Block 0306, lot 020
555 Post St
- City’s use
- Commercial Hotel
- Built
- 1922
- Stories
- 7
- Units
- 81
- Building
- 53,390 sq ft
- Lot
- 9,452 sq ft
- Zoning
- C3G
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
44 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 11, 2026 | Completed final sign-off Aug 2026 | 555 Post St | Centric Construction Inc | revision to 202305057166, 2023-09206pta: add replacement of 2 penthouse windows with new aluminum windows. removal of east coping under 202306099668. coping shall be installed under sep permit.Details
revision to 202305057166, 2023-09206pta: add replacement of 2 penthouse windows with new aluminum windows. removal of east coping under 202306099668. coping shall be installed under sep permit. | $7,000 |
| Jun 9, 2023 | Completed final sign-off Aug 2026 | 555 Post St | Centric Construction Inc | replacement of (4) rain gutters & rainwater leaders on north & south elevation of (e) penthouse. addition of coping at the east & west perimeter parapets of building. no work on post st facadeDetails
replacement of (4) rain gutters & rainwater leaders on north & south elevation of (e) penthouse. addition of coping at the east & west perimeter parapets of building. no work on post st facade | $4,000 |
| May 5, 2023 | Completed final sign-off Aug 2026 | 555 Post St | Centric Construction Inc | replace (44) windows along post street facadeDetails
replace (44) windows along post street facade | $50,000 |
| Nov 30, 2022 | Never finaled filed Nov 2022, never issued | 555 Post St | priority process - exterior repairs/deferred maintenance in compliance w/facade/inspection ord. remove brick to determine condition of embedded steel. repair/waterproofing of (e) embedded steel elements. replace corroded steel w/in wall. r/r brick as needed. repointing of brick mortar joints.Details
priority process - exterior repairs/deferred maintenance in compliance w/facade/inspection ord. remove brick to determine condition of embedded steel. repair/waterproofing of (e) embedded steel elements. replace corroded steel w/in wall. r/r brick as needed. repointing of brick mortar joints. | $165,000 | |
| Feb 5, 2020 | Never finaled issued Feb 2020, no final | 555 Post St | Pacific Auxiliary Fire Alarm | fire alarm t.i. : adding 4 horn strobes and 2 strobes to extg notifier nfs2-3030 fire alarm system. ref app#201907256971Details
fire alarm t.i. : adding 4 horn strobes and 2 strobes to extg notifier nfs2-3030 fire alarm system. ref app#201907256971 | $5,612 |
| Feb 5, 2020 | Never finaled issued Feb 2020, no final | 555 Post St | Foothill Fire Protection Inc. | ref pa# 202001131702; as builtsDetails
ref pa# 202001131702; as builts | $3,400 |
| Jan 13, 2020 | Never finaled issued Jan 2020, no final | 555 Post St | Foothill Fire Protection Inc., Devlin/Mcnally Construction | relocate 1 e upright sprinkler, change 17 e upright sprinkler to match relocate tyepe, delete 2 e upright sprinklers, delete 1 pendent sprinkler in mezzanineDetails
relocate 1 e upright sprinkler, change 17 e upright sprinkler to match relocate tyepe, delete 2 e upright sprinklers, delete 1 pendent sprinkler in mezzanine | $3,400 |
| Dec 12, 2019 | Never finaled issued Dec 2019, no final | 555 Post St | Pacific Auxiliary Fire Alarm | revision to pa #2019-0923-2395 - fire alarm ti: as-built submittal (per lt. tom haney) deleting 1 pull station and 1 strobe. adding 1 horn-strobe to existing notifier nfs2-3030 fire alarm systemDetails
revision to pa #2019-0923-2395 - fire alarm ti: as-built submittal (per lt. tom haney) deleting 1 pull station and 1 strobe. adding 1 horn-strobe to existing notifier nfs2-3030 fire alarm system | |
| Sep 23, 2019 | Never finaled issued Sep 2019, no final | 555 Post St | Pacific Auxiliary Fire Alarm | fire alarm t.i. adding 1 power supply, 4 horn- strobes, 1 strobe, 1 smoke detetor, 1 pull station to extg notifier nfs2-3030 fire alarm system. ref app#201008108463Details
fire alarm t.i. adding 1 power supply, 4 horn- strobes, 1 strobe, 1 smoke detetor, 1 pull station to extg notifier nfs2-3030 fire alarm system. ref app#201008108463 | $6,390 |
| Jul 25, 2019 | Never finaled issued Oct 2019, no final | 555 Post St | Devlin/Mcnally Construction | revision to 201906244293 ti work on existing mezzanine to include partitions and non bearing walls, build 3 walls with demo of selected light fixtures, new lighting only on mezzanine floorDetails
revision to 201906244293 ti work on existing mezzanine to include partitions and non bearing walls, build 3 walls with demo of selected light fixtures, new lighting only on mezzanine floor | $20,000 |
| Jun 24, 2019 | Completed final sign-off Nov 2019 | 555 Post St | Devlin/Mcnally Construction | demo and remove 3 non structural wall that act as partitions that were put in during previous remodelDetails
demo and remove 3 non structural wall that act as partitions that were put in during previous remodel | $1,000 |
| May 2, 2019 | Never finaled filed May 2019, never issued | 555 Post St | ti removation part of the ground floor and basement, work includes interior work for new classrooms, kitchen area, common and utility areas, mep work deferred, no structural or exterior work.Details
ti removation part of the ground floor and basement, work includes interior work for new classrooms, kitchen area, common and utility areas, mep work deferred, no structural or exterior work. | $400,000 | |
| Jan 15, 2016 | Completed final sign-off Mar 2016 | 555 Post St | Pacific Auxiliary Fire Alarm | fire alarm permit. installation of new fire alarm system as part of a t.i of bldg(s) renovation. ref approved bldg permit#201504224344.Details
fire alarm permit. installation of new fire alarm system as part of a t.i of bldg(s) renovation. ref approved bldg permit#201504224344. | $160,000 |
| Jan 11, 2016 | Completed final sign-off Sep 2016 | 555 Post St | K N S Electric | revision to pa 2015-0422-4344 changes to guestroom & corridor lighting and updates to luminaire schedule.Details
revision to pa 2015-0422-4344 changes to guestroom & corridor lighting and updates to luminaire schedule. | |
| Dec 18, 2015 | Completed final sign-off Mar 2016 | 555 Post St | Incom Mechanical Inc | as built for fourth floor to be applied to existing fire sprinkler permit 2015-1216-5216Details
as built for fourth floor to be applied to existing fire sprinkler permit 2015-1216-5216 | $1,500 |
| Dec 16, 2015 | Completed final sign-off Mar 2016 | 555 Post St | Incom Mechanical Inc | as built to be applied to existing fire sprinkler permit 2015-1211-4863- relocate 32 on floors 5,6 and 7 for new units configurations- as built required with calculations and 5 year certifaction updateDetails
as built to be applied to existing fire sprinkler permit 2015-1211-4863- relocate 32 on floors 5,6 and 7 for new units configurations- as built required with calculations and 5 year certifaction update | $5,000 |
| Dec 11, 2015 | Completed final sign-off Mar 2016 | 555 Post St | Incom Mechanical Inc | modify (e) fire sprinkler system to accomodate guest room changes on floor 5 - 7. relocate 17 and remove 5Details
modify (e) fire sprinkler system to accomodate guest room changes on floor 5 - 7. relocate 17 and remove 5 | $5,000 |
| Nov 4, 2015 | Completed final sign-off Sep 2016 | 555 Post St | K N S Electric | revision to pa 2015-0422-4344, scope of work consists of electrical system layout modificationsDetails
revision to pa 2015-0422-4344, scope of work consists of electrical system layout modifications | |
| Aug 10, 2015 | Never finaled issued Oct 2015, no final | 555 Post St | Centric Building Inc. | this permit includes the alteration of (1) existing passenger elevator,new compliant stair & door, will be added at elevator penthouse on roof, mep shall be part of a separate permit.Details
this permit includes the alteration of (1) existing passenger elevator,new compliant stair & door, will be added at elevator penthouse on roof, mep shall be part of a separate permit. | $16,000 |
| Jul 2, 2015 | Completed final sign-off Dec 2015 | 555 Post St | K C Glass Inc | replacing selected (e) wood single hung widows with (n) aluminum single hung windows. all windows to be replaced do not fall on post st. facade. (not visible from street). replacement in kind. 127 windows to be replaced within light courts. max u-factor - 0.46.Details
replacing selected (e) wood single hung widows with (n) aluminum single hung windows. all windows to be replaced do not fall on post st. facade. (not visible from street). replacement in kind. 127 windows to be replaced within light courts. max u-factor - 0.46. | $57,000 |
| Jun 2, 2015 | Completed final sign-off Jun 2015 | 555 Post St | Aquamatic Fire Protection | first floor and basement: add 5 upright. add 1 pendent sprinkler. upgrade existing earthquake bracing in area of work. no underground work. ref. t.i. appl.# 2015.0409.3262.Details
first floor and basement: add 5 upright. add 1 pendent sprinkler. upgrade existing earthquake bracing in area of work. no underground work. ref. t.i. appl.# 2015.0409.3262. | $4,400 |
| May 6, 2015 | Completed final sign-off Jul 2015 | 555 Post St | building new raised concrete and steel platform and steps down to extg finishes floor level. structure work deferred from pa#201504093262Details
building new raised concrete and steel platform and steps down to extg finishes floor level. structure work deferred from pa#201504093262 | $20,000 | |
| Apr 22, 2015 | Completed final sign-off Sep 2016 | 555 Post St | Digney York Associates-California Lp | flrs: 4-7; the project scope of work consist of converting (e) suites into separate guestrooms,interior renovation of all (e) guest restrms incl finishes & plmbg fixtures & upgrade of (e)accessible rooms to be fully compliant for 555 post st bldg.a total of 17 new guestrooms will be added.Details
flrs: 4-7; the project scope of work consist of converting (e) suites into separate guestrooms,interior renovation of all (e) guest restrms incl finishes & plmbg fixtures & upgrade of (e)accessible rooms to be fully compliant for 555 post st bldg.a total of 17 new guestrooms will be added. | $1,000,000 |
| Apr 9, 2015 | Completed final sign-off Jul 2015 | 555 Post St | move interior tenant front door, move existing ramps and doors at basement. reconfiguration of rooms within,no external work,new framing for sturctural floors/walls- under separate permit.Details
move interior tenant front door, move existing ramps and doors at basement. reconfiguration of rooms within,no external work,new framing for sturctural floors/walls- under separate permit. | $50,000 | |
| Sep 14, 2010 | Completed final sign-off Sep 2010 | 555 Post St | Innovative Technologies | 1st & 2nd floors-connect 2 new duct smoke detectors to existing fire alarm system for supervisory onlyDetails
1st & 2nd floors-connect 2 new duct smoke detectors to existing fire alarm system for supervisory only | $800 |
| Sep 7, 2010 | Completed final sign-off Dec 2010 | 555 Post St | West Coast Premier Construction Inc | install new counter balance alum ladder to augment the existing fire escape egress at north elevation, front of 555 post. prior approval for install of ladder was obtained from dbi, 20108108463. ref 2.a.1. proposed ladder is installed between 2nd and gr fl for fire egressDetails
install new counter balance alum ladder to augment the existing fire escape egress at north elevation, front of 555 post. prior approval for install of ladder was obtained from dbi, 20108108463. ref 2.a.1. proposed ladder is installed between 2nd and gr fl for fire egress | $8,000 |
| Sep 7, 2010 | Completed final sign-off Sep 2010 | 555 Post St | O'keeffe-Mechanical Co | basement & 2nd floor-duct work per drawing @ 1st floor & 2nd floor. ref pa #201008108463.Details
basement & 2nd floor-duct work per drawing @ 1st floor & 2nd floor. ref pa #201008108463. | $15,000 |
| Aug 10, 2010 | Completed final sign-off Dec 2010 | 555 Post St | change of occupancy of tenant space on basement, 1st and 2nd floors from office ( b occupancy) to educational ( e occupancy) . minor demo and patching of walls, doors and frames, no work in existing tourist hotel, no exterior workDetails
change of occupancy of tenant space on basement, 1st and 2nd floors from office ( b occupancy) to educational ( e occupancy) . minor demo and patching of walls, doors and frames, no work in existing tourist hotel, no exterior work | $25,000 | |
| Feb 7, 2003 | Completed final sign-off Apr 2003 | 555 Post St | Cic Associates, Inc | painting of walls cut in doorway from gen managers office to conference rm replace (e) lighting fixtDetails
painting of walls cut in doorway from gen managers office to conference rm replace (e) lighting fixt | $2,000 |
| Oct 8, 2002 | Completed final sign-off Jan 2003 | 555 Post St | new door at rear of property 3 hrs door. rev to 2000/01/06/348Details
new door at rear of property 3 hrs door. rev to 2000/01/06/348 | $2,500 | |
| Jul 14, 2000 | Completed final sign-off Jan 2001 | 555 Post St | rev. to previously approved pa#2000/01/06/348Details
rev. to previously approved pa#2000/01/06/348 | $1,900 | |
| May 11, 2000 | Expired or cancelled expired May 2001 | 555 Post St | Acker & Guerrero Roof Co | re roofingDetails
re roofing | $29,000 |
| May 11, 2000 | Completed final sign-off Dec 2000 | 555 Post St | Sasco | replacement of existing fire alarm system devices in the buildng core area as required by core renovDetails
replacement of existing fire alarm system devices in the buildng core area as required by core renov | $30,000 |
| Apr 19, 2000 | Completed final sign-off Jan 2001 | 555 Post St | t.i. fire protection/sprinkler planDetails
t.i. fire protection/sprinkler plan | $12,500 | |
| Mar 21, 2000 | Completed final sign-off Jan 2001 | 555 Post St | provide electrical per plans ti under app #2000115215 mech under app #200003144237Details
provide electrical per plans ti under app #2000115215 mech under app #200003144237 | $10,000 | |
| Mar 21, 2000 | Completed final sign-off Jan 2001 | 555 Post St | provide elect per plan t/i under ap#20000115223 mech under ap#20003144239 basementDetails
provide elect per plan t/i under ap#20000115223 mech under ap#20003144239 basement | $10,000 | |
| Mar 21, 2000 | Completed final sign-off Jan 2001 | 555 Post St | provide elect per plan ti under ap#20000115213 mech under ap#200003144238 1st floorDetails
provide elect per plan ti under ap#20000115213 mech under ap#200003144238 1st floor | $10,000 | |
| Mar 14, 2000 | Completed final sign-off Jan 2001 | 555 Post St | t/i under app #20000115213 1st floorDetails
t/i under app #20000115213 1st floor | $10,000 | |
| Mar 14, 2000 | Completed final sign-off Jan 2001 | 555 Post St | t/i under app #20000115223 provide mech per plansDetails
t/i under app #20000115223 provide mech per plans | $10,000 | |
| Mar 14, 2000 | Completed final sign-off Jan 2001 | 555 Post St | t/i under app #20000115215 provide mech epr plansDetails
t/i under app #20000115215 provide mech epr plans | $10,000 | |
| Jan 15, 2000 | Completed final sign-off Jan 2001 | 555 Post St | 1st floor tenant improvementDetails
1st floor tenant improvement | $50,000 | |
| Jan 15, 2000 | Completed final sign-off Jan 2001 | 555 Post St | basement tenant improvementDetails
basement tenant improvement | $50,000 | |
| Jan 15, 2000 | Completed final sign-off Jan 2001 | 555 Post St | 2/f & mezz level t/iDetails
2/f & mezz level t/i | $50,000 | |
| Jan 6, 2000 | Completed final sign-off Jan 2001 | 555 Post St | conversion approx 18,500 basementDetails
conversion approx 18,500 basement | $200,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.