Luat Duong
- Listed as
- architect, authorized agent-others
- Firm
- Ltd Architecture
- Based in
- Oakland
- On San Francisco permits
- May 2018 to Sep 2026
50 permits since 2000 (architect on 49 permits, authorized agent-others on 1 permit): 26 completed, 16 in progress, 5 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 28, 2026 | In progress issued Sep 2026 | 160 Richland Av | Superbuilt | add doors and windows to shed, self elect to repair and reinforce structure of shed, no added occupiable space add electrical outlets and light, rot repair per uif. no work @ front structure.Details
add doors and windows to shed, self elect to repair and reinforce structure of shed, no added occupiable space add electrical outlets and light, rot repair per uif. no work @ front structure. | $20,000 |
| Sep 18, 2026 | In progress filed Sep 2026, not yet issued | 3067 Sacramento St | revision to 202508112730, revise bathroom layout, add mechanical unit.Details
revision to 202508112730, revise bathroom layout, add mechanical unit. | $10,000 | |
| Sep 18, 2026 | In progress issued Sep 2026 | 160 Richland Av | Superbuilt | increase opening in dining room, replace window at side and rear in kind, replace (e) water heater for lower floor unit.Details
increase opening in dining room, replace window at side and rear in kind, replace (e) water heater for lower floor unit. | $28,000 |
| Jul 30, 2026 | In progress issued Aug 2026 | 574 30th Av | Fox Brothers Construction Inc | revision to pa # 202411014180 - minor interior wall adjustment on 1st and 2nd floor. add rear elevation window on 1st floor, expand interior opening and removal of door and header at kitchen on 2nd floor. replace skylight.Details
revision to pa # 202411014180 - minor interior wall adjustment on 1st and 2nd floor. add rear elevation window on 1st floor, expand interior opening and removal of door and header at kitchen on 2nd floor. replace skylight. | $15,000 |
| Jun 15, 2026 | In progress filed Jun 2026, not yet issued | 832 Page St | convert laundry to 2nd bathroom. change entry door into exit stair 2.Details
convert laundry to 2nd bathroom. change entry door into exit stair 2. | $20,000 | |
| Jun 15, 2026 | In progress filed Jun 2026, not yet issued | 834 Page St | remodel (e) bath to add additional vanity/ faucet fixture.Details
remodel (e) bath to add additional vanity/ faucet fixture. | $2,500 | |
| Apr 16, 2026 | In progress issued May 2026 | 134 02nd Av | Cej Construction Llc | close the windows in nombers 206, 307, 306, 402, 404. revision to pa #202102174839 (s1) (r8)Details
close the windows in nombers 206, 307, 306, 402, 404. revision to pa #202102174839 (s1) (r8) | |
| Mar 5, 2026 | Completed final sign-off Mar 2026 | 1390 Rhode Island St | Line Construction Llc | revision to pa #202410032218: adjust window size at 1st entry floor & 2nd flr to reflect built condition, revise powder room layout for unit 1. revise primary bath/bedroom layout for unit 2. add interior railling dtlDetails
revision to pa #202410032218: adjust window size at 1st entry floor & 2nd flr to reflect built condition, revise powder room layout for unit 1. revise primary bath/bedroom layout for unit 2. add interior railling dtl | $2,000 |
| Nov 20, 2025 | In progress issued Jan 2026 | 18 Parnassus Av | D K G Construction Inc | add spa @ rear yardDetails
add spa @ rear yard | $30,000 |
| Aug 11, 2025 | In progress issued Feb 2026 | 3067 Sacramento St | Eco Logic Construction & Design Inc. | 1st floor ti: for design professional space, converted from retail with accesable entry and bathroom.Details
1st floor ti: for design professional space, converted from retail with accesable entry and bathroom. | $120,000 |
| Jul 29, 2025 | In progress issued Aug 2025 | 40 Day St | interior renovation of bottom floor rear of garage space, add wall for felex room, with modification of rear openings. add bar sink in den.Details
interior renovation of bottom floor rear of garage space, add wall for felex room, with modification of rear openings. add bar sink in den. | $50,000 | |
| Jun 13, 2025 | In progress issued Jun 2025 | 42 Jasper Pl | D K G Construction Inc | revision to 202001141806. remove door 013, resize window, relocate mech door location. prior revision 202310209130.Details
revision to 202001141806. remove door 013, resize window, relocate mech door location. prior revision 202310209130. | $10,000 |
| Apr 17, 2025 | In progress issued Jun 2025 | 18 Parnassus Av | D K G Construction Inc | revision to pa 202203150007 add 1 skylight to rear roof volume to existing permitDetails
revision to pa 202203150007 add 1 skylight to rear roof volume to existing permit | $5,000 |
| Dec 2, 2024 | In progress issued Nov 2025 | 574 30th Av | capture rear garage space for den, living space, laundry and bath. re-arrange upstair primary bath, add bath, renovate kitchen. new rear yard deck, 243 sqft.Details
capture rear garage space for den, living space, laundry and bath. re-arrange upstair primary bath, add bath, renovate kitchen. new rear yard deck, 243 sqft. | $300,000 | |
| Oct 3, 2024 | Completed final sign-off Mar 2026 | 1390 Rhode Island St | Line Construction Llc | interior renovation at floor 1 and upper unit: floor 2 and attic floors, (n) rear deck, modify windows and doors at side/rear or bldg. basement scope of work issued thru 202409160807Details
interior renovation at floor 1 and upper unit: floor 2 and attic floors, (n) rear deck, modify windows and doors at side/rear or bldg. basement scope of work issued thru 202409160807 | $200,000 |
| Sep 16, 2024 | Completed final sign-off Mar 2026 | 1390 Rhode Island St | Line Construction Llc | internal renovation @lower floor from of unit 1 per plan, modify and relocate basement windows and door at side and rear of bldg. no other scope at entry or upper unit#2 pf any envelope expansion.Details
internal renovation @lower floor from of unit 1 per plan, modify and relocate basement windows and door at side and rear of bldg. no other scope at entry or upper unit#2 pf any envelope expansion. | $175,000 |
| Jul 3, 2024 | In progress issued Dec 2025 | 725 Sanchez St | Cej Construction Llc | to demolish a 2-story, type v-b, single family building.Details
to demolish a 2-story, type v-b, single family building. | $25,000 |
| Jul 3, 2024 | In progress issued Dec 2025 | 725 Sanchez St | Cej Construction Llc | to erect a 3-story over 1 basement, type v-b, single family residence. within delores heights special use district restrictionsDetails
to erect a 3-story over 1 basement, type v-b, single family residence. within delores heights special use district restrictions | $750,000 |
| Feb 6, 2024 | Completed final sign-off Jan 2025 | 4727 25th St | Line Construction Llc | revision to bpa# 202311301683: minor changes to structural design due to (e) conditions.Details
revision to bpa# 202311301683: minor changes to structural design due to (e) conditions. | |
| Dec 6, 2023 | Completed final sign-off Jun 2025 | 182 Liberty St | Cej Construction Llc | interior remodel, remodel kitchen, baths, switch lving area to top floor, add 1 full bath. no changes to front or visible areas from street,no envelope expansionDetails
interior remodel, remodel kitchen, baths, switch lving area to top floor, add 1 full bath. no changes to front or visible areas from street,no envelope expansion | $100,000 |
| Nov 30, 2023 | Completed final sign-off Dec 2023 | 2726 Greenwich St | Cej Construction Llc | revision to pa#202102255351 r1. documenting changed window & doors during construction per inspector request. front door & opening decor. garage door & opening decor, front 3rd flr window & rear 2nd & 3rd flr windows. no structural changes.Details
revision to pa#202102255351 r1. documenting changed window & doors during construction per inspector request. front door & opening decor. garage door & opening decor, front 3rd flr window & rear 2nd & 3rd flr windows. no structural changes. | |
| Oct 20, 2023 | In progress issued May 2025 | 42 Jasper Pl | D K G Construction Inc | revision to pa# 2020-0114-1806; adjust walls at utility, front bedroom /bath and rear media and office rooms, move rear bath room to front existing utility locations to remainDetails
revision to pa# 2020-0114-1806; adjust walls at utility, front bedroom /bath and rear media and office rooms, move rear bath room to front existing utility locations to remain | |
| Jun 12, 2023 | Completed final sign-off Jun 2023 | 928 Van Ness Av | Maverick Construction & Project Executio | revision to bpa#202112204686, remove scissor gates from exterior from apprvd scope, keep (e) roll down shutters, relocate ada counter, add wall into inventory room. no concumption on site dph n/a on original permitDetails
revision to bpa#202112204686, remove scissor gates from exterior from apprvd scope, keep (e) roll down shutters, relocate ada counter, add wall into inventory room. no concumption on site dph n/a on original permit | $500 |
| Nov 2, 2022 | Completed final sign-off Dec 2022 | 799 Haight St | Devlin/Mcnally Construction | add ceiling light fixtures, power outlets. add storage space, removal of (e) signage. main permit /revision to 202208050033. deferred /separate : elec, plumb, mech, signage.Details
add ceiling light fixtures, power outlets. add storage space, removal of (e) signage. main permit /revision to 202208050033. deferred /separate : elec, plumb, mech, signage. | $10,000 |
| Oct 18, 2022 | Expired or cancelled withdrawn Nov 2023 | 25 Anzavista Av | renovation of interior, exterior openings, finishes, no vertical/horizontal expansion beyond (e) envelope.Details
renovation of interior, exterior openings, finishes, no vertical/horizontal expansion beyond (e) envelope. | $120,000 | |
| Aug 26, 2022 | Completed final sign-off Apr 2023 | 53 Mccoppin St | De Brus Construction Inc, Merlyn Construction | to comply with nov202289571: repair rear stairs per place.Details
to comply with nov202289571: repair rear stairs per place. | $60,000 |
| Aug 5, 2022 | Completed final sign-off Dec 2022 | 799 Haight St | Devlin/Mcnally Construction | remodel existing employee restroom in-kind. replace fixtures and finishes. no change of use under this permit.Details
remodel existing employee restroom in-kind. replace fixtures and finishes. no change of use under this permit. | $15,000 |
| Jul 19, 2022 | Completed final sign-off Dec 2023 | 320 Liberty St | Devlin/Mcnally Construction | repair, replace, reclad decking, railing, stair threads/risers. side rear property line perimeter fence. no structural scope.Details
repair, replace, reclad decking, railing, stair threads/risers. side rear property line perimeter fence. no structural scope. | $10,000 |
| Jun 1, 2022 | Expired or cancelled withdrawn Oct 2023 | 4727 25th St | horizontal expansion to rear, new layout of interior spaces, refinish exterior facadeDetails
horizontal expansion to rear, new layout of interior spaces, refinish exterior facade | $250,000 | |
| May 31, 2022 | Completed final sign-off Apr 2024 | 2726 Greenwich St | Pro Plumbing & Fire Sprinkler Inc | install new fire sprinkler system throughout building per nfpa 13r including new dedicated 2" fire service per nfpa 24. total sprinklers = 54. ref pa# 202102255351.Details
install new fire sprinkler system throughout building per nfpa 13r including new dedicated 2" fire service per nfpa 24. total sprinklers = 54. ref pa# 202102255351. | $30,456 |
| Dec 20, 2021 | Completed final sign-off Jun 2023 | 928 Van Ness Av | Maverick Construction & Project Executio | change of use of 3000 sf under the planning code from retail to cannabis retail with no change in occupancy code on the ground floor of a one story building over basement. interior: new product display, interior wall, floor finishes, new accessible restroom for customers. patch and repair as needed.Details
change of use of 3000 sf under the planning code from retail to cannabis retail with no change in occupancy code on the ground floor of a one story building over basement. interior: new product display, interior wall, floor finishes, new accessible restroom for customers. patch and repair as needed. | $60,000 |
| Dec 14, 2021 | Completed final sign-off Dec 2023 | 320 Liberty St | Devlin/Mcnally Construction | remodel 2nd floor, capture pear of garage space for bed/bath. repair front windows, relocate and replace rear openings, roof skylights, resurface exterior surfaces. no envelope expansion.Details
remodel 2nd floor, capture pear of garage space for bed/bath. repair front windows, relocate and replace rear openings, roof skylights, resurface exterior surfaces. no envelope expansion. | $180,000 |
| Nov 24, 2021 | Completed final sign-off Mar 2024 | 1132 Sanchez St | Line Construction Llc | bay window addition in front facade. replace exterior stucco w/thin brick replace siding fnish w/stucco.Details
bay window addition in front facade. replace exterior stucco w/thin brick replace siding fnish w/stucco. | $25,000 |
| Oct 13, 2021 | Completed final sign-off Jun 2023 | 2832 Sacramento St | Ben Hardy & Company | new rooftop ac unit (151 lbs) with platform and hatch on rear pitched roof. not visible from the street.Details
new rooftop ac unit (151 lbs) with platform and hatch on rear pitched roof. not visible from the street. | $10,000 |
| Sep 24, 2021 | Completed final sign-off May 2022 | 415 Cornwall St | Bethel Construction Inc Dba Aaa Construc | inteiror renovation on 3rd fl master bedroom suite, inlcuding, lighting,plumbing fixtures, relocate one rear facade sling door.no expansion of envelope or added sqft.Details
inteiror renovation on 3rd fl master bedroom suite, inlcuding, lighting,plumbing fixtures, relocate one rear facade sling door.no expansion of envelope or added sqft. | $55,000 |
| Feb 25, 2021 | Completed final sign-off Apr 2024 | 2726 Greenwich St | Cej Construction Llc | interior renovation floor 1-4 with new windows in existing openings at rear & front elevation. new roof deck with hatch access, 240 sqft.Details
interior renovation floor 1-4 with new windows in existing openings at rear & front elevation. new roof deck with hatch access, 240 sqft. | $440,000 |
| Feb 17, 2021 | Never finaled issued Aug 2023, no final | 134 02nd Av | Cej Construction Llc | vertical expansion at rear portion of bldg, excavation at rear of garage storage for bedroom and living space, refinish front facade. sprinkler 13 throughoutDetails
vertical expansion at rear portion of bldg, excavation at rear of garage storage for bedroom and living space, refinish front facade. sprinkler 13 throughout | $400,000 |
| Dec 2, 2020 | Completed final sign-off Mar 2022 | 1818 Great Hy | Bethel Construction Inc Dba Aaa Construc | renovation of 2/f kitchen with minor int. wall change. raise ceiling 2/f living/kitchen max 12ft; new struct per plans. replace 2/f tub with walk-in shwr, curbed; no envelope expansion.Details
renovation of 2/f kitchen with minor int. wall change. raise ceiling 2/f living/kitchen max 12ft; new struct per plans. replace 2/f tub with walk-in shwr, curbed; no envelope expansion. | $40,000 |
| Dec 2, 2020 | Completed final sign-off Mar 2024 | 1132 Sanchez St | Line Construction Llc | rev to pa201605026342:interior layout change 1-3 floors,reconfigure windows on side,rear facades, skylights on roof, add heat pump system. electrical, pump fixt per plans, struct revision perplan, no envelope expansion.Details
rev to pa201605026342:interior layout change 1-3 floors,reconfigure windows on side,rear facades, skylights on roof, add heat pump system. electrical, pump fixt per plans, struct revision perplan, no envelope expansion. | $200,000 |
| Dec 2, 2020 | Completed final sign-off Apr 2024 | 2726 Greenwich St | g/f: minor interior layout revision: enlarge garage opening 6in, new painted wood garage door. new structural mat slab per structural drawings.Details
g/f: minor interior layout revision: enlarge garage opening 6in, new painted wood garage door. new structural mat slab per structural drawings. | $160,000 | |
| Sep 24, 2020 | Completed final sign-off Aug 2021 | 3316 17th St | t.i., renovation of (e) restaurant space, building new counterDetails
t.i., renovation of (e) restaurant space, building new counter | ||
| Sep 8, 2020 | Completed final sign-off Jan 2023 | 312 Liberty St | interior renovation including stair layout. (n) rear facade windows in (e) openings. (1) side facade window smaller size. relocate skylight (roof). electrical & plumbing per plans. new mech cooling system.Details
interior renovation including stair layout. (n) rear facade windows in (e) openings. (1) side facade window smaller size. relocate skylight (roof). electrical & plumbing per plans. new mech cooling system. | $400,000 | |
| Sep 8, 2020 | Never finaled issued Feb 2021, no final | 1265 Masonic Av | new roof cutout for 64 sf of roof deck & 37 sf of mech unit. 2 new street side skylightsDetails
new roof cutout for 64 sf of roof deck & 37 sf of mech unit. 2 new street side skylights | $50,000 | |
| Sep 5, 2020 | Completed final sign-off Dec 2021 | 2388 Greenwich St | Cej Construction Llc | revision to pa #202002063772: add 235 sq ft roof deck w/ access stair and sliding roof hatch. lighting and power as requiredDetails
revision to pa #202002063772: add 235 sq ft roof deck w/ access stair and sliding roof hatch. lighting and power as required | $40,000 |
| Aug 15, 2019 | Completed final sign-off Dec 2019 | 4276 26th St | Devlin/Mcnally Construction | reclad exterior stairs (front), new railing, posts, balusters step tile claddingDetails
reclad exterior stairs (front), new railing, posts, balusters step tile cladding | $5,000 |
| Aug 12, 2019 | Expired or cancelled expired Mar 2026 | 2400 Folsom St | retrofit restaurant interior only, new built in counter, lighting, commercial kitchen appliances, plumbing, fixtures, new wall, floor finishes, accessible. restroom signage/life safety signage.Details
retrofit restaurant interior only, new built in counter, lighting, commercial kitchen appliances, plumbing, fixtures, new wall, floor finishes, accessible. restroom signage/life safety signage. | $50,000 | |
| Jul 25, 2019 | Never finaled issued Oct 2019, no final | 555 Post St | Devlin/Mcnally Construction | revision to 201906244293 ti work on existing mezzanine to include partitions and non bearing walls, build 3 walls with demo of selected light fixtures, new lighting only on mezzanine floorDetails
revision to 201906244293 ti work on existing mezzanine to include partitions and non bearing walls, build 3 walls with demo of selected light fixtures, new lighting only on mezzanine floor | $20,000 |
| May 2, 2019 | Never finaled filed May 2019, never issued | 555 Post St | ti removation part of the ground floor and basement, work includes interior work for new classrooms, kitchen area, common and utility areas, mep work deferred, no structural or exterior work.Details
ti removation part of the ground floor and basement, work includes interior work for new classrooms, kitchen area, common and utility areas, mep work deferred, no structural or exterior work. | $400,000 | |
| Dec 27, 2018 | Never finaled issued Jun 2019, no final | 68 Rockwood Ct | to comply with nov #201857591. to legalize existing unauthorized dwelling unit on the lower floor. plant (1) new tree in front setback. rescape front set to include permeable and landscape surfaces. there is no change to the extg structural (ord 43-14)Details
to comply with nov #201857591. to legalize existing unauthorized dwelling unit on the lower floor. plant (1) new tree in front setback. rescape front set to include permeable and landscape surfaces. there is no change to the extg structural (ord 43-14) | $25,000 | |
| May 22, 2018 | Completed final sign-off Nov 2018 | 771 Teresita Bl | Merlyn Construction | interior renovation on 1st fl - convert (e) garage into master suite, add laundry and bathroom; new replacment window and patio door at rear facade; new electric, plumbing work at affected areasDetails
interior renovation on 1st fl - convert (e) garage into master suite, add laundry and bathroom; new replacment window and patio door at rear facade; new electric, plumbing work at affected areas | $100,000 |