Engin Yagmur
- Listed as
- architect, attorney, authorized agent-others, designer, engineer, pmt consultant/expediter
- Firm
- Ecr Engineering
- Based in
- San Francisco
- On San Francisco permits
- Jun 2015 to Sep 2026
849 permits since 2000 (engineer on 814 permits, architect on 24 permits, authorized agent-others on 16 permits, designer on 3 permits, attorney on 1 permit, pmt consultant/expediter on 1 permit): 603 completed, 112 in progress, 53 never finaled, 81 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 849.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 29, 2026 | In progress filed Sep 2026, not yet issued | 1443 Broderick St | revision to pa #202512222414. replace the 8 ft long brick retaining wall with new concrete wall in the lightwell.Details
revision to pa #202512222414. replace the 8 ft long brick retaining wall with new concrete wall in the lightwell. | $10,000 | |
| Sep 29, 2026 | In progress filed Sep 2026, not yet issued | 663 09th Av | new plan configuration: move existing kitchen and 2 bathrooms for the new layout and remodel them. remove load bearing wall in the kitchen. replace the existing fire egress stair ladder with new stairs and landing in the rear.remodel existing master bedroom and bathroom on upper unit.Details
new plan configuration: move existing kitchen and 2 bathrooms for the new layout and remodel them. remove load bearing wall in the kitchen. replace the existing fire egress stair ladder with new stairs and landing in the rear.remodel existing master bedroom and bathroom on upper unit. | $160,000 | |
| Sep 28, 2026 | In progress filed Sep 2026, not yet issued | 1838 11th Av | add new wood-framed first and 2nd floor decks in the rear. no firewall construction. change family room to closet on the ground floor.Details
add new wood-framed first and 2nd floor decks in the rear. no firewall construction. change family room to closet on the ground floor. | $35,000 | |
| Sep 28, 2026 | In progress issued Sep 2026 | 160 Richland Av | Superbuilt | add doors and windows to shed, self elect to repair and reinforce structure of shed, no added occupiable space add electrical outlets and light, rot repair per uif. no work @ front structure.Details
add doors and windows to shed, self elect to repair and reinforce structure of shed, no added occupiable space add electrical outlets and light, rot repair per uif. no work @ front structure. | $20,000 |
| Sep 14, 2026 | In progress filed Sep 2026, not yet issued | 219 Jules Av | replace (e) foundation and rebuild the rear wall on the ground floorDetails
replace (e) foundation and rebuild the rear wall on the ground floor | $25,000 | |
| Sep 14, 2026 | In progress filed Sep 2026, not yet issued | 224 Gennessee St | rebuild the front entry brick stairs in kind due to deterioration.Details
rebuild the front entry brick stairs in kind due to deterioration. | $20,000 | |
| Aug 17, 2026 | In progress issued Aug 2026 | 212 Elsie St | revision to pa#202504224944. replace windows on front elevation inkind. replace the concrete retaining wall and guard on the front yard in kind.Details
revision to pa#202504224944. replace windows on front elevation inkind. replace the concrete retaining wall and guard on the front yard in kind. | $25,000 | |
| Aug 14, 2026 | In progress filed Aug 2026, not yet issued | 953 Rhode Island St | replace the existing 5 ft high 30 ft long concrete retaining wall in the backyard at the north side of the building due to tilting and cracking.Details
replace the existing 5 ft high 30 ft long concrete retaining wall in the backyard at the north side of the building due to tilting and cracking. | $60,000 | |
| Aug 14, 2026 | In progress issued Aug 2026 | 1455 Filbert St | Matthew Kelly Construction Inc | replace dry rotted wood beam that supports the upper floor balconies with new steel tube beam at the 3rd floor level.Details
replace dry rotted wood beam that supports the upper floor balconies with new steel tube beam at the 3rd floor level. | $60,000 |
| Aug 12, 2026 | In progress issued Sep 2026 | 850 Elizabeth St | Velic Construction Inc | revision to 202211146473-s1 (ref 202603026779). revise rear patio and concrete steps and retaining wall. revise stair from rear deck adjusting for corrected grade. widen garage door by 11". revise 3/f rear terrace railing.Details
revision to 202211146473-s1 (ref 202603026779). revise rear patio and concrete steps and retaining wall. revise stair from rear deck adjusting for corrected grade. widen garage door by 11". revise 3/f rear terrace railing. | $15,000 |
| Aug 7, 2026 | In progress filed Aug 2026, not yet issued | 4345 20th St | legalization udu on 1/f and addition of state adu at basement lvl. excavate (e) slab and add (n),convert into habitable space. modify front & side elevations, access stairs & add landscaping. new laundry.Details
legalization udu on 1/f and addition of state adu at basement lvl. excavate (e) slab and add (n),convert into habitable space. modify front & side elevations, access stairs & add landscaping. new laundry. | $220,000 | |
| Aug 6, 2026 | In progress filed Aug 2026, not yet issued | 1526 Broderick St | Deep Elm Construction Llc | excavate ground floor to create new adu.Details
excavate ground floor to create new adu. | $75,000 |
| Jul 22, 2026 | In progress filed Jul 2026, not yet issued | 1627 Kirkwood Av | to comply with n.o.v. #200006672 items 4 and 5. rebuild existing collapsed fire egress stairs in kind in the rear. no firewall constrution.Details
to comply with n.o.v. #200006672 items 4 and 5. rebuild existing collapsed fire egress stairs in kind in the rear. no firewall constrution. | $35,000 | |
| Jul 21, 2026 | In progress issued Jul 2026 | 3639 16th St | Universe Painting Inc | revision to (e) pa#202509306398, revise the design to match the existing conditions. revise framing size and nailing spacing.Details
revision to (e) pa#202509306398, revise the design to match the existing conditions. revise framing size and nailing spacing. | |
| Jul 20, 2026 | In progress issued Jul 2026 | 844 Baker St | remodel in unit #1, #3, & #4. move kitchens and remodel them. remodel existing bathrooms.Details
remodel in unit #1, #3, & #4. move kitchens and remodel them. remodel existing bathrooms. | $280,000 | |
| Jun 29, 2026 | In progress issued Oct 2026 | 2246 26th Av | Sft Construction Corp | remodel on both floors. remodel (e) kitchen and bathroom on 2/f and close (e) lightwell at the north side. convert ground floor into living space and add a new master bedroom and bathroom. lower slab approx 12 inches. replace (e) furnace and wh. add new retaining wall. add new skylight and 1-hr wallDetails
remodel on both floors. remodel (e) kitchen and bathroom on 2/f and close (e) lightwell at the north side. convert ground floor into living space and add a new master bedroom and bathroom. lower slab approx 12 inches. replace (e) furnace and wh. add new retaining wall. add new skylight and 1-hr wall | $380,000 |
| Jun 29, 2026 | In progress issued Jul 2026 | 713 24th Av | interior remodel 2nd/f: remodel (e) kitchena and bathroom and add a new full bath. remove the load bearing wall in the kitchen. remodel the (e) bathroom on the g/f and add a walk-in closet.Details
interior remodel 2nd/f: remodel (e) kitchena and bathroom and add a new full bath. remove the load bearing wall in the kitchen. remodel the (e) bathroom on the g/f and add a walk-in closet. | $180,000 | |
| Jun 23, 2026 | In progress issued Jul 2026 | 143 Peralta Av | Edri Construction Inc *See Notes* | remodel (e) kitchen. remove bearing wall between kitchen and dining room. add double french door in the kitchen.Details
remodel (e) kitchen. remove bearing wall between kitchen and dining room. add double french door in the kitchen. | $55,000 |
| Jun 23, 2026 | In progress issued Jul 2026 | 826 47th Av | Lean Buiders Inc | comply with nov202656052. replace garage door and do framing repairs due to damage caused by car into building.Details
comply with nov202656052. replace garage door and do framing repairs due to damage caused by car into building. | $15,000 |
| Jun 22, 2026 | In progress filed Jun 2026, not yet issued | 2556 Chestnut St | rebuid the fire egress stairs in the light well due to dryrot damage. no fire wall construction.Details
rebuid the fire egress stairs in the light well due to dryrot damage. no fire wall construction. | $45,000 | |
| Jun 15, 2026 | In progress issued Jul 2026 | 68 Castro St | All Homes And Construction Inc | revision to (e) permit#202601204134: encapturing the dead space and the 3rd floor and incorporation that into the new bathroom layout. no vertical addition.Details
revision to (e) permit#202601204134: encapturing the dead space and the 3rd floor and incorporation that into the new bathroom layout. no vertical addition. | $15,000 |
| Jun 15, 2026 | In progress issued Jul 2026 | 2374 Fulton St | Seismic Retrofitters Inc. | do structural repairs in the garage due to damage. replace concrete foundation and concrete slab in the garage. add ply shear walls in the garage.Details
do structural repairs in the garage due to damage. replace concrete foundation and concrete slab in the garage. add ply shear walls in the garage. | $60,000 |
| Jun 15, 2026 | In progress issued Jul 2026 | 743 19th Av | Gnetzer General Contractor | add a new second floor deck with stairs to the backyard. no firewall construction. replace windows with double french door to the new deck at the back of house.Details
add a new second floor deck with stairs to the backyard. no firewall construction. replace windows with double french door to the new deck at the back of house. | $30,000 |
| May 12, 2026 | Completed final sign-off Sep 2026 | 670 Joost Av | Seismic Retrofitters Inc. | temporary shoring for foundation work under pa# 202511199969Details
temporary shoring for foundation work under pa# 202511199969 | $5,000 |
| May 11, 2026 | In progress issued May 2026 | 2036 Noriega St | Yi Da Construction | relocate the kitchen and remodel it. new floor plan configuration. remove bearing wall. replace the furnace and water heater. close existing window at kitchenDetails
relocate the kitchen and remodel it. new floor plan configuration. remove bearing wall. replace the furnace and water heater. close existing window at kitchen | $60,000 |
| May 11, 2026 | In progress issued Jun 2026 | 1551 Vallejo St | De Brus Construction Inc | voluntary strengthening on the ground floor. add steel moment frame and plywood shear walls w/ concrete grade beams. replace concrete foundation in the alley in kind. remove partition wall in the top unit.Details
voluntary strengthening on the ground floor. add steel moment frame and plywood shear walls w/ concrete grade beams. replace concrete foundation in the alley in kind. remove partition wall in the top unit. | $120,000 |
| Apr 22, 2026 | In progress issued Apr 2026 | 289 Frederick St | Seismic Retrofitters Inc. | revision to permit 202512081199. add a full bathroom on the ground floor. remove a load bearing wall.Details
revision to permit 202512081199. add a full bathroom on the ground floor. remove a load bearing wall. | $35,000 |
| Apr 21, 2026 | In progress issued May 2026 | 2828 Divisadero St | Bjlgc Inc | add tow new windows at the front elevation on the second floor. replace metal railings at the front elevation. remodel existing bathroom and do dry-rot repair on the ground floor. replace existing window on 4th floor and enlarge it. replace dry-rot beam on third floor.Details
add tow new windows at the front elevation on the second floor. replace metal railings at the front elevation. remodel existing bathroom and do dry-rot repair on the ground floor. replace existing window on 4th floor and enlarge it. replace dry-rot beam on third floor. | $70,000 |
| Apr 21, 2026 | In progress issued Apr 2026 | 2021 California St | De Brus Construction Inc | supplemental structural drawings to permits 202511129473, 202512161945, 202601143821, and 202604018713. add new header beams and posts to remove same bearing walls in the units.Details
supplemental structural drawings to permits 202511129473, 202512161945, 202601143821, and 202604018713. add new header beams and posts to remove same bearing walls in the units. | $15,000 |
| Apr 14, 2026 | In progress filed Apr 2026, not yet issued | 1230 46th Av | lower the concrete slab approx 1 ft to achieve 8 ft ceiling height on the ground floor. replace the existing concrete foundation in kind and add a full bathroom on the ground floor. replace the concrete slab in the driveway and add trench drain in front of the garage doorDetails
lower the concrete slab approx 1 ft to achieve 8 ft ceiling height on the ground floor. replace the existing concrete foundation in kind and add a full bathroom on the ground floor. replace the concrete slab in the driveway and add trench drain in front of the garage door | $140,000 | |
| Apr 14, 2026 | In progress filed Apr 2026, not yet issued | 90 Stanford Heights Av | rebuild the upper balcony in-kind due to dry-rot damage in the rear of the building, no change in size of balconyDetails
rebuild the upper balcony in-kind due to dry-rot damage in the rear of the building, no change in size of balcony | $25,000 | |
| Apr 14, 2026 | In progress issued Apr 2026 | 2116 Leavenworth St | revision to pa# 202510016490: revise the design of the new concrete retaini9ng wall to one with spread foundation instead of deep piers.Details
revision to pa# 202510016490: revise the design of the new concrete retaini9ng wall to one with spread foundation instead of deep piers. | $5,000 | |
| Apr 13, 2026 | Completed final sign-off Aug 2026 | 3939 19th St | Darc Ventures Inc Dba Spl Construction S | new plan configuration for the master bedroom bathroom, remove non-load bearing walls. bathroom remodel is uner permit 202601204129Details
new plan configuration for the master bedroom bathroom, remove non-load bearing walls. bathroom remodel is uner permit 202601204129 | $15,000 |
| Apr 13, 2026 | In progress issued Aug 2026 | 2550 Chestnut St | Simply Handyworks | to comply w/ notice of violation # 202544912: do repairs on the exterior stud wall in living room inboth units and the roof framing on the east side due to fire damage.Details
to comply w/ notice of violation # 202544912: do repairs on the exterior stud wall in living room inboth units and the roof framing on the east side due to fire damage. | $40,000 |
| Apr 6, 2026 | In progress filed Apr 2026, not yet issued | 3806 Clay St | revision to permits 202410082572 & 202606123086: to remove the skylights in the roof and replace them with dormers. this revision will also expand powder room beneath the dormer, add a new attic utility sink, and a new attic dishwasher.Details
revision to permits 202410082572 & 202606123086: to remove the skylights in the roof and replace them with dormers. this revision will also expand powder room beneath the dormer, add a new attic utility sink, and a new attic dishwasher. | $250,000 | |
| Mar 9, 2026 | In progress issued Mar 2026 | 708 Cole St | Matthew Kelly Construction Inc | revision to pa 202510147290. underpinning the existing foundation at the south and west sides. regrading the backyard to level it and add a 30" high concrete wall with a fence.Details
revision to pa 202510147290. underpinning the existing foundation at the south and west sides. regrading the backyard to level it and add a 30" high concrete wall with a fence. | $60,000 |
| Mar 9, 2026 | Completed final sign-off Sep 2026 | 1240 15th Av | Wei Dang Builders Inc. | revision to existing pa#202404260882. rebuild existing 2nd story deck with exterior stairs. maximum deck projection is 9 feet. no firewall construction. replace interior stairs guardrails with glass guardrails. in kind.Details
revision to existing pa#202404260882. rebuild existing 2nd story deck with exterior stairs. maximum deck projection is 9 feet. no firewall construction. replace interior stairs guardrails with glass guardrails. in kind. | $25,000 |
| Mar 3, 2026 | In progress issued Jun 2026 | 286 Eureka St | Elisha Mayost | rear additoin (22 sf) and roof raise (approx 15") to e 1 story rear room at 2nd fl. construct new interior 1st to 2nd fl stair, relocate kitchen and powder room on 2nd fl. provide new exterior doors, windows, and skylight. demo existing rear deck, relocate and reconstruct with new 30" h fire ratedDetails
rear additoin (22 sf) and roof raise (approx 15") to e 1 story rear room at 2nd fl. construct new interior 1st to 2nd fl stair, relocate kitchen and powder room on 2nd fl. provide new exterior doors, windows, and skylight. demo existing rear deck, relocate and reconstruct with new 30" h fire rated | $240,000 |
| Feb 25, 2026 | In progress filed Feb 2026, not yet issued | 1040 Folsom St | mandatory soft story retrofit per 2022 sfebc, chapter a.4. add (2) steel moment frames and plywood shear walls with foundations. (residential)Details
mandatory soft story retrofit per 2022 sfebc, chapter a.4. add (2) steel moment frames and plywood shear walls with foundations. (residential) | $120,000 | |
| Feb 24, 2026 | In progress issued Jun 2026 | 4089 26th St | replace existing foundation in kind in the garage wall due to deteroiration. add two plywood walls for voluntary strengthening in the garage.Details
replace existing foundation in kind in the garage wall due to deteroiration. add two plywood walls for voluntary strengthening in the garage. | $25,000 | |
| Feb 24, 2026 | In progress filed Feb 2026, not yet issued | 1044 Folsom St | mandatory soft story retrofit per 2022 sfebc, chapter a.4. add (2) steel moment frames and plywood shear walls with foundations. (commercial)Details
mandatory soft story retrofit per 2022 sfebc, chapter a.4. add (2) steel moment frames and plywood shear walls with foundations. (commercial) | $30,000 | |
| Feb 17, 2026 | Completed final sign-off May 2026 | 171 Moffitt St | M & L Construction | do structural repairs on the 2nd floor balcony due to dryrot damage. no change in balcony size. replace joists and guardrails.Details
do structural repairs on the 2nd floor balcony due to dryrot damage. no change in balcony size. replace joists and guardrails. | $30,000 |
| Feb 17, 2026 | In progress issued Mar 2026 | 318 Guerrero St | Gnetzer General Contractor | replace the existing 5 ft high failed brick retaining wall with a new concrete retaining wall in the rear yard.Details
replace the existing 5 ft high failed brick retaining wall with a new concrete retaining wall in the rear yard. | $35,000 |
| Feb 17, 2026 | Completed final sign-off Aug 2026 | 948 Lake St | M & L Construction | comply with complaint #202534159. do structural repairs on the existing fire egress stairs. less than 50% repair.Details
comply with complaint #202534159. do structural repairs on the existing fire egress stairs. less than 50% repair. | $10,000 |
| Jan 25, 2026 | In progress filed Jan 2026, not yet issued | 150 25th Av | converting ground fl into living space, add new office room, one full bathroom, kitchenette and entertaining room. full foundation replacement to lower slab level approx 3ft to achieve 10ft ceiling ht on ground fl. small addition in rear with new 2nd fl deck. removing 5 steps at front yard andDetails
converting ground fl into living space, add new office room, one full bathroom, kitchenette and entertaining room. full foundation replacement to lower slab level approx 3ft to achieve 10ft ceiling ht on ground fl. small addition in rear with new 2nd fl deck. removing 5 steps at front yard and | $320,000 | |
| Jan 20, 2026 | In progress issued May 2026 | 1954 10th Av | add a new 9ft wide 2nd fl deck in the rear with spiral stairs. no fire wall construction.Details
add a new 9ft wide 2nd fl deck in the rear with spiral stairs. no fire wall construction. | $25,000 | |
| Jan 20, 2026 | In progress issued Feb 2026 | 68 Castro St | All Homes And Construction Inc | remodel the kitchen and remove bearing wall on 2nd floor. remodel the bathroom and new plan configuration on the 3rd floor. interior remodel only.Details
remodel the kitchen and remove bearing wall on 2nd floor. remodel the bathroom and new plan configuration on the 3rd floor. interior remodel only. | $100,000 |
| Jan 20, 2026 | Completed final sign-off Sep 2026 | 270 San Jose Av | Tres Total Real Estate Services Llc | convert one parking spot to a laundry room and storage. convert a second parking spot into enclosed parking.Details
convert one parking spot to a laundry room and storage. convert a second parking spot into enclosed parking. | $25,000 |
| Dec 23, 2025 | Completed final sign-off Apr 2026 | 562 Hayes St | Sft Construction Corp | revision to pa # 2020-0923-4855 & 2025-0923-5919: mandatory soft story retrofit. revision due to (e) field conditions. move new steel frame to the other commercial space. add new ply shear walls with grade beams in the basement.Details
revision to pa # 2020-0923-4855 & 2025-0923-5919: mandatory soft story retrofit. revision due to (e) field conditions. move new steel frame to the other commercial space. add new ply shear walls with grade beams in the basement. | $20,000 |
| Dec 23, 2025 | Completed final sign-off Apr 2026 | 560 Hayes St | Sft Construction Corp | revision to pa # 2020-0923-4857 & 2025-0923-5919: mandatory soft story retrofit. revision due to (e) field conditions. move new steel frame to the other commercial space. add new ply shear walls with grade beams in the basement.Details
revision to pa # 2020-0923-4857 & 2025-0923-5919: mandatory soft story retrofit. revision due to (e) field conditions. move new steel frame to the other commercial space. add new ply shear walls with grade beams in the basement. | $20,000 |
| Dec 22, 2025 | Completed final sign-off Jul 2026 | 2516 Bryant St | Mission Home Remodeling Inc | do framing repair in the storage rooms on the ground floor, add new beams and posts with footings.Details
do framing repair in the storage rooms on the ground floor, add new beams and posts with footings. | $15,000 |
| Dec 22, 2025 | In progress issued Aug 2026 | 1443 Broderick St | Noble Construction Services Llc | revision to pa# 202412136782: provide the structural drawings for approved adu permit. all work is structural. partial foundation replacement, underpin existing foundation and add new concrete slab to lower existing slab level.Details
revision to pa# 202412136782: provide the structural drawings for approved adu permit. all work is structural. partial foundation replacement, underpin existing foundation and add new concrete slab to lower existing slab level. | $80,000 |
| Dec 22, 2025 | In progress filed Dec 2025, not yet issued | 464 Noe St | divide the existing bedroom to create 2 new bedrooms on the 3rd floor in the top unit. replace existing 3 windows with 4 new windows on the top floor at the front elevation.Details
divide the existing bedroom to create 2 new bedrooms on the 3rd floor in the top unit. replace existing 3 windows with 4 new windows on the top floor at the front elevation. | $25,000 | |
| Dec 10, 2025 | In progress issued Dec 2025 | 1116 Mason St | revision to pa #2025-0908-4735: additional scope to include voluntary structural strengthening of (e) conditions found during demolition.Details
revision to pa #2025-0908-4735: additional scope to include voluntary structural strengthening of (e) conditions found during demolition. | $8,000 | |
| Dec 9, 2025 | Completed final sign-off Dec 2025 | 3154 Octavia St | Zebra Awning Co Inc | comply with nov #202546911. installation of 1 awning (1'-6" x 19'-0" x 3'-6" projection)Details
comply with nov #202546911. installation of 1 awning (1'-6" x 19'-0" x 3'-6" projection) | $8,000 |
| Dec 8, 2025 | Completed final sign-off Jun 2026 | 1772 Union St | L C Builders Inc. | g/f commercial: add a new closet wall in the alley for new electric panels. add a new partition wall to create an office room. do ada upgrade.Details
g/f commercial: add a new closet wall in the alley for new electric panels. add a new partition wall to create an office room. do ada upgrade. | $25,000 |
| Dec 8, 2025 | In progress issued Feb 2026 | 2036 Green St | Atlas General Construction | add interior stairs from unit# 1 to basement and convert the storage rooms in the basement into habitable space. add 2 bedrooms and 2 bathrooms. add rear landing, rear firewall, and rear access door for common access.Details
add interior stairs from unit# 1 to basement and convert the storage rooms in the basement into habitable space. add 2 bedrooms and 2 bathrooms. add rear landing, rear firewall, and rear access door for common access. | $200,000 |
| Dec 8, 2025 | In progress issued Jan 2026 | 289 Frederick St | Seismic Retrofitters Inc. | replace (e) brick foudation with (n) reinforced concrete foundation in the main house. repalce the deteriorated concrete foundation in kind in the garage structure. adding plywood shear wallDetails
replace (e) brick foudation with (n) reinforced concrete foundation in the main house. repalce the deteriorated concrete foundation in kind in the garage structure. adding plywood shear wall | $100,000 |
| Dec 8, 2025 | In progress issued Aug 2026 | 846 25th Av | M & L Construction | add a new 2nd/f deck in rear w/ new bifold doors & exterior stairs to backyard. replace rear elevation windowsDetails
add a new 2nd/f deck in rear w/ new bifold doors & exterior stairs to backyard. replace rear elevation windows | $50,000 |
| Dec 8, 2025 | In progress issued Jan 2026 | 1917 Larkin St | A T Prime Builders | remodel top unit: remodel e) kitchen & bathrooms, add 1 bew master bathroom, add 7 new skylights (invisible from st) no other exterior workDetails
remodel top unit: remodel e) kitchen & bathrooms, add 1 bew master bathroom, add 7 new skylights (invisible from st) no other exterior work | $100,000 |
| Nov 19, 2025 | Completed final sign-off Apr 2026 | 1950 15th St | comply with a portion of nov# 202421131. document the existing fence added on the low roof and replace the portion of the (e) fence with new guardrail added without a permit. the other portion of the nov was addressed under permit 202503142289Details
comply with a portion of nov# 202421131. document the existing fence added on the low roof and replace the portion of the (e) fence with new guardrail added without a permit. the other portion of the nov was addressed under permit 202503142289 | $10,000 | |
| Nov 19, 2025 | Completed final sign-off Mar 2026 | 530 Dewey Bl | Sft Construction Corp | revision to pa #202510147322. revsion due to existing field conditions. replace existing foundation in the storage room with new concrete with new concrete foundation instead of underpinning.Details
revision to pa #202510147322. revsion due to existing field conditions. replace existing foundation in the storage room with new concrete with new concrete foundation instead of underpinning. | $20,000 |
| Nov 18, 2025 | In progress filed Nov 2025, not yet issued | 1001 Castro St | voluntary strengthening. add plywood sheer wall and a steel frame with concrete grade beam.Details
voluntary strengthening. add plywood sheer wall and a steel frame with concrete grade beam. | $40,000 | |
| Nov 18, 2025 | In progress filed Nov 2025, not yet issued | 2180 Union St | comply with nov# 202542646: do structural framing repairs due to fire damage. replace the damaged stud wall, stairs, framing and windows in kind in the rear building room in both apartment units.Details
comply with nov# 202542646: do structural framing repairs due to fire damage. replace the damaged stud wall, stairs, framing and windows in kind in the rear building room in both apartment units. | $50,000 | |
| Oct 28, 2025 | In progress issued Nov 2025 | 1824 Green St | interior remodel to include (e) kitchen and powder room on 2nd floor . remodel 2 (e) bathrooms on 3rd floor. (n) plan configuration on both levels. replace (e) windows with (n) windows in the rear on the 2nd floor and facing street.Details
interior remodel to include (e) kitchen and powder room on 2nd floor . remodel 2 (e) bathrooms on 3rd floor. (n) plan configuration on both levels. replace (e) windows with (n) windows in the rear on the 2nd floor and facing street. | $160,000 | |
| Oct 15, 2025 | In progress issued Oct 2025 | 286 Eureka St | Elisha Mayost | revision to (e) pa#2025-0603-7801 move the wall in the garage supporting the landing about 6" for extra room.Details
revision to (e) pa#2025-0603-7801 move the wall in the garage supporting the landing about 6" for extra room. | $5,000 |
| Oct 14, 2025 | Completed final sign-off Aug 2026 | 1338 28th Av | Paul O'driscoll Inc | revision to (e) permit# 202308315751: remove (e) post and replace (e) deteriorated concrete foundation in kind on the ground floor.Details
revision to (e) permit# 202308315751: remove (e) post and replace (e) deteriorated concrete foundation in kind on the ground floor. | $25,000 |
| Oct 14, 2025 | Completed final sign-off Mar 2026 | 530 Dewey Bl | Sft Construction Corp | structural work only. replace and underpin portions of the existing foundation. replace concrete slab 2 new 6" slab. add perimeter drain. no plumbing fixtures.Details
structural work only. replace and underpin portions of the existing foundation. replace concrete slab 2 new 6" slab. add perimeter drain. no plumbing fixtures. | $150,000 |
| Oct 14, 2025 | In progress issued Nov 2025 | 708 Cole St | Matthew Kelly Construction Inc | widen the garage door 9" from 8'-3" to 9'-0". remove existing posts in the garage and add new posts and beams. do seismic strengthening in the garage on the ground floor.Details
widen the garage door 9" from 8'-3" to 9'-0". remove existing posts in the garage and add new posts and beams. do seismic strengthening in the garage on the ground floor. | $110,000 |
| Oct 1, 2025 | In progress issued Dec 2025 | 2116 Leavenworth St | replacing existing 42" high concrete retaining wall and fence in kind with new and concrete retaining wall in the rear property line.Details
replacing existing 42" high concrete retaining wall and fence in kind with new and concrete retaining wall in the rear property line. | $30,000 | |
| Sep 30, 2025 | Completed final sign-off Feb 2026 | 2 Balceta Av | Aya Homes Llc | comply with nov# 202537951: replace damaged garage door, stucco, and concrete foundation in kind.Details
comply with nov# 202537951: replace damaged garage door, stucco, and concrete foundation in kind. | $15,000 |
| Sep 30, 2025 | Completed final sign-off Dec 2025 | 128 Cervantes Bl | Aya Homes Llc | rebuilding the front brick main entry stairs in kind due to cracking/deterioration. 14 steps total.Details
rebuilding the front brick main entry stairs in kind due to cracking/deterioration. 14 steps total. | $20,000 |
| Sep 18, 2025 | In progress issued Dec 2025 | 1180 Guerrero St | Atlas General Construction | convert ground floor storage to habitable space, add 173 sf stair in rear yardDetails
convert ground floor storage to habitable space, add 173 sf stair in rear yard | $45,000 |
| Sep 9, 2025 | In progress issued Sep 2025 | 2036 Green St | Seismic Retrofitters Inc. | revision to existing permit pa #20250520689. relocate the shear walls in the storage rooms in the basement.Details
revision to existing permit pa #20250520689. relocate the shear walls in the storage rooms in the basement. | $5,000 |
| Sep 4, 2025 | Completed final sign-off Dec 2025 | 26 Retiro Wy | revision to pa #202412036049 #26 retiro (upper unit) omit reconfiguring of existing bathroom, existing toilet room and existing kitchen- omit removal of existing non-structural partition wall- omit new structural openings.Details
revision to pa #202412036049 #26 retiro (upper unit) omit reconfiguring of existing bathroom, existing toilet room and existing kitchen- omit removal of existing non-structural partition wall- omit new structural openings. | ||
| Sep 3, 2025 | In progress issued Oct 2025 | 2519 32nd Av | We Do Construction Inc., Yao Star Construction | interior remodel converting ground fl. into habitable space on ground floor. remodeling kitchen, bathroom, new plan configuration, adding 2 moere bedrooms & recreational room in ground fl., rebuilding stairs, adding a 2nd floor deck & exterior stairs, adding new windows/skylights. replacing cielingDetails
interior remodel converting ground fl. into habitable space on ground floor. remodeling kitchen, bathroom, new plan configuration, adding 2 moere bedrooms & recreational room in ground fl., rebuilding stairs, adding a 2nd floor deck & exterior stairs, adding new windows/skylights. replacing cieling | $400,000 |
| Sep 3, 2025 | Completed final sign-off Nov 2025 | 3037 California St | Sft Construction Corp | volutary strengthening and foundation repair in the garage area on the ground floorDetails
volutary strengthening and foundation repair in the garage area on the ground floor | $50,000 |
| Aug 26, 2025 | In progress issued Dec 2025 | 2454 22nd Av | Mission Home Remodeling Inc | interior remodel of existing kitchen & laundry room in place. conversion of powder room into full bathroom via the addition of 32 sq ft of interior inhabitable space within existing building envelope.nw deck & deck exterior stairs within rear yard set back. 369 sq ft total within rear yard setbackDetails
interior remodel of existing kitchen & laundry room in place. conversion of powder room into full bathroom via the addition of 32 sq ft of interior inhabitable space within existing building envelope.nw deck & deck exterior stairs within rear yard set back. 369 sq ft total within rear yard setback | $80,000 |
| Aug 6, 2025 | Completed final sign-off Mar 2026 | 1215 Bay St | Brennan Strong Hold Construction Inc | voluntary strengthening on the ground floor. add plywood shear walls.Details
voluntary strengthening on the ground floor. add plywood shear walls. | $70,000 |
| Aug 6, 2025 | Completed final sign-off Jan 2026 | 2069 Jefferson St | replace the guardrails on the existing 2nd & 3rd floor decks. no change in deck sizes.Details
replace the guardrails on the existing 2nd & 3rd floor decks. no change in deck sizes. | $25,000 | |
| Jul 30, 2025 | In progress filed Jul 2025, not yet issued | 649 Fillmore St | floor '4': convert attic to habitable area to unit 649. add interior connecting stair. create bedroom, (2) baths, family room and utility. create dormers utilizing za bulletin no. 3Details
floor '4': convert attic to habitable area to unit 649. add interior connecting stair. create bedroom, (2) baths, family room and utility. create dormers utilizing za bulletin no. 3 | $200,000 | |
| Jul 22, 2025 | In progress issued Nov 2025 | 731 Duboce Av | revision to pa #202407317628. revising the layout on the 3rd floor with new master bathroom.Details
revision to pa #202407317628. revising the layout on the 3rd floor with new master bathroom. | ||
| Jul 9, 2025 | In progress filed Jul 2025, not yet issued | 1037 Pacific Av | Gilheany Construction | minor reconfig of (e) floor plans for 3 residential units, including the additional deck area at lvl 2 lightwell.install new f/s syst.remove (e) fire escape.replace all wdws.update all appliances,fixtures,trim; update clad materials at bldg ext.Details
minor reconfig of (e) floor plans for 3 residential units, including the additional deck area at lvl 2 lightwell.install new f/s syst.remove (e) fire escape.replace all wdws.update all appliances,fixtures,trim; update clad materials at bldg ext. | $725,000 |
| Jul 3, 2025 | In progress filed Jul 2025, not yet issued | 4528 Fulton St | rebuild the (e) illegal balcony on the 3rd floor in the rear and add a 3 ft wide balcony.Details
rebuild the (e) illegal balcony on the 3rd floor in the rear and add a 3 ft wide balcony. | $25,000 | |
| Jul 3, 2025 | Completed final sign-off Apr 2026 | 2326 Balboa St | Seismic Retrofitters Inc. | voluntary strengthening & foundation repair at g/f: add plywood shear walls & simpson panels w/ concrete grade beams.Details
voluntary strengthening & foundation repair at g/f: add plywood shear walls & simpson panels w/ concrete grade beams. | $100,000 |
| Jul 3, 2025 | Completed final sign-off Feb 2026 | 3268 20th St | Antormen Inc | remodel existing kitchen and bathroom. remove bearing wall in the kitchen and add new posts and beam.Details
remodel existing kitchen and bathroom. remove bearing wall in the kitchen and add new posts and beam. | $80,000 |
| Jul 1, 2025 | In progress issued Sep 2025 | 925 Olmstead St | Jean Design Build Inc | voluntary strengthening on the ground fl based on fema p11dd. add a steel frame ply shear walls. replace siding in kind.Details
voluntary strengthening on the ground fl based on fema p11dd. add a steel frame ply shear walls. replace siding in kind. | $40,000 |
| Jul 1, 2025 | Completed final sign-off Apr 2026 | 1256 Stanyan St | comply with nov 202428372- restore the backyard to its original conditions. add 2ft high retaining wall back to restore to original conditions and compact soil for new grade.Details
comply with nov 202428372- restore the backyard to its original conditions. add 2ft high retaining wall back to restore to original conditions and compact soil for new grade. | $20,000 | |
| Jun 18, 2025 | Completed final sign-off Feb 2026 | 716 Waller St | G A Seismic & Retrofitting Construction | replace deteriorated brick foundation with (n) concrete foundation at the west side. do voluntary strenthening by adding ply shear walls and a simpson pond. replace concrete slab in kind in the garage.Details
replace deteriorated brick foundation with (n) concrete foundation at the west side. do voluntary strenthening by adding ply shear walls and a simpson pond. replace concrete slab in kind in the garage. | $45,000 |
| Jun 17, 2025 | In progress filed Jun 2025, not yet issued | 2100 Green St | unit 704- add (n) catwalk and fireman stairs on the roof . add safety barriers around (e) skylights.Details
unit 704- add (n) catwalk and fireman stairs on the roof . add safety barriers around (e) skylights. | $15,000 | |
| Jun 17, 2025 | Completed final sign-off Feb 2026 | 70 Belcher St | M & L Construction | fire egress stair repair in the backyard. repair stairs due to significant dry rot damage. no firewall construction. replace posts and gaurdrails in kind.Details
fire egress stair repair in the backyard. repair stairs due to significant dry rot damage. no firewall construction. replace posts and gaurdrails in kind. | $25,000 |
| Jun 11, 2025 | In progress issued Aug 2026 | 155 Saint Elmo Wy | Leet Construction Corp | replace (e) concrete retaining wall foundation in the rear wall, due to significant titling. structural work onlyDetails
replace (e) concrete retaining wall foundation in the rear wall, due to significant titling. structural work only | $100,000 |
| Jun 10, 2025 | In progress filed Jun 2025, not yet issued | 3737 Folsom St | Ruben's Crew Construction Inc | revised title 24 sheets for pa # 2024-0531-3454Details
revised title 24 sheets for pa # 2024-0531-3454 | $20 |
| Jun 3, 2025 | Completed final sign-off Nov 2025 | 343 Hill St | Matthew Kelly Construction Inc | replace a 10 feet long brick fdn wall with concrete foundation wall on the east side. structural work only.Details
replace a 10 feet long brick fdn wall with concrete foundation wall on the east side. structural work only. | $20,000 |
| Jun 3, 2025 | In progress issued Jul 2025 | 286 Eureka St | Elisha Mayost | foundation replacement. replace the existing brick foundation with new concrete foundation. replace raised floor framing with concrete slab on grade. revise storage areas. close existing door on the front elevation. all work on the ground floor.Details
foundation replacement. replace the existing brick foundation with new concrete foundation. replace raised floor framing with concrete slab on grade. revise storage areas. close existing door on the front elevation. all work on the ground floor. | $125,000 |
| May 23, 2025 | In progress filed May 2025, not yet issued | 3372 22nd St | revision to (e) permit# 202310168685. replace the structural drawings of original permit w/ new structural drawings. structural work only under this permit. no architectural work.Details
revision to (e) permit# 202310168685. replace the structural drawings of original permit w/ new structural drawings. structural work only under this permit. no architectural work. | ||
| May 21, 2025 | Completed final sign-off Aug 2025 | 3726 21st St | Ehj Construction,Inc. | remodel (e) kitchen on the 2/f. remove bearing wall between kitchen and dining room.Details
remodel (e) kitchen on the 2/f. remove bearing wall between kitchen and dining room. | $60,000 |
| May 20, 2025 | In progress filed May 2025, not yet issued | 4901 Mission St | revision to pa #202308245174 structural only.Details
revision to pa #202308245174 structural only. | ||
| May 20, 2025 | Completed final sign-off Apr 2026 | 28 Harry St | M & L Construction | add a new 2nd fl deck on the side with glass guardrails. no firewall construction.Details
add a new 2nd fl deck on the side with glass guardrails. no firewall construction. | $25,000 |
| May 20, 2025 | In progress issued Aug 2025 | 2036 Green St | Seismic Retrofitters Inc. | mandatory soft-story retrofit int he basement and in the garage area on the 1/f per 2022 sfebc chapter a4. add new plywood shear walls and simpson panels with concrete grade beams.Details
mandatory soft-story retrofit int he basement and in the garage area on the 1/f per 2022 sfebc chapter a4. add new plywood shear walls and simpson panels with concrete grade beams. | $100,000 |