453 permits since 2000: 398 completed, 14 in progress, 25 never finaled, 16 expired or cancelled.
Of the 25 never-finaled permits, 2 are 3 to 5 years old, 23 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 453.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 1000 Guerrero St | revision to pa 202001293050 & 202001293052 soft story retrofit. revise previously approved retrofit to comply with 2025 cbc standardsDetails
revision to pa 202001293050 & 202001293052 soft story retrofit. revise previously approved retrofit to comply with 2025 cbc standards | |
| Oct 2, 2026 | In progress issued Oct 2026 | 1000 Guerrero St | reccomencement and completion of work approved under pa#202001293050. residential.Details
reccomencement and completion of work approved under pa#202001293050. residential. | $10,000 |
| Oct 2, 2026 | In progress issued Oct 2026 | 1000 Guerrero St | reccomencement and completion of work approved under pa#202001293052. commercial.Details
reccomencement and completion of work approved under pa#202001293052. commercial. | $10,000 |
| Aug 31, 2026 | In progress issued Sep 2026 | 712 Tennessee St | revision to pa#202604219836: replace the simpson panel with plywood shear wall due to (e) field conditions.Details
revision to pa#202604219836: replace the simpson panel with plywood shear wall due to (e) field conditions. | $1,000 |
| Aug 19, 2026 | In progress issued Sep 2026 | 2512 Quint St | revision to approved pa#201909060953: structural soft story retrofit due to site conditions.Details
revision to approved pa#201909060953: structural soft story retrofit due to site conditions. | $10,000 |
| Jul 14, 2026 | In progress issued Jul 2026 | 2512 Quint St | recommencement and completion of work approved under pa#201909060953Details
recommencement and completion of work approved under pa#201909060953 | $27,500 |
| Jun 29, 2026 | In progress issued Oct 2026 | 2246 26th Av | remodel on both floors. remodel (e) kitchen and bathroom on 2/f and close (e) lightwell at the north side. convert ground floor into living space and add a new master bedroom and bathroom. lower slab approx 12 inches. replace (e) furnace and wh. add new retaining wall. add new skylight and 1-hr wallDetails
remodel on both floors. remodel (e) kitchen and bathroom on 2/f and close (e) lightwell at the north side. convert ground floor into living space and add a new master bedroom and bathroom. lower slab approx 12 inches. replace (e) furnace and wh. add new retaining wall. add new skylight and 1-hr wall | $380,000 |
| Jun 8, 2026 | In progress issued Jun 2026 | 2512 Quint St | to obtain final inspection for work approved under pa# 201909060953. all work is complete.Details
to obtain final inspection for work approved under pa# 201909060953. all work is complete. | |
| May 11, 2026 | Completed final sign-off Jul 2026 | 1038 Filbert St | revision to bpa: 202510026543- shift longitudinal shear walls (e/w side) at basement level update gl c shearwall trasition (from garage level to laundry to basement retainig wall)Details
revision to bpa: 202510026543- shift longitudinal shear walls (e/w side) at basement level update gl c shearwall trasition (from garage level to laundry to basement retainig wall) | |
| Apr 21, 2026 | In progress issued May 2026 | 712 Tennessee St | comply with nov#201993791. do mandatory soft story retrofit on the ground floor per 2025 ebc, chapter a.4. add plywood shear walls and simpson panels with concrete grade beams.Details
comply with nov#201993791. do mandatory soft story retrofit on the ground floor per 2025 ebc, chapter a.4. add plywood shear walls and simpson panels with concrete grade beams. | $100,000 |
| Feb 27, 2026 | In progress issued Mar 2026 | 50 Raymond Av | revision to pa #2025-0314-2296: replace final sheet gs6 with revised versionDetails
revision to pa #2025-0314-2296: replace final sheet gs6 with revised version | |
| Dec 24, 2025 | Completed final sign-off Jan 2026 | 1675 Green St | revision to pa 202508153118 minor relocation of steel moment columns @ garages. foundation revision lateral brace modifications. remove required special inspections 2,18a for original permit - n/a for retrofit since only stl moment framesDetails
revision to pa 202508153118 minor relocation of steel moment columns @ garages. foundation revision lateral brace modifications. remove required special inspections 2,18a for original permit - n/a for retrofit since only stl moment frames | |
| Dec 23, 2025 | Completed final sign-off Apr 2026 | 562 Hayes St | revision to pa # 2020-0923-4855 & 2025-0923-5919: mandatory soft story retrofit. revision due to (e) field conditions. move new steel frame to the other commercial space. add new ply shear walls with grade beams in the basement.Details
revision to pa # 2020-0923-4855 & 2025-0923-5919: mandatory soft story retrofit. revision due to (e) field conditions. move new steel frame to the other commercial space. add new ply shear walls with grade beams in the basement. | $20,000 |
| Dec 23, 2025 | Completed final sign-off Apr 2026 | 560 Hayes St | revision to pa # 2020-0923-4857 & 2025-0923-5919: mandatory soft story retrofit. revision due to (e) field conditions. move new steel frame to the other commercial space. add new ply shear walls with grade beams in the basement.Details
revision to pa # 2020-0923-4857 & 2025-0923-5919: mandatory soft story retrofit. revision due to (e) field conditions. move new steel frame to the other commercial space. add new ply shear walls with grade beams in the basement. | $20,000 |
| Dec 22, 2025 | Completed final sign-off Apr 2026 | 562 Hayes St | recommencement and completion of work approved under pa#202009234855Details
recommencement and completion of work approved under pa#202009234855 | |
| Dec 3, 2025 | Completed final sign-off Jul 2026 | 1038 Filbert St | voluntary soft story retrofit to comply with sf ab-094 (per asce 7-16)/chapter 4d per 2022 cebc appendix a-4 standards.there are (3)target stories given the slope of the site.lateral system to consist of(2)n steel special moment frames over garage openings adjDetails
voluntary soft story retrofit to comply with sf ab-094 (per asce 7-16)/chapter 4d per 2022 cebc appendix a-4 standards.there are (3)target stories given the slope of the site.lateral system to consist of(2)n steel special moment frames over garage openings adj | $82,000 |
| Nov 19, 2025 | Completed final sign-off Mar 2026 | 530 Dewey Bl | revision to pa #202510147322. revsion due to existing field conditions. replace existing foundation in the storage room with new concrete with new concrete foundation instead of underpinning.Details
revision to pa #202510147322. revsion due to existing field conditions. replace existing foundation in the storage room with new concrete with new concrete foundation instead of underpinning. | $20,000 |
| Oct 14, 2025 | Completed final sign-off Mar 2026 | 530 Dewey Bl | structural work only. replace and underpin portions of the existing foundation. replace concrete slab 2 new 6" slab. add perimeter drain. no plumbing fixtures.Details
structural work only. replace and underpin portions of the existing foundation. replace concrete slab 2 new 6" slab. add perimeter drain. no plumbing fixtures. | $150,000 |
| Sep 23, 2025 | Completed final sign-off Apr 2026 | 560 Hayes St | recommencement and completion of work approved under pa# 202009234857Details
recommencement and completion of work approved under pa# 202009234857 | $30,000 |
| Sep 3, 2025 | Completed final sign-off Nov 2025 | 3037 California St | volutary strengthening and foundation repair in the garage area on the ground floorDetails
volutary strengthening and foundation repair in the garage area on the ground floor | $50,000 |
| Aug 15, 2025 | Completed final sign-off Jan 2026 | 1675 Green St | response to nov#202537534: soft story retrofit to comply with 2022 sfebc chapter 4d per 2022 cebc appendix a-4 standards. install (2) steel special moment frames over garage openings adj to green st.Details
response to nov#202537534: soft story retrofit to comply with 2022 sfebc chapter 4d per 2022 cebc appendix a-4 standards. install (2) steel special moment frames over garage openings adj to green st. | $85,000 |
| Mar 14, 2025 | In progress issued Jan 2026 | 50 Raymond Av | replacement and repair of weather envelope and windows on selected elevations, replacement of joists, sheathing, and waterproof surface of 2nd floor deck. no interior work.Details
replacement and repair of weather envelope and windows on selected elevations, replacement of joists, sheathing, and waterproof surface of 2nd floor deck. no interior work. | $900,000 |
| Sep 18, 2024 | Completed final sign-off May 2025 | 538 Dewey Bl | foundation repair in the garage area due to deterioration and settlement. replace the (e) foundation in kind w/conc foundation at the south side. underpin (e) foundation at 2 sides. replace concrete slab in kind w/6in thick slab. all structural work.Details
foundation repair in the garage area due to deterioration and settlement. replace the (e) foundation in kind w/conc foundation at the south side. underpin (e) foundation at 2 sides. replace concrete slab in kind w/6in thick slab. all structural work. | $120,000 |
| Aug 13, 2024 | Completed final sign-off May 2025 | 326 Lawton St | framing revison to accomodate existing conditoins. revison to pa# 202309287573Details
framing revison to accomodate existing conditoins. revison to pa# 202309287573 | |
| Jul 1, 2024 | Completed final sign-off Jan 2025 | 104 Eureka St | rev to pa# 2019-0409-7445; rev to previously pulled seismic related permit. standard, non blase resistant glass at store front, (3) sistered strong walls in lieu of steel monent frameDetails
rev to pa# 2019-0409-7445; rev to previously pulled seismic related permit. standard, non blase resistant glass at store front, (3) sistered strong walls in lieu of steel monent frame | |
| May 17, 2024 | Completed final sign-off Aug 2024 | 2530 Lombard St | revision to 202401254622 (nov 202417769) bid framing modifications to 1st fl structural repair,beams and joistsDetails
revision to 202401254622 (nov 202417769) bid framing modifications to 1st fl structural repair,beams and joists | |
| Apr 3, 2024 | In progress issued Apr 2024 | 8 Santa Ynez Av | revision to "1" to (e) pa 2023-1204-1872. revision due to field conditions. revise minimum anchor depth to 12 ft. add 3 more concrete grade beamsDetails
revision to "1" to (e) pa 2023-1204-1872. revision due to field conditions. revise minimum anchor depth to 12 ft. add 3 more concrete grade beams | |
| Mar 19, 2024 | Completed final sign-off Aug 2024 | 802 Divisadero St | accessibility revision to bpa# 202302091731: to comply w/ abe program abe#20240612052 - relocate entry door and reconfigure storefront glazing to accomodate relocated steel column that disrupts entry. to correct laundromat address to 802 divisadero st.Details
accessibility revision to bpa# 202302091731: to comply w/ abe program abe#20240612052 - relocate entry door and reconfigure storefront glazing to accomodate relocated steel column that disrupts entry. to correct laundromat address to 802 divisadero st. | |
| Feb 8, 2024 | Completed final sign-off Jul 2025 | 3624 17th St | replace (9) first floor windows in-kind. street facing windows to be replaced w/ wood w/ ogee lugs.Details
replace (9) first floor windows in-kind. street facing windows to be replaced w/ wood w/ ogee lugs. | $18,000 |
| Feb 5, 2024 | Completed final sign-off Oct 2025 | 3620 17th St | voluntary structural strenghen of (e) first floor with plywood shearwall and holdown. replace (e) brick foundations for permimeter and interior foundations.Details
voluntary structural strenghen of (e) first floor with plywood shearwall and holdown. replace (e) brick foundations for permimeter and interior foundations. | $112,000 |
| Jan 30, 2024 | Completed final sign-off Mar 2024 | 1239 21st Av | revision to pa# 202401043432, reflect (e) garage grade bm, dowel (n) footings into (e), change c10x to c8x to match (e) girder. strengthen 2nd flr w/ 2x blocking underneath walls.Details
revision to pa# 202401043432, reflect (e) garage grade bm, dowel (n) footings into (e), change c10x to c8x to match (e) girder. strengthen 2nd flr w/ 2x blocking underneath walls. | |
| Jan 25, 2024 | Completed final sign-off Aug 2024 | 2530 Lombard St | to comply w nov 202417769 repair partially collapsed gr floor. structural girder bends, framing joists, floorDetails
to comply w nov 202417769 repair partially collapsed gr floor. structural girder bends, framing joists, floor | $42,000 |
| Jan 25, 2024 | Completed final sign-off Aug 2024 | 2524 Lombard St | structural revision 202311291599 (soft story retrofit) update foundation anchorage and floor connection of steel moment frames at front/rear of structure (gl a/e)Details
structural revision 202311291599 (soft story retrofit) update foundation anchorage and floor connection of steel moment frames at front/rear of structure (gl a/e) | |
| Jan 25, 2024 | Completed final sign-off Mar 2024 | 560 Scott St | revision to pa# 202309217068 (soft story retrofit). update plywood shearwall locations and anchorage based on existing structural conditions.Details
revision to pa# 202309217068 (soft story retrofit). update plywood shearwall locations and anchorage based on existing structural conditions. | |
| Jan 4, 2024 | Completed final sign-off Mar 2024 | 1239 21st Av | upgrade 4 garage post foundations and strenghening of 1 garage girder beam with new steel channel.Details
upgrade 4 garage post foundations and strenghening of 1 garage girder beam with new steel channel. | $32,000 |
| Dec 4, 2023 | In progress issued Dec 2023 | 8 Santa Ynez Av | full foundation replacement on the ground fl. replace (e) deteriorated comcre foundation due to settlement with new reinforced concrete foundation with helical achors with new 6" concrete slabDetails
full foundation replacement on the ground fl. replace (e) deteriorated comcre foundation due to settlement with new reinforced concrete foundation with helical achors with new 6" concrete slab | $100,000 |
| Oct 31, 2023 | Completed final sign-off Dec 2023 | 1639 Ulloa St | strengthen 25 ft of rear (nw) permeter foundation. replace (e) exterior rear yard slab.Details
strengthen 25 ft of rear (nw) permeter foundation. replace (e) exterior rear yard slab. | $23,000 |
| Oct 26, 2023 | Completed final sign-off Apr 2025 | 1515 Fillmore St | to comply w/ accessible business entrance program- abe# 202310118882, ada entry/ bathroom upgrades for commercial restaurant, required by structural work at 1730 ofarrell st .(same bldg).Details
to comply w/ accessible business entrance program- abe# 202310118882, ada entry/ bathroom upgrades for commercial restaurant, required by structural work at 1730 ofarrell st .(same bldg). | $35,000 |
| Oct 26, 2023 | Completed final sign-off Apr 2025 | 1740 Ofarrell St | to comply w/ accessible business entrance program - abe# 20231011881, ada upgrades for commercial restaurant, required by structual work at 1730 ofarrell st (same bldg).Details
to comply w/ accessible business entrance program - abe# 20231011881, ada upgrades for commercial restaurant, required by structual work at 1730 ofarrell st (same bldg). | $35,000 |
| Oct 26, 2023 | Completed final sign-off Apr 2025 | 1730 Ofarrell St | voluntary partial structural strengthening - reinforced concrete column jackets/wall overlays at street shearwalls. removal & replacement of architectural finishes to allow for structural work to be completed, ada upgrades of residential lobby.Details
voluntary partial structural strengthening - reinforced concrete column jackets/wall overlays at street shearwalls. removal & replacement of architectural finishes to allow for structural work to be completed, ada upgrades of residential lobby. | $500,000 |
| Oct 18, 2023 | Completed final sign-off Oct 2023 | 415 Tehama St | to obtain final inspection for work approved under pa# 2019-0115-0366. all work is complete.Details
to obtain final inspection for work approved under pa# 2019-0115-0366. all work is complete. | |
| Oct 18, 2023 | Completed final sign-off Jun 2025 | 3819 23rd St | revision to pa# 202207279420: reconfigure basement foundation wall to job around entry stair. reconfigure proposed master bath on 2nd fl & change proposed window type. reconfigure proposed stair from 2nd to 3rd fl. remove 1 proposed bathroom & 1 proposed dormer window on 3rd fl. several dimensional.Details
revision to pa# 202207279420: reconfigure basement foundation wall to job around entry stair. reconfigure proposed master bath on 2nd fl & change proposed window type. reconfigure proposed stair from 2nd to 3rd fl. remove 1 proposed bathroom & 1 proposed dormer window on 3rd fl. several dimensional. | |
| Sep 28, 2023 | Completed final sign-off May 2025 | 326 Lawton St | enlarge 3rd floor bedroom & add bathroom by raising (e) roofline. new construction to cover (e) lightwell at 2nd floor. no change in building footprint of overall building height.Details
enlarge 3rd floor bedroom & add bathroom by raising (e) roofline. new construction to cover (e) lightwell at 2nd floor. no change in building footprint of overall building height. | $90,000 |
| Sep 21, 2023 | Completed final sign-off Mar 2024 | 560 Scott St | supercede 201709158459. mandatory soft story retrofit to comply w/ 2022 sfebc chapter 4d per 2022 cebc appendix a-4 standards. new plywood shearwalls anchored into (n) and (e) foundations, at ground level and crawl space (ref to 202002194869)Details
supercede 201709158459. mandatory soft story retrofit to comply w/ 2022 sfebc chapter 4d per 2022 cebc appendix a-4 standards. new plywood shearwalls anchored into (n) and (e) foundations, at ground level and crawl space (ref to 202002194869) | $46,000 |
| Sep 11, 2023 | Completed final sign-off Feb 2024 | 393 Crescent Av | voluntary strengthening in the garage area only on gr fl. add plywood shear walls and simpson panel concrete grade beams. replace concrete slab in the garage. close door next to garage door at front elevationDetails
voluntary strengthening in the garage area only on gr fl. add plywood shear walls and simpson panel concrete grade beams. replace concrete slab in the garage. close door next to garage door at front elevation | $25,000 |
| Aug 22, 2023 | Completed final sign-off Aug 2024 | 808 Divisadero St | revision to 202302091729, 202302091731. revision to soft story lateral strengthening elements per field conditions.Details
revision to 202302091729, 202302091731. revision to soft story lateral strengthening elements per field conditions. | |
| Aug 17, 2023 | Completed final sign-off Dec 2023 | 2160 Market St | revision to pa201609147647. update retrofit details per field conditions.Details
revision to pa201609147647. update retrofit details per field conditions. | $10,000 |
| Aug 3, 2023 | Completed final sign-off Aug 2024 | 2530 Lombard St | commercial - soft story retrofit per sfebc chaper 4d 2022 cebc appendix a-4. residential soft story under pa 202308033616Details
commercial - soft story retrofit per sfebc chaper 4d 2022 cebc appendix a-4. residential soft story under pa 202308033616 | $60,000 |
| Aug 3, 2023 | Completed final sign-off Aug 2024 | 2524 Lombard St | residential - soft story retrofit per sfebc chaper 4d 2022 cebc appendix a-4. new steel moment frames @ front/rear. interior plywood shearwalls. retrofit to extend to basment level. commercial soft story under pa 202308033613Details
residential - soft story retrofit per sfebc chaper 4d 2022 cebc appendix a-4. new steel moment frames @ front/rear. interior plywood shearwalls. retrofit to extend to basment level. commercial soft story under pa 202308033613 | $50,000 |
| Aug 3, 2023 | Completed final sign-off Aug 2024 | 2530 Lombard St | comply with abe 202205271052. accessibility upgrade t o (e) entry for commercial space. new accessible door w/power door operator. install (2) push buttons on interior/exterior entry.Details
comply with abe 202205271052. accessibility upgrade t o (e) entry for commercial space. new accessible door w/power door operator. install (2) push buttons on interior/exterior entry. | $5,000 |
| Jul 12, 2023 | Completed final sign-off Dec 2025 | 24 Retiro Wy | inter remodel of all 3 (e) flrs: unit 24 1/f-convert (e)unconditioned areas to new conditioned areas to inc den, full bath & closet. new tradesman alley dr, enlarge & relocate e garage dr. 2/f- remodel kitchen & full bath, add n half bath, enlarge e wall opnings new kitchen windows. unit 26 remodelDetails
inter remodel of all 3 (e) flrs: unit 24 1/f-convert (e)unconditioned areas to new conditioned areas to inc den, full bath & closet. new tradesman alley dr, enlarge & relocate e garage dr. 2/f- remodel kitchen & full bath, add n half bath, enlarge e wall opnings new kitchen windows. unit 26 remodel | $350,000 |
| Jun 27, 2023 | Completed final sign-off Jan 2024 | 252 Alma St | mandatory soft story retrofit per 2022 sfebc, chapter a3, add plywood shear walls & new concreete foundations in basement. to comply ces w/nov #202173677 9/23/2022Details
mandatory soft story retrofit per 2022 sfebc, chapter a3, add plywood shear walls & new concreete foundations in basement. to comply ces w/nov #202173677 9/23/2022 | $100,000 |
| May 30, 2023 | Expired or cancelled cancelled Jun 2024 | 4741 19th St | retaining wall replacement of uphill south neighbor 46 eagle st. ref # 202211156523. shared foundation system-concrete retaining wall, grade beam, drilled piers.Details
retaining wall replacement of uphill south neighbor 46 eagle st. ref # 202211156523. shared foundation system-concrete retaining wall, grade beam, drilled piers. | |
| May 24, 2023 | Completed final sign-off Jun 2025 | 2515 Gough St | creation of 207 sq. ft. of living space in the lower level by infilling under (e) living space. partial foundation replacement & structural upgradesDetails
creation of 207 sq. ft. of living space in the lower level by infilling under (e) living space. partial foundation replacement & structural upgrades | $80,000 |
| Mar 31, 2023 | Never finaled issued Apr 2023, no final | 1751 Fulton St | upgrade proposed steel moment frames w/new concrete grade beams connecting column footings. strengthen connection of steel moment frame to (e) roof diaphragm. ref.:bpa# 2013-0423-5214. 05 mar '23, efm.Details
upgrade proposed steel moment frames w/new concrete grade beams connecting column footings. strengthen connection of steel moment frame to (e) roof diaphragm. ref.:bpa# 2013-0423-5214. 05 mar '23, efm. | $33,000 |
| Mar 30, 2023 | Completed final sign-off May 2023 | 3654 20th St | to obtain final inspection for work approved under pa# 201511132576. all work is complete.Details
to obtain final inspection for work approved under pa# 201511132576. all work is complete. | |
| Mar 9, 2023 | Completed final sign-off May 2023 | 425 Lake St | revision to (202301300962) removal of structural load bearing wall at 1st fl between kitchen and dining room. new beam,posats, and concrete footings.modifications to crawl space retrofit per existing field conditionsDetails
revision to (202301300962) removal of structural load bearing wall at 1st fl between kitchen and dining room. new beam,posats, and concrete footings.modifications to crawl space retrofit per existing field conditions | $19,500 |
| Mar 8, 2023 | Completed final sign-off Mar 2023 | 1395 Union St | to obtain final inspection for work approved under pa# 201810163337. all work is complete. ref# 201808107107 & 202303033023.Details
to obtain final inspection for work approved under pa# 201810163337. all work is complete. ref# 201808107107 & 202303033023. | |
| Mar 3, 2023 | Completed final sign-off Mar 2023 | 1395 Union St | to obtain final inspection for work approved under pa# 2018-0810-7107 all work is completeDetails
to obtain final inspection for work approved under pa# 2018-0810-7107 all work is complete | |
| Mar 3, 2023 | Completed final sign-off Mar 2023 | 1395 Union St | to obtain final inspection for work approved under pa# 2018-0810-7103Details
to obtain final inspection for work approved under pa# 2018-0810-7103 | |
| Feb 14, 2023 | Never finaled issued Feb 2023, no final | 3321 21st St | revision to 201910033492 soft story retrofit. document e transverse foundation are concrete at gl 2 and 3, modify anchorage of seismic elements.Details
revision to 201910033492 soft story retrofit. document e transverse foundation are concrete at gl 2 and 3, modify anchorage of seismic elements. | |
| Jan 30, 2023 | Completed final sign-off May 2023 | 425 Lake St | voluntary seismic retrofit of existing crawl space, comply w/ sf ab-094 standards for seismic code compliance w/ plywood shearwalls, anchor bolts & holdowns.Details
voluntary seismic retrofit of existing crawl space, comply w/ sf ab-094 standards for seismic code compliance w/ plywood shearwalls, anchor bolts & holdowns. | $40,000 |
| Jan 27, 2023 | Completed final sign-off May 2023 | 3656 20th St | revision to pa# 201511132576 (soft story retrofit), supercede design & engineer of record. soft story retrofit to comply w/ 2022 sfebc chap.5e per 2022 cebc appendix a-4 standards. relocate plywood shearwalls & concrete grade beams & capped ftg.Details
revision to pa# 201511132576 (soft story retrofit), supercede design & engineer of record. soft story retrofit to comply w/ 2022 sfebc chap.5e per 2022 cebc appendix a-4 standards. relocate plywood shearwalls & concrete grade beams & capped ftg. | |
| Jan 24, 2023 | Completed final sign-off Mar 2025 | 415 Tehama St | structural strengthening of rear popout structure, to be enclosed (4 story, type 5. strengthen framing, posts, foundations. rear windows at edge to be resized,center doors to be removed/relocated. existing exterior porch studs & floor/room framing joist to remainDetails
structural strengthening of rear popout structure, to be enclosed (4 story, type 5. strengthen framing, posts, foundations. rear windows at edge to be resized,center doors to be removed/relocated. existing exterior porch studs & floor/room framing joist to remain | $68,000 |
| Jan 10, 2023 | Completed final sign-off Dec 2024 | 3819 23rd St | temporary soil shoring /excavation of new basement foundation system proposed under pa# 2022-0727-9420Details
temporary soil shoring /excavation of new basement foundation system proposed under pa# 2022-0727-9420 | $18,000 |
| Nov 28, 2022 | Expired or cancelled cancelled Jun 2024 | 4757 19th St | retaining wall replacement of uphill south neighbor 46 eagle st. ref 202211156523. shared foundation system-concrete retaining wall, grade beam, drilled piersDetails
retaining wall replacement of uphill south neighbor 46 eagle st. ref 202211156523. shared foundation system-concrete retaining wall, grade beam, drilled piers | |
| Nov 28, 2022 | Expired or cancelled cancelled Jun 2024 | 30 Eagle St | retaining wall replacement of uphill west neighbor (46 eagle st) ref bpa 202211156523. shared foundation system, concrete retaining wall, grade beam and drilled piersDetails
retaining wall replacement of uphill west neighbor (46 eagle st) ref bpa 202211156523. shared foundation system, concrete retaining wall, grade beam and drilled piers | |
| Nov 15, 2022 | Completed final sign-off Jan 2023 | 79 Cervantes Bl | revision to bpa#202209273179 voluntary retrofit, relocate steel moment frame to front of structure @ gle (previously at garage door inset from exterior). dowel shear wall foundation into (e) post piers at gl bDetails
revision to bpa#202209273179 voluntary retrofit, relocate steel moment frame to front of structure @ gle (previously at garage door inset from exterior). dowel shear wall foundation into (e) post piers at gl b | |
| Nov 10, 2022 | Completed final sign-off Apr 2023 | 2595 43rd Av | soft story retrofit per sfebc chapter 4d engineering criteria cebc appendix a-4. add new plywood shear walls to comply with nov 201812931Details
soft story retrofit per sfebc chapter 4d engineering criteria cebc appendix a-4. add new plywood shear walls to comply with nov 201812931 | $90,000 |
| Nov 8, 2022 | Completed final sign-off Mar 2023 | 60 Dearborn St | rev to pa# 2018-0918-0701: (soft story retrofit) relocate interior plywood shear walls and add steel moment frame to allow garage parking proposed seismic system will allow approved adu laoutDetails
rev to pa# 2018-0918-0701: (soft story retrofit) relocate interior plywood shear walls and add steel moment frame to allow garage parking proposed seismic system will allow approved adu laout | |
| Oct 26, 2022 | Completed final sign-off Feb 2023 | 2751 Clay St | madatory soft stoy retrofit per sfebc ch 4dDetails
madatory soft stoy retrofit per sfebc ch 4d | $28,000 |
| Sep 27, 2022 | Completed final sign-off Jan 2023 | 79 Cervantes Bl | voluntary ground fl laterl seismic upgrade to comply with sf ab094 ord based on asce 7-16 standards. steel moment frame over garage, plywood shearwalls at interior. new conc foundations to support seismic elementDetails
voluntary ground fl laterl seismic upgrade to comply with sf ab094 ord based on asce 7-16 standards. steel moment frame over garage, plywood shearwalls at interior. new conc foundations to support seismic element | $72,000 |
| Sep 15, 2022 | Completed final sign-off Oct 2023 | 936 Geary St | structural revision to bpa# 202206287283 (voluntary retrofit) relocate rear steel moment frame 10'-0" behind garage door opening. modify lateral bracing. add plywood to ceiling for cantilever diaphragm.Details
structural revision to bpa# 202206287283 (voluntary retrofit) relocate rear steel moment frame 10'-0" behind garage door opening. modify lateral bracing. add plywood to ceiling for cantilever diaphragm. | |
| Aug 31, 2022 | Completed final sign-off Apr 2025 | 2579 28th Av | rev pa 202205023365: underpin the (e) foundation at the north side 30lf.Details
rev pa 202205023365: underpin the (e) foundation at the north side 30lf. | $15,000 |
| Aug 22, 2022 | Completed final sign-off Nov 2022 | 1930 Eddy St | to comply to nov202292291: repair cmu wall adj to garage facing street. replace with new reinforced cmu wall.Details
to comply to nov202292291: repair cmu wall adj to garage facing street. replace with new reinforced cmu wall. | $18,000 |
| Aug 22, 2022 | Completed final sign-off Oct 2022 | 924 South Van Ness Av | rev to pa201911268287: structural revisions: construct new concrete retaining wall at rear of garage since none exists. remove ol a/d ply sw - add vrfp clips to (e) full height concrete/masonary walls at n/s pl.Details
rev to pa201911268287: structural revisions: construct new concrete retaining wall at rear of garage since none exists. remove ol a/d ply sw - add vrfp clips to (e) full height concrete/masonary walls at n/s pl. | $29,000 |
| Aug 16, 2022 | Completed final sign-off Nov 2022 | 914 Broderick St | structural revision to 201705318011. superced design and engineer on record. relocate plywood shearwalls not to disrupt meters. replace black font at sw holddownsDetails
structural revision to 201705318011. superced design and engineer on record. relocate plywood shearwalls not to disrupt meters. replace black font at sw holddowns | |
| Aug 8, 2022 | Completed final sign-off Jan 2023 | 1406 Pacific Av | revision to bpa#201904097513 & 201904097517 (soft story retrofit). reconfigure plywood shearwall locations.Details
revision to bpa#201904097513 & 201904097517 (soft story retrofit). reconfigure plywood shearwall locations. | |
| Jul 27, 2022 | Completed final sign-off Dec 2024 | 3819 23rd St | convert crawlspace into habitable space and garage through approx 200 cu yds excavation,add interior stair, 1 bedroom, 1 full bath, sitting area.1st fl add 1 bath, enlarge kitchen,remove wall between kitchen and lr. 2nd fl add 1 bath,enlarge kitche,remove wall betwn kitchen and lr, convert atticDetails
convert crawlspace into habitable space and garage through approx 200 cu yds excavation,add interior stair, 1 bedroom, 1 full bath, sitting area.1st fl add 1 bath, enlarge kitchen,remove wall between kitchen and lr. 2nd fl add 1 bath,enlarge kitche,remove wall betwn kitchen and lr, convert attic | $320,000 |
| Jun 28, 2022 | Completed final sign-off Jul 2022 | 2595 Clay St | repair exterior rear stair in-kind, less than 50% replacement. replace structural post & replace landing framing joists.Details
repair exterior rear stair in-kind, less than 50% replacement. replace structural post & replace landing framing joists. | $25,000 |
| Jun 28, 2022 | Completed final sign-off Oct 2023 | 936 Geary St | voluntary ground floor lateral retrofit of (e) type 3 structure with steel ordinary moment frame & (n) concrete foundation at front & rear of structure. accessible upgrades to (e) commercial bathroom.Details
voluntary ground floor lateral retrofit of (e) type 3 structure with steel ordinary moment frame & (n) concrete foundation at front & rear of structure. accessible upgrades to (e) commercial bathroom. | $65,000 |
| Jun 2, 2022 | Completed final sign-off Sep 2022 | 1900 Eddy St | rev to pa201902284019: install new plumbing, electrical & flooring in retail space.Details
rev to pa201902284019: install new plumbing, electrical & flooring in retail space. | $5,750 |
| May 4, 2022 | Completed final sign-off Sep 2022 | 2517 Octavia St | voluntary strengthening in the basement, add two steel moment frames with concrete grade beams and ply sheer wallsDetails
voluntary strengthening in the basement, add two steel moment frames with concrete grade beams and ply sheer walls | $75,000 |
| May 2, 2022 | Completed final sign-off Sep 2022 | 326 Lawton St | revision to pa# 2021-1022-1026: change/reduce design of voluntary structural upgrade, new edr no new interior walls/ conditioned space, 25 ft linear exterior foundation replaement, replace (4) post ftgDetails
revision to pa# 2021-1022-1026: change/reduce design of voluntary structural upgrade, new edr no new interior walls/ conditioned space, 25 ft linear exterior foundation replaement, replace (4) post ftg | |
| Apr 26, 2022 | Completed final sign-off Oct 2022 | 2697 Mission St | boa #22-027, ref bpa#202203180291. commercial soft story retrofit, shift steel moment frame to interior to avoid disrupting interior bar space, add cantilever column @ front of structureDetails
boa #22-027, ref bpa#202203180291. commercial soft story retrofit, shift steel moment frame to interior to avoid disrupting interior bar space, add cantilever column @ front of structure | |
| Apr 26, 2022 | Completed final sign-off Oct 2022 | 2697 Mission St | boa #22-028, ref bpa#202203180289. residential soft story retrofit, shift steel moment frame to interior to avoid disrupting interior bar space, add cantilever column @ front of structureDetails
boa #22-028, ref bpa#202203180289. residential soft story retrofit, shift steel moment frame to interior to avoid disrupting interior bar space, add cantilever column @ front of structure | |
| Mar 31, 2022 | Completed final sign-off Jul 2022 | 3155 Broderick St | rev pa201702240116: soft story retrofit to comply with the 2019 sfbc chapter 4d per 2019 cebc appendix a-4 standards. supercede design and change engineer. plywall shearwall relocations.Details
rev pa201702240116: soft story retrofit to comply with the 2019 sfbc chapter 4d per 2019 cebc appendix a-4 standards. supercede design and change engineer. plywall shearwall relocations. | |
| Mar 18, 2022 | Completed final sign-off Oct 2022 | 2697 Mission St | residential: soft story retrofit to comply with 2019 sfebc ch-40 per 2019 appendix a-4 standards.Details
residential: soft story retrofit to comply with 2019 sfebc ch-40 per 2019 appendix a-4 standards. | $60,000 |
| Mar 18, 2022 | Completed final sign-off Oct 2022 | 2697 Mission St | commercial: soft story retrofit to comply with 2019 sfebc ch-40 per 2019 appendix a-4 standards. ada upgrades at both commercial entries (2 total)Details
commercial: soft story retrofit to comply with 2019 sfebc ch-40 per 2019 appendix a-4 standards. ada upgrades at both commercial entries (2 total) | $29,000 |
| Mar 17, 2022 | Completed final sign-off Apr 2022 | 1330 Irving St | revision to bpa 202112164540 (soft story retrofit). reduce swcgl a.2/i-1.5. strengthen (e) moment frome grade beam. shift cantilever column 3' for parking. update collector beam connection to floor.Details
revision to bpa 202112164540 (soft story retrofit). reduce swcgl a.2/i-1.5. strengthen (e) moment frome grade beam. shift cantilever column 3' for parking. update collector beam connection to floor. | |
| Mar 15, 2022 | Completed final sign-off Dec 2022 | 274 Staples Av | remodel on the ground floor only. convert storage into habitable space. add a bedroom, office room and 2 full bathrooms. add new beams, posts and foundation.Details
remodel on the ground floor only. convert storage into habitable space. add a bedroom, office room and 2 full bathrooms. add new beams, posts and foundation. | $95,000 |
| Feb 25, 2022 | Completed final sign-off Jun 2022 | 2430 Fillmore St | repair deteriorated concrete & wood stair framing @ rear stair. stair not visible from street. repair less than 50% replacement like for likeDetails
repair deteriorated concrete & wood stair framing @ rear stair. stair not visible from street. repair less than 50% replacement like for like | $20,000 |
| Feb 17, 2022 | Completed final sign-off Nov 2025 | 1751 Fulton St | convert an (e) vacant commercial bldg to a gymnasium. the scope of work includes facade renovation, new interior partitions, new flooring, new bathrooms, and new skylights. there is no expansion in bldg envelope.Details
convert an (e) vacant commercial bldg to a gymnasium. the scope of work includes facade renovation, new interior partitions, new flooring, new bathrooms, and new skylights. there is no expansion in bldg envelope. | $250,000 |
| Dec 28, 2021 | Completed final sign-off Apr 2022 | 510 South Van Ness Av | ground fl lateral upgrade to comply w/ sf ab-094 ordinance (based on asce 7-16 standards). 3 steel special moment frames and concrete foundation in lobby. 1 smf in front storage unit.Details
ground fl lateral upgrade to comply w/ sf ab-094 ordinance (based on asce 7-16 standards). 3 steel special moment frames and concrete foundation in lobby. 1 smf in front storage unit. | $130,000 |
| Dec 16, 2021 | Completed final sign-off Apr 2022 | 1330 Irving St | soft story retrofit to comply w/ sfebc 2019 chapter 4d per 2019 cebc appendix a4 standards. steel moment frame, steel cantilever column, plywood shearwalls, holdowns, new concrete foundations.Details
soft story retrofit to comply w/ sfebc 2019 chapter 4d per 2019 cebc appendix a4 standards. steel moment frame, steel cantilever column, plywood shearwalls, holdowns, new concrete foundations. | $87,000 |
| Oct 1, 2021 | Completed final sign-off Aug 2022 | 617 Castro St | voluntary foundation strengthening.Details
voluntary foundation strengthening. | $24,000 |
| Aug 31, 2021 | Completed final sign-off Dec 2021 | 1895 08th Av | mandatory soft-story retrofit per 2019 cebc appendex a-4. add plywood shear walls and steel moment frames on the ground floor.Details
mandatory soft-story retrofit per 2019 cebc appendex a-4. add plywood shear walls and steel moment frames on the ground floor. | $80,000 |
| Aug 18, 2021 | Completed final sign-off Nov 2021 | 30 Worth St | replace (e) 4ft-6in concrete retaining wall & wood fence at rear yeard. ref pa202107073914 for connected retaining wall at 217 grandview av. (adjacent uphill neighbor)Details
replace (e) 4ft-6in concrete retaining wall & wood fence at rear yeard. ref pa202107073914 for connected retaining wall at 217 grandview av. (adjacent uphill neighbor) | $18,000 |
| Aug 17, 2021 | Completed final sign-off Dec 2021 | 1180 Jackson St | soft story retrofit to comply with 2019 sbc ch4d 2019 cebc appendix a-4 standards: new steel moment frame, plywood shear wall holdowns & concrete grade beams.Details
soft story retrofit to comply with 2019 sbc ch4d 2019 cebc appendix a-4 standards: new steel moment frame, plywood shear wall holdowns & concrete grade beams. | $95,000 |
| Aug 3, 2021 | Completed final sign-off Oct 2023 | 51 Sycamore St | seismic improvements @ ground story to comply w/sfebc 2019, chapter 5e under soft story programDetails
seismic improvements @ ground story to comply w/sfebc 2019, chapter 5e under soft story program | $75,000 |