Block 0527, lot 020A
2650 Franklin St
- City’s use
- Multi-Family Residential
- Built
- 1925
- Stories
- 3
- Units
- 27
- Rooms
- 27 bathrooms
- Building
- 17,211 sq ft
- Lot
- 6,930 sq ft
- Zoning
- RM2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
30 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 14, 2025 | Completed final sign-off Sep 2025 | 2650 Franklin St | Everjoy Builders Inc | replace 1300 sf siding in kind at back of the house. not visible from the street, hardi board siding.Details
replace 1300 sf siding in kind at back of the house. not visible from the street, hardi board siding. | $15,000 |
| Nov 30, 2023 | Completed final sign-off Jan 2024 | 2650 Franklin St | Allied Bay Contractors | unit #24: kitchen and bath remodel; no layout changesDetails
unit #24: kitchen and bath remodel; no layout changes | $13,000 |
| May 23, 2023 | Completed final sign-off Oct 2023 | 2650 Franklin St | Imperial Construction | unit# 16: kitchen and bath remodel. cabinets, floors, tub surround, sink, vanity. new ktichen and bath fans. repalce bath window. new plugs, new lights, and switches and new fixtures. new toilet. no outside work. no fire alarm work. all replacement to be like in kind.Details
unit# 16: kitchen and bath remodel. cabinets, floors, tub surround, sink, vanity. new ktichen and bath fans. repalce bath window. new plugs, new lights, and switches and new fixtures. new toilet. no outside work. no fire alarm work. all replacement to be like in kind. | $54,000 |
| May 23, 2023 | Completed final sign-off Sep 2023 | 2650 Franklin St | Imperial Construction | unit #25: kitchen and bathroom remodel. cabinets, floors, tub surround, sink, vanity. new kitchen and bath fans. replace bath window. new plugs, new lights, and switches. new fixtures. new toilet. no outside work. no alarm work. all replacement to be in kind.Details
unit #25: kitchen and bathroom remodel. cabinets, floors, tub surround, sink, vanity. new kitchen and bath fans. replace bath window. new plugs, new lights, and switches. new fixtures. new toilet. no outside work. no alarm work. all replacement to be in kind. | $54,000 |
| Feb 2, 2023 | Completed final sign-off Feb 2023 | 2650 Franklin St | Imperial Construction | apt 28: replace windows, non-street facing windows. all windows are at the back of the building. 5 in the living room 1 in kitchen, 6 total windows. u-factor 0.30 or better.Details
apt 28: replace windows, non-street facing windows. all windows are at the back of the building. 5 in the living room 1 in kitchen, 6 total windows. u-factor 0.30 or better. | $2,500 |
| Jan 13, 2023 | Completed final sign-off Apr 2023 | 2650 Franklin St | Imperial Construction | unit 27: kitchen and bath remodel: cabinets, floors, tub surround, sink and vanity, new kitchen and bath fun. new plugs, new lights switches, replace bath window. no outside work and no fire alarm work. new toilet. all replacements to be in kind, window in toiletry.Details
unit 27: kitchen and bath remodel: cabinets, floors, tub surround, sink and vanity, new kitchen and bath fun. new plugs, new lights switches, replace bath window. no outside work and no fire alarm work. new toilet. all replacements to be in kind, window in toiletry. | $36,000 |
| Jan 13, 2023 | Completed final sign-off Jul 2023 | 2650 Franklin St | Imperial Construction | unit 18: kitchen and bath remodel: cabinet, floors, tub surround, sink and vanity. new kitchen and bath fun. new plugs, new lights and switches, new fixtures. replace bath window. no outside work. no fire alarm work. new toliet.Details
unit 18: kitchen and bath remodel: cabinet, floors, tub surround, sink and vanity. new kitchen and bath fun. new plugs, new lights and switches, new fixtures. replace bath window. no outside work. no fire alarm work. new toliet. | $36,000 |
| Nov 7, 2022 | Completed final sign-off Feb 2023 | 2650 Franklin St | Imperial Construction | unit #28: one kitchen & one bathroom remodel, cabinets, floors, tub soround, sinks, add gfci/a fli brakers and new elec, paint, new tile, new plug, new fixture, new kitchen & bath faucet, new light switches, new vanity, smoke new, no outside work no building fire alarm workDetails
unit #28: one kitchen & one bathroom remodel, cabinets, floors, tub soround, sinks, add gfci/a fli brakers and new elec, paint, new tile, new plug, new fixture, new kitchen & bath faucet, new light switches, new vanity, smoke new, no outside work no building fire alarm work | $36,000 |
| Feb 14, 2020 | Completed final sign-off Apr 2021 | 2650 Franklin St | Traube Construction Company | #12: kitchen & bathroom remodel in kind. cabinets, floor, tub surround, sinks, add gfi, panel, fixtures, no work in common area. all work within units. no fire alarm or sprinkler work required.Details
#12: kitchen & bathroom remodel in kind. cabinets, floor, tub surround, sinks, add gfi, panel, fixtures, no work in common area. all work within units. no fire alarm or sprinkler work required. | $28,000 |
| Feb 14, 2020 | Completed final sign-off Apr 2021 | 2650 Franklin St | Traube Construction Company | #10: kitchen & bathroom remodel in kind. cabinets, floor, tub surround, sinks, add gfi, panel, fixtures, no work in common area. all work within units. no fire alarm or sprinkler work required.Details
#10: kitchen & bathroom remodel in kind. cabinets, floor, tub surround, sinks, add gfi, panel, fixtures, no work in common area. all work within units. no fire alarm or sprinkler work required. | $28,000 |
| Feb 5, 2020 | Completed final sign-off Feb 2020 | 2650 Franklin St | Traube Construction Company | unit 14: amend permit to include kitchen only. no bath. no bath. revision to pa # 2019-1104-6376Details
unit 14: amend permit to include kitchen only. no bath. no bath. revision to pa # 2019-1104-6376 | |
| Nov 4, 2019 | Completed final sign-off Feb 2020 | 2650 Franklin St | Traube Construction Company | unit #14: kitchen and bathroom remodel in kind. cabinets, floors, tub surround, sinks, add gfi, panel, fixtures. no work in common area. all work within units. no fire alarm or sprinkler work required.Details
unit #14: kitchen and bathroom remodel in kind. cabinets, floors, tub surround, sinks, add gfi, panel, fixtures. no work in common area. all work within units. no fire alarm or sprinkler work required. | $5,000 |
| Nov 4, 2019 | Never finaled issued Nov 2019, no final | 2650 Franklin St | Traube Construction Company | unit #19: kitchen and bathroom remodel in kind. cabinets, floors, tub surround, sinks, add gfi, panel, fixtures. no work in common area. all work within units. no fire alarm or sprinkler work required.Details
unit #19: kitchen and bathroom remodel in kind. cabinets, floors, tub surround, sinks, add gfi, panel, fixtures. no work in common area. all work within units. no fire alarm or sprinkler work required. | $5,000 |
| Dec 1, 2017 | Completed final sign-off Dec 2017 | 2650 Franklin St | Ultra Construction | replace 53x27 concrete slab @middle secton of garage area level, (e) footing to remain, no elevation change, concrete to be 2500 psi or more, no structural work reinforcement #4 at 16"oc each wayDetails
replace 53x27 concrete slab @middle secton of garage area level, (e) footing to remain, no elevation change, concrete to be 2500 psi or more, no structural work reinforcement #4 at 16"oc each way | $10,000 |
| Nov 13, 2017 | Completed final sign-off Apr 2018 | 2650 Franklin St | F & A Plumbing & Rooter | apt #17 & garage: repair inlkind floor in bathroom & kitchen & living in unit 17. overhaed plumbing in main garage, repair leaks, change from streel to copper in answer to complaint #201715514.Details
apt #17 & garage: repair inlkind floor in bathroom & kitchen & living in unit 17. overhaed plumbing in main garage, repair leaks, change from streel to copper in answer to complaint #201715514. | $6,000 |
| Oct 30, 2017 | Completed final sign-off Mar 2018 | 2650 Franklin St | F & A Plumbing & Rooter | apt #26: kitchen & bathroom remodel, r/r bathtub, vanity; kitchen sink, faucet cabinets, coutnertop,r elocated plumbing in answer to complaint 201713441.Details
apt #26: kitchen & bathroom remodel, r/r bathtub, vanity; kitchen sink, faucet cabinets, coutnertop,r elocated plumbing in answer to complaint 201713441. | $8,500 |
| May 5, 2017 | Completed final sign-off Jun 2018 | 2650 Franklin St | Basec | soft story retrofit 2016 cebc a4 maher naDetails
soft story retrofit 2016 cebc a4 maher na | $92,000 |
| Nov 7, 2016 | Completed final sign-off Feb 2017 | 2650 Franklin St | Hoskold Construction | replace existing toilet, replace stove, exhaust fan and sink shhoer head and tub walls, remove floor tiles, install linoleum. 2 gfci outletDetails
replace existing toilet, replace stove, exhaust fan and sink shhoer head and tub walls, remove floor tiles, install linoleum. 2 gfci outlet | $8,000 |
| May 11, 2016 | Completed final sign-off Jun 2016 | 2650 Franklin St | J C Quality Construction | unit #36 - replace bathtub surrounding tiles to quartz panels in the bathroom, patch-up walls in kitchen & bathroom after plumbing work is done. install kitchen countertops (one 8'& one 18"). n/a maher ordinanceDetails
unit #36 - replace bathtub surrounding tiles to quartz panels in the bathroom, patch-up walls in kitchen & bathroom after plumbing work is done. install kitchen countertops (one 8'& one 18"). n/a maher ordinance | $3,000 |
| Nov 23, 2015 | Completed final sign-off Mar 2016 | 2650 Franklin St | J C Quality Construction | unit 30: replace bathtub surrounding tiles, repalce floor tiles. patch up walls after plumbing work is done.Details
unit 30: replace bathtub surrounding tiles, repalce floor tiles. patch up walls after plumbing work is done. | $1,500 |
| Aug 7, 2015 | Completed final sign-off Sep 2015 | 2650 Franklin St | J C Quality Construction | unit 34: replace bathtub surrounding tiles, replace floor tiles, patch walls after plumbing work is done. countertop replacement in kitchen. no walls to be moved/no structural. all fire rated assemblies to be maintained. compliance with maher ordinance no 155-13 not required.Details
unit 34: replace bathtub surrounding tiles, replace floor tiles, patch walls after plumbing work is done. countertop replacement in kitchen. no walls to be moved/no structural. all fire rated assemblies to be maintained. compliance with maher ordinance no 155-13 not required. | $1,000 |
| Aug 7, 2015 | Completed final sign-off Sep 2015 | 2650 Franklin St | J C Quality Construction | unit 35: replace bathtub surrounding tiles, replace floor tiles, patch walls after plumbing work is done. no walls to be moved/no structural. all fire rated assemblies to be maintained. compliance with maher ordinance no 155-13 not required.Details
unit 35: replace bathtub surrounding tiles, replace floor tiles, patch walls after plumbing work is done. no walls to be moved/no structural. all fire rated assemblies to be maintained. compliance with maher ordinance no 155-13 not required. | $1,000 |
| May 15, 2015 | Completed final sign-off Jun 2015 | 2650 Franklin St | J C Quality Construction | unit 37: replace bathtub surrounding tiles, new faucet, replace floor tiles for bathroom & patch walls after plumbing work is done.Details
unit 37: replace bathtub surrounding tiles, new faucet, replace floor tiles for bathroom & patch walls after plumbing work is done. | $1,000 |
| Feb 17, 2015 | Never finaled issued Feb 2015, no final | 2650 Franklin St | replace countertops and cabinets, in unit # 21. fixtures & finishes only, no walls to be removed / no structuralDetails
replace countertops and cabinets, in unit # 21. fixtures & finishes only, no walls to be removed / no structural | $5,000 | |
| Feb 10, 2015 | Completed final sign-off Jul 2015 | 2650 Franklin St | unit#19 to obtain final inspection for work approved under pa # 201301097569. all work is complete.Details
unit#19 to obtain final inspection for work approved under pa # 201301097569. all work is complete. | ||
| Jan 9, 2013 | Expired or cancelled expired Jul 2015 | 2650 Franklin St | to comply with complaint 201236301 window not visible from street - replace 5 windows in livingroom in apt 19m 3 ft x 4 ft eacgDetails
to comply with complaint 201236301 window not visible from street - replace 5 windows in livingroom in apt 19m 3 ft x 4 ft eacg | $2,500 | |
| May 9, 2012 | Expired or cancelled cancelled Jun 2012 | 2650 Franklin St | Alexander Company | replace 5 windows, size for size, not visable from the street with simonton vinyl windows double pane, u-value 0.40 max, no structural work.Details
replace 5 windows, size for size, not visable from the street with simonton vinyl windows double pane, u-value 0.40 max, no structural work. | $2,890 |
| Jan 25, 2012 | Expired or cancelled cancelled Feb 2012 | 2650 Franklin St | comply with 201280861. replace panel on garage door. no structural workDetails
comply with 201280861. replace panel on garage door. no structural work | $200 | |
| Sep 13, 2011 | Expired or cancelled expired Jun 2015 | 2650 Franklin St | Barnecut Roofing Inc | reroofing | $45,369 |
| Jul 31, 2006 | Never finaled issued Jul 2006, no final | 2650 Franklin St | street space & sidewalk |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Imperial Construction (6), J C Quality Construction (5), Traube Construction Company (5), F & A Plumbing & Rooter (2), Alexander Company, Allied Bay Contractors, Barnecut Roofing Inc, Basec, Everjoy Builders Inc, Hoskold Construction, Ultra Construction
- Engineers
- Christopher M Bradbury
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.