Block 0824, lot 012
556 Scott St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 4
- Units
- 15
- Rooms
- 15 bathrooms
- Building
- 8,382 sq ft
- Lot
- 3,463 sq ft
- Zoning
- RM2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 20, 2025 | Completed final sign-off Oct 2025 | 556 Scott St | Red Light Fire Alarms | low frequency fire alarm upgrade 1103.7.6.1 phase 2 project ref pa 202207128308Details
low frequency fire alarm upgrade 1103.7.6.1 phase 2 project ref pa 202207128308 | $12,000 |
| Jan 25, 2024 | Completed final sign-off Mar 2024 | 560 Scott St | Sft Construction Corp | revision to pa# 202309217068 (soft story retrofit). update plywood shearwall locations and anchorage based on existing structural conditions.Details
revision to pa# 202309217068 (soft story retrofit). update plywood shearwall locations and anchorage based on existing structural conditions. | |
| Sep 21, 2023 | Completed final sign-off Mar 2024 | 560 Scott St | Sft Construction Corp | supercede 201709158459. mandatory soft story retrofit to comply w/ 2022 sfebc chapter 4d per 2022 cebc appendix a-4 standards. new plywood shearwalls anchored into (n) and (e) foundations, at ground level and crawl space (ref to 202002194869)Details
supercede 201709158459. mandatory soft story retrofit to comply w/ 2022 sfebc chapter 4d per 2022 cebc appendix a-4 standards. new plywood shearwalls anchored into (n) and (e) foundations, at ground level and crawl space (ref to 202002194869) | $46,000 |
| Jul 12, 2022 | Completed final sign-off Oct 2025 | 556 Scott St | Imperial Construction | install/upgrade f/a system in common areas only. phase i (4) smoke detector, (5) horn strobes, & (5) pull station and wireless communicatorDetails
install/upgrade f/a system in common areas only. phase i (4) smoke detector, (5) horn strobes, & (5) pull station and wireless communicator | $12,500 |
| Feb 19, 2020 | Never finaled issued May 2023, no final | 556 Scott St | Rei Build Up Construction Corporation | adu (4) units w/in (e) envelop in accordance w/ ord# 162-16. ref. soft story pa# 2017-0915-8459.**comply w/ maher ord# 155-13, route to dph**Details
adu (4) units w/in (e) envelop in accordance w/ ord# 162-16. ref. soft story pa# 2017-0915-8459.**comply w/ maher ord# 155-13, route to dph** | $500,000 |
| Sep 15, 2017 | Expired or cancelled cancelled Sep 2023 | 560 Scott St | Rei Build Up Construction Corp | soft story upgrade in compliance with mandatory ord per sfbc ch 4d cebc a4Details
soft story upgrade in compliance with mandatory ord per sfbc ch 4d cebc a4 | $70,000 |
| Oct 10, 2014 | Never finaled issued Oct 2014, no final | 556 Scott St | Ryan And Ryan Construction Inc | replace tile bathroom, toilet, vanity, sink faucet; add one gfic outlet, bathroom on 1st flrDetails
replace tile bathroom, toilet, vanity, sink faucet; add one gfic outlet, bathroom on 1st flr | $16,000 |
| Apr 4, 2011 | Never finaled issued Apr 2011, no final | 560 Scott St | street spaceDetails
street space | ||
| Dec 2, 2008 | Never finaled issued Dec 2008, no final | 560 Scott St | street space only.Details
street space only. | ||
| Nov 25, 2008 | Completed final sign-off Dec 2008 | 556 Scott St | Marcos Construction | revision to pa# 2008/10/17/4490. upgrade windows at back of building where existing work is being done. 3 windows. no change to existing openings.Details
revision to pa# 2008/10/17/4490. upgrade windows at back of building where existing work is being done. 3 windows. no change to existing openings. | $2,000 |
| Oct 17, 2008 | Completed final sign-off Dec 2008 | 556 Scott St | Marcos Construction | remove and replace wood siding and assocaited framing at rear of apartment building. not visable from street.Details
remove and replace wood siding and assocaited framing at rear of apartment building. not visable from street. | $25,000 |
| Jul 25, 2000 | Completed final sign-off Nov 2000 | 556 Scott St | American Marketing Systems Inc. | secure side stairs with brackets, repair and replaceDetails
secure side stairs with brackets, repair and replace | $700 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.