Jan Labicki
- Listed as
- authorized agent-others, contractor, designer
- Firm
- Imperial Construction
- Based in
- California City
- On San Francisco permits
- Aug 2021 to May 2023
15 permits since 2000 (contractor on 15 permits, designer on 2 permits, authorized agent-others on 1 permit): 13 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 23, 2023 | Completed final sign-off Sep 2023 | 2650 Franklin St | Imperial Construction | unit #25: kitchen and bathroom remodel. cabinets, floors, tub surround, sink, vanity. new kitchen and bath fans. replace bath window. new plugs, new lights, and switches. new fixtures. new toilet. no outside work. no alarm work. all replacement to be in kind.Details
unit #25: kitchen and bathroom remodel. cabinets, floors, tub surround, sink, vanity. new kitchen and bath fans. replace bath window. new plugs, new lights, and switches. new fixtures. new toilet. no outside work. no alarm work. all replacement to be in kind. | $54,000 |
| May 23, 2023 | Completed final sign-off Oct 2023 | 2650 Franklin St | Imperial Construction | unit# 16: kitchen and bath remodel. cabinets, floors, tub surround, sink, vanity. new ktichen and bath fans. repalce bath window. new plugs, new lights, and switches and new fixtures. new toilet. no outside work. no fire alarm work. all replacement to be like in kind.Details
unit# 16: kitchen and bath remodel. cabinets, floors, tub surround, sink, vanity. new ktichen and bath fans. repalce bath window. new plugs, new lights, and switches and new fixtures. new toilet. no outside work. no fire alarm work. all replacement to be like in kind. | $54,000 |
| Feb 2, 2023 | Completed final sign-off Feb 2023 | 2650 Franklin St | Imperial Construction | apt 28: replace windows, non-street facing windows. all windows are at the back of the building. 5 in the living room 1 in kitchen, 6 total windows. u-factor 0.30 or better.Details
apt 28: replace windows, non-street facing windows. all windows are at the back of the building. 5 in the living room 1 in kitchen, 6 total windows. u-factor 0.30 or better. | $2,500 |
| Jan 13, 2023 | Completed final sign-off Jul 2023 | 2650 Franklin St | Imperial Construction | unit 18: kitchen and bath remodel: cabinet, floors, tub surround, sink and vanity. new kitchen and bath fun. new plugs, new lights and switches, new fixtures. replace bath window. no outside work. no fire alarm work. new toliet.Details
unit 18: kitchen and bath remodel: cabinet, floors, tub surround, sink and vanity. new kitchen and bath fun. new plugs, new lights and switches, new fixtures. replace bath window. no outside work. no fire alarm work. new toliet. | $36,000 |
| Jan 13, 2023 | Completed final sign-off Apr 2023 | 2650 Franklin St | Imperial Construction | unit 27: kitchen and bath remodel: cabinets, floors, tub surround, sink and vanity, new kitchen and bath fun. new plugs, new lights switches, replace bath window. no outside work and no fire alarm work. new toilet. all replacements to be in kind, window in toiletry.Details
unit 27: kitchen and bath remodel: cabinets, floors, tub surround, sink and vanity, new kitchen and bath fun. new plugs, new lights switches, replace bath window. no outside work and no fire alarm work. new toilet. all replacements to be in kind, window in toiletry. | $36,000 |
| Nov 7, 2022 | Completed final sign-off Feb 2023 | 2650 Franklin St | Imperial Construction | unit #28: one kitchen & one bathroom remodel, cabinets, floors, tub soround, sinks, add gfci/a fli brakers and new elec, paint, new tile, new plug, new fixture, new kitchen & bath faucet, new light switches, new vanity, smoke new, no outside work no building fire alarm workDetails
unit #28: one kitchen & one bathroom remodel, cabinets, floors, tub soround, sinks, add gfci/a fli brakers and new elec, paint, new tile, new plug, new fixture, new kitchen & bath faucet, new light switches, new vanity, smoke new, no outside work no building fire alarm work | $36,000 |
| Oct 27, 2022 | Expired or cancelled cancelled Jan 2026 | 940 Bay St | Imperial Construction | revision bpa#202203230709, reduction of scope, omit bathroom window in unit #2Details
revision bpa#202203230709, reduction of scope, omit bathroom window in unit #2 | |
| Jul 12, 2022 | Completed final sign-off Oct 2025 | 556 Scott St | Imperial Construction | install/upgrade f/a system in common areas only. phase i (4) smoke detector, (5) horn strobes, & (5) pull station and wireless communicatorDetails
install/upgrade f/a system in common areas only. phase i (4) smoke detector, (5) horn strobes, & (5) pull station and wireless communicator | $12,500 |
| Mar 23, 2022 | Completed final sign-off Oct 2022 | 2888 Folsom St | Imperial Construction | install fire alarm control for sprinkler supervision.Details
install fire alarm control for sprinkler supervision. | $4,500 |
| Mar 23, 2022 | Completed final sign-off Nov 2022 | 940 Bay St | Imperial Construction | replace bathroom windows in unit #1,2,4,7,8,10, and 14. (7) windows one in each unit. not visible from street. wood to vinyl.Details
replace bathroom windows in unit #1,2,4,7,8,10, and 14. (7) windows one in each unit. not visible from street. wood to vinyl. | $3,000 |
| Oct 19, 2021 | Completed final sign-off Aug 2022 | 940 Bay St | Imperial Construction | unt 4 & 7. kitchen and bath remodeling, cabinets, floors, tub surround panel work gfci/faci breakers. bath exhause fan. no outside work, no fire alarm work. in kind replacement.Details
unt 4 & 7. kitchen and bath remodeling, cabinets, floors, tub surround panel work gfci/faci breakers. bath exhause fan. no outside work, no fire alarm work. in kind replacement. | $36,000 |
| Oct 19, 2021 | Completed final sign-off May 2022 | 1701 Sloat Bl | Imperial Construction | bathroom remodel & electrical and plumbing all in bathroom. paint interior.Details
bathroom remodel & electrical and plumbing all in bathroom. paint interior. | $7,000 |
| Aug 27, 2021 | Completed final sign-off Dec 2021 | 950 Bay St | Imperial Construction | unit 18: kitchen and bathroom remodel: cabinets, floors, tub surround, sinks, panel work, gfci/afci ciruits, fixtures, kitchen and bath exhaust fans. no outside work. no fire alarm work. replace in-kind, lights/enc 150.0(k)Details
unit 18: kitchen and bathroom remodel: cabinets, floors, tub surround, sinks, panel work, gfci/afci ciruits, fixtures, kitchen and bath exhaust fans. no outside work. no fire alarm work. replace in-kind, lights/enc 150.0(k) | $18,000 |
| Aug 27, 2021 | Completed final sign-off Nov 2022 | 940 Bay St | Imperial Construction | unit 1,8,10,14: kitchen and bathroom remodel: cabinets, floors, tub surround, sinks, panel work, gfci/afci ciruits, fixtures, kitchen and bath exhaust fans. no outside work. no fire alarm work. replace in-kind, lights/end 150.0(k)Details
unit 1,8,10,14: kitchen and bathroom remodel: cabinets, floors, tub surround, sinks, panel work, gfci/afci ciruits, fixtures, kitchen and bath exhaust fans. no outside work. no fire alarm work. replace in-kind, lights/end 150.0(k) | $72,000 |
| Aug 5, 2021 | Never finaled issued Aug 2021, no final | 1945 Clay St | Imperial Construction | install fire alarm system to mointor new sprinlker system. install low freq sounders in units. upgrade (e) fire system to addressable.Details
install fire alarm system to mointor new sprinlker system. install low freq sounders in units. upgrade (e) fire system to addressable. | $9,000 |