Rei Build Up Construction Corporation

Contractor license
1034261
State license record
Based in
Oakland
On San Francisco permits
Mar 2015 to Mar 2022
Last 24 months
0 permits filed

24 permits since 2000: 14 completed, 9 never finaled, 1 expired or cancelled.

Of the 9 never-finaled permits, 3 are 3 to 5 years old, 6 are 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

AllKitchen remodel 1Bathroom remodel 2
FiledOutcomeAddressWork described on the permitDeclared cost
Mar 10, 2022Never finaled
issued Apr 2023, no final
648 Castro Ststructural revision work only. revision to pa 201709158461 and 201903195709.
Details
Permit
202203109747
Permit issued
Apr 28, 2023

structural revision work only. revision to pa 201709158461 and 201903195709.

Open the permit page

Mar 10, 2022Never finaled
issued Mar 2022, no final
648 Castro Stto obtain final inspection for work approved under 201709158461 and 201903195709. all work is complete
Details
Permit
202203109742
Permit issued
Mar 10, 2022

to obtain final inspection for work approved under 201709158461 and 201903195709. all work is complete

Open the permit page

Sep 9, 2021Completed
final sign-off Mar 2022
2208 Vallejo Stvoluntary seismic strengthening
Details
Permit
202109098052
Permit issued
Sep 15, 2021
Final sign-off
Mar 15, 2022

voluntary seismic strengthening

Open the permit page

$50,000
Apr 12, 2021Completed
final sign-off Jul 2022
532 Roosevelt Wystructural revision based on field changes. ref app#201911268300
Details
Permit
202101273423
Permit issued
Apr 15, 2021
Final sign-off
Jul 12, 2022

structural revision based on field changes. ref app#201911268300

Open the permit page

Sep 27, 2020Completed
final sign-off Mar 2021
1760 Golden Gate Avrev 201908088296 to match field conditions. rev n-s shearwalls to mainting sheathing and holddowns installs from pa201412153712. revise holddowns at gride b.4,c.6,c.7 & f to reflect field changes. maher n/a
Details
Permit
202009275185
Permit issued
Nov 16, 2020
Final sign-off
Mar 2, 2021

rev 201908088296 to match field conditions. rev n-s shearwalls to mainting sheathing and holddowns installs from pa201412153712. revise holddowns at gride b.4,c.6,c.7 & f to reflect field changes. maher n/a

Open the permit page

Jul 8, 2020Never finaled
issued Jul 2020, no final
642 Castro Stinfill an abandoned well in grade ref. soft story pa# 201903195708 & 201903195709.
Details
Permit
202007089777
Permit issued
Jul 9, 2020

infill an abandoned well in grade ref. soft story pa# 201903195708 & 201903195709.

Open the permit page

$3,000
Jul 8, 2020Never finaled
issued Jul 2020, no final
648 Castro Stinfill an abandoned well in grade ref. soft story pa# 201903195708 & 201903195709.
Details
Permit
202007089775
Permit issued
Jul 9, 2020

infill an abandoned well in grade ref. soft story pa# 201903195708 & 201903195709.

Open the permit page

$3,000
Feb 19, 2020Never finaled
issued May 2023, no final
556 Scott Stadu (4) units w/in (e) envelop in accordance w/ ord# 162-16. ref. soft story pa# 2017-0915-8459.**comply w/ maher ord# 155-13, route to dph**
Details
Permit
202002194869
Permit issued
May 18, 2023

adu (4) units w/in (e) envelop in accordance w/ ord# 162-16. ref. soft story pa# 2017-0915-8459.**comply w/ maher ord# 155-13, route to dph**

Open the permit page

$500,000
Nov 26, 2019Completed
final sign-off Jul 2022
532 Roosevelt Wyrevision to 201907226485, extend garage with new retaining wall, lower rear patio, revise 2/f bedrooms and bath layout
Details
Permit
201911268300
Permit issued
Jun 23, 2020
Final sign-off
Jul 12, 2022

revision to 201907226485, extend garage with new retaining wall, lower rear patio, revise 2/f bedrooms and bath layout

Open the permit page

$50,000
Nov 19, 2019Completed
final sign-off Aug 2020
3875 18th Stsoft story retrofit per sfebc chapter 40 engineering criteria 2016 cebc appendix a-4
Details
Permit
201911197672
Permit issued
Nov 21, 2019
Final sign-off
Aug 6, 2020

soft story retrofit per sfebc chapter 40 engineering criteria 2016 cebc appendix a-4

Open the permit page

$105,000
Aug 30, 2019Completed
final sign-off Sep 2020
390 Liberty Strevision to 201709058363 soft story. per cebc 2016. new concrete grade beam of shear wall location adjustment per site conditions
Details
Permit
201908300311
Permit issued
Aug 30, 2019
Final sign-off
Sep 2, 2020

revision to 201709058363 soft story. per cebc 2016. new concrete grade beam of shear wall location adjustment per site conditions

Open the permit page

$15,000
Aug 14, 2019Completed
final sign-off Jan 2020
330 Divisadero Stremoval & replacement of existing masonry footing in 3-phases.
Details
Permit
201908148815
Permit issued
Aug 14, 2019
Final sign-off
Jan 28, 2020

removal & replacement of existing masonry footing in 3-phases.

Open the permit page

$45,000
Aug 8, 2019Completed
final sign-off Mar 2021
1760 Golden Gate Avrevision to pa 2015-0317-1054 (soft story) revise plywood shear wall along grid b5 and c5. replace hardy frame with plywood shear wall at grid f
Details
Permit
201908088296
Permit issued
Aug 27, 2019
Final sign-off
Mar 2, 2021

revision to pa 2015-0317-1054 (soft story) revise plywood shear wall along grid b5 and c5. replace hardy frame with plywood shear wall at grid f

Open the permit page

Jul 22, 2019Completed
final sign-off Jul 2022
532 Roosevelt Wyremodel of (e) 2-level unit include, new kitchen, new half bath on 2nd fl(floor above garage). remodel 2 (e) bedrooms and bathrooms on 3rd fl. replace (e) windows and patio doors at rear & front. no ext expansion
Details
Permit
201907226485
Permit issued
Jul 29, 2019
Final sign-off
Jul 12, 2022

remodel of (e) 2-level unit include, new kitchen, new half bath on 2nd fl(floor above garage). remodel 2 (e) bedrooms and bathrooms on 3rd fl. replace (e) windows and patio doors at rear & front. no ext expansion

Open the permit page

$150,000
May 9, 2019Completed
final sign-off May 2019
1531 Hyde Stsite revision of shear wall at line 8, ref soft story 201609076989
Details
Permit
201905090260
Permit issued
May 9, 2019
Final sign-off
May 13, 2019

site revision of shear wall at line 8, ref soft story 201609076989

Open the permit page

Mar 19, 2019Never finaled
issued May 2019, no final
648 Castro Stadd ground level storage, (n) foundation & slab.
Details
Permit
201903195709
Permit issued
May 22, 2019

add ground level storage, (n) foundation & slab.

Open the permit page

$65,000
Mar 19, 2019Never finaled
issued May 2019, no final
642 Castro Stadd ground level storage, (n) foundation & slab.
Details
Permit
201903195708
Permit issued
May 22, 2019

add ground level storage, (n) foundation & slab.

Open the permit page

$65,000
Nov 21, 2018Expired or cancelled
cancelled Jan 2026
1531 Hyde St(n) storefront window & door, (n) lightwell. new retaining wall for egress alleway basement storage addition. no work to dwelling units
Details
Permit
201811216551

(n) storefront window & door, (n) lightwell. new retaining wall for egress alleway basement storage addition. no work to dwelling units

Open the permit page

$70,000
Nov 5, 2018Completed
final sign-off Mar 2019
615 Linden Streplacement of extg brick foundation with concrete in 3 phases
Details
Permit
201811055014
Permit issued
Nov 7, 2018
Final sign-off
Mar 6, 2019

replacement of extg brick foundation with concrete in 3 phases

Open the permit page

$25,000
Sep 15, 2017Never finaled
issued Mar 2019, no final
648 Castro Stsoft story upgrade in compliance with mandatory ord per sfbc ch 4d, cebc a4
Details
Permit
201709158461
Permit issued
Mar 6, 2019

soft story upgrade in compliance with mandatory ord per sfbc ch 4d, cebc a4

Open the permit page

$65,000
Sep 15, 2017Completed
final sign-off Aug 2020
390 Liberty Stsoft story retrofit per sfebc ch 34b, 2016 cebc a4
Details
Permit
201709158363
Permit issued
Jul 25, 2019
Final sign-off
Aug 7, 2020

soft story retrofit per sfebc ch 34b, 2016 cebc a4

Open the permit page

$65,000
Sep 15, 2017Never finaled
issued Mar 2019, no final
642 Castro Stsoft story upgrade in compliance w mandatory ordinance per sfbc ch 4d, 2016 cebc appendex a-4.
Details
Permit
201709158460
Permit issued
Mar 6, 2019

soft story upgrade in compliance w mandatory ordinance per sfbc ch 4d, 2016 cebc appendex a-4.

Open the permit page

$65,000
Sep 7, 2016Completed
final sign-off May 2019
1531 Hyde Stsoft story upgrade in compliance with mandatory ordinance per sfbc chap ter 4d, 2016 iebc appendix a4
Details
Permit
201609076989
Permit issued
Nov 1, 2018
Final sign-off
May 13, 2019

soft story upgrade in compliance with mandatory ordinance per sfbc chap ter 4d, 2016 iebc appendix a4

Open the permit page

$70,000
Mar 17, 2015Completed
final sign-off Mar 2021
1760 Golden Gate Avmandatory retrofit of soft story per sfbc chapter 34b, fema p-807.
Details
Permit
201503171054
Permit issued
Aug 1, 2019
Final sign-off
Mar 2, 2021

mandatory retrofit of soft story per sfbc chapter 34b, fema p-807.

Open the permit page

$50,000