305026872 administrative permit to confirm occupancy counts for ground fl restaurant | |
| Nov 17, 2023 | Completed final sign-off Dec 2023 | 333 Battery St | revision pa # 202212138174: revision to mechanical title 24 forms.Details
revision pa # 202212138174: revision to mechanical title 24 forms. | |
| Oct 10, 2023 | Completed final sign-off Aug 2024 | 335 Powell St | revision of ceiling and associated lighting configuration to pdr space. this is a permit revision for 202305238377. remove one door from pdr space.Details
revision of ceiling and associated lighting configuration to pdr space. this is a permit revision for 202305238377. remove one door from pdr space. | |
| Sep 14, 2023 | Completed final sign-off May 2024 | 333 Battery St | revision to pa# 202305026872. (e) storefront to remain. (n) framing & finishes at entry facade. (n) power door operator & high/low actuator switches for (n) entry door. revisions to structural and electrical drawings.Details
revision to pa# 202305026872. (e) storefront to remain. (n) framing & finishes at entry facade. (n) power door operator & high/low actuator switches for (n) entry door. revisions to structural and electrical drawings. | |
| Jul 14, 2023 | Completed final sign-off Sep 2024 | 335 Powell St | renovation of (e) level 1.5 mezzanine kitchen. fire alarm and fire sprinkler under sep permit. no change to (e) mech systems. (e) hvac/hood & duct to remain.Details
renovation of (e) level 1.5 mezzanine kitchen. fire alarm and fire sprinkler under sep permit. no change to (e) mech systems. (e) hvac/hood & duct to remain. | $202,500 |
| Jun 26, 2023 | Completed final sign-off Dec 2023 | 333 Battery St | structural shop drawings and calculations for new 3/f outdoor trellis. (design previously approved under permit 202212138174)Details
structural shop drawings and calculations for new 3/f outdoor trellis. (design previously approved under permit 202212138174) | $50,000 |
| Jun 23, 2023 | Completed final sign-off May 2024 | 333 Battery St | new mechanical system for (n)ground fl restaurant renovation.scope of work basement level a and levels 1-3.ref# 202305026872Details
new mechanical system for (n)ground fl restaurant renovation.scope of work basement level a and levels 1-3.ref# 202305026872 | $250,000 |
| Jun 15, 2023 | Completed final sign-off Sep 2024 | 335 Powell St | renovation of (e) restaurant seating area. add new lobby bar + finishes. replace interior storefront at private dining room entry. fire sprinkler + alarm under separate permit. **associated with 2023-001338prv project review meeting with rebecca salgado.Details
renovation of (e) restaurant seating area. add new lobby bar + finishes. replace interior storefront at private dining room entry. fire sprinkler + alarm under separate permit. **associated with 2023-001338prv project review meeting with rebecca salgado. | $527,000 |
| Jun 9, 2023 | Completed final sign-off Aug 2026 | 555 Post St | replacement of (4) rain gutters & rainwater leaders on north & south elevation of (e) penthouse. addition of coping at the east & west perimeter parapets of building. no work on post st facadeDetails
replacement of (4) rain gutters & rainwater leaders on north & south elevation of (e) penthouse. addition of coping at the east & west perimeter parapets of building. no work on post st facade | $4,000 |
| Jun 6, 2023 | Completed final sign-off Apr 2024 | 333 Battery St | basement: conversion of (e) back of house space to new offices/changing rooms, new partitions, finishes & lightingDetails
basement: conversion of (e) back of house space to new offices/changing rooms, new partitions, finishes & lighting | $20,000 |
| May 30, 2023 | Completed final sign-off Mar 2024 | 555 North Point St | interior alterations prefunction finishes, lighting, ff&e, ada compliance, door hardware. meeting spaces, finishes, lighting ff+e, public restrooms, layouts to comply with current ada code complianceDetails
interior alterations prefunction finishes, lighting, ff&e, ada compliance, door hardware. meeting spaces, finishes, lighting ff+e, public restrooms, layouts to comply with current ada code compliance | $700,000 |
| May 23, 2023 | Completed final sign-off Sep 2024 | 335 Powell St | renovation of (e) clock bar space to new pdr lounge located north of historic lobby. f/a & f/s under separate permit. seating area only, no food or drink prepDetails
renovation of (e) clock bar space to new pdr lounge located north of historic lobby. f/a & f/s under separate permit. seating area only, no food or drink prep | $148,850 |
| May 12, 2023 | Completed final sign-off Jun 2025 | 335 Powell St | proposed renovation of existing retail space along geary blvd. fire sprinkler and fire alarm-deferred submittalDetails
proposed renovation of existing retail space along geary blvd. fire sprinkler and fire alarm-deferred submittal | $225,000 |
| May 5, 2023 | Completed final sign-off Sep 2024 | 335 Powell St | replace (e) revolving door & swing doors w/vestibule and store front. mep under sep permit fire alarm & sprinkler under sep permitDetails
replace (e) revolving door & swing doors w/vestibule and store front. mep under sep permit fire alarm & sprinkler under sep permit | $40,000 |
| May 5, 2023 | Completed final sign-off Jul 2026 | 545 Post St | replace (90) windows along post street facadeDetails
replace (90) windows along post street facade | $95,000 |
| May 5, 2023 | Completed final sign-off Aug 2026 | 555 Post St | replace (44) windows along post street facadeDetails
replace (44) windows along post street facade | $50,000 |
| May 2, 2023 | Completed final sign-off May 2024 | 333 Battery St | basement l/a, l/1 and l/2: scope includes new wine storage condensing unit on basement level a, renovation of (e) restaurant and bar on l/1, new partitions, finishes, and lighting, new kitchen with new partitions, finishes, lighting, & equipment. new boh restaurant prep area on l/2.Details
basement l/a, l/1 and l/2: scope includes new wine storage condensing unit on basement level a, renovation of (e) restaurant and bar on l/1, new partitions, finishes, and lighting, new kitchen with new partitions, finishes, lighting, & equipment. new boh restaurant prep area on l/2. | $1,000,000 |
| May 1, 2023 | Expired or cancelled cancelled Oct 2024 | 335 Powell St | lobby level: convert (6) stall women restroom to (9) single occupant all-gender restrooms.Details
lobby level: convert (6) stall women restroom to (9) single occupant all-gender restrooms. | $128,000 |
| Apr 5, 2023 | Completed final sign-off Jun 2024 | 1 Kearny St | revision to pa# 202209122232, add dbi special inspection form for permit, for record keeping purposes only.Details
revision to pa# 202209122232, add dbi special inspection form for permit, for record keeping purposes only. | |
| Mar 29, 2023 | Completed final sign-off Jun 2023 | 1 Kearny St | 1/f: revision to pa# 202208261400, revise to lighting, mechanical and finishes. reduced scope of workDetails
1/f: revision to pa# 202208261400, revise to lighting, mechanical and finishes. reduced scope of work | |
| Jan 30, 2023 | Never finaled issued Mar 2023, no final | 450 Powell St | revision to pa# 202206226855 for record keeping purposes only, sffd only permit: plan revised for assembly stamp.Details
revision to pa# 202206226855 for record keeping purposes only, sffd only permit: plan revised for assembly stamp. | |
| Jan 23, 2023 | Completed final sign-off Apr 2026 | 335 Powell St | replacement of existing emergency transformer(generator).relocation from 32nd fl roof to 4th floor roof.installation of new electrical room and fuel pump room at service level.Details
replacement of existing emergency transformer(generator).relocation from 32nd fl roof to 4th floor roof.installation of new electrical room and fuel pump room at service level. | $375,000 |
| Jan 6, 2023 | Completed final sign-off Mar 2026 | 1940 Broadway | revision to bpa#202110221029 to unit #4: omission of floor opening @ showers, concrete wall openings @ north wall of dining room, fake fireplace in study, addition of repair details for unseen conditionsDetails
revision to bpa#202110221029 to unit #4: omission of floor opening @ showers, concrete wall openings @ north wall of dining room, fake fireplace in study, addition of repair details for unseen conditions | |
| Dec 13, 2022 | Completed final sign-off Dec 2023 | 333 Battery St | the project scope include: level 3. renovation of (e) public restrooms, renovation of (e) restaurant and bar, (n) reception louge and coffee bar. renovation of (e) outdoor patio with (n) outdoor bar, concrete planter, trellis.Details
the project scope include: level 3. renovation of (e) public restrooms, renovation of (e) restaurant and bar, (n) reception louge and coffee bar. renovation of (e) outdoor patio with (n) outdoor bar, concrete planter, trellis. | $1,775,000 |
| Oct 31, 2022 | Completed final sign-off Oct 2023 | 450 Powell St | revision to pa# 202108186642. 2nd fl: add beer coolet into scope. add equipment in warming kitchen.Details
revision to pa# 202108186642. 2nd fl: add beer coolet into scope. add equipment in warming kitchen. | $10,000 |
| Oct 14, 2022 | Completed final sign-off May 2023 | 145 Leavenworth St | revision 201804136335 s3 to document the revised area with the mechanical room at roof levelDetails
revision 201804136335 s3 to document the revised area with the mechanical room at roof level | |
| Sep 12, 2022 | Completed final sign-off Jun 2024 | 1 Kearny St | repair facade. works includes remove and replace seals, remove and replace waterproofing membrane. e copper slope roof repair seal open joints and seams, replace fasteners. solder open seamsDetails
repair facade. works includes remove and replace seals, remove and replace waterproofing membrane. e copper slope roof repair seal open joints and seams, replace fasteners. solder open seams | $10,000 |
| Aug 26, 2022 | Completed final sign-off Dec 2023 | 333 Battery St | basement c: expansion of (e) fitness center, new finishes, mech & lighting. basement b & level 2: new finishes, retrofit lighting at (e) prefunction & meeting spaces, new vanity, sinks, lighting at public restrooms. maher n/a.Details
basement c: expansion of (e) fitness center, new finishes, mech & lighting. basement b & level 2: new finishes, retrofit lighting at (e) prefunction & meeting spaces, new vanity, sinks, lighting at public restrooms. maher n/a. | $400,000 |
| Aug 26, 2022 | Completed final sign-off Jun 2023 | 1 Kearny St | 1/f: partial demo of wall between (e) lobby & (e) retail. installation of a new movable glass wall between lobby & retail space and relocationg of guard desk. lighting, mech, electrical, & plumbing design/build under sep permit.Details
1/f: partial demo of wall between (e) lobby & (e) retail. installation of a new movable glass wall between lobby & retail space and relocationg of guard desk. lighting, mech, electrical, & plumbing design/build under sep permit. | $65,000 |
| Aug 17, 2022 | Completed final sign-off Dec 2023 | 333 Battery St | level 1: new paving, drains, finishes, exterior screen, entry door at porte-cochere; new lighting, mech, finishes, ff&e @new pre-arrival lobby; new handrail extensions (level 1 only) & floor finishes @ grand stair (levels 1-3).Details
level 1: new paving, drains, finishes, exterior screen, entry door at porte-cochere; new lighting, mech, finishes, ff&e @new pre-arrival lobby; new handrail extensions (level 1 only) & floor finishes @ grand stair (levels 1-3). | $600,000 |
| Jun 22, 2022 | Never finaled issued Jun 2022, no final | 450 Powell St | for record keeping purposes only. sffd only permit. obtain sffd assembly stamps for approved public space ti under pa 2021-0818-6642. sffd assembly stamps needed for sffd assembly operation permitDetails
for record keeping purposes only. sffd only permit. obtain sffd assembly stamps for approved public space ti under pa 2021-0818-6642. sffd assembly stamps needed for sffd assembly operation permit | |
| Apr 5, 2022 | Completed final sign-off Sep 2024 | 1 Kearny St | this submittal revised pa#202102164724. changes consist of revised location for new mechanical riser and associated ductwork, revised structural design to accomodate new riser location, and new ceilings.Details
this submittal revised pa#202102164724. changes consist of revised location for new mechanical riser and associated ductwork, revised structural design to accomodate new riser location, and new ceilings. | |
| Mar 31, 2022 | Completed final sign-off Apr 2023 | 145 Leavenworth St | revision to pa 201804136335-s3. revised walls with unit bathrooms. revised wall layout with community laundry space.Details
revision to pa 201804136335-s3. revised walls with unit bathrooms. revised wall layout with community laundry space. | |
| Mar 31, 2022 | Completed final sign-off Apr 2023 | 361 Turk St | revision to pa# 201804136327 s3. revised walls with unit bathrooms. revised wall layout with community laundry space.Details
revision to pa# 201804136327 s3. revised walls with unit bathrooms. revised wall layout with community laundry space. | |
| Mar 18, 2022 | Completed final sign-off Nov 2023 | 432 Powell St | lower level demo interior finish & non-structural. former scala's bistro location. no ceiling demo is included in this permit. per ab-017a permit showing accessability will be submitted with t.i. permit.Details
lower level demo interior finish & non-structural. former scala's bistro location. no ceiling demo is included in this permit. per ab-017a permit showing accessability will be submitted with t.i. permit. | $20,000 |
| Mar 1, 2022 | Completed final sign-off Nov 2023 | 450 Powell St | revision to pa 202108317502. changes include modifications to guestrooms and layout for a partial remodel of an existing 21 story 419 room, tourist hotel.Details
revision to pa 202108317502. changes include modifications to guestrooms and layout for a partial remodel of an existing 21 story 419 room, tourist hotel. | |
| Feb 8, 2022 | Never finaled issued Apr 2023, no final | 450 Powell St | non-structural partial remodel of exterior facade on powell/sutter st. remove awnings, gooseneck lights, scones & projecting cornices & small portion of damaged (e) street level exterior cladding. add (n) awnings, entrance lights, sconces, planters & replace (e) cladding finish w/ similar (n) finishDetails
non-structural partial remodel of exterior facade on powell/sutter st. remove awnings, gooseneck lights, scones & projecting cornices & small portion of damaged (e) street level exterior cladding. add (n) awnings, entrance lights, sconces, planters & replace (e) cladding finish w/ similar (n) finish | $50,000 |
| Feb 4, 2022 | Completed final sign-off Aug 2022 | 450 Powell St | rev to pa202107094114. changes include revised layouts for womens, mens and gender newtual bathrooms.Details
rev to pa202107094114. changes include revised layouts for womens, mens and gender newtual bathrooms. | |
| Sep 15, 2021 | Expired or cancelled withdrawn Feb 2023 | 450 Powell St | level 21 -interior remodel of existing space including enlarging an existing kitchen, renovating an existing bar, modifying mechanial, plumbing and electrical systems to accommodate kitchen/bar changes + lighting. new finishes and furniture.Details
level 21 -interior remodel of existing space including enlarging an existing kitchen, renovating an existing bar, modifying mechanial, plumbing and electrical systems to accommodate kitchen/bar changes + lighting. new finishes and furniture. | $300,000 |
| Sep 1, 2021 | Expired or cancelled withdrawn Apr 2024 | 2345 03rd St | t.i. in suite 319 & 320: select demo, construct of new interior walls, finishes, & relevant lighting. mep & fire life safety under separate permitDetails
t.i. in suite 319 & 320: select demo, construct of new interior walls, finishes, & relevant lighting. mep & fire life safety under separate permit | $653,000 |
| Aug 31, 2021 | Completed final sign-off Nov 2023 | 450 Powell St | guestroom remodel for levels 3-20: non-structural demo of interior finishes and fixtures of (e) hotel rooms partial remodel of ada rooms and suites to achieve accessibility reqs.partial remodel of non-accessible rooms to suites and premium rooms with enlarged bathrooms. see plans for add'l room workDetails
guestroom remodel for levels 3-20: non-structural demo of interior finishes and fixtures of (e) hotel rooms partial remodel of ada rooms and suites to achieve accessibility reqs.partial remodel of non-accessible rooms to suites and premium rooms with enlarged bathrooms. see plans for add'l room work | $1,049,000 |
| Aug 18, 2021 | Completed final sign-off Oct 2023 | 450 Powell St | lower lobby lvl: construction of meeting room space. lobby lvl: n lighting/elec outlets, finishes & furniture. mezz lvl: renovate (e) kitchen, convert meeting space to kitch area, n finishes in (e) lounge area, n bar canopy, millwork/equip, n lighting & elec outlets. 2/f: n equip in kitchen area...Details
lower lobby lvl: construction of meeting room space. lobby lvl: n lighting/elec outlets, finishes & furniture. mezz lvl: renovate (e) kitchen, convert meeting space to kitch area, n finishes in (e) lounge area, n bar canopy, millwork/equip, n lighting & elec outlets. 2/f: n equip in kitchen area... | $2,000,000 |
| Aug 11, 2021 | Completed final sign-off Nov 2021 | 400 Winston Dr | racking plan details and structural cals for (n) racking. ref t.i. 201912190042Details
racking plan details and structural cals for (n) racking. ref t.i. 201912190042 | $1,000 |
| Jul 23, 2021 | Never finaled issued Aug 2021, no final | 361 Turk St | revision to pa#202106011408: protion of bldg storm water is directed to flow-thru bio-retention planter that is located below the sewer lvl. storm sump is located on the basement lvl to collect&lift the storm water to gravity flow storm drain. 3way failsafe valves are utilized to re-direct stormwateDetails
revision to pa#202106011408: protion of bldg storm water is directed to flow-thru bio-retention planter that is located below the sewer lvl. storm sump is located on the basement lvl to collect&lift the storm water to gravity flow storm drain. 3way failsafe valves are utilized to re-direct stormwate | |
| Jul 14, 2021 | Completed final sign-off Nov 2021 | 400 Winston Dr | rev to pa201912190042: including egress & layout revisions.Details
rev to pa201912190042: including egress & layout revisions. | |
| Jul 9, 2021 | Completed final sign-off Aug 2022 | 450 Powell St | interior non structural demolition of interior partitions and bar area. remodel of extg office spaces and reception area to provide new accessible restrooms. documentation of extg accessibilty hardshi recently approved by sfdbi. minor misecellaneous corrections of accessibility deficiencies.Details
interior non structural demolition of interior partitions and bar area. remodel of extg office spaces and reception area to provide new accessible restrooms. documentation of extg accessibilty hardshi recently approved by sfdbi. minor misecellaneous corrections of accessibility deficiencies. | $200,000 |
| Jun 17, 2021 | Completed final sign-off May 2022 | 8 Mission St | interior renovation (ti)to extg lounge and restaurant dining area at outdoor patio 1st floor. no change in use or occupancy. no new sq footage to include non structural. non bearing partiiton walls, new lighting outlets, now hanging plant shelf, new finishes.Details
interior renovation (ti)to extg lounge and restaurant dining area at outdoor patio 1st floor. no change in use or occupancy. no new sq footage to include non structural. non bearing partiiton walls, new lighting outlets, now hanging plant shelf, new finishes. | $380,000 |
| Jun 1, 2021 | Never finaled issued Jun 2021, no final | 361 Turk St | plumbing only: stormwater system permit for future construction of building at 361 turk street under pa# 201804136327.Details
plumbing only: stormwater system permit for future construction of building at 361 turk street under pa# 201804136327. | $10,000 |
| May 12, 2021 | Completed final sign-off May 2023 | 145 Leavenworth St | stormwater systempermit for future construction of building at 145 leavenworth under pa #201804136335-sDetails
stormwater systempermit for future construction of building at 145 leavenworth under pa #201804136335-s | $10,000 |
| Feb 16, 2021 | Completed final sign-off Nov 2022 | 1 Kearny St | work includes (n) exhaust ductwork & equipment serving greast duct system. exterior modification are limited to (n) louvers in (e) wall at 2nd flr of recess in annex facade on geary st. all electrical & plumbing work will be design-build by the general contractor under a separate permit.Details
work includes (n) exhaust ductwork & equipment serving greast duct system. exterior modification are limited to (n) louvers in (e) wall at 2nd flr of recess in annex facade on geary st. all electrical & plumbing work will be design-build by the general contractor under a separate permit. | $259,700 |
| Feb 10, 2021 | Never finaled issued Feb 2021, no final | 8 Mission St | patch wall where existing electrical outlet moved (1)Details
patch wall where existing electrical outlet moved (1) | $1,500 |
| Feb 4, 2021 | Completed final sign-off Jan 2024 | 500 Sansome St | demolition of (e) front door, glazing & finishes per plan.construction of (n) front doors and glaszing at (e) opening.construction of new structural supports as needed for (n) construction.Details
demolition of (e) front door, glazing & finishes per plan.construction of (n) front doors and glaszing at (e) opening.construction of new structural supports as needed for (n) construction. | $30,000 |
| Jan 27, 2021 | Never finaled issued Jun 2021, no final | 400 Winston Dr | install electrical & lighting, heating ventilating & air conditioning system to serve tenant improvement work under pa# 201912190042.Details
install electrical & lighting, heating ventilating & air conditioning system to serve tenant improvement work under pa# 201912190042. | $500,000 |
| Dec 15, 2020 | Completed final sign-off Dec 2024 | 340 Stockton St | renovation to (e) lobby & meeting room levels to include replacement of (e) finishes & millwork. ada upgrades to (e) restrooms. replace (e) lighting. no hvac or structural work.Details
renovation to (e) lobby & meeting room levels to include replacement of (e) finishes & millwork. ada upgrades to (e) restrooms. replace (e) lighting. no hvac or structural work. | $425,000 |
| Nov 20, 2020 | Completed final sign-off Dec 2021 | 500 Sansome St | demo and removal of (e) walls and (1) run of stairs within stairwell 1. construction of (n) walls, stairs and landing to accomodate (n) layout within stairwell 1.Details
demo and removal of (e) walls and (1) run of stairs within stairwell 1. construction of (n) walls, stairs and landing to accomodate (n) layout within stairwell 1. | $150,000 |
| Oct 16, 2020 | Completed final sign-off May 2023 | 145 Leavenworth St | mayor dir 17-02. revision to pa #201804136335s1, changes include: ground floor load map updated to arch plans, shift shear walls as needed. update elevator shaft dimensions.Details
mayor dir 17-02. revision to pa #201804136335s1, changes include: ground floor load map updated to arch plans, shift shear walls as needed. update elevator shaft dimensions. | |
| Sep 23, 2020 | Completed final sign-off Feb 2023 | 145 Leavenworth St | mayor dir# 17-02. rev to pa# 201804136335-s9. 46 ri columns were added in vicenity of tower crane. these ri's are shown in plan review on attached & also highlighted in ri column section. dimension of added "c" type ri's are same as "a" type ri's but they are on a 4' spacing instead of 8'spacing.Details
mayor dir# 17-02. rev to pa# 201804136335-s9. 46 ri columns were added in vicenity of tower crane. these ri's are shown in plan review on attached & also highlighted in ri column section. dimension of added "c" type ri's are same as "a" type ri's but they are on a 4' spacing instead of 8'spacing. | |
| Sep 14, 2020 | Completed final sign-off Jun 2022 | 154 Lombard St | interior remodel of common corridors include new tile flooring on level 1, new finishes (wall to wall carpet, wall covering, paint). and replacing existing light fixtures wiht new low energy light fixtures. new led lighting at select locations.Details
interior remodel of common corridors include new tile flooring on level 1, new finishes (wall to wall carpet, wall covering, paint). and replacing existing light fixtures wiht new low energy light fixtures. new led lighting at select locations. | $35,000 |
| Sep 10, 2020 | Completed final sign-off Jun 2022 | 156 Lombard St | common area: interior remodel to include new tile flooring on level 1, new finishes, walls, carpet, wall coverings, paint. replace existing light fixtures w/ new led fixtures, new led lighting at select locations as required to meet code.Details
common area: interior remodel to include new tile flooring on level 1, new finishes, walls, carpet, wall coverings, paint. replace existing light fixtures w/ new led fixtures, new led lighting at select locations as required to meet code. | $35,000 |
| Aug 26, 2020 | Completed final sign-off Apr 2023 | 361 Turk St | mayor dir# 17-02. rev to pa# 201804136327-s2. level 2 re-designed to incorporated new skylight @ courtyard. minor updated to level a code formed steel stud framing; dimensions clarified & details cleaned up & vertical stiffeners removed from details 14 + 15/s4.64. no changes made to lateral system.Details
mayor dir# 17-02. rev to pa# 201804136327-s2. level 2 re-designed to incorporated new skylight @ courtyard. minor updated to level a code formed steel stud framing; dimensions clarified & details cleaned up & vertical stiffeners removed from details 14 + 15/s4.64. no changes made to lateral system. | $20,000 |
| Jul 15, 2020 | Completed final sign-off Apr 2023 | 361 Turk St | mayor dir# 17-02. revision to pa# 201804136327-s1. work includes changes to shear walls. location of steps & depressions. dimension cleanups for coordination purposes. ** maher: n/a **Details
mayor dir# 17-02. revision to pa# 201804136327-s1. work includes changes to shear walls. location of steps & depressions. dimension cleanups for coordination purposes. ** maher: n/a ** | |
| Feb 28, 2020 | Never finaled issued Mar 2020, no final | 500 Sansome St | ste. #402 - demo of (e) non-load bearing partitions, doors & lighting; construction of (n) non-load bearing partitions, doors, finishing & lighting.Details
ste. #402 - demo of (e) non-load bearing partitions, doors & lighting; construction of (n) non-load bearing partitions, doors, finishing & lighting. | $605,646 |
| Feb 7, 2020 | Completed final sign-off Oct 2022 | 361 Turk St | revision to pa 2019-0726-7068 and 2019-0919-2189 add cap beams along turk street side. add soldier beams for future tower crane elevator pit and lagging along north wall. update details and minesions per field conditionsDetails
revision to pa 2019-0726-7068 and 2019-0919-2189 add cap beams along turk street side. add soldier beams for future tower crane elevator pit and lagging along north wall. update details and minesions per field conditions | $50,000 |
| Feb 3, 2020 | Completed final sign-off May 2020 | 63 Jefferson St | revision to pa #2019-1218-9841: revsie glass spec and t24 to performance based analysis for increased u-factor. work on retail space only.Details
revision to pa #2019-1218-9841: revsie glass spec and t24 to performance based analysis for increased u-factor. work on retail space only. | |
| Jan 9, 2020 | Completed final sign-off Oct 2022 | 361 Turk St | tower crane foundation and erect tower craneDetails
tower crane foundation and erect tower crane | $50,000 |
| Dec 20, 2019 | Never finaled issued Jan 2020, no final | 2620 Buchanan St | revision to pa# 2015-1009-9357: addition of a 60-minute fire rated parapet to an existing roof.Details
revision to pa# 2015-1009-9357: addition of a 60-minute fire rated parapet to an existing roof. | $2,000 |
| Dec 19, 2019 | Completed final sign-off Nov 2021 | 400 Winston Dr | new non load bearing walls (n) interior doors (n) ada compliant public bathrooms,(n) employee bathroom & shower room, elec closet, (n) janitors closet, (n) dressing rooms, elec, mech, plumbing, fire sprinkler under sep permitDetails
new non load bearing walls (n) interior doors (n) ada compliant public bathrooms,(n) employee bathroom & shower room, elec closet, (n) janitors closet, (n) dressing rooms, elec, mech, plumbing, fire sprinkler under sep permit | $1,000,000 |
| Dec 18, 2019 | Completed final sign-off Feb 2020 | 63 Jefferson St | space "l" tenant improvement of retail space of interior and storefront. new partitions, toilet room, fixtures, furnishings, finishes. work also includes modification to storefrontDetails
space "l" tenant improvement of retail space of interior and storefront. new partitions, toilet room, fixtures, furnishings, finishes. work also includes modification to storefront | $91,602 |
| Dec 13, 2019 | Never finaled issued Feb 2021, no final | 500 Sutter St | comply w/ sf accessible business entry program. this building is a compliance category 3. the sidewalk slope will be modified to eliminate the step and provide an accessible entrance. door and hardware will be upgradedDetails
comply w/ sf accessible business entry program. this building is a compliance category 3. the sidewalk slope will be modified to eliminate the step and provide an accessible entrance. door and hardware will be upgraded | $15,000 |
| Oct 17, 2019 | Completed final sign-off Nov 2019 | 250 Beach St | interior work only including modification of a few walls, the floor, patching & repair work to be completed as required. work to also include new power outlets/lightingDetails
interior work only including modification of a few walls, the floor, patching & repair work to be completed as required. work to also include new power outlets/lighting | $50,000 |
| Aug 22, 2019 | Never finaled issued Nov 2019, no final | 1333 Columbus Av | change of use and occpancy from restauran/bar to merchantile with assembly space. tenant improvement for mercantile use. new interior walls and finishes. no exterior work. ref pa #201907115596 (for fire damage). maher naDetails
change of use and occpancy from restauran/bar to merchantile with assembly space. tenant improvement for mercantile use. new interior walls and finishes. no exterior work. ref pa #201907115596 (for fire damage). maher na | $167,000 |
| Jul 26, 2019 | Never finaled issued Aug 2019, no final | 140 Mason St | all floors: evacuation signage related to pa 2016-1115-2731 interior signs only. maher n/a.Details
all floors: evacuation signage related to pa 2016-1115-2731 interior signs only. maher n/a. | $20,000 |
| Jul 11, 2019 | Never finaled issued Aug 2019, no final | 1333 Columbus Av | fire repair exterior and interior: new accessible restroom on ground floor. new bathroom 3rd floor residence. new interior stairs throughout, new elevator, new storefront at ground floor. comply with nov #201876901. tenant improvement under separate permitDetails
fire repair exterior and interior: new accessible restroom on ground floor. new bathroom 3rd floor residence. new interior stairs throughout, new elevator, new storefront at ground floor. comply with nov #201876901. tenant improvement under separate permit | $320,000 |
| Jul 8, 2019 | Completed final sign-off Mar 2021 | 595 Clipper St | as per planning confirmation of demo calculations only for 2018015629enf & 2019012759enf. revision to 201107079682, 201711073406, 201803093281, 201901241098, 201905312200.Details
as per planning confirmation of demo calculations only for 2018015629enf & 2019012759enf. revision to 201107079682, 201711073406, 201803093281, 201901241098, 201905312200. | |
| Jun 26, 2019 | Never finaled issued Jun 2019, no final | 2741 16th St | evacuation sign mapsDetails
evacuation sign maps | |
| Jun 21, 2019 | Completed final sign-off May 2021 | 1076 Howard St | replacement in kind of 2 windows instead of repair and replacemDetails
replacement in kind of 2 windows instead of repair and replacem | $30,000 |
| May 31, 2019 | Expired or cancelled withdrawn Apr 2023 | 145 Leavenworth St | excavation of (e) soil to sub-grade to prepare for (n) constructionDetails
excavation of (e) soil to sub-grade to prepare for (n) construction | $250,500 |
| May 31, 2019 | Expired or cancelled withdrawn Jul 2019 | 361 Turk St | excavation of (e) soil to allow for (n) building constructionDetails
excavation of (e) soil to allow for (n) building construction | $300,000 |
| May 9, 2019 | Completed final sign-off Feb 2020 | 2741 16th St | revision to pa 2018-1018-3533, split production 110 into two equal size rooms. add new secure door at stair @ ground floor with panic hardware for free egress at all timesDetails
revision to pa 2018-1018-3533, split production 110 into two equal size rooms. add new secure door at stair @ ground floor with panic hardware for free egress at all times | |
| Apr 9, 2019 | Completed final sign-off Mar 2020 | 2741 16th St | underground fire line ref pa 2019-0226-3812 (install new fire sprinkler system per nfpa 3 through-out existing building with new 4-inch fire service off of 8-inch main on 16th st per nfpa 24. install 271 sprinklers.)Details
underground fire line ref pa 2019-0226-3812 (install new fire sprinkler system per nfpa 3 through-out existing building with new 4-inch fire service off of 8-inch main on 16th st per nfpa 24. install 271 sprinklers.) | $30,000 |
| Apr 5, 2019 | Completed final sign-off Feb 2020 | 2741 16th St | electrical, lighting & power & t-24 for pa #201810183533Details
electrical, lighting & power & t-24 for pa #201810183533 | $350,000 |
| Apr 1, 2019 | Never finaled issued Feb 2021, no final | 529 Powell St | barrier removal modification of an a2 occup located on powell(&sutter) to comply with sf accessible bus entry prog 51-16. cat ii. the threshold will be adjusted for an accessible entrance & ele push button will be installed to allow access. to comply with abe ord 51-16Details
barrier removal modification of an a2 occup located on powell(&sutter) to comply with sf accessible bus entry prog 51-16. cat ii. the threshold will be adjusted for an accessible entrance & ele push button will be installed to allow access. to comply with abe ord 51-16 | $15,000 |
| Mar 28, 2019 | Completed final sign-off Nov 2020 | 12 04th St | interior to - remove (e) wood floor replace with new tile floor. remove and replace (2) decorative ceiling fixtures (same power location) remove and replace wall mounted lighting fixtureDetails
interior to - remove (e) wood floor replace with new tile floor. remove and replace (2) decorative ceiling fixtures (same power location) remove and replace wall mounted lighting fixture | $65,000 |
| Mar 26, 2019 | Completed final sign-off Apr 2019 | 562 Sutter St | rev to pa201809170423; remove of scope of levl 1 recessed entry. scope includes door j, door h and type a5 eterior wall. this scope under sep pa201811054938. this permit to satisy requ from dcp kelly wong.Details
rev to pa201809170423; remove of scope of levl 1 recessed entry. scope includes door j, door h and type a5 eterior wall. this scope under sep pa201811054938. this permit to satisy requ from dcp kelly wong. |