Rei Build Up Construction Corporation
- Based in
- Oakland
- On San Francisco permits
- Mar 2015 to Mar 2022
- Last 24 months
- 0 permits filed
24 permits since 2000: 14 completed, 9 never finaled, 1 expired or cancelled.
Of the 9 never-finaled permits, 3 are 3 to 5 years old, 6 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 10, 2022 | Never finaled issued Apr 2023, no final | 648 Castro St | structural revision work only. revision to pa 201709158461 and 201903195709.Details
structural revision work only. revision to pa 201709158461 and 201903195709. | |
| Mar 10, 2022 | Never finaled issued Mar 2022, no final | 648 Castro St | to obtain final inspection for work approved under 201709158461 and 201903195709. all work is completeDetails
to obtain final inspection for work approved under 201709158461 and 201903195709. all work is complete | |
| Sep 9, 2021 | Completed final sign-off Mar 2022 | 2208 Vallejo St | voluntary seismic strengtheningDetails
voluntary seismic strengthening | $50,000 |
| Apr 12, 2021 | Completed final sign-off Jul 2022 | 532 Roosevelt Wy | structural revision based on field changes. ref app#201911268300Details
structural revision based on field changes. ref app#201911268300 | |
| Sep 27, 2020 | Completed final sign-off Mar 2021 | 1760 Golden Gate Av | rev 201908088296 to match field conditions. rev n-s shearwalls to mainting sheathing and holddowns installs from pa201412153712. revise holddowns at gride b.4,c.6,c.7 & f to reflect field changes. maher n/aDetails
rev 201908088296 to match field conditions. rev n-s shearwalls to mainting sheathing and holddowns installs from pa201412153712. revise holddowns at gride b.4,c.6,c.7 & f to reflect field changes. maher n/a | |
| Jul 8, 2020 | Never finaled issued Jul 2020, no final | 642 Castro St | infill an abandoned well in grade ref. soft story pa# 201903195708 & 201903195709.Details
infill an abandoned well in grade ref. soft story pa# 201903195708 & 201903195709. | $3,000 |
| Jul 8, 2020 | Never finaled issued Jul 2020, no final | 648 Castro St | infill an abandoned well in grade ref. soft story pa# 201903195708 & 201903195709.Details
infill an abandoned well in grade ref. soft story pa# 201903195708 & 201903195709. | $3,000 |
| Feb 19, 2020 | Never finaled issued May 2023, no final | 556 Scott St | adu (4) units w/in (e) envelop in accordance w/ ord# 162-16. ref. soft story pa# 2017-0915-8459.**comply w/ maher ord# 155-13, route to dph**Details
adu (4) units w/in (e) envelop in accordance w/ ord# 162-16. ref. soft story pa# 2017-0915-8459.**comply w/ maher ord# 155-13, route to dph** | $500,000 |
| Nov 26, 2019 | Completed final sign-off Jul 2022 | 532 Roosevelt Wy | revision to 201907226485, extend garage with new retaining wall, lower rear patio, revise 2/f bedrooms and bath layoutDetails
revision to 201907226485, extend garage with new retaining wall, lower rear patio, revise 2/f bedrooms and bath layout | $50,000 |
| Nov 19, 2019 | Completed final sign-off Aug 2020 | 3875 18th St | soft story retrofit per sfebc chapter 40 engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 40 engineering criteria 2016 cebc appendix a-4 | $105,000 |
| Aug 30, 2019 | Completed final sign-off Sep 2020 | 390 Liberty St | revision to 201709058363 soft story. per cebc 2016. new concrete grade beam of shear wall location adjustment per site conditionsDetails
revision to 201709058363 soft story. per cebc 2016. new concrete grade beam of shear wall location adjustment per site conditions | $15,000 |
| Aug 14, 2019 | Completed final sign-off Jan 2020 | 330 Divisadero St | removal & replacement of existing masonry footing in 3-phases.Details
removal & replacement of existing masonry footing in 3-phases. | $45,000 |
| Aug 8, 2019 | Completed final sign-off Mar 2021 | 1760 Golden Gate Av | revision to pa 2015-0317-1054 (soft story) revise plywood shear wall along grid b5 and c5. replace hardy frame with plywood shear wall at grid fDetails
revision to pa 2015-0317-1054 (soft story) revise plywood shear wall along grid b5 and c5. replace hardy frame with plywood shear wall at grid f | |
| Jul 22, 2019 | Completed final sign-off Jul 2022 | 532 Roosevelt Wy | remodel of (e) 2-level unit include, new kitchen, new half bath on 2nd fl(floor above garage). remodel 2 (e) bedrooms and bathrooms on 3rd fl. replace (e) windows and patio doors at rear & front. no ext expansionDetails
remodel of (e) 2-level unit include, new kitchen, new half bath on 2nd fl(floor above garage). remodel 2 (e) bedrooms and bathrooms on 3rd fl. replace (e) windows and patio doors at rear & front. no ext expansion | $150,000 |
| May 9, 2019 | Completed final sign-off May 2019 | 1531 Hyde St | site revision of shear wall at line 8, ref soft story 201609076989Details
site revision of shear wall at line 8, ref soft story 201609076989 | |
| Mar 19, 2019 | Never finaled issued May 2019, no final | 648 Castro St | add ground level storage, (n) foundation & slab.Details
add ground level storage, (n) foundation & slab. | $65,000 |
| Mar 19, 2019 | Never finaled issued May 2019, no final | 642 Castro St | add ground level storage, (n) foundation & slab.Details
add ground level storage, (n) foundation & slab. | $65,000 |
| Nov 21, 2018 | Expired or cancelled cancelled Jan 2026 | 1531 Hyde St | (n) storefront window & door, (n) lightwell. new retaining wall for egress alleway basement storage addition. no work to dwelling unitsDetails
(n) storefront window & door, (n) lightwell. new retaining wall for egress alleway basement storage addition. no work to dwelling units | $70,000 |
| Nov 5, 2018 | Completed final sign-off Mar 2019 | 615 Linden St | replacement of extg brick foundation with concrete in 3 phasesDetails
replacement of extg brick foundation with concrete in 3 phases | $25,000 |
| Sep 15, 2017 | Never finaled issued Mar 2019, no final | 648 Castro St | soft story upgrade in compliance with mandatory ord per sfbc ch 4d, cebc a4Details
soft story upgrade in compliance with mandatory ord per sfbc ch 4d, cebc a4 | $65,000 |
| Sep 15, 2017 | Completed final sign-off Aug 2020 | 390 Liberty St | soft story retrofit per sfebc ch 34b, 2016 cebc a4Details
soft story retrofit per sfebc ch 34b, 2016 cebc a4 | $65,000 |
| Sep 15, 2017 | Never finaled issued Mar 2019, no final | 642 Castro St | soft story upgrade in compliance w mandatory ordinance per sfbc ch 4d, 2016 cebc appendex a-4.Details
soft story upgrade in compliance w mandatory ordinance per sfbc ch 4d, 2016 cebc appendex a-4. | $65,000 |
| Sep 7, 2016 | Completed final sign-off May 2019 | 1531 Hyde St | soft story upgrade in compliance with mandatory ordinance per sfbc chap ter 4d, 2016 iebc appendix a4Details
soft story upgrade in compliance with mandatory ordinance per sfbc chap ter 4d, 2016 iebc appendix a4 | $70,000 |
| Mar 17, 2015 | Completed final sign-off Mar 2021 | 1760 Golden Gate Av | mandatory retrofit of soft story per sfbc chapter 34b, fema p-807.Details
mandatory retrofit of soft story per sfbc chapter 34b, fema p-807. | $50,000 |